HomeMy WebLinkAboutContract 58073-SP1Docusign Envelope ID: 7691 BA?E-AFDE-410E-8E9E-E135F89286F7 CSC No. 58073-SP1
UPRR Project No. 570869
SUPPLEMENTAL AGREEMENT
Felix Street DOT 415956J
MP 246.21 Ft. Worth Subdivision
Fort Worth, Tarrant County, Texas
THIS SUPPLEMENTAL AGREEMENT (the "Supplement") is made as of 10/2/2024 , by and between UNION PACIFIC RAILROAD COMPANY, a
Delaware corporation ("Railroad") and the CITY OF FORT WORTH, a municipal
corporation or political subdivision to be addressed at 200 Texas Street, Fort Worth, TX,
76102 ("Political Body").
RECITALS
By instrument dated September 6th, 2022, Union Pacific Railroad Company and
the Political Body entered into an agreement identified by the UPRR Project number
above (the "Agreement").
The Political Body has requested a Supplemental Agreement to include an
addendum to Exhibit C Railroad Material and Force Account Estimates (the "Exhibit").
AGREEMENT
NOW, THEREFORE, IT IS MUTUALLY AGREED BY AND BETWEEN THE
PARTIES HERETO AS FOLLOWS:
SECTION 1 -AMENDMENT OF THE AGREEMENT
Railroad amends the Agreement to include an addendum to the Exhibit.
The Agreement Section 7, and the related Exhibit attached to the Agreement,
is amended to include an Estimate to cover additional work in the amount of Forty
Five Thousand and 00/100 Dollars ($45,000.00) as shown on the Exhibit
Addendum, attached hereto and hereby made a part hereof as Exhibit to the Agreement,
which shall be, and hereby is amended to include the attached Exhibit Addendum.
SECTION 2-EFFECTIVE DATE
This Supplemental Agreement shall be effective as of the instrument date above.
Page 1 of 2
Docusign Envelope ID: 7691 BA7E-AFDE-410E-8E9E-E135F892B6F7
SECTION 3 -AGREEMENT SUPPLEMENTAL
This agreement is supplemental to the Agreement, as herein amended, and
nothing herein contained shall be construed as amending or modifying the same except
as herein specifically provided.
IN WITNESS WHEREOF, the parties hereto have caused this Supplement to be
executed in duplicate as of the date first herein written.
UNION PACIFIC RAILROAD COMPANY
1gna ure
Paul Rathgeber
Printed Name
Director, Industry & Public Projects
Title
CITY OF FORT WORTH, TEXAS
Signature
Jesica McEachern
Printed Name
Assistant City Manager
Title
Page 2 of 2
Docusign Envelope ID: 7691 BA7E-AFDE-410E-8E9E-E135F892B6F7
E�HIBIT C-1 Addendum
To Agreement
Railroad's Estimate
Docusign Envelope ID: 7691 BA7E-AFDE-410E-8E9E-E135F892B6F7
ESTIMATE OF MATERIAL AND FORCE ACCOUNT WORK BY THE
UNION PACIFIC RAILROAD COMPANY
FOR CITY OF FORT WORTH
DESCRIPTION OF WORK: Supplemental estimate for City of Fort Worth, TX Felix Street Overpass Deck Demo and
Reconstruction. Removal and replacement of bridge deck. Union Pacific Railroad to provide
plan review, construction management, coordination, and observation. Project location: Fort
Worth, TX, Felix Street, MP 246.2, Fort Worth Subdivision, DOT 415956J.
LOCATION: FORT WORTH
DESCRIPTION
JOB 001 - ENGINEERING
Engineering Labor
Engineering Consultant
TOTAL PROJECT:
EXISTING REUSABLE MATERIAL: NONE
STATE: TX
LABOR
$0
$40,000
$40,000
DIRECT COSTS
$0
$5,000
$5,000
DATE: 03/25/2024
TOTAL
$0
$45,000
$45,000
$45,000
EXISTING NONREUSABLE MATERIAL: NONE
TOTAL ESTIMATED COST OF PROJECT LESS CREDITS:
THE ABOVE FIGURES ARE ESTIMATES ONLY AND SUBJECT TO FLUCTUATION.
IN THE EVENT OF AN INCREASE OR DECREASE IN THE COST OR QUANTITY OF
MATERIAL OR LABOR REQUIRED, THE RAILROAD WILL BILL FOR ACTUAL
CONSTRUCTION COSTS AT THE CURRENT EFFECTIVE RATE.
UPRR CONTRACT AMENDMENT
PROJECT NAME: W FELIX BRIDGE AND PAVEMENT REHABILITATION
Contract Compliance Manager:
ADDITIONAL ROUTING SIGNATURES
CITY OF FORT WORTH
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Christian Cardona � (;a,,d',,,u;, I
Title: Professional Engineer
Email: christian.cardona@fortworthtexas.gov
APPROVAL RECOMMENDED:
X-,z., BY: Lau�en Prieur (Sep 5, 202414:54 CDT)
Lauren Prieur, Director
Transportation and Public Work
Email: lauren.prieur@fortworthtexas.gov
CONTRACT AUTHORIZATION
M&C: N/A
Date Approved: N/A
Form 1295: N/ A
APPROVED AS TO FORM AND LEGALITY:
BY: Douglas Black (Sep 6, 202412:52 CDT)
Douglas W. Black
Senior Assistant City Attorney
Email: douglas.black@fortworthtexas.gov
ATTEST AS TO CITY MANAGER SIGNATURE:
� k �BY: U �-----------
Jannette Goodall
City Secretary
Email: jannette.goodall@fortworthtexas.gov
FO�T ��RTH�
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE' �'�' Felix Bridge Project - Supplemental Agreement #1
M&C:
CPN: 101385 CSO: 58073 DOC#:
Date:
To: Name Department Initials Date Out
1. Sophia Flores TPW - initials Sep 4, 2024
2. Christian Cardona TPW - signature « �� Sep 4, 2024
3. Gregory Robbins TPW - initials � Sep 4, 2024
4. Mary Hanna TPW - initials ��' Sep 4, 2024
5. Patricia Wadsack TPW - initials pL� Sep 5, 2024
6. Lauren Prieur TPW - signature ��, Sep 5, 2024
7. Doug Black Legal - signature �,; Sep 6, 2024
8. Jesica McEachern CMO - signature ,,a` Sep 19, 2024
9. Jannette Goodall CSO - signature ,� Sep 19, 2024
10. TPW Contracts
DOCUMENTS FOR CITV MANAGER'S SIGNATURE: All documents received from any
and all City Departments requesting City Manager's signature for approval MUST BE ROUTED
TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip,
David will review and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES �No
RUSH: �YES ❑No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES �No
ROUTING TO CSO: �YES ❑No
Action Repuired:
❑ As Requested
❑ For Your Information
� Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts(a�FortWorthTexas.�ov at ext. 7233 for pick up when completed.
Thank you!