HomeMy WebLinkAboutContract 54568-A3CSC No. 54568-A3
AMENDMENT No.3
TO CITY SECRETARY CONTRACT No. 54568
WHEREAS, the City of Fort Worth (CITY) and Pape-Dawson Engineers,
Inc., (ENGINEER) made and entered into City Secretary Contract No. 54568,
(the CONTRACT) which was authorized by M&C 20-0637 on the 1st day of
September, 2020, in the amount of $265,845.00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment No.l in
the amount of $74,357.00 administratively authorized on January 11, 2022
and Amendment No.2 in the amount of $56,040.00 authorized by M&C 22-0888
on November 8, 2022; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Sanitary Sewer Rehabi1itation, Contract 98, CPN C02719; and
WHEREAS, it has become necessary to execute Amendment No. 3 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $2,155.00 (Sewer).
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $398,397.00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
City of Fort Worth, Texas Prof Services Agreement Amendment Template
Revision Date: 12/08/2023
Page 1 of 2
SS Rehab. Contract 98 CPN C02719
EXECUTED and EFFECTIVE as of the date subscribed by the City's designated
Assistant City Manager.
APPROVED:
City of Fort Worth
Wil.1.iam Johnson
Assistant City Manager
DATE : 10/01/2024
ATTEST:
�A�
Jannette S. Goodall
City Secretary
APPROVAL RECOMMENDED: Chtisto12het Harder Christopher HarAer (Oct 1, 2024 09:31 CDT)
Christopher Harder, P. E.
Director, Water Department
Contract Compliance Manager:
ENGINEER
Pape-
�
n
�
En
z;__
,
_
I
_
n
_
c
_
.
-
Greg vaugnn, r.i:.,.
Managing Vice President
DATE: September 25, 2024
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Suzanne Abbe, P.E.
Project Manager
APPROVED AS TO FORM AND LEGALITY:
Douglas Black (Oct 1, 202410:40 CDT)
Douglas W. Black
Sr. Assistant City Attorney
City of fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: 12/08/2023 Page 2 of 2
M&C No.#:
M&C Date:
Form 1295:
N/A
N/A
N/A
SS Rehab. Contract 98 CPN C02719
PAPE-DAWSON
� ENG/NEERS
September 16, 2024
Ms. Suzanne Abbe
City of Fort Worth Water Department
311 West 10th Street
Fort Worth, TX 76102
Re: CO2719 Sanitary Sewer Rehabilitation & Waterline Replacement
City Secretary Contract 98 — Amendment #3
Dear Ms. Abbe:
Pape-Dawson Engineers proposes to revise the scope of services based on the attached scope of
additional services for the adciitional amount of $2,155. The items included in Amendment #3 are related
to the addition of construction phase services.
Summary of Contract Fee
Original Contract Amount
Requested Amendment #1
Contract to Date
Requested Amendment #2
Revised Contract Amount
Requested Amendment #3
Revised Contract Amount
$265,845
$74,357
$340,202
$56,040
$396,242
$2,155
$398,397
If you have questions or if I may be of further assistance, please contact me at 214-420-8494.
Sincerely,
/i'w��Cl � 7����
Randy Haney, P.E., CFM, PMP
Senior Project Manager
Attachments:
Attachment A— Scope of Services
Attachment B — LOE
telephone: 214-420-8494 address: 6105 TENNYSON PARKWAY, SUITE 210 PLANO, TX 75024 website: PAPE-DAWSON.COM
lexns Enginee�ing Firrn N470 Texas Surveying 1 imi #1007&300
PAPE-DAWSON
� ENG/ NEERS
City of Fort Worth
Sanitary Sewer Rehabilitation & Waterline Replacement, Contract 98 — Amendment #3
SCOPE OF SERVICES
CONSTRUCTION PHASE SERVICES (TASK 6)
6.1 The ENGINEER shall produce one (1) additional plan and profile sheet to be included in
the record drawings for the additional 236 linear feet installed for SS L-755.
II. ASSUMPTIONS
• No additional survey or existing conditions data collection shall be included.
• The extension of the SS L-755 alignment and profile will be solely based on as-built information
provided by the contractor.
telephone; 214-420-8494 address: 6105 TENNYSON PARKWAY, SUITE 210 PLANO, TX 75024 website: PAPE-DAWSON.COM
/eros Fnqineerinq l�irrtr Nq70 lexns Su�veying Fim� 1f10028500
�
E
E
Q
�
m «
� o
w U
E �
u �
��
Q=
�
C
N
R
N
Signature: � ��8�
Email: Elisa.Winterrowd@fortworthtexas.gov