HomeMy WebLinkAboutContract 59115-FP1-FPl City Secretary 59115Contract No. ______ _ FORT WORTH® Date Received 09/30/2024 EW NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Madero Sendera Ranch Blvd. City Project No.: 103700 Improvement Type(s): � Paving � Drainage � Street Lights □Traffic Signals Original Contract Price: Amount of Approved Change Order(s): Revised Contract Amount: Total Cost of Work Complete: Jay7nen (Sep 25, 2024 08:51 CDT) Contractor Project manager Title Conaster Construction TX, LP Company Name rlnspector Project Manager ft,"'e;,� Owen (Sep 30, 2024 08:05 COT) CFA Manager ;r....&,.. Lau�en Prieur (Sep 30, 2024 08:30 COT) TPW Director Asst. City Manager $2,407,537.50 -$69,696.85 $2,337,840.65 $2,337,840.65 Sep 25, 2024 Date Sep 27, 2024 Date Sep 29, 2024 Date Sep 30, 2024 Date Sep 30, 2024 Date Sep 30, 2024 Date Page 1 of 2 Notice of Project Completion Project Name: Madero Sendera Ranch Blvd. City Project No.: 103700 City's Attachments Final Pay Estimate 0 Change Order(s): 0 Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid � Consent of Surety � Statement of Contract Time Contract Time 120 WD Days Charged: 266 Work Start Date: 7/17/2023 Work Complete Date: 8/23/2024 Completed number of Soil Lab Test: 418 Completed number of Water Test: 8 Page 2 of 2 FORTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name MADERO - SENDERA RANCH BOULEVARD Contract Limits Project Type DRAINAGE City Project Numbers 103700 DOE Number 3700 Estimate Number 0 Payment Number � For Period Ending 8/23/2024 WD City Secretary Contract Number Contract Date Project Manager NA Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH , TX 76119 Inspectors T. GARDNER / J. ROGERS Contract Time 24�D Days Charged to Date 266 Contract is 100.00 Complete Friday, September 6, 2024 Page 1 of 6 City Project Numbers 103700 Contract Name MADERO - SENDERA RANCH BOULEVARD Contract Limits Project Type DRAINAGI; Project Funding L?NTI' III: DRAINAGE IMPROVEMENTS DOE Number 3700 Estimate Number 0 Payment Number 0 For Period Ending 8/23/2024 Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quaniry Total Quanity Total 1 TRENCH SAFETY 4580 LF $1.00 $4,580.00 4580 $4,580.00 2 CONCRETE COLLAR 6 EA $750.00 $4,500.00 6 $4,500.00 3 21" RCP, CLASS III 968 LF $65.00 $62,920.00 968 $62,920.00 4 24" RCP, CLASS III 1590 LF $75.00 $119,250.00 1590 $119,250.00 � 27" RCP, CLASS III 245 LF $80.00 $19,600.00 245 $19,600.00 6 30" RCP, CLASS III 61 LF $85.00 $5,185.00 61 $5,185.00 7 33" RCP, CLASS III 298 LF $105.00 $31,290.00 298 $31,290.00 8 36" RCP, CLASS III 189 LF $120.00 $22,680.00 189 $22,680.00 9 42" RCP, CLASS III 1007 LF $150.00 �151,0�0.00 1007 $I51,050.00 10 4X3 BOX CULVERT 222 LF $225.00 $49,950.00 222 $49,950.00 11 10' RECESSED INLET 12 EA $4,600.00 $55,200.00 12 $55,200.00 12 4' DROP INLET 1 EA $5,800.00 $5,800.00 1 $5,800.00 13 4' STROM JUNCTION BOX 7 EA $4,800.00 $33,600.00 7 $33,600.00 14 5' STROM JUNCTION BOX 2 EA $6,200.00 $12,400.00 2 $12,400.00 15 LARGE STONE TYPE "A" DRY RIP RAP (12" 92 SY $115.00 $10,580.00 92 $10,580.00 DEEP) 16 LARGE STONE TYPE "A" DRY RIP RAP (18" 98 SY $165.00 $16,170.00 98 $16,170.00 DEEP) 17 4:1-CH-FW-O HEADWALL - 42" 1 EA $6,500.00 $6,500.00 1 $6,500.00 18 4:1 SLOPED END HEADWALL- 24" 1 EA $3,500.00 $3,500.00 1 $3,500.00 19 TXDOT PW-1 4:1 WINGWALL 1 EA $48,500.00 $48,500.00 1 $48,500.00 20 TXDOT FW-1 4:1 WINGWALL 1 EA $22,500.00 $22,500.00 1 $22,500.00 21 TXDOT PR1 PEDESTRAIAN RAIL 68 EA $160.00 $10,880.00 68 $10,880.00 22 INLET PROTECTION 13 EA $150.00 $1,950.00 13 $1,950.00 23 REMOVE 21" STORM LINE (CO#2) 38 LF $30.00 $1,140.00 38 $1,140.00 24 RELOCATE 21" RCP (CO#2) 4 LF $105.00 $420.00 4 $420.00 25 10' RECESSED INLETS REMOVE AND 4 EA $4,600.00 $18,400.00 4 $18,400.00 RELOCATE (CO#2) Sub-Total of Previous Unit $718,545.00 $718,545.00 Friday, September 6, 2024 Page 2 of 6 City Project Numbers 103700 Contract Name MADERO - SENDERA RANCH BOULEVARD Contract Limits Project Type PAVING Project Funding L?NTI' IV: PAVING IMPROVEI�lENTS Item Description of Items Estimated U No. Quaniry 1 HYDRATED LIME (36LBS/SY) (SENDERA 24997 TN RANCH BLVD & RANCHO CANYON WAY) (CO#2) 2 8" LIME TREATMENT (SENDERA RANCH 13887 SY BLVD & RANCHO CANYON WAY) (CO#2) 3 10" CONC PVMT (SENDERA RANCH BLVD & 12835 SY RANCHO CANYON WAY) (CO#2) 4 4" CONC SIDEWALK (CO#2) 447�3 SF 5 BARRIER FREE RAMP, TYPE R-1 8 EA 6 BARRIER FREE RAMP, TYPE P-1 2 EA 7 TOPSOIL 1025 CY 8 BLOCK SOS PALCEMENT 6147 CY 9 CONTRUCT STD. PVMT HEADER 179 LF 10 CONTRUCT BARICADE 6 EA 11 STOP SIGNS (RI-1) 1 EA 12 STREET SIGN NAME BLADE PAIR 1 EA 13 NO OUTLET SIGN (W14-2) 1 EA 14 STREET SIGN POLE 2 EA I S REMOVE BARRICADE & CONNECT TO 1 EA EXISTING PAVEMENT 16 TYPEII-A-A 4" RPM 119 EA 17 REFL PAV MRK TY I(Y)(6")(DBL)(SLD) 4728 LF 18 REFL PAV MRK TY I(W)(6")(SNG)(SLD (CO#2) 0 LF 19 REFL PAV MRK TY I(V�(8")(SNG)(SLD) (CO#2) 0 LF Sub-Total of Previous Unit DOE Number 3700 Estimate Number 1 Payment Number 1 For Period Ending 8/23/2024 Unit Cost Estimated Completed Completed Total Quanity Total $195.00 $48,74415 249.97 $48,74415 $4.00 $55,548.00 $72.00 $924,120.00 $3.50 $156,635.50 $1,800.00 $14,400.00 $1,500.00 $3,000.00 $24.00 $24,600.00 $8.00 $49,176.00 $20.00 $3,580.00 $600.00 $3,600.00 $750.00 $750.00 $200.00 $200.00 $500.00 $500.00 $250.00 $500.00 $500.00 $500.00 $5.00 $595.00 $6.00 $28,368.00 $4.00 $0.00 $6.00 $0.00 $1,314,816.65 iJNTI' V: STREET LIGH1'ING IMPROVEMENTS 13887 $55,548.00 12835 $924,120.00 447�3 $156,635.50 8 $14,400.00 2 $3,000.00 1025 $24,600.00 6147 $49,176.00 179 $3,580.00 6 $3,600.00 1 $750.00 1 $200.00 1 $500.00 2 $500.00 1 $500.00 119 $59�.00 4728 $28,368.00 0 $0.00 0 $0.00 $1,314,816.65 Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 2605.3015 2" CONDT PVC SCH 80 (T) 4699 LF $15.00 $70,48�.00 4699 $70,485.00 2 3441.3201 LED Lighting Fixture (138W) 50 EA $800.00 $40,000.00 50 $40,000.00 3 3441.1632 Install Type 33A Ami 50 EA $600.00 $30,000.00 50 $30,000.00 Friday, September 6, 2024 Page 3 of 6 City Project Numbers 103700 Contract Name MADERO - SENDERA RANCH BOULEVARD Contract Limits Project Type STREI:T LIGHTING Project Funding DOE Number 3700 Estimate Number 1 Payment Number 1 For Period Ending 8/23/2024 4 3441.3003 Rdwy Illum Assembly TY 18,18A,19, 25 EA $3,400.00 $85,000.00 25 $85,000.00 and D-40 � 3441.3302 Rdwy Illum Foundation TY 3,5,6, and 8 25 EA $1,500.00 $37,500.00 25 $37,500.00 6 Ground Box 14 EA $950.00 $13,300.00 14 $13,300.00 7 3-#2 Copper Wire 4699 LF $6.00 $28,194.00 4699 $28,194.00 Sub-Total of Previous Unit $304,479.00 $304,479.00 Friday, September 6, 2024 Page 4 of 6 City Project Numbers 103700 Contract Name MADERO - SENDERA RANCH BOULEVARD Contract Limits Project Type STREI:T LIGHTING Project Funding Contract Information Summary Original Contract Amount Change Orders Change Order Number 2 Change Order Number 2 DOE Number 3700 Estimate Number 1 Payment Number 1 For Period Ending 8/23/2024 $2,407,537.50 �i9,96o.00 ($89,6�6.85) Total Contract Price $2>337,840.65 Total Cost of Work Completed $2,337,840.65 Less % Retained $0.00 Net Earned $2,337,840.65 Earned This Period $2,337,840.65 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $2,337,840.65 Friday, September 6, 2024 Page 5 of 6 City Project Numbers 103700 Contract Name MADERO - SENDERA RANCH BOULEVARD Contract Limits Project Type STREI:T LIGHTING Project Funding Project Manager NA Inspectors T. GARDNER / J. ROGERS Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH, TX 76119 DOE Number 3700 Estimate Number 1 Payment Number 1 For Period Ending 8/23/2024 City Secretary Contract Number Contract Date Contract Time 240 WD Days Charged to Date 266 WD Contract is 000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed Less % Retained Net Earned Earned This Period $2,337,840.65 Retainage This Period $0.00 Less Liquidated Damages � Days @ $0.00 / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $2,337,840.65 $0.00 $2,337,840.65 $0.00 $0.00 $0.00 $0.00 $0.00 $2,337,840.65 Friday, September 6, 2024 Page 6 of 6 CSC No. 59115-CO1 DEVELOPER-AWARDED-PROJECT CHANGE ORDER INSPECTOR: Adam Payan PhoneNo: PFtUJtCI- MaNAGER: Sandip Adhikari Phone No: 817-392-8424 CONTR4CT UNIT WATER SEWER PAVING DRAINAGE STREETLIGHTS CONTRACT Developer Developer Developer DAYS Cost GiryCost DeveloperCost CiryCost DeveloperCost CiryCost Cost CiryCost Cost CiTyCost ORIGINALCONTRACT $630,543.35 $2,374,171.65 $0.00 $0.00 $1,404,473.50 50.00 5698,585.00 50.00 5304,479.00 50.00 240 EXTRAS TO DATE $0.00 $0.00 $0.00 50.00 50.00 50.00 $0.00 50.00 50.00 $0.00 0 CREDITS TO DATE $0.00 $0.00 $0.00 50.00 $0.00 50.00 $0.00 50.00 50.00 $0.00 CONTR4CTTODATE $630,543.35 $2,374,171.65 $0.00 $0.00 $1,404,473.50 50.00 5698,585.00 $0.00 $304,479.00 50.00 240 AMOUNT OF PROP. CHANGE ORDER $67,190.00 $0.00 $0.00 50.00 $0.00 50.00 30.00 $0.00 $0.00 30.00 0 REVISEDCONTR4CTAMOUNT $697,733.35 $2,374,'17'I.65 $0.00 $0.00 $1,404,473.50 $0.00 Sfi98,585.00 $0.00 $304,479.00 $0.00 240 TOTAL REVISED CONTRQCT AMOUNT PER UNIT $3,071,905.00 $0.00 5�,404,473.50 5698,585.00 5304,479.00 REVISED COST SHARE Dev. COst: 53,105,270.85 CiTy Cost: $2,374,171.65 TOTAL REVISE� CONTRACT $5,479,442.50 REVIEWED By Sandip Adhika�i at 2:04 pm, Ju/28, 20T3 Revised: 12-17-2018 Page 1 You are directed to make the following changes in the contract tlocuments: I CITV BID ITEM f'AY ITEM # # 12' 13` 16" Nonpressure Sleeve 20" Nonpressure Sleeve 20" Steel Sleeves fT = CFW Unil I I Developer PfiCe UNITPRICF Cost UNIT II: WATER IMPROVEMENTS - DEVELOPER 567.�90.00 $0.00 567,190.00 Asterisk (") indicates New Pay Item REVIEWED By Sandip Adhikari af 2:04 pm, Jul 28, 2023 Revised: 12-17-2018 Page 2 REASONS FOR CHANGE ORDER UNIT ll: This revision is to adhere to the City o/Fort Worth Detail #D 706 to indude the correc[ s[eel encdsement sleeve size. Sleeves B 8 C upsized from 16" Steel Sleeves to 20" Steel Sleeves. 16" Nonpressure Sleeve Plugs upsized to 20"Nonpressure Sleeve Plugs. THERE IS NO IMPACT TO CITY COST PARTICIPATION ON THIS CHANGE ORDER RECOMMENDED: APPROVED: APPROVE�: LJA Engineenng. Inc GBTM Sendera. LLC ConatserConstruction „se� y3 S✓acK {;uQ9ms By �k"`eG�:,. .,,,,.�,� ey ey. ,. Name: Daniel Betten, PE Name: Bobby Samuel Name: Brock Huggins Title: Project Manager Titic: Director of Land Development Title: Presitlent Email: dbetten(a)lia.com Email: bsamuel(o�qreenbrickpartners.com Email: brock(a�conatserconstruction.com APPROVAL RECOMMENDED: APPROVED: APPROVED AS TO FORM AND LEGALITY: CFW - Water Department CFW - Assistant Ciry Manager CFW - Assistant Ciry Attomey a eu✓�hdo�%f �_.-- BY. ..,.Yi`1ar Tornero- BY Dan.,., .. By: . Name: Taylor Gunderman Name: Dana Burghdoff Name: Richard McCracken Title: Cngineering Manager Title: Assistant City Manager Title: SeniorAssistant CiryAttorney RECOMMENDED: CFW-'Contract Compliance Manager ATTEST ' Contract Compliance Manager (Project Manager): S�GNAdI.��, P/' By signing I acknowledge that I am the person responsible By: `�,°' A-�a%=<= for the monitoring and administration of this contract, indude U� ensurin9 a�l performance and reporting requirements. Name: Sandip Adhikari Jannette S. Goodall City Secretary ❑There are NO City Funds associated with this Contract Title: Sr. Professional Engineer ❑� There are City Funds associated with this Contract M&C Number. z3-0122 M&C Date Approved: 2�14/2023 REVIEWED By Sandip Adhika�i at 2:OE pm, Ju/28, 2023 Revised: 12-17-2016 Page 3 CSC No. 59115-0O2 DEVELOPER-AWARDED-PROJECT CHANGE ORDER INSPECTOR: Adam Payan Phone No: 682-225-9106 PROJECT MANAGER: Sandip Adhika�i Phone No: 817-392-8424 CONTRACT UNIT WATER SEWER PAVING DRQINAGE STREET LIGHTS CONTRACT Developer Developer Developer DAYS Cost Ciry Cost Developer Cost City Cost Developer Cost City Cost Cost City Cos[ Cos[ City Cost ORIGINALCONTRACT $630,543.35 52,374,171.65 50.00 ba00 $'I604,473.50 $0.00 5698,585.00 $0.00 5306,479.00 50.00 240 EXTR4S TO DATE 567,190 00 $0.00 50.00 $0.00 50.00 50.00 50.00 $0.00 50.00 $0.00 0 rRFf71T$ TC] nATF $0.00 50.00 $0.00 $0.00 $0.00 $0.00 50.00 50.00 50.00 50.00 CONTR9CTTODATE 5697,733.35 52,374,171.65 50.00 50.00 51.404,473.50 $0.00 5698,585.00 50.00 5304,479.00 50.00 240 AMOUNT OF PROP. CHANGE ORDER $4,500.00 $0.00 $0.00 50.00 (589,65G.65) 50.00 S19,960.00 $0.00 50.00 50.00 O REVISEDCONTRACTAMOUNY $702,233.35 52,374,171.65 $0.06 50.00 $1,314,816.65 $0.00 5718,Sd5.00 50.00 5304,479.00 50.00 240 TOTAL REVISED CONTR4CTAMOUNT PER UNIT $3,076,405.00 50.00 $1,374,816.65 5718,545.00 5304,479.00 REVISEDGOSTSHARE DeV.COSt: 83,040,074.00 CityCOSt: 52,374,�71.65 TOTAL REVISED CONTRACT $5,414,245.65 Revised: 12-17-2018 Page 1 You are directed to make the following changes in the contrad documents CITY BID ITEM PAY ITEM # # QUANTITY 14' 9999.0026 1 CITY BID ITEM PAY ITEM # * QUANTITY 23' 24t.3014 30 24` 9999.0027 4 25' 9999.0028 4 CITV BID ITEM PAY ITEM � # �UANTITY 'I 3211.0400 (1723) 3211.0502 (956) 2 3213.0105 (957) 3 4 32'13.030t 230 18 9999.0022 (1450) 19 9999.0023 (1429) Asterisk (') fntlfcates New Pay Item INIT ITEM DESCRIPTION EA Atljust 6' Blow off Manhole Rim Elevation UNIT II: WATER IMPROVEMENT: UNIT III: DRAINAGE IMPROVEMENTS INIT ITEM DESCRIPTION LF Remove 21" Srorm Line LF Relocate 2'i" RCP EA 10' Recessed Inlets Remove and Reloca[e UNIT III: DRAINAGE IM UNIT IV: PAVING IMPROVEMENTS INIT ITEM DESCRIPTION TN Hytlratetl Lime (36Ibs/sy) (Sentlera Ranch SY 8" Lime Treatment (Sendera Ranch Blvd & Rancho Can on Wa SY 10" Conc Pvmt (Sentlera Ranch Blvtl S Rancho Can on Wa SF 4" Conc Sidewalk LF REFL PAV MRK TY I(W)(6")(SNG)(SLD) LF REFL PAV MRK TY I(W)(8")(SNG)(SLbI CFW Unit I I Developer I I Price UNIT PRICE Cost Ciry Cost TOTAL 50.00 54500.00 $4,500.00 $0.00 $4,500.00 !VELOPER 4 500.00 50_00 54,500.00 CFW Umt �evelopef Pnce UNIT PRICE Cost Ciry Cost TO7AL 50.00 $30.00 $t.140.00 $0.00 51,140.00 $0.00 5105.00 5420.00 ^y0.00 $420.00 50.00 54,600.00 518,400.00 �0.00 $t840000 �VEMENTS $19,960.00 SO_00 $19,960.00 CFW Unit Developer Price UNIT PRICE Cost City Cost TOTAL $0.00 $195.00 (�3359.A5) $0.00 (53,359.85) sa.00 50.00 (53,824.00) $0.00 (S:S.tlL4 UD) 572.00 $0.00 (558.904.00) $0.00 (S68.904.00) Revised: 12-17-2018 Page 2 REASONS FOR CHANGE ORDER This Revision pertains fo right turn lane pavemerrt �enrovals with adjusfrnent to sform and wate� improvements THERE IS NO IMPACT TO CITY COST PARTICIPATION ON THIS CHANGE ORDER FORM RECOMMENDED: APPROVED: APPROVED: LJA tngineering, Inc GBTM Sendera, LLC Conafser Gonstructiun Daniel Bet�len "58 a=��� gY: ..,.., gy_. . �:��..,,. ...,,. ey�-.:,,�,.. ,.,__...,. Name: Daniel 6etten, PC Name: Bobby Samuel Name: Brock Huggins Title: Project Manager Title: Director of Land Development Title: President Email: dbetten(a1lia.com Em2il: bs2moei(�qreenhrickpartners.r.om EmaiC brocka�conatserconstruction.com __ APPROVAL RECOMMENDED: APPROVED: APPROVED AS TO FORM AND LEGALITY: CFW - Watel Department CFW - ASSiStant City Manager CFW - Assisten! City At(orney �, kese- Dana Bur�hdoFF �✓2 ^— � e ��������, , .._�,.; B --�.,,� ,,:� :,�� ,s,�, BY Y Y Name: Suby Varughese Name: Dana Burghdoff Name: Richard McCracken Title: Interim Engineering Manager Title: Assistant City Manaper Title: SeniorAssistant CityAttorney RECOMMENDED: CFW-'ContracfComplianceManager ATTEST Sai� Aii/s.f.E. Q� A J�= By: - v Name: Sandip Adhikari Jannette S. Goodall City Secretary Title: Sr. Professional Engineer M&C Number. 23-0122 M&C Date Approved: 2/14/2023 * Contract Compliance Manager (Project Manager): 8y signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, include _ ensuring all pertormance and reporting requirements. ❑ There are NO City Funds associated with this Contract 0 There are Ciry Funds associated with this Contract Revised� 12-17-2018 Page 3 �o��r ����r�� TRANSPORTATION AND PUBLIC WORKS September S, 2024 Conatser Construction TX, L.P. 5327 Wichita Street Fort worth, Texas 76119 RE: Acceptance Letter Project Name: Madera Sendera Ranch Blvd. Project Type: Water,Paving, Drainage & Street Light City Project No.: 103700 To Whom It May Concern: On August 29, 2024 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on September 5, 2024. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on September S, 2024, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 682- 210-8044. Sincerely, � Sandip Adhikari, Project Manager Cc: John Rogers, Inspector Troy Gardner, Inspection Supervisor Cody Horton, Senior Inspector Andrew Gooman, Program Manager LJ A Engineering, Inc, Consultant Conatser Construction TX, L.P., Contractor GBTM, Sendera,LLC„ Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19 AFFiDAV �T STATE OF TFXAS GQUNTV �t� 'I�AF�RANT F3cfore me, thc undersign�d autharity, a ltiotary Public in thC stale and c;ounty afvresaid, ori this day persor�ally ap�ared Brnck Huggins, President vf Cor�atser Mana�em�r�t Group, Inc., general par�ner of Canatser Cc�nstxuctian T3C,_ I.�, kr�own �a mc to be a crcdib�c person, who heing by me duty swam, r�pan hus vath deposed and said: T�at all persor�s, firms. assaciations, corporations ar ather arga�rii�atians furnis�in� la6or aztdlar matcrials h�v� heen paid in full; 1"hat tt�e wage sca�e esta�lishcd �y t�e Csty Council iri thc City of �art Wort�, has hcen �aid in tull; aild "�'hat there are no claims pending f`ar persana� injury andlor pro�crty ci�una�es; �n Cantract describcd as: SENi)ERA RANCH B�ULEVARD WATER, 5�4NiTARY SEWER, DRAINAGE, PAi�II�iG, & STREET I.IGHT IMPRflYEMENT5 CFA �R� #: 22-D�182 C1TY PitaJECT #: 143700 CITY OF FORT 1�+UFtTH STATE �F TEXAS CO�fATS�:R C�I�IS`l`RUCTIC7N rt`X, X.� , Brock 1-Iuggt s Subscrihcd and swam t� bcfore me !l�is 22"� day of Aprik, �024. �� �-�� ,,�..,�,4 +���s,�aT� < ,a, ,s,+�T�3s h�vtary Fublic in 'l'arrant County, Texas �' - � r� com�..ia� �=r..= " r �s� ii6I�f17�N 3� �G� , GONSENT �F SURETY C�MPANY T� fllllAL PAYMENT CoMarrne wkh Lhs Am�ericsn Instidits ofi Architec�, A4�4 Doa�mant [ii�7 owr��R ❑ ARCHI7��T ❑ C�N�'RAGT�R ❑ 5€1RE7Y ❑ OTN ER aar,� �vo aza�3�s PR�J�CT: (n8�r1e, Bd�rBSSjSendera Ranch Boulevard F o�# VYaath. T7C T� {�wnerl IGBTM SENpERA, LLC J�ID TME C1TY O� FOi4T 1NbF2T FI 2805 h1, DaYa� Parkway. Svile 4p� Plano TX 75093 � ARCHtTEG�'S ��iDJ�C� N�: CFA hio. 22-0782 carvr�acT Fa�: Two Yea� !d4a�n:enartiee `nr 5endeva RanGh �n+�evard � C��ITR�#CT ❑ATE. C�NTRACT�R: CaM1l�1TSER CQNSTR�JCTI�N T?{. L P Itt accord�cc wit� the prouisions vf #he Contract betu+een the Uwn�r and ti�e Cnotractnr as indicated a6ove, the trrxa a�n r�me .n4 ap�ax, or s„r�t.,� coRspenvl $ERICLEY !lIISUF2i4h1�� GD�IIPAIVY d75 Stear�boat Rcad ��� cT osas� . Slfl;�Tlf COMPAlrtY �n ��a of �. � ��..� � � �¢�►��4�� CDIVATSER CDNSTf#L�CTIOM T){. L.P �3�� VlfeChita 5i. F4Tf 1N��th T7{ i$'# 19-fi035 , CdNTRACTQR, hCr�by 8�p��[]vc5 0� #�ie �iqal pa}�rttellt tD t�e Con#racir�r, a�� agrees that Cna� payment to the C�ntrgctar s�a11 noi relieve t�e Sur�ty Corn�any af a�y of it� abligations to [hara insstt nart� and addr�sr of O�m�+F GBTM SEND�RA. LL� AMIJ THE CE�1' OF FQFi7 1NQRTH 2505 N a��las Farkway. 5u�te 4�0 Plano 1`}C 75�93 , ❑WNER. �s set fotth i�t the sai� Surety Cornpany'� bond. IN ii�I�NESS,1iVHEREDF, the Surety Comgany has hetc�nta set its hand this � 9tt� d�y of April, 2D2e SERItLEY INSUfiANCE C�MPAI�{Y Surery Cnmpany . Art[CS�: - r • ~ _ {5ea1}; �,',� , f.. '�r•�,-f L•. ,_-� - S�gneture of Autharized R�presentativc .�'- �iobai Mor�fas Attamer'-iR-Fa�t Title HoTE: �1rs 1pren q ta tia used ss a c,omp�ninn �ocumert to AL4 D�CUM€NT G7U6, C4NtRACTQF�'S A�1dAYfT QF PAI+hII�1VT pF DE�TS RNO CUIR�A5, Cure�ns Edf�on ONE PA6E