HomeMy WebLinkAboutContract 62021LICENSE AGREEMENT
FOR
WORK PRODUCT RELATED TO
WAGLEY ROBERTSON DESIGN-BUILD PROJECT (CPN 104154)
CSC No. 62021
WHEREAS, on May 23, 2024, the City of Fort Worth, a Texas municipal
corporation ("City"), received a proposal from Sundt Construction, Inc.,
("Proposer") in response to a Request for Proposals issued on April 4, 2024 for
the Wagley Robertson Design-Build Project (CPN 104154) ("Project"); and
WHEREAS, the City, after evaluation and ranking, did not select Proposer
for the Project; however, Proposer submitted a proposal with unique or non
ordinary design elements, techniques, methods, or processes ("Work Product")
that City desires to acquire; and
WHEREAS, the City has offered a stipend to Proposer for the acquisition
of its Work Product and Proposer has accepted said offer;
NOW, THEREFORE:
For and in consideration of the above recitals and the covenants and
conditions contained herein, the City and the Proposer do hereby agree as
follows:
A.The stipend amount of $10,179.50, as further described in Attachment A
hereto, has been accepted by Proposer.
B.In exchange for the stipend, Proposer grants to City a license for the City's
use of the Work Product contained in Proposer's proposal.
C.The City may retain and use any or all parts of the Work Product under
this grant of License. The City may make use of any Work Product contained in
the proposal, including the techniques, methods, processes, and information
contained therein.
D.The use by the City of any design element contained in the Work Product
is at the sole risk and discretion of the City and does not confer liability on the
Proposer.
E.City shall return to Proposer all other components of the proposal.
ACCORDINGLY, the City, by its Assistant City Manager, and Proposer,
by its duly authorized representative, have executed this instrument to be
Work Product License Agreement -Wagley Robertson Page 1 of 3
effective as of the date subscribed by the City's Assistant City Manager.
BY:
City of Fort Worth
Jesica McEachern
Assistant City Manager
Date: Sep 20, 2024
APPROVAL RECOMMENDED:
By:Lau�en Prieur (Sep 20, 2024 07:05 CDT)
Lauren Prieur, Director
Transportation and Public Works
Department
APPROVED AS TO FORM AND
LEGALITY
By: Douglas Black (Sep 20, 202413:44 CDT)
Douglas W. Black
Sr. Assistant City Attorney
ATTEST:
Jannette S. Goodall
City Secretary
BY:
Proposer
Sundt Construction, Inc.
Joseph D;ley (Aug 30, 2024 �02 CDT)
Joe Dooley
Sr. Vice President
Texas Regional Manager, Transportation
Group
Date: Aug 30, 2024
Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
DtUHd9. /;�
David Kastendick, P.E.
Sr. Project Manager
Work Product License Agreement -Wagley Robertson Page 2 of 3
Attachment A— Stipend Offer Letter
[follows]
Work Product License Agreement - Wagley Robertson Page 3 of 3
�ORTWORTH�
TRANSPORTATION AND PUBLIC WORKS
August 20, 2024
Joe Dooley
Senior Vice President, Texas Regional Manager, Transportation Group
8445 Freeport PI<wy, Suite 240
Irving, TX 75063
Re: CPN 104154 Wagley Robertson Progressive Design-Build Stipend Offer
Dear Mr. Dooley,
We appreciate the time and effort your team invested in the proposal for the Wagley Robertson Roadway
Reconstruction Project from Coneflower Trail to Quicl<silver Trail (CPN 104154} under the progressive
design-build solicitation. While we have decided to move forward with another firm for this project, we
were impressed with the quality and innovations within your submission.
In accordance with the Texas Government Code Section 2269, the City is offering a stipend of $10,179.50,
which is one-half of one percent (0.5%) of the contract amount as the City desires to mal<e use of the worl<
product contained in your proposal.
Details of the Stipend Offer:
• Stipend Amount: $10,179.50
Purpose: Compensation for possible use of ideas included in the submitted statement of
qualifications and proposal. All unused portions of the proposal will be returned or destroyed.
Please confirm your acceptance of this stipend offer by signing and returning a copy of this letter by
8/30/2024.
We hope to have the opportunity to collaborate with your firm on future projects.
Sincerely, ACCEPTANCE By Sundt Construction, Inc.:
��� � K � �
David I<astendicl<, P.E.
Senior Project Manager
City of Fort Worth
Department ofTransportation & Public Worlcs
Capital Delivery Division
200 Texas Street
ot9uauy sty�ed by �oe 000i�y
oN: c=us,
Joe Dooley E-;e°°°'°Y@s°°d"°m.
0=5undt ConsWdlon, CN=Joe
�oo:ey
Dafe: 2024.OB.20 1528:53-OS'00'
Joe Dooley
Senior Vice President
Texas Regional Manager, Transportation Group
Fort Worth, Texas 76102
104154-DBLA-Wagley Robertson Stipend
Final Audit Report 2024-08-30
Created: 2024-08-30
By: Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
Status: Signed
Transaction ID: CBJCHBCAABAAaPoq1kouwy_IttSYRXVs76_bm56y7yjt
"104154-DBLA-Wagley Robertson Stipend" History
Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2024-08-30 - 6:57:57 PM GMT- IP address: 204.10.90.100
Document emailed to Joseph Dooley (jedooley@sundt.com) for signature
2024-08-30 - 6:59:47 PM GMT
`: Email viewed by Joseph Dooley Qedooley@sundt.com)
2024-08-30 - 7:01:23 PM GMT- IP address: 104.47.74.126
��:: Document e-signed by Joseph Dooley (jedooley@sundt.com)
Signature Date: 2024-08-30 - 7:02:43 PM GMT - Time Source: server- IP address: 155.190.8.5
Document emailed to David Kastendick (david.kastendick@fortworthtexas.gov) for signature
2024-08-30 - 7:02:53 PM GMT
; Email viewed by David Kastendick (david.kastendick@fortworthtexas.gov)
2024-08-30 - 7:04:27 PM GMT- IP address: 204.10.90.100
:?E� Document e-signed by David Kastendick (david.kastendick@fortworthtexas.gov)
Signature Date: 2024-08-30 - 7:06:00 PM GMT - Time Source: server- IP address: 204.10.90.100
� Agreement completed.
2024-08-30 - 7:06:00 PM GMT
���� 1'1'd�i��'iy Pawered by
� Adohe
Acrobat 5ign
FORT��RTH�
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Wagley Robertson Stipend
M&C: N/A CPN: 104154 CSO: DOC#:
Date:
To: Name De artment Initials Date Out
1. Joe Dooley-Signature Sundt ,�`L Aug 30, 2024
2. David Kastendick-Signature TPW D� Aug 30, 2024
3. Raul Lopez-Review TPW i il
4. Lissette Acevedo-Review TPW " "
5. Patricia WadsackReview TPW " "
6. Lauren Prieur-Signature TPW ,, Sep 20, 2024
7. Doug Black-Signature Legal a Sep 20, 2024
8. Jesica McEachern-Signature CMO ,a' Sep 20, 2024
9. Jannette Goodall CSO �� Sep 20, 2024
10. TPW Contracts TPW
CC: TPW BSPAP Recon Team, TPW Records Room, Michelle McCullough
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and
all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will
review and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES �No
RUSH: ❑YES �No SAME DAY: ❑YES �No
NEXT DAY: ❑YES �No
ROUTING TO CSO: �YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
� Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: Please notify TPWContracts(u�fortworthtexas.�ov for pickup when complete. Call ext.
7233 or ext. 8363 with questions. Thank you!