HomeMy WebLinkAboutIR 24-1904INFORMAL REPORT TO CITY COUNCIL MEMBERS
No. 24-1904
To the Mayor and Members of the City Council
September 24, 2024
Page 1 of 4
SUBJECT: MONTHLY DEVELOPMENT ACTIVITY REPORT
This Informal Report is in response to the City Council's request to receive a monthly update on
development activity within the City and the measures staff are using to improve the
development process. Staff also generates a monthly report to keep the Council informed of the
volume of development activity, process improvements and staff's performance in implementing
changes and improving the delivery of plan review and permits. This activity report consists of
metrics associated with building permits, infrastructure, stormwater development, and water
development plan review. It provides updates on continuous development process improvement
efforts. The monthly Development Activity Report is attached for your use and information. The
following highlights are for the month of August 2024:
August 2024 Highlights
Building Permits
Permits Aug-24 Jul-24 DifferenceAug-23 Difference
New Commercial Permits Issued 132 103 1 +28% 1 105 1 +26%
New Multifamily Permits Issued (1)
6
47
-87%
2
+200%
New Detached Multifamily Permits
23
34
-32%
3
+667%
Issued 2
New Residential Dwelling Permits
632
368
+72%
768
-18%
Issued 3
Total New Permits Issued (4)
661
449
+47%
773
-14%
Total Commercial Valuation ($ Millions)
$253M
$556M
-54%
$188M
+35%
Permit Applications
Aug-24
P�]
D fference
Aug-23
Yr
D ffr - ncej
New Commercial Permit Apps Received) 22 I 28 -21% I 23 I -4%
New Multi -family & Detached Multi- 43 12 +258% 50 -14%
family Apps Received(5)
New Residential Dwelling Apps 697 416 +68% 455 +53%
Received (5)
Data as of September 3, 2024
(1) Includes apartments and Commercial Townhouse apartments
(2) Includes detached multifamily (i.e. single family for rent) properties- Data tracked as of Jan 2022
(3) Includes duplexes, townhomes on a single lot, single family and single family model homes (excludes Pool/Spa and Non -
Dwelling Strucures)
(4) Excludes New Non -Dwelling Structures and Pool/Spa
Data as of September 3, 2024
(5) New Commercial, New Multi -family & Detached Multi -family and New Residential Dwelling applications received only includes
new building permit applications
ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS
INFORMAL REPORT TO CITY COUNCIL MEMBERS
No. 24-1904
To the Mayor and Members of the City Council
September 24, 2024
Page 2 of 4
SUBJECT: MONTHLY DEVELOPMENT ACTIVITY REPORT
Development Support Services
• The Overall Customer Service Satisfaction was 83% for either Very Positive or Somewhat
Positive for August 2024, based on 77 out of 92 responses. This is down from 90% for either
Very Positive or Somewhat Positive for July 2024. Refer to Chart A and Chart B, below. Out of
92 respondents, 15 people provided feedback. Majority of the feedback was centered around
customers requesting improvements to our overall communication during both customer
service intake and plan review process.
• In August 2024, there was no inspection satisfaction survey results.
• Chart A shows survey responses for August 2024.
1oo.00i Chart A How would you rate the quality of your customer service experience?
90.00 /°
83.70% -
80.00
60.00%
40.00%
20.00% No ■
6.52% 5.43% 4.35%
- 0.00% 0.00% 0.00%
0.00%
Very Positive + Somewhat Neutral Somewhat Negative Very Negative
Positive
■ City of Fort Worth Customers ■ CFW Goal
Aug 24
• Chart B shows commercial vs residential survey responses for August 2024.
Chart B Overall, how would you rate the quality of your customer service experience?
100.00% 90.00%
83.34% 82.50%
80.00% -
60.00%
40.00%
20.00% 4.17% 10.00%
0.00%
0.00% 111 �
Very Positive + Somewhat Neutral
Positive ■ City of Fort Worth Customers (Com.)
Aug 24
6.25% 5.00%
0.00% 6 °2.50% 0.00%
Somewhat Negative Very Negative
■ City of Fort Worth Customers (Res) ■ CFW Goal
ISSUED BY THE CITY MANAGER
FORT WORTH, TEXAS
INFORMAL REPORT TO CITY COUNCIL MEMBERS
No. 24-1904
To the Mayor and Members of the City Council
September 24, 2024
Page 3 of 4
SUBJECT: MONTHLY DEVELOPMENT ACTIVITY REPORT
X-Team Buildina Plan Review
X-Team Activity
Aug
2024*
July
2024
Mo - Mo
Difference
Aug
2023
Yr - Yr
Difference
X-Team Applications
16
17
-6%
14
+14%
Conferences Held
18
10
+80%
18
0%
Building Permits Issued
30
46
-35%
20
+50%
Data as of September 3, 2024
X-Team Activity Totals
YTD 2024*
CY 2023
CY 2022
Total
X-Team Applications
124
165
183
472
Conferences Held
102
143
136
381
Building Permits Issued
486
372
573
1431
Data as of September 3, 2024
• As of September 3, 2024, there are 151 pending X-Team building permits with the following
status:
0 26 are in Initial Plan Review,
0 109 are Awaiting Client Reply
0 16 permits have been Approved with payment pending
Building Plan Review
• On September 3, 2024, the review times to first comment were as follows:
Days to first review Commercial Plans Actual 8 Days Goal 7 Days
Days to first review Residential Plans Actual 5 Days Goal 7 Days
Department -wide Building Permit Review
• For August 2024, the average departmental review times to first comment were as follows:
Days to first review Commercial Plans
Days to first review Residential Plans
Average 3 Days Goal 7 Days
Average 4 Days Goal 7 Days
ISSUED BY THE CITY MANAGER
FORT WORTH, TEXAS
INFORMAL REPORT TO CITY COUNCIL MEMBERS
No. 24-1904
To the Mayor and Members of the City Council
September 24, 2024
Page 4 of 4
SUBJECT: MONTHLY DEVELOPMENT ACTIVITY REPORT
Development Activitv Aaalications
Type
Aug-24
Jul-24
Cha ge
Aug-23
Change
Building Permits"
1,767
1,373
+28.7%
1,453
+21.6%
Infrastructure Plans
42
56
-25.0%
74
-43.2%
Community Facility Agreement
14
8
+75.0%
18
-22.2%
Platted Lots (Residential & Non-
Residential
567
785
-27.8%
273
+107.7%
Plats
1 47
43
1 +9.3%
46
+2.2%
Zoning /Site Plans
1 22
14
1 +57.1 %
18
+22.20/o
Data as of September 3, 2024
** Incl: New Commercial & Residential, Comm/Res Remodel, Comm/Res Accessory, Comm/Res Addition, Occupancy Change of
Use, etc.
Please contact D.J. Harrell, Development Services Director, at 817-392-8032 or
Dalton. Harrel l(a-)fortworthtexas.gov if you have any questions, concerns or comments.
David Cooke
City Manager
ISSUED BY THE CITY MANAGER
FORT WORTH, TEXAS
FORT WORTH.
Development
Activity Report
I%AZI VIV 9. `VLM
INSIDE THIS EDITION Building Permits.......................................................................2
CFA and Platting...................................................................10
Infrastructure.........................................................................11
Traffic & Water Studies..........................................................14
Stormwater Studies...............................................................15
Stormwater............................................................................16
Development Process Improvement......................................17
Building Permit Comparison
25,000
20,000
4 15,000
a) 11,131 11,320
0 10,000 ■ ■
5,000
0
2014
2015
■ Multi -Family
376
349
■ Residential
8,471
8,792
■Commercial
2,284
2,179
All data is in calendar year
18,455 19,537
16,349 15,832
13 467 14,717 14,573
12,853 '
11 561
2016 2017 2018 2019 2020 2021 2022 2023 YTD
2024
803 487 421 451 552 624 788 713 1,120
9,522 10,562 11,687 11,523 13,920 15,552 15,998 13,063 9,016
2,528 2,418 2,609 2,599 1,877 2,279 2,751 2,056 1,425
New Single -Family Permits*
900
800
700
600
500
400
300
200
100
0
Jan
Feb
Mar
2022
537
606
835
■ 2023
191
276
478
■ 2024
428
561
694
Apr
May
Jun
Jul
Aug
535
550
570
636
725
523
835
716
669
763
512
494
422
357
590
All data is in calendar year
*Data only shows New Single -Family permits. Excludes all other residential permits.
Sep
720
262
Oct
405
468
Nov
480
439
Dec
250
406
Development Activity Report
2
New Multi -Family (MF) and Detached Multi -Family (DMF) Permits
400
350
300
250
z
E 200 s
150
0
100
50
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 MF 8 44 80 372 9 64 11 11 1 7 3 14
■2022 DMF 35 38 70 33 1 4 0 4 78 221 1 212
■2023 MF 8 3 14 3 37 11 22 2 17 21 2 93
■2023 DMF 11 34 1 50 67 0 140 3 10 8 7 1
2024 MF 17 9 6 83 1 46 47 6
■2024 DMF 33 46 0 183 321 17 34 23
All data is in calendar year
New Multi -Family (MF) and Detached Multi -Family (DMF) Valuation
$800.0
$700.0
$600.0
c $500.0
0
_ $400.0
64 $300.0
$200.0
$100.0
$-
L
2022 MF
$16.1
■2022 DMF
$2.9
■2023 MF
$68.0
■2023 DMF
$5.5
2024 MF
$91.8
■2024 DMF
$4.5
■
_ a
.■ t
Feb
Mar
Apr
May
$31.5
$59.4
$127.4
$37.3
$1.9
$4.6
$3.5
$-
$0.5
$44.5
$1.5
$20.6
$12.5
$0.1
$14.0
$24.2
$37.9
$14.7
$741.4
$0.5
$6.2
$-
$50.4
$40.6
All data is in calendar yea -
Jun
Jul
Aug
$86.1
$212.3
$81.3
$2.0
$-
$0.2
$46.9
$44.0
$0.6
$-
$24.9
$1.6
$71.2
$159.8
$44.7
$1.5
$251.3
$14.8
Sep
Oct
Nov
Dec
$4.5
$39.6
$32.0
$41.2
$9.2
$22.1
$7.0
$46.3
$58.2
$80.3
$1.3
$53.1
$1.4
$4.2
$3.3
$0.4
Development Activity Report
3
New Private Development, Non -Residential Commercial Permits*
140
120
100
80
E
60
0
40
20
0
•
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug Sep ct
■ 2022
98
101
73
59
45
50
65
101 97 71
■ 2023
58
79
95
61
79
91
119
85 81 80
■ 2024
72
102
88
109
101
63
86
131
I ki
Nov Dec
50 92
64 121
Excludes all New Multi -family (MF) and Detached Multi -family (DMF), Education, Institutional and Townhouse Apartments. Only
new permits are included in this data set. Excludes additions and remodels.
New Private Development, Non -Residential Commercial Permit Valuation*
300
250
200
c
150
Gq
100
50
0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
■ 2022 $188 $107 $113 $170 $103 $28 $69 $111 $18 $165 $52
■ 2023 $63 $180 $84 $95 $124 $129 $87 $71 $134 $117 $194
■ 2024 $164 $277 $127 $155 $223 $229 $36 $43
•c
$77
$20
Excludes all New Multi -family (MF) and Detached Multi -family (DMF), Education, Institutional, and Townhouse Apartments.
Only new permits are included in this data set. Excludes additions and remodels.
Development Activity Report
4
New Non -Residential Commercial Permits*
140
120
100
E 80
a�
d
0 60
40
20
0
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug Sep
■ 2022
98
102
76
83
60
54
67
104 100
■ 2023
59
80
95
65
82
96
120
100 81
■ 2024
72
105
89
109
101
64
103
132
Oct
Nov
Dec
73
60
92
82
66
123
Excludes Multi -family (MF) and Detached Multi -family (DMF), New Townhouse Apartments, addition, and remodel permits.
Does include Education and Institutional new permits.
New Non -Residential Commercial Permit Valuations*
$450
$400
$350
$300
o $250
$200
$150
$100
$50
'
$0
Jan Feb
■ 2022
$188 $107
■ 2023
$67 $182
■ 2024 $164 $411
111111
Mar
Apr
May
$114
$170
$387
$84
$101
$127
$128
$155
$223
Jun
Jul
Aug Sep
$32
$100
$181 $72
$163
$88
$107 $134
$234
$40
$43
to
Oct Nov
Dec
$244 $52
$77
$198 $207
$36
Excludes New Multi -family (MF), Detached Multi -family (DMF), and Townhouse Apartments, additions and remodels.
All data is in calendar year.
Development Activity Report
5
Total Commercial Valuation*
$1,200
$1,000
$800
U)
c
$600
$400
$200
$0
I
I 1
I
Jan
Feb
Mar
Apr
May
Jun
2022
$304
$173
$198
$377
$496
$208
■ 2023
$197
$240
$190
$197
$265
$253
■ 2024
$361
$453
$182
$1,043
$338
$413
111111 1 1
Jul Aug Sep Oct Nov Dec
$441 $337 $162 $340 $312 $334
$284 $188 $349 $352 $268 $139
$556 $253
Data includes new, additions, and remodel permits for all commercial types including MF, DMF, Education and Institutional. All
data is in calendar year.
Development Activity Report 6
Large uommerciai
vro
ecis
LargeAugust Commercial
Projects
Address
Council
District
Project Name
Work Desc
Sq. Ft
Valuation
4969, 4929, &
Palladium E Lancaster
New Commercial Construction of 3
4949 E Lancaster
11
- Bldg 1, 2, & 3
Multi -Family Apt Bldgs Consisting
235,806
$13,333,333
Ave
of 243 Units
1900 Gravel Dr
11
Riverbend East Office
New Commercial Construction of
147,033
$10,480,000
Park - Bldg 2
Industrial Shell Warehouse Bldg
5401 Birchman
7
Birchman Office
New Commercial Construction of
48,381
$9,991,053
Ave
Development
Three -Story Office Bldg
300 W Risinger
8
CTDI Phase 2
Commercial Remodel of Office
607,074
$3,925,603
Rd
Area in a Spec Warehouse
New Commercial Construction of
12400 Trinity Blvd
5
FHR Office Relocation
Office Bldg and Associated Site
9,225
$3,200,000
Work
1200 Maxine
Commercial Remodel of
4900 Airport Fwy
11
Warehouse Partial
Warehouse Roof, Roof Support
122,326
$2,800,000
Roof Replacement
Framing, Lighting, Power & Fire
Suppression
2824 & 2820
Lofts at Weisenberger
New Commercial Construction of 2
Weisenberer St
9
- Bldg 1 &2
Townhouse Apt Bldgs Consisting
28,620
$2,000,000
of 12 Units Total
14100 Park Vista
QTS FTW1 UPS-R1
Commercial Remodel of
Blvd
10
Replacement
Warehouse to Replace UPS at
6,400
$1,980,545
Existing Data Center
6633 Oak Grove
Commercial Remodel of
Rd
8
FlowCo
Warehouse to Expand Tenant
135,141
$1,696,804
Space
1280 Highway 114
New Commercial Construction of
Rd
10
McDonald's
Fast Food Restaurant with Drive
4,063
$1,500,000
Thru
6500 West Fwy
3
6500 West Fwy
Commercial Remodel of Office
178,000
$1,245,239
Bldg & Deck
5401 Blirchman
7
Birchman Garage
New Commercial Construction of
48,422
$1,100,000
Ave
Two -Story Open Parking Garage
Crockett Row -
Commercial Remodel of Existing
913 Currie St
9
Elevator Addition SE
Multi -level Parking Garage Adding
20,335
$1,000,000
Block
Hydraulic Elevator
* Excludes Institutional and Educational Uses
Development Activity Report
New Commercial Permit Heat Map
? 1 25 5 7.5 10
� � Miles
A
L.rlporld
eCommaroal Budrhng F>enuts Augrret M24
n 0-5
Q 5-10
M 10 -16
■ 15 - 20
20 - 25 —14
TRdtY Fiver
a CFWCftyuma
Development Activity Report
N
New Residential Permit Heat Mar)
D 1 2.5 5 7.5 10
Miles
6
4
A
A�
Log"
a ReaKk tial Buiding Hermits August 2024 - Within
n Ramkmtlel Buiding Hermits August 2024 - Beyond
Muniaqxal Why Dretrcb {Muds)
Arne m FTJ Under Developrnent Agreernent
L70-S
OS-14
�1.0-is
his-20
■20-25
— TrinKy Rrvar
q CFW Cky trait
Development Activity Report
CFA Project Overview
$60.0
$50.0
$40.0
U)
c
$30.0
$20.0
$10.0
$ Jan Feb Mar Apr May June July Aug Sept
2022 $16.5 $30.5 $29.3 $27.5 $1.7 $24.5 $28.4 $13.8 $34.8
■2023 $30.7 $4.0 $25.5 $28.3 $22.7 $23.9 $12.9 $47.4 $48.0
■ 2024 $55.1 $47.8 $36.0 $23.4 $34.7 $21.9 $7.7 $7.8
All data is in calendar year
Platted Lots Overview
1800
1600
1400
0 1200
v 1000
800
a
p 600
400
200
0
■ '22 Res
...................
■ '22. Noel
.................
■ '23 Res
..................
■ '23 Nonl
.................
■ '24 Res
....................
■ '24 Nord
.................
■ '24 MF
.............. -
All data is in calendar year
Oct Nov Dec
$7.7 $16.9 $14.1
$42.3 $31.2 $16.8
_Oct
S9B
Nov
531 ...
21
298
Dec
945
.......
44
.. .
6110
7
-......
1;
229
7
Development Activity Report 10
IPRC Overview*
IPRC Overview Report
Cycles Complete
52
35
5
4
Total Projects
169
147
19
18
Avg. Project Total Per Cycle
3.5
4.2
4.2
4.2
Total Accepted Projects
149
111
13
11
Plan Rev. & Ret w/n 14 days
84%
94%
100%
100%
'All data is in calendar year
IPRC Quarterly Details*
Cycles Complete
13
13
13
13
9
Total Projects
51
37
77
39
37
Avg. Projects Per Cycle
3.9
2.9
6
3.0
4.1
Avg. Accepted Projects Per Cycle
2.6
2.3
2.5
3.7
2.6
Plan Rev. & Ret w/n 14 days
57%
84%
90%
97%
100%
*All data is in calendar year
Public Infrastructure Residential Projects
$60.0
$50.0
$40.0
c
$30.0
$20.0
$10.0
$
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug Sep Oct
Nov Dec
■2022
$16.5
$24.3
$25.3
$27.2
$0.3
$13.0
$18.2
$12.1 $27.6 $2.3
$14.7 $12.4
■2023
$27.7
$0.6
$19.5
$22.1
$7.8
$20.5
$8.8
$39.7 $36.8 $38.1
$15.9 $8.2
■2024
$54.2
$23.2
$34.4
$13.9
$24.2
$17.3
$6.5
$6.1
All data is in calendar year
Development Activity Report 11
Public Infrastructure Commercial Projects
$12.0
$10.0
$8.0
c
0
$6.0
$4.0
$2.0
$ Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2022 $- $3.9 $1.5 $0.1 $1.2 $0.5 $- $0.5 $0.1 $1.4 $0.9 $0.2
■2023 $1.3 $0.2 $3.8 $3.6 $1.1 $1.9 $1.7 $0.2 $9.7 $2.8 $0.6 $2.7
■2024 $0.4 $0.5 $1.6 $3.9 $1.0 $0.4 $0.7 $0.2
All data is in calendar year
Public Infrastructure Industrial Projects
$18.0
$16.0
$14.0
$12.0
o $10.0
$8.0
$6.0
$4.0
$2.0 L L L
Jan Feb Mar Apr May Jun Jul Aug Sep
2022 $- $- $0.1 $- $0.1 $8.6 $3.7 $0.3 $5.7
■2023 $1.0 $1.3 $1.4 $1.7 $3.8 $1.0 $1.1 $6.7 $1.0
■2024 $0.3 $16.7 $0.1 $4.0 $9.3 $2.5 $- $1.5
All data is in calendar year
f
•t
$2.4
$1.0
Nov
$0.2
$13.6
Dec
$0.1
$0.2
Development Activity Report
12
Public Infrastructure Multi -Family Projects
$12.0
$10.0
$8.0
o $6.0
$4.0
$2.0
$
Jan
Feb
Mar
■ 2022 $-
$2.4
$0.2
■ 2023 $0.1
$1.9
$-
■ 2024 $0.3
$0.1
$-
All data is in calendar year
Apr
May
Jun
Jul
Aug
Sep Oct
$-
$0.2
$1.8
$4.3
$0.9
$1.4 $_
$1.0
$10.1
$0.6
$1.4
$0.8
$0.5 $0.4
$2
$0.2
$1.8
$0.4
$_
Public Infrastructure Institutional Projects
$3.0
$2.5
$2.0
c
0 $1.5
$1.0
$0.5
$
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
2022
$-
$-
$-
$0.2
$0.1
$0.6
$2.3
$0.0
■ 2023
$0.6
$-
$0.8
$-
$-
$0.1
$-
$-
■ 2024
$-
$2.4
$-
$-
$-
$-
$0.1
$_
All data is in calendar year
1
Sep Oct
$- $0.1
$0.4 $0.0
Nov
$0.5
$1.0
It
Nov
$0.6
Dec
$1.5
$5.1
Dec
$0.7
Development Activity Report 13
Traffic Study Review Performance
(TIA) Study Review Performance* CY23
Newly Submitted Traffic Studies 76
YTD'24 Jully'24
AugTraffic
59 2 9
Traffic Submittal Review Cycles Completed 50
46 1 12
Avg. Review Time in Days for Completed Traffic Submittals (City) 11
9.4 10 9.3
Avg. Traffic Study Iterations (City)** 1.4
1.2 1 1.3
*TIA Study data supplied only for CY'22 & CY'23
**A study can be submitted multiple times prior to the reported month before being approved
Water/Sewer Study Review Performance
Water Study Review Performance
Newly Submitted Water Studies
CY23
105
.Aug
48
6
4
Water Submittal Review Cycles Completed
49
105
14
13
Avg. Review Time in Days for Completed Water Submittals (City)
9.1
8.6
5.8
8.3
Avg. Water Study Iterations (City)*
2.3
2.2
2.3
2.2
StudySewer •Aug
Newly Submitted Sewer Studies
103
49
5
7
Sewer Study Review Cycles Completed
32
82
9
16
Avg. Review Time in Days for Completed Sewer Submittals (City)
5.6
7.1
6.3
9.7
Avg. Sewer Study Iterations (City)*
2.3
2.1
2.3
2.3
* A study can be submitted multiple times prior to the reported month before being approved
Water/Sewer Studies in Process
Water Study Reviews in Process
392
253
36
Aug
34
Water Study Reviews in Process with City
89
31
3
4
Water Study Reviews in Process with Owner
303
222
33
30
Avg. Water Study Review Completed - time with City (Days)
9.6
8.7
5.9
8.4
Avg. Water Study Review Completed - time with Owner (Days)
Sewer Study Reviews in Process
11.5
403
15.6
296
5.4
42
28.3
41
Sewer Study Reviews in Process with City
78
28
3
8
Sewer Study Reviews in Process with Owner
325
268
39
33
Avg. Sewer Study Review Completed - time with City (Days)
9.3
7.1
6.3
9.8
Avg. Sewer Study Review Completed - time with Owner (Days)
17.0
21.1
3.6
89.3
Development Activity Report
14
Small Scale Infrastructure Projects Review Performance
PerformanceSmall Scale Infrastructure Projects Review Aug
Newly Submitted Small Scale Infrastructure Jobs N/A 6 1 0
Newly Submitted Small Scale Infrastructure Inquiries N/A 32 6 2
*There were 11 inquiries reported in April 2024 upon program inception.
Stormwater Study Review Performance
Stormwater Review P-Aug
Newly Submitted Stormwater Studies
412
347
45
34
Stormwater Submittal Review Cycles Completed
1,425
989
128
126
Avg. City Review Time (days)
7.6
6.9
6.3
6.6
Avg. IPRC Review Iterations (City)
3.2
2.7
3.2
2.8
Avg. Drainage Studies Iterations (City)*
3.9
3.6
3.8
4.9
*Item tracked as a result of HB 3167
New Stormwater Submissions
We
70
60
50
a 40
o
E 30
U) 20
0
10
Jan Feb Mar Apr May Jun Jul Aug
■ 2022 39 50 67 49 40 55 48 46
■ 2023 30 35 47 33 23 33 38 43
■ 2024 42 53 43 46 40 44 45 34
All data is in calendar year
Sep
40
36
Oct
34
36
Nov
43
27
Dec
38
31
Development Activity Report
15
Stormwater Pipeline Number of Reviews
250
W
150
100
50
0
1
Sept Oct Nov Dec
'23 '23 '23 '23
Reviews in process 195 181 166 166
Reviews with City 75 43 22 32
111111
Jan
Feb
Mar
'24
'24
'24
178
189
203
41
46
58
Stormwater Pipeline Average Days for Review
We
50
II
Apr
May
June
July
Aug
'24
'24
'24
'24
'24
177
201
199
211
206
35
60
56
67
43
3:
40
A)
a�
30
0
p
20
10
0
Sept
Oct Nov
Dec
Jan
Feb
Mar
Apr
May
June
July
Aug
'23
'23 '23
'23
'24
'24
'24
'24
'24
'24
'24
'24
■Avg. age of Reviews 4 14 5 7 5 7 6 7 6 8 4 10
with City (Days)
■ Avg. age of Reviews 34 28 26 27 30 30 30 31 30 30 31 31
with Developer (Days)
Development Activity Report
16
Active Development
P•Improvements
Department/ Status
Staff Assigned
Accela Automation/
Websitel Technology
Improvements (2 in progress)
Connecting Accela to Laserfiche to seamlessly send
Connecting Laserfiche to Accela
Development
Certificates of Occupancy and other permit related
Services
documents to Laserfiche for easier public access.
Expected to go live in September 2024.
Improving 47 Water processes in Accela. Also, improving
Development
the communication process between Water Applications,
Water Applications Improvement
Services/Water
Water Meter Services, and the customer. The identified
improvements are expected to be complete by December
2024.
ProcessBusiness
• •
• ••
DSD has completed 30 out of the 31 total CO BPI
Lean process evaluation of the
recommendations. Seventeen (17) recommendations
Certificate of Occupancy Process
Development
were due by September 30, 2022. All 17 are complete.
Report Completed: May 2022; Rev.
Services
There were 14 recommendations due by April 30, 2023.
Of these 14, 13 are complete and 1 is 95% complete. The
Aug 2022.
remaining task includes automating the creation of the CO
due by September 2024.
DSD has completed 12 out of the 13 total Pre -Plat/ Platting
BPI recommendations. Eleven (11) recommendations
were due by March 31, 2023. Of these 11, 10 are
Lean process evaluation of the
Development
complete and 1 is 90% complete. There are 2
Pre -Plat/ Platting process
Services
recommendations due by September 30, 2023. Both are
Report Completed: Sept 2022
complete. The remaining item is to finish working with the
p g g
FWLab on a Power BI dashboard that will show platting
study review times with an expected go live in September
2024.
County•
A•
• ••
Update Interlocal Agreements with 2
Development
The City and Tarrant continue to work together to discuss
of the 5 adjoining counties covering
Services, TPW,
details of the items to be included in the Term sheet for the
plat regulations in the City of Fort
and Legal
ILA update. Coordination with Tarrant County will resume
Worth ETJ
in FY25.
Development
• • ••
Working with FWLab on the FWStat project to revive value
Fort Worth Lab KPI Project
Development
added KPIs for the Development Services Department.
Services
The current KPIs have been evaluated. The new and
revised KPIs will be measured starting in October 2024.
City staff to meet with stakeholders in August with the final
Infill Development Subdivision Project
Platting
draft. Plan to meet with the Interdepartmental Group and
DAC in October; hopeful City Plan Commission and City
Council presentation in November 2024.
The Urban Forest Master Plan was adopted by City
Urban Forest Ordinance Updates
Urban Forestry
Council in June. City staff is scheduled to meet with DAC
in September and meet with City Council in October 2024.
Development Activity Report
17
Development Services
D.J. Harrell, Director
Development Services Department
817-392-8032
Dalton.Harrell@fortworthtexas.gov
Building Permits
Evan Roberts, Assistant Director
Development Services Department
817-392-7843
Evan. Roberts@fortworthtexas.gov
Infrastructure
Andrew Goodman, Engineering Manager
Development Services Department
817-392-6251
Andrew.Goodman@fortworthtexas.gov
Stormwater
Leon Wilson, Engineering Manager
Development Services Department
817-392-6591
Leon.Wilson@fortworthtexas.gov
Water Engineering
Suby Varughese, Water Engineering Manager
Development Services Department
817-392-8009
Suby.Varughese@fortworthtexas.gov
Small Scale Infrastructure
Vic Tornero, Senior Capital Projects Officer
Development Services Department
817-392-7800
Victor.Tornero@fortworthtexas.gov
Development Activity Report 18