HomeMy WebLinkAboutContract 59846-CO2CSC No. 59846-C02 FORT WORTH ----w-City of Fort Worth Change Order Request DOE No. Project No.(s): ,._ ____________ __, Installation of Backup Generators, Electric Motor and Switchgear Replacement and otherimprovements at Four PumpProject Description: Stations ( Altamesa, Edwards Ranch Eastside and Como Pum Stations Contractor:! ACME Electric Company Change Order# I 2 Date: 7/10/2024 City Project Mgr.I David R. Townsend, P.E. City Inspector: I Ronnie Cardenas Phone Number:! 716-392-8430 Phone Number:! 682-309-3761 Dept. Water Unit I Sewer Unit 2 TPW Unit3 Original Contract Amount $23,119 632.00 Extras to Date S39177 34 Credits to Date Pending Change Orders (In M&C Process) Contract Cost to Date $23 158 809.34 !Amount of Proposed Change Order $60 550.67 Revised Contract Amount $23 219 360.01 Original Funds Available for Change Orders $346,794.00 Remaining Funds Available for this CO $307 616.66 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS ¾ OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER Totals $23,119,632.00 539177.34 $23 158 809.34 $60,550.67 $23 219 360.01 $346,794.00 $307,616.66 0.43% $28,899,540.00 Contract Time (Calender days) 1,090 1 090 1 090 This contract change is to replace the existing 6-feet cha in link fence {with 3-strand braded wire) and install a concrete mow strip for the fence at the Edwards Ranch Pump Station. The existing fence is in poor condition and only a small portion of existing fence would be replaced as part of the original contract. The Engineer and Production Staff request the fence be replaced as the location is in residential area next to a park. The concrete mow is added to ease of mowing next to the fence on either side .. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents � payment in full (both lime and money) for all costs arising out of, or incidental to, the above Change Order. � Contractofs Com an Name Contractor Name Contractor SI nature � ACME Electric Com an ugluelllck(Sep24,202417:48COT) M&C Number NIA /' � Sep 21, 2024 Date Sep 24, 20 Council Action If Re uired M&C Date Approved C"NIA Se �'t 9 I� fI" V��( ) I�T �-f city of Fort wo�tn -��"�=�� ��"�'��v Change Order Additions ProJect Name Backu Power and Electrical Improvements at Four Pump Stations Ciry Sec No.: 59846 Project No.(s): DOE No.� City ProJ. No.: 103410-2 Project Description Installation of Backup Generators, Electric Motor and Switchgear Replacement and otherimprovements at Four Pump Statfons (Altamesa, Edwards Ranch Easlside and Como Pump Stations Contractor ACME Electric Compan Change Order:0 Date: 7l10/2024 City ProJect Mgr. David R. Townsend, P.E. City Inspector Ronnie Cardenas ADDITIONS �1'�� ' " ' '' ��'���� 0' ' �� � � � •-.. � ��� ',.� � . �,.� � � � -��-- � -��-- � --�-- � --�-- � -��-- � -��-- � --�-- � -��-- � --�-- � -���- � -��-- � --�-- � -��-- � -��-- � -��-- � -��-- � -��-- � -���- � --�-- � -��-- � -��-- � --�-- � -���- ,�i � � �- .� ' - ��� � � �. �,.i �� �'� )�' T�/'�) � r�' �'i City of Fort Worth y -�`�� Change Order Deletions ProJect Name Backup Power and Electrical Improvements at Four Pump Stations Project No.(s); DOE No. � Project Descri tion �nstallation of Backup Generators, Electric Motor and Switchgear Replacement and othE City Sec No.: 59846 City Proj. No.: 103410-2 �provements at Four P Pump Stations (Altamesa, Edwards Ranch Eastside and Como Pump Stations � Contractor ACME Electric Company Change Order: �2 Date 711012024 City Projecl Mgr. David R. Townsend, P.E. City Inspector: Ronnie Cardenas DELETIONS Page 4 of 4 �nange vrder Project Four Pump Station Backup Generators Project Number Owner City of Fort Worth CPN13410-2 Contractor ACME Electric FNI FTW21473-2 Construction Manager Freese & Nichols INC Design Professional Freese & Nichols INC Change OrderNo. 001 Date OS/31/2024 Make the following modifications to the Contract Documents: Item Description Change Amount 1 Move generator from east fence line to north fence line IAW RCP-004.1 $ 72,294.81 2 $ 3 $ 4 $ 5 $ Net Change in Contract Price this Change Order $ Net Change in Contract Times this Change Order 0 days The compensation in ihis Change Order is the full, complete, and final compensation for al! costs Contractor may incur because of or relating to this change whether said costs are known, unknown, foreseen, or unforeseen at this time, including without limitation, any cost for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged Work because of this Change Order. The changes in Contract Times are the complete and fina! adjustments far impacts to the ability of Contractor to complete the Work within the Contract Times and are the only adjustments to which Contractor is entitled. All terms and provisions of the Contract Documents remain in effecr except as specifically modified by this Change Order. a. Original Contract Price $ 23,119,632.00 b. Previously Approved Change Order/Contract Amendment Amounts $ 00.00 c. Adjusted Contract Price ( a+ b) $ 23,119,632.00 d. Contract Amendment Amount $ 72,294.81 e. Revised Contract Price ( c+ d) $ 23,191,926.81 f. Percent Change in Contract Price to Date .6 % Original Prevfous Current Substantial Completion Date 04/27/2026 04/27/2026 04/27/2026 Final Completion Date 07/26/2026 07/26/2026 07/26/2026 Recommended by Design Professional Recommendle.�d by Construction Manager i' ,i.���,.�._ �-�.�ss��-- 6/3/2024 Name Da[e Name Date Approved by Contractor Approved by Owner �n �10�1 y �%���iw ��,�GL�,�� /Vame a e Name Date � Change Order Page 1 of 1 From: To: Cc: Subject: Date: Attachments: Townsend. David Alan Cossabone (alan.cossaboneCalfreese.com) Robert M. Otey�Robb.OteyCa�freese.com) Four Pump Station Back-up Generators (CPN103410-2) Edwards Ranch PS - RCP-004 (Relocate Generator) Wednesday, May 29, 2024 3:08:00 PM imaae001.�a RCP-004.1-Relocate aenerator at Edwards Ranch-Amber Batista-Pendina.�df RCP-004-Relocate aeneratorat Edwards Ranch-Alan Cossabone-RCP Rejected.odf The Water Department has received your e-mail dated May 28,2024, for Pending Change Request (RCP-004.1) for relocating the proposed Generator Pad at the Edwards Ranch Pump Station. The installation of the generator, as shown on the plans, is very tight and may require the removal of trees in Overton Park. The plant staff request that the generator be moved from east fence line to the north fence line as this would minimize maintenance and generator fueling issues. The proposed north side would not require any park tree removal. T The Water Department agrees with your recommendation that the contractor's proposed cost of $72,294.81 for this work should be accepted as the cost is fair and reasonable. No additional time has been requested. This office will recommend to the City Council (and/or the City Manager's Office), the approval and acceptance of this additional cost as part of a change order to be prepared and submitted by you to this office. Sincerely: David R Townsend, PE Facilities Engineer Manager Fort Worth Water Department From: Charlie From: Alan Cossabone <AIan.Cossabone@freese.com> Sent: Tuesday, May 28, 2024 11:23 AM To: Townsend, David <David.Townsend@fortworthtexas.gov> Subject: RE: 4 PS Edwards Ranch RCP-004 CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open attachments unless you recognize the sender and know the content is safe. David Perhaps you might be missing the request for change proposal. The attached RCP-004 has the detailed design change included and the attached RCP-4.1 is tlle new resubmitted cost. Let us lo�ow if you are in agceement with RCP-4.1 so we can close it out on FNiManager. Thank you Alan Cossabone, CCR � Construction Services � Freese and Nichols, Inc. � M: 806-282-6130 alan.cossaboneC�freese.com � www.freese.com ��, FitEEs� NICHOLS From: Townsend, David <David.TownsendC�fortworthtexas.�ov.> Sent: Friday, May 24, 2024 2:26 PM To: Alan Cossabone <AIan.Cossabone�freese.com> Subject: RE: 4 PS Edwards Ranch RCP-001 This is an email from an EXTERNAL source. DO NOT click links or open attachments without positive sender verification of purpose. Never enter USERNAME, PASSWORD or sensitive information on linked pages fi•om this email. Please report all suspicious messages using the Report Message button in Outlool<. I have no real issues with this. However, I need more information to approve this. From: Alan Cossabone <AIan.CossaboneC�freese.com> Sent: Tuesday, April 30, 2024 3:27 PM To: Townsend, David <David.Townsend�fortworthtexas. o�v> Cc: Bill Pannell <BiII.Pannelllc�freese.com>; David Beckman <dsb�freese.com> Subject: 4 PS Edwards Ranch RCP-001 CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open attachments unless you recognize the sender and know the content is safe. David We Ilave reviewed this RCP and find the pi•oposal reasonable. Please t�eview and if you approve so we can close out to issue the next Change Order. Than]< you Alan Cossabone, CCR � Construction Services � Freese and Nichols, Inc. � M: 806-282-6130 alan.cossabone�freese.co��� � www.freese.com �7 NICH045 This electronic mail message is intended exclusively foi• the individual or entity to which it is addressed. This message, togethec with any attachment, may contain the sender's ocganization's confidential aild privileged information. The recipient is hei•eby notified to treat tile infoi•mation as co�lfidential and privileged and to not disclose oi• ��se the infori��atio►1 except as authorized by sender's organization. Any unauthorized ceview, pl'117i1I1�T, Cetelltl011, copying, disclosu��e, distribution, retransmission, dissemination or other use of, or talcing of any action in celiance upon, this information by pecsons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact tlie sender by reply email and delete all copies of the material fcom any computer. Thanl< you for your City of Fort Worth PENDING CHANGE REQUEST COST ANALYSIS To be complered by General Contractor or Subcontractor as outlined in the Uniform General Conditions Section 6.6.1 PROJECT: Ft Worth Generator c�i 4 PS Work performed by: JOB NO. 2699 ( X) General Cootractor CONTRACTOR: Acme Electric If subconlmclor, givc Co. namc: Timc Ettension (i(any): Description of C] Move ADDITIONS AND/OR [CREDITS] Description Qunntity Unit FSG 1 EA Coordination Effort. 29 HRS PCMN: CPR#: 4 itFli�: ASI#: or from its current location to the side of the driveway for better access. EXTENSiON A B C D E CosUUnit Material Labor Equip. Trans. Storage 563,667.00 $63,667.00 50.00 �3,480.00 Subtotals �$63,667.00 �$3,480.00 � 50.00 I 50.00 Line I: Enter total of Columns A+B+C+D+E $67,147.00 Line [I: Enter 49'/0 of Col II for Workman's Comp. Social Seciuity, and like taxes Line lll: Enter total Col E(Storage) Line IV: If Line [ indicates an ADD, Gnter 5% of Line I. If Line 1 indicates CREDIT, enter -0- Line V: Total Line I thru Line IV Enter liere and on Summary Sheet $1,705.20 SO $3,442.G ] $72,294.81 ;r SIGNATURE: �6P��`��`OGu�� DATE: 5/23/2024 CONTRACTORlSUBCONTRACTOR SIGNATURE: DATE: FNf ,,,,,, ������ � �� �� FACILITY SOLUTIONS GROLIP lighting y electrical > energy technology > signs Change Proposal ,ACME ; 5000 Martin St. I Fort Worth, Tx 76119 � Contact: Brent McDaniel CCN # RCP-004 CCN Date 5/10/2024 Project Name: Edwards Ranch Project Number: 30J7869 Page Number: 1 Work Description This change notice includes all labor, material, and supervision for the below scope of work. We reserve the right to correct this change notfce for errors and omissions. This price is good for acceptance within 14 days from date of receipt. Scape of Work: 1. Duct Bank, Raceway, and Wire extension for Relocation of Generator at Edwards Ranch (RCP #4) Exciuslon: 1. Any utility/permit costs. 2, Any sheetrock cutting, patching, andlor painting required. 3. Any concrete cutting or patching. 4. Overtime. Added Days: 2.5 Itemized Breakdown DescNption 2" PVC 4" PVC 2" PVC FEM ADAPTER 4" PVC FEM ADAPTER #14 XHHW BLACK �18 XHHW BLACK #1 XHHW BLACK #350MCM XHHW BLACK #500MCM XHHW BLACK Alum PVC Coated 45 Degree Bend 2" Slx Strand MM Flber Alum PVC Coated 45 Degree Bend 4" Totals Qty 250 500 10 20 850 50 200 350 1,400 5 1 10 3,746 Net Price U 175.00 C 480.00 C 656.00 C 989.00 C 185.00 M 489.60 M 2,737.52 M 8,024,00 M 13,170,00 M 50.00 E 372.00 E 200.00 E Totai Mat. 437.50 2,400.40 65.60 197.80 175.75 24.48 547,50 2,808.40 18,438.00 250.00 372.00 2,000.00 27,717.03 Labor U 0.00 C 0.00 C 0.00 C 30.00 C 5.16 M 8.40 M 16.20 M 37.80 M 4fi.56 M 0.00 E 2.00 E 0.00 E Total Hrs. 0.00 0.00 0.00 6.00 4.90 0.42 3.24 13.23 65.18 0.00 2.00 0.00 94.98 Summary General Materials Material Total Composite Crew (94.98 Hrs Cm $36,00) Foreman (19.00 Hrs @ $48.00) Project Manager (9.50 Hrs (� $75.00) Materfal Handling (9.50 Hrs @ $36.00) Labor Burden (@ 42.000 %) Tugger (1.00 @ 1.00 @ $250.00 + 8,000 % �r 5.000 % + 10.000 %) Subtotal 27,717.03 27,717.03 3,419.28 912.00 712.50 342,00 2,262.03 311.85 35,6T6,69 Change Proposal CCN # RCP-004 CCN Date 5/10/2024 Proyect Name: Edwards Ranch Project Number: 30J7869 Page Number: 2 r.._��_�_ iw__i��� Subtotal Conerstone Subtotal Bond Adjustment #3 Final Amount ($18,520.00 + 0.000 % + 5.000 % + 10.000 %) (@ 2.000 %) (C� -0.000 %) 41,028.19 21,390.60 62,418.79 1,248.38 -U.17 $fi3,667.00 Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Digitally signed by David R. Townsend, David R. Townsend, PE PE Signature David Townsend Name of Employee Engineering Manager Title ATTEST: Jannette Goodall City Secretary Date: 2022.12.28 16:43:46 -06'00'