HomeMy WebLinkAboutContract 59969-A1CSC No. 59969-Al
AMENDMENT No.1
TO CITY SECRETARY CONTRACT No. 59969
WHEREAS, the City of Fort Worth (CITY) and Kiml.ey-Horn and Associates,
Inc., (ENGINEER) made and entered into City Secretary Contract No. 59969,
(the CONTRACT) which was authorized M&C 23-0656 on the 8th day of August,
2023, in the amount of $1,992,700.00; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
NASJRB Water and Sanitary Sewer Main Repl.acement, CPN 104344; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $88,400.00. (Water: $48,620.00 ; Sewer: $39,780.00)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $2,081,100.00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
City of Fort Worth, Texas Prof Services Agreement Amendment Template
Revision Date: 12/08/2023
Page 1 of 2
NASJRB \•/&SS Main Replacement CPN 104344
for
Kimley>>> Horn
September 19, 2024
Mrs. Preeti KC, P.E.
Project Manager
City of Fort Worth Water Department
1000 Throckmorton Street
Fort Worth, TX 76102
RE: NASJRB Water and Sewer Main Replacement
Amendmenf No. 1
KHA No. 061018454
City Secrefary No. 59969 — City Project No. 104344
Dear Preeti:
This letter is in reference to a contract between Kimley-Horn and Associates, Inc. (Kimley-
Horn) and the City of Fort Worth (the City) dated 8-08-2023 referred to herein as the
"Contract". Kimley-Horn is pleased to submit Amendment No. 1 for the NASJRB Water and
Sewer Main Replacement. The fees for this Amendment are not to exceed $88,400,
increasing the total not to exceed fee to $2,081,100.
The City has requested that Kimley-Horn perform additional services under Amendment
Number 1 for the NASJRB Water and Sewer Main Replacement which are out of the scope
of services as defined in the Contract. These services include SubsurFace Utility Engineering
(SUE) Services. Service details are further described as follows:
Kimley-Horn will continue the services outlined as follows and as directed by the City:
TASK 8. SURVEY AND SUE SERVICES
ENGINEER will provide survey support as follows.
8.3 SubsurFace Utility Engineering (SUE):
• The SUE shall be performed in accordance with Cl/ASCE 38-02.
• Four different levels of SUE are identified. The following is a description of each level of SUE
used on this project.
1. Level D— Collect level D as part of this scope of services.
2. Level C
Kimley>>> Horn
Page 2
a) Field locate and obtain horizontal position of visible utility surface features for all of the
utility systems described within Level D.
3. Level B
a) Indicate by marking with paint, the presence and approximate horizontal location of
subsurface utilities using geophysical prospecting techniques, including electromagnetic,
sonic, and acoustical techniques.
4. Level A
a) Location (Test Hole) Services: Locating the horizontal and vertical position of the utility by
excavating a test hole using vacuum excavation techniques and equipment. In
performing locating (test hole) services ENGINEER will:
1) Excavate Thirt 30 test holes to expose the utility to be measured in such a manner
that ensures the safety of the excavation and the integrity of the utility to be
measured. Excavations will be performed using specially developed vacuum
excavation equipment that is non-destructive to existing facilities. If contaminated
soils are discovered during the excavation process, the ENGINEER will notify the
CITY.
2) Obtain x,y and Z information at each test hole.
ASSUMPTIONS
• Level A Subsurface Utility Engineering will be performed for up to thirty (30) locations.
DELIVERABLES
A. SUE records and measurements will be uploaded to E-Builder.
We recommend that the City increase the budget by $88,400 for these additional services. The
following tables summarize our recommended budget revisions, water design fees, and revised
contract amount:
801 Cherry Street, Unit 11, Suite 1300, Ft. Worth, TX 76102
.
Kim ey>>> Horn Page 3
Description Water Sewer Total
Task 1 — Design Management $0 �� $0
Task 2 — Conceptual Design (30%) $0 �� $0
Task 3 — Preliminary Design (60%) $0 $0 $0
Task 4— Final Design (90% and 100%) $0 �� $0
Task 5— Bid Phase Services $0 �� $0
Task 6— Construction Phase Services $0 �� $0
Task 7 — ROW/Easement Services $0 $� $0
Task 8— Survey and SUE Services $48,620 $39,780 $88,400
Task 9 — Permitting $0 �� $0
Total $48,620 $39,780 $88,400
The following table summarizes the Fee per Work Phase breakdown:
Work Phase Water Sewer Total
30 $48,620 $39,780 $88,400
The following table summarizes our recommended budget revisions and shows the revised contract
amount:
Original Contract Amendment No. Revised
1 Contract
Task 1 $58,900 $0 $58,900
Task 2 $180,700 $0 $180,700
Task 3 $597,050 $0 $597,050
Task 4 $468,000 $0 $468,000
Task 5 $42,450 $0 $42,450
Task6 $0 $0 $0
Task 7 $127,400 $0 $127,400
Task 8 $338,150 $88,400 $426,550
Task 9 $150,050 $0 $150,050
Total Project $1,992,700 $88,400 $2,081,100
Kimley>>>Horn
The following table summarizes the fee for this amendment by project phase:
Water Sewer Total
Original Contract $1,095,985 $896,715 $1,992,700
Amendment No. 1 $48,620 $39,780 $88,400
Total $1,144,605 $936,495 $2,081,100
Page 4
Kimley-Horn will perform the construction phase services. The original contract had $444,350 (22.3%)
SBE participation. The total contract SBE participation is now $515,050 (24.7%) for this amendment.
The following tables summarize our revisions to the SBE percentages:
Total Contract
Description Original Amend No. 1
ContractAmount $1,992,700 $88,400
Total Contract SBE $444,350 $70,700
Total Contract SBE 22,3 /o
Percentage � 24.7%
City's SBE Goal 13% 13%
We appreciate the opportunity to be of continued service to the City. Please contact us if we need to
provide any further information.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES, INC.
Texas Registration No. F-928
.-� /1.�, �. E.
John Atkins, P.E.
Sr. Vice President
Copy to: Tony Sholola, P.E., City of Fort Worth
Attachments: Level of Effort Spreadsheet
I<:\FTW Ulili�ies\061018454-NASJRB-W-and-SS\PPP\POST_NTP�Amendmenl 1\NASJRB_CPIJ 104344_Amendment 1 Summary LV.docx
kimley-horn.com
x
v
Z p
O Z
❑
� a`
m
K U
�
= F c
N .2 d y it
m � u A a
t F � a E
m a N K �
wG C C
O1 'ro E
ro u � Q
: � u`
N ;
C N
0
�
W b
D
� �
J m
K
N
a
z
�e x
S � 8
� �
SSo
s�s
's ". "