Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 62014
CSC No. 62014 FORTWORTH, CONTRACT FOR THE CONSTRUCTION OF WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2020 WSM-M City Project No. 103413 Mattie Parker David Cooke Mayor City Manager Chris Harder Director, Water Department Lauren Prieur, P.E. Director, Transportation and Public Works Department Prepared for The City of Fort Worth Water Department 2024 Gresham Smith 500 North Akard Street, Suite 3210, Dallas, Texas 75201 TBPE Firm F-3629 00 BRIDGET M. SHEAL.Y d lO/',� i16020 .s,... (rya..•, 5/6/2024 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORTWORTH. 4* City of Fort Worth Standard Construction Specification Documents Adopted September 2011 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 5 SECTION 00 00 00 TABLE OF CONTENTS Division 00 - General Conditions Last Revised 0005 10 Mayor and Council Communication 07/01/2011 0005 15 Addenda 07/01/2011 00 11 13 Invitation to Bidders 02/08/2024 0021 13 Instructions to Bidders 01/17/2024 0035 13 Conflict of Interest Statement 02/24/2020 00 41 00 Bid Form 09/30/2021 00 42 43 Proposal Form Unit Price 01/20/2012 0043 13 Bid Bond 09/11/2017 00 43 37 Vendor Compliance to State Law Nonresident Bidder 06/27/2011 0045 11 Bidders Prequalifications 08/13/2011 0045 12 Prequalification Statement 09/30/2021 0045 13 Prequalification Application 08/13/2021 00 45 26 Contractor Compliance with Workers' Compensation Law 07/01/2011 00 45 40 Business Equity Goal 10/27/2021 00 52 43 Agreement 3/08/2024 0061 13 Performance Bond 12/08/2023 0061 14 Payment Bond 12/08/2023 0061 19 Maintenance Bond 12/08/2023 00 61 25 Certificate of Insurance 07/01/2011 00 72 00 General Conditions 03/08/2024 0073 00 Supplementary Conditions 03/08/2024 Division 01- General Requirements Last Revised 01 1100 Summary of Work 12/20/2012 01 25 00 Substitution Procedures 07/01/2011 01 31 19 Preconstruction Meeting 08/17/2012 01 31 20 Project Meetings 07/01/2011 0132 16 Construction Schedule 10/06/2023 01 32 33 Preconstruction Video 07/01/2011 0133 00 Submittals 12/20/2012 01 35 13 Special Project Procedures 03/11/2022 01 45 23 Testing and Inspection Services 03/09/2020 01 5000 Temporary Facilities and Controls 07/01/2011 01 5526 Street Use Permit and Modifications to Traffic Control 03/22/2021 01 57 13 Storm Water Pollution Prevention Plan 07/01/2011 0158 13 Temporary Project Signage 07/01/2011 01 60 00 Product Requirements 03/09/2020 01 66 00 Product Storage and Handling Requirements 07/01/2011 01 70 00 Mobilization and Remobilization 11/22/2016 01 7123 Construction Staking and Survey 02/14/2018 01 74 23 Cleaning 07/01/2011 01 77 19 Closeout Requirements 03/22/2021 01 78 23 Operation and Maintenance Data 12/20/2012 01 78 39 Project Record Documents 07/01/2011 CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised December 8, 2024 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 5 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents NONE Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: httn:Hfortworthtexas.izov/tnw/contractors/ or httns://aups.fortworthtexas.LFov/Proi ectResources/ Division 02 - Existing Conditions Last Revised 0241 13 Selective Site Demolition 03/11/2022 0241 14 Utility Removal/Abandonment 12/20/2012 0241 15 Paving Removal 02/02/2016 Division 03 - Concrete 03 30 00 Cast -In -Place Concrete 03/11/2022 0334 13 Controlled Low Strength Material (CLSM) 12/20/2012 0334 16 Concrete Base Material for Trench Repair 12/20/2012 03 8000 Modifications to Existing Concrete Structures 12/20/2012 Division 26 - Electrical 260500 Gem,f.en Weds Results f .. L'leetf ea /12/1v�r11420 z 7L�no De,f.elitieff f f leetf e,.l Sy4e ffis 12,42042012 7L�7 T ndefg feund D ets a ffd R eewerys f ,. Eleetf eal Systems 07/hm7v1,9014 02�26,9016 Division 31 - Earthwork 31 00 00 Site Clearing 03/22/2021 3123 16 Unclassified Excavation 01/28/2013 3 i 23 23 Beffe 01,42842013. 3124 -00 Embenlafteffts 01,42842013. 31 25 00 1Erosion and Sediment Control 04/29/2021 313600 00 Cabielis 1 Nrt 20190ia 31�0 Ripfap 1 /�tz Division 32 - Exterior Improvements 3201 17 Permanent Asphalt Paving Repair 12/20/2012 3201 18 Temporary Asphalt Paving Repair 12/20/2012 32 01 29 Concrete Paving Repair 12/20/2012 32 1123 Flexible Base Courses 12/20/2012 32 1129 Z7�7 Lime Treated Base Courses refner4 Base re 12/20/2012 32 1137 �Soil T-feeAe,l Liquid 'T feated S 1.' .c ill ✓.11�� 06/1 i 0421 201 c �� 32 1216 Asphalt Paving 12/20/2012 32 1273 Asphalt Paving Crack Sealants 12/20/2012 CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised December 8, 2023 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 5 32 13 13 Concrete Paving 06/10/2022 32 1320 Concrete Sidewalks, Driveways and Barrier Free Ramps 12/09/2022 32 13 73 Concrete Paving Joint Sealants 12/20/2012 32 14 16 $viol TU.k'-A1Vi*g Q�2019 32 16 13 Concrete Curb and Gutters and Valley Gutters 12/09/2022 32 1723 Pavement Markings 06/10/2022 32 1725 Curb Address Painting 11/04/2013 3231 13 Chain Fences and Gates 12/20/2012 32 31 26 Wire Fences and Gates 12/20/2012 32 31 29 Wood Fences and Gates Dl..ee �x7.,11� -oho Detai Cast 12/20/2012 4 3232 i3 �� 3291 19 i a ing Topsoil Placement and Finishing of Roadway Right-of-ways 06�05420 vvrv�rrv�v 03/11/2022 32 92 13 Sodding 05/13/2021 32 92 14 Non -Native Seeding 05/13/2021 3292 15 Native Grass and Wildflower Seeding 10/06/2023 32 93 43 Trees and Shrubs 12/20/2012 Division 33 - Utilities 33 01 30 Sewer and Manhole Testing 09/07/2018 33 01 31 Closed Circuit Television (CCTV) Inspection - Sanitary Sewer 03/11/2022 �z 33 0132 C1 t Television (CCT-V) T.� spee S �e�e�C�r��ele�;�: ��tfe���r D><ai-1} 12/089023 �� 3303 10 2 2410 22�= Bypass Pumping of Existing Sewer Systems joint Be«.din,. PAid Eleetfie..l 1selat e reffesion Cefftfel Test 12/20/2012 12/ z 22�2 33 04 30 SteA;efls M eresiu Areae Cat ed e P feteetien Sys4e... Temporary Water Services 129z 12i20,9012 07/01/2011 33 04 40 Cleaning and Acceptance Testing of Water Mains 02/06/2013 33 04 50 Cleaning of Pipes 03/11/2022 3305 10 Utility Trench Excavation, Embedment, and Backfill 04/02/2021 3305 12 Water Line Lowering 12/20/2012 3305 13 Frame, Cover and Grade Rings 09/09/2022 3305 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to 03/11/2022 � Grade 12i�20,9012 0 3305 17 3Z�v Ce..e,.ete Were,. V, uks_ Concrete Collars Augef Befiftg 03/11/2022 171 N z Z ZIT 33 05 22 Tame! T i of Plate Steel Casing Pipe 12,90,QO z 12/20/2012 171 N 33 05 23 33 05 24 Hand Tooffeliffg Installation of Carrier Pipe in Casing or Tunnel Liner Plate z 12/09/2022 33 05 26 Utility Markers/Locators 12/20/2012 33 05 30 Location of Existing Utilities 12/20/2012 33 11 05 Bolts, Nuts, and Gaskets 12/20/2012 33 11 10 Ductile Iron Pipe 12/09/2022 33 11 11 Ductile Iron Fittings 09/20/2017 33 11 12 33 1 1 1'2 T_�-rrr� Polyvinyl Chloride (PVC) Pressure Pipe Be.. �1l faPped creel cylinde f Type C6a@Fe�e�eS`,:iiic , , 09/09/2022 124204'l0 r�rtvrzvrs 3,T 1_ 1 4 33 12 10 3 ZIT Bef e,l Steel Pipe and L':4iffgs Water Services 1-inch to 2-inch T afge [] atef T Rene fs 1220,90 z 02/14/2017 1 2 Nr� 20,9012 CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised December 8, 2023 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 5 33 1220 2,2 12 ']l 33 1225 22�0 Resilient Seated Gate Valve A AT" Rubber- Seated Butte,-fl„ Valves Connection to Existing Water Mains Combination Air- Valve Assemblies f Potable Walef System 05/06/2015 nn /o 2�n 02/06/2013 12/2042012 33 1240 f Fire Hydrants 01/03/2014 33 1250 22�0 Water Ear r)e Stations Standafd Blow VaNe Assembly 1�/-,�12 06/1wr19i2013 2 2�2 off wed in Na3 a 12 /''�r2 22 21 12 �� 22�s of «eed Pipe f f !`_,.ay �,. i'�3CL'�,�1L%L��' ��'SItQ��S 12 /2n/2n12 �� nn 33 31 20 High Density Polyethylene (NDPE) -Pipe for- Sanit r-y Sewe,. Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 93 Q0119 09/09/2022 22 21 71 -,SApe /amit�.J SwdbseP 12/2n/2n1.1z �T 22 q 1 Sanitaf:y SewwS'1r, lining 12 / 1�r2 33 3150 22�0 Sanitary Sewer Service Connections and Service Line Ce,f.l.;.atio.. A;« f C`.,n;", 04/26/2013 1220% 3339 10 Se„ e f Fe fee Mains, Valve f Cast -in -Place Concrete Manholes 12/20/2012 33 39 20 22�0 22�0 Precast Concrete Manholes Fite«glass Ti a ff eles- Write,,,°« A eeess Cl,.,mbe f (WAG) 12/20/2012 12,90,QO z 1 2/20% 22�0 22�= neinf feed Genefete Ste,..., Sewer Pipe Gulyefts High Density Del„etl yle,..e (NDP ) Pipe f ,. Storm. D7dn n�/n�„�14 129z 22�2 Rein f feed Del„ethyle,..e (WE)!'*a 1 1 /1 s 22�3 23 Del,,p fepyle«.e Pipe f .• St >o D'Qirt 06/lvvr10,9022 1212 4600 33 46 01 22�z 22�0 drainage Sletted Storm 'Drdms T- fene>, >,fai ff Uleee > er,1 Cast 20% n�/n�14- n�/n�„�11 ^�z 22�0 22�0 in anheles junetion Be*es Cttfb and Dfep hilets �flln✓CQl�.eHe,l,.11s and W;n.,a is i2 n2/1�z 07,/-01,�20n1 1 Division 34 - Transportation 24 41 1n 'Tf ff;e S;gfifl �o 24 41 1001 nnttaerrt A ilefG�e t � Ce�tre�n��� 24 41 1002 n Cep llefSpe ��it��7�m��t��+�� t�n�.--�����tin 2 ^ ^7�-4 1 10.09 Att£tehffiefft G Sef4wafe Speei ivution 34 41 1= Ta1alrolra j T- f ff;e Q;g,..el� 2 A�3 Removing 'T,.., ffie S 1gMc�s 2n�no Readw , IllurAirlatie1 Assemblies 2 n nano 1r LED a„ Imumina 24 .vs Ff,,n1 2nn2 eeayTEDRoa,wayl, 34 4120.09 Residential enti l LED Roadway ay !lxtl�rnF3S 34 4130 � 34 �o Single Mode Fibef Optie Cable 3471 13 Traffic Control CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 8, 2023 WATER AND SANITARY SEWER REPLACEMENT CPN: 103413 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Appendix Page 5 of 5 GC-4.01 Availability of Lands GC-6.06.13 Minority and Women Owned Business Enterprise Compliance GC-6.07 Wage Rates GC-6.09 Permits and Utilities GC-6.24 Nondiscrimination GR-01 60 00 Product Requirements END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN. 103413 Revised December 8, 2023 City of Fort Worth, Texas Mayor and Council Communication DATE: 08/13/24 LOG NAME: 60WSSC20WSMM-VENUS SUBJECT M&C FILE NUMBER: M&C 24-0683 (CD 2 and CD 8) Authorize Execution of a Contract with Venus Construction Company, Inc., in the Amount of $10,103,000.75, for Water and Sanitary Sewer Replacement, Contract 2020 WSM-M Project, Adopt Appropriation Ordinances to Effect a Portion of Water's Contribution to the Fiscal Years 2024-2028 Capital Improvement Program and Amend Transportation & Public Works Department's Fiscal Years 2024-2028 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council.- 1 . Authorize execution of a contract with Venus Construction Company, Inc., in the amount of $10,103,000.75 for Water and Sanitary Sewer Replacement, Contract 2020 WSM-M project; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $10,557,444.00, transferred from available PayGo funds within the Water and Sewer Fund, for the purpose of funding the Water and Sanitary Sewer Replacement Contract 2020 WSM-M project (City Project No. 103413); 3. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the General Capital Projects Fund by increasing estimated receipts and appropriations in Water and Sanitary Sewer Replacement, Contract 2020 WSM-M project (City Project No. 103413) in the amount of $623,958.00 and decreasing estimated receipts and appropriations in the Contract Street Maintenance programmable project (City Project No. P00020) by the same amount and to effect a portion of Water's contribution to the Fiscal Years 2024-2028 Capital Improvement Program; and 4. Amend the Transportation & Public Works Department's Fiscal Years 2024-2028 Capital Improvement Program. DISCUSSION: This Mayor & Council Communication (M&C) is to authorize execution of construction contract for the replacement of cast iron water and deteriorated sanitary sewer mains as indicated on the following streets and easements: Street East (E) Davis Avenue E. Davis Avenue Harvey Avenue E. Powell Avenue E. Jessamine Street Evans Avenue Evans Avenue Scope of From To Work Mississippi E. Dead Water Avenue End 1-35 Freeway Evans Water/Sewer Avenue Mississippi E. Dead Water/Sewer Avenue End 1-35 Freeway Mississippi Water/Sewer Avenue 1-35 Freeway E. Davis Avenue E. Powell Avenue Delaware Avenue Davis Avenue (Unpaved) Alley between Davis 1-35 Freeway Avenue and Harvey Avenue Alley between Davis Mississippi Avenue and Harvey Avenue Avenue New York Avenue Harvey Avenue E. Jesamine Street Harvey Avenue Evans Avenue 185 feet East Water Water Water Water Sewer Sewer Alley between Harvey Mississippi Yuma Street Sewer Avenue and Powell Avenue Avenue Great Northeast Rondo Drive Southwest Parkway Water/Sewer Parkway Additionally, asphalt pavement rehabilitation will be conducted on all the roadways (curb to curb) subsequent to the water and sanitary sewer main replacement. The Transportation and Public Works Department is responsible for 50% of the pavement restoration cost on Rondo Drive. The Water Department's share of this contract is $9,622,294.50 and the Transportation & Public Works Department's share of this contract is $480,706.25. The project was advertised for bids on May 9, 2024 and May 16, 2024 in the Fort Worth Star -Telegram. On June 13, 2024, the following bids were received: Bidder Amount Time of Completion 630 Venus Construction, Inc. $10,103,000.75 Calendar Days William J. Schults, Inc. dba Circle C $10,192,010.25 Construction Company, Inc. Gra-Tex Utilities, Inc. $11,236,076.49 Jackson Construction, Ltd Woody Contractors, Inc. $13,456,775.63 $14,480,319.50 In addition to the contract amount $693,549.25 (Water $391,467.50: Sewer $206,901.00; Paving $95,180.75) is required for project management, material testing and inspection, and $384,852.00 (Water $222,081.00; Sewer $114,700.00; Paving: $48,071.00) is provided for project contingencies. The sanitary sewer component of this project is part of the Water Department's Sanitary Sewer Overflow Initiative Program. Approximately 11,883 linear feet of cast iron water pipe will be removed and replaced as part of this project. This project will have no impact on the Transportation & Public Works' or the Water Department's operating budgets when completed. Funding for this project was not included in the Fiscal Year (FY) 2024-2028 Capital Improvement Program (CIP) because Transportation & Public Works Department amounts for the project were unknown at the time of CIP development. The action in this M&C will amend the FY2024-2028 Capital Improvement Program as approved in connection with Ordinance 26453-09-2023 as follows: 60WSSC20WSMM-VENUS Capital Project Additional Project Fund Name Exsisting Appropriations Authority Appropriations Total* Name 30100- P00020- General Contract Capital Street $7,335,885.66 This M&C $(623,958.00) $6,711,927.66 Project Maintenance Fund *Note: There may be other pending actions or recently approved actions that are not reflected in the table due to timing. It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of Fort Worth's Fiscal Years 2024-2028 Capital Improvement Program, as follows: 60WSSC20WSMM-VENUS Capital Revised Project FY2024 CIP Budget ChangBudget Fund Name Appropriations Authority (Increase/Decrease) Name Budget W&S 103413- Capital W/SS Projects- Contract $0.00 This M&C $10,557,444.00 $10,557,444.00 Fund 2020 56002 WSM-M Funding is budgeted in the Contract Street Maintenance programmable project within the General Capital Projects Fund and in the Transfer to Water/Sewer account of the Water and Sewer operating budget for the purpose of funding the W/SS Repl Contract 2020 WSM-M project within the Water & Sewer Capital Projects Fund. FY2024 - Water PayGo Appropriations per City Ordinance 26453-09-2023 FY2024 Amended FY2024 PayGo(includes YTD PayGo FY2024 Original any council Approved This M&C Remaining Adopted actions for/Moved to PayGo PayGo subsequent to Capital Projects Balance budget adoption) $84,505,035.00 $143,330,035.00 $(68,397,751.38) $(10,557,444.00) $64,374,839.62 Note: There may be other pending actions or recently approved actions that are not reflected in the table due to timing. Appropriations for the Water and Sanitary Sewer Replacement, Contract 2020 WSM-M project are as depicted below: Fund Existing Additional project Total* Appropriations Appropriations Water & Sewer Capital Projects $479,599.00 $10,557,444.00 $11,037,043.00 Fund 56002 General Capital Projects Fund $0.00 $623,958.00 $623,958.00 30100 Project Total $479,599.00 $11,181,402.00 $11,661,001.00 *Numbers rounded for presentation purposes. Business Equity: The Business Opportunity Division placed a 20.95 percent business equity goal on this solicitation/contract. Venus Construction Company Inc., will be exceeding the goal at 21.06 percent meeting the City's Business Equity Ordinance. Any changes in subcontractors will be reviewed by the Business Opportunity Division. The project is located in Council Districts 2 and 8. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Contract Street Maintenance programmable project within the General Capital Projects Fund and in the Water & Sewer Fund, and upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the W&S Capital Projects Fund and the General Capital Projects Fund for the W&SS Repl Contract 2020 WSM-M project to support execution of the contract. Prior to any expenditure being incurred, the Water and Transportation & Public Works Departments have the responsibility of verifying the availabilty of funds. Submitted for Citv Manaaer's Office by Oriainatina Business Unit Head: Fernando Costa 6022 Chris Harder 5020 Additional Information Contact: Preeti KC 5467 60WSSC20WSMM-VENUS FID Table 2 56002 0600430 103413 2024 $6,958,709.00 2 56002 0700430 4956001 103413 2024 $3,598,735.00 2 56002 0700430 103413 2024 $3,598,735.00 3 30100 0200431 4910100 P00020 2024 ($623,958.00) 3 30100 0200431 4910100 103413 2024 $623,958.00 3 30100 0200431 P00020 2024 ($623,958.00) 3 30100 0200431 103413 2024 $623,958.00 2 56002 0600430 4956001 103413 001780 9999 ($6,958,709.00) 2 56001 0709020 5956001 $3,598,735.00 2 56002 0700430 4956001 103413 001780 9999 ($3,598,735.00) 2 56002 0600430 5110101 103413 001780 9999 $59,105.50 Water Staff Costs 2 56002 0600430 5550102 103413 001780 9999 $4,000.00 Public Outreach 1 56002 0600430 5740010 103413 001780 9999 $6,345,160.50 Pay to Contractor 2 56002 0600430 5740010 103413 001780 9999 $222,081.00 Contract Contingency 2 56002 0600430 5330500 103413 001784 9999 $85,374.00 Soil Lab Consultant 2 56002 0600430 5310350 103413 001784 9999 $26,269.00 Soil Lab TPW Staff Cost 2 56002 0600430 5110101 103413 001785 9999 $216,719.00 TPW Inspection Staff 2 56002 0700430 4956001 103413 001780 9999 ($3,598,735.00) 2 56002 0700430 5110101 103413 001780 9999 $33,918.00 Water Staff Costs 1 56002 0700430 5740010 103413 001780 9999 $3,277,134.00 Pay to Contractor 2 56002 0700430 5740010 103413 001780 9999 $114,700.00 Contract Contingency 2 56002 0700430 5330500 103413 001784 9999 $44,094.00 Soil Lab Consultant 2 56002 0700430 5310350 103413 001784 9999 $13,567.00 Soil Lab TPW Staff Cost 2 56002 0700430 5110101 103413 001785 9999 $115,322.00 TPW Inspection Staff 56002 2060000 103413 RETAIN Retainage FID $6,958,709.00 $3,598,735.00 i 1 30100 0200431 5740010 103413 002480 9999 $480,706.25 To Pay Contractor 30100 0200431 5740010 103413 002480 9999 $48,071.00 Contract Contingency I 3 30100 0200431 5330500 103413 002484 9999 $26,439.00 Soil Lab Consultant 3 30100 0200431 5310350 103413 002484 9999 $15,863.00 Soil Lab TPW Staff 3 30100 0200431 5310350 103413 002485 9999 $52,878.00 TPW Inspection Staff 30100 2060000 103413 RETAIN Retainage FID $623,957.25 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 0005 10-1 MAYOR AND COUNCIL COMMUNICATION (M&C) Pagel of 2 SECTION 00 05 10 MAYOR AND COUNCIL COMMUNICATION (M&C) [Assembler: For Contract Document execution, remove this page and replace with the approved M&C for the award of the project. M&C insert shall be on blue paper.] CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 WATER AND SANITARYSEWER REPLACEMENT CPN: 103413 000510-2 MAYOR AND COUNCIL COMMUNICATION (M&C) Page 2 of 2 END OF SECTION CITY OF FORT WORTH WATER AND SANITARYSEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised July 1, 2011 FORTWORTH. ADDENDUM TO INVITATION TO BID NO. 24-0213 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2020 WSM-M (Unit 1&2 and Unit 3 Paving- Rondo Drive) ADDENDUM NO. 1 INVITATION TO BID (ITB): 24-0213 BID OPENING DATE: June 06, 2024 DATE ISSUED: May 28, 2024 ITB No. 24-0213, issued May 09, 2024, is hereby amended as follows: 1. Contractor to start and complete Rondo Drive (water, sewer and paving) first before commencing with the rest of the project. 2. Signed Cover Sheet is attached. 3. Sheet 2 of 83 has been revised. Updated sheet attached. 4. Sheet 25 of 83 has been revised. Updated sheet attached. 5. Sheet 33 of 83 has been revised. Updated sheet attached. 6. Sheet 34 of 83 has been revised. Updated sheet attached. 7. Sheet 34 A has been added. New Sheet attached. 8. Sheet 58 A has been added. New Sheet attached. 9. Sheet 72 of 83 has been revised. Updated sheet attached. 10. Sheet 72 A has been added. New Sheet attached. 11. Sheet 83 A has been added. New Sheet attached. 12. Bid proposal workbook has been replaced in its entirety. All other terms and,c, nditions remain unchanged. ��iJ TONY SHOLOLA, P.E. ASSISTANT DIRECTOR, WATER DEPARTMENT ■ r■ r r r r r a r r r r r r r r a a r r r r r r r r r r r r ............................ a r r r r r r a r a r r r r r r r r r l By the signature affixed below, Addendum No. 1 is hereby incorporated into and made part of the above referenced Invitation to Bid. COMPANY NAME: V1 Nam% C') ", C-r(� — SIGNATURE: J454t A&.� NOTE: Company name and signature must be the same as on the original bid documents. Failure to return this form with your sealed bid may constitute grounds for rejection of your offer. FORTWORTH, ADDENDUM TO INVITATION TO BID NO. 24-0213 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2020 WSM-M (Unit 1&2 and Unit 3 Paving- Rondo Drive) ADDENDUM NO. 2 INVITATION TO BID (ITB): 24-0213 BID OPENING DATE: June 06, 2024 DATE ISSUED: May 31, 2024 ITB No. 24-0213, issued May 09, 2024, is hereby amended as follows: 1. Sheet 2 of 83 has been revised. Updated sheet attached. 2. Sheet 34A of 83 has been revised. Updated sheet attached. 3. Sheet 34 B has been added. New Sheet attached. 4. Sheet 40 of 83 has been revised. Updated sheet attached. 5. Sheet 41 of 83 has been revised. Updated sheet attached. 6. Sheet 42 of 83 has been revised. Updated sheet attached. 7. Sheet 42A has been added. New Sheet attached. 8. Sheet 42 B has been added. New Sheet attached. 9. Sheet 75 of 83 has been revised. Updated sheet attached. 10. Sheet 76 of 83 has been revised. Updated sheet attached. 11. Sheet 77 of 83 has been revised. Updated sheet attached. 12. Bid proposal workbook has been replaced in its entirety. 13. Responses to the questions for this project are as follows, Water: • Need tree removal items for waterline W-6 on sheet 20. Pay items will be added. Please see updated bid proposal workbook. • Rondo, sheets 75-77, Delete bid item 46 " 6" temporary water services (Includes fire lines) (Rondo)". Leave the existing 8" waterline active instead of installing a 6" temporary line since the proposed line is in a separate ditch. Leaving the existing line active throughout construction of proposed waterline would reduce the amount of times the fire lines would have to be shut down to make connections. The water line shall be replaced in the same trench per the plans. • Does the city want gate valves on each side of the fire line tees? No, it is not required. • We have a bid item for 4' wide asphalt pavement repair, residential but we don't have one for extra width, beyond defined width, residential to be paid by SY. Could you add that item with about 150 SY? Pay items will be added. Please refer to updated bid proposal workbook. Bid item 39 is for Asphalt paving repair, industrial (Rondo) but I don't see where we would install permanent asphalt in Rondo. We're putting temporary asphalt over the ditches since we're doing POL after and both ends of the waterline are in concrete paving so they'll get concrete pavement repair, which we have items for. If I'm correct could you delete item 39 and if not could you tell me where the permanent asphalt is? This bid item is for temporary asphalt pavement repair outside of the defined temporary trench repair. For clarification, the Bid Proposal workbook has been updated to include "Temporary" on bid item 40. • What is bid item 58- 6" flexbase 250 SY for? This is for repair/replacement of gravel driveways. Please see updated bid proposal workbook for updated quantities. • Could you delete bid item 60- Utility adjustment 1 LS? I'm not sure what that item is for, if you can't delete it could you give it an allowance? The bid item has been deleted. Sewer: • Lines S-5 & S-5, possibly others, we will need to take down fences / place temporary fences to give us room to work. There are bid items for fences and temporary fences but has the city obtained temporary easements? Contractor will need to obtain Temporary Right of Entry (TROE) from residents prior to construction. • There are a lot of alleys that have notes saying that the trees should be protected but some of those trees may need to be removed in order for us to have room to work. Line S-6 on sheet 35 is a good example of this because the proposed line is 17' deep and we will need a big machine and room to swing, just because the trunk is located on the fence line doesn't mean that the canopy isn't in conflict. Contractor shall contact appropriate owner before removing trees and secure tree removal permit from City Forester. Station 0+00 on sheets 40 & 42, could we leave those cast in place manholes in and core them to make them drop manholes instead of removing and replacing them. The manholes seemed to be in good condition and it would save the city money on some bypass pumping if we aren't required to completely remove them. The bid item could something like "Modify existing manhole to create drop manhole by coring, including removal of existing liner and replacement with new epoxy manhole liner". Pay item will be provided as recommended above to also include rehabilitation of the manhole if necessary. A pay item will also be provided for new epoxy manhole liner at 250 Mils. • There is a bid item for 6" sewer services on Rondo, will we be required to install manholes at the ROW on those services? If so, please make sure we have enough manhole quantities for them. Do you know which properties have 6" services? There are no 6" sewer services per plans. Pay item will be removed. • We need a bid item for Epoxy Manhole Liner at 250 Mils and bid item 16 in unit 2 needs to be revised to clarify that it is for 125 mils. This item would be used if we were to leave an existing manhole in place that required liner or if we do a major adjustment on a manhole that requires epoxy liner. We need items for both thicknesses because 125 mils is required on new structures and 250 mils is required on existing structures. A pay item for Epoxy Manhole Liner at 250 Mils will be provided. Please see updated bid proposal workbook. • Sheet 36 calls for 100' of 8" PVC sewer 150 psi but we don't have a bid item for that. The 100' is lumped in with the rest of the 8" PVC sewer. Could you reduce the quantity of bid item 4 by 100' and give us an item for 8" PVC sewer, 150 psi - 100 LF? A Pay item will be added. Please refer to updated bid proposal workbook. • Bid item 35 is for Asphalt paving repair, industrial (Rondo) but I don't see where we would install permanent asphalt in Rondo (same question as in the water section) This bid item is for temporary asphalt pavement repair outside of the defined temporary trench repair. For clarification, the Bid Proposal workbook has been updated to include "Temporary" on bid item 36. Paving: • Will TPW be doing the POL on Rondo or will the contractor be doing that work? Notes have been deleted. Please see the updated plan sheets. Contract time: • The 450 calendar days in the agreement is not enough time to complete this project. Could you change the contract time to 630 calendar days? Contract time has been changed to 570 calendar days. All other terms and conditions remain unchanged. O TONY SHOLOLA, P.E. ASSISTANT DIRECTOR, WATER DEPARTMENT .................. 0 0 N H 0 0 a K K 0 0 0 0 N N 0 N N ...... 0 0 0 0 0 ■ • • • • • • • • • • • • • • • • • • • • • • • • • • • • • ■ ■ By the signature affixed below, Addendum No. 1 is hereby incorporated into and made part of the above referenced Invitation to Bid. COMPANY NAME: VriNvs SIGNATURE: .2t� NOTE: Company name and signature must be the same as on the original bid documents. Failure to return this form with your sealed bid may constitute grounds for rejection of your offer. FORT WORTH„ ADDENDUM TO INVITATION TO BID NO. 24-0213 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2020 WSM-M (UNIT 1&2 AND UNIT 3 PAVING -RONDO DRIVE) WATER DEPARTMENT ADDENDUM NO. 3 DATE ISSUED: June 4, 2024 INVITATION TO BID (ITB): 24-0213 BID OPENING DATE: June 06, 2024 (CHANGED) REVISED BID OPENING DATE: June 13, 2024 ITB No. 24-0213, issued May 8, 2024, is hereby amended as follows: 1. The Bid Opening Date has been changed from June 6, 2024 to June 13, 2024 2. TECHNICAL SPECIFICATIONS a. Section 00 41 00 BID FORM Bid Form to be REPLACED in its entirety with the attached revised Bid Form. Changes to the original include: 1. Updating the Contract Time from 450 days to 630 days. b. Section 00 52 43 AGREEMENT Agreement to be REPLACED in its entirety with the attached revised Agreement. Changes to the original include: 1. Updating the Final Acceptance contract time from 450 days to 630 days. All other terms and conditions remain unchanged. /7 TONY SHOLOLA, P.E. ASSISTANT DIRECTOR, WATER DEPARTMENT ............................................................................... By the signature affixed below, Addendum No. 3 is hereby incorporated into and made part of the above referenced Invitation to Bid. COMPANY NAME: SIGNATURE: NOTE: Company name and signature must be the same as on the original bid documents. Failure to return this form with your sealed bid may constitute grounds for rejection of your offer. ITB 24-0213 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2020 WSM-M (UNIT 1&2 AND UNIT 3 PAVING -RONDO DRIVE) Addendum No. 3, Page 1 of 1 0041 00 BID FORM Page 1 of 3 SECTION 00 41 00 BID FORM TO: The Purchasing Manager c/o: The Purchasing Division 200 Texas Street City of Fort Worth, Texas 76102 FOR: WATER AND SANITARY REPLACEMENT 2020 WSM-M City Project No.: 103413 Units/Sections: Unit 1: Water Improvements Unit 2: Sewer Improvements 1. Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of City (b) to establish Bid prices at artificial non-competitive levels, or (c) to deprive City of the benefits of free and open competition. c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of City, a purpose of which is to establish Bid prices at artificial, non- competitive levels. d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 00 41 00 Bid Proposal Workbook.xlsx property to influence their participation in the bidding process or affect the execution of the Contract. 3. Prequalification 0041 00 BID FORM Page 2 of 3 The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors: a. Water Distribution, Urban and Renewal, 8-inch diameter and smaller b. Sewer Collection System, 18-inch and smaller C. Sanitary Sewer Manholes/Structure Interior Lining (Warren or Chesteron) Coating d. Asphalt Paving Construction/Reconstruction (15,000 SY and less) 4. Time of Completion 4.1. The Work will be complete for Final Acceptance within 630 days after the date when the the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work {and/or achievement of Milestones} within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form, Section 00 41 00 b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. c. Proposal Form, Section 00 42 43 d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37 e. MWBE Forms (optional at time of bid) f. Prequalification Statement, Section 00 45 12 g. Conflict of Interest Affidavit, Section 00 35 13 *If necessary, CIQ or CIS forms are to be provided directly to City Secretary h. Any additional documents that may be required by Section 12 of the Instructions to Bidders 6. Total Bid Amount CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 00 41 00 Bid Proposal Workbook.xlsx 0041 00 BID FORM Page 3 of 3 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project. Only this figure will be read publicly by the City at the bid opening. 6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts. Total Bid 7. Bid Submittal This Bid is submitted on Respectfully submitted, By: (Signature) (Printed Name) Title: Company: Address: State of Incorporation: Email: Phone: END OF SECTION #REF! by the entity named below. Receipt is acknowledged of the following Addenda: Addendum No. 1: Addendum No. 2: Addendum No. 3: Addendum No. 4: Corporate Seal: Initial CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 00 41 00 Bid Proposal Workbook.xlsx 00 52 43 - 1 Agreement Page 1 of 6 SECTION 00 52 43 AGREEMENT THIS AGREEMENT, authorized on , is made by and between the City of Fort Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager, ("City"), and , authorized to do business in Texas, acting by and through its duly authorized representative, ("Contractor"). City and Contractor may jointly be referred to as Parties. City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK Contractor shall complete all Work as specified or indicated in the Contract Documents for the Project identified herein. Article 2. PROJECT The project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: Water and Sanitary Sewer Replacement. 2020 WSM-M Citv Proiect No. 103413 Article 3. CONTRACT PRICE City agrees to pay Contractor for performance of the Work in accordance with the Contract Documents an amount, in current funds, of Dollars ($ ). Contract price may be adjusted by change orders duly authorized by the Parties. Article 4. CONTRACT TIME 4.1 Final Acceptance. The Work shall be complete for Final Acceptance within 630 days after the date when the Contract Time commences to run, as provided in Paragraph 2.02 of the General Conditions, plus any extension thereof allowed in accordance with Article 12 of the General Conditions. 4.2 Liquidated Damages Contractor recognizes that time is of the essence for completion of Milestones, if any, and to achieve Final Acceptance of the Work and City and the public will suffer from loss of use if the Work is not completed within the time(s) specified in Paragraph 4.1 above. The Contractor also recognizes the delays, expense and difficulties involved in proving in a legal proceeding, the actual loss suffered by the City if the Work is not completed on time. Accordingly, instead of requiring any such proof, Contractor agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay City Six Hundred and Fiftv Dollars ($650.00) for each day that expires after the time specified in Paragraph 4.1 for Final Acceptance until the City issues the Final Letter of Acceptance. OFFICIAL RECORD Article 5. CONTRACT DOCUMENTS 5.1 CONTENTS: CITY SECRETARY FT. WORTH, TX A.The Contract Documents which comprise the entire agreement between City and Contractor concerning the Work consist of the following: CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised March 3, 2024 00 52 43 - 2 Agreement Page 2 of 6 1. This Agreement. 2. Attachments to this Agreement: a. Bid Form 1) Proposal Form 2) Vendor Compliance to State Law Non -Resident Bidder 3) Prequalification Statement 4) State and Federal documents (project specific) b. Current Prevailing Wage Rate Table c. Insurance Certification Form (ACORD or equivalent) d. Payment Bond e. Performance Bond f. Maintenance Bond g. Power of Attorney for the Bonds h. Worker's Compensation Affidavit i. MBE and/or SBE Utilization Form 3. General Conditions. 4. Supplementary Conditions. 5. Specifications specifically made a part of the Contract Documents by attachment or, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents. 6. Drawings. 7. Addenda. 8. Documentation submitted by Contractor prior to Notice of Award. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. Article 6. INDEMNIFICATION 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the city, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under this contract. This indemnification provision is specifically intended to operate and be effective even if it is alleged or proven that all or some of the damages being, sought were caused, in whole or in part, by anv act, omission or ne ligence of the citv. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the city in defending against such claims and causes of actions. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised March 3, 2024 00 52 43 - 3 Agreement Page 3 of 6 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the city, arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licensees or invitees under this contract. This indemnification Drovision is specifically intended to operate and be effective even if it is alleged or proven that all or some of the damages being sought were caused, in whole or in Dart, by anv act, omission or negligence of the citv. Article 7. MISCELLANEOUS 7.1 Terms. Terms used in this Agreement which are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions. 7.2 Assignment of Contract. This Agreement, including all of the Contract Documents may not be assigned by the Contractor without the advanced express written consent of the City. 7.3 Successors and Assigns. City and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, in respect to all covenants, agreements and obligations contained in the Contract Documents. 7.4 Severability/Non-Waiver of Claims. Any provision or part of the Contract Documents held to be unconstitutional, void or unenforceable by a court of competent jurisdiction shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon City and Contractor. The failure of City or Contractor to insist upon the performance of any term or provision of this Agreement or to exercise any right granted herein shall not constitute a waiver of City's or Contractor's respective right to insist upon appropriate performance or to assert any such right on any future occasion. 7.5 Governing Law and Venue. This Agreement, including all of the Contract Documents is performable in the State of Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the Northern District of Texas, Fort Worth Division. 7.6 Authority to Sign. Contractor shall attach evidence of authority to sign Agreement if signed by someone other than the duly authorized signatory of the Contractor. OFFICIAL RECORD 7.7 Non -appropriation of Funds. CITY SECRETARY FT. WORTH, TX In the event no funds or insufficient funds are appropriated by City in any fiscal period for any payments due hereunder, City will notify Vendor of such occurrence and this Agreement shall terminate on the last day of the fiscal period for which appropriations were received without penalty or expense to City of any kind whatsoever, except as to the portions of the payments herein agreed upon for which funds have been appropriated. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised March 3, 2024 00 52 43 - 4 Agreement Page 4 of 6 7.8 Prohibition On Contracts With Companies Boycotting Israel. Contractor, unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of the Texas Government Code, if Contractor has 10 or more full time -employees and the contract value is $100,000 or more, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Contractor certifies that Contractor's signature provides written verification to the City that if Chapter 2271, Texas Government Code applies, Contractor: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. 7.9 Prohibition on Boycotting Energy Companies. Contractor acknowledges that in accordance with Chapter 2276 of the Texas Government Code, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more, which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meaning ascribed to those terms by Chapter 2276 of the Texas Government Code. To the extent that Chapter 2276 of the Government Code is applicable to this Agreement, by signing this Agreement, Contractor certifies that Contractor's signature provides written verification to the City that Contractor: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. 7.10 Prohibition on Discrimination Against Firearm and Ammunition Industries. Contractor acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Contractor certifies that Contractor's signature provides written verification to the City that Contractor: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX CITY OF FORT WORTH WATER AND SANITARYSEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised March 3, 2024 005243-5 Agreement Page 5 of 6 7.11 Immigration Nationality Act. Contractor shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Contractor shall provide City with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Contractor shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Contractor employee who is not legally eligible to perform such services. CONTRACTOR SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY CONTRACTOR, CONTRACTOR'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Contractor, shall have the right to immediately terminate this Agreement for violations of this provision by Contractor. 7.12 No Third -Party Beneficiaries. This Agreement gives no rights or benefits to anyone other than the City and the Contractor and there are no third -party beneficiaries. 7.13 No Cause of Action Against Engineer. Contractor, its subcontractors and equipment and materials suppliers on the PROJECT or their sureties, shall maintain no direct action against the Engineer, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the City will be the beneficiary of any undertaking by the Engineer. The presence or duties of the Engineer's personnel at a construction site, whether as on -site representatives or otherwise, do not make the Engineer or its personnel in any way responsible for those duties that belong to the City and/or the City's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The Engineer and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX CITY OF FORT WORTH WATER AND SANITARYSEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised March 3, 2024 00 52 43 - 6 Agreement Page 6 of 6 IN WITNESS WHEREOF, City and Contractor have each executed this Agreement to be effective as of the date subscribed by the City's designated Assistant City Manager ("Effective Date"). Contractor: By: Signature (Printed Name) Title Address FCity/State/Zip Date CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 3, 2024 City of Fort Worth Fernando Costa Assistant City Manager Date Attest: Jannette Goodall, City Secretary (Seal) M&C: Date: Approved as to Form and Legality: Douglas W. Black Sr. Assistant City Attorney WATER AND SANITARY SEWER REPLACEMENT CPN: 103413 FORTWORTH. ADDENDUM TO INVITATION TO BID NO. 24-0213 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2020 WSM-M (UNIT 1&2 AND UNIT 3 PAVING -RONDO DRIVE) WATER DEPARTMENT ADDENDUM NO. 4 DATE ISSUED: June 7, 2024 INVITATION TO BID (ITB): 24-0213 BID OPENING DATE: June 13, 2024 ITB No. 24-0213, issued May 8, 2024, is hereby amended as follows: 1. PLANS 1.1 Sheet 62 of 83 Sheet 62 to be REPLACED in its entirety with the attached revised Sheet 62 2. TECHNICAL SPECIFICATIONS 2.1 Section 00 42 43 PROPOSAL FORM Proposal Form to be REPLACED in its entirety with the attached revised Proposal Form. Changes to the original include: RENUMBERED Unit 1 — Water Improvements bid items list due to items shown below: a. REMOVED Bid Item 5 "Imported Embedment/Backfill, CLSM, CY — 472 CY" ii. REVISED Description of Unit 1 — Water Improvements Bid Items 8 — 15 (Revised Numbering) Waterline Lowerings to include ", Including CLSM Embedment/Backfill" iii. REVISED Specification Section No. of Unit 1 —Water Improvements Bid Items 8 —15 (Revised Numbering) Waterline Lowerings to include "03 34 13" iv. RENUMBERED Unit 2 — Sewer Improvements bid items list due to items shown below: a. ADDED Bid Item 3 "16" DIP Minimum Pressure Class 250 Sewer (w/ Epoxy Lining Protecto 401 Or Equal), CLSM Backfill, LF — 10 LF" b. ADDED Bid Item 6 "8" SDR26 Sewer Pipe, CLSM Backfill, LF — 16 LF" c. ADDED Bid Item 9 "8" DIP Minimum Pressure Class 350 Sewer Pipe (w/ Epoxy Lining Protecto 401 Or Equal), CLSM Backfill, LF — 55 LF" d. REMOVED Bid Item 7 "Imported Embedment/Backfill, CLSM, CY — 34 CY" REVISED quantities of Unit 2 Sewer Improvements Bid Items 2, 5, and 8 (Revised Numbering) Sewer Pipe ITB 24-0213 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2020 WSM-M (UNIT 1&2 AND UNIT 3 PAVING -RONDO DRIVE) Addendum No. 4, Page 1 of 2 vi. REVISED quantities of Unit 2 Sewer Improvements Bid Items 32 - 35 (Revised Numbering) Tree Removals All other terms and conditions remain unchanged. TONY SHOLOLA, P.E. ASSISTANT DIRECTOR, WATER DEPARTMENT ..................................................................... 0 M M 9 ... 1 By the signature affixed below, Addendum No. 4 is hereby incorporated into and made part of the above referenced Invitation to Bid. COMPANY NAME: V ,ter Cv<-i7 -c,�rr SIGNATURE: It NOTE: Company name and signature must be the same as on the original bid documents. Failure to return this form with your sealed bid may constitute grounds for rejection of your offer. ITB 24-0213 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2020 WSM-M (UNIT 1 &2 AND UNIT 3 PAVING -RONDO DRIVE) Addendum No. 4, Page 2 of 2 Bidlist Item Specification Section Unit of Bid No. Description No. I Measure Quantity Unit 1 - Wa'er Improvements 1 3311.0461 12" PVC DR14 Water Pipe (Rondo) 33 11 12 LF 21 2 3311.0261 8" PVC DR14 Water Pipe 33 11 12 LF 11,362 3 3311.0161 6" PVC DR14 Water Pipe 33 11 12 LF 247 4 3311.0251 8" DIP Water (Rondo) 33 11 10 LF 24 5 3305.1003 20" Casing By Open Cut 33 05 22 LF 20 6 3312.3003 8" Gate Valve 33 1220 EA 47 7 3312.3002 6" Gate Valve 33 12 20, 03 EA 17 3305.0003 8" DIP Waterline in 20" Steel Encasement Lowering A (Line W-1, STA 8+02), Including CLSM 33 05 12, 03 34 13 EA 1 8 Embedment/Backfill 3305.0003 8" DIP Waterline in 20" Steel Encasement 9 Lowering B (Line W-2, STA 5+44), 33 05 12, 03 34 13 EA 1 Includup_ CLSM EmbedmentBackfill 3305.0003 8" DIP Waterline in 20" Steel Encasement Lowering C (Line W-3, STA 1+36), Including CLSM 33 05 12, 03 34 13 EA 1 10 EmbedmentBackfill 3305.0003 8" DIP Waterline in 20" Steel Encasement Lowering D (Line W-3, STA 7+83), Including CLSM 33 05 12, 03 34 13 EA 1 1 EmbedmentBackfill 3305.0003 8" DIP Waterline in 20" Steel Encasement 12 Lowering E (Line W-4, STA 0+49), Including CLSM 33 05 12, 03 34 13 EA 1 EmbedmentBackfill 3305.0003 8" DIP Waterline in 20" Steel Encasement Lowering F (Line W-5, STA 0+13), Including CLSM 33 05 12, 03 34 13 EA 1 13 EmbedmentBackfill 3305.0003 8" DIP Waterline in 20" Steel Encasement 14 Lowering G (Line W-7, STA 2+58), Including CLSM 33 05 12, 03 34 13 EA 1 EmbedmentBackfill 3305.0003 8" Waterline Lowering (Rondo), 33 05 12, 03 34 13 EA 1 15 Including CLSM EmbedmentBackfill 16 3312.0117 Connection to Existing 4"-12" Water Main 33 1225 EA 17 17 3312.2001 1" Water Service, Meter Reconnection 33 1210 EA 301 18 3312.2003 1" Water Service 33 1210 EA 301 19 3312.2004 1" Private Water Service 33 1210 LF 222 3312.2101 1 1/2" Water Service, Meter Reconnection 33 1210 EA 4 20 (Rondo) 21 3312.2103 1 1/2" Water Service (Rondo) 33 1210 EA 4 22 3312.2801 3" Water Meter and Vault (Rondo) 33 1211 EA 1 9999.0001 3" Water Service, Meter Reconnection EA 1 23 (Rondo) 24 9999.0002 3" Private Water Service (Rondo) LF 4 25 0241.1511 Salvage 3/4" Water Meter (Rondo) 0241 14 EA 12 26 0241.1513 Salvage 1 1/2" Water Meter (Rondo) 0241 14 EA 4 27 0241.1515 Salvage 3" Water Meter (Rondo) 0241 14 EA 1 28 3312.0001 Fire Hydrant 33 1240 EA 13 29 3311.0001 Ductile Iron Water Fittings w/ Restraint 33 11 11 TON 6 30 0241.1302 Remove and Salvage 6" Water Valve 0241 14 EA 22 31 0241.1303 Remove and Salvage 8" Water Valve 0241 14 EA 6 32 0241.1602 Remove Concrete Water Vault 0241 14 EA 1 33 0241.1510 Salvage Fire Hydrant 0241 14 EA 12 34 0241.1001 Water Line Grouting 0241 14 CY 35 35 0241.1218 4"-12" Water Abandonment Plug 0241 14 EA 19 36 3110.0105 24" and Larger Tree Removal 31 1000 EA 5 37 3201.0111 4' Wide Asphalt Pvmt Repair, Residential 3201 17 LF 1,656 3201.0201 Asphalt Pvmt Repair Beyond Defined 3201 17 SY 150 38 Width. Residential 39 3201.0203 Temporary Asphalt Pvmt Repair Beyond 3201 17 SY 235 Defined Width, Industrial Tondo) 3201.0400 Temporary Aspalt Pavement Repair (2" 320117 LF 12,931 40 HMAC on 6" Flexible Base) 41 3201.0614 Conc Pvmt Repair, Residential 32 01 29 SY 46 42 3201.0616 Conc Pvmt Repair, Arterial/Industrial 32 01 29 SY 770 43 3201.0654 Conc Pvmt Repair, HES, Residential 32 01 29 SY 100 00 42 43 BID PROPOSAL Page 1 of 7 ADDENDUM Unit Price I Bid Value CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 00 41 00 Bid Proposal Workbook_Addend=4 xlsx Bidlist Item No. 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 61 62 63 64 65 66 67 68 69 70 71 72 I 73 74 75 I 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 00 42 43 BID PROPOSAL Page 2 of 7 ADDENDUM Description Specification Section Unit of Bid Unit Price Bid Value No. Measure Quantity 3292.0201 Utility Service Surface Restoration 32 92 13 SY 244 Seedine 3304.0101 Temporary Water Services 33 04 30 LS 1 3304.0101 6" Temporary Water Services(Includes 33 04 30 LS 1 Fire Lines) (Rondo) 3305.0103 Exploratory Excavation of Existing 33 0530 EA 11 Utilities 3471.0001 Traffic Control 3471 13 MO 14 3471.002 Portable Message Sign 3471 13 WK 12 0171.0101 Construction Staking 01 71 23 LS 1 0171.0102 As -Built Survey 01 71 23 LS 1 3125.0101 SWPPP > 1 acre 31 25 00 LS 1 3305.0108 Miscellaneous Utility Adjustment(Irrigation 33 05 14 LS 1 $20,000.00 $20,000.00 adiustments) 0241.0703 Remove and Replace Mailbox - Brick 0241 13 EA 5 0241.0704 Remove and Replace Mailbox - Traditional 0241 13 EA 5 3217.0102 6" SLD Pvmt Marking HAS (Y) 32 1723 LF 1,520 3217.0103 6" BRK Pvmt Marking HAS (W) 32 1723 LF 760 3211.0112 6" Flexible Base, Type A, GR-1 32 1123 SY 50 3213.0311 4" Conc Sidewalk, Adjacent to Curb 32 1320 SF 410 0241.1300 Remove Existing Concrete Curb and 0241 15 LF 1,930 Gutter 3216.0101 Install New 6" Concrete Curb and Gutter 32 1613 LF 2,160 0241.0401 Remove Existing Concrete Driveway 0241 13 SF 4,521 3213.0401 Install New 6-Inch Concrete Driveway 32 1320 SF 3,771 3213.0403 8" Concrete Driveway (Rondo) 32 1320 SF 1,050 0241.0100 Remove Concrete Sidewalk 0241 13 SF 2,020 3213.0322 Concrete Curb, Back of Sidewalk 32 1320 LF 150 3213.0301 4" Concrete Sidewalk 32 1320 SF 1,610 0241.0300 Remove Existing Wheelchair Ramp 0241 13 EA 8 3213.0501 Barrier Free Ramp, Type R-1 32 1320 EA 3 3213.0506 Barrier Free Ramp, Type P-1 32 1320 EA 6 0241.1400 Remove Existing Concrete Valley Gutter 0241 15 SY 301 3216.0301 Install New 7" Concrete Valley Gutter 32 1613 SY 301 0241.1700 12-Inch Pavement Pulverization (Rondo) 0241 15 SY 2,313 0241.1700 11-inch Pavement Pulverization 0241 15 SY 17,035 3211.0601 cem-Lime Stabilization @ 32 lbs/sy 32 1129 TN 310 3123.0101 Unclassified Street Excavation 3123 16 CY 663 3305.0202 hnported Embedment/Backfill, CSS 33 05 10 CY 20 5Mo on .d02 4 Imported Embedment/Backfill, Crushed Rock (Rondo) 33 05 10 CY 20 3305.0207 hnported Embedment/Backfill, Select Fill 33 05 10 CY 20 (Rondo) 3212.0303 3-Inch Surface Coarse Asphalt, Type "D" 32 1216 SY 17,035 3305.0111 Water Valve Box Adjustment with 33 05 14 EA 47 Concrete Collar 3305.0107 Manhole Adjustment with Concrete Collar 33 05 14 EA 9 3217.5001 Painting Curb Addresses 32 1725 EA 180 3291.0100 Topsoil 3291 19 CY 86 3292.01 Block Sod Replacement 32 92 13 SY 456 3349.5006 Remove and Replace Inlet Top, 10' 34 49 20 EA 5 3212.0401 HMAC Transition 32 1216 TN 30 3212.0600 HMAC Pavement Level Up 32 1216 TN 20 3212.0302 2-Inch Surface Course Asphalt PG 70-22 32 1216 SY 2,313 Tv�e "D" ondo) 3212.0501 2-Inch Surface Course Asphalt, PG 64-22 Tvoe" B" (Rondo) 32 1216 SY 2,313 3212.0302 2" Asphalt Pvmt Type D 32 1216 SY 5,780 0241.1506 2" Surface Milling 0241 15 SY 5,780 9999.0003 Tree Protection 31 1000 EA 17 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 00 41 00 Bid Proposal Workbook_Addend=4 xlsx 00 42 43 BID PROPOSAL Page 3 of 7 ADDENDUM Bidlist Item Description Specification Section Unit of Bid Unit Price Bid Value No. No. Measure Quantity 95 9999.0004 Remove and Replace Concrete Flume 32 13 13 LS 1 9999.0005 Reconnect to 6" Fire Department EA 5 96 Connectionrondol 97 9999.0006 econnect to 8" Fire Department EA 3 Connection (Rondo) 98 9999.0007 Water Construction Allowance LS 1 $150,000.00 $150,000.00 Sub -Total Unit 1- Water Improvements: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 00 41 00 Bid Proposal Workbook_Addend=4 xlsx Bidlist Item Specification Section Unit of Bid No. Description No. I Measure Quantity Unit 2 - Sewer Improvements 1 3331.4225 18" ASTM F679 Sewer Pipe 33 11 10, 33 31 12, 33 LF 468 3120 Z 3331.4222 16" DIP Minimum Pressure Class 250 33 11 10 LF 21 Sewer w/ Epg L' mp Protecto 401 Or Eaual 3331. 755 16" D1P1nMmimim Pressure Class 2 0 3 Sewer (w/ Epoxy Lining Protecto 401 Or Equal), 33 11 10, 03 34 13 LF 10 CLSM Backfill 4 3331.4215 15" SDR26 Sewer Pipe 33 11 10, 33 31 12,33 LF 504 3120 5 3331.4115 8" SDR26 Sewer Pipe 33 11 10, 33 31 12,33 LF 4,762 3120 6 3331.5747 8" SDR26 Sewer Pipe, CLSM Backfill 33 11 10, 33 31 12,33 LF 16 31 20. 03 34 13 7 3331.4115 8" SDR26 (Min 150 PSI) Sewer Pipe 33 11 10, 33 31 12,33 LF 100 3120 8 3331.4119 8" DIP Minimum Pressure Class 350 33 1110 LF 869 Sewer Pipe (w/ Epoxy Lining Protecto 401 Or Equal) 3331.4119 8" DIP Minimum Pressure Class 350 9 Sewer Pipe (w/ Epoxy Lining Protecto 401 Or Equal), 33 11 10, 03 34 13 LF 55 CLSM Backfill 10 3331.3101 4" Sewer Service 33 3150 EA 120 11 3331.3105 4" Private Sewer Service 33 3150 LF 1,840 12 3331.3102 4" 2-Way Cleanout(Private) 33 3150 EA 16 13 3339.1101 5' Manhole 33 39 10, 33 39 20 EA 2 14 3339.1001 4' Manhole 33 39 10, 33 39 20 EA 31 15 3339.1103 5' Extra Depth Manhole 33 39 10, 33 39 20 VF 9 16 3339.1003 4' Extra Depth Manhole 34 39 10, 33 39 20 VF 114 9999.0001 Modify existing manhole to create drop 17 manhole/hydraulic slide by coring, including removal 33 39 10, 33 39 20 EA 3 of existina liner 18 3339.0001 Epoxy Manhole Liner(Exist SSMH, 250 33 39 60 VF 53 mils, Warren or A.W. Chesterton or Approved Equal) 19 3339.0001 Epoxy Manhole Liner (New SSMH, 150 33 39 60 VF 123 mils, Warren or A.W. Chesterton or Approved Equal) 20 9999.0002 Connect to Existing Manhole 33 39 10, 33 39 20 EA 3 21 3303.0001 Bypass Pumping 33 03 10 LS 1 22 0241.2106 15" Sewer Abandonment Plug 0241 14 EA 4 23 0241.2104 10" Sewer Abandonment Plug 0241 14 EA 2 24 0241.2103 8" Sewer Abandonment Plug (Rondo) 0241 14 EA 2 25 0241.2102 6" Sewer Abandonment Plug 0241 14 EA 2 26 0241.2101 4" Sewer (Service) Abandonment Plug 0241 14 EA 42 27 0241.2202 Remove 5' Sewer Manhole 0241 14 EA 5 28 0241.2201 Remove 4' Sewer Manhole 0241 14 EA 9 29 0241.5001 Abandon Manhole 0241 14 EA 6 30 0241.0500 Remove Fence 0241 13 LF 640 31 0241.2001 Sanitary Line Grouting 0241 14 CY 37 32 3110.0102 6"-12" Tree Removal 31 1000 EA 28 33 3110.0103 12"-18" Tree Removal 31 1000 EA 18 34 3110.0104 18"-24" Tree Removal 31 1000 EA 8 35 3110.0105 24" and Larger Tree Removal 31 1000 EA 10 36 9999.0008 Tree Protection 31 1000 EA 29 37 3201.0112 5' Wide Asphalt Pvmt Repair, Residential 3201 17 LF 206 38 3201.0201 Asphalt Pvmt Repair Beyond Defined 3201 17 SY 35 Width Residential 39 3201.0&3 Temporary Asphalt Pvmt Repair Beyond 3201 17 SY 179 Defined Width. Industrial (Rondo) 3201.0400 Temporary Asphalt Pavement Repair 40 (2" 320117 LF 3,434 BMAC on 6" Flexible Base) 41 3201.0614 Conc Pvmt Repair, Residential 32 01 29 SY 70 42 9999.0003 Temporary Fencing 3231 13 LF 640 43 3231.0121 4' Chain Link, Aluminum 3231 13 LF 50 00 42 43 BID PROPOSAL Page 4 of 7 ADDENDUM Unit Price I Bid Value CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 00 41 00 Bid Proposal Workbook_Addend=4 xlsx 00 42 43 BID PROPOSAL Page 5 of 7 ADDENDUM Bidlist Item Specification Section Unit of Bid Description Unit Price Bid Value No. No. Measure Quantity 44 3231.0123 6' Chain Link, Aluminum 3231 13 LF 175 45 3231.0131 4' Wrought Iron Fence 3231 13 LF 20 46 3231.0132 5' Wrought Iron Fence 3231 13 LF 15 47 3231.0412 6' Fences, Wood 32 31 29 LF 380 3292.0101 Utility Service Surface Restoration 48 Soddingg_ 3292.0501 Utility Service Surface Restoration 32 92 13 SY 220 49 Seeding 32 92 13 SY 1,817 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 00 41 00 Bid Proposal Workbook_Addend=4 xlsx Bidlist Item No. Description 50 3301.0001 Pre -CCTV Inspection (Rondo) 51 3301.0001 Pre -CCTV Inspection (For Existing Service Locations) 52 3301.0002 Post -CCTV Inspection 53 3301.0002 Final -CCTV Inspection 54 3301.0002 Final- Manhole CCTV Inspection 55 3301.0101 Manhole Vacuum Testing 56 3305.0103 Exploratory Excavation of Existing Utilities 57 3305.0107 Manhole Adjustment, Minor (Rondo) 58 3305.0109 Trench Safety 59 3305.0112 Concrete Collar for Manhole 60 3305.0113 Trench Water Stops (Rondo) 61 3471.0001 Traffic Control 62 3125.0101 SWPPP > 1 acre 63 0171.0102 As -Built Survey 64 0171.0101 Construction Staking 65 0241.13 Remove Existing Concrete Curb and Gutter (Rondo) 66 3216.0101 6" Cone Curb and Gutter (Rondo) 67 0241.0401 Remove Existing Concrete Driveway 68 3213.0401 Install New 6-Inch Concrete Driveway 69 3213.0403 8" Concrete Driveway (Rondo) 70 0241.0100 Remove Concrete Sidewalk 71 3213.0301 4" Concrete Sidewalk 72 0241.1700 12-Inch Pavement Pulverization (Rondo) 73 0241.1700 11-inch Pavement Pulverization 74 3211.0601 cem-Lime Stabilization @ 32 lbs/sy 75 3123.0101 Unclassified Street Excavation 76 3212.0302 2-Inch Surface Course Asphalt PG 70-22 Tvv((��e "D" ondo 77 3212.050 -Inch urface Course Asphalt, PG 64-22 Twe" B" (Rondo) 78 3212.0303 3-Inch Surface Coarse Asphalt, Type "D" 79 3305.0202 Imported Embedment/Backfrll, CSS (Rondo) 80 3305.0204 Imported Embedment/Backfill, Crushed Rock (Rondo) 81 3305.0207 Imported Embedment/Backfrll, Select Fill (Rondo) 82 3217.5001 Painting Curb Addresses 83 3291.0100 Topsoil 84 3292.01 Block Sod Replacement 85 9999.0004 Landscape allowance (for Sewer Service reroute) 86 9999.0005 Sanitary Sewer Construction Allowance Specification Section No. 33 01 31 33 01 31 33 01 31 33 01 31 33 01 31 33 01 30 33 0530 33 05 14 33 05 10 33 05 17 33 05 15 3471 13 31 25 00 01 71 23 01 71 23 0241 15 32 1613 0241 13 32 1320 32 1320 0241 13 32 1320 0241 15 0241 15 32 1129 3123 16 32 1216 32 1216 32 1216 33 05 10 33 05 10 33 05 10 32 1725 3291 19 32 92 13 Unit of Measure LF LF LF LF EA EA EA EA LF EA EA MO LS LS LS LF LF SF SF SF SF SF SY SY TN CY SY SY SY Bid Quantity 1,910 1,000 6,755 6,755 32 32 15 6 6,755 29 2 14 1 1 1 400 445 2,831 2,081 840 545 545 2,313 4,385 103 163 2,313 2,313 4,385 CY 10 CY 10 00 42 43 BID PROPOSAL Page 6 of 7 ADDENDUM Unit Price Bid Value CY 10 EA 47 CY 23 SY 126 LS 1 $60,000.00 $60,000.00 LS 1 $100,000.00 $100,000.00 Sub -Total Unit 2 - Sewer Improvements: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 00 41 00 Bid Proposal Workbook_Addend=4 xlsx 00 42 43 BID PROPOSAL Page 7 of 7 ADDENDUM Bidlist Item Description Specification Section I Unit of Bid Unit Price Bid Value No. No. Measure Quantity Unit 3 - Paving Improvements TPW 50150 (Rondo Dr. ONLY) 3305.0108 Utility Adjustment (Irrigation adjustments) 33 05 14 LS 1 $10,000.00 $10,000.00 M500) /5 )1. 3 Remove Existing Concrete Curb and Gutter 0241 15 LF 750 (50/50) 3 3216.0102 6" Concrete Curb and Gutter (50150) 32 1613 LF 750 4 0241.0401 Remove Concrete Drive (50150) 0241 13 SF 2,500 5 3213.0401 6" Concrete Driveway (50/50) 32 1320 SF 1,000 6 3213.0403 8" Concrete Driveway (50150) 32 1320 SF 1,500 7 0241.0100 Remove 4-Inch Concrete Sidewalk (50150) 0241 13 SF 50 8 3213.0301 Install New 4-hich Concrete Sidewalk 32 1320 SF 50 (50/50) 9 0241.1700 12-Inch Pavement Pulverization (50150) 0241 15 SY 4,625 10 3211.3300 8-hich Chem -Lime Stabilization @ TN 69 32Lbs/SY (50150) 11 3123.0101 Unclassified Street Excavation (50150) 3123 16 CY 25 12 3212.0302 2-hich Surface Course Asphalt PG 70-22 32 1216 SY 4,625 Tvv((��e "D" 50/50 13 3212.050 2-hich Surface Course Asphalt, PG 64-22 Ti�e" B" (�50/50 3305.0111 WatNalve Box Adjustment with 32 1216 SY 4,625 14 Concrete Collar (50/50) 33 05 14 EA 6 15 3217.5001 Painting Curb Addresses (50150) 32 1725 EA 8 16 3291.0100 Topsoil (50150) 3291 19 CY 10 17 3292.0100 Block Sod Replacement (50/50) 32 92 13 SY 50 18 3349.5006 Remove and Replace Inlet Top, 10' (50/50) 33 49 20 EA 2 19 9999.0001 Paving Construction Allowance LS 1 $60,000.00 $60,000.00 Sub -Total Unit 3 - Paving Improvments: Total Bid = Sub -Total Unit 1 + Sub -Total Unit 2 + Sub -Total Unit 3: S END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 00 41 00 Bid Proposal Workbook_Addend=4 xlsx 0011 13 INVITATION TO BIDDERS Pagel of 3 SECTION 00 11 13 INVITATION TO BIDDERS RECEIPT OF BIDS Electronic bids for the construction of Water and Sanitary Sewer Replacement Contract 2020 WSM -M (Unit 1 & 2 and Unit 3 Paving — Rondo Drive) CPN 103413 will be received by the City of Fort Worth via the Procurement Portal httns://fortworthtexas.bonfirehub.com/nortal/?tab=onenOnnortunities, under the respective Project until 2:00 P.M. CST, Thursday, June 06, 2024. Bids will then be opened publicly and read aloud beginning at 2:00 PM CST in the City Council Chambers. In lieu of delivering completed Business Equity (M/WBE) forms for the project to the Purchasing Office, bidders shall e-mail the completed Business Equity forms to the City Project Manager no later than 2:00 PM on the second City Business Day after the bid opening date, exclusive of the bid opening date. Your submissions must be uploaded, finalized and submitted prior to the Project's posted due date. The City strongly recommends allowing sufficient time to complete this process (ideally a week prior to the deadline) to begin the uploading process and to finalize your submission. Uploading large documents may take time, depending on the size of the file(s) and your Internet connection speed. The Bonfire portal can be accessed using Microsoft Edge, Google Chrome, or Mozilla Firefox. Javascript must be enabled. Browser cookies must be enabled. Electronic submission is subject to electronic interface latency, which can result in transmission delays. All bidders or proposers assume the risk of late transmission/ submission. The City shall not be held liable if an interested bidder or proposer is unable to submit a complete bid/response before the published deadline due to transmission delays or any other technical issues or obstructions. The City strongly recommends allowing sufficient time to complete the submission process (ideally a week before the deadline) to begin the uploading process and to finalize your submission to give adequate time in the event an issue arises. All submissions must be submitted electronically prior to the close date and time under the respective Project via the Procurement Portal: httns://fortworthtexas.bonfirehub.com/nortal/?tab=oDenOnnortunities Failure to submit all completed required information listed in the respective Solicitation will be grounds for rejection of a bid as non -responsive. No late bids/proposals shall be accepted. Bids delivered in any other manner than using the Bonfire Platform (Procurement Portal) will not be accepted or considered. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN: 103413 Revised 2/08/24 0011 13 INVITATION TO BIDDERS Page 2 of 3 If, upon being opened, a submission is unreadable to the degree that material conformance to the requirements of the procurement specifications cannot be ascertained, such submission will be rejected without liability to the City, unless such bidder provides clear and convincing evidence (a) of the content of the submission as originally submitted and (b) that the unreadable condition of the Electronic Bid was caused solely by error or malfunction of the Bonfire Platform (Procurement Portal). Failure to scan a clear or readable copy of a bid into the system does not constitute and shall not be considered an error or malfunction of the Bonfire Platform (Procurement Portal). Bidders are encouraged to fully review each page of every document within their submission prior to submitting to ensure all documents are clear, legible, and complete. SUPPORT For technical questions, visit Bonfire's help forum at https://vendorsupport.gobonfire.com/hc/en- us Contact the Bonfire support team at Support@GoBonfire.com or by calling 1-800-354-8010. To get started with Bonfire, watch this five-minute training video: Vendor Registration and Submission [VIDEO] — Bonfire Vendor Support (gobonfire.com) GENERAL DESCRIPTION OF WORK The major work will consist of the (approximate) following: Water: 21 LF- 12" PVC DR14 Water Pipe by Open Cut 11,362 LF - 8" PVC DR14 Water Pipe by Open Cut 24 LF — 8" DIP Water 247 LF - 6" PVC DR14 Water Pipe by Open Cut 47 EA - 8" Gave Valve 17 EA - 6" Gate Valve Sanitary Sewer: 468 LF - 18" PVC ASTM F679 Sanitary Sewer Pipe by Open Cut 31 LF - 16" DI Min Pressure Class 250 Sanitary Sewer Pipe by Open Cut 504 LF - 15" PVC ASTM D3034/SDR-26 Sanitary Sewer Pipe by Open Cut 4,382 LF - 8" PVC SDR-26 Sanitary Sewer Pipe by Open Cut 818 LF - 8" DI Min Pressure Class 350 Sanitary Sewer Pipe by Open Cut 28 EA - 4' Diameter Manholes 5 EA - 5' Diameter Manholes Bypass Pumping Paving: 15,031 SY — Mill and Overlay Asphalt Pavement 30,671 SY — Pulverize and Overlay Asphalt Pavement 6,656 SF — 6" Concrete Driveway 3,390 SF - 8" Concrete Driveway 3,355 LF - Curb and Gutter PREQUALIFICATION Certain improvements included in this project must be performed by a contractor or designated subcontractor who is pre -qualified by the City at the time of bid opening. The procedures for qualification and pre -qualification are outlined in the Section 3 of 00 21 13 — INSTRUCTIONS TO BIDDERS. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN: 103413 Revised 2/08/24 0011 13 INVITATION TO BIDDERS Page 3 of 3 DOCUMENT EXAMINATION AND PROCUREMENTS The Bidding and Contract Documents may be examined or obtained via the Procurement Portal httbs://fortworthtexas.bonfirehub.com/DortaV?tab=ODenODDortunities. under the respective Project. Contract Documents may be downloaded, viewed, and printed by interested contractors and/or suppliers. EXPRESSION OF INTEREST To ensure potential bidders are kept up to date of any new information pertinent to this project, all interested parties should indicate their intent to bid in the Procurement Portal by selecting "yes" under the Intent to Bid section. All Addenda will be posted in the Procurement Portal httbs://fortworthtexas.bonfirehub.com/DortaV?tab=ODenODDortunities, under the respective Project. PREBID CONFERENCE — Web Conference A prebid conference will be held as discussed in Section 00 21 13 - INSTRUCTIONS TO BIDDERS at the following date, and time via a web conferencing application: DATE: May 28, 2024 TIME: 10:00 am Invitations with links to the web conferencing application will be distributed directly to those who have submitted an Expression of Interest. If a prebid conference is held, the presentation and any questions and answers provided at the prebid conference will be issued as an Addendum to the call for bids. If a prebid conference is not being held, prospective bidders should direct all questions about the meaning and intent of the Bidding Documents electronically through the Vendors discussions section under the respective Project via the Procurement Portal. If necessary, Addenda will be issued pursuant to the Instructions to Bidders. CITY'S RIGHT TO ACCEPT OR REJECT BIDS City reserves the right to waive irregularities and to accept or reject any or all bids. AWARD City will award a contract to the Bidder presenting the lowest price, qualifications and competencies considered. ADVERTISEMENT DATES May 9, 2024 May 16, 2024 END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN: 103413 Revised 2/08/24 0021 13 INSTRUCTIONS TO BIDDERS SECTION 00 2113 INSTRUCTIONS TO BIDDERS 1. Defined Terms Page 1 of 9 1.1. Capitalized terms used in these INSTRUCTIONS TO BIDDERS are defined in Section 00 72 00 - GENERAL CONDITIONS. 1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the meanings indicated below which are applicable to both the singular and plural thereof. 1.2.1. Bidder: Any person, firm, partnership, company, association, or corporation acting directly through a duly authorized representative, submitting a bid for performing the work contemplated under the Contract Documents. 1.2.2. Nonresident Bidder: Any person, firm, partnership, company, association, or corporation acting directly through a duly authorized representative, submitting a bid for performing the work contemplated under the Contract Documents whose principal place of business is not in the State of Texas. 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City (on the basis of City's evaluation as hereinafter provided) makes an award. 2. Copies of Bidding Documents 2.1. Neither City nor Engineer shall assume any responsibility for errors or misinterpretations resulting from the Bidders use of incomplete sets of Bidding Documents. 2.2. City and Engineer in making electronic Bidding Documents available do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license or grant for any other use. 3. Prequalification of Bidders (Prime Contractors and Subcontractors) 3.1. Bidders or their designated subcontractors are required to be prequalified for the work types requiring prequalification as per Sections 00 45 11 BIDDERS PREQUALIFICATIONS and 00 45 12 PREQUALIFICATION STATEMENT. Firms seeking pre -qualification, must submit the documentation identified in Section 00 45 11 on Section 00 45 13 PREQUALIFICATION APPLICATION at least seven (7) calendar days prior to Bid opening for review and, if qualified, acceptance. The subcontractors listed by a Bidder on 00 45 12 must be prequalified for the appropriate work types. Subcontractors must follow the same timelines as Bidders for obtaining prequalification review. Bidders or Subcontractors who are not prequalified at the time bids are opened and reviewed may cause the bid to be rejected. Prequalification requirement work types and documentation are available by accessing all required files through the City's website at: httDs://aDDS.fortworthtexas.gov/ProiectResources/ CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN. 103413 Revised/Updated 1/17/24 0021 13 INSTRUCTIONS TO BIDDERS Page 2 of 9 3.1.1. Paving — Requirements document located at: httDs://aDDs.fortworthtexas. aov/ProiectResources/ResourcesP/02%20- %20Construction%2ODocuments/Contractor%2OPreaualification/TPW%2OPavina %20Contractor%2OPreaualification%2OProaram/PREQUALIFICATION%20REO UIREMENTS%20FOR%2OPAVING%2000NTRACTORS.Ddf 3.1.2. Roadway and Pedestrian Lighting — Requirements document located at: httbs://aDDS.fortworthtexas. aov/ProiectResources/ResourcesP/02%20- %20Construction%2ODocuments/Contractor%2OPrecivalification/TPW%2ORoadwa v%20and%2OPedestrian%2OLiahtina%2OPrecivalification%2OProaram/STREET% 20LIGHT%20PREQUAL%20REQMNTS.Ddf 3.1.3. Water and Sanitary Sewer — Requirements document located at: httbs://aDDS.fortworthtexas. aov/ProiectResources/ResourcesP/02%20- %20Construction%2ODocuments/Contractor%2OPrecivalification/Water%2Oand%2 OSanitarv%2OSewer%2OContractor%2OPrequalification%2OProaram/W S S%2ODre aual%20reauirements.Ddf 3.2. Each Bidder, unless currently prequalified, must submit to City at least seven (7) calendar days prior to Bid opening, the documentation identified in Section 00 45 11, BIDDERS PREQUALIFICATIONS. 3.2. 1. Submission of and/or questions related to prequalification should be addressed to the City contact as provided in Paragraph 6.1. 3.3. The City reserves the right to require any pre -qualified contractor who is the apparent low bidder for a project to submit such additional information as the City, in its sole discretion may require, including but not limited to manpower and equipment records, information about key personnel to be assigned to the project, and construction schedule to assist the City in evaluating and assessing the ability of the apparent low bidder to deliver a quality product and successfully complete projects for the amount bid within the stipulated time frame. Based upon the City's assessment of the submitted information, a recommendation regarding the award of a contract will be made to the City Council. Failure to submit the additional information, if requested, may be grounds for rejecting the apparent low bidder as non -responsive. Affected contractors will be notified in writing of a recommendation to the City Council. 3.4. In addition to prequalification, additional requirements for qualification may be required within various sections of the Contract Documents. 4. Examination of Bidding and Contract Documents, Other Related Data, and Site 4.1. Before submitting a Bid, each Bidder: CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN. 103413 Revised/Updated 1/17/24 0021 13 INSTRUCTIONS TO BIDDERS Page 3 of 9 4.1.1. Shall examine and carefully study the Contract Documents and other related data identified in the Bidding Documents (including "technical data" referred to in Paragraph 4.2. below). No information given by City or any representative of the City other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the City. 4.1.2. Should visit the site to become familiar with and satisfy Bidder as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the Work. 4.1.3. Shall consider federal, state and local Laws and Regulations that may affect cost, progress, performance or furnishing of the Work. 4.1.4. Shall study all: (i) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities) that have been identified in the Contract Documents as containing reliable "technical data" and (ii) reports and drawings of Hazardous Environmental Conditions, if any, at the Site that have been identified in the Contract Documents as containing reliable "technical data." 4.1.5. Is advised that the Contract Documents on file with the City shall constitute all of the information which the City will furnish. All additional information and data which the City will supply after promulgation of the formal Contract Documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents. No information given by the City other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the City. 4.1.6. Should perform independent research, investigations, tests, borings, and such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during the construction of the project. For projects with restricted access, upon request, City may provide each Bidder access to the site to conduct such examinations, investigations, explorations, tests and studies as each Bidder deems necessary for submission of a Bid. Bidder must fill all holes and clean up and restore the site to its former conditions upon completion of such explorations, investigations, tests and studies. 4.1.7. Shall determine the difficulties of the Work and all attending circumstances affecting the cost of doing the Work, time required for its completion, and obtain all information required to make a proposal. Bidders shall rely exclusively and solely upon their own estimates, investigation, research, tests, explorations, and other data which are necessary for full and complete information upon which the proposal is to be based. It is understood that the submission of a proposal or bid is prima -facie evidence that the Bidder has made the investigations, examinations and tests herein required. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN. 103413 Revised/Updated 1/17/24 0021 13 INSTRUCTIONS TO BIDDERS Page 4 of 9 4.1.8. Shall promptly notify City of all conflicts, errors, ambiguities or discrepancies in or between the Contract Documents and such other related documents. The Contractor shall not take advantage of any gross error or omission in the Contract Documents, and the City shall be permitted to make such corrections or interpretations as may be deemed necessary for fulfillment of the intent of the Contract Documents. 4.1.9.Indicate their intent to bid by selecting "yes" in the Procurement Portal under the Intent to Bid section. You must indicate your intent to bid to be able to submit a bid to the City. 4.2. Reference is made to Section 00 73 00 — Supplementary Conditions for identification of: 4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to the site which have been utilized by City in preparation of the Contract Documents. The logs of Soil Borings, if any, on the plans are for general information only. Neither the City nor the Engineer guarantee that the data shown is representative of conditions which actually exist. 4.2.2. those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site that have been utilized by City in preparation of the Contract Documents. 4.2.3. copies of such reports and drawings will be made available by City to any Bidder on request. Those reports and drawings may not be part of the Contract Documents, but the "technical data" contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.02. of the General Conditions has been identified and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion drawn from any "technical data" or any other data, interpretations, opinions or information. 4.2.4. Standard insurance requirements, coverages and limits. 4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder: (i) that Bidder has complied with every requirement of this Paragraph 4, (ii) that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and applying the specific means, methods, techniques, sequences or procedures of construction (if any) that may be shown or indicated or expressly required by the Contract Documents, (iii) that Bidder has given City written notice of all conflicts, errors, ambiguities and discrepancies in the Contract Documents and the written resolutions thereof by City are acceptable to Bidder, and when said conflicts, etc., have not been resolved through the interpretations by City as described in Paragraph 6., and (iv) that the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work. 4.4. The provisions of this Paragraph 4, inclusive, do not apply to Asbestos, Polychlorinated biphenyls (PCBs), Petroleum, Hazardous Waste or Radioactive Material covered by Paragraph 4.06. of the General Conditions, unless specifically identified in the Contract Documents. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN. 103413 Revised/Updated 1/17/24 0021 13 INSTRUCTIONS TO BIDDERS Page 5 of 9 5. Availability of Lands for Work, Etc. 5.1. The lands upon which the Work is to be performed, rights -of -way and easements for access thereto and other lands designated for use by Contractor in performing the Work are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by City unless otherwise provided in the Contract Documents. 5.2. Outstanding right-of-way, easements, and/or permits to be acquired by the City are listed in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right- of-way, easements, and/or permits are not obtained, the City reserves the right to cancel the award of contract at any time before the Bidder begins any construction work on the project. 5.3. The Bidder shall be prepared to commence construction without all executed right-of- way, easements, and/or permits, and shall submit a schedule to the City of how construction will proceed in the other areas of the project that do not require permits and/or easements. 6. Interpretations and Addenda 6.1. All questions about the meaning or intent of the Bidding Documents are to be directed to City electrically through the Vendor Discussions section under the respective Project via the Procurement Portal httos://fortworthtexas.bonfirehub.com/portal/?tab=oDenODDortunities on or before 2 p.m., the Monday prior to the Bid opening. Questions received after this day may not be responded to. Interpretations or clarifications considered necessary by City in response to such questions will be issued by Addenda. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 6.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by City. 6.3. Addenda or clarifications shall be posted under the respective Project via the Procurement Portal httDs://fortworthtexas.bonfirehub.com/Dortal/?tab=oDenODDortunities 6.4. A prebid conference may be held at the time and place indicated in the Advertisement or INVITATION TO BIDDERS. Representatives of City will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. City will transmit to all prospective Bidders of record such Addenda as City considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. 7. Bid Security CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN. 103413 Revised/Updated 1/17/24 0021 13 INSTRUCTIONS TO BIDDERS Page 6 of 9 7.1. Each Bid must be accompanied by a Bid Bond made payable to City in an amount of five (5) percent of Bidder's maximum Bid price, on the form attached or equivalent, issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. 7.2. The Bid Bonds provided by a Bidder will be retained until the conditions of the Notice of Award have been satisfied. If the Successful Bidder fails to execute and return the Contract Documents within 14 days after the Notice of Award conveying same, City may consider Bidder to be in default, rescind the Notice of Award and act on the Bid Bond. Such action shall be City's exclusive remedy in the event Bidder is deemed to have defaulted. 8. Contract Times The number of days within which, or the dates by which, Milestones are to be achieved in accordance with the General Requirements and the Work is to be completed and ready for Final Acceptance is set forth in the Agreement or incorporated therein by reference to the attached Bid Form. 9. Liquidated Damages Provisions for liquidated damages are set forth in the Agreement. 10. Substitute and "Or -Equal" Items The Contract, if awarded, will be on the basis of materials and equipment described in the Bidding Documents without consideration of possible substitute or "or -equal" items. Whenever it is indicated or specified in the Bidding Documents that a "substitute" or "or - equal" item of material or equipment may be furnished or used by Contractor if acceptable to City, application for such acceptance will not be considered by City until after the Effective Date of the Agreement. The procedure for submission of any such application by Contractor and consideration by City is set forth in Paragraphs 6.05A., 6.05B. and 6.05C. of the General Conditions and is supplemented in Section 0125 00 of the General Requirements. 11. Subcontractors, Suppliers and Others 11.1. In accordance with the City's Business Equity Ordinance No.25165-10-2021 the City has goals for the participation of minority business and/or women business enterprises in City contracts $100,000 or greater. See Section 00 45 40 for the M/WBE Project Goals and additional requirements. Failure to comply shall render the Bidder as non -responsive. Business Equity Ordinance No.25165-10-2021, as amended (replacing Ordinance No. 24534-11-2020), codified at: httas://codelibrarv.amleizal.com/codes/ftworth/latest/ftworth tx/0-0-0-22593 11.2. No Contractor shall be required to employ any Subcontractor, Supplier, other person or organization against whom Contractor or City has reasonable objection. 12. Bid Form 12.1. The Bid Form is included with the Bidding Documents. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN. 103413 Revised/Updated 1/17/24 0021 13 INSTRUCTIONS TO BIDDERS Page 7 of 9 12.2. All blanks on the Bid Form must be completed and the Bid Form signed electronically or signed in ink and scan. A Bid price shall be indicated for each Bid item, alternative, and unit price item listed therein. In the case of optional alternatives, the words "No Bid," "No Change," or "Not Applicable" may be entered. Bidder shall state the prices for which the Bidder proposes to do the work contemplated or furnish materials required. 12.3. Bids by corporations shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed. The corporate address and state of incorporation shall be shown below the signature. 12.4. Bids by partnerships shall be executed in the partnership name and signed by a partner, whose title must appear under the signature accompanied by evidence of authority to sign. The official address of the partnership shall be shown below the signature. 12.5. Bids by limited liability companies shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown. 12.6. Bids by individuals shall show the Bidder's name and official address. 12.7. Bids by joint ventures shall be executed by each joint venture in the manner indicated on the Bid Form. The official address of the joint venture shall be shown. 12.8. All names shall be typed or printed in ink below the signature. 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form. 12.10. Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown. 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of Texas shall be provided in accordance with Section 00 43 37 — Vendor Compliance to State Law Non Resident Bidder. 13. Submission of Bids Bids shall be submitted electronically in the Procurement Portal on the prescribed Bid Form, provided with the Bidding Documents, prior to the time indicated in the Advertisement or INVITATION TO BIDDERS. 14. Withdrawal of Bids 14.1. Bids submitted electronically may be withdrawn prior to the time set for bid opening via the Procurement Portal httDs://fortworthtexas.bonfirehub.com/Dortal/?tab=or)enODDortunities. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN: 103413 Revised/Updated 1/17/24 0021 13 INSTRUCTIONS TO BIDDERS Page 8 of 9 15. Opening of Bids Bids will be opened and read aloud publicly. An abstract of the amounts of the base Bids and major alternates (if any) will be made available to Bidders after the opening of Bids. 16. Bids to Remain Subject to Acceptance All Bids will remain subject to acceptance for a minimum of 90 days or the time period specified for Notice of Award and execution and delivery of a complete Agreement by Successful Bidder. City may, at City's sole discretion, release any Bid and nullify the Bid security prior to that date. 17. Evaluation of Bids and Award of Contract 17.1. City reserves the right to reject any or all Bids, including without limitation the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if City believes that it would not be in the best interest of the Project to make an award to that Bidder. City reserves the right to waive informalities not involving price, contract time or changes in the Work and award a contract to such Bidder. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words. 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists among the Bidders, Bidder is an interested party to any litigation against City, City or Bidder may have a claim against the other or be engaged in litigation, Bidder is in arrears on any existing contract or has defaulted on a previous contract, Bidder has performed a prior contract in an unsatisfactory manner, or Bidder has uncompleted work which in the judgment of the City will prevent or hinder the prompt completion of additional work if awarded. 17.2. In addition to Bidder's relevant prequalification requirements, City may consider the qualifications and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work where the identity of such Subcontractors, Suppliers, and other persons and organizations must be submitted as provided in the Contract Documents or upon the request of the City. City also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award. 17.3. City may conduct such investigations as City deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to City's satisfaction within the prescribed time. 17.4. Contractor shall perform with his own organization, work of a value not less than 3 5 % of the value embraced on the Contract, unless otherwise approved by the City. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN. 103413 Revised/Updated 1/17/24 0021 13 INSTRUCTIONS TO BIDDERS Page 9 of 9 17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and responsive Bidder whose evaluation by City indicates that the award will be in the best interests of the City. 17.6. Pursuant to Texas Government Code Chapter 2252.001, the City will not award contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than the lowest bid submitted by a responsible Texas Bidder by the same amount that a Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located. 17.7. A contract is not awarded until formal City Council authorization. If the Contract is to be awarded, City will award the Contract within 90 days after the day of the Bid opening unless extended in writing. No other act of City or others will constitute acceptance of a Bid. Upon the contract award, a Notice of Award will be issued by the City. 17.7.1. The contractor is required to fill out and sign the Certificate of Interested Parties Form 1295 and the form must be submitted to the Project Manager before the contract will be presented to the City Council. The form can be obtained at httDS://www.ethics.state.tx.us/data/forms/1295/1295.Ddf 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid. 18. Signing of Agreement 18.1. When City issues a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Project Manual. Within 14 days thereafter, Contractor shall sign and deliver the required number of counterparts of the Project Manual to City with the required Bonds, Certificates of Insurance, and all other required documentation. 18.2. City shall thereafter deliver one fully signed counterpart to Contractor. END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN. 103413 Revised/Updated 1/17/24 00 35 13 CONFLICT OF INTEREST STATEMENT Page 1 of 15 SECTION 00 35 13 CONFLICT OF INTEREST STATEMENT Each bidder, offeror or respondent to a City of Fort Worth procurement is required to complete a Conflict of Interest Questionnaire or certify that one is current and on file with the City Secretary's Office pursuant to state law. If a member of the Fort Worth City Council, any one or more of the City Manager or Assistant City Managers, or an agent of the City who exercise discretion in the planning, recommending, selecting or contracting with a bidder, offeror or respondent is affiliated with your company, then a Local Government Officer Conflicts Disclosure Statement (CIS) may be required. You are urged to consult with counsel regarding the applicability of these forms and Local Government Code Chapter 176 to your company. The referenced forms may be downloaded from the links provided below. Form CIQ (Conflict of Interest Questionnaire) (state.tx.us) httiDs://www.ethics.state.tx. us/data/forms/confIict/C IS. odf ❑ CIQ Form does not apply ❑ CIQ Form is on file with City Secretary ❑ CIQ Form is being provided to the City Secretary ❑ CIS Form does not apply P1 CIS Form is on File with City Secretary ❑ CIS Form is being provided to the City Secretary BIDDER: Venus Construction By: Josh McAda / Q Signature: J� (1 1t�/ldu END OF SECTION Title: President CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised February 24, 2020 Addendum 4 00 41 00 Bid Proposal Workbook 0041 00 BID FORM Page 1 of 3 SECTION 00 41 00 BID FORM TO: The Purchasing Manager c/o: The Purchasing Division 200 Texas Street City of Fort Worth, Texas 76102 FOR: WATER AND SANITARY REPLACEMENT 2020 WSM-M City Project No.: 103413 Units/Sections: Unit 1: Water Improvements Unit 2: Sewer Improvements 1. Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. 'fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of City (b) to establish Bid prices at artificial non-competitive levels, or (c) to deprive City of the benefits of free and open competition. c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of City, a purpose of which is to establish Bid prices at artificial, non-competitive levels. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 VENUS -Addendum 4 00 41 00 Bid Proposal Workbook.xlsx 0041 00 BID FORM Page 2 of 3 d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. 3. Prequalification The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors: a. Water Distribution, Urban and Renewal, 8-inch diameter and smaller b. Sewer Collection System, 18-inch and smaller c. Sanitary Sewer Manholes/Structure Interior Lining (Warren or Chesteron) Coating d. Asphalt Paving Construction/Reconstruction (15,000 SY and less) 4. Time of Completion 4.1. The Work will be complete for Final Acceptance within 630 days after the date when the the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work {and/or achievement of Milestones} within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form, Section 00 41 00 b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. c. Proposal Form, Section 00 42 43 d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37 e. MWBE Forms (optional at time of bid) f. Prequalification Statement, Section 00 45 12 g. Conflict of Interest Affidavit, Section 00 35 13 "If necessary, CIQ or CIS forms are to be provided directly to City Secretary h. Any additional documents that may be required by Section 12 of the Instructions to Bidders CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 VENUS -Addendum 4 00 41 00 Bid Proposal Workbook.xlsx 0041 00 BID FORM Page 3 of 3 6. Total Bid Amount 6.1. Bidder will complete the Work In accordance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project. Only this figure will be read publicly by the City at the bid opening. 6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts. 41011031600.16 Total Bidet G v yi.v J 7. Bid Submittal This Bid is submitted on June 13, 2024 Respectfusubmitted, By: �Jacl� Vtf/%�o.� (Signature) Josh McAda (Printed Name) Title: President Company; Venus Construction Address: 1426 S. Main Street Mansfield, Texas 76063 Stale of Incorporation: Texas Email: JMcAda@venusconstruction.com Phone: 817-477-2050 END OF SECTION #REF! by the entity named below. Receipt is acknowledged of the Initial following Addenda: Addendum No. 1:M Addendum No. 2: J NI 4Addendum No. 3: ✓ P7 JAddendum No. 4: I ,7 Corporate Seal: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9130/2021 Addendum 4 00 4100 Bid Proposal Workbook 00 42 43 BID PROPOSAL Page 1 of 7 ADDENDUM Bidlist Item) Description I Specification Section I Unit of I Bid I Unit Price I Bid Value No. No. Measure Quantity Unit 1 - Water Improvements 1 3311.0461 12" PVC DR14 Water Pipe (Rondo) 33 11 12 LF 21.00 $213.00 $4,473.00 2 3311.0261 8" PVC DR14 Water Pipe 33 11 12 LF 11,362.00 $100.00 $1,136,200.00 3 3311.0161 6" PVC DR14 Water Pipe 33 11 12 LF 247.00 $90.00 $22,230.00 4 3311.0251 8" DIP Water (Rondo) 33 11 10 LF 24.00 $218.00 $5,232.00 5 3305.1003 20" Casing By Open Cut 33 05 22 LF 20.00 $276.00 $5,520.00 6 3312.3003 8" Gate Valve 33 1220 EA 47.00 $3,000.00 $141,000.00 7 3312.3002 6" Gate Valve 33 12 20, 03 EA 17.00 $2,200.00 $37,400.00 3305.0003 8" DIP Waterline in 20" Steel Encasement Lowering A (Line W-1, STA 8+02), Including CLSM 33 05 12, 03 34 13 EA 1.00 $37,500.00 8 Embedment/Backfill $37,500.00 3305.0003 8" DIP Waterline in 20" Steel Encasement 9 Lowering B (Line W-2, STA 5+44), 33 05 12, 03 34 13 EA 1.00 $4,900.00 Includingp_ CLSM Embedment/Backfill $4,900.00 3305.0083 8" DIP Waterline in 20" Steel Encasement Lowering C (Line W-3, STA 1+36), Including CLSM 33 05 12, 03 34 13 EA 1.00 $91,500.00 10 Embedment/Backfill $91,500.00 3305.0003 8" DIP Waterline in 20" Steel Encasement Lowering D (Line W-3, STA 7+83), Including CLSM 33 05 12, 03 34 13 EA 1.00 $43,000.00 11 Embedment/Backfill $43,000.00 3305.0003 8" DIP Waterline in 20" Steel Encasement 12 Lowering E (Line W-4, STA 0+49), Including CLSM 33 05 12, 03 34 13 EA 1.00 $34,000.00 Embedment/Backfill $34,000.00 3305.0003 8" DIP Waterline in 20" Steel Encasement Lowering F (Line W-5, STA 0+13), Including CLSM 33 05 12, 03 34 13 EA 1.00 $27,500.00 13 Embedment/Backfill $27,500.00 3305.0003 8" DIP Waterline in 20" Steel Encasement 14 Lowering G (Line W-7, STA 2+58), Including CLSM 33 05 12, 03 34 13 EA 1.00 $35,500.00 Embedment/Backfill $35,500.00 3305.0003 8" Waterline Lowering (Rondo), 33 05 12, 03 34 13 EA 1.00 $24,000.00 15 Includine CLSM Embedment/Backfill $24,000.00 16 3312.0117 Connection to Existing 4"-12" Water Main 33 1225 EA 17.00 $7,600.00 $129,200.00 17 3312.2001 1" Water Service, Meter Reconnection 33 12 10 EA 301.00 $825.00 $248,325.00 18 3312.2003 1" Water Service 33 12 10 EA 301.00 $2,500.00 $752,500.00 19 3312.2004 1" Private Water Service 33 12 10 LF 222.00 $117.00 $25,974.00 3312.2101 1 1/2" Water Service, Meter Reconnection 33 1210 EA 4.00 $1,100.00 20 (Rondo) $4,400.00 21 3312.2103 1 1/2" Water Service (Rondo) 33 1210 EA 4.00 $3,350.00 $13,400.00 22 3312.2801 3" Water Meter and Vault (Rondo) 33 1211 EA 1.00 $31,500.00 $31,500.00 9999.0001 3" Water Service, Meter Reconnection EA 1.00 $6,600.00 23 (Rondo) $6,600.00 24 9999.0002 3" Private Water Service (Rondo) LF 3.96 $150.00 $594.00 25 0241.1511 Salvage 3/4" Water Meter (Rondo) 0241 14 EA 12.00 $250.00 $3,000.00 26 0241.1513 Salvage 1 1/2" Water Meter (Rondo) 0241 14 EA 4.00 $250.00 $1,000.00 27 0241.1515 Salvage 3" Water Meter (Rondo) 0241 14 EA 1.00 $250.00 $250.00 28 3312.0001 Fire Hydrant 33 1240 EA 13.00 $7,100.00 $92,300.00 29 3311.0001 Ductile Iron Water Fittings w/ Restraint 33 11 11 TON 6.00 $6,000.00 $36,000.00 30 0241.1302 Remove and Salvage 6" Water Valve 0241 14 EA 22.00 $250.00 $5,500.00 31 0241.1303 Remove and Salvage 8" Water Valve 0241 14 EA 6.00 $250.00 $1,500.00 32 0241.1602 Remove Concrete Water Vault 0241 14 EA 1.00 $600.00 $600.00 33 0241.1510 Salvage Fire Hydrant 0241 14 EA 12.00 $300.00 $3,600.00 34 0241.1001 Water Line Grouting 0241 14 CY 35.00 $410.00 $14,350.00 35 0241.1218 4"-12" Water Abandonment Plug 0241 14 EA 19.00 $600.00 $11,400.00 36 3110.0105 24" and Larger Tree Removal 31 1000 EA 5.00 $1,675.00 $8,375.00 37 3201.0111 4' Wide Asphalt Pvmt Repair, Residential 3201 17 LF 1,656.00 $120.00 $198,720.00 3201.0201 Asphalt Pvmt Repair Beyond Defined 3201 17 SY 150.00 $135.00 38 Width Residential $20,250.00 3201.N3 Temporary Asphalt Pvmt Repair Beyond 39 Defined Width. Industrial (Rondo) 3201 17 SY 235.00 $155.00 $36,425.00 3201.041 Temporary Asphalt Pavement Repair (2" 320117 LF 12,931.00 $26.00 40 HMAC on 6" Flexible Base) $336,206.00 41 3201.0614 Conc Pvmt Repair, Residential 32 01 29 SY 46.00 $200.00 $9,200.00 42 3201.0616 Conc Pvmt Repair, Arterial/Industrial 32 01 29 SY 770.00 $197.00 $151,690.00 43 3201.0654 Conc Pvmt Repair, HES, Residential 32 01 29 SY 100.00 $215.00 $21,500.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 1-Addendum 4 00 41 00 Bid Proposal Workbook 00 42 43 BID PROPOSAL Page 2 of 7 ADDENDUM Bidhst Item Description Specification Section Unit of Bid Unit Price Bid Value No. No. Measure Quantity 44 3292.0201 Utility Service Surface Restoration Seeding 3292 13 SY 244.00 $8.00 $1,952.00 45 3304.0101 Temporary Water Services 33 04 30 LS 1.00 $263,000.00 $263,000.00 3304.0101 6" Temporary Water Services(Includes Fire 33 04 30 LS 1.00 $130,000.00 46 Linsj(Rlrndo) $130,000.00 47 3305.0j0 Exploratory Excavation of Existing 33 05 30 EA 11.00 $3,500.00 Utilities $38,500.00 48 3471.0001 Traffic Control 3471 13 MO 14.00 $4,100.00 $57,400.00 49 3471.002 Portable Message Sign 3471 13 WK 12.00 $500.00 $6,000.00 50 0171.0101 Construction Staking 01 71 23 LS 1.00 $28,000.00 $28,000.00 51 0171.0102 As -Built Survey 017123 LS 1.00 $1,000.00 $1,000.00 52 3125.0101 SWPPP > 1 acre 31 25 00 LS 1.00 $52,000.00 $52,000.00 3305.0108 Miscellaneous Utility Adjustment(Irrigation 3305 14 LS 1.00 $20,000.00 $20,000.00 53 adiustments) 54 0241.0703 Remove and Replace Mailbox - Brick 0241 13 EA 5.00 $2,100.00 $10,500.00 55 0241.0704 Remove and Replace Mailbox - Traditional 0241 13 EA 5.00 $600.00 $3,000.00 56 3217.0102 6" SLD Pvmt Marking 14AS (Y) 32 1723 LF 1,520.00 $2.50 $3,800.00 57 3217.0103 6" BRK Pvmt Marking HAS (W) 32 1723 LF 760.00 $3.00 $2,280.00 58 3211.0112 6" Flexible Base, Type A, GR-1 32 1123 SY 50.00 $8.00 $400.00 59 3213.0311 4" Conc Sidewalk, Adjacent to Curb 32 1320 SF 410.00 $20.00 $8,200.00 0241.1300 Remove Existing Concrete Curb and 0241 15 LF 1,930.00 $7.15 $13,799.50 61 Gutter 62 3216.0101 Install New 6" Concrete Curb and Gutter 32 16 13 LF 2,160.00 $68.20 $147,312.00 63 0241.0401 Remove Existing Concrete Driveway 0241 13 SF 4,521.00 $4.00 $18,084.00 64 3213.0401 Install New 6-Inch Concrete Driveway 32 1320 SF 3,771.00 $16.00 $60,336.00 65 3213.0403 8" Concrete Driveway (Rondo) 32 1320 SF 1,050.00 $17.60 $18,480.00 66 0241.0100 Remove Concrete Sidewalk 0241 13 SF 2,020.00 $2.75 $5,555.00 67 3213.0322 Concrete Curb, Back of Sidewalk 32 1320 LF 150.00 $49.50 $7,425.00 68 3213.0301 4" Concrete Sidewalk 32 1320 SF 1,610.00 $13.20 $21,252.00 69 0241.0300 Remove Existing Wheelchair Ramp 0241 13 EA 8.00 $385.00 $3,080.00 70 3213.0501 Barrier Free Ramp, Type R-1 32 13 20 EA 3.00 $4,950.00 $14,850.00 71 3213.0506 Barrier Free Ramp, Type P-1 32 13 20 EA 6.00 $4,620.00 $27,720.00 72 0241.1400 Remove Existing Concrete Valley Gutter 0241 15 SY 301.00 $43.00 $12,943.00 73 3216.0301 Install New 7" Concrete Valley Gutter 32 16 13 SY 301.00 $182.00 $54,782.00 74 0241.1700 12-Inch Pavement Pulverization (Rondo) 0241 15 SY 2,312.50 $14.00 $32,375.00 75 0241.1700 11-inch Pavement Pulverization 0241 15 SY 17,035.00 $11.50 $195,902.50 76 3211.0601 cem-Lime Stabilization @ 32 lbs/sy 32 1129 TN 310.00 $478.00 $148,180.00 77 3123.0101 Unclassified Street Excavation 3123 16 CY 663.00 $51.00 $33,813.00 3305.0202 Imported Embedment/Backfill, CSS 33 05 10 CY 20.00 $150.00 $3,000.00 78 (Rondol 3305.02b4 Imported Embedment/Backfill, Crushed 79 Rock (Rondo) 33 05 10 CY 20.00 $75.00 $1,500.00 3305.0207 Imported Embedment/Backfill, Select Fill 33 05 10 CY 20.00 $41.00 $820.00 80 (Rondo) 81 3212.0303 3-Inch Surface Coarse Asphalt, Type "D" 3212 16 SY 17,035.00 $30.00 $511,050.00 82 3305.0111 Water Valve Box Adjustment with 3305 14 EA 47.00 $800.00 $37,600.00 Concrete Collar 83 3305.0107 Manhole Adjustment with Concrete Collar 3305 14 EA 9.00 $1,600.00 $14,400.00 84 3217.5001 Painting Curb Addresses 32 1725 EA 180.00 $60.00 $10,800.00 85 3291.0100 Topsoil 3291 19 CY 86.00 $76.00 $6,536.00 86 3292.01 Block Sod Replacement 3292 13 SY 456.00 $12.00 $5,472.00 87 3349.5006 Remove and Replace Inlet Top, 10' 34 49 20 EA 5.00 $5,100.00 $25,500.00 88 3212.0401 HMAC Transition 32 12 16 TN 30.00 $500.00 $15,000.00 89 3212.0600 HMAC Pavement Level Up 32 12 16 TN 20.00 $612.00 $12,240.00 3212.0302 2-Inch Surface Course Asphalt PG 70-22 32 12 16 SY 2,312.50 $21.50 $49,718.75 90 Tv�e "D" f Rondo` 3212.0501 2-Inch Surface Course Asphalt, PG 64-22 91 Tvne" B" (Rondo) 32 12 16 SY 2,312.50 $19.50 $45,093.75 92 3212.0302 2" Asphalt Pvmt Type D 3212 16 SY 5,780.00 $20.00 $115,600.00 93 0241.1506 2" Surface Milling 0241 15 SY 5,780.00 $4.00 $23,120.00 94 9999.0003 Tree Protection 31 1000 EA 17.00 $200.00 $3,400.00 95 9999.0004 Remove and Replace Concrete Flume 32 13 13 LS 1.00 $5,775.00 $5,775.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 1-Addendum 4 00 41 00 Bid Proposal Workbook Bidlist Item Description Specification Section Unit of Bid Unit Price No. No. Measure Quantity 9999.0005 Reconnect to 6" Fire Department EA 5.00 $6,500.00 96 Connection (Rondo) 97 9999.0006 Reconnect to 8" Fire Department EA 3.00 $6,600.00 Connection (Rondo) 98 9999.0007 Water Construction Allowance LS 1.00 $150,000.00 Sub -Total Unit 1- Water Improvements: 00 42 43 BID PROPOSAL Page 3 of 7 ADDENDUM Bid Value $32,500.00 $19,800.00 $150,000.00 $6,345,160.50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 1-Addendum 4 00 41 00 Bid Proposal Workbook 00 42 43 BID PROPOSAL Page 4 of 7 ADDENDUM Bidlist Item) Description I Specification Section I Unit of I Bid I Unit Price I Bid Value No. No. Measure Quantity Unit 2 - Sever Improvements 1 3331.4225 18" ASTM F679 Sewer Pipe 33 11 10, 33 31 12, 33 LF 468.00 $196.00 $91,728.00 3120 2 3331.4222 16" DIP Minimum Pressure Class 250 33 11 10 LF 21.00 $365.00 $7,665.00 Sewer w/ Epoxy Linir{r Protecto 401 Or Equal 3331. /55 16" DIP Mmlmim Pressure Class 230 3 Sewer (w/ Epoxy Lining Protecto 401 Or Equal), 33 11 10, 03 34 13 LF 10.00 $850.00 $8,500.00 CLSM Backfill 4 3331.4215 15" SDR26 Sewer Pipe 33 11 10,33 31 12,33 LF 504.00 $175.00 $88,200.00 3120 5 3331.4115 8" SDR26 Sewer Pipe 33 11 10,33 31 12,33 LF 4,762.00 $107.00 $509,534.00 3120 6 3331.5747 8" SDR26 Sewer Pipe, CLSM Backfill 33 11 10,33 31 12,33 LF 16.00 $480.00 $7,680.00 3120 0334 13 33 11 10,)3 31 12,33 7 3331.4115 8" SDR26 (Min 150 PSI) Sewer Pipe LF 100.00 $108.00 $10,800.00 3120 8 3331.4119 8" DIP Minimum Pressure Class 350 33 11 10 LF 869.00 $178.00 $154,682.00 Sewer Pi a (w/ Epoxy Lining Protecto 401 Or pal) 3331.41 8" DIP Mmmum iPressure Class 32 9 Sewer Pipe (w/ Epoxy Lining Protecto 401 Or Equal), 33 11 10, 03 34 13 LF 55.00 $572.00 $31,460.00 CLSM Backfill 10 3331.3101 4" Sewer Service 33 3150 EA 120.00 $2,600.00 $312,000.00 11 3331.3105 4" Private Sewer Service 33 3150 LF 1,840.00 $81.00 $149,040.00 12 3331.3102 4" 2-Way Cleanout(Private) 33 3150 EA 16.00 $1,850.00 $29,600.00 13 3339.1101 5' Manhole 33 39 10, 33 39 20 EA 2.00 $16,000.00 $32,000.00 14 3339.1001 4' Manhole 33 39 10, 33 39 20 EA 31.00 $11,700.00 $362,700.00 15 3339.1103 5' Extra Depth Manhole 33 39 10, 33 39 20 VF 9.00 $500.00 $4,500.00 16 3339.1003 4' Extra Depth Manhole 34 39 10, 33 39 20 VF 113.70 $350.00 $39,795.00 9999.0001 Modify existing manhole to create drop 17 manhole/hydraulic slide by coring, including removal 33 39 10, 33 39 20 EA 3.00 $1,500.00 $4,500.00 of existing liner 18 3339.0001 Epoxy Manhole Liner(Exist SSMH, 250 33 39 60 VF 53.00 $510.00 $27,030.00 mils, Warren or A.W. Chesterton or Approved Equal) 19 3339.0001 Epoxy Manhole Liner (New SSMH, 150 33 39 60 VF 123.00 $419.00 $51,537.00 mils, Warren or A.W. Chesterton or Approved Equal) 20 9999.0002 Connect to Existing Manhole 33 39 10, 33 39 20 EA 3.00 $2,200.00 $6,600.00 21 3303.0001 Bypass Pumping 3303 10 LS 1.00 $19,000.00 $19,000.00 22 0241.2106 15" Sewer Abandonment Plug 0241 14 EA 4.00 $1,300.00 $5,200.00 23 0241.2104 10" Sewer Abandonment Plug 0241 14 EA 2.00 $800.00 $1,600.00 24 0241.2103 8" Sewer Abandonment Plug (Rondo) 0241 14 EA 2.00 $700.00 $1,400.00 25 0241.2102 6" Sewer Abandonment Plug 0241 14 EA 2.00 $675.00 $1,350.00 26 0241.2101 4" Sewer (Service) Abandonment Plug 0241 14 EA 42.00 $600.00 $25,200.00 27 0241.2202 Remove 5' Sewer Manhole 0241 14 EA 5.00 $500.00 $2,500.00 28 0241.2201 Remove 4' Sewer Manhole 0241 14 EA 9.00 $500.00 $4,500.00 29 0241.5001 Abandon Manhole 0241 14 EA 6.00 $1,500.00 $9,000.00 30 0241.0500 Remove Fence 0241 13 LF 640.00 $15.00 $9,600.00 31 0241.2001 Sanitary Line Grouting 0241 14 CY 37.00 $410.00 $15,170.00 32 3110.0102 6"-12" Tree Removal 31 1000 EA 28.00 $480.00 $13,440.00 33 3110.0103 12"-18" Tree Removal 31 1000 EA 18.00 $1,100.00 $19,800.00 34 3110.0104 18"-24" Tree Removal 31 1000 EA 8.00 $1,500.00 $12,000.00 35 3110.0105 24" and Larger Tree Removal 31 1000 EA 10.00 $2,100.00 $21,000.00 36 9999.0008 Tree Protection 31 1000 EA 29.00 $200.00 $5,800.00 37 3201.0112 5' Wide Asphalt Pvmt Repair, Residential 3201 17 LF 206.00 $126.00 $25,956.00 38 3201.0201 Asphalt Pvmt Repair Beyond Defined 3201 17 SY 35.00 $135.00 $4,725.00 WidthResidential 39 3201.6203 Temporary Asphalt Pvmt Repair Beyond 3201 17 SY 179.00 $155.00 $27,745.00 Defined Width. Industrial Rondo) 3201.0400 Temporary Asp Pavement Repair 40 alt (2" 320117 LF 3,434.00 $26.00 $89,284.00 HMAC on 6" Flexible Base) 41 3201.0614 Cone Pvmt Repair, Residential 32 01 29 SY 70.00 $182.00 $12,740.00 42 9999.0003 Temporary Fencing 3231 13 LF 640.00 $11.00 $7,040.00 43 3231.0121 4' Chain Link, Aluminum 3231 13 LF 50.00 $61.00 $3,050.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 1-Addendum 4 00 41 00 Bid Proposal Workbook 00 42 43 BID PROPOSAL Page 5 of 7 ADDENDUM Bidlist Item Description Specification Section Unit of Bid Unit Price Bid Value No. No. Measure Quantity 44 3231.0123 6' Chain Link, Aluminum 3231 13 LF 175.00 $67.00 $11,725.00 45 3231.0131 4' Wrought Iron Fence 3231 13 LF 20.00 $91.00 $1,820.00 46 3231.0132 5' Wrought Iron Fence 3231 13 LF 15.00 $95.00 $1,425.00 47 3231.0412 6' Fences, Wood 32 31 29 LF 380.00 $91.00 $34,580.00 48 3292.0101 Utility Service Surface Restoration 3292 13 SY 220.00 $8.00 $1,760.00 Soddinc 49 3292.0201 Utility Service Surface Restoration Seeding 3292 13 SY 1,817.00 $2.00 $3,634.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 1-Addendum 4 00 41 00 Bid Proposal Workbook 00 42 43 BID PROPOSAL Page 6 of 7 ADDENDUM Bidhst Item Description Specification Section Unit of Bid Unit Price Bid Value No. No. Measure Quantity 50 3301.0001 Pre -CCTV Inspection (Rondo) 33 01 31 LF 1,910.00 $4.50 $8,595.00 51 3301.0001 Pre -CCTV Inspection (For Existing 33 01 31 LF 1,000.00 $3.50 $3,500.00 Service Locations) 52 3301.0002 Post -CCTV Inspection 33 01 31 LF 6,755.00 $3.00 $20,265.00 53 3301.0002 Final -CCTV Inspection 33 01 31 LF 6,755.00 $2.00 $13,510.00 54 3301.0002 Final- Manhole CCTV Inspection 33 01 31 EA 32.00 $300.00 $9,600.00 55 3301.0101 Manhole Vacuum Testing 33 01 30 EA 32.00 $165.00 $5,280.00 56 3305.0103 Exploratory Excavation of Existing 33 05 30 EA 15.00 $3,500.00 $52,500.00 Utilities 57 3305.0107 Manhole Adjustment, Minor (Rondo) 3305 14 EA 6.00 $1,900.00 $11,400.00 58 3305.0109 Trench Safety 3305 10 LF 6,755.00 $1.00 $6,755.00 59 3305.0112 Concrete Collar for Manhole 3305 17 EA 29.00 $1,650.00 $47,850.00 60 3305.0113 Trench Water Stops (Rondo) 3305 15 EA 2.00 $500.00 $1,000.00 61 3471.0001 Traffic Control 3471 13 MO 14.00 $4,100.00 $57,400.00 62 3125.0101 SWPPP > 1 acre 31 25 00 LS 1.00 $52,000.00 $52,000.00 63 0171.0102 As -Built Survey 01 71 23 LS 1.00 $1,000.00 $1,000.00 64 0171.0101 Construction Staking 017123 LS 1.00 $16,500.00 $16,500.00 65 0241.13 Remove Existing Concrete Curb and Gutter 0241 15 LF 400.00 $7.15 $2,860.00 (Rondo) 66 3216.0101 6" Conc Curb and Gutter (Rondo) 32 16 13 LF 445.00 $68.20 $30,349.00 67 0241.0401 Remove Existing Concrete Driveway 0241 13 SF 2,831.00 $4.00 $11,324.00 68 3213.0401 Install New 6-Inch Concrete Driveway 32 1320 SF 2,081.00 $16.00 $33,296.00 69 3213.0403 8" Concrete Driveway (Rondo) 32 1320 SF 840.00 $17.60 $14,784.00 70 0241.0100 Remove Concrete Sidewalk 0241 13 SF 545.00 $3.00 $1,635.00 71 3213.0301 4" Concrete Sidewalk 32 1320 SF 545.00 $13.20 $7,194.00 72 0241.1700 12-Inch Pavement Pulverization (Rondo) 0241 15 SY 2,312.50 $14.00 $32,375.00 73 0241.1700 11-inch Pavement Pulverization 0241 15 SY 4,385.00 $12.00 $52,620.00 74 3211.0601 cem-Lime Stabilization @ 32 lbs/sy 32 1129 TN 103.00 $478.00 $49,234.00 75 3123.0101 Unclassified Street Excavation 3123 16 CY 163.00 $51.00 $8,313.00 76 3212.0302 2-Inch Surface Course Asphalt PG 70-22 32 12 16 SY 2,312.50 $22.00 $50,875.00 Tv9e "D" Rondo` 3212.0501 2-Inch Surface Course Asphalt, PG 64-22 77 32 12 16 SY 2,312.50 $20.00 $46,250.00 Tvoe" B" (Rondo) 78 3212.0303 3-Inch Surface Coarse Asphalt, Type "D" 32 12 16 SY 4,385.00 $31.00 $135,935.00 79 3305.0202 Imported Embedment/Backfill, CSS 33 05 10 CY 10.00 $150.00 $1,500.00 (Rondo) 80 3305.0204 Imported Embedment/Backfill, Crushed 33 05 10 CY 10.00 $75.00 $750.00 Rock (Rondo) 81 3305.0207 Imported Embedment/Backfill, Select Fill 33 05 10 CY 10.00 $41.00 $410.00 (Rondo) 82 3217.5001 Painting Curb Addresses 32 1725 EA 47.00 $65.00 $3,055.00 83 3291.0100 Topsoil 329119 CY 23.00 $135.00 $3,105.00 84 3292.01 Block Sod Replacement 32 92 13 SY 126.00 $20.00 $2,520.00 85 9999.0004 Landscape allowance (for Sewer Service - LS 1.00 $60,000.00 $60,000.00 reroute) 86 9999.0005 Sanitary Sewer Construction Allowance LS 1.00 $100,000.00 $100,000.00 Sub -Total Unit 2 - Sewer Improvements: $3,277,134.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 1-Addendum 4 00 41 00 Bid Proposal Workbook 00 42 43 BID PROPOSAL Page 7 of 7 ADDENDUM Bidlist Item) Description I Specification Section I Unit of I Bid I Unit Price I Bid Value No. No. Measure Quantity Unit 3 - Paving Improvements TPW 50150 (Rondo Dr. ONLY) 1 3305.0108 Utility Adjustment (Irrigation adjustments) 3305 14 LS 1.00 $10,000.00 $10,000.00 {50/50) 2 241. 3 Remove Existing Concrete Curb and Gutter 0241 15 LF 750.00 $7.15 $5,362.50 rsn/Sm 3 3216.0102 6" Concrete Curb and Gutter (50150) 32 16 13 LF 750.00 $68.20 $51,150.00 4 0241.0401 Remove Concrete Drive (50150) 0241 13 SF 2,500.00 $3.85 $9,625.00 5 3213.0401 6" Concrete Driveway (50150) 32 1320 SF 1,000.00 $15.40 $15,400.00 6 3213.0403 8" Concrete Driveway (50150) 32 1320 SF 1,500.00 $17.60 $26,400.00 7 0241.0100 Remove 4-Inch Concrete Sidewalk (50150) 0241 13 SF 50.00 $2.75 $137.50 8 3213.0301 Install New 4-Inch Concrete Sidewalk 32 1320 SF 50.00 $13.20 $660.00 (50/50) 9 0241.1700 12-Inch Pavement Pulverization (50150) 0241 15 SY 4,625.00 $11.50 $53,187.50 10 3211.3300 8-Inch Chem -Lime Stabilization @ TN 69.375 $478.00 $33,161.25 32Lbs/SY (50150) 11 3123.0101 Unclassified Street Excavation (50150) 3123 16 CY 25.00 $51.00 $1,275.00 12 3212.0302 2-Inch Surface Course Asphalt PG 70-22 32 12 16 SY 4,625.00 $22.00 $101,750.00 Tv�e "D" f 50/50) 3212.0501 2-Inch Surface Course Asphalt, PG 64-22 13 Tvr�e" B" f 50/50 32 12 16 SY 4,625.00 $20.00 $92,500.00 14 3305.0111 Water Valve Box Adjustment with Concrete Collar (50150) 3305 14 EA 6.00 $800.00 $4,800.00 15 3217.5001 Painting Curb Addresses (50150) 32 1725 EA 7.50 $65.00 $487.50 16 3291.0100 Topsoil (50150) 3291 19 CY 10.00 $236.00 $2,360.00 17 3292.0100 Block Sod Replacement (50150) 3292 13 SY 50.00 $45.00 $2,250.00 18 3349.5006 Remove and Replace Inlet Top, 10' (50/50) 33 49 20 EA 2.00 $5,100.00 $10,200.00 19 9999.0001 Paving Construction Allowance LS 1.00 $60,000.00 $60,000.00 Sub -Total Unit 3 - Paving Improvments: $480,706.25 Total Bid = Sub -Total Unit 1 + Sub -Total Unit 2 + Sub -Total Unit 3: $ $10,103,000.75 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 1-Addendum 4 00 41 00 Bid Proposal Workbook KNOW ALL MEN BY THESE PRESENTS: That We, Venus Construction Company As Principal, and the Hartford Fire Insurance Co, a corporation organized and existing under the laws of the state of New York, and authorized to do business in the State of Texas as Surety are held and firmly bound unto the City of Fort Worth as Obligee, In the amount of Five Percent of Greatest Amount Bid (5% of GAB) DOLLARS, Lawful money of the United States of America, to the payment of which sum of money well and truly to be made, the said Principal and Surety bind themselves, their and each of their heirs, executors, administrators, successors and assigns, jointly and severally, by these presents. THE CONDITIONS OF THIS OBLIGATION IS SUCH, that, if the Obligee shall make any award to the principal for: Water and Sanitary Sewer Replacement Contract 2020, WSM-M City Project No. 103413 According to the terms of the proposal or bid made by the Principal therefor, and the Principal shall duly make and enter into a contract with the Obligee in accordance with the terms of said proposal or bid and award and shall give bond for the faithful performance thereof, with The Hartford Fire Insurance Co as Surety or with other Surety or Sureties approved by the Obligee; or if the Principal shall, in case of failure so to do, pay to the Obligee the damages which the Obligee may suffer by reason of such failure not exceeding the penalty of this bond, then this obligation shall be null and void; otherwise it shall be and remain in full force and effect. Signed, Sealed, and Dated this 13th day of June , 2024 Venus Construction Company Principal BY art (Seal) Hartford Fire Insurance Co BY (Seal) Lloyd Ray itts Jr -Attorney-ln-Fact Direct Inquiries/Claims to: THE HARTFORD POWER OF ATTORNEY BO Hartfoneord, Connecticut 06155 Bond.Claims(a).thehartford.com call: 888-266-3488 or fax: 860-757-5835 KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Name: PITTS FENNELL & ASSOCIATES LLC Agency Code: 4 6 - 508944 X� Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut 0 Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana 0 Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint, up to the amount of Unlimited : Lloyd R. Pitts, Jordan A. Pitts of DALLAS, Texas their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on beha!f of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness `Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on May 23, 2016 the Companies have caused these presents to be. signed by its Assistant Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. �� y��.,,ss�\v�� __ 'r ��ey'`',��'..y�+c:nae�.ti.:ruris.u..::ro�br�.r'1a� � " ' L%9s.I�A7t?► �''v`s,,;* Ici�n�cs9s jf4i�_= 3'y3��`-40 •79�Ojfia97"IOIM..o��t9 `,.. Shelby Wiggins, Assistant Secretary Joelle L. LaPierre, Assistant Vice President STATE OF FLORIDA Ss. Lake Mary COUNTY OF SEMINOLE On this 20th day of May, 2021, before me personally came Joelle LaPierre, to me known, who being by me duly sworn, did depose and say: that (s)he resides in Seminole County, State of Florida; that (s)he is the Assistant Vice President of the Companies, the corporations described in and which executed the above instrument; that (s)he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that (s)he signed his/her name thereto by like authority. Jessica Ciccone My Commission HH 122280 Expires June 20, 2025 I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is still in full force effective as of June 13 th, 2024 Signed and sealed in Lake Mary, Florida. �tY rtk� J� �•�\lies rirF �yy. ��sa�a� c M vee+.�e.rri�• ►' y,9a%' �.1 3' ,r�°n°"+.o`i'"^se. �s rosulNl, }tSs 1079 a ?079 = 79T9 • � F6Tat""0\��. �jIL '. R►�� • �".. 'Lf r�OIS� h01M�. "44 1A j Z` ?-� Keith D. Dozois, Assistant Vice President 00 43 37 VENDOR COMPLIANCE TO STATE LAW Page 14 of 15 SECTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors whose corporate offices or principal place of business are outside the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresident's principal place of business is located. The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by State Law. A copy of the statute is attached. Nonresident bidders in the State of are not required to underbid resident bidders. , our principal place of business, B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. 0 BIDDER: END OF SECTION By: Josh McAda (Signature) Title: President Date: 13-Jun-24 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 Addendum 4 00 41 00 Bid Proposal Workbook 004511-1 BIDDERS PREQUALIFICATIONS Pagel of 3 1 SECTION 00 45 11 2 BIDDERS PREQUALIFICATIONS 4 1. Summary. A Bidder or their designated subcontractors are required to be prequalified or 5 have applied for prequalification by the City for the work types requiring prequalification 6 prior to submitting bids. To be considered for award of contract the Bidder must submit 7 Section 00 45 12, PREQUALIFICATION STATEMENT for the work type(s) listed with 8 their Bid. Any contractor or subcontractor who is not prequalified for the work type(s) listed 9 must submit Section 00 45 13, PREQUALIFICATION APPLICATION in accordance with 10 the requirements below. The information must be submitted seven (7) days prior to the 11 date of the opening of bids. Subcontractors must follow the same timelines as contractors 12 for obtaining prequalification review. Bidders or Subcontractors who are not prequalified at 13 the time bids are opened and reviewed may cause the bid to be rejected. 14 15 16 The prequalification process will establish a bid limit based on a technical evaluation and 17 financial analysis of the contractor. For example, a contractor wishing to submit bids on 18 projects to be opened on the 7th of April must file the information by the 31 st day of March 19 in order to eligible to work on these projects. In order to facilitate the approval of a Bidder's 20 Prequalification Application, the following must accompany the submission. 21 a. A complete set of audited or reviewed financial statements. 22 (1) Classified Balance Sheet 23 (2) Income Statement 24 (3) Statement of Cash Flows 25 (4) Statement of Retained Earnings 26 (5) Notes to the Financial Statements, if any 27 b. A certified copy of the firm's organizational documents (Corporate Charter, Articles 28 of Incorporation, Articles of Organization, Certificate of Formation, LLC 29 Regulations, and Certificate of Limited Partnership Agreement). 30 c. A completed Bidder Prequalification Application. 31 (1) The firm's Texas Taxpayer Identification Number as issued by the Texas 32 Comptroller of Public Accounts. To obtain a Texas Taxpayer Identification 33 number visit the Texas Comptroller of Public Accounts online at the 34 following web address www.window.state.tx.us/taxoermit/ and fill out the 35 application to apply for your Texas tax ID. 36 (2) The firm's e-mail address and fax number. 37 (3) The firm's DUNS number as issued by Dun & Bradstreet. This number 38 is used by the City for required reporting on Federal Aid projects. The DUNS 39 number may be obtained at www.dnb.com. 40 d. Resumes reflecting the construction experience of the principles of the firm for firms 41 submitting their initial prequalification. These resumes should include the size and 42 scope of the work performed. 43 e. Other information as requested by the City. 44 45 2. Prequalification Requirements 46 a. Financial Statements. Financial statement submission must be provided in 47 accordance with the following: 48 (1) The City requires that the original Financial Statement or a certified copy 49 be submitted for consideration. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised August 13, 2021 0045 11 - 2 BIDDERS PREQUALIFICATIONS Page 2 of 3 1 (2) To be satisfactory, the financial statements must be audited or reviewed 2 by an independent, certified public accounting firm registered and in 3 good standing in any state. Current Texas statues also require that 4 accounting firms performing audits or reviews on business entities within 5 the State of Texas be properly licensed or registered with the Texas State 6 Board of Public Accountancy. 7 (3) The accounting firm should state in the audit report or review whether 8 the contractor is an individual, corporation, or limited liability company. 9 (4) Financial Statements must be presented in U.S. dollars at the current rate 10 of exchange of the Balance Sheet date. 11 (5) The City will not recognize any certified public accountant as 12 independent who is not, in fact, independent. 13 (6) The accountant's opinion on the financial statements of the contracting 14 company should state that the audit or review has been conducted in 15 accordance with auditing standards generally accepted in the United 16 States of America. This must be stated in the accounting firm's opinion. 17 It should: (1) express an unqualified opinion, or (2) express a qualified 18 opinion on the statements taken as a whole. 19 (7) The City reserves the right to require a new statement at any time. 20 (8) The financial statement must be prepared as of the last day of any month, 21 not more than one year old and must be on file with the City 16 months 22 thereafter, in accordance with Paragraph 1. 23 (9) The City will determine a contractor's bidding capacity for the purposes 24 of awarding contracts. Bidding capacity is determined by multiplying the 25 positive net working capital (working capital = current assets — current 26 liabilities) by a factor of 10. Only those statements reflecting a positive 27 net working capital position will be considered satisfactory for 28 prequalification purposes. 29 (10) In the case that a bidding date falls within the time a new financial 30 statement is being prepared, the previous statement shall be updated with 31 proper verification. 32 b. Bidder Prequalification Application. A Bidder Prequalification Application must be 33 submitted along with audited or reviewed financial statements by firms wishing to be 34 eligible to bid on all classes of construction and maintenance projects. Incomplete 35 Applications will be rejected. 36 (1) In those schedules where there is nothing to report, the notation of 37 "None" or "N/A" should be inserted. 38 (2) A minimum of five (5) references of related work must be provided. 39 (3) Submission of an equipment schedule which indicates equipment under 40 the control of the Contractor and which is related to the type of work for 41 which the Contactor is seeking prequalification. The schedule must 42 include the manufacturer, model and general common description of 43 each piece of equipment. Abbreviations or means of describing 44 equipment other than provided above will not be accepted. 45 46 3. Eligibility for Award of Contract 47 a. The City shall be the sole judge as to a contractor's prequalification. 48 b. The City may reject, suspend, or modify any prequalification for failure by the 49 contractor to demonstrate acceptable financial ability or performance. 50 c. The City will issue a letter as to the status of the prequalification approval. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised August 13, 2021 0045 11 -3 BIDDERS PREQUALIFICATIONS Page 3 of 3 1 d. If a contractor has a valid prequalification letter, the contractor will be eligible to 2 perform the prequalified work types until the expiration date stated in the letter. 3 8 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS WATER AND SANITARY SEWER REPLACEMENT Revised August 13, 2021 CPN.• 103413 00 45 12 PREQUALIFICATION STATEMENT Page 15 of 15 SECTION 00 45 12 PREQUALIFICATION STATEMENT Each Bidder for a City procurement is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. Major Work Type Water Distribution, Urban and Renewal, 8-inch diameter and smaller Sewer Collection System, 18- inch and smaller odinLdiy JCWCI Manholes/Structure Interior Lining (Warren or Chesteron) ('nnfinn Asphalt Paving Construction/Reconstruction (15,000 SY and less) Contractor/Subcontractor Company Name Prequalification Expiration Date Venus Construction 5/31/2025 Venus Construction 5/31/2025 BCAC Underground, LLC 4/30/2025 Texas Materials Group, Inc. 12/31/2024 The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: Venus Construction 1426 S. Main Street Mansfield, Texas 76063 0 END OF SECTION By: Josh M/c,Ada(� Signature) Title: President Date: 6 /3— z ° z CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 09/30/2021 Addendum 4 00 41 00 Bid Proposal Workbook FORT WORTH. SECTION 00 4513 PREQUALIFICATION APPLICATION Date of Balance Sheet Name under which you wish to qualify Post Office Box Street Address (required) ( 1 Telephone Mark only one: Individual Limited Partnership General Partnership Corporation Limited Liability Company City State Zip Code City State Zip Code ( 1 Fax Email Texas Taxpayer Identification No. Federal Employers Identification No. DUNS No. (if applicable) Email/mail this questionnaire along with financial statements to the appropriate group below. A separate submittal is required for water/sewer, paving, and lighting: Work Category — Water Dept - Water/sewer Work Category — TPW Paving Work Category — TPW Ped/Rdwy Lighting john.kasavich@FortWorthTexas.gov TPW_Prequalification@fortworthtexas.gov clint.hoover@fortworthtexas.gov Fort Worth Water Department Engineering and City of Fort Worth Transportation and Public City of Fort Worth TPW Transportation Fiscal Services Division 200 Texas St. Fort Works Dept. 3741 SW Loop 820, Fort Worth, Management Attn: Clint Hoover, P.E. 5001 Worth, TX 76102 TX 76133 Attn: Alicia Garcia James Ave. Fort Worth, TX 76115 *Financial Statements must be mailed. Mark the envelope: "Bidder Prequalification Application" 004513-2 BIDDER PREQUALIFICATION APPLICATION Page 2 of 8 BUSINESS CLASSIFICATION The following should be completed in order that we may properly classify your firm: (Check the block(s) which are applicable — Block 3 is to be left blank if Block 1 and/or Block 2 is checked) Has fewer than 100 employees and/or Has less than $6,000,000.00 in annual gross receipts OR Does not meet the criteria for being designated a small business as provided in Section 2006.001 of the Texas Government Code. The classification of your firm as a small or large business is not a factor in determining eligibility to become prequalified. Select major work categories for which you would like to be prequalified (City may deem you are not qualified for selected category or may approve you at a lesser size/length and maximum size may not be listed specifically under a major work category): MAJOR WORK CATEGORIES Water Department Augur Boring - 24-inch diameter casing and less Augur Boring - Greater than 24-inch diameter casing and greater Tunneling — 36-Inches — 60 —inches, and 350 LF or less Tunneling - 36-Inches — 60 —inches, and greater than 350 LF Tunneling — 66" and greater, 350 LF and greater Tunneling — 66" and greater, 350 LF or Less _ Cathodic Protection Water Distribution, Development, 8-inch diameter and smaller _ Water Distribution, Urban and Renewal, 8-inch diameter and smaller Water Distribution, Development, 12-inch diameter and smaller _ Water Distribution, Urban and Renewal, 12-inch diameter and smaller Water Transmission, Development, 24-inches and smaller _ Water Transmission, Urban/Renewal, 24-inches and smaller Water Transmission, Development, 42-inches and smaller _ Water Transmission, Urban/Renewal, 42-inches and smaller Water Transmission, Development, All Sizes _ Water Transmission, Urban/Renewal, All Sizes Sewer Bypass Pumping, 18-inches and smaller Sewer Bypass Pumping, 18-inches — 36-inches Sewer Bypass Pumping 42-inches and larger _ CCTV, 8-inches and smaller _ CCTV, 12-inches and smaller _ CCTV, 18-inches and smaller CCTV, 24-inches and smaller CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.- 103413 Revised August 13, 2021 004513-3 BIDDER PREQUALIFICATION APPLICATION Page 3 of 8 MAJOR WORK CATEGORIES, CONTINUED _! CCTV, 42-inches and smaller _ CCTV, 48-inches and smaller _ Sewer CIPP, 12-inches and smaller _ Sewer CIPP, 24-inches and smaller _ Sewer CIPP, 42-inches and smaller _ Sewer CIPP, All Sizes Sewer Collection System, Development, 8-inches and smaller Sewer Collection System, Urban/Renewal, 8-inches and smaller Sewer Collection System, Development, 12-inches and smaller Sewer Collection System, Urban/Renewal, 12-inches and smaller Sewer Interceptors, Development, 24-inches and smaller Sewer Interceptors, Urban/Renewal, 24-inches and smaller Sewer Interceptors, Development, 42-inches and smaller Sewer Interceptors, Urban/Renewal, 42-inches and smaller Sewer Interceptors, Development, 48-inches and smaller Sewer Interceptors, Urban/Renewal, 48-inches and smaller Sewer Pipe Enlargement 12-inches and smaller Sewer Pipe Enlargement 24-inches and smaller Sewer Pipe Enlargement, All Sizes Sewer Cleaning, 24-inches and smaller Sewer Cleaning, 42-inches and smaller Sewer Cleaning, All Sizes Sewer Cleaning, 8-inches and smaller Sewer Cleaning, 12-inches and smaller Sewer Siphons 12-inches or less Sewer Siphons 24-inches or less Sewer Siphons 42-inches or less Sewer Siphons All Sizes Transportation Public Works Asphalt Paving Construction/Reconstruction (LESS THAN 15,000 square yards) Asphalt Paving Construction/Reconstruction (15,000 square yards and GREATER) Asphalt Paving Heavy Maintenance (UNDER $1,000,000) Asphalt Paving Heavy Maintenance ($1,000,000 and OVER) Concrete Paving Construction/Reconstruction (LESS THAN 15,000 square yards)* Concrete Paving Construction/Reconstruction (15,000 square yards and GREATER)* Roadway and Pedestrian Lighting NOTE *There is not a prequalification requirement for installation of concrete sidewalk, curb & gutter, driveways, and panel replacement, only on concrete street / ROW paving CITY OF FORT WORTH WATER AND SANITARYSEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 13, 2021 CPN: 103413 004513-4 BIDDER PREQUALIFICATION APPLICATION Page 4 of 8 1. List equipment you do not own but which is available by renting DESCRIPTION OF EQUIPMENT NAME AND DETAILED ADDRESS OF OWNER 2. How many years has your organization been in business as a general contractor under your present name? List previous business names: 3. How many years of experience in had: (a) As a General Contractor: construction work has your organization (b) As a Sub -Contractor: 4. *What projects has your organization completed in Texas and elsewhere? CLASS LOCATION CONTRACT OF DATE CITY -COUNTY - AMOUNT WORK COMPLETED STATE *If requalifying only show work performed since last statement. 5.Have you ever failed to complete any work awarded to you? If so, where and why? NAME AND DETAILED ADDRESS OF OFFICIAL TO WHOM YOU REFER 6. Has any officer or owner of your organization ever been an officer of another organization that failed to complete a contract? If so, state the name of the individual, other organization and reason. 7. Has any officer or owner of your organization ever failed to complete a contract executed in his/her name? If so, state the name of the individual, name of owner and reason. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 13, 2021 CPN: 103413 004513-5 BIDDER PREQUALIFICATION APPLICATION Page 5 of 8 8. In what other lines of business are you financially interested? 9. Have you ever performed any work for the City? If so, when and to whom do you refer? 10. State names and detailed addresses of all producers from whom you have purchased principal materials during the last three years. I NAME OF FIRM OR COMPANY DETAILED ADDRESS 11. Give the names of any affiliates or relatives currently debarred by the City. Indicate your relationship to this person or firm. 12. What is the construction experience of the principal individuals in your organization? PRESENT MAGNITUDE POSITION OR YEARS OF AND TYPE OF IN WHAT NAME OFFICE EXPERIENCE WORK CAPACITY 13. If any owner, officer, director, or stockholder of your firm is an employee of the City, or shares the same household with a City employee, please list the name of the City employee and the relationship. In addition, list any City employee who is the spouse, child, or parent of an owner, officer, stockholder, or director who does not live in the same household but who receives care and assistance from that person as a direct result of a documented medical condition. This includes foster children or those related by adoption or marriage. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS WATER AND SANITARY SEWER REPLACEMENT Revised August 13, 2021 CPN.- 103413 CORPORATION BLOCK If a corporation: Date of Incorporation Charter/File No. President Vice Presidents Secretary Treasurer LIMITED LIABILITY COMPANY BLOCK If a corporation: State of Incorporation Date of organization File No. Officers or Managers (with titles, if any) 004513-6 BIDDER PREQUALIFICATION APPLICATION Page 6 of 8 PARTNERSHIP BLOCK If a partnership: State of Organization Date of organization Is partnership general, limited, or registered limited liability partnership? File No. (if Limited Partnership) General Partners/Officers Limited Partners (if applicable) Individuals authorized to sign for Partnership Except for limited partners, the individuals listed in the blocks above are presumed to have full signature authority for your firm unless otherwise advised. Should you wish to grant signature authority for additional individuals, please attach a certified copy of the corporate resolution, corporate minutes, partnership agreement, power of attorney or other legal documentation which grants this authority. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 13, 2021 WATER AND SANPTARYSEWER REPLACEMENT CPN: 103413 004513-7 BIDDER PREQUALIFICATION APPLICATION Page 7 of 8 14. Equipment TOTAL Similar types of equipment may be lumped together. If your firm has more than 30 types of equipment, you may show these 30 types and show the remainder as 'various". The City, by allowing you to show only 30 types of equipment, reserves the right to request a complete, detailed list of all your equipment. The equipment list is a representation of equipment under the control of the firm and which is related to the type of work for which the firm is seeking qualification. In the description include, the manufacturer, model, and general common description of each. ITEM QUANTITY 1 2 3 4 5 6 7 8 9 10 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Various - ITEM DESCRIPTION TOTAL BALANCE SHEET VALUE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS WATER AND SANITARY SEWER REPLACEMENT Revised August 13, 2021 CPN: 103413 004513-8 BIDDER PREQUALIFICATION APPLICATION Page 8 of 8 BIDDER PREQUALIFICATION AFFIDAVIT STATE OF COUNTY OF The undersigned hereby declares that the foregoing is a true statement of the financial condition of the entity herein first named, as of the date herein first given; that this statement is for the express purpose of inducing the party to whom it is submitted to award the submitter a contract; and that the accountant who prepared the balance sheet accompanying this report as well as any depository, vendor or any other agency herein named is hereby authorized to supply each party with any information, while this statement is in force, necessary to verify said statement. , being duly sworn, deposes and says that he/she is the of . the entity described in and which executed the foregoing statement that he/she is familiar with the books of the said entity showing its financial condition; that the foregoing financial statement taken from the books of the said entity as of the date thereof and that the answers to the questions of the foregoing Bidder Prequalification Application are correct and true as of the date of this affidavit. Firm Name: Signature: Sworn to before me this day of Notary Public Notary Public must not be an officer, director, or stockholder or relative thereof. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 13, 2021 CPN: 103413 2 3 4 5 6 7 8 9 10 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 00 45 2b - 1 CONTRACTOR COMPLIANCE WITII WORKER'S COMPENSATION LAW Page I of I SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No. 103413. Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: VL'Nu5 CON Jr/TU By: 0_of d %`'fcAoA Company (Please Print) I'4JI1A/ S' _Ti2Cc r Signature: c, Address MA,vs/i�r.� . errs 76 o G 3 Title: Piz D'S/pa',�i City/State/Zip (Please Print) THE STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, on this day personally appeared Tvs1� M,AIa , known to me to be the person whose name is subscribed to the fare of 'going instrument, and acknowledged to me that he/she executed the same as the act and deed of Vrrs�, d\* sJ - for the purposes and consideration therein expressed and in the capacity therein stated. GIx EN UNDER MY HAND AND EAL OF OFFICE this a day of kC6, %V , 2000!, •,,`5`�411t1111 i11 I,,, �n/ RE/IIAV[: l Jftl Q `t/ Notaly Public in and for the State of Texas •••5�' ............ ENF�''% '•g' R..� :z n: END OF SECTION of 071�`••�• IIIIIIIIII%k0o CITY OF FORT WORTH sTANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 201 t I NATF. R AND S; f dV17:J RY SE1VF. R REPLACEMENT CPV: 103413 00 45 40 - 1 Business Equity Goal Page 1 of 2 1 SECTION 00 45 40 2 Business Equity Goal 3 APPLICATION OF POLICY 4 If the total dollar value of the contract is $100,000 or more, then a Business Equity goal is applicable. 5 A Business Equity Firm refers to certified Minority-, and/or Women-, owned Business Enterprises 6 (M/WBEs). 7 8 POLICY STATEMENT 9 It is the policy of the City of Fort Worth to ensure the full and equitable participation of Business Equity 10 Firms when applicable, in the procurement of all goods and services. All requirements and regulations 11 stated in the City's Business Equity Ordinance No.25165-10-2021, (replacing Ordinance No. 24534-11- 12 2020 (codified at: httDs:Hcodelibrarv.amleaal.com/codes/ftworth/latest/ftworth tx/0-0-0-22593) apply to 13 this bid. 14 15 BUSINESS EOUITY PROJECT GOAL 16 The City's Business Equity goal on this project is 20.95% of the total bid value of the contract (Base bid 17 applies to Parks and Community Services). 18 19 METHODS TO COMPLY WITH THE GOAL 20 On City contracts where a Business Equity Goal is applied, offerors are required to comply with the City's 21 Business Equity Ordinance by meeting or exceeding the above stated goal or otherwise comply with the 22 ordinance through one of the following methods: 1. Commercially useful services performed by a 23 Business Equity prime contractor, 2. Business Equity subcontracting participation, 3. Combination 24 of Business Equity prime services and Business Equity subcontracting participation, 4. Business 25 Equity Joint Venture/Mentor-Prot6g6 participation, 5. Good Faith Effort documentation, or 6. 26 Prime contractor Waiver documentation. 27 28 SUBMITTAL OF REOUIRED DOCUMENTATION 29 Applicable documents (listed below) must be received by the Purchasing Division, OR the offeror shall 30 EMAIL the Business Equity documentation to the assigned City of Fort Worth Project Manager or 31 Department Designee. Documents are to be received no later than 2:00 p.m., on the third City 32 business day after the bid opening date, exclusive of the bid opening date. 33 34 The Offeror must submit one or more of the following documents: 35 1. Utilization Form and Letter(s) of Intent, if the goal is met or exceeded; 36 2. Good Faith Effort Form and Utilization Form, including supporting documentation, if 37 participation is less than stated goal, or no Business Equity participation is accomplished; 38 3. Prime Contractor Waiver Form, including supporting documentation, if the Offeror will perform 39 all subcontracting/supplier opportunities; or 40 4. Joint Venture/Mentor-Prot6g6 Form, if goal is met or exceeded with a Joint Venture or Mentor- 41 Prot6g6 participation. 42 43 These forms can be found at: 44 Business Equity Utilization Form and Letter of Intent 45 httas://aaas.fortworthtexas.aov/ProiectResources/ResourcesP/60 - MWBEBusiness Ea_uity Utilization 46 Form DVIN 2022 220324.ndf 47 48 Letter of Intent CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised October 27, 2021 004540-2 Business Equity Goal Page 2 of 2 1 httDs://aDDs.fortworthtexas.2_ ov/Pro_iectResources/ResourcesP/60 - MWBE/Letter of Intent_DVIN 2 2021.Ddf 3 4 Business Equity Good Faith Effort Form 5 httDs://aDDs.fortworthtexas.aov/ProiectResources/ResourcesP/60 - MWBE/Good Faith Effort 6 Form DVIN 2022.Ddf 7 8 Business Equity Prime Contractor Waiver Form 9 httDs://aDDs.fortworthtexas.aov/ProiectResources/ResourcesP/60 - MWBE/MWBE Prime Contractor 10 Waiver-220313.Ddf 11 12 Business Equity Joint Venture Form 13 httDs://aDDs.fortworthtexas.2ov/Pro_iectResources/ResourcesP/60 - MWBE/MWBE Joint 14 Venture 220225.Ddf 15 16 17 FAILURE TO ACHIEVE THE GOAL OR OTHERWISE COMPLY WITH THE ORDINANCE WILL 18 RESULT IN THE BIDDER/OFFEROR BEING DECLARED NON -RESPONSIVE AND THE BID 19 REJECTED. 20 21 22 FAILURE TO SUBMIT THE REOUIRED BUSINESS EOUTY DOCUMENTATION OR OTHERWISE 23 COMPLY WITH THE ORDINANCE WILL RESULT IN THE BID BEING DECLARED NON- 24 RESPONSIVE, THE BID REJECTED AND MAY SUBJECT THE BIDDER/OFFEROR TO SANCTIONS 25 AS DESCRIBED IN SEC. 20-373 OF THE ORDINANCE. 26 27 For Questions, Please Contact The Business Equity Division of the Department of Diversity and 28 Inclusion at (817) 392-2674. 29 END OF SECTION 30 CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised October 27, 2021 00 52 43 - 1 Agreement Page 1 of SECTION 00 52 43 AGREEMENT THIS AGREEMENT, authorized on , is made by and between the City of Fort Worth, a Texas home rule municipality, ac ing UY and through its duly authorized City Manager, ("City"), and Venus Construction Company, Inc. , authorized to do business in Texas, acting by and through its duly authorized representative, ("Contractor"), City and Contractor may jointly be referred to as Parties. City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK Contractor shall complete all Work as specified or indicated in the Contract Documents for the Project identified herein. Article 2. PROJECT The project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: Water and Sanitary Server Replacement, 2020 WSM-M Citv Proiect No. 103413 Article 3. CONTRACT PRICE City agrees to pay Contractor for performance of the Work in accordance with the Contract Documents an amount, in current funds, of Ten Million One Hundred Three Thousand and 75/100 Dollars ($ 10,103,000.75 ). Contract price may be adjusted by change orders duly authorized by the Parties. Article 4. CONTRACT TIME 4.1 Final Acceptance. The Work shall be complete for Final Acceptance within 630 days after the date when the Contract Time commences to run, as provided in Paragraph 2.02 of the General Conditions, plus any extension thereof allowed in accordance with Article 12 of the General Conditions. 4.2 Liquidated Damages Contractor recognizes that time is of the essence for completion of Milestones, if any, and to achieve Final Acceptance of the Work and City and the public will suffer from loss of use if the Work is not completed within the time(s) specified in Paragraph 4.1 above. The Contractor also recognizes the delays, expense and difficulties involved in proving in a legal proceeding, the actual loss suffered by the City if the Work is not completed on time. Accordingly, instead of requiring any such proof, Contractor agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay City Six Hundred and Fiftv Dollars ($650.00i for each day that expires after the time specified in Paragraph 4.1 for Final Acceptance until the City issues the Final Letter of Acceptance. OFFICIAL RECORD Article 5. CONTRACT DOCUMENTS 5.1 CONTENTS: CITY SECRETARY FT. WORTH, TX A.The Contract Documents which comprise the entire agreement between City and Contractor concerning the Work consist of the following: CITY OF FORT WORTH ]PATER AND SANITARY Sri ER REPLACEb1ENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised March 3, 2024 00 52 43 - 2 Agreement Page 2 of 6 1. This Agreement. 2. Attachments to this Agreement: a. Bid Form 1) Proposal Form 2) Vendor Compliance to State Law Non -Resident Bidder 3) Prequalification Statement 4) State and Federal documents (project specific) b. Current Prevailing Wage Rate Table c. Insurance Certification Form (ACORD or equivalent) d. Payment Bond e. Performance Bond f. Maintenance Bond g. Power of Attorney for the Bonds h. Worker's Compensation Affidavit i. MBE and/or SBE Utilization Form 3. General Conditions. 4. Supplementary Conditions. 5. Specifications specifically made a part of the Contract Documents by attachment or, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents. 6. Drawings. 7. Addenda. 8. Documentation submitted by Contractor prior to Notice of Award. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. Article 6. INDEMNIFICATION 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the city, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under this contract. This indemnification provision is specifically intended to operate and be effective even if it is alleged or proven that all or some of the damages being; sought were caused, in whole or in part, by anv act, omission or ne ligence of the citv. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the city in defending against such claims and causes of actions. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised March 3, 2024 00 52 43 - 3 Agreement Page 3 of 6 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the city, arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licensees or invitees under this contract. This indemnification Drovision is specifically intended to operate and be effective even if it is alleged or proven that all or some of the damages being sought were caused, in whole or in Dart, by anv act, omission or negligence of the citv. Article 7. MISCELLANEOUS 7.1 Terms. Terms used in this Agreement which are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions. 7.2 Assignment of Contract. This Agreement, including all of the Contract Documents may not be assigned by the Contractor without the advanced express written consent of the City. 7.3 Successors and Assigns. City and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, in respect to all covenants, agreements and obligations contained in the Contract Documents. 7.4 Severability/Non-Waiver of Claims. Any provision or part of the Contract Documents held to be unconstitutional, void or unenforceable by a court of competent jurisdiction shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon City and Contractor. The failure of City or Contractor to insist upon the performance of any term or provision of this Agreement or to exercise any right granted herein shall not constitute a waiver of City's or Contractor's respective right to insist upon appropriate performance or to assert any such right on any future occasion. 7.5 Governing Law and Venue. This Agreement, including all of the Contract Documents is performable in the State of Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the Northern District of Texas, Fort Worth Division. 7.6 Authority to Sign. Contractor shall attach evidence of authority to sign Agreement if signed by someone other than the duly authorized signatory of the Contractor. OFFICIAL RECORD 7.7 Non -appropriation of Funds. CITY SECRETARY FT. WORTH, TX In the event no funds or insufficient funds are appropriated by City in any fiscal period for any payments due hereunder, City will notify Vendor of such occurrence and this Agreement shall terminate on the last day of the fiscal period for which appropriations were received without penalty or expense to City of any kind whatsoever, except as to the portions of the payments herein agreed upon for which funds have been appropriated. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised March 3, 2024 00 52 43 - 4 Agreement Page 4 of 6 7.8 Prohibition On Contracts With Companies Boycotting Israel. Contractor, unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of the Texas Government Code, if Contractor has 10 or more full time -employees and the contract value is $100,000 or more, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Contractor certifies that Contractor's signature provides written verification to the City that if Chapter 2271, Texas Government Code applies, Contractor: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. 7.9 Prohibition on Boycotting Energy Companies. Contractor acknowledges that in accordance with Chapter 2276 of the Texas Government Code, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more, which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meaning ascribed to those terms by Chapter 2276 of the Texas Government Code. To the extent that Chapter 2276 of the Government Code is applicable to this Agreement, by signing this Agreement, Contractor certifies that Contractor's signature provides written verification to the City that Contractor: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. 7.10 Prohibition on Discrimination Against Firearm and Ammunition Industries. Contractor acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Contractor certifies that Contractor's signature provides written verification to the City that Contractor: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX CITY OF FORT WORTH WATER AND SANITARYSEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised March 3, 2024 005243-5 Agreement Page 5 of 6 7.11 Immigration Nationality Act. Contractor shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Contractor shall provide City with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Contractor shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Contractor employee who is not legally eligible to perform such services. CONTRACTOR SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY CONTRACTOR, CONTRACTOR'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Contractor, shall have the right to immediately terminate this Agreement for violations of this provision by Contractor. 7.12 No Third -Party Beneficiaries. This Agreement gives no rights or benefits to anyone other than the City and the Contractor and there are no third -party beneficiaries. 7.13 No Cause of Action Against Engineer. Contractor, its subcontractors and equipment and materials suppliers on the PROJECT or their sureties, shall maintain no direct action against the Engineer, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the City will be the beneficiary of any undertaking by the Engineer. The presence or duties of the Engineer's personnel at a construction site, whether as on -site representatives or otherwise, do not make the Engineer or its personnel in any way responsible for those duties that belong to the City and/or the City's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The Engineer and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX CITY OF FORT WORTH WATER AND SANITARYSEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised March 3, 2024 005243-G Agreement Page 6 of IN WITNESS WHEREOF, City and Contractor have each executed this Agreement to be effective as of the date subscribed by the City's designated Assistant City Manager ("Effective Date"). Contractor: City of Fort Worth By: By: is Signature Fernando Costa Assistant City Manager (Printed Name) Se p 13, 2024 an Date 9Fr°bpd F1z , S 1 p 4N7 >s Vu°n°°°°ho, Title Attest: � ��4 aaIlIln�o 654ga 161 Z6 S. PA I A, 7 Address Jannette Goodall, City Secretary City/State/Zip (Seal) e-/1 3 / Zu z y M&C: 4,"Q kk Date Date: 13 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. P"411- Ale Preeti KC, P.E. Senior Project Manager Approved as to Form and Legality: giioGe9501—r Douglas Black (Sep 13, 202417:12 CDT) Douglas W. Black Sr. Assistant City Attorney APPROVAL. RECOMMENDED: Chki; rtovheY tfayo(el- Christopher Har r(Sep 12, 202407:49 CDT) Christopher P. Harder, P.E. Director, Water Department OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX CITY OF FORT WORTH 11'ATER AND SANITARYSEII'ER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Devised March 3, 2024 0061 13 - 1 PERFORMANCE BOND Page 1 of 2 Bond Number: 46BCSJE9666 1 SECTION 00 6113 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, Venus Construction Cornnanv, Inc. known as 8 "Principal" herein and Hartford Fire Insurance Comuanv a corporate 9 SUrety(sureties, if more than one) duly authorized to do business in the State of Texas, known as 10 "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a 11 municipal corporation created pursuant to the laws of Texas, known as "City" herein, in the penal 12 sum of, Teat Million One Hundred TIu'ee Thousand and 75/100 Dollars 13 ($ 10,103,000.75 _), lawful money of the United States, to be paid in Fort Worth, 14 Tarrant County, Texas for the payment of which sum well and truly to be made, Ave bind 15 ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, 16 firmly by these presents. 17 WHEREAS, the Principal has entered into a certain written contract with the City 18 awarded the 13th day of August , 20 24 , which Contract is hereby referred to and 19 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment 20 labor and other accessories defined by law, in the prosecution of the Work, including any Change 21 Orders, as provided for in said Contract designated as Water and Sanitary Sewer Replacement, 22 Contract 2020 WSM-M, City Project No. 103413. 23 NOW, THEREFORE, the condition of this obligation is such that if the said Principal 24 shall faithfully perform it obligations under the Contract and shall in all respects dilly and 25 faithfully perform the Work, including Change Orders, ,order the Contract, according to the plans, 26 specifications, and contract documents therein referred to, and as well during any period of 27 extension of the Contract that may be granted on the part of the City, then this obligation shall be 28 and become null and void, otherwise to remain in full force and effect. 29 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 30 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 31 Worth Division. CITY OF FORT WORTH li 4TERANDSANITARY3E11'Isli REPLACEd1ENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPA: 103413 Revised July I, 2011 0061 13 - 2 PERFORMANCE BOND Page 2 of 2 i This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statue. 4 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED 5 this instrument by duly authorized agents and officers on this the 13th day of 6 August 2024 . 7 8 9 10 11 12 13 c 16 (Principal) Secretary 17 18 19 2d 21 oc/ 22 Witness as to Principal 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 Witness as to Surety 38 Lloyd Ray Pitts Jr 39 40 PRINCIPAL: Venus Construction Company �n nn II f I) Signature 1 Nalne and Title Address: 1426 S Main Mansfield, TX 76063 SURETY: Hartford Fire Insurance Company BY: S iga}a�•e Jordan A Pitts, Attorney -In -Fact Naune and Title Address: One Hartford Plaza Hartford. Connecticut 06155 Telephone Number: 469-661-0314 41 *Note: 1f signed by an officer of the Surety Company, there must be on file a certified extract 42 from the by-laws showing that this person has authority to sign such obligation. If 43 Surety's physical address is different from its mailing address, both must be provided. 44 The date of the bond shall not be prior to the date the Contract is awarded. 45 CITY OF FORT WORTH W4TU AND S4A(1T11R)'SE1VER REPLICE,ILENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPA': 103413 Revised July 1, 2011 0061 la - 1 PAYMENT BOND Page l of 2 Bond Number: 46BCSJE9666 I SECTION 00 61 14 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, Venus Construction Company, Inc• known as 8 "Principal" herein, and Hartford Fire Insurance Company , a 9 corporate surety (sureties), duly authorized to do business in the State of Texas, known as 10 "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a I I municipal corporation created pursuant to the laws of the State of Texas, known as "City" herein, 12 in the penal suns of Ten Million One Hundred Three Thousand and 75/100 Dollars 13 ($ 10,103,000.75 ), lawful money of the United States, to be paid in Fort Worth, 14 Tarrant County, Texas, for the payment of which SUM well and truly be made, %ve bind ourselves, 15 our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these 16 presents: 17 WHEREAS, Principal has entered into a certain written Contract with City, awarded the 18 13°° day of August , 20 24 , which Contract is hereby referred to and 19 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, 20 labor and other accessories as defined by law, in the prosecution of the Work as provided for in 21 said Contract and designated as Water and Sanitary Sewer Replacement, Contract 2020 22 WSM-M, City Project No. 103413. 23 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 24 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 25 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 26 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 27 force and effect. 28 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 29 Texas Government Code, as amended, and all liabilities on this bond shall be determined ill 30 accordance with the provisions of said statute. 31 CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEe11ENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised July 1, 2011 0061 14-2 PAYMENT BOND Page 2 of 2 l IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED 2 this instrurnent by duly authorized agents and officers on this the 13th day of 3 Auaust , 2024 . 4 5 6 7 8 9 10 12 ATT T: r2���3*0 (Principal) Secretary Witness as to Principal ATTEST: T/�` , &- (Surety) Secretary Melissa Pitts, Bond Secretary Witness as to Surety Lloyd Ray Pitts Jr PRINCIPAL: Venus Construction Cottlpany Signature Y-e Sj e, Name and Title Address: 1426 S Main Mansfield, TX 76063 SURETY: Hartford Fire Insurance Company BY: l / Signatu lordan A Pitts, Attorn.ev_ -In-Fact Name and Title Address: One Hartford Plaza Hartford, Connecticut 06155 Telephone Number: 469-661-0314 Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical address is different front its rnailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. END OF SECTION CITY OF FORT WORTH M4TER AND SAN1TAR r SEWER REPLACEMENT STANDARD CONSTRUCr[ON SPECIFICATION DOCUMENTS CM 103413 Revised Juty 1, 2011 POWER OF ATTORNEY KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Name: PITTS FENNELL Agency Code: 46-508944 Direct Inquiries/Claims to: THE HARTFORD BOND, T-11 One Hartford Plaza Hartford, Connecticut 06155 Bond.Claims(a).thehartford.corrt call. 888-266-3468 orfax: 860.757.5835 & ASSOCIATES LLC Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut Hartford Underwriters Insurance Company, it corporation duly organized under the laws of the State of Connecticut Twin City Fire Insurance Company, it corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of Illinois, it corporation duly organized under the laws of the State of Illinois Hartford insurance Company of the Midwest, a corptoration duly organized under the laws of the State of Indiana Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint, up to the amount of unlimited : Lloyd R. Pitts, Jordan A. Pitts of DALLAS, Texas their true and lawful Attorneys) -in -Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by ®, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on May 23. 2016 the Companies have caused these presents to be signed by its Assistant Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. Mr F t9O T � ri k", x r au ♦!►4 [• 1to7 a-C. ".0 el,�4 19T4M•1 iS \i'Ise • 4'ry�r 111f0''r Irirll�, � __ A� Shelby Wiggins, Assistant Secretary Joelle L. LaPierre, Assistant Vice President STATE OF FLORIDA ss. Lake Mary COUNTY OF SEMINOLE On this 201h day of May, 2021, before me personally came Joelle LaPierre, to me known, who being by me duly sworn, did depose and say: that (s)he resides in Seminole County, State of Florida; that (s)he is the Assistant Vice President of the Companies, the corporations described in and which executed the above instrument; that (s)he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that (s)he signed hislher name thereto by like authority. .ICSSki Ciccone • '.�41 ..Couumssion HH 122280 Expiras hine 20, 2025 I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies• which is still in full force effective as of August 13 th, 2024 Signed and sealed in Lake Mary, Florida. rY ilk,' {^lklr-,f {r co{ �►r - 1's� rKr[r[u[�`; � �aHaM' �;4.1 ti 7 -C� r. • * y'-_[,[14\;- �Afd� CIA 'r ally • �9..R �t[Il9t5f ••f 111F•• �. Keith D. Dozois, Assistant Vice President Have a complaint or need help? If you have a problem with a claim or your premium, call your insurance company or HMO first. If you can't work out the issue, the Texas Department of Insurance may be able to help. Even if you file a complaint with the Texas Department of Insurance, you should also file a complaint or appeal through your insurance company or HMO. If you don't, you may lose your right to appeal. The Hartford To get information or file a complaint with your insurance company or HMO: Call: Consumer Affairs at 1-800- 451-6944 Toll -free: 1-800-451-6944 Email• bond.claims@thehartfoi-d.com Mail: The Hartford Financial Services One Hartford Plaza, T-14 Hartford, CT 06155 Attn: Bond Claims Department The Texas Department of Insurance To get help with an insurance question or file a complaint with the state: Call with a question: 1-800-252-3439 Email: ConsumerProtection@tdi.texas.gov File a complaint: www.tdi.texas.gov Mail: MC 111-1A, P.O. Box 149091, Austin, TX 78714-9091 0061 19- 1 MAINTENANCE BOND Page I of 3 Bond Number: 46BCSJE9666 1 SECTION 00 61 19 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we Venus Construction Company, Inc. known as S "Principal" herein and Hartford Fire Insurance Comuanv , a corporate surety 9 (sureties, if more than one) duly authorized to do business in the State of Texas, known as 10 "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a I municipal corporation created pursuant to the laws of the State of Texas, known as "City" herein, 12 in the sum of Ten Million One Hundred Three Thousand and 75/100 Dollars 13 ($ 10,103,000.75 ), lawful money of the United States, to be paid in Fort Worth, 14 Tarrant County, Texas, for payment of which sum well and truly be made unto the City and its 15 successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly 16 and severally, firmly by these presents. 17 18 WHEREAS, the Principal has entered into a certain written contract with the City awarded 19 the 13°' day of Aelgust , 20 24 , which Contract is hereby 20 referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all 21 materials, equipment labor and other accessories as defined by law, in the prosecution of the 22 Work, including any Work resulting from a duly authorized Change Order (collectively herein, 23 the "Work") as provided for in said contract and designated as Water and Sanitary Sewer 24 Replacement, Contract 2020 WSM-M, City Project No. 103413; and 25 26 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 27 accordance with the plans, specifications and Contract Documents that the Work is and will 28 remain free from defects in materials or workmanship for and during the period of two (2) years 29 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and 30 31 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part 32 upon receiving notice from the City of the need therefor at any time within the Maintenance 33 Period. 34 CITY OF FORT WORTH J 147T R AND .SAAITAR r SEII CR REPLACEHENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPA: 10343 Revised July I, 2011 1 2 3 4 5 G 7 S 9 10 11 12 13 14 15 16 17 IS 19 0061 19-2 MAINTENANCE BOND Page 2 of 3 NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy any defective Work, for which timely notice was provided by City, to a completion satisfactory to the City, then this obligation shall become null and void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely noticed defective Work, it is agreed that the City may caLIse any and all such defective Work to be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and the Surety under this Maintenance bond; and PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division; and PROVIDED FURTHER, that this obligation shall be continuous in nature and successive recoveries may be had hereon for successive breaches. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 JVATF,'R AND SANITARI'SEIi CR REPLACEMENT CPA!• 103413 0061 19-3 MAINTENANCE BOND Pace 3 of 3 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the 13th day of 3 August , 20 24 5 6 7 8 9 10 ll 12 �A 7 3 15 16 17 18 ff 19 l� 20 Witness as to Principal I 21 22 23 24 25 26 27 28 29 ATTEST: 30 n , 31 32 (Surety) Secretary M issa Pitts, Bond Secretary 33 34 35 Witness as to Surety Lloyd Ray Pitts Jr 36 PRINCIPAL: Venus Construction Company B Y • _7s" C"t, �k C"' Signature Name and Title) Address: 1426 S Main Mansfield, TX 76063 SURETY: Hartford Fire Insurance Company BY: •Si ure Jordan A Pitts, Attorney -In -Fact Name and Title Address: One Hartford PIaza Hartford, Connecticut 06155 Telephone Number: 469-661-0314 37 *Note: If signed by an officer of the Suety Company, there inust be on file a certified extract 38 from the by-laws showing that this person has authority to sign such obligation. If 39 Surety's physical address is different from its mailing address, both must be provided. 40 The date of the bond shall not be prior to the date the Contract is awarded. 41 CITY OF PORT WORTH II'ATER AND SANITARY SEIVER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPA': 103413 Revised July 1, 2011 Direct Inquiries/Claims to: THE HARTFORD POWER OF ATTORNEY °°"pectic One Hartford Plaza Hartford, Connecticut 06155 Bond.Claials(dthehartford.com call: 888-266.3488 orfax: 860-757-5835 KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Name: PITTS FENNELL, & ASSOCIATES LLC Agency Code: 46-5OB944 Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connectleut Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State or Indiana Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State ofCounecticut Hartford Underwriters Insurance Company, a corporation duly organized under the la%vs ofthe State of Connecticut Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana Hartford Insurance Company of Illinois, a corporationl duly organized under the laws of the State of Illinois Hartford Insurance Company of the Midwest, a corporation duly organized under the lanes of the State of Indiana Hartford Insurance Company of the Southeast, a corporation drily organized under late laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint, up to the amount of unlimited : Lloyd R. Pitts, Jordan A. Pitts of DALLAS, Texas their true and lawful Attorneys) -in -Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by R and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on May 23, 2016 the Companies have caused these presents to be signed by its Assistant Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. O RON: �4 ;� )le1R79 ��.rne��\'� ��tyaowo•�r r.r+f • ".Thll�01 rf 11Aa9• — fWaM SAS Shelby Wiggins, Assistant Secretary STATE OF FLORIDA 5s. Lake Mary COUNTY OF SEMINOLf On this 201h day of May, 2021, before me personally came Joelle LaPierre, to me known, who being by me duly sworn, did depose and say: that (S)he resides in Seminole County, State of Florida; that (s)he is the Assistant Vice President of the Companies, the corporations described in and which executed the above instrument; that (s)he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that (s)he signed his/her name thereto by like authority. yl a{?. Jessica Ciccone f of rtia.` %fy r'onuuissiun Hr3 122280 F.xpkcs hale 20, 2025 I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is still in full force effective as of August 13th, 2024 Signed and sealed in Lake Mary, Florida. 9 6 Z b 0 0 � W,,Ul, Joelle L. LaPierre, Assistant Vice President ,`rtdls ,frh ltrllY� Nta��4- y��ety°►. o ::4sk..f r,rril r . 0 r! r �,^+v�, -a'6 Jp°ro�" + ��P - of suffr,t.s •�l�N► € l8T 9 € rA T 0 f� �•y�`:•,_,nY, � : '+�-. .�s� st• � ;. � RC S►, .✓�� -fig,-IIPR9 �4t>.iU' R'. Y• • ..R f[f�91S !f1l R.� `� Keith D. Dozois, Assistant Vice President Have a complaint or need help? If you have a problem with a claim or your premium, call your insurance company or HMO first. If you can't work out the issue, the Texas Department of Insurance may be able to help. Even if you file a complaint with the Texas Department of Insurance, you should also file a complaint or appeal through your insurance company or HMO. If you don't, you may lose your right to appeal. The Hartford To get information or file a complaint with your insurance company or HMO: Call: Consumer Affairs at 1-800- 451-6944 Toll -free: 1-800-451-6944 Email: bond.claims@thehartfoi-d.com Mail: The Hartford Financial Services One Hartford Plaza, T-14 Hartford, CT 06155 Attn: Bond Claims Department The Texas Department of Insurance To get help with an insurance question or file a complaint with the state: Call with a question: 1-800-252-3439 Email: ConsumerProtection@tdi.texas.gov File a complaint: www.tdi.texas.gov Mail: MC 111-1A, P.O. Box 149091, Austin, TX 78714-9091 POLICY NUMBER: 41PKG1991901 COMMERCIAL GENERAL LIABILITY CG 20 34 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - LESSOR OF LEASED EQUIPMENT - AUTOMATIC STATUS WHEN REQUIRED IN LEASE AGREEMENT WITH YOU This endorsement modifies insurance provided under the following: COMMERCIAL_ GENERAL LIABILITY COVERAGE PART A. Section II — Who Is An Insured is amended to include as an additional insured any person(s) or organization(s) from whom you lease equipment when you and such person(s) or organization(s) have agreed in writing in a contract or agreement that such person(s) or organization(s) be added as an additional insured on your policy. Such person(s) or organization(s) is an insured only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by your maintenance, operation or use of equipment leased to you by such person(s) or organization(s). However, the insurance afforded to such additional insured: 1. Only applies to the extent permitted by law; and 2. Will not be broader than that which you are required by the contract or agreement to provide for such additional insured. A person's or organization's status as an additional insured under this endorsement ends when their contract or agreement with you for such leased equipment ends. B. With respect to the insurance afforded to these additional insureds, this insurance does not apply to any "occurrence" which takes place after the equipment lease expires. C. With respect to the insurance afforded to these additional insureds, the following is added to Section III -- Limits Of Insurance: The most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement you have entered into with the additional insured; or 2. Available under the applicable limits of insurance; whichever is less. This endorsement shall not increase the applicable limits of insurance. CG 20 34 12 19 ©insurance Services Office, Inc., 2018 Page 'I of 1 POLICY NUMBER: 41 PKG1991901 COMMERCIAL GENERAL LIABILITY CG 20 38 1219 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - AUTOMATIC STATUS FOR OTHER PARTIES WHEN REQUIRED IN WRITTEN CONSTRUCTION AGREEMENT This endorsement modifies insurance provided under the following: COMMERCIAL. GENERAL LIABILITY COVERAGE PART A. Section II — Who Is An Insured is amended to include as an additional insured: 1. Any person or organization for whom you are performing operations when you and such person or organization have agreed in writing in a contract or agreement that such person or organization be added as an additional insured on your policy; and 2. Any other person or organization you are required to add as an additional insured under the contract or agreement described in Paragraph 1. above. Such person(s) or organization(s) is an additional insured only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: a. Your acts or omissions; or b. The acts or omissions of those acting on your behalf; in the performance of your ongoing operations for the additional insured described in Paragraph 1. or 2. above. However, the insurance afforded to such additional insured described above: a. Only applies to the extent permitted by law; and b. Will not be broader than that which you are required by the contract or agreement to provide for such additional insured. A person's or organization's status as an additional insured under this endorsement ends when your operations for the person or organization described in Paragraph 1. above are completed. B. With respect to the insurance afforded to these additional insureds, the following additional exclusions apply: This insurance does not apply to: 1. "Bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering of, or the failure to render, any professional architectural, engineering or surveying services, including: a. The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or b. Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the "occurrence" which caused the "bodily injury" or "property damage", or the offense which caused the "personal and advertising injury", involved the rendering of, or the failure to render, any professional architectural, engineering or surveying services. 2. "Bodily injury" or "property damage" occurring after: a. All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or CG 20 38 12 19 0 Insurance Services Office, Inc., 2018 Page 1 of 2 b. That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. C. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance; The most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement described in Paragraph A.1.; or 2. Available under the applicable limits of insurance; whichever is less. This endorsement shall applicable limits of insurance. not increase the Page 2 of 2 0 Insurance Services Office, Inc., 2018 CG 20 38 12 19 POLICY NUMBER: 41 PKG1991901 COMMERCIAL GENERAL LIABILITY CG 20 40 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED -- OWNERS, LESSEES OR CONTRACTORS - AUTOMATIC STATUS FOR OTHER PARTIES WHEN REQUIRED IN WRITTEN CONSTRUCTION AGREEMENT (COMPLETED OPERATIONS) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART A. Section II — Who Is An Insured is amended to include as an additional insured: 1. Any person or organization for whom you have performed operations when you and such person or organization have agreed in writing in a contract or agreement that such person or organization be added as an additional insured on your policy; and 2. Any other person or organization you are required to add as an additional insured under the contract or agreement described in Paragraph 1. above. Such person(s) or organization(s) is an additional insured only with respect to liability for "bodily injury" or "property damage" caused, in whole or in part, by "your work" performed for the additional insured described in Paragraph 1. or 2. above and included in the "products -completed operations hazard". However, the insurance afforded to such additional insured described above: a. Only applies to the extent permitted by law; and b. Will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following additional exclusion applies: This insurance does not apply to: "Bodily injury" or "property damage" arising out of the rendering of, or the failure to render, any professional architectural, engineering or surveying services, including: 1. The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or 2. Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the "occurrence" which caused the "bodily injury" or "property damage" involved the rendering of, or the failure to render, any professional architectural, engineering or surveying services. CG 20 40 12 19 O Insurance Services Office, Inc., 2018 Page 1 of 2 C. With respect to the insurance afforded to these 2. Available under the applicable limits of additional insureds, the following is added to insurance; Section III -- Limits Of Insurance: whichever is less. The most we will pay on behalf of the additional This endorsement shall not increase the insured is the amount of insurance: applicable limits of insurance. 1. Required by the contract or agreement described in Paragraph A.1.; or Page 2 of 2 0 Insurance Services Office, Inc., 2018 CG 20 40 12 19 POLICY NUMBER: 41PKG1991901 COMMERCIAL GENERAL LIABILITY CG 20 01 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY -- OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART The following is added to the Other Insurance (2) You have agreed in writing in a contract or Condition and supersedes any provision to the agreement that this insurance would be contrary: primary and would not seek contribution Primary And Noncontributory Insurance from any other insurance available to the This insurance is primary to and will not seek additional insured. contribution from any other insurance available to an additional insured under your policy provided that: (1) The additional insured is a Named Insured under such other insurance; and CG 20 01 12 19 eQ Insurance Services Office, Inc., 2018 Page 1 of 1 POLICY NUMBER: 41PKG1991901 COMMERCIAL GENERAL LIABILITY CG24041219 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART ELECTRONIC DATA LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART POLLUTION LIABILITY COVERAGE PART DESIGNATED SITES POLLUTION LIABILITY LIMITED COVERAGE PART DESIGNATED SITES PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART UNDERGROUND STORAGE TANK POLICY DESIGNATED TANKS SCHEDULE Name Of Person(s) Or Organization(s): ANY PERSON OR ORGANIZATION WHERE WAIVER OF OUR RIGHT TO RECOVER IS PERMITTED BY LAWAND IS REQUIRED BY WRITTEN CONTRACT PROVIDED SUCH CONTRACT WAS EXECUTED PRIOR TO THE LOSS. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. The following is added to Paragraph 8. Transfer Of Rights Of Recovery Against Others To Us of Section IV —Conditions: We waive any right of recovery against the person(s) or organization(s) shown in the Schedule above because of payments we make under this Coverage Part. Such waiver by us applies only to the extent that the insured has waived its right of recovery against such person(s) or organization(s) prior to loss. This endorsement applies only to the person(s) or organization(s) shown in the Schedule above. CG 24 0412 19 0 Insurance Services Office, Inc., 2018 Page 1 of 1 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - BLANKET This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM Under Covered Autos Liability Coverage, the Who is An Insured provision is amended to include as an "insured" the person or organization who is required under a written contract to be included as an "insured" under this policy, but only with respect to their legal liability for your acts or omissions or the act or omissions of a person for whom Covered Autos Liability Coverage is afforded under this policy. All other terms and conditions of this policy remain unchanged. Endorsement Number: OOCA0115001013 Policy Number: 41 PKG 1991901 Named Insured: Venus Construction Co. Inc. dba Venus Construction Company This endorsement is effective on the inception date of this Policy unless otherwise stated herein Endorsement Effective Date: April 16, 2024 00 CA0115 00 10 13 Page 1 of 1 POLICY NUMBER: 41PKG1991901 COMMERCIAL AUTO CA04491116 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY - OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. A. The following is added to the Other Insurance B. The following is added to the Other Insurance Condition in the Business Auto Coverage Form Condition in the Auto Dealers Coverage Form and the Other Insurance — Primary And and supersedes any provision to the contrary: Excess Insurance Provisions in the Motor This Coverage Form's Covered Autos Liability Carrier Coverage Form and supersedes any Coverage and General Liability Coverages are provision to the contrary: primary to and will not seek contribution from This Coverage Form's Covered Autos Liability any other insurance available to an "insured" Coverage is primary to and will not seek under your policy provided that: contribution from any other insurance available 1. Such "insured" is a Named Insured under to an "insured" under your policy provided that: such other insurance; and 1. Such "insured" is a Named Insured under 2. You have agreed in writing in a contract or such other insurance; and a regiment fhat this insurance would be 2. You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to such "insured". 9 primary and would not seek contribution from any other insurance available to such "insured". CA 04 4911 16 © Insurance Services Office, Inc.,2016 Page 1 of 1 POLICY NUMBER: 41PKG1991901 COMMERCIAL AUTO CA 04 44 10 13 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below. Named Insured: Venus Construction Co. Inc. dba Venus Construction Company Endorsement Effective Date: April 16, 2024 SCHEDULE Name(s) Of Person(s) Or Organization(s): ANY PERSON OR ORGANIZATION WHERE WAIVER OF OUR RIGHT TO RECOVER IS PERMITTED BY LAW AND IS REQUIRED BY WRITTEN CONTRACT PROVIDED SUCH CONTRACT WAS EXECUTED PRIOR TO THE LASS Information required to complete this Schedule, if not shown above, will be shown in the Declarations. The Transfer Of Rights Of Recovery Against Others To Us condition does not apply to the person(s) or organization(s) shown in the Schedule, but only to the extent that subrogation is waived prior to the "accident" or the "loss" under a contract with that person or organization. CA 04 44 10 13 0 Insurance Services Office, Inc., 2011 Page 1 of 1 WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 42 03 04 B (Ed. 6-14) POLICY NUMBER: 41 WC11991901 TEXAS WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in Item 3.A. of the Information Page. We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule, but this waiver applies only with respect to bodily injury arising out of the operations described in the Schedule where you are required by a written contract to obtain this waiver from us. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. The premium for this endorsement is shown in the Schedule. Schedule 1. (0) Specific Waiver Name of person or organization (®) Blanket Waiver Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver. 2. Operations: 3. Premium. - The premium charge for this endorsement shall be 2 percent of the premium developed on payroll in connection with work performed for the above person(s) or organization(s) arising out of the operations described. 4. Advance Premium: INCLUDED This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective April 16, 2024 Policy No. 41 WCI1991900 Insured enus Construction Co Inc Insurance Company Arch Insurance Company DATE OF ISSUE: April 16, 2024 Countersigned By WC 42 03 04 B (Ed. 6-14) © Copyright 2014 National Council on Compensation Insurance, Inc. All Rights Reserved. Endorsement No. Premium INCL. Policy Number: 414FP1991901 COMMERCIAL EXCESS LIABILITY CX 24 33 11 16 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. NONCONTRIBUTORY - OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: COMMERCIAL EXCESS LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s): ANY ADDITIONAL INSURED. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. Paragraph 8. of Section III — Conditions is replaced (c) You have agreed in writing in a by the following: contract or agreement that this 8. Other Insurance insurance would not seek contribution from any other insurance available to a. This insurance is excess over, and shall not the additional insured. contribute with any of the other insurance, whether primary, excess, contingent or on When this insurance is excess, if no other any other basis. However: insurer defends, we will undertake to do so, but we will be entitled to the insured's rights (1) This condition will not apply to other against all those other insurers. insurance specifically written as excess over this Coverage Part. b. When this insurance is excess over other insurance, we will pay only our share of the (2) The insurance provided under this "ultimate net loss" that exceeds the sum of: Coverage Part will not seek contribution (1) The total amount that all such other from any other insurance available to an insurance would a for the loss in the additional insured, provided that: pay absence of the insurance provided under (a) The additional insured is a Named this Coverage Part; and Insured under such other insurance; (2) The total of all deductible and self -insured (b) The additional insured is shown in the amounts under all that other insurance. Schedule; and CX 24 33 11 16 0 Insurance Services Office, Inc., 2016 Page 1 of 1 Additional Named Insureds Other Named Insureds Venus Construction Company Doing Business As, Additional Named Insured CLLA Group, LLC Additional Named Insured Midlothian Machinery, LLC Additional Named Insured Tierra X Excavation, LLC Additional Named Insured OFAPPINF (0212007) COPYRIGHT 2007, AMS SERVICES INC 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 006125-1 CERTIFICATE OF INSURANCE Page 1 of 1 SECTION 00 6125 CERTIFICATE OF INSURANCE [Assembler: For Contract Document execution, remove this page and replace with standard ACORD Certificate of Insurance form. ] END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 WATER AND SANITARY SEWER REPLACEMENT CPN. 103413 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT TABLE OF CONTENTS Page Article 1 — Definitions and Terminology ..................................... 1.01 Defined Terms.......................................................... 1.02 Terminology............................................................. Article2 — Preliminary Matters......................................................................................................................... 7 2.01 Copies of Documents....................................................................................................................7 2.02 Commencement of Contract Time; Notice to Proceed................................................................ 7 2.03 Starting the Work.......................................................................................................................... 8 2.04 Before Starting Construction........................................................................................................ 8 2.05 Preconstruction Conference.......................................................................................................... 8 2.06 Public Meeting.............................................................................................................................. 8 2.07 Initial Acceptance of Schedules.................................................................................................... 8 Article 3 — Contract Documents: Intent, Amending, Reuse............................................................................ 8 3.01 Intent.............................................................................................................................................. 8 3.02 Reference Standards...................................................................................................................... 9 3.03 Reporting and Resolving Discrepancies....................................................................................... 9 3.04 Amending and Supplementing Contract Documents.................................................................10 3.05 Reuse of Documents...................................................................................................................10 3.06 Electronic Data............................................................................................................................11 Article 4 — Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental Conditions; Reference Points...........................................................................................................11 4.01 Availability of Lands..................................................................................................................11 4.02 Subsurface and Physical Conditions..........................................................................................12 4.03 Differing Subsurface or Physical Conditions.............................................................................12 4.04 Underground Facilities...............................................................................................................13 4.05 Reference Points.........................................................................................................................14 4.06 Hazardous Environmental Condition at Site..............................................................................14 Article 5 — Bonds and Insurance.....................................................................................................................16 5.01 Licensed Sureties and Insurers...................................................................................................16 5.02 Performance, Payment, and Maintenance Bonds.......................................................................16 5.03 Certificates of Insurance.............................................................................................................16 5.04 Contractor's Insurance................................................................................................................18 5.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................19 Article 6 — Contractor's Responsibilities .............. 6.01 Supervision and Superintendence..... CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 ................................19 ................................19 6.02 Labor; Working Hours................................................................................................................20 6.03 Services, Materials, and Equipment...........................................................................................20 6.04 Project Schedule..........................................................................................................................21 6.05 Substitutes and "Or-Equals"....................................................................................................... 21 6.06 Concerning Subcontractors, Suppliers, and Others....................................................................24 6.07 Wage Rates..................................................................................................................................25 6.08 Patent Fees and Royalties........................................................................................................... 26 6.09 Permits and Utilities.................................................................................................................... 27 6.10 Laws and Regulations................................................................................................................. 27 6.11 Taxes........................................................................................................................................... 28 6.12 Use of Site and Other Areas....................................................................................................... 28 6.13 Record Documents......................................................................................................................29 6.14 Safety and Protection..................................................................................................................29 6.15 Safety Representative.................................................................................................................. 30 6.16 Hazard Communication Programs............................................................................................. 30 6.17 Emergencies and/or Rectification............................................................................................... 30 6.18 Submittals....................................................................................................................................31 6.19 Continuing the Work................................................................................................................... 32 6.20 Contractor's General Warranty and Guarantee..........................................................................32 6.21 Indemnification......................................................................................................................... 33 6.22 Delegation of Professional Design Services.............................................................................. 34 6.23 Right to Audit.............................................................................................................................. 34 6.24 Nondiscrimination.......................................................................................................................35 Article 7 - Other Work at the Site................................................................................................................... 35 7.01 Related Work at Site................................................................................................................... 35 7.02 Coordination................................................................................................................................36 Article 8 - City's Responsibilities...................................................................................................................36 8.01 Communications to Contractor...................................................................................................36 8.02 Furnish Data................................................................................................................................ 36 8.03 Pay When Due............................................................................................................................36 8.04 Lands and Easements; Reports and Tests...................................................................................36 8.05 Change Orders.............................................................................................................................36 8.06 Inspections, Tests, and Approvals.............................................................................................. 36 8.07 Limitations on City's Responsibilities....................................................................................... 37 8.08 Undisclosed Hazardous Environmental Condition....................................................................37 8.09 Compliance with Safety Program............................................................................................... 37 Article 9 - City's Observation Status During Construction........................................................................... 37 9.01 City's Project Manager............................................................................................................ 37 9.02 Visits to Site................................................................................................................................ 37 9.03 Authorized Variations in Work.................................................................................................. 38 9.04 Rejecting Defective Work..........................................................................................................38 9.05 Determinations for Work Performed.......................................................................................... 38 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work ..................... 38 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 Article 10 - Changes in the Work; Claims; Extra Work.... 10.01 Authorized Changes in the Work ................... 10.02 Unauthorized Changes in the Work ............... 10.03 Execution of Change Orders ........................... 10.04 Extra Work ...................................................... 10.05 Notification to Surety ...................................... 10.06 Contract Claims Process ................................. ....................................................................... 38 ....................................................................... 38 ....................................................................... 39 ....................................................................... 39 ....................................................................... 39 ....................................................................... 39 ....................................................................... 40 Article 11 - Cost of the Work; Allowances; Unit Price Work; Plans Quantity Measurement ......................41 11.01 Cost of the Work.........................................................................................................................41 11.02 Allowances.................................................................................................................................. 43 11.03 Unit Price Work.......................................................................................................................... 44 11.04 Plans Quantity Measurement......................................................................................................45 Article 12 - Change of Contract Price; Change of Contract Time................................................................. 46 12.01 Change of Contract Price............................................................................................................ 46 12.02 Change of Contract Time............................................................................................................ 47 12.03 Delays.......................................................................................................................................... 47 Article 13 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work ...................... 48 13.01 Notice of Defects........................................................................................................................ 48 13.02 Access to Work...........................................................................................................................48 13.03 Tests and Inspections.................................................................................................................. 48 13.04 Uncovering Work........................................................................................................................49 13.05 City May Stop the Work............................................................................................................. 49 13.06 Correction or Removal of Defective Work................................................................................ 50 13.07 Correction Period........................................................................................................................ 50 13.08 Acceptance of Defective Work................................................................................................... 51 13.09 City May Correct Defective Work............................................................................................. 51 Article 14 - Payments to Contractor and Completion.................................................................................... 52 14.01 Schedule of Values...................................................................................................................... 52 14.02 Progress Payments...................................................................................................................... 52 14.03 Contractor's Warranty of Title................................................................................................... 54 14.04 Partial Utilization........................................................................................................................55 14.05 Final Inspection...........................................................................................................................55 14.06 Final Acceptance......................................................................................................................... 55 14.07 Final Payment.............................................................................................................................. 56 14.08 Final Completion Delayed and Partial Retainage Release........................................................ 56 14.09 Waiver of Claims........................................................................................................................ 57 Article 15 - Suspension of Work and Termination........................................................................................ 57 15.01 City May Suspend Work............................................................................................................. 57 15.02 City May Terminate for Cause................................................................................................... 58 15.03 City May Terminate For Convenience....................................................................................... 60 Article 16 - Dispute Resolution...................................................................................................................... 61 16.01 Methods and Procedures............................................................................................................. 61 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 Article 17 — Miscellaneous......................................................................................................... 17.01 Giving Notice......................................................................................................... 17.02 Computation of Times........................................................................................... 17.03 Cumulative Remedies............................................................................................ 17.04 Survival of Obligations.......................................................................................... 17.05 Headings................................................................................................................. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 1 of 63 ARTICLE 1— DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda —Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the proposed Contract Documents. 2. Agreement —The written instrument which is evidence of the agreement between City and Contractor covering the Work. 3. Application for Payment —The form acceptable to City which is to be used by Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 4. Asbestos —Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 5. Award — Authorization by the City Council for the City to enter into an Agreement. 6. Bid —The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed. 7. Bidder —The individual or entity who submits a Bid directly to City. 8. Bidding Documents —The Bidding Requirements and the proposed Contract Documents (including all Addenda). 9. Bidding Requirements —The advertisement or Invitation to Bid, Instructions to Bidders, Bid security of acceptable form, if any, and the Bid Form with any supplements. 10. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 11. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 2 of 63 12. Change Order —A document, which is prepared and approved by the City, which is signed by Contractor and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 13. City— The City of Fort Worth, Texas, a home -rule municipal corporation, authorized and chartered under the Texas State Statutes, acting by its governing body through its City Manager, his designee, or agents authorized under his behalf, each of which is required by Charter to perform specific duties with responsibility for final enforcement of the contracts involving the City of Fort Worth is by Charter vested in the City Manager and is the entity with whom Contractor has entered into the Agreement and for whom the Work is to be performed. 14. City Attorney — The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. 15. City Council - The duly elected and qualified governing body of the City of Fort Worth, Texas. 16. City Manager — The officially appointed and authorized City Manager of the City of Fort Worth, Texas, or his duly authorized representative. 17. Contract Claim —A demand or assertion by City or Contractor seeking an adjustment of Contract Price or Contract Time, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Contract Claim. 18. Contract —The entire and integrated written document between the City and Contractor concerning the Work. The Contract contains the Agreement and all Contract Documents and supersedes prior negotiations, representations, or agreements, whether written or oral. 19. Contract Documents —Those items so designated in the Agreement. All items listed in the Agreement are Contract Documents. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 20. Contract Price —The moneys payable by City to Contractor for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of Paragraph 11.03 in the case of Unit Price Work). 21. Contract Time —The number of days or the dates stated in the Agreement to: (i) achieve Milestones, if any and (ii) complete the Work so that it is ready for Final Acceptance. 22. Contractor —The individual or entity with whom City has entered into the Agreement. 23. Cost of the Work —See Paragraph 11.01 of these General Conditions for definition. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 3 of 63 24. Damage Claims — A demand for money or services arising from the Project or Site from a third party, City or Contractor exclusive of a Contract Claim 25. Day or day — A day, unless otherwise defined, shall mean a Calendar Day. 26. Director of Aviation — The officially appointed Director of the Aviation Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 27. Director of Parks and Community Services — The officially appointed Director of the Parks and Community Services Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 28. Director of Planning and Development — The officially appointed Director of the Planning and Development Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 29. Director of Transportation Public Works — The officially appointed Director of the Transportation Public Works Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 30. Director of Water Department — The officially appointed Director of the Water Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 31. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 32. Effective Date of the Agreement —The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver. 33. Engineer —The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the City. 34. Extra Work — Additional work made necessary by changes or alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents. Extra work shall be part of the Work. 35. Field Order — A written order issued by City which requires changes in the Work but which does not involve a change in the Contract Price, Contract Time, or the intent of the Engineer. Field Orders are paid from Field Order Allowances incorporated into the Contract by funded work type at the time of award. 36. Final Acceptance — The written notice given by the City to the Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 4 of 63 37. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 38. General Requirements —Sections of Division 1 of the Contract Documents. 39. Hazardous Environmental Condition —The presence at the Site of Asbestos, PCBs, Petroleum, Hazardous Waste, Radioactive Material, or other materials in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto. 40. Hazardous Waste —Hazardous waste is defined as any solid waste listed as hazardous or possesses one or more hazardous characteristics as defined in the federal waste regulations, as amended from time to time. 41. Laws and Regulations —Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 42. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 43. Major Item — An Item of work included in the Contract Documents that has a total cost equal to or greater than 5% of the original Contract Price or $25,000 whichever is less. 44. Milestone —A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 45. Notice of Award —The written notice by City to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, City will sign and deliver the Agreement. 46. Notice to Proceed —A written notice given by City to Contractor fixing the date on which the Contract Time will commence to run and on which Contractor shall start to perform the Work specified in Contract Documents. 47. PCBs —Polychlorinated biphenyls. 48. Petroleum —Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non -Hazardous Waste and crude oils. 49. Plans — See definition of Drawings. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 5 of 63 50. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 51. Project —The Work to be performed under the Contract Documents. 52. Project Manager —The authorized representative of the City who will be assigned to the Site. 53. Public Meeting — An announced meeting conducted by the City to facilitate public participation and to assist the public in gaining an informed view of the Project. 54. Radioactive Material —Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954 (42 USC Section 2011 et seq.) as amended from time to time. 55. Regular Working Hours — Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 56. Samples —Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 57. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 58. Schedule of Values —A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment. 59. Site —Lands or areas indicated in the Contract Documents as being furnished by City upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City which are designated for the use of Contractor. 60. Specifications —That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 61. Subcontractor —An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 6 of 63 62. Submittals —All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 63. Substantial Completion — The stage in the progress of the Project when the Work is sufficiently complete in accordance with the Contract Documents for Final Inspection. 64. Successful Bidder —The Bidder submitting the lowest and most responsive Bid to whom City makes an Award. 65. Superintendent — The representative of the Contractor who is available at all times and able to receive instructions from the City and to act for the Contractor. 66. Supplementary Conditions —That part of the Contract Documents which amends or supplements these General Conditions. 67. Supplies —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 68. Underground Facilities —All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 69 Unit Price Work —See Paragraph 11.03 of these General Conditions for definition. 70. Weekend Working Hours — Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. 71. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Change Order or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 72. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.13 through E are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Intent of Certain Terms orAdjectives: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 7 of 63 1. The Contract Documents include the terms "as allowed," "as approved," "as ordered," "as directed" or terms of like effect or import to authorize an exercise of judgment by City. In addition, the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," or adjectives of like effect or import are used to describe an action or determination of City as to the Work. It is intended that such exercise of professional judgment, action, or determination will be solely to evaluate, in general, the Work for compliance with the information in the Contract Documents and with the design concept of the Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). C. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. D. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. E. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. ARTICLE 2 — PRELIMINARY MATTERS 2.01 Copies of Documents City shall furnish to Contractor one (1) original executed copy and one (1) electronic copy of the Contract Documents, and four (4) additional copies of the Drawings. Additional copies will be furnished upon request at the cost of reproduction. 2.02 Commencement of Contract Time; Notice to Proceed The Contract Time will commence to run on the day indicated in the Notice to Proceed. A Notice to Proceed may be given no earlier than 14 days after the Effective Date of the Agreement, unless agreed to by both parties in writing. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 8 of 63 2.03 Starting the Work Contractor shall start to perform the Work on the date when the Contract Time commences to run. No Work shall be done at the Site prior to the date on which the Contract Time commences to run. 2.04 Before Starting Construction Baseline Schedules: Submit in accordance with the Contract Documents, and prior to starting the Work. 2.05 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.06 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to the Public Meeting if scheduled by the City. 2.07 Initial Acceptance of Schedules No progress payment shall be made to Contractor until acceptable schedules are submitted to City in accordance with the Schedule Specification as provided in the Contract Documents. ARTICLE 3 — CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE 3.01 Intent A. The Contract Documents are complementary; what is required by one is as binding as if required by all. B. It is the intent of the Contract Documents to describe a functionally complete project (or part thereof) to be constructed in accordance with the Contract Documents. Any labor, documentation, services, materials, or equipment that reasonably may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result will be provided whether or not specifically called for, at no additional cost to City. C. Clarifications and interpretations of the Contract Documents shall be issued by City. D. The Specifications may vary in form, format and style. Some Specification sections may be written in varying degrees of streamlined or declarative style and some sections may be relatively narrative by comparison. Omission of such words and phrases as "the Contractor shall," "in conformity with," "as shown," or "as specified" are intentional in streamlined sections. Omitted words and phrases shall be supplied by inference. Similar types of provisions may appear in various parts of a section or articles within a part depending on the format of the CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 9 of 63 section. The Contractor shall not take advantage of any variation of form, format or style in making Contract Claims. E. The cross referencing of specification sections under the subparagraph heading "Related Sections include but are not necessarily limited to:" and elsewhere within each Specification section is provided as an aid and convenience to the Contractor. The Contractor shall not rely on the cross referencing provided and shall be responsible to coordinate the entire Work under the Contract Documents and provide a complete Project whether or not the cross referencing is provided in each section or whether or not the cross referencing is complete. 3.02 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision of any such standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the duties or responsibilities of City, Contractor, or any of their subcontractors, consultants, agents, or employees, from those set forth in the Contract Documents. No such provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies: Contractor's Review of Contract Documents Before Starting Work: Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein against all applicable field measurements and conditions. Contractor shall promptly report in writing to City any conflict, error, ambiguity, or discrepancy which Contractor discovers, or has actual knowledge of, and shall obtain a written interpretation or clarification from City before proceeding with any Work affected thereby. 2. Contractor's Review of Contract Documents During Performance of Work: If, during the performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents, or between the Contract Documents and (a) any applicable Law or Regulation, (b) any standard, specification, manual, or code, or (c) any instruction of any Supplier, then Contractor shall promptly report it to City in writing. Contractor shall not proceed with the Work affected thereby (except in an emergency as required by Paragraph CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 10 of 63 6.17.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in Paragraph 3.04. 3. Contractor shall not be liable to City for failure to report any conflict, error, ambiguity, or discrepancy in the Contract Documents unless Contractor had actual knowledge thereof. B. Resolving Discrepancies: 1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or discrepancy between the provisions of the Contract Documents and the provisions of any standard, specification, manual, or the instruction of any Supplier (whether or not specifically incorporated by reference in the Contract Documents). 2. In case of discrepancies, figured dimensions shall govern over scaled dimensions, Plans shall govern over Specifications, Supplementary Conditions shall govern over General Conditions and Specifications, and quantities shown on the Plans shall govern over those shown in the proposal. 3.04 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; 2. City's review of a Submittal (subject to the provisions of Paragraph 6.18.C); or 3. City's written interpretation or clarification. 3.05 Reuse of Documents A. Contractor and any Subcontractor or Supplier shall not: 1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereof) prepared by or bearing the seal of Engineer, including electronic media editions; or 2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of City and specific written verification or adaptation by Engineer. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 11 of 63 B. The prohibitions of this Paragraph 3.05 will survive final payment, or termination of the Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract Documents for record purposes. 3.06 Electronic Data A. Unless otherwise stated in the Supplementary Conditions, the data furnished by City or Engineer to Contractor, or by Contractor to City or Engineer, that may be relied upon are limited to the printed copies included in the Contract Documents (also known as hard copies) and other Specifications referenced and located on the City's on-line electronic document management and collaboration system site. Files in electronic media format of text, data, graphics, or other types are furnished only for the convenience of the receiving party. Any conclusion or information obtained or derived from such electronic files will be at the user's sole risk. Ifthere is a discrepancy between the electronic files and the hard copies, the hard copies govern. B. When transferring documents in electronic media format, the transferring party makes no representations as to long term compatibility, usability, or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by the data's creator. ARTICLE 4 — AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS 4.01 Availability of Lands A. City shall furnish the Site. City shall notify Contractor of any encumbrances or restrictions not of general application but specifically related to use of the Site with which Contractor must comply in performing the Work. City will obtain in a timely manner and pay for easements for permanent structures or permanent changes in existing facilities. The City has obtained or anticipates acquisition of and/or access to right-of-way, and/or easements. Any outstanding right-of-way and/or easements are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding right-of-way, and/or easements. 2. The City has or anticipates removing and/or relocating utilities, and obstructions to the Site. Any outstanding removal or relocation of utilities or obstructions is anticipated in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding utilities or obstructions to be removed, adjusted, and/or relocated by others. B. Upon reasonable written request, City shall furnish Contractor with a current statement of record legal title and legal description of the lands upon which the Work is to be performed. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 12 of 63 C. Contractor shall provide for all additional lands and access thereto that may be required for construction facilities or storage of materials and equipment. 4.02 Subsurface and Physical Conditions A. Reports and Drawings: The Supplementary Conditions identify: 1. those reports known to City of explorations and tests of subsurface conditions at or contiguous to the Site; and 2. those drawings known to City of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities). B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions, and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions, or information. 4.03 Differing Subsurface or Physical Conditions A. Notice: If Contractor believes that any subsurface or physical condition that is uncovered or revealed either: 1. is of such a nature as to establish that any "technical data" on which Contractor is entitled to rely as provided in Paragraph 4.02 is materially inaccurate; or 2. is of such a nature as to require a change in the Contract Documents; or 3. differs materially from that shown or indicated in the Contract Documents; or 4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 13 of 63 then Contractor shall, promptly after becoming aware thereof and before further disturbing the subsurface or physical conditions or performing any Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), notify City in writing about such condition. B. Possible Price and Time Adjustments Contractor shall not be entitled to any adjustment in the Contract Price or Contract Time if- 1. Contractor knew of the existence of such conditions at the time Contractor made a final commitment to City with respect to Contract Price and Contract Time by the submission of a Bid or becoming bound under a negotiated contract; or 2. the existence of such condition could reasonably have been discovered or revealed as a result of the examination of the Contract Documents or the Site; or 3. Contractor failed to give the written notice as required by Paragraph 4.03. A. 4.04 Underground Facilities A. Shown or Indicated.• The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the Site is based on information and data furnished to City or Engineer by the owners of such Underground Facilities, including City, or by others. Unless it is otherwise expressly provided in the Supplementary Conditions: 1. City and Engineer shall not be responsible for the accuracy or completeness of any such information or data provided by others; and 2. the cost of all of the following will be included in the Contract Price, and Contractor shall have full responsibility for: a. reviewing and checking all such information and data; b. locating all Underground Facilities shown or indicated in the Contract Documents; c. coordination and adjustment of the Work with the owners of such Underground Facilities, including City, during construction; and d. the safety and protection of all such Underground Facilities and repairing any damage thereto resulting from the Work. B. Not Shown or Indicated.• 1. If an Underground Facility which conflicts with the Work is uncovered or revealed at or contiguous to the Site which was not shown or indicated, or not shown or indicated with reasonable accuracy in the Contract Documents, Contractor shall, promptly after becoming aware thereof and before further disturbing conditions affected thereby or performing any CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 14 of 63 Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), identify the owner of such Underground Facility and give notice to that owner and to City. City will review the discovered Underground Facility and determine the extent, if any, to which a change may be required in the Contract Documents to reflect and document the consequences of the existence or location of the Underground Facility. Contractor shall be responsible for the safety and protection of such discovered Underground Facility. 2. If City concludes that a change in the Contract Documents is required, a Change Order may be issued to reflect and document such consequences. 3. Verification of existing utilities, structures, and service lines shall include notification of all utility companies a minimum of 48 hours in advance of construction including exploratory excavation if necessary. 4.05 Reference Points A. City shall provide engineering surveys to establish reference points for construction, which in City's judgment are necessary to enable Contractor to proceed with the Work. City will provide construction stakes or other customary method of marking to establish line and grades for roadway and utility construction, centerlines and benchmarks for bridgework. Contractor shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations. Contractor shall report to City whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations. The City shall be responsible for the replacement or relocation of reference points or property monuments not carelessly or willfully destroyed by the Contractor. The Contractor shall notify City in advance and with sufficient time to avoid delays. B. Whenever, in the opinion of the City, any reference point or monument has been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost for replacing such points plus 25% will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. 4.06 Hazardous Environmental Condition at Site A. Reports and Drawings: The Supplementary Conditions identify those reports and drawings known to City relating to Hazardous Environmental Conditions that have been identified at the Site. B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 15 of 63 construction to be employed by Contractor and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions or information. C. Contractor shall not be responsible for any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work. Contractor shall be responsible for a Hazardous Environmental Condition created with any materials brought to the Site by Contractor, Subcontractors, Suppliers, or anyone else for whom Contractor is responsible. D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for whom Contractor is responsible creates a Hazardous Environmental Condition, Contractor shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such condition and in any area affected thereby (except in an emergency as required by Paragraph 6.17.A); and (iii) notify City (and promptly thereafter confirm such notice in writing). City may consider the necessity to retain a qualified expert to evaluate such condition or take corrective action, if any. E. Contractor shall not be required to resume Work in connection with such condition or in any affected area until after City has obtained any required permits related thereto and delivered written notice to Contractor: (i) specifying that such condition and any affected area is or has been rendered suitable for the resumption of Work; or (ii) specifying any special conditions under which such Work may be resumed. F. If after receipt of such written notice Contractor does not agree to resume such Work based on a reasonable belief it is unsafe, or does not agree to resume such Work under such special conditions, then City may order the portion of the Work that is in the area affected by such condition to be deleted from the Work. City may have such deleted portion of the Work performed by City's own forces or others. G. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition created by Contractor or by anyone for whom Contractor is responsible. Nothing in this Paragraph 4.06. G shall obligate Contractor to indemnify any individual or entity from and against the consequences of that individual's or entity's own negligence. H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental Condition uncovered or revealed at the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 16 of 63 ARTICLE 5 — BONDS AND INSURANCE 5.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. 5.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 5.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 5.01 and 5.02.C. 5.03 Certificates of Insurance Contractor shall deliver to City, with copies to each additional insured and loss payee identified in the Supplementary Conditions, certificates of insurance (other evidence of insurance requested by City or any other additional insured) in at least the minimum amount as specified in the Supplementary Conditions which Contractor is required to purchase and maintain. 1. The certificate of insurance shall document the City, and all identified entities named in the Supplementary Conditions as "Additional Insured" on all liability policies. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 17 of 63 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in the Supplementary Conditions 6. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 7. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 8. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 9. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 10. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 18 of 63 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 11. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 12. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 13. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 14. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 5.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 19 of 63 insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project (if identified in the Supplementary Conditions). C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the requirements identified in the Supplementary Conditions. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 5.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 6 — CONTRACTOR'S RESPONSIBILITIES 6.01 Supervision and Superintendence A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 20 of 63 B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 6.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 6.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 21 of 63 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. D. All items of standard equipment to be incorporated into the Work shall be the latest model at the time of bid, unless otherwise specified. 6.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.07 and the General Requirements as it may be adjusted from time to time as provided below. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.07 and the General Requirements) proposed adjustments in the Project Schedule that will not result in changing the Contract Time. Such adjustments will comply with any provisions of the General Requirements applicable thereto. 2. Contractor shall submit to City a monthly Project Schedule with a monthly progress payment for the duration of the Contract in accordance with the schedule specification 01 32 16. 3. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 12. Adjustments in Contract Time may only be made by a Change Order. 6.05 Substitutes and "Or -Equals " A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. "Or -Equal " Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 6.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if a. the City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 22 of 63 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 6.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 0125 00 and: 1) shall certify that the proposed substitute item will: a) perform adequately the functions and achieve the results called for by the general design; b) be similar in substance to that specified; c) be suited to the same use as that specified; and 2) will state: a) the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; b) whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 23 of 63 c) whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: a) all variations of the proposed substitute item from that specified; b) available engineering, sales, maintenance, repair, and replacement services; and 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 6.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 6.05.A and 6.05.13. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 6.05.A.2 and 6.05.13. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents (or in the provisions of any other direct contract with City) resulting from the acceptance of each proposed substitute. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 24 of 63 G. City Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Change Order. H. Time Extensions: No additional time will be granted for substitutions. 6.06 Concerning Subcontractors, Suppliers, and Others A. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract, unless otherwise approved by the City. B. Contractor shall not employ any Subcontractor, Supplier, or other individual or entity, whether initially or as a replacement, against whom City may have reasonable objection. Contractor shall not be required to employ any Subcontractor, Supplier, or other individual or entity to furnish or perform any of the Work against whom Contractor has reasonable objection (excluding those acceptable to City as indicated in Paragraph 6.06.C). C. The City may from time to time require the use of certain Subcontractors, Suppliers, or other individuals or entities on the project, and will provide such requirements in the Supplementary Conditions. D. Minority and Women Business Enterprise Compliance: It is City policy to ensure the full and equitable participation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for MWBE goal, Contractor is required to comply with the intent of the City's MWBE Business Enterprise Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by MWBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract in accordance with Paragraph 15.02.A. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. E. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 25 of 63 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. F. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. G. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. H. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of City. 6.07 Wage Rates A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 26 of 63 D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 1 lth day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Affadavit. Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code related to paying prevailing wage rates on completion of the project. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 6.08 Patent Fees and Royalties A. Contractor shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Documents for use in the performance of the Work and if, to the actual knowledge of City, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by City in the Contract Documents. Failure of the City to disclose such information does not relieve the Contractor from its obligations to pay for the use of said fees or royalties to others. B. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 27 of 63 the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 6.09 Permits and Utilities A. Contractor obtained permits and licenses. Contractor shall obtain and pay for all construction permits and licenses except those provided for in the Supplementary Conditions or Contract Documents. City shall assist Contractor, when necessary, in obtaining such permits and licenses. Contractor shall pay all governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement, except for permits provided by the City as specified in 6.09.B. City shall pay all charges of utility owners for connections for providing permanent service to the Work. B. City obtained permits and licenses. City will obtain and pay for all permits and licenses as provided for in the Supplementary Conditions or Contract Documents. It will be the Contractor's responsibility to carry out the provisions of the permit. If the Contractor initiates changes to the Contract and the City approves the changes, the Contractor is responsible for obtaining clearances and coordinating with the appropriate regulatory agency. The City will not reimburse the Contractor for any cost associated with these requirements of any City acquired permit. The following are permits the City will obtain if required: 1. Texas Department of Transportation Permits 2. U.S. Army Corps of Engineers Permits 3. Texas Commission on Environmental Quality Permits 4. Railroad Company Permits C. Outstanding permits and licenses. The City anticipates acquisition of and/or access to permits and licenses. Any outstanding permits and licenses are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding permits and licenses. 6.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 28 of 63 court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.02. C. Changes in Laws or Regulations not known at the time of opening of Bids having an effect on the cost or time of performance of the Work may be the subject of an adjustment in Contract Price or Contract Time. 6.11 Taxes A. On a contract awarded by the City, an organization which qualifies for exemption pursuant to Texas Tax Code, Subchapter H, Sections 151.301-335 (as amended), the Contractor may purchase, rent or lease all materials, supplies and equipment used or consumed in the performance of this contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption certificate to comply with State Comptroller's Ruling .007. Any such exemption certificate issued to the Contractor in lieu of the tax shall be subject to and shall comply with the provision of State Comptroller's Ruling .011, and any other applicable rulings pertaining to the Texas Tax Code, Subchapter H. B. Texas Tax permits and information may be obtained from: httas://comDtroller.texas. aov/taxes/Dermit/ 6.12 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 29 of 63 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 6.21, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and the costs of such direct action, plus 25 % of such costs, shall be deducted from the monies due or to become due to the Contractor. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.13 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 6.14 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 30 of 63 take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 6.14.A.2 or 6.14.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 6.15 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. 6.16 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 6.17 Emergencies and/or Rectification A. In emergencies affecting the safety or protection of persons or the Work or property at the Site or adjacent thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss. Contractor shall give City prompt written notice if Contractor believes that any significant CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 31 of 63 changes in the Work or variations from the Contract Documents have been caused thereby or are required as a result thereof. If City determines that a change in the Contract Documents is required because of the action taken by Contractor in response to such an emergency, a Change Order may be issued. B. Should the Contractor fail to respond to a request from the City to rectify any discrepancies, omissions, or correction necessary to conform with the requirements of the Contract Documents, the City shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City shall deduct an amount equal to the entire costs for such remedial action, plus 25%, from any funds due or become due the Contractor on the Project. 6.18 Submittals A. Contractor shall submit required Submittals to City for review and acceptance in accordance with the accepted Schedule of Submittals (as required by Paragraph 2.07). Each submittal will be identified as City may require. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 6.18.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 6.18.C. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 32 of 63 B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review.• 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 6.19 Continuing the Work Except as otherwise provided, Contractor shall carry on the Work and adhere to the Project Schedule during all disputes or disagreements with City. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as City and Contractor may otherwise agree in writing. 6.20 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 33 of 63 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 5.02.B. The City will give notice of observed defects with reasonable promptness. 6.21 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE ELUCTI17F EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED. IN WHOLE OR IN PART. BY ANY ACT. OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 34 of 63 SPECIFICALLY INTENDED TO OPERATE AND RE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT. OMISSION OR NEGLIGENCE OF THE CITY. 6.22 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 6.22, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 6.18.C. 6.23 Right to Audit A. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. B. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 35 of 63 Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. C. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 6.24 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. ARTICLE 7 — OTHER WORK AT THE SITE 7.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 36 of 63 7.02 Coordination A. If City intends to contract with others for the performance of other work on the Project at the Site, the following will be set forth in Supplementary Conditions: the individual or entity who will have authority and responsibility for coordination of the activities among the various contractors will be identified; 2. the specific matters to be covered by such authority and responsibility will be itemized; and 3. the extent of such authority and responsibilities will be provided. B. Unless otherwise provided in the Supplementary Conditions, City shall have authority for such coordination. ARTICLE 8 — CITY'S RESPONSIBILITIES 8.01 Communications to Contractor Except as otherwise provided in the Supplementary Conditions, City shall issue all communications to Contractor. 8.02 Furnish Data City shall timely furnish the data required under the Contract Documents. 8.03 Pay When Due City shall make payments to Contractor in accordance with Article 14. 8.04 Lands and Easements; Reports and Tests City's duties with respect to providing lands and easements and providing engineering surveys to establish reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to City's identifying and making available to Contractor copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface structures at or contiguous to the Site that have been utilized by City in preparing the Contract Documents. 8.05 Change Orders City shall execute Change Orders in accordance with Paragraph 10.03. 8.06 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 13.03. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 37 of 63 8.07 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 6.14. 8.08 Undisclosed Hazardous Environmental Condition City's responsibility with respect to an undisclosed Hazardous Environmental Condition is set forth in Paragraph 4.06. 8.09 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 6.14. ARTICLE 9 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 9.01 City's Project Manager City will provide one or more Project Manager(s) during the construction period. The duties and responsibilities and the limitations of authority of City's Project Manager during construction are set forth in the Contract Documents. The City's Project Manager for this Contract is identified in the Supplementary Conditions. 9.02 Visits to Site A. City's Project Manager will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Manager will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Manager will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Manager's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Manager's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents including those set forth in Paragraph 8.07. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 38 of 63 9.03 Authorized Variations in Work City's Project Manager may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City and also on Contractor, who shall perform the Work involved promptly. 9.04 Rejecting Defective Work City will have authority to reject Work which City's Project Manager believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 13, whether or not the Work is fabricated, installed, or completed. 9.05 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Manager will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work A. City will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. B. City will render a written decision on any issue referred. C. City's written decision on the issue referred will be final and binding on the Contractor, subject to the provisions of Paragraph 10.06. ARTICLE 10 — CHANGES IN THE WORK; CLAIMS; EXTRA WORK 10.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price, a Field Order may be issued by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 39 of 63 10.02 Unauthorized Changes in the Work Contractor shall not be entitled to an increase in the Contract Price or an extension of the Contract Time with respect to any work performed that is not required by the Contract Documents as amended, modified, or supplemented as provided in Paragraph 3.04, except in the case of an emergency as provided in Paragraph 6.17. 10.03 Execution of Change Orders A. City and Contractor shall execute appropriate Change Orders covering: changes in the Work which are: (i) ordered by City pursuant to Paragraph 10.01.A, (ii) required because of acceptance of defective Work under Paragraph 13.08 or City's correction of defective Work under Paragraph 13.09, or (iii) agreed to by the parties; 2. changes in the Contract Price or Contract Time which are agreed to by the parties, including any undisputed sum or amount of time for Work actually performed. 10.04 Extra Work A. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof, and the City insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep accurate account of the actual reasonable cost thereof. Contract Claims regarding Extra Work shall be made pursuant to Paragraph 10.06. B. The Contractor shall furnish the City such installation records of all deviations from the original Contract Documents as may be necessary to enable the City to prepare for permanent record a corrected set of plans showing the actual installation. C. The compensation agreed upon for Extra Work whether or not initiated by a Change Order shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the change or Extra Work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result of the change or Extra Work. 10.05 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 40 of 63 10.06 Contract Claims Process A. City's Decision Required: All Contract Claims, except those waived pursuant to Paragraph 14.09, shall be referred to the City for decision. A decision by City shall be required as a condition precedent to any exercise by Contractor of any rights or remedies he may otherwise have under the Contract Documents or by Laws and Regulations in respect of such Contract Claims. B. Notice: 1. Written notice stating the general nature of each Contract Claim shall be delivered by the Contractor to City no later than 15 days after the start of the event giving rise thereto. The responsibility to substantiate a Contract Claim shall rest with the party making the Contract Claim. 2. Notice of the amount or extent of the Contract Claim, with supporting data shall be delivered to the City on or before 45 days from the start of the event giving rise thereto (unless the City allows additional time for Contractor to submit additional or more accurate data in support of such Contract Claim). 3. A Contract Claim for an adjustment in Contract Price shall be prepared in accordance with the provisions of Paragraph 12.01. 4. A Contract Claim for an adjustment in Contract Time shall be prepared in accordance with the provisions of Paragraph 12.02. 5. Each Contract Claim shall be accompanied by Contractor's written statement that the adjustment claimed is the entire adjustment to which the Contractor believes it is entitled as a result of said event. 6. The City shall submit any response to the Contractor within 30 days after receipt of the claimant's last submittal (unless Contract allows additional time). C. City's Action: City will review each Contract Claim and, within 30 days after receipt of the last submittal of the Contractor, if any, take one of the following actions in writing: 1. deny the Contract Claim in whole or in part; 2. approve the Contract Claim; or 3. notify the Contractor that the City is unable to resolve the Contract Claim if, in the City's sole discretion, it would be inappropriate for the City to do so. For purposes of further resolution of the Contract Claim, such notice shall be deemed a denial. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 41 of 63 D. City's written action under Paragraph 10.06.0 will be final and binding, unless City or Contractor invoke the dispute resolution procedure set forth in Article 16 within 30 days of such action or denial. E. No Contract Claim for an adjustment in Contract Price or Contract Time will be valid if not submitted in accordance with this Paragraph 10.06. ARTICLE 11— COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK; PLANS QUANTITY MEASUREMENT 11.01 Cost of the Work A. Costs Included: The term Cost of the Work means the sum of all costs, except those excluded in Paragraph 11.013, necessarily incurred and paid by Contractor in the proper performance of the Work. When the value of any Work covered by a Change Order, the costs to be reimbursed to Contractor will be only those additional or incremental costs required because of the change in the Work. Such costs shall not include any of the costs itemized in Paragraph 11.0l.B, and shall include but not be limited to the following items: 1. Payroll costs for employees in the direct employ of Contractor in the performance of the Work under schedules of job classifications agreed upon by City and Contractor. Such employees shall include, without limitation, superintendents, foremen, and other personnel employed full time on the Work. Payroll costs for employees not employed full time on the Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall include; a. salaries with a 55% markup, or b. salaries and wages plus the cost of fringe benefits, which shall include social security contributions, unemployment, excise, and payroll taxes, workers' compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay applicable thereto. The expenses of performing Work outside of Regular Working Hours, Weekend Working Hours, or legal holidays, shall be included in the above to the extent authorized by City. 2. Cost of all materials and equipment furnished and incorporated in the Work, including costs of transportation and storage thereof, and Suppliers' field services required in connection therewith. 3. Rentals of all construction equipment and machinery, and the parts thereof whether rented from Contractor or others in accordance with rental agreements approved by City, and the costs of transportation, loading, unloading, assembly, dismantling, and removal thereof. All such costs shall be in accordance with the terms of said rental agreements. The rental of any such equipment, machinery, or parts shall cease when the use thereof is no longer necessary for the Work. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 42 of 63 4. Payments made by Contractor to Subcontractors for Work performed by Subcontractors. If required by City, Contractor shall obtain competitive bids from subcontractors acceptable to City and Contractor and shall deliver such bids to City, who will then determine, which bids, if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the Subcontractor's Cost of the Work and fee shall be determined in the same manner as Contractor's Cost of the Work and fee as provided in this Paragraph 11.01. 5. Costs of special consultants (including but not limited to engineers, architects, testing laboratories, surveyors, attorneys, and accountants) employed for services specifically related to the Work. 6. Supplemental costs including the following: a. The proportion of necessary transportation, travel, and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the Work. b. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office, and temporary facilities at the Site, and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost, less market value, of such items used but not consumed which remain the property of Contractor. c. Sales, consumer, use, and other similar taxes related to the Work, and for which Contractor is liable not covered under Paragraph 6.11, as imposed by Laws and Regulations. d. Deposits lost for causes other than negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for permits and licenses. e. Losses and damages (and related expenses) caused by damage to the Work, not compensated by insurance or otherwise, sustained by Contractor in connection with the performance of the Work, provided such losses and damages have resulted from causes other than the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of City. No such losses, damages, and expenses shall be included in the Cost of the Work for the purpose of determining Contractor's fee. f. The cost of utilities, fuel, and sanitary facilities at the Site. g. Minor expenses such as telegrams, long distance telephone calls, telephone and communication services at the Site, express and courier services, and similar petty cash items in connection with the Work. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 43 of 63 h. The costs of premiums for all bonds and insurance Contractor is required by the Contract Documents to purchase and maintain. B. Costs Excluded.• The term Cost of the Work shall not include any of the following items: 1. Payroll costs and other compensation of Contractor's officers, executives, principals (of partnerships and sole proprietorships), general managers, safety managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks, and other personnel employed by Contractor, whether at the Site or in Contractor's principal or branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in Paragraph 11.0LA. 1 or specifically covered by Paragraph 11.0I.A.4, all of which are to be considered administrative costs covered by the Contractor's fee. 2. Expenses of Contractor's principal and branch offices other than Contractor's office at the Site. 3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges against Contractor for delinquent payments. 4. Costs due to the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property. 5. Other overhead or general expense costs of any kind. C. Contractor's Fee: When all the Work is performed on the basis of cost-plus, Contractor's fee shall be determined as set forth in the Agreement. When the value of any Work covered by a Change Order for an adjustment in Contract Price is determined on the basis of Cost of the Work, Contractor's fee shall be determined as set forth in Paragraph 12.01.C. D. Documentation: Whenever the Cost of the Work for any purpose is to be determined pursuant to Paragraphs 11.01.A and 11.01.13, Contractor will establish and maintain records thereof in accordance with generally accepted accounting practices and submit in a form acceptable to City an itemized cost breakdown together with supporting data. 11.02 Allowances A. Specified Allowance: It is understood that Contractor has included in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be performed for such sums and by such persons or entities as may be acceptable to City. B. Pre -bid Allowances: 1. Contractor agrees that: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 44 of 63 a. the pre -bid allowances include the cost to Contractor of materials and equipment required by the allowances to be delivered at the Site, and all applicable taxes; and b. Contractor's costs for unloading and handling on the Site, labor, installation, overhead, profit, and other expenses contemplated for the pre -bid allowances have been included in the allowances, and no demand for additional payment on account of any of the foregoing will be valid. C. Contingency Allowance: Contractor agrees that a contingency allowance, if any, is for the sole use of City. D. Prior to final payment, an appropriate Change Order will be issued to reflect actual amounts due Contractor on account of Work covered by allowances, and the Contract Price shall be correspondingly adjusted. 11.03 Unit Price Work A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performed by Contractor will be made by City subject to the provisions of Paragraph 9.05. C. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. Work described in the Contract Documents, or reasonably inferred as required for a functionally complete installation, but not identified in the listing of unit price items shall be considered incidental to unit price work listed and the cost of incidental work included as part of the unit price. D. City may make an adjustment in the Contract Price in accordance with Paragraph 12.01 if: 1. the quantity of any item of Unit Price Work performed by Contractor differs materially and significantly from the estimated quantity of such item indicated in the Agreement; and 2. there is no corresponding adjustment with respect to any other item of Work. E. Increased or Decreased Quantities: The City reserves the right to order Extra Work in accordance with Paragraph 10.01. If the changes in quantities or the alterations do not significantly change the character of work under the Contract Documents, the altered work will be paid for at the Contract unit price. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 45 of 63 2. If the changes in quantities or alterations significantly change the character of work, the Contract will be amended by a Change Order. 3. If no unit prices exist, this will be considered Extra Work and the Contract will be amended by a Change Order in accordance with Article 12. 4. A significant change in the character of work occurs when: a. the character of work for any Item as altered differs materially in kind or nature from that in the Contract or b. a Major Item of work varies by more than 25% from the original Contract quantity. 5. When the quantity of work to be done under any Major Item of the Contract is more than 125% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price on the portion of the work that is above 125%. 6. When the quantity of work to be done under any Major Item of the Contract is less than 75% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price. 11.04 Plans Quantity Measurement A. Plans quantities may or may not represent the exact quantity of work performed or material moved, handled, or placed during the execution of the Contract. The estimated bid quantities are designated as final payment quantities, unless revised by the governing Section or this Article. B. If the quantity measured as outlined under "Price and Payment Procedures" varies by more than 25% (or as stipulated under "Price and Payment Procedures" for specific Items) from the total estimated quantity for an individual Item originally shown in the Contract Documents, an adjustment may be made to the quantity of authorized work done for payment purposes. The party to the Contract requesting the adjustment will provide field measurements and calculations showing the final quantity for which payment will be made. Payment for revised quantity will be made at the unit price bid for that Item, except as provided for in Article 10. C. When quantities are revised by a change in design approved by the City, by Change Order, or to correct an error, or to correct an error on the plans, the plans quantity will be increased or decreased by the amount involved in the change, and the 25% variance will apply to the new plans quantity. D. If the total Contract quantity multiplied by the unit price bid for an individual Item is less than $250 and the Item is not originally a plans quantity Item, then the Item may be paid as a plans quantity Item if the City and Contractor agree in writing to fix the final quantity as a plans quantity. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 46 of 63 E. For callout work or non -site specific Contracts, the plans quantity measurement requirements are not applicable. ARTICLE 12 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 12.01 Change of Contract Price A. The Contract Price may only be changed by a Change Order. B. The value of any Work covered by a Change Order will be determined as follows: where the Work involved is covered by unit prices contained in the Contract Documents, by application of such unit prices to the quantities of the items involved (subject to the provisions of Paragraph 11.03); or 2. where the Work involved is not covered by unit prices contained in the Contract Documents, by a mutually agreed lump sum or unit price (which may include an allowance for overhead and profit not necessarily in accordance with Paragraph 12.0l.C.2), and shall include the cost of any secondary impacts that are foreseeable at the time of pricing the cost of Extra Work; or 3. where the Work involved is not covered by unit prices contained in the Contract Documents and agreement to a lump sum or unit price is not reached under Paragraph 12.0l.B.2, on the basis of the Cost of the Work (determined as provided in Paragraph 11.01) plus a Contractor's fee for overhead and profit (determined as provided in Paragraph 12.01.C). C. Contractor's Fee: The Contractor's additional fee for overhead and profit shall be determined as follows: 1. a mutually acceptable fixed fee; or 2. if a fixed fee is not agreed upon, then a fee based on the following percentages of the various portions of the Cost of the Work: a. for costs incurred under Paragraphs 11.0l.A.1, 11.0l.A.2. and 11.01.A.3, the Contractor's additional fee shall be 15 percent except for: 1) rental fees for Contractor's own equipment using standard rental rates; 2) bonds and insurance; b. for costs incurred under Paragraph 11.01.A.4 and 11.01.A.5, the Contractor's fee shall be five percent (5%); 1) where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon, the intent of Paragraphs 12.0l.C.2.a and 12.0l.C.2.b is that the Subcontractor who actually performs the Work, at whatever CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 47 of 63 tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under Paragraphs 11.0l.A.1 and 11.0l.A.2 and that any higher tier Subcontractor and Contractor will each be paid a fee of five percent (5%) of the amount paid to the next lower tier Subcontractor, however in no case shall the cumulative total of fees paid be in excess of 25%; no fee shall be payable on the basis of costs itemized under Paragraphs 11.0l.A.6, and 11.013; d. the amount of credit to be allowed by Contractor to City for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost plus a deduction in Contractor's fee by an amount equal to five percent (5%) of such net decrease. 12.02 Change of Contract Time A. The Contract Time may only be changed by a Change Order. B. No extension of the Contract Time will be allowed for Extra Work or for claimed delay unless the Extra Work contemplated or claimed delay is shown to be on the critical path of the Project Schedule or Contractor can show by Critical Path Method analysis how the Extra Work or claimed delay adversely affects the critical path. 12.03 Delays A. Where Contractor is reasonably delayed in the performance or completion of any part of the Work within the Contract Time due to delay beyond the control of Contractor, the Contract Time may be extended in an amount equal to the time lost due to such delay if a Contract Claim is made therefor. Delays beyond the control of Contractor shall include, but not be limited to, acts or neglect by City, acts or neglect of utility owners or other contractors performing other work as contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God. Such an adjustment shall be Contractor's sole and exclusive remedy for the delays described in this Paragraph. B. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. C. Contractor shall not be entitled to an adjustment in Contract Price or Contract Time for delays within the control of Contractor. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor. D. The Contractor shall receive no compensation for delays or hindrances to the Work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if any, which is to be furnished by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 48 of 63 ARTICLE 13 — TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 13.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 13.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 13.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations acceptable to City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 13.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 49 of 63 3. Any amounts owed for any retest under this Section 13.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue Final Payment until the Testing Lab is paid. E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. F. Uncovering Work as provided in Paragraph 13.03.E shall be at Contractor's expense. G. Contractor shall have the right to make a Contract Claim regarding any retest or invoice issued under Section 13.03 D. 13.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. B. If City considers it necessary or advisable that covered Work be observed by City or inspected or tested by others, Contractor, at City's request, shall uncover, expose, or otherwise make available for observation, inspection, or testing as City may require, that portion of the Work in question, furnishing all necessary labor, material, and equipment. If it is found that the uncovered Work is defective, Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such uncovering, exposure, observation, inspection, and testing, and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); or City shall be entitled to accept defective Work in accordance with Paragraph 13.08 in which case Contractor shall still be responsible for all costs associated with exposing, observing, and testing the defective Work. 2. If the uncovered Work is not found to be defective, Contractor shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering, exposure, observation, inspection, testing, replacement, and reconstruction. 13.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 50 of 63 Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 13.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 13.06 or Paragraph 13.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 13.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 6.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 51 of 63 C. In special circumstances where a particular item of equipment is placed in continuous service before Final Acceptance of all the Work, the correction period for that item may start to run from an earlier date if so provided in the Contract Documents. D. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 13.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor should such additional warranty coverage be required. Contractor may dispute this requirement by filing a Contract Claim, pursuant to Paragraph 10.06. E. Contractor's obligations under this Paragraph 13.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 13.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 13.08 Acceptance of Defective Work If, instead of requiring correction or removal and replacement of defective Work, City prefers to accept it, City may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) attributable to City's evaluation of and determination to accept such defective Work and for the diminished value of the Work to the extent not otherwise paid by Contractor. If any such acceptance occurs prior to Final Acceptance, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and City shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work so accepted. 13.09 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 13.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 13.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 52 of 63 costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 13.09. ARTICLE 14 — PAYMENTS TO CONTRACTOR AND COMPLETION 14.01 Schedule of Values The Schedule of Values for lump sum contracts established as provided in Paragraph 2.07 will serve as the basis for progress payments and will be incorporated into a form of Application for Payment acceptable to City. Progress payments on account of Unit Price Work will be based on the number of units completed. 14.02 Progress Payments A. Applications for Payments: Contractor is responsible for providing all information as required to become a vendor of the City. 2. At least 20 days before the date established in the General Requirements for each progress payment, Contractor shall submit to City for review an Application for Payment filled out and signed by Contractor covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents. 3. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the Site or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice, or other documentation warranting that City has received the materials and equipment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate insurance or other arrangements to protect City's interest therein, all of which must be satisfactory to City. 4. Beginning with the second Application for Payment, each Application shall include an affidavit of Contractor stating that previous progress payments received on account of the Work have been applied on account to discharge Contractor's legitimate obligations associated with prior Applications for Payment. 5. The amount of retainage with respect to progress payments will be as described in subsection C. unless otherwise stipulated in the Contract Documents. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 53 of 63 B. Review of Applications: 1. City will, after receipt of each Application for Payment, either indicate in writing a recommendation of payment or return the Application to Contractor indicating reasons for refusing payment. In the latter case, Contractor may make the necessary corrections and resubmit the Application. 2. City's processing of any payment requested in an Application for Payment will be based on City's observations of the executed Work, and on City's review of the Application for Payment and the accompanying data and schedules, that to the best of City's knowledge: a. the Work has progressed to the point indicated; b. the quality of the Work is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Final Acceptance, the results of any subsequent tests called for in the Contract Documents, a final determination of quantities and classifications for Work performed under Paragraph 9.05, and any other qualifications stated in the recommendation). 3. Processing any such payment will not thereby be deemed to have represented that: a. inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved detailed inspections of the Work beyond the responsibilities specifically assigned to City in the Contract Documents; or b. there may not be other matters or issues between the parties that might entitle Contractor to be paid additionally by City or entitle City to withhold payment to Contractor; or c. Contractor has complied with Laws and Regulations applicable to Contractor's performance of the Work. 4. City may refuse to process the whole or any part of any payment because of subsequently discovered evidence or the results of subsequent inspections or tests, and revise or revoke any such payment previously made, to such extent as may be necessary to protect City from loss because: a. the Work is defective or completed Work has been damaged by the Contractor or subcontractors requiring correction or replacement; b. discrepancies in quantities contained in previous applications for payment; c. the Contract Price has been reduced by Change Orders; d. City has been required to correct defective Work or complete Work in accordance with Paragraph 13.09; or CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 54 of 63 e. City has actual knowledge of the occurrence of any of the events enumerated in Paragraph 15.02.A. C. Retainage: 1. For contracts less than $400,000 at the time of execution, retainage shall be ten percent (10%). 2. For contracts greater than $400,000 at the time of execution, retainage shall be five percent (5%). D. Liquidated Damages. For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents, the sum per day specified in the Agreement will be assessed against the monies due the Contractor, not as a penalty, but as damages suffered by the City. E. Payment: Contractor will be paid pursuant to the requirements of this Article 14 and payment will become due in accordance with the Contract Documents. F. Reduction in Payment: 1. City may refuse to make payment of the amount requested because: a. Liens have been filed in connection with the Work, except where Contractor has delivered a specific bond satisfactory to City to secure the satisfaction and discharge of such Liens; b. there are other items entitling City to a set-off against the amount recommended; or c. City has actual knowledge of the occurrence of any of the events enumerated in Paragraphs 14.02.B.4.a through 14.02.B.4.e or Paragraph 15.02.A. 2. If City refuses to make payment of the amount requested, City will give Contractor written notice stating the reasons for such action and pay Contractor any amount remaining after deduction of the amount so withheld. City shall pay Contractor the amount so withheld, or any adjustment thereto agreed to by City and Contractor, when Contractor remedies the reasons for such action. 14.03 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to City no later than the time of payment free and clear of all Liens. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 55 of 63 14.04 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any part of the Work which has specifically been identified in the Contract Documents, or which City determines constitutes a separately functioning and usable part of the Work that can be used for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 14.05 Finallnspection A. Upon written notice from Contractor that the entire Work is Substantially Complete in accordance with the Contract Documents: 1. Within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective ("Punch List Items"). Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. B. No time charge will be made against the Contractor between said date of notification to the City of Substantial Completion and the date of Final Inspection. Should the City determine that the Work is not ready for Final Inspection, City will notify the Contractor in writing of the reasons and Contract Time will resume. 2. Should the City concur that Substantial Completion has been achieved with the exception of any Punch List Items, Contract Time will resume for the duration it takes for Contractor to achieve Final Acceptance. 14.06 Final Acceptance Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 56 of 63 14.07 Final Payment A. Application for Payment: 1. Upon Final Acceptance, and in the opinion of City, Contractor may make an application for final payment following the procedure for progress payments in accordance with the Contract Documents. 2. The final Application for Payment shall be accompanied (except as previously delivered) by: a. all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; b. consent of the surety, if any, to final payment; c. a list of all pending or released Damage Claims against City that Contractor believes are unsettled. and d. affidavits of payments for employees, subcontractors, and suppliers; and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. B. Payment Becomes Due: 1. After City's acceptance of the Application for Payment and accompanying documentation, requested by Contractor, less previous payments made and any sum City is entitled, including but not limited to liquidated damages, will become due and payable. 2. After all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 3. The making of the final payment by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. 14.08 Final Completion Delayed and Partial Retainage Release A. If final completion of the Work is significantly delayed, and if City so confirms, City may, upon receipt of Contractor's final Application for Payment, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by City for Work not fully completed or corrected is less than the retainage stipulated in Paragraph 14.02.C, and if bonds have been furnished as required in Paragraph 5.02, the written consent of the surety to the payment of the balance due for that CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 57 of 63 portion of the Work fully completed and accepted shall be submitted by Contractor to City with the Application for such payment. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of Contract Claims. B. Partial Retainage Release. For a Contract that provides for a separate vegetative establishment and maintenance, and test and performance periods following the completion of all other construction in the Contract Documents for all Work locations, the City may release a portion of the amount retained provided that all other work is completed as determined by the City. Before the release, all submittals and final quantities must be completed and accepted for all other work. An amount sufficient to ensure Contract compliance will be retained. 14.09 Waiver of Claims The acceptance of final payment will constitute a release of the City from all claims or liabilities under the Contract for anything done or furnished or relating to the work under the Contract Documents or any act or neglect of City related to or connected with the Contract. ARTICLE 15 — SUSPENSION OF WORK AND TERMINATION 15.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will make no extra payment for stand-by time of construction equipment and/or construction crews. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. D. Contractor may be reimbursed for the cost of moving his equipment off the job and returning the necessary equipment to the job when it is determined by the City that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. Reimbursement may not be allowed if the equipment is moved to another construction project for the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 58 of 63 15.02 City May Terminate for Cause A. The occurrence of any one or more of the following events by way of example, but not of limitation, may justify termination for cause: 1. Contractor's persistent failure to perform the Work in accordance with the Contract Documents (including, but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment, failure to adhere to the Project Schedule established under Paragraph 2.07 as adjusted from time to time pursuant to Paragraph 6.04, or failure to adhere to the City's Business Diversity Enterprise Ordinance #20020-12-2011established under Paragraph 6.06.D); 2. Contractor's disregard of Laws or Regulations of any public body having jurisdiction; 3. Contractor's repeated disregard of the authority of City; or 4. Contractor's violation in any substantial way of any provisions of the Contract Documents; or 5. Contractor's failure to promptly make good any defect in materials or workmanship, or defects of any nature, the correction of which has been directed in writing by the City; or 6. Substantial indication that the Contractor has made an unauthorized assignment of the Contract or any funds due therefrom for the benefit of any creditor or for any other purpose; or 7. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable to carry on the Work satisfactorily; or 8. Contractor commences legal action in a court of competent jurisdiction against the City. B. If one or more of the events identified in Paragraph 15.02A. occur, City will provide written notice to Contractor and Surety to arrange a conference with Contractor and Surety to address Contractor's failure to perform the Work. Conference shall be held not later than 15 days, after receipt of notice. 1. If the City, the Contractor, and the Surety do not agree to allow the Contractor to proceed to perform the construction Contract, the City may, to the extent permitted by Laws and Regulations, declare a Contractor default and formally terminate the Contractor's right to complete the Contract. Contractor default shall not be declared earlier than 20 days after the Contractor and Surety have received notice of conference to address Contractor's failure to perform the Work. 2. If Contractor's services are terminated, Surety shall be obligated to take over and perform the Work. If Surety does not commence performance thereof within 15 consecutive calendar days after date of an additional written notice demanding Surety's performance of its CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 59 of 63 obligations, then City, without process or action at law, may take over any portion of the Work and complete it as described below. a. If City completes the Work, City may exclude Contractor and Surety from the site and take possession of the Work, and all materials and equipment incorporated into the Work stored at the Site or for which City has paid Contractor or Surety but which are stored elsewhere, and finish the Work as City may deem expedient. 3. Whether City or Surety completes the Work, Contractor shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds all claims, costs, losses and damages sustained by City arising out of or resulting from completing the Work, such excess will be paid to Contractor. If such claims, costs, losses and damages exceed such unpaid balance, Contractor shall pay the difference to City. Such claims, costs, losses and damages incurred by City will be incorporated in a Change Order, provided that when exercising any rights or remedies under this Paragraph, City shall not be required to obtain the lowest price for the Work performed. 4. Neither City, nor any of its respective consultants, agents, officers, directors or employees shall be in any way liable or accountable to Contractor or Surety for the method by which the completion of the said Work, or any portion thereof, may be accomplished or for the price paid therefor. 5. City, notwithstanding the method used in completing the Contract, shall not forfeit the right to recover damages from Contractor or Surety for Contractor's failure to timely complete the entire Contract. Contractor shall not be entitled to any claim on account of the method used by City in completing the Contract. 6. Maintenance of the Work shall continue to be Contractor's and Surety's responsibilities as provided for in the bond requirements of the Contract Documents or any special guarantees provided for under the Contract Documents or any other obligations otherwise prescribed by law. C. Notwithstanding Paragraphs 15.02.13, Contractor's services will not be terminated if Contractor begins within seven days of receipt of notice of intent to terminate to correct its failure to perform and proceeds diligently to cure such failure within no more than 30 days of receipt of said notice. D. Where Contractor's services have been so terminated by City, the termination will not affect any rights or remedies of City against Contractor then existing or which may thereafter accrue. Any retention or payment of moneys due Contractor by City will not release Contractor from liability. E. If and to the extent that Contractor has provided a performance bond under the provisions of Paragraph 5.02, the termination procedures of that bond shall not supersede the provisions of this Article. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 60 of 63 15.03 City May Terininate For Convenience A. City may, without cause and without prejudice to any other right or remedy of City, terminate the Contract. Any termination shall be effected by mailing a notice of the termination to the Contractor specifying the extent to which performance of Work under the contract is terminated, and the date upon which such termination becomes effective. Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Postal Service Mail by the City. Further, it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no proof in any claim, demand or suit shall be required of the City regarding such discretionary action. B. After receipt of a notice of termination, and except as otherwise directed by the City, the Contractor shall: 1. Stop work under the Contract on the date and to the extent specified in the notice of termination; 2. place no further orders or subcontracts for materials, services or facilities except as may be necessary for completion of such portion of the Work under the Contract as is not terminated; 3. terminate all orders and subcontracts to the extent that they relate to the performance of the Work terminated by notice of termination; 4. transfer title to the City and deliver in the manner, at the times, and to the extent, if any, directed by the City: a. the fabricated or unfabricated parts, Work in progress, completed Work, supplies and other material produced as a part of, or acquired in connection with the performance of, the Work terminated by the notice of the termination; and b. the completed, or partially completed plans, drawings, information and other property which, if the Contract had been completed, would have been required to be furnished to the City. 5. complete performance of such Work as shall not have been terminated by the notice of termination; and 6. take such action as may be necessary, or as the City may direct, for the protection and preservation of the property related to its contract which is in the possession of the Contractor and in which the owner has or may acquire the rest. C. At a time not later than 30 days after the termination date specified in the notice of termination, the Contractor may submit to the City a list, certified as to quantity and quality, of any or all items of termination inventory not previously disposed of, exclusive of items the disposition of which has been directed or authorized by City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 61 of 63 D. Not later than 15 days thereafter, the City shall accept title to such items provided, that the list submitted shall be subject to verification by the City upon removal of the items or, if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to final settlement. E. Not later than 60 days after the notice of termination, the Contractor shall submit his termination claim to the City in the form and with the certification prescribed by the City. Unless an extension is made in writing within such 60 day period by the Contractor, and granted by the City, any and all such claims shall be conclusively deemed waived. F. In such case, Contractor shall be paid for (without duplication of any items): 1. completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, including fair and reasonable sums for overhead and profit on such Work; 2. expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials, or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses; and 3. reasonable expenses directly attributable to termination. G. In the event of the failure of the Contractor and City to agree upon the whole amount to be paid to the Contractor by reason of the termination of the Work, the City shall determine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined. Contractor shall not be paid on account of loss of anticipated profits or revenue or other economic loss arising out of or resulting from such termination. ARTICLE 16 — DISPUTE RESOLUTION 16.01 Methods and Procedures A. Either City or Contractor may request mediation of any Contract Claim submitted for a decision under Paragraph 10.06 before such decision becomes final and binding. The request for mediation shall be submitted to the other party to the Contract. Timely submission of the request shall stay the effect of Paragraph 10.06.E. B. City and Contractor shall participate in the mediation process in good faith. The process shall be commenced within 60 days of filing of the request. C. If the Contract Claim is not resolved by mediation, City's action under Paragraph 10.06.0 or a denial pursuant to Paragraphs 10.06.C.3 or 10.06.1) shall become final and binding 30 days after termination of the mediation unless, within that time period, City or Contractor: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 62 of 63 1. elects in writing to invoke any other dispute resolution process provided for in the Supplementary Conditions; or 2. agrees with the other party to submit the Contract Claim to another dispute resolution process; or 3. gives written notice to the other party of the intent to submit the Contract Claim to a court of competent jurisdiction. ARTICLE 17 — MISCELLANEOUS 17.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if. 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 17.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 17.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 007200-1 GENERAL CONDITIONS Page 63 of 63 17.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 17.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 3/08/2024 00 73 00 SUPPLEMENTARY CONDITIONS SECTION 00 73 00 SUPPLEMENTARY CONDITIONS TO GENERAL CONDITIONS Supplementary Conditions Page 1 of 5 These Supplementary Conditions modify and supplement Section 00 72 00 - General Conditions, and other provisions of the Contract Documents as indicated below. All provisions of the General Conditions that are modified or supplemented remain in full force and effect as so modified or supplemented. All provisions of the General Conditions which are not so modified or supplemented remain in full force and effect. Defined Terms The terms used in these Supplementary Conditions which are defined in the General Conditions have the meaning assigned to them in the General Conditions, unless specifically noted herein. Modifications and Supplements The following are instructions that modify or supplement specific paragraphs in the General Conditions and other Contract Documents. SC-3.03B.2, "Resolving Discrepancies" Plans govern over Specifications. SC-4.01A Easement limits shown on the Drawing are approximate and were provided to establish a basis for bidding. Upon receiving the final easements descriptions, Contractor shall compare them to the lines shown on the Contract Drawings. SC-4.01A.1., "Availability of Lands" The following is a list of known outstanding right-of-way, and/or easements to be acquired, if any as of May 2024: Outstanding Right -Of -Way, and/or Easements to Be Acquired PARCEL OWNER TARGET DATE NUMBER OF POSSESSION NONE The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, and do not bind the City. If Contractor considers the final easements provided to differ materially from the representations on the Contract Drawings, Contractor shall within five (5) Business Days and before proceeding with the Work, notify City in writing associated with the differing easement line locations. SC-4.01A.2, "Availability of Lands" CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised March 8, 2024 00 73 00 SUPPLEMENTARY CONDITIONS Page 2 of 5 Utilities or obstructions to be removed, adjusted, and/or relocated The following is list of utilities and/or obstructions that have not been removed, adjusted, and/or relocated as of May 2024: EXPECTED UTILITY AND LOCATION TARGET DATE OF OWNER ADJUSTMENT NONE The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, and do not bind the City. SC-4.02A., "Subsurface and Physical Conditions" The following are reports of explorations and tests of subsurface conditions at the site of the Work: None The following are drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site of the Work: None SC-4.06A., "Hazardous Environmental Conditions at Site" The following are reports and drawings of existing hazardous environmental conditions known to the City: Nonw SC-5.03A., "Certificates of Insurance" The entities listed below are "additional insureds as their interest may appear" including their respective officers, directors, agents and employees. (1) City (2) Consultant: Gresham Smith (3) Other: None SC-5.04A., "Contractor's Insurance" The limits of liability for the insurance required by Paragraph GC-5.04 shall provide the following coverages for not less than the following amounts or greater where required by laws and regulations: 5.04A. Workers' Compensation, under Paragraph GC-5.04A. Statutory limits Employer's liability $100, 000 each accident/occurrence $100, 000 Disease - each employee $500, 000 Disease -policy limit SC-5.04B., "Contractor's Insurance" 5.04B. Commercial General Liability, under Paragraph GC-5.0413. Contractor's Liability Insurance under Paragraph GC-5.04B., which shall be on a per project basis covering the Contractor with minimum limits of: CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised March 8, 2024 00 73 00 SUPPLEMENTARY CONDITIONS Page 3 of 5 $1, 000, 000 each occurrence $2, 000, 000 aggregate limit The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. SC 5.04C., "Contractor's Insurance" 5.04C. Automobile Liability, under Paragraph GC-5.04C. Contractor's Liability Insurance under Paragraph GC-5.04C., which shall be in an amount not less than the following amounts: (1) Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. $1, 000, 000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: $250, 000 Bodily Injury per person / $500, 000 Bodily Injury per accident / $100, 000 Property Damage SC-5.04D., "Contractor's Insurance" The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks None The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: (1) General Aggregate: (2) Each Occurrence: Required for this Contract X Not required for this Contract With respect to the above outlined insurance requirements, the following shall govern: 1. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at -grade crossing CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised March 8, 2024 00 73 00 SUPPLEMENTARY CONDITIONS Page 4 of 5 is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. 2. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights -of -way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. 3. If, in addition to a grade separation or an at -grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at -grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. 4. If no grade separation is involved but other work is proposed on a railroad company's right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. SC-6.04., "Project Schedule" Project schedule shall be tier 3 for the project. SC-6.07 A.., "Duty to pay Prevailing Wage Rates" The following is the prevailing wage rate table(s) applicable to this project and is provided in the Appendixes: GC-6.07 A copy of the table is also available by accessing the City's website at: httDS://aDDS.fortworthtexas.gov/ProiectResources/ You can access the file by following the directory path: 02-Construction Documents/Specifications/Div00 — General Conditions SC-6.09., "Permits and Utilities" SC-6.09A., "Contractor obtained permits and licenses" 1. The following are known permits and/or licenses required by the Contract to be acquired by the Contractor: Street Use Permit 2. Storm Water Pollution Prevention (SWPPP) SC-6.09B. "City obtained permits and licenses" The following are known permits and/or licenses required by the Contract to be acquired by the City: 1. TxDOT Utility Crossing Permit CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised March 8, 2024 00 73 00 SUPPLEMENTARY CONDITIONS Page 5 of 5 SC-6.09C. "Outstanding permits and licenses" The following is a list of known outstanding permits and/or licenses to be acquired, if any as of May 2024: Outstanding Permits and/or Licenses to Be Acquired OWNER PERMIT OR LICENSE AND LOCATION TARGET DATE OF POSSESSION None SC-7.02., "Coordination" The individuals or entities listed below have contracts with the City for the performance of other work at the Site: None SC-8.01, "Communications to Contractor" SC-9.01., "City's Project Manager" The City's Project Manager for this Contract is Pretti KC or his/her successor pursuant to written notification from the Director of Water Department SC-13.03C., "Tests and Inspections" None SC-16.01C.1, "Methods and Procedures" None END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1/22/2016 F. Griffin SC-9.01., "City's Project Representative" wording changed to City's Project Manager. 3/9/2020 D.V. Magana SC-6.07, Updated the link such that files can be accessed via the City's website. 10/06/23 Michael Owen SC-6.07, Allow affidavit regarding paying prevailing wages to be submitted on completion of job, as opposed to with each progress report 3/08/24 Michael Owen Removed revisions related to affidavit, as those changes have been made in General Conditions CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised March 8, 2024 011100-1 SUMMARY OF WORK SECTION 01 11 00 SUMMARY OF WORK PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 3 1. Summary of Work to be performed in accordance with the Contract Documents B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 - General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Work Covered by Contract Documents 1. Work is to include furnishing all labor, materials, and equipment, and performing all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work 1. Any and all Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included on the standard bid item list, then the item shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. C. Use of Premises 1. Coordinate uses of premises under direction of the City. 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. Use and occupy only portions of the public streets and alleys, or other public places or other rights -of -way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the City. a. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised December 20, 2012 01 11 00 - 2 SUMMARY OF WORK Page 2 of 3 b. Excavated and waste materials shall be stored in such a way as not to interfere with the use of spaces that may be designated to be left free and unobstructed and so as not to inconvenience occupants of adjacent property. c. If the street is occupied by railroad tracks, the Work shall be carried on in such manner as not to interfere with the operation of the railroad. 1) All Work shall be in accordance with railroad requirements set forth in Division 0 as well as the railroad permit. D. Work within Easements 1. Do not enter upon private property for any purpose without having previously obtained permission from the owner of such property. 2. Do not store equipment or material on private property unless and until the specified approval of the property owner has been secured in writing by the Contractor and a copy furnished to the City. 3. Unless specifically provided otherwise, clear all rights -of -way or easements of obstructions which must be removed to make possible proper prosecution of the Work as a part of the project construction operations. 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, lawns, fences, culverts, curbing, and all other types of structures or improvements, to all water, sewer, and gas lines, to all conduits, overhead pole lines, or appurtenances thereof, including the construction of temporary fences and to all other public or private property adjacent to the Work. 5. Notify the proper representatives of the owners or occupants of the public or private lands of interest in lands which might be affected by the Work. a. Such notice shall be made at least 48 hours in advance of the beginning of the Work. b. Notices shall be applicable to both public and private utility companies and any corporation, company, individual, or other, either as owners or occupants, whose land or interest in land might be affected by the Work. c. Be responsible for all damage or injury to property of any character resulting from any act, omission, neglect, or misconduct in the manner or method or execution of the Work, or at any time due to defective work, material, or equipment. 6. Fence a. Restore all fences encountered and removed during construction of the Project to the original or a better than original condition. b. Erect temporary fencing in place of the fencing removed whenever the Work is not in progress and when the site is vacated overnight, and/or at all times to provide site security. c. The cost for all fence work within easements, including removal, temporary closures and replacement, shall be subsidiary to the various items bid in the project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised December 20, 2012 01 11 00 - 3 SUMMARY OF WORK Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised December 20, 2012 012500-1 SUBSTITUTION PROCEDURES SECTION 0125 00 SUBSTITUTION PROCEDURES PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 4 The procedure for requesting the approval of substitution of a product that is not equivalent to a product which is specified by descriptive or performance criteria or defined by reference to 1 or more of the following: a. Name of manufacturer b. Name of vendor c. Trade name d. Catalog number 2. Substitutions are not "or -equals". B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Request for Substitution - General 1. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2. Certain types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or -equals," as determined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a. Or -equals are unavailable due to strike, discontinued production of products meeting specified requirements, or other factors beyond control of Contractor; or, CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised July 1, 2011 01 25 00 - 2 SUBSTITUTION PROCEDURES Page 2 of 4 b. Contractor proposes a cost and/or time reduction incentive to the City. 1.5 SUBMITTALS A. See Request for Substitution Form (attached) B. Procedure for Requesting Substitution 1. Substitution shall be considered only: a. After award of Contract b. Under the conditions stated herein 2. Submit 3 copies of each written request for substitution, including: a. Documentation 1) Complete data substantiating compliance of proposed substitution with Contract Documents 2) Data relating to changes in construction schedule, when a reduction is proposed 3) Data relating to changes in cost b. For products 1) Product identification a) Manufacturer's name b) Telephone number and representative contact name c) Specification Section or Drawing reference of originally specified product, including discrete name or tag number assigned to original product in the Contract Documents 2) Manufacturer's literature clearly marked to show compliance of proposed product with Contract Documents 3) Itemized comparison of original and proposed product addressing product characteristics including, but not necessarily limited to: a) Size b) Composition or materials of construction c) Weight d) Electrical or mechanical requirements 4) Product experience a) Location of past projects utilizing product b) Name and telephone number of persons associated with referenced projects knowledgeable concerning proposed product c) Available field data and reports associated with proposed product 5) Samples a) Provide at request of City. b) Samples become the property of the City. c. For construction methods: 1) Detailed description of proposed method 2) Illustration drawings C. Approval or Rejection 1. Written approval or rejection of substitution given by the City 2. City reserves the right to require proposed product to comply with color and pattern of specified product if necessary to secure design intent. 3. In the event the substitution is approved, the resulting cost and/or time reduction will be documented by Change Order in accordance with the General Conditions. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised July 1, 2011 01 25 00 - 3 SUBSTITUTION PROCEDURES Page 3 of 4 4. No additional contract time will be given for substitution. Substitution will be rejected if: a. Submittal is not through the Contractor with his stamp of approval b. Request is not made in accordance with this Specification Section c. In the City's opinion, acceptance will require substantial revision of the original design d. In the City's opinion, substitution will not perform adequately the function consistent with the design intent 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. In making request for substitution or in using an approved product, the Contractor represents that the Contractor: 1. Has investigated proposed product, and has determined that it is adequate or superior in all respects to that specified, and that it will perform function for which it is intended 2. Will provide same guarantee for substitute item as for product specified 3. Will coordinate installation of accepted substitution into Work, to include building modifications if necessary, making such changes as may be required for Work to be complete in all respects 4. Waives all claims for additional costs related to substitution which subsequently arise 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 SUMMARY OF CHANGE WATER AND SANITARY SEWER REPLACEMENT CPN.• 103413 EXHIBIT A REQUEST FOR SUBSTITUTION FORM: TO: 01 25 00 - 4 SUBSTITUTION PROCEDURES Page 4 of 4 PROJECT: DATE: We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature as noted Firm Address Date Telephone For Use by City: Approved City Recommended Not recommended By Date Remarks Date Rejected Recommended Received late CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised July 1, 2011 01 31 19 - 1 PRECONSTRUCTION MEETING SECTION 013119 PRECONSTRUCTION MEETING PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 3 1. Provisions for the preconstruction meeting to be held prior to the start of Work to clarify construction contract administration procedures B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the execution of the Agreement and before Work is started. a. The meeting will be scheduled and administered by the City. 2. The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3. Attendance shall include: a. Project Representative b. Contractor's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised August 17, 2012 01 31 19 - 2 PRECONSTRUCTION MEETING Page 2 of 3 e. Other City representatives f. Others as appropriate 4. Construction Schedule a. Prepare baseline construction schedule in accordance with Section 0132 16 and provide at Preconstruction Meeting. b. City will notify Contractor of any schedule changes upon Notice of Preconstruction Meeting. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals In. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre -Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. M/WBE or MBE/SBE procedures hh. Final Acceptance ii. Final Payment J. Questions or Comments CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised August 17, 2012 01 31 19 - 3 PRECONSTRUCTION MEETING Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised August 17, 2012 01 32 16 -1 CONSTRUCTION PROGRESS SCHEDULE Page 1 of 10 1 SECTION 0132 16 2 CONSTRUCTION SCHEDULE 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General requirements for the preparation, submittal, updating, status reporting and 7 management of the Construction Progress Schedule 8 2. Specific requirements are presented in the City of Fort Worth Schedule Guidance 9 Document 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include, but are not necessarily limited to: 13 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1— General Requirements 15 D. Purpose 16 The City of Fort Worth (City) is committed to delivering quality, cost-effective 17 infrastructure to its citizens in a timely manner. Akey tool to achieve this purpose is a 18 properly structured schedule with accurate updates. This supports effective monitoring 19 of progress and is input to critical decision making by the project manager throughout 20 the life of the project. Data from the updated project schedule is utilized in status 21 reporting to various levels of the City organization and the citizenry. 22 23 This Document complements the City's Standard Agreement to guide the construction 24 contractor (Contractor) in preparing and submitting acceptable schedules for use by the 25 City in project delivery. The expectation is the performance of the work follows the 26 accepted schedule and adhere to the contractual timeline. 27 28 The Contractor will designate a qualified representative (Project Scheduler) responsible 29 for developing and updating the schedule and preparing status reporting as required by 30 the City. 31 1.2 PRICE AND PAYMENT PROCEDURES 32 A. Measurement and Payment 33 1. Work associated with this Item is considered subsidiary to the various items bid. 34 No separate payment will be allowed for this Item. 35 2. Non-compliance with this specification is grounds for City to withhold payment of 36 the Contractor's invoices until Contractor achieves said compliance. 37 1.3 REFERENCES 38 A. Project Schedules CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised August 13, 2021 01 32 16 -2 CONSTRUCTION PROGRESS SCHEDULE Page 2 of 10 1 Each project is represented by City's master project schedule that encompasses the 2 entire scope of activities envisioned by the City to properly deliver the work. When the 3 City contracts with a Contractor to perform construction of the Work, the Contractor 4 will develop and maintain a schedule for their scope of work in alignment with the 5 City's standard schedule requirements as defined herein. The data and information of 6 each such schedule will be leveraged and become integral in the master project 7 schedule as deemed appropriate by the City's Project Control Specialist and approved 8 by the City's Project Manager. 10 1. Master Project Schedule 11 The master project schedule is a holistic representation of the scheduled activities 12 and milestones for the total project and be Critical Path Method (CPM) based. The 13 City's Project Manager is accountable for oversight of the development and 14 maintaining a master project schedule for each project. When the City contracts for 15 the design and/or construction of the project, the master project schedule will 16 incorporate elements of the Design and Construction schedules as deemed 17 appropriate by the City's Project Control Specialist. The assigned City Project 18 Control Specialist creates and maintains the master project schedule in P6 (City's 19 scheduling software). 20 21 2. Construction Schedule 22 The Contractor is responsible for developing and maintaining a schedule for the 23 scope of the Contractor's contractual requirements. The Contractor will issue an 24 initial schedule for review and acceptance by the City's Project Control Specialist 25 and the City's Project Manager as a baseline schedule for Contractor's scope of 26 work. Contractor will issue current, accurate updates of their schedule(Progress 27 Schedule) to the City at the end of each month throughout the life of their work. 28 B. Schedule Tiers 29 The City has a portfolio of projects that vary widely in size, complexity and content 30 requiring different scheduling to effectively deliver each project. The City uses a 31 "tiered" approach to align the proper schedule with the criteria for each project. The 32 City's Project Manager determines the appropriate schedule tier for each project, and 33 includes that designation and the associated requirements in the Contractor's scope of 34 work. The following is a summary of the "tiers". 35 36 1. Tier 1: Small Size and Short Duration Project (design not required) 37 The City develops and maintains a Master Project Schedule for the project. No 38 schedule submittal is required from Contractor. City's Project Control Specialist 39 acquires any necessary schedule status data or information through discussions with 40 the respective party on an as -needed basis. 41 42 2. Tier 2: Small Size and Short to Medium Duration Project 43 The City develops and maintains a Master Project Schedule for the project. The 44 Contractor identifies "start" and "finish" milestone dates on key elements of their 45 work as agreed with the City's Project Manager at the kickoff of their work effort. 46 The Contractor issues to the City, updates to the "start" and "finish" dates for such 47 milestones at the end of each month throughout the life of their work on the project. 48 49 3. Tier 3: Medium and Large Size and/or Complex Projects Regardless of Duration CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised August 13, 2021 01 32 16 - 3 CONSTRUCTION PROGRESS SCHEDULE Page 3 of 10 1 The City develops and maintains a Master Project Schedule for the project. The 2 Contractor develops a Baseline Schedule and maintains the schedule of their 3 respective scope of work on the project at a level of detail (generally Level 3) and in 4 alignment with the WBS structure in Section 1.4.H as agreed by the Project 5 Manager. The Contractor issues to the City, updates of their respective schedule 6 (Progress Schedule) at the end of each month throughout the life of their work on the 7 project. 8 C. Schedule Types 9 Project delivery for the City utilizes two types of schedules as noted below. The City 10 develops and maintains a Master Project Schedule as a "baseline" schedule and issue 11 monthly updates to the City Project Manager (end of each month) as a "progress" 12 schedule. The Contractor prepares and submits each schedule type to fulfill their 13 c ontractual requirements. 14 15 1. Baseline Schedule 16 The Contractor develops and submits to the City, an initial schedule for their scope 17 of work in alignment with this specification. Once reviewed and accepted by the 18 City, it becomes the "Baseline" schedule and is the basis against which all progress 19 is measured. The baseline schedule will be updated when there is a change or 20 addition to the scope of work impacting the duration of the work, and only after 21 receipt of a duly authorized change order issued by the City. In the event progress is 22 significantly behind schedule, the City's Project Manager may authorize an update 23 to the baseline schedule to facilitate a more practical evaluation of progress. An 24 example of a Baseline Schedule is provided in Specification 0132 16.1 25 Construction Project Schedule Baseline Example. 26 27 2. Progress Schedule 28 The Contractor updates their schedule at the end of each month to represent the 29 progress achieved in the work which includes any impact from authorized changes 30 in the work. The updated schedule must accurately reflect the current status of the 31 work at that point in time and is referred to as the "Progress Schedule". The City's 32 Project Manager and Project Control Specialist reviews and accepts each progress 33 schedule. In the event a progress schedule is deemed not acceptable, the 34 unacceptable issues are identified by the City within 5 working days and the 35 Contractor must provide an acceptable progress schedule within 5 working days 36 after receipt of non -acceptance notification. An example of a Progress Schedule is 37 provided in Specification 01 32 16.2 Construction Project Schedule Progress 38 Example. 39 D. City Standard Schedule requirements 40 The following is an overview of the methodology for developing and maintaining a 41 schedule for delivery of a project. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised August 13, 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 01 32 16 -4 CONSTRUCTION PROGRESS SCHEDULE Page 4 of 10 1. Schedule Framework - The schedule will be based on the defined scope of work and follow the (Critical Path Methodology) CPM method. The Contractor's schedule will align with the requirements of this specification and will be cost loaded to reflect their plan for execution. Compliance with cost loading can be provided with traditional cost loading of line items OR a projected cost per month for the project when the initial schedule is submitted, updated on a quarterly basis is significant change is anticipated. Overall schedule duration will align with the contractual requirements for the respective scope of work and be reflected in City's Master Project Schedule. The Project Number and Name of the Project is required on each schedule and must match the City's project data. E. Schedule File Name All schedules submitted to the City for a project will have a file name that begins with the City's project number followed by the name of the project followed by baseline (if a baseline schedule) or the year and month (if a progress schedule), as shownbelow. • Baseline Schedule File Name Format: City Project Number_Project Name _Baseline Example: 101376 North Montgomery Street HMAC_Baseline • Progress Schedule File Name Format: City Project Number _Project Name _YYYY-MM Example: 101376 North Montgomery Street FIMAC_2018_01 • Project Schedule Progress Narrative File Name Format: City Project Number_Project Name _PN_YYYY-MM Example: 101376 North Montgomery Street HMAC_PN_2018_01 F. Schedule Templates The Contractor will utilize the relevant sections from the City's templates provided in the City's document management system as the basis for creating their respective project schedule. Specifically, the Contractor's schedule will align with the layout of the Construction section. The templates are identified by type of project as noted below. • Arterials • Aviation • Neighborhood Streets • Sidewalks (later) • Quiet Zones (later) • Street Lights (later) • Intersection Improvements (later) • Parks • Storm water • Street Maintenance • Traffic • Water G. Schedule Calendar CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.- 103413 Revised August 13, 2021 01 32 16 - 5 CONSTRUCTION PROGRESS SCHEDULE Page 5 of 10 I The City's standard calendar for schedule development purposes is based on a 5-day 2 workweek and accounts for the City's eight standard holidays (New Years, Martin 3 Luther King, Memorial, Independence, Labor, Thanksgiving, day after Thanksgiving, 4 Christmas). The Contractor will establish a schedule calendar as part of the schedule 5 development process and provide to the Project Control Specialist as part of the basis 6 for their schedule. Variations between the City's calendar and the Contractor's 7 calendar must be resolved prior to the City's acceptance of their Baseline project 8 schedule. 10 H. WBS & Milestone Standards for Schedule Development 11 The scope of work to be accomplished by the Contractor is represented in the schedule 12 in the form of a Work Breakdown Structure (WBS). The WBS is the basis for the 13 development of the schedule activities and shall be imbedded and depicted in the 14 schedule. 15 16 The following is a summary of the standards to be followed in preparing and 17 maintaining a schedule for project delivery. 18 19 1. Contractor is required to utilize the City's WBS structure and respective 20 project type template for "Construction" as shown in Section 1.4.Hbelow. 21 Additional activities maybe added to Levels 1 - 4 to accommodate the needs 22 of the organization executing the work. Specifically the Contractor will add 23 activities under WBS XXXXXX.80.83 "Construction Execution" that 24 delineates the activities associated with the various components of the work. 25 26 2. Contractor is required to adhere to the City's Standard Milestones as shown 27 in Section 1.4.I below. Contractor will include additional milestones 28 representing intermediate deliverables as required to accurately reflect their 29 scope of work. 30 31 I. Schedule Activities 32 Activities are the discrete elements of work that make up the schedule. They will be 33 organized under the umbrella of the WBS. Activity descriptions should adequately 34 describe the activity, and in some cases the extent of the activity. All activities are 35 logically tied with a predecessor and a successor. The only exception to this rule is for 36 "project start" and "project finish" milestones. 37 38 The activity duration is based on the physical amount of work to be performed for the 39 stated activity, with a maximum duration of 20 working days OR a continuous activity 40 in one location. If the work for any one activity exceeds 20 days, break that activity 41 down incrementally to achieve this duration constraint. Any exception to this requires 42 review and acceptance by the City's Project Control Specialist. 43 44 J. Change Orders 45 When a Change Order is issued by the City, the impact is incorporated into the 46 previously accepted baseline schedule as an update, to clearly show impact to the 47 project timeline. The Contractor submits this updated baseline schedule to the City for CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised August 13, 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 01 32 16 - 6 CONSTRUCTION PROGRESS SCHEDULE Page 6 of 10 review and acceptance as described in Section 1.5 below. Updated baseline schedules adhere to the following: 1. Time extensions associated with approved contract modifications are limited to the actual amount of time the project activities are anticipated to be delayed, unless otherwise approved by the Program Manager. 2. The re-baselined schedule is submitted by the Contractor within ten workdays after the date of receipt of the approved Change Order. 3. The changes in logic or durations approved by the City are used to analyze the impact of the change and is included in the Change Order. The coding for anew activity(s) added to the schedule for the Change Order includes the Change Order number in the Activity ID. Use as many activities as needed to accurately show the work of the Change Order. Revisions to the baseline schedule are not effective until accepted by the City. K City's Work Breakdown Structure WBS Code WBS Name XXXXXX Project Name XXXXXX.30 Design XXXXXX.30.10 Design Contractor Agreement XXXXXX.30.20 Conceptual Design (30%) XXXXXX.30.30 Preliminary Design (60%) XXXXXX.30.40 Final Design XXXXXX.30.50 Environmental XXXXXX.30.60 Permits XXXXXX.30.60.10 Permits - Identification XXXXXX.30.60.20 Permits - Review/Approve XXXXXX.40 ROW & Easements XXXXXX.40.10 ROW Negotiations XXXXXX.40.20 Condemnation XXXXXX.70 Utility Relocation XXXXXX.70.10 Utility Relocation Co-ordination XXXXXX.80 Construction XXXXXX.80.81 Bid and Award XXXXXX.80.83 Construction Execution XXXXXX. 80.85 Inspection XXXXXX.80.86 Landscaping XXXXXX.90 Closeout XXXXXX.90.10 Construction Contract Close-out XXXXXX.90.40 Design Contract Closure L. City's Standard Milestones The following milestone activities (i.e., important events on a project that mark critical points in time) are of particular interest to the City and must be reflected in the project schedule for all phases of work. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised August 13, 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 01 32 16 - 7 CONSTRUCTION PROGRESS SCHEDULE Page 7 of 10 Activitv ID Activitv Name Design 3020 Award Design Agreement 3040 Issue Notice to Proceed - Design Engineer 3100 Design Kick-off Meeting 3120 Submit Conceptual Plans to Utilities, ROW, Traffic, Parks, Storm Water, Water & Sewer 3150 Peer Review Meeting/Design Review meeting (technical) 3160 Conduct Design Public Meeting #1 (required) 3170 Conceptual Design Complete 3220 Submit Preliminary Plans and Specifications to Utilities, ROW, Traffic, Parks, Storm Water, Water & Sewer 3250 Conduct Design Public Meeting #2 (required) 3260 Preliminary Design Complete 3310 Submit Final Design to Utilities, ROW, Traffic, Parks, Storm Water, Water & Sewer 3330 Conduct Design Public Meeting #3 (if required) 3360 Final Design Complete ROW & Easements 4000 Right of Way Start 4230 Right of Way Complete Utility Relocation 7000 Utilities Start 7120 Utilities Cleared/Complete Construction Bid and Award 8110 Start Advertisement 8150 Conduct Bid Opening 8240 Award Construction Contract Construction Execution 8330 Conduct Construction Public Meeting #4 Pre -Construction 8350 Construction Start 8370 Substantial Completion 8540 Construction Completion 9130 Notice of Completion/Green Sheet 9150 Construction Contract Closed 9420 Design Contract Closed 38 39 1.4 SUBMITTALS 40 A. Schedule Submittal & Review 41 The City's Project Manager is responsible for reviews and acceptance of the Contractor's 42 schedule. The City's Project Control Specialist is responsible for ensuring alignment of 43 the Contractor's baseline and progress schedules with the Master Project Schedule as 44 support to the City's Project Manager. The City reviews and accepts or rejects the 45 schedule within ten workdays of Contractor's submittal. 46 CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised August 13, 2021 01 32 16 - 8 CONSTRUCTION PROGRESS SCHEDULE Page 8 of 10 1 1. Schedule Format 2 The Contractor will submit each schedule in two electronic forms, one in native file 3 format (.xer, .xml, .mpx) and the second in apdf format, in the City's document 4 management system in the location dedicated for this purpose and identified by the 5 Project Manager. In the event the Contractor does not use Primavera P6 or MS 6 Project for scheduling purposes, the schedule information must be submitted in .xls or 7 .xlsx format in compliance with the sample layout (See Specification 0132 16.1 8 Construction Project Schedule Baseline Example), including activity predecessors, 9 successors and total float. 10 11 2. Initial & Baseline Schedule 12 The Contractor will develop their schedule for their scope of work and submit their 13 initial schedule in electronic form (in the file formats noted above), in the City's 14 document management system in the location dedicated for this purpose at least 5 15 working days prior to Pre Construction Meeting. 16 17 The City's Project Manager and Project Control Specialist review this initial schedule 18 to determine alignment with the City's Master Project Schedule, including format & 19 WBS structure. Following the City's review, feedback is provided to the Contractor 20 for their use in finalizing their initial schedule and issuing (within five workdays) their 21 Baseline Schedule for final review and acceptance by the City. 22 23 3. Progress Schedule 24 The Contractor will update and issue their project schedule (Progress Schedule) by the 25 last day of each month throughout the life of their work on the project. The Progress 26 Schedule is submitted in electronic form as noted above, in the City's document 27 management system in the location dedicated for this purpose. 28 29 The City's Project Controlteam reviews each Progress Schedule for data and 30 information that support the assessment of the update to the schedule. In the event 31 data or information is missing or incomplete, the Project Controls Specialist 32 communicates directly with the Contractor's scheduler for providing same. The 33 Contractor re -submits the corrected Progress Schedule within 5 workdays, following 34 the submittal process noted above. The City's ProjectManager and Project Control 35 Specialist review the Contractor's progress schedule for acceptance and to monitor 36 performance and progress. 37 38 The following list of items are required to ensure proper status information is 39 contained in the Progress Schedule. 40 • Baseline Start date 41 • Baseline Finish Date 42 a % Complete 43 • Float 44 • Activity Logic (dependencies) 45 • Critical Path 46 • Activities added or deleted 47 a Expected Baseline Finish date 48 • Variance to the Baseline Finish Date 49 CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised August 13, 2021 01 32 16 - 9 CONSTRUCTION PROGRESS SCHEDULE Page 9 of 10 1 B. Monthly Construction Status Report 2 The Contractor submits a written status report (referred to as a progress narrative) at the 3 monthly progress meeting (if monthly meetings are held) or at the end of each month to 4 accompany the Progress Schedule submittal, using the standard format provided in 5 Specification 0132 16.3 Construction Project Schedule Progress Narrative. The content 6 of the Construction Project Schedule Progress Narrative should be concise and complete 7 to include only changes, delays, and anticipated problems. 8 9 C. Submittal Process 10 • Schedules and Monthly Construction Status Reports are submitted in in the City's 11 document management system in the location dedicated for this purpose. 12 • Once the project has been completed and Final Acceptance has been issued by the 13 City, no further progress schedules or construction status reports are required from 14 the Contractor. 15 1. 16 1.5 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS SNOT USED 17 1.6 CLOSEOUT SUBMITTALS [NOT USED] 18 1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 19 1.8 QUALITY ASSURANCE 20 A. The person preparing and revising the construction Progress Schedule shallbe 21 experienced in the preparation of schedules of similar complexity. 22 B. Schedule and supporting documents addressed in this Specification shall be prepared, 23 updated and revised to accurately reflect the performance of the construction. 24 C. Contractor is responsible for the quality of all submittals in this section meeting the 25 standard of care for the construction industry for similar projects. 26 1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 27 1.10 FIELD [SITE] CONDITIONS [NOT USED] 28 1.11 WARRANTY [NOT USED] 29 1.12 ATTACHMENTS 30 Spec 01 32 16.1 Construction Project Schedule Baseline Example 31 Spec 01 32 16.2 Construction Project Schedule Progress Example 32 Spec 01 32 16.3 Construction Project Schedule Progress Narrative 33 CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised August 13, 2021 1 01 32 16 -10 CONSTRUCTION PROGRESS SCHEDULE Page 10 of 10 2 PART 2 - PRODUCTS [NOT USED] 3 PART 3 - EXECUTION [NOT USED] 4 5 6 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/13/2021 Michael Owen Revised to update specification requirements and eliminate duplicate schedule specifications. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised August 13, 2021 01 32 16.1 CONSTRUCTION PROGRESS SCHEDULE — BASELINE EXAMPLE Pagel of 5 1 SECTION 0132 16.1 2 CONSTRUCTION SCHEDULE - BASELINE EXAMPLE 3 PART1- GENERAL 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 The following is an example of a Contractor's project schedule that illustrates the data and expectation for schedule content depicting the baseline for the project. This version of the schedule is referred to as a "baseline" schedule. This example is intended to provide guidance for the Contractor when developing and submitting a baseline schedule. See CFW Specification 0132 16 Construction Schedule for details and requirements regarding the Contractor's project schedule. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 13, 2021 WATER AND SANITARY SEWER REPLACEMENT CPN.- 103413 f 'rb CFW - Integrated Program No FTW - Project Manager Pre -Construction 8200 Award c:onsmucnon contract 8210 SW Pollution Prevent on Plan (Contractor Prepare and Submit 8220 Sue WalkThrough 82 Pre -Construction 8230 Notice To ProceecPP reC onstmdion Meet ng 8240 Pre -Con Sruchon-Pu bhc Meeting 8250 Mobilization Construction Contract Execution 83 Construction Street 1 Water & Stam 3010 TempWater 3000 Construction Start 3020 Lay 8" water and services 3030 ` Temp Paving Repair Paving 3040 Excavatiun 2050 Stablization 3060 Paving 3070 Flat Work 3080 Glean up 3090 Street 1 Complete Street 2 Water 8 SYam 3100 Tern pWater 3110 Lay 8'. water and services 3120 Temp Paving Repair 3130 Lay 8'. Sewer and Semnes 3140 Temp Paving Repair 3150 Storm Drain & Structures Paving 3160 Excavation 3170 Stablization Project Schedule 38 38 02-Apr-18 23-May-18 396 0 U U2-Apr-16 3210.8220 0 10 10 02-Apr-18 13Apr-18 8200 424 1 1 02-Apr-18 02-Apr-18 8200 8230 0 � 38 38 02-Apr-18 23May-18 396 1 1 17-Apr-18 17-Apr -18 8220 8240 0 1 1 25-Apr-18 25Apr-18 8230 3000.8250 0 20 20 26-Apr-18 23May-18 8240 3310 81 - 230 230 03MW18 01-Apr-19 20 230 03May-18 01-Apr-19 0 90 90 03May-18 10-Sep18 140 40 40 03May-18 2&Jon-18 0 10 10 03May-18 16-May-18 3000 3020 0 0 0 03May-18 8240 3010.8500 0 25 25 17-May08 21-J-18 3010 3030 0 5 5 22-Jun-18 28iJao-18 3020 3040.3100 0 45 45 lti3JJF18 10-Sep18 140 5 5 09-1118 13Jul-18 3030 3050 110 5 5 1&11-18 20.Jul-18 3U40 3050 110 3b 30 23-11-18 31-Aug18 3050 3070.3186 46' 20 20 06-Aug 18 31-Aug18 3050 3080 140 10 10 27-Aug 18 10-Sep18 3070 3090 140 0 0 10-Sep18 3080 8510 140 113 113 29-Jun-18 10-Dec 18 77 63 63 29-Jun-18 27-Sep-18 67 10 10 29-Jun-18 13Jul-18 3030 3110 0 15 15 16.11-18 03-Aug-18 3100 3120 0 5 5 06-Aug18 14Aug18 3110 3130 0 8 8 13Aug18 22-Aug 18 3120 $110 0 5 5 23Aug 18 29-Aug18 3130 3150.3220 0 20 20 30-Aug 18 27Sep18 3140 3160 67 45 45 05-Oct-18 10-Dec18 77 5 5 OSOct-18 11-0d-18 370 3170. 3250 67 5 5 12-Oct-18 18-Oct-18 3160 3180 77 Data Date: 30-Mar-18 tlJullAISIOINIDIJIFIMIAIMIJJJullAISIOlNIDIJI c Actual Work ♦ ♦ Milestone Remainin... Remaining Work ♦ ♦ Critical Milestone Actual Lea... CIP-01B - Neighborhood Street Critical Remaining Work ♦ ♦ Completed Milestone Project Ba... Construction Baseline Schedule Example FORT WORTH N 0 0 f lzy'1 'rb CFW - Integrated Program Project Schedule 3190 Flat Work 20 20 02-Nov-18 03Dec-18 3180 - 3200 3100 Clean up 10 10 27 Nov-18 10-D.c 18 3190 3210 3210 Street 2 Complete 0 0 10-Dec 18 3200 8510 Street3 80 80 30Aug. 18 24-E—I8 Water-& SiOnn 13 13 30-Aug18 18-Sep-18 3220 Temp Water 4 4 30-Aug18 Qt} ep-18 2140 3230 3230 Lay 8" water and services 8 8 06-Sep18 17-Sep-18 3220 3240 3240 Temp Paving Repair 1 1 18-Sep18 18-Sep18 3230 3250, 3310 Paving 50 50 12-Oct 18 24-Dec 18 3250 Excavation b 5 12-11ch18 111111111 8240, 811 3260 3260 Stablization I 5 5 19-Oct 18 250ct 18 iMb 33% 3270 Paving 20 20 26-0ct 18 26-Nov-18 3260 3280 3280 Flat Work 20 20 16-10v-18 17 Dec 18 3270 3290 3290 Clean up 10 10 11-Dec-18 24-Deo-18 3280 3300 3300 Street 3 Complete 0 0 24-0eo-18 3290 8510 Sh`eet4 134 134 19-Sep18 01-Apr-19 Water &Stuan 69 69 19-Sep 18 27-Dec-18 L 3310 Tom p✓eater 0 6 1&Sep 18 2&Sep-18 3240. 82: 2220 3M) Lay �" wder and services M 40 '1- ep1A �U¢ 41 } gt i(I YY9 o 3330 Temp Pacing Repair 3 3 25-Oct-18 29-Oct18 3320 3340 3340 Lay 8" Sewer Lines L-3203 & L-8346 and Services 20 20 30-Oct18 2&Nov-18 3330 3350 3350 Lay 8" Sewer Lines L-3212 & L-8355 and Services 15 15 23Nov-18 13Deo-18 3340 3310 3350 Temp Paving Repair 5 5 20-Dec 18 27 Dec 18 3350 3370 Paving 60 60 07-Jen-19 01-Air,19 3370 Excavation 10 10 07-Jar-19 18-Jo-19 3360 3380 3380 Stablization 10 10 22-Jar-19 04feb-10 3370 3390 3390 Paving 20 20 OS-Feb,19 04-Mar-19 3380 3400 3400 Flat Work 20 20 26-Feb-19 25Mar--19 3390 3410 3410 Clean up I 10 10 13Mar-19 01-Apr-19 3400 3420 3420 Street CompletNSubstantial Complete I 0 0 01-Apr-19 3410 8510 Inspections 276 275 03May-18 05Ln-19 85 Inspection 276 276 03May08 05-J-19 �600 Inspection �2� 03�ayo1 25Uar--1`9 3000 i 8510 8510 1�inal Inspection 10 10 02-Apr-19 15Apr-19 �420, 331 8520 M20 Complete Punch List Tasks 30 30 16-Apr-19 28-May-19 &510 -&530 Actual Work ♦ ♦ Milestone Remainin... Remaining Work ♦ ♦ Critical Milestone Actual Lev... Critical Remaining Work ♦ ♦ Completed Milestone Project Ba... Data Date: 30-Mar-18 M `W M I J licl I S O N D J I Fl M I A I M I J lJull A I S 1 01 N I DI J CIP-01B - Neighborhood Street Construction Baseline Schedule Example FORT WORTH,, 'rb CFW - Integrated Program I Project Schedule Hc[NIty IU Na me UU kU Siart Nnlsh Su[.cessors otal IHc[Ivltci I I I IF'retlecesscl FI❑at I 8530 Final WalkThrough for Completed Punch List Tasks- I ! 1 I 05-Jun-19 05-Jm-19 8520 8540 0 8540 Construction Final Completion 0 0 05:Lrr19 8530 9100.9110 0 Closeout 135 135 06-Jun-19 17 Dec 10 d 90 Closeout 135 135 05-Jun-19 17 Dec 10 0 Cormtructlol Contract Close-oult fl - 135 135 06-Jun-19 17-Dec-10 0 As -Bunt SLuvey 5 5 of Jun-19 12-:L o-19 25 9100 AsBuilt Survey(Submitted _by Contractor) 5 5 06-Jun-19 12-Jan-19 8540 9110 25 Contract Closeout 135 135 06-Jun-19 17-Deo-19 0 9110 Contract Reconciliation 30 30 06-Jun-19 18-Juk19 9100. 85w 9120 0 9120 Submittals (Project Closeout Documentation) 38 38 19-1419 11SeP-10 9110 9130 0 9130 0 Cr— 230d-19 9120 9140 0 9140 Final Construction Contract Invoice Paid 1 1 14-Nov-10 14-N -10 9130 9150 6 9150 Construction Contrad C000d 0 0 14-N -19 9140 9166 0 9160 t Lessons Learned 1 1 I17-Deol9 17Dec 19 9150 0 Actual Work ♦ ♦ Milestone Remaining Work ♦ ♦ Critical Milestone Critical Remaining Work ♦ ♦ Completed Milestone Data Date: 30-Mar-18 2U18 2UIn '2f1 Lu MAIMIJIJullAIsIoINIo JIFIMIAIMIJIJagAIslollvID 1 ___------ --- _------------ ___;____ Remainin... w CIP-01B - Neighborhood Street FORT WORTH. � Actual Lev... � Project Ba... Construction Baseline Schedule Example DATE July 20, 2018 01 32 16.1 CONSTRUCTION PROGRESS SCHEDULE — BASELINE EXAMPLE Page 5 of 5 END OF SECTION NAME M. Jarrell Initial Issue Revision Log SUMMARY OF CHANGE May 7, 2021 M Owen Revised name due to revising the schedule specification CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.- 103413 Revised August 13, 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 01 32 16.2 CONSTRUCTION PROGRESS SCHEDULE — PROGRESS EXAMPLE Pagel of 5 SECTION 0132 16.2 CONSTRUCTION SCHEDULE - PROGRESS EXAMPLE PART1- GENERAL The following is an example of a Contractor's project schedule that illustrates the data and expectation for schedule content depicting the progress for the project. This version of the schedule is referred to as a "progress" schedule. This example is intended to provide guidance for the Contractor when developing and submitting a progress schedule. See CFW Specification 0132 16 Construction Schedule for details and requirements regarding the Contractor's project schedule. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 13, 2021 WATER AND SANITARY SEWER REPLACEMENT CPN.• 103413 CFW - Integrated Program I t vilU Adivity lname ui Project Schedule 'iystcee-'otee_�tuI , �-oteu'_-1 S:i amplete � �� � Sri_ ini ota Peet Data Date: anance- Pnisb Date J J A 30-Apr-18 iq ;J J J A No FTW - Project Manager 432 411 -02-Apr-18 ITDi -19 02-Apr-18A 13-Dec-19 - 0 2 C1 P-01 P - Neighborhood Street Construction Progress Schedule I Pre -Construction 38 11 02-Apr18 23May-18 02-Apr18A 1�-May-18 400 6 8200 Award Constmcfion Contrad 0 0 100% 02-Apr -13 02- Apr -18A U 8220 Site WalkThrough 1 0 100% 02-Apr -18 02- Apr -18 02- Apr -18A 02-Apr-18A 0 j 3210 SW Pollution prevention Plan (Contractor Prepare and Submit) 10 0 100% 02-Apr-18 13Apr-18 02-Apr-18A 13-Apr-18A 0 I 8230 Noto9To Prooe9cVFr&Constn Meeting I 1 0 100% 17-Apr-18 17-Apr-18 17-Apr-18A 17-Apr-I8A _----_ 0 p `.- _`_ pion 8240 Pre-Con Srulion -Pu on Meetln 1 0 100% 25Apr-18 25Apr-18 19-Apr-18A 1&Apr-18A 4 82 PraConstruction 38 11 0% 02-Apr-16 23May-18 02-Ap, 8A 1SMay-18 85 6 8250 Mobilization 20 11 50% 26-Apr-18 23May-18 18-Apr-18A I�-May-18 89 6 Construction Contract Execution 230 230 03 May 18 01-Apr-19 01-May-18 2&Mar-19 0 2 33 Constmdlon 230 230 0% 03-May-18 01-Apr-19 01-May-18 28-Mar-19 0 2 t Street1 90 90 03May -18 1OSep18 ol-May-18 06-Sep18 140 2 -------- Water Storm 40 40 :03-May-18 2&,lln-18 01-May-18 26-Jin-18 0 2 3000 Constmchon Start 0 0 0% 03May-18 01-May-18 0 2 3010 To Water 10 10 0% 03May-18 15-MW I- 01-May-18 14-MW 18 0 2 3020 Lay 8" water and services 25 25 0% 17 May 18 21-1,18 15May-18 19,Ln-18 0 2 ' 3030 Temp Paving Repair 5 5 0% 22Jun- 18 23J1n-18 29fun-18 26-Jin-18 0 2 Paving 45 45 03Ju1-1&' 10.Sep18 05-Jul-18 OFSep-18 140 2 3040 Excavation .? 5 096 09-Jul-18 13JJF18 05-Ju118 11-Jul8 110 2 3050 Stablization 5 5 0% 16-Ju1-13 2c 1F18 12-Ju-18 13-Jul-13 110 2 ' 3060 Paving 30 30 0% 23-Jul-18 31-Aug-18 13Jul-18 23Aug-18 110 2 3070 Flat Work 20 20 0% 06-Aug18 31-Aug 18 02-Aug 18 2&Aug18 140 2 3080 Clean no 10 10 0% 27-Anal 10 See 18 23Aug18 06-Sep18 140 2 ' I', 3090 Street 1 Complete 0 0 0% 10-Sep18 06-Sep18 140 2 I ...../,-., j Street 2 113 113 29-Jurr18 1OD c 18 27-Juni 06Dec 18 77 2 Wall Storm 63 63- 23Jun-18 27-Sep-18 27-Jun-18 25-Sep-18 67 2 3100 Temp Water 10 10 0%23Jun-18 13J1F18 27-Jun-18 11-Jul-18 0 2', 3110 Lay B" water and services 95 15 0% 16-Jul-18 03-Aug 12-Jul-18 01-Aug o-1l 2 j 3120 Temp Paving Repair 5 b 0% 06-Aug-18 10-Aug-18 02-Aug18 08-Aug18 3130 Lay 8" Sewer and SeMces 8 8 0% 13Anal 22-Aug 18 09Aug18 20-Auu 18 0, 2 3140 Temp Paving Repair 5 5 o90 23Anal 29Aug18 21-Aug18 27-Aug 18 0 2 3150 Storm Drain & Structures 20 20 0% 30-Aug-18 27-Sep18 28 Aug 18 25Sep18 6� 2 Paving 45 45 05-Od-13 10-Wc-13 03-0d-1& OEDe€18 77 2 3160 Excavation 5 5 0% OSOct 8 11-0d-18 03-Oot a 09-Oct-18 67 2 3170 Stablization 5 5 0% 12-Oct-18 1&Oct-18 10-Oct-18 16-Oct-18 77! Actual Work ♦ ♦ Milestone Remainin... FORT WORM, Remaining Work ♦ ♦ Critical Milestone - Actual Lev... CIP-01P - Neighborhood Street Critical Remaining Work ♦ ♦ Completed Milestone Project Be... Construction Progress Schedule Example 0 CFW - Integrated Program y ty Name I Project Schedule _'olet�"ote�'_-i s:i Sri_ ini Cb mpl ete 2180 -Paving 20 20 0% 13Oct-18 15-NOV-18 17-Oct-18 13-NN-18 3190 Flat Work 20 20 0% 02INN 18 03Wc-18 31-Od-18 29-NN 18 3200 Clean up 10 10 0% 27 N -18 10 D c-18 - 21-N 18 06-D.c 18 3210 Street 2 Complete 0 0 0% �30-Aug-18 1&CAc-18 05-D.c18 Street 80 80 24-Wc-18 28Aug 18 20-D.c18 Water -&StOnn 13 13 30-Aug-18 18-Seg18 28Aug18 14Seg18 3220 TempWater 4 4 0% 30-Aug-18 05Sep-18 28-Aug18 31-Aug18 3230 Lay8" water and services 8 8 0% 06-Sep-18 17-Sep18 04-Sep18 13Ssp-18 3240 Temp Paving Repair 1 1 0% 1&Sep-18 18-Sep18 14-Sep18 14Sep18 Paving 50 50 12 0d 18 24-W c-18 16 Od-18 20-D.c 18 3250 Excavation b 5 0`%a 12-0c[-18 1iiOd-18 11}Qd-18 1b Od-18 3260 Stablization I 5 5 0% -5-Oct 25Oct 18 17-Oct 18 2?-Oct 18 3270 Paving 20 20 0% 26-11d-18 11-11 -18 24-11d-18 20-Nov-18 3280 Flat Work 20 20 0% 16-Nov-18 17 Doc-13 14-Novr18 13Dec 18 3290 Cleanup 10 10 0% 11-Dec-18 24-Wc-18 07-Dec-18 20-Dec-18 3300 Street 3 Complete 0 0 0% 24Wc-18 20-Deo-18 Street 134 134 19-Sep-18 01-Apr-19 17-Sep 18 28-Mar-19 Water &Stcrm 69 69 19-Sep-18 27-Dec-18 17-Sep 18 24- Doc -18 3310 Tom p✓eater 0 6 0% 1&Sep-18 _ 25-Sep18 17-Sep 18 24Sep18 3M) Lay �Il water and services Za y20 K 1� ep 18 74-Qc:�8 2rSep1� �16a: 3330 Temp Paving Repair 3 3 0% 25-0cP13 29-Oct-18 2?-Oct-18 25-Oct-18 3340 Lay 8" Sewer Lines L-3203 & L-8346 and Services 20 20 0% , O-Od-18 23-Nov-18 25-Oct-18 26-Nw-18 3350 Lay 8" Sewer Lines L-3212 & L-8355 and Services 15 15 0% 23Nw-18 13Dac-18 27-Nov-18 17-Cec-18 3350 Temp Paving Repair 5 5 0% 20-Dec 18 27 Doc1818-Dec 18 24-0eo-18 Paving 60 60 ' 07 Jan-19 01-Apr-19 03Jan-19 2&Mar-19 3370 Excavation 10 10 0% 07Jarr19 18-J -19 03Jan-19 16-J -19 3380 Stablizatiou 10 10 0% 22 Jan-19 04Feb-19 17-Jan-19 31-J -19 3390 Paving 20 20 0% 05Feb19 04Mar-19 01-Feb19 28-Feb19 3400 Flat Work 20 20 0% 2&Fetr19 25Mar--19 22-Feb19 21-Mar-19 3410 Clean up 10 10 0% 13Mar-19- 01-Apr-19 15-19 2&Mar-19 3420 Street CompletNSubstantial Complete I 0 0 0% 01-Apr-19 28-Mar-19 Inspections 276 275 03 May-18 051n-19 01-May-18 03-1n-19 8500 Inspection 225 225 0% 03May-18 25Mar-19 01-May-18 21-Mar-19 �516 �nallnspection 1,6 16 X 62Apr19 4�Apri9 26-Q --19 I-Apr-19 8520 �om plete Pun on List Tasks 30 30 0% 1&Apr-19 28-May-19 12-Apr-19 23-MW 19 8540 Construction Final Completion 0 0 0% 05J1n-19 03J1n-19 Actual Work ♦ ♦ Milestone Remainin... Remaining Work ♦ ♦ Critical Milestone Actual Lev... Critical Remaining Work ♦ ♦ Completed Milestone Project Ba... Data Date: 30-Apr-18 77 2 77 217 77 2II 77 2 _..I 67 2� 0 2 0 2 0 2 0 2 67 2 of 2 67 2 67 2 67 2 b, 2 67 2 0 2 2 2 C 2 � I ci 2 0 2 I 0 2 0 2 0 2 0 2 u 2 0 2 0 2 0. 2 0 2 0 2 5 2 L 11 1 6 I r - --- -- 0 2 61 2 11 CIP-01P - Neighborhood Street FORT WORTH(, Construction Progress Schedule Example CFW - Integrated Program Project Schedule Data Date: 30-Apr-18 8530 Fin al WalkThrough for Completed Punch List Taks I 1 I 1 I 0% 05-Jurr19 05Jm-19 03-Jun-19 03uni 0 2 I I 85 Inspection 276 276 0% 03May-18 05-J-19 01-May-18 0?-Lo-19 0 2 Closeout 135 135 06-Jurr19 17 Doc 19 04-Jun-19 13Dec19 0 2 --... -_ - ____ ----- ______ 90 C—out 135 135 046 06-Jun-19 17 Dec1904-Jun-19 13Dec19 0 2 Construction Contract Closeout 135 135 O&Jun-19 17-Dec-19 04-Jun-19 13Dec19 0 2 As-Ba ltSurvey 5 5 0&Jun-19 12-Jon-19 04-Jun-19 10-Jin-19 25 2 9100 AsBmTSurvey(Submittedby Contrador) 5 5 0% 06-Jun-19 12-J-19 CC-Jun-19 10-J-19 25 2 Contract Closeout 135 135 06-JmL19 17Dec -19 04-Jun-19 13Dec19 0 2 9110 Contract Reconciliation 30 30 096 06-Jurr19 18-Jab19 04-Jun-19 16-Jull 0 2 9120 Submittals (Project Closeout Documentation) 38 38 0% 13Ju1-19 11-Sep-19 17-Jul-19 Wsgp-l9 0 2 9130 Notice of CompletionlGreen Sheet 0 0 0% 230d-19 21-0d-19 0 2 i t 9140 Final Construction Contrat Invoice Paid 1 1 0% 14Cloa-19 14-Nov-19 12Nov-19 12NN 19 6 2 C_____ --- 9150 Cons[rudion Contrail Closed 0 0 0% 14-Nov-19 12N -19 0 2 9160 Lessons Learned 1 1 0% 17 Dec 19 1 17 Dec-19 13Dec19 13Dec 19 0 2 t Actual Work ♦ ♦ Milestone o Remainin.. FORT WORTH, WORTH, Remaining Work ♦ ♦ Critical Milestone - Actual Leer... CIP-01P - Neighborhood Street A Critical Remaining Work ♦ ♦ Completed Milestone Project Ba... Construction Progress Schedule Example 0 DATE July 20, 2018 01 32 16.2 CONSTRUCTION PROGRESS SCHEDULE — PROGRESS EXAMPLE Page 5 of 5 END OF SECTION NAME M. Jarrell Initial Issue Revision Log SUMMARY OF CHANGE May 7, 2021 M Owen Revised name due to revising the schedule specification CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised August 13, 2021 0132 16.3 —PROGRESS NARRATIVE Page 1 of 1 SECTION 0132 16.3 CONSTRUCTION PROJECT SCHEDULE PROGRESS NARRATIVE Reporting Period: Date Issued: Project Name: Contractor Company Name: City Project No: Contractor Schedule Contact: City Project Manager: A. List of activities changed in the reporting period. 1. (insert text here) 2. (insert text here) 3. (insert text here) 4. (insert text here) 5. (insert text here) 6. (insert text here) B. List any potential delays and provide mitigation actions 1. (insert text here) 2. (insert text here) 3. (insert text here) C. List any actual delays and provide recovery actions 1. (insert text here) 2. (insert text here) 3. (insert text here) City of Fort Worth, Texas WATER AND SANITARYSEWER REPLACEMENT Construction Project Schedule Narrative Report for CFW Projects CPN: 103413 Revised August 13, 2021 Page 1 of 1 013233-1 PRECONSTRUCTION VIDEO Page 1 of 2 SECTION 0132 33 PRECONSTRUCTION VIDEO PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative and procedural requirements for: a. Preconstruction Videos B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Preconstruction Video 1. Produce a preconstruction video of the site/alignment, including all areas in the vicinity of and to be affected by construction. a. Provide digital copy of video upon request by the City. 2. Retain a copy of the preconstruction video until the end of the maintenance surety period. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised July 1, 2011 01 32 33 - 2 PRECONSTRUCTION VIDEO PART 3 - EXECUTION [NOT USED] Page 2 of 2 END OF SECTION Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 SUMMARY OF CHANGE WATER AND SANITARY SEWER REPLACEMENT CPN.• 103413 SECTION 0133 00 SUBMITTALS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 013300-1 SUBMITTALS Page 1 of 8 General methods and requirements of submissions applicable to the following Work -related submittals: a. Shop Drawings b. Product Data (including Standard Product List submittals) c. Samples d. Mock Ups B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication f) Delivery g) Similar sequenced activities c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised December 20, 2012 013300-2 SUBMITTALS Page 2 of 8 d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents 2. Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) `By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8 '/z inches x 11 inches to 8 '/2 inches x 11 inches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised December 20, 2012 013300-3 SUBMITTALS Page 3 of 8 2. The Project title and number 3. Contractor identification 4. The names of: a. Contractor b. Supplier c. Manufacturer 5. Identification of the product, with the Specification Section number, page and paragraph(s) 6. Field dimensions, clearly identified as such 7. Relation to adjacent or critical features of the Work or materials 8. Applicable standards, such as ASTM or Federal Specification numbers 9. Identification by highlighting of deviations from Contract Documents 10. Identification by highlighting of revisions on resubmittals 11. An 8-inch x 3-inch blank space for Contractor and City stamps F. Shop Drawings 1. As specified in individual Work Sections includes, but is not necessarily limited to: a. Custom -prepared data such as fabrication and erection/installation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates f. Special wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable to the Work 2. Details a. Relation of the various parts to the main members and lines of the structure b. Where correct fabrication of the Work depends upon field measurements 1) Provide such measurements and note on the drawings prior to submitting for approval. G. Product Data 1. For submittals of product data for products included on the City's Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City's Standard Product List, submittal data may include, but is not necessarily limited to: a. Standard prepared data for manufactured products (sometimes referred to as catalog data) 1) Such as the manufacturer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of compliances and applicability 4) Roughing -in diagrams and templates 5) Catalog cuts 6) Product photographs CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised December 20, 2012 01 33 00 - 4 SUBMITTALS Page 4 of 8 7) Standard wiring diagrams 8) Printed performance curves and operational -range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare -parts listing and printed product warranties 12) As applicable to the Work H. Samples As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: 1) Sections of manufactured or fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work I. Do not start Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1. Fabrication performed, materials purchased or on -site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals d. Samples 1) Distributed to the Project Representative 2. Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised December 20, 2012 013300-5 SUBMITTALS Page 5 of 8 a. Shop Drawings 1) Distributed to the City 2) Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. 3. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review 1. The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City rinds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1) "NO EXCEPTIONS TAKEN' is assigned when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. b. Code 2 CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised December 20, 2012 013300-6 SUBMITTALS Page 6 of 8 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non -conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked b. Submittals for each item will be reviewed no more than twice at the City's expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the City at least 7 Calendar Days prior to release for manufacture. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised December 20, 2012 013300-7 SUBMITTALS Page 7 of 8 9. When the shop drawings have been completed to the satisfaction of the City, the Contractor may carry out the construction in accordance therewith and no further changes therein except upon written instructions from the City. 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days following receipt of submittal by the City. L. Mock ups 1. Mock Up units as specified in individual Sections, include, but are not necessarily limited to, complete units of the standard of acceptance for that type of Work to be used on the Project. Remove at the completion of the Work or when directed. M. Qualifications 1. If specifically required in other Sections of these Specifications, submit a P.E. Certification for each item required. N. Request for Information (RFI) Contractor Request for additional information a. Clarification or interpretation of the contract documents b. When the Contractor believes there is a conflict between Contract Documents c. When the Contractor believes there is a conflict between the Drawings and Specifications 1) Identify the conflict and request clarification 2. Use the Request for Information (RFI) form provided by the City. 3. Numbering of RFI a. Prefix with "RFI" followed by series number, "-xxx", beginning with "01" and increasing sequentially with each additional transmittal. 4. Sufficient information shall be attached to permit a written response without further information. 5. The City will log each request and will review the request. a. If review of the project information request indicates that a change to the Contract Documents is required, the City will issue a Field Order or Change Order, as appropriate. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised December 20, 2012 013300-8 SUBMITTALS Page 8 of 8 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised December 20, 2012 0135 13- 1 SPECIAL PROJECT PROCEDURES Page 1 of 8 1 SECTION 0135 13 2 SPECIAL PROJECT PROCEDURES 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedures for special project circumstances that includes, but is not limited to: 7 a. Coordination with the Texas Department of Transportation 8 b. Work near High Voltage Lines 9 c. Confined Space Entry Program 10 d. Use of Explosives, Drop Weight, Etc. 11 e. Water Department Notification 12 f. Public Notification Prior to Beginning Construction 13 g. Coordination with United States Army Corps of Engineers 14 h. Coordination within Railroad permits areas 15 i. Dust Control 16 j. Employee Parking 17 B. Deviations from this City of Fort Worth Standard Specification 18 1. None. 19 C. Related Specification Sections include, but are not necessarily limited to: 20 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 21 2. Division 1— General Requirements 22 3. Section 33 12 25 — Connection to Existing Water Mains 23 1.2 PRICE AND PAYMENT PROCEDURES 24 A. Measurement and Payment 25 1. Coordination within Railroad permit areas 26 a. Measurement 27 1) Measurement for this Item will be by lump sum. 28 b. Payment 29 1) The work performed and materials furnished in accordance with this Item 30 will be paid for at the lump sum price bid for Railroad Coordination. 31 c. The price bid shall include: 32 1) Mobilization 33 2) Inspection 34 3) Safety training 35 4) Additional Insurance 36 5) Insurance Certificates 37 6) Other requirements associated with general coordination with Railroad, 38 including additional employees required to protect the right-of-way and 39 property of the Railroad from damage arising out of and/or from the 40 construction of the Project. 41 2. Railroad Flagmen 42 a. Measurement CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised March 11, 2022 0135 13 - 2 SPECIAL PROJECT PROCEDURES Page 2 of 8 1 1) Measurement for this Item will be per working day. 2 b. Payment 3 1) The work performed and materials furnished in accordance with this Item 4 will be paid for each working day that Railroad Flagmen are present at the 5 Site. 6 c. The price bid shall include: 7 1) Coordination for scheduling flagmen 8 2) Flagmen 9 3) Other requirements associated with Railroad 10 3. All other items 11 a. Work associated with these Items is considered subsidiary to the various Items 12 bid. No separate payment will be allowed for this Item. 13 1.3 REFERENCES 14 A. Reference Standards 15 1. Reference standards cited in this Specification refer to the current reference 16 standard published at the time of the latest revision date logged at the end of this 17 Specification, unless a date is specifically cited. 18 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 19 High Voltage Overhead Lines. 20 1.4 ADMINISTRATIVE REQUIREMENTS 21 A. Coordination with the Texas Department of Transportation 22 1. When work in the right-of-way which is under the jurisdiction of the Texas 23 Department of Transportation (TxDOT): 24 a. Notify the Texas Department of Transportation prior to commencing any work 25 therein in accordance with the provisions of the permit 26 b. All work performed in the TxDOT right-of-way shall be performed in 27 compliance with and subject to approval from the Texas Department of 28 Transportation 29 B. Work near High Voltage Lines 30 1. Regulatory Requirements 31 a. All Work near High Voltage Lines (more than 600 volts measured between 32 conductors or between a conductor and the ground) shall be in accordance with 33 Health and Safety Code, Title 9, Subtitle A, Chapter 752. 34 2. Warning sign 35 a. Provide sign of sufficient size meeting all OSHA requirements. 36 3. Equipment operating within 10 feet of high voltage lines will require the following 37 safety features 38 a. Insulating cage -type of guard about the boom or arm 39 b. Insulator links on the lift hook connections for back hoes or dippers 40 c. Equipment must meet the safety requirements as set forth by OSHA and the 41 safety requirements of the owner of the high voltage lines 42 4. Work within 6 feet of high voltage electric lines 43 a. Notification shall be given to: 44 1) The power company (example: ONCOR) CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised March 11, 2022 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 013513-3 SPECIAL PROJECT PROCEDURES Page 3 of 8 a) Maintain an accurate log of all such calls to power company and record action taken in each case. b. Coordination with power company 1) After notification coordinate with the power company to: a) Erect temporary mechanical barriers, de -energize the lines, or raise or lower the lines c. No personnel may work within 6 feet of a high voltage line before the above requirements have been met. C. Confined Space Entry Program 1. Provide and follow approved Confined Space Entry Program in accordance with OSHA requirements. 2. Confined Spaces include: a. Manholes b. All other confined spaces in accordance with OSHA's Permit Required for Confined Spaces D. Use of Explosives, Drop Weight, Etc. 1. When Contract Documents permit on the project the following will apply: a. Public Notification 1) Submit notice to City and proof of adequate insurance coverage, 24 hours prior to commencing. 2) Minimum 24 hour public notification in accordance with Section 01 31 13 E. Water Department Coordination 1. During the construction of this project, it will be necessary to deactivate, for a period of time, existing lines. The Contractor shall be required to coordinate with the Water Department to determine the best times for deactivating and activating those lines. 2. Coordinate any event that will require connecting to or the operation of an existing City water line system with the City's representative. a. Coordination shall be in accordance with Section 33 12 25. b. If needed, obtain a hydrant water meter from the Water Department for use during the life of named project. c. In the event that a water valve on an existing live system be turned off and on to accommodate the construction of the project is required, coordinate this activity through the appropriate City representative. 1) Do not operate water line valves of existing water system. a) Failure to comply will render the Contractor in violation of Texas Penal Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor will be prosecuted to the full extent of the law. b) In addition, the Contractor will assume all liabilities and responsibilities as a result of these actions. F. Public Notification Prior to Beginning Construction 1. Prior to beginning construction on any block in the project, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice shall be prepared as follows: a. Post notice or flyer and City of Fort Worth Door Hangers, 7 days prior to beginning any construction activity on each block in the project area. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 11, 2022 WATER AND SANITARY SEWER REPLACEMENT CPN: 103413 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 0135 13 - 4 SPECIAL PROJECT PROCEDURES Page 4 of 8 1) Prepare flyer on the Contractor's letterhead and include the following information: a) Name of Project b) City Project No (CPN) c) Scope of Project (i.e. type of construction activity) d) Actual construction duration within the block e) Name of the contractor's foreman and phone number f) Name of the City's inspector and phone number g) City's after-hours phone number 2) A sample of the `pre -construction notification' flyer is attached as Exhibit A. 3) City of Fort Worth Door Hangers will be provided to the Contractor for distribution with their notice. 4) Submit schedule showing the construction start and fmish time for each block of the project to the inspector. 5) Deliver flyer to the City Inspector for review prior to distribution. b. No construction will be allowed to begin on any block until the flyer and door hangers are delivered to all residents of the block. G. Public Notification of Temporary Water Service Interruption during Construction 1. In the event it becomes necessary to temporarily shut down water service to residents or businesses during construction, prepare and deliver a notice or flyer of the pending interruption to the front door of each affected resident. 2. Prepared notice as follows: a. The notification or flyer shall be posted 24 hours prior to the temporary interruption. b. Prepare flyer on the contractor's letterhead and include the following information: 1) Name of the project 2) City Project Number 3) Date of the interruption of service 4) Period the interruption will take place 5) Name of the contractor's foreman and phone number 6) Name of the City's inspector and phone number c. A sample of the temporary water service interruption notification is attached as Exhibit B. d. Deliver a copy of the temporary interruption notification to the City inspector for review prior to being distributed. e. No interruption of water service can occur until the flyer has been delivered to all affected residents and businesses. f. Electronic versions of the sample flyers can be obtained from the Project Construction Inspector. H. Coordination with United States Army Corps of Engineers (USACE) 1. At locations in the Project where construction activities occur in areas where USACE permits are required, meet all requirements set forth in each designated permit. 1. Coordination within Railroad Permit Areas CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 11, 2022 WATER AND SANITARY SEWER REPLACEMENT CPN: 103413 013513-5 SPECIAL PROJECT PROCEDURES Page 5 of 8 1 1. At locations in the project where construction activities occur in areas where 2 railroad permits are required, meet all requirements set forth in each designated 3 railroad permit. This includes, but is not limited to, provisions for: 4 a. Flagmen 5 b. Inspectors 6 c. Safety training 7 d. Additional insurance 8 e. Insurance certificates 9 f. Other employees required to protect the right-of-way and property of the 10 Railroad Company from damage arising out of and/or from the construction of 11 the project. Proper utility clearance procedures shall be used in accordance 12 with the permit guidelines. 13 2. Obtain any supplemental information needed to comply with the railroad's 14 requirements. 15 3. Railroad Flagmen 16 a. Submit receipts to City for verification of working days that railroad flagmen 17 were present on Site. 18 J. Dust Control 19 1. Use acceptable measures to control dust at the Site. 20 a. If water is used to control dust, capture and properly dispose of waste water. 21 b. If wet saw cutting is performed, capture and properly dispose of slurry. 22 K. Employee Parking 23 1. Provide parking for employees at locations approved by the City. 24 1.5 SUBMITTALS [NOT USED] 25 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 26 1.7 CLOSEOUT SUBMITTALS [NOT USED] 27 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 28 1.9 QUALITY ASSURANCE [NOT USED] 29 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 30 1.11 FIELD [SITE] CONDITIONS [NOT USED] 31 1.12 WARRANTY [NOT USED] 32 PART 2 - PRODUCTS [NOT USED] 33 PART 3 - EXECUTION [NOT USED] 34 END OF SECTION 35 Revision Log CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 11, 2022 WATER AND SANITARY SEWER REPLACEMENT CPN. 103413 013513-6 SPECIAL PROJECT PROCEDURES Page 6 of 8 DATE NAME SUMMARY OF CHANGE 1.4.13— Added requirement of compliance with Health and Safety Code, Title 9. 8/31/2012 D. Johnson Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. 1.4.E — Added Contractor responsibility for obtaining a TCEQ Air Permit Remove references to Air Pollution watch Days and NCTCOG Clean construction 3/11/2022 M Owen Specification requirements. Clarify need for Door Hangers under in addition to contractor notification of public. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised March 11, 2022 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 013513-7 SPECIAL PROJECT PROCEDURES Page 7 of 8 EXHIBIT A (To be printed on Contractor's Letterhead) Date: CPN No.: Project Name: Mapsco Location: Limits of Construction: THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> m Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 11, 2022 WATER AND SANITARY SEWER REPLACEMENT CPN:103413 1 2 3 4 013513-8 SPECIAL PROJECT PROCEDURES Page 8 of 8 EXHIBIT B FORT WORTH; Date: DOE NO. XXXX Project Name: NOTICE OF TEMPORARY WATER SERVICE INTERRUPTIONI DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 11, 2022 ,CONTRACTOR WATER AND SANITARY SEWER REPLACEMENT CPN: 103413 01 45 23 TESTING AND INSPECTION SERVICES Page 1 of 2 SECTION 0145 23 TESTING AND INSPECTION SERVICES PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Testing and inspection services procedures and coordination B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a. Contractor is responsible for performing, coordinating, and payment of all Quality Control testing. b. City is responsible for performing and payment for first set of Quality Assurance testing. 1) If the first Quality Assurance test performed by the City fails, the Contractor is responsible for payment of subsequent Quality Assurance testing until a passing test occurs. a) Final acceptance will not be issued by City until all required payments for testing by Contractor have been paid in full. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Testing 1. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be performed by the City, notify City, sufficiently in advance, when testing is needed. b. When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3. Distribution of Testing Reports a. Electronic Distribution 1) Confirm development of Project directory for electronic submittals to be uploaded to the City's document management system, or another external FTP site approved by the City. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised March 9, 2020 01 45 23 TESTING AND INSPECTION SERVICES Page 2 of 2 2) Upload test reports to designated project directory and notify appropriate City representatives via email of submittal posting. 3) Hard Copies a) 1 copy for all submittals submitted to the Project Representative b. Hard Copy Distribution (if required in lieu of electronic distribution) 1) Tests performed by City a) Distribute 1 hard copy to the Contractor 2) Tests performed by the Contractor a) Distribute 3 hard copies to City's Project Representative 4. Provide City's Project Representative with trip tickets for each delivered load of Concrete or Lime material including the following information: a. Name of pit b. Date of delivery c. Material delivered B. Inspection 1. Inspection or lack of inspection does not relieve the Contractor from obligation to perform work in accordance with the Contract Documents. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 3/9/2020 D.V. Magana Removed reference to Buzzsaw and noted that electronic submittals be uploaded through the City's document management system. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised March 9, 2020 01 50 00 - 1 TEMPORARY FACILITIES AND CONTROLS Page 1 of 4 SECTION 0150 00 TEMPORARY FACILITIES AND CONTROLS PART1- GENERAL 1.1 SUMMARY A. Section Includes: Provide temporary facilities and controls needed for the Work including, but not necessarily limited to: a. Temporary utilities b. Sanitary facilities c. Storage Sheds and Buildings d. Dust control e. Temporary fencing of the construction site B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Temporary Utilities 1. Obtaining Temporary Service a. Make arrangements with utility service companies for temporary services. b. Abide by rules and regulations of utility service companies or authorities having jurisdiction. c. Be responsible for utility service costs until Work is approved for Final Acceptance. 1) Included are fuel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as required for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic consumption by Contractor personnel and City's Project Representatives. c. Coordination 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised July 1, 2011 01 50 00 - 2 TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 d. Contractor Payment for Construction Water 1) Obtain construction water meter from City for payment as billed by City's established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as required for Work, including testing of Work. 1) Provide power for lighting, operation of equipment, or other use. b. Electric power service includes temporary power service or generator to maintain operations during scheduled shutdown. 4. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and others performing work or furnishing services at Site. 5. Temporary Heat and Ventilation a. Provide temporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe working conditions. B. Sanitary Facilities 1. Provide and maintain sanitary facilities for persons on Site. a. Comply with regulations of State and local departments of health. 2. Enforce use of sanitary facilities by construction personnel at job site. a. Enclose and anchor sanitary facilities. b. No discharge will be allowed from these facilities. c. Collect and store sewage and waste so as not to cause nuisance or health problem. d. Haul sewage and waste off -site at no less than weekly intervals and properly dispose in accordance with applicable regulation. 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 4. Remove facilities at completion of Project C. Storage Sheds and Buildings 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off ground. 3. Store materials in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventory. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Final Acceptance. D. Temporary Fencing Provide and maintain for the duration or construction when required in contract documents E. Dust Control CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised July 1, 2011 01 50 00 - 3 TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1. Contractor is responsible for maintaining dust control through the duration of the project. a. Contractor remains on -call at all times b. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Temporary Facilities 1. Maintain all temporary facilities for duration of construction activities as needed. 3.5 [REPAIR] / [RESTORATION] 3.6 RE -INSTALLATION 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES A. Temporary Facilities CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised July 1, 2011 01 50 00 - 4 TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1. Remove all temporary facilities and restore area after completion of the Work, to a condition equal to or better than prior to start of Work. 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 SUMMARY OF CHANGE WATER AND SANITARY SEWER REPLACEMENT CPN.• 103413 01 55 26 -1 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 1 of 3 1 SECTION 0155 26 2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Administrative procedures for: 7 a. Street Use Permit 8 b. Modification of approved traffic control 9 c. Removal of Street Signs 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include, but are not necessarily limited to: 13 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1— General Requirements 15 3. Section 34 71 13 — Traffic Control 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES 21 A. Reference Standards 22 1. Reference standards cited in this specification refer to the current reference standard 23 published at the time of the latest revision date logged at the end of this 24 specification, unless a date is specifically cited. 25 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Traffic Control 28 1. General 29 a. Contractor shall minimize lane closures and impact to vehicular/pedestrian 30 traffic. 31 b. When traffic control plans are included in the Drawings, provide Traffic 32 Control in accordance with Drawings and Section 34 71 13. 33 c. When traffic control plans are not included in the Drawings, prepare traffic 34 controlplans in accordance with Section 34 71 13 and submit to City for 35 review. 36 1) Allow minimum 10 working days for review of proposed Traffic Control. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised March 22, 2021 01 55 26 - 2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 1 2) A traffic control "Typical" published by City of Fort Worth, the Texas 2 Manual Unified Traffic Control Devices (TMUTCD) or Texas Department 3 of Transportation (TxDOT) can be used as an alternative to preparing 4 project/site speck traffic controlplan if the typical is applicable to the 5 specific project/site. 6 B. Street Use Permit 7 1. Prior to installation of Traffic Control, a City Street Use Permit is required. 8 a. To obtain Street Use Permit, submit Traffic Control Plans to City 9 Transportation and Public Works Department. 10 1) Allow a minimum of 5 working days for permit review. 11 2) It is the Contractor's responsibility to coordinate review of Traffic Control 12 plans for Street Use Permit, such that construction is not delayed. 13 C. Modification to Approved Traffic Control 14 1. Prior to installation traffic control: 15 a. Submit revised traffic control plans to City Department Transportation and 16 Public Works Department. 17 1) Revise Traffic Controlplans in accordance with Section 34 71 13. 18 2) Allow minimum 5 working days for review of revised Traffic Control. 19 3) It is the Contractor's responsibility to coordinate review of Traffic Control 20 plans for Street Use Permit, such that construction is not delayed. 21 D. Removal of Street Sign 22 1. If it is determined that a street sign must be removed for construction, then contact 23 City Transportation and Public Works Department, Signs and Markings Division to 24 remove the sign. 25 E. Temporary Signage 26 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting 27 requirements of the latest edition of the Texas Manual on Uniform Traffic Control 28 Devices (MUTCD). 29 2. Install temporary sign before the removal of permanent sign. 30 3. When construction is complete, to the extent that the permanent sign can be 31 reinstalled, contact the City Transportation and Public Works Department, Signs 32 and Markings Division, to reinstall the permanent sign. 33 F. Traffic Control Standards 34 1. Traffic Control Standards can be found on the City's website. 35 1.5 SUBMITTALS [NOT USED] 36 A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised March 22, 2021 1 2 3 4 5 6 7 E 01 55 26 - 3 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] 9 PART 3 - EXECUTION [NOT USED] 10 11 12 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1.4 A. Added language to emphasize minimizing of lane closures and impact to traffic. 1.4 A. 1. c. Added language to allow for use of published traffic control "Typicals" if 3/22/2021 M Owen applicable to specific project/site. 1.4 F. 1) Removed reference to Buzzsaw 1.5 Added language re: submittal of permit CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised March 22, 2021 015713-1 STORM WATER POLLUTION PREVENTION Page 1 of 3 SECTION 01 5713 STORM WATER POLLUTION PREVENTION PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for Storm Water Pollution Prevention Plans B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 3125 00 — Erosion and Sediment Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Activities resulting in less than 1 acre of disturbance a. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 2. Construction Activities resulting in greater than 1 acre of disturbance a. Measurement and Payment shall be in accordance with Section 3125 00. 1.3 REFERENCES A. Abbreviations and Acronyms 1. Notice of Intent: NOI 2. Notice of Termination: NOT 3. Storm Water Pollution Prevention Plan: SWPPP 4. Texas Commission on Environmental Quality: TCEQ 5. Notice of Change: NOC A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Integrated Storm Management (iSWM) Technical Manual for Construction Controls 1.4 ADMINISTRATIVE REQUIREMENTS A. General 1. Contractor is responsible for resolution and payment of any fines issued associated with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.- 103413 Revised July 1, 2011 0157 13 - 2 STORM WATER POLLUTION PREVENTION Page 2 of 3 B. Construction Activities resulting in: 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 3125 00 and Drawings. 2. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 1.5 SUBMITTALS A. SWPPP Submit in accordance with Section 0133 00, except as stated herein. a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City as follows: 1) 1 copy to the City Project Manager a) City Project Manager will forward to the City Department of Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.- 103413 Revised July 1, 2011 015713-3 STORM WATER POLLUTION PREVENTION Page 3 of 3 B. Modified SWPPP 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City in accordance with Section 0133 00. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 SUMMARY OF CHANGE WATER AND SANITARY SEWER REPLACEMENT CPN.- 103413 SECTION 0158 13 TEMPORARY PROJECT SIGNAGE PART1- GENERAL 1.1 SUMMARY 015813-1 TEMPORARY PROJECT SIGNAGE Page 1 of 3 A. Section Includes: 1. Temporary Project Signage Requirements B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 EQUIPMENT, PRODUCT TYPES, AND MATERIALS A. Design Criteria 1. Provide free standing Project Designation Sign in accordance with City's Standard Details for project signs. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.- 103413 Revised July 1, 2011 0158 13 - 2 TEMPORARY PROJECT SIGNAGE Page 2 of 3 B. Materials 1. Sign a. Constructed of 3/4-inch fir plywood, grade A-C (exterior) or better 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. General 1. Provide vertical installation at extents of project. 2. Relocate sign as needed, upon request of the City. B. Mounting options a. Skids b. Posts c. Barricade 3.5 REPAIR / RESTORATION [NOT USED 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE A. General 1. Maintenance will include painting and repairs as needed or directed by the City. 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.- 103413 Revised July 1, 2011 015813-3 TEMPORARY PROJECT SIGNAGE Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.- 103413 Revised July 1, 2011 SECTION 0160 00 PRODUCT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 01 60 00 PRODUCT REQUIREMENTS Page 1 of 2 1. References for Product Requirements and City Standard Products List B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. A list of City approved products for use is available through the City's website at: https:Happs.fortworthtexas.gov/ProjectResources/ and following the directory path; 02 - Construction Documents/Standard Products List B. Only products specifically included on City's Standard Product List in these Contract Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the City. C. Any specific product requirements in the Contract Documents supersede similar products included on the City's Standard Product List. 1. The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City's Standard Product List. D. Although a specific product is included on City's Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that manufacturer's standard product. E. See Section 0133 00 for submittal requirements of Product Data included on City's Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised March 9, 2020 01 60 00 PRODUCT REQUIREMENTS Page 2 of 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City's Standard Product List 3/9/2020 D.V. Magaiia Removed reference to Buzzsaw and noted that the City approved products list is accessible through the City's website. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised March 9, 2020 016600-1 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 1 of 4 SECTION 0166 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: l . Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A. Delivery Requirements 1. Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised July 1, 2011 01 66 00 - 2 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 4. Deliver products or equipment in manufacturer's original unbroken cartons or other containers designed and constructed to protect the contents from physical or environmental damage. 5. Clearly and fully mark and identify as to manufacturer, item and installation location. 6. Provide manufacturer's instructions for storage and handling. B. Handling Requirements 1. Handle products or equipment in accordance with these Contract Documents and manufacturer's recommendations and instructions. C. Storage Requirements 1. Store materials in accordance with manufacturer's recommendations and requirements of these Specifications. 2. Make necessary provisions for safe storage of materials and equipment. a. Place loose soil materials and materials to be incorporated into Work to prevent damage to any part of Work or existing facilities and to maintain free access at all times to all parts of Work and to utility service company installations in vicinity of Work. 3. Keep materials and equipment neatly and compactly stored in locations that will cause minimum inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. a. Arrange storage to provide easy access for inspection. 4. Restrict storage to areas available on construction site for storage of material and equipment as shown on Drawings, or approved by City's Project Representative. 5. Provide off -site storage and protection when on -site storage is not adequate. a. Provide addresses of and access to off -site storage locations for inspection by City's Project Representative. 6. Do not use lawns, grass plots or other private property for storage purposes without written permission of owner or other person in possession or control of premises. 7. Store in manufacturers' unopened containers. 8. Neatly, safely and compactly stack materials delivered and stored along line of Work to avoid inconvenience and damage to property owners and general public and maintain at least 3 feet from fire hydrant. 9. Keep public and private driveways and street crossings open. 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to satisfaction of City's Project Representative. a. Total length which materials may be distributed along route of construction at one time is 1,000 linear feet, unless otherwise approved in writing by City's Project Representative. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised July 1, 2011 016600-3 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non -Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised July 1, 2011 01 66 00 - 4 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised July 1, 2011 01 70 00 - 1 MOBILIZATION AND REMOBILIZATION Pagel of 4 1 SECTION 0170 00 2 MOBILIZATION AND REMOBILIZATION 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 1. Mobilization and Demobilization a. Mobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies to the Site 2) Establishment of necessary general facilities for the Contractor's operation at the Site 3) Premiums paid for performance and payment bonds 4) Transportation of Contractor's personnel, equipment, and operating supplies to another location within the designated Site 5) Relocation of necessary general facilities for the Contractor's operation from 1 location to another location on the Site. b. Demobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies away from the Site including disassembly 2) Site Clean-up 3) Removal of all buildings and/or other facilities assembled at the Site for this Contract c. Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. 2. Remobilization a. Remobilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: 1) Demobilization a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b) Site Clean-up as designated in the Contract Documents 2) Remobilization a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site necessary to resume the Work. b) Establishment of necessary general facilities for the Contractor's operation at the Site necessary to resume the Work. 3) No Payments will be made for: a) Mobilization and Demobilization from one location to another on the Site in the normal progress of performing the Work. b) Stand-by or idle time c) Lost profits 3. Mobilizations and Demobilization for Miscellaneous Projects a. Mobilization and Demobilization CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised November 22, 2016 WATER AND SANITARY REPLACEMENT CPN: 103413 01 70 00 - 2 MOBILIZATION AND REMOBILIZATION Page 2 of 4 1 1) Mobilization shall consist of the activities and cost on a Work Order basis 2 necessary for: 3 a) Transportation of Contractor's personnel, equipment, and operating 4 supplies to the Site for the issued Work Order. 5 b) Establishment of necessary general facilities for the Contractor's 6 operation at the Site for the issued Work Order 7 2) Demobilization shall consist of the activities and cost necessary for: 8 a) Transportation of Contractor's personnel, equipment, and operating 9 supplies from the Site including disassembly for each issued Work 10 Order 11 b) Site Clean-up for each issued Work Order 12 c) Removal of all buildings or other facilities assembled at the Site for 13 each Work Oder 14 b. Mobilization and Demobilization do not include activities for specific items of 15 work for which payment is provided elsewhere in the contract. 16 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects 17 a. A Mobilization for Miscellaneous Projects when directed by the City and the 18 mobilization occurs within 24 hours of the issuance of the Work Order. 19 B. Deviations from this City of Fort Worth Standard Specification 20 1. None. 21 C. Related Specification Sections include, but are not necessarily limited to: 22 1. Division 0 —Bidding Requirements, Contract Forms and Conditions of the Contract 23 2. Division 1 — General Requirements 24 1.2 PRICE AND PAYMENT PROCEDURES 25 A. Measurement and Payment 26 1. Mobilization and Demobilization 27 a. Measure 28 1) This Item is considered subsidiary to the various Items bid. 29 b. Payment 30 1) The work performed and materials furnished in accordance with this Item 31 are subsidiary to the various Items bid and no other compensation will be 32 allowed. 33 2. Remobilization for suspension of Work as specifically required in the Contract 34 Documents 35 a. Measurement 36 1) Measurement for this Item shall be per each remobilization performed. 37 b. Payment 38 1) The work performed and materials furnished in accordance with this Item 39 and measured as provided under "Measurement" will be paid for at the unit 40 price per each "Specified Remobilization" in accordance with Contract 41 Documents. 42 c. The price shall include: 43 1) Demobilization as described in Section 1.1.A.2.a.1) 44 2) Remobilization as described in Section I.1.A.2.a.2) 45 d. No payments will be made for standby, idle time, or lost profits associated this 46 Item. CITY OF FORT WORTH WATER AND SANITARY REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised November 22, 2016 017000-3 MOBILIZATION AND REMOBILIZATION Page 3 of 4 1 3. Remobilization for suspension of Work as required by City 2 a. Measurement and Payment 3 1) This shall be submitted as a Contract Claim in accordance with Article 10 4 of Section 00 72 00. 5 2) No payments will be made for standby, idle time, or lost profits associated 6 with this Item. 7 4. Mobilizations and Demobilizations for Miscellaneous Projects 8 a. Measurement 9 1) Measurement for this Item shall be for each Mobilization and 10 Demobilization required by the Contract Documents 11 b. Payment 12 1) The Work performed and materials furnished in accordance with this Item 13 and measured as provided under "Measurement" will be paid for at the unit 14 price per each "Work Order Mobilization" in accordance with Contract 15 Documents. Demobilization shall be considered subsidiary to mobilization 16 and shall not be paid for separately. 17 c. The price shall include: 18 1) Mobilization as described in Section 1.1.A.3.a.1) 19 2) Demobilization as described in Section 1.1.A.3.a.2) 20 d. No payments will be made for standby, idle time, or lost profits associated this 21 Item. 22 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects 23 a. Measurement 24 1) Measurement for this Item shall be for each Mobilization and 25 Demobilization required by the Contract Documents 26 b. Payment 27 1) The Work performed and materials furnished in accordance with this Item 28 and measured as provided under "Measurement" will be paid for at the unit 29 price per each "Work Order Emergency Mobilization" in accordance with 30 Contract Documents. Demobilization shall be considered subsidiary to 31 mobilization and shall not be paid for separately. 32 c. The price shall include 33 1) Mobilization as described in Section 1.1.A.4.a) 34 2) Demobilization as described in Section 1.1.A.3.a.2) 35 d. No payments will be made for standby, idle time, or lost profits associated this 36 Item. 37 1.3 REFERENCES [NOT USED] 38 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 39 1.5 SUBMITTALS [NOT USED] 40 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 41 1.7 CLOSEOUT SUBMITTALS [NOT USED] 42 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 43 1.9 QUALITY ASSURANCE [NOT USED] 44 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH WATER AND SANITARY REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised November 22, 2016 01 70 00 - 4 MOBILIZATION AND REMOBILIZATION Page 4 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION [NOT USED] 5 END OF SECTION 6 Revision Log DATE NAME SUMMARY OF CHANGE 11/22/16 Michael Owen 1.2 Price and Payment Procedures - Revised specification, including blue text, to make specification flexible for either subsidiary or paid bid item for Mobilization. 7 CITY OF FORT WORTH WATER AND SANITARY REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN. 103413 Revised November 22, 2016 017123-1 CONSTRUCTION STAKING AND SURVEY Page 1 of 8 SECTION 01 71 23 CONSTRUCTION STAKING AND SURVEY PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Requirements for construction staking and construction survey B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Construction Staking a. Measurement 1) Measurement for this Item shall be by lump sum. b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the lump sum price bid for "Construction Staking". 2) Payment for "Construction Staking" shall be made in partial payments prorated by work completed compared to total work included in the lump sum item. c. The price bid shall include, but not be limited to the following: 1) Verification of control data provided by City. 2) Placement, maintenance and replacement of required stakes and markings in the field. 3) Preparation and submittal of construction staking documentation in the form of "cut sheets" using the City's standard template. 2. Construction Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 3. As -Built Survey a. Measurement 1) Measurement for this Item shall be by lump sum. b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the lump sum price bid for "As -Built Survey". CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised February 14, 2018 017123-2 CONSTRUCTION STAKING AND SURVEY Page 2 of 8 2) Payment for "Construction Staking" shall be made in partial payments prorated by work completed compared to total work included in the lump sum item. c. The price bid shall include, but not be limited to the following:: 1) Field measurements and survey shots to identify location of completed facilities. 2) Documentation and submittal of as -built survey data onto contractor redline plans and digital survey files. 1.3 REFERENCES A. Definitions 1. Construction Survev - The survey measurements made prior to or while construction is in progress to control elevation, horizontal position, dimensions and configuration of structures/improvements included in the Project Drawings. 2. As -built Survev —The measurements made after the construction of the improvement features are complete to provide position coordinates for the features of a project. 3. Construction Stakinir — The placement of stakes and markings to provide offsets and elevations to cut and fill in order to locate on the ground the designed structures/improvements included in the Project Drawings. Construction staking shall include staking easements and/or right of way if indicated on the plans. 4. Survev "Field Checks" — Measurements made after construction staking is completed and before construction work begins to ensure that structures marked on the ground are accurately located per Project Drawings. B. Technical References 1. City of Fort Worth — Construction Staking Standards (available on City's Buzzsaw website) — 01 71 23.16.01— Attachment A Survey Staking Standards 2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files (available on City's Buzzsaw website). 3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision 4. Texas Society of Professional Land Surveyors (TSPS), Manual of Practice for Land Surveying in the State of Texas, Category 5 1.4 ADMINISTRATIVE REQUIREMENTS A. The Contractor's selection of a surveyor must comply with Texas Government Code 2254 (qualifications based selection) for this project. 1.5 SUBMITTALS A. Submittals, if required, shall be in accordance with Section 0133 00. B. All submittals shall be received and reviewed by the City prior to delivery of work. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS A. Field Quality Control Submittals CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised February 14, 2018 017123-3 CONSTRUCTION STAKING AND SURVEY Page 3 of 8 1. Documentation verifying accuracy of field engineering work, including coordinate conversions if plans do not indicate grid or ground coordinates. 2. Submit "Cut -Sheets" conforming to the standard template provided by the City (refer to 01 71 23.16.01 — Attachment A — Survey Staking Standards). 1.7 CLOSEOUT SUBMITTALS B. As -built Redline Drawing Submittal 1. Submit As -Built Survey Redline Drawings documenting the locations/elevations of constructed improvements signed and sealed by Registered Professional Land Surveyor (RPLS) responsible for the work (refer to 01 71 23.16.01 — Attachment A — Survey Staking Standards) . 2. Contractor shall submit the proposed as -built and completed redline drawing submittal one (1) week prior to scheduling the project final inspection for City review and comment. Revisions, if necessary, shall be made to the as -built redline drawings and resubmitted to the City prior to scheduling the construction final inspection. 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Construction Staking 1. Construction staking will be performed by the Contractor. 2. Coordination a. Contact City's Project Representative at least one week in advance notifying the City of when Construction Staking is scheduled. b. It is the Contractor's responsibility to coordinate staking such that construction activities are not delayed or negatively impacted. 3. General a. Contractor is responsible for preserving and maintaining stakes. If City surveyors are required to re -stake for any reason, the Contractor will be responsible for costs to perform staking. If in the opinion of the City, a sufficient number of stakes or markings have been lost, destroyed disturbed or omitted that the contracted Work cannot take place then the Contractor will be required to stake or re -stake the deficient areas. B. Construction Survey 1. Construction Survey will be performed by the Contractor. 2. Coordination a. Contractor to verify that horizontal and vertical control data established in the design survey and required for construction survey is available and in place. 3. General a. Construction survey will be performed in order to construct the work shown on the Construction Drawings and specified in the Contract Documents. b. For construction methods other than open cut, the Contractor shall perform construction survey and verify control data including, but not limited to, the following: 1) Verification that established benchmarks and control are accurate. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised February 14, 2018 017123-4 CONSTRUCTION STAKING AND SURVEY Page 4 of 8 2) Use of Benchmarks to furnish and maintain all reference lines and grades for tunneling. 3) Use of line and grades to establish the location of the pipe. 4) Submit to the City copies of field notesused to establish all lines and grades, if requested, and allow the City to check guidance system setup prior to beginning each tunneling drive. 5) Provide access for the City, if requested, to verify the guidance system and the line and grade of the carrier pipe. 6) The Contractor remains fully responsible for the accuracy of the work and correction of it, as required. 7) Monitor line and grade continuously during construction. 8) Record deviation with respect to design line and grade once at each pipe joint and submit daily records to the City. 9) If the installation does not meet the specified tolerances (as outlined in Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct the installation in accordance with the Contract Documents. C. As -Built Survey 1. Required As -Built Survey will be performed by the Contractor. 2. Coordination a. Contractor is to coordinate with City to confirm which features require as - built surveying. b. It is the Contractor's responsibility to coordinate the as -built survey and required measurements for items that are to be buried such that construction activities are not delayed or negatively impacted. c. For sewer mains and water mains 12" and under in diameter, it is acceptable to physically measure depth and mark the location during the progress of construction and take as -built survey after the facility has been buried. The Contractor is responsible for the quality control needed to ensure accuracy. 3. General a. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features during the progress of the construction including the following: 1) Water Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Minimum every 250 linear feet, including (2) Horizontal and vertical points of inflection, curvature, etc. (3) Fire line tee (4) Plugs, stub -outs, dead-end lines (5) Casing pipe (each end) and all buried fittings 2) Sanitary Sewer a) Top of pipe elevations and coordinates for force mains and siphon sanitary sewer lines (non -gravity facilities) at the following locations: (1) Minimum every 250 linear feet and any buried fittings (2) Horizontal and vertical points of inflection, curvature, etc. 3) Stormwater — Not Applicable CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised February 14, 2018 017123-5 CONSTRUCTION STAKING AND SURVEY Page 5 of 8 b. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features after the construction is completed including the following: 1) Manholes a) Rim and flowline elevations and coordinates for each manhole 2) Water Lines a) Cathodic protection test stations b) Sampling stations c) Meter boxes/vaults (All sizes) d) Fire hydrants e) Valves (gate, butterfly, etc.) f) Air Release valves (Manhole rim and vent pipe) g) Blow off valves (Manhole rim and valve lid) h) Pressure plane valves i) Underground Vaults (1) Rim and flowline elevations and coordinates for each Underground Vault. 3) Sanitary Sewer a) Cleanouts (1) Rim and flowline elevations and coordinates for each b) Manholes and Junction Structures (1) Rim and flowline elevations and coordinates for each manhole and junction structure. 4) Stormwater — Not Applicable 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY PART 2 - PRODUCTS A. A construction survey will produce, but will not be limited to: 1. Recovery of relevant control points, points of curvature and points of intersection. 2. Establish temporary horizontal and vertical control elevations (benchmarks) sufficiently permanent and located in a manner to be used throughout construction. 3. The location of planned facilities, easements and improvements. a. Establishing final line and grade stakes for piers, floors, grade beams, parking areas, utilities, streets, highways, tunnels, and other construction. b. A record of revisions or corrections noted in an orderly manner for reference. c. A drawing, when required by the client, indicating the horizontal and vertical location of facilities, easements and improvements, as built. 4. Cut sheets shall be provided to the City inspector and Survey Superintendent for all construction staking projects. These cut sheets shall be on the standard city template which can be obtained from the Survey Superintendent (817-392-7925). 5. Digital survey files in the following formats shall be acceptable: a. AutoCAD (.dwg) b. ESRI Shapefile (.shp) CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised February 14, 2018 017123-6 CONSTRUCTION STAKING AND SURVEY Page 6 of 8 c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use standard templates, if available) 6. Survey files shall include vertical and horizontal data tied to original project control and benchmarks, and shall include feature descriptions PART 3 - EXECUTION 3.1 INSTALLERS A. Tolerances: The staked location of any improvement or facility should be as accurate as practical and necessary. The degree of precision required is dependent on many factors all of which must remain judgmental. The tolerances listed hereafter are based on generalities and, under certain circumstances, shall yield to specific requirements. The surveyor shall assess any situation by review of the overall plans and through consultation with responsible parties as to the need for specific tolerances. a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical tolerance. Horizontal alignment for earthwork and rough cut should not exceed 1.0 ft. tolerance. b. Horizontal alignment on a structure shall be within .0.1 ft tolerance. c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and walkways shall be located within the confines of the site boundaries and, occasionally, along a boundary or any other restrictive line. Away from any restrictive line, these facilities should be staked with an accuracy producing no more than 0.05ft. tolerance from their specified locations. d. Underground and overhead utilities, such as sewers, gas, water, telephone and electric lines, shall be located horizontally within their prescribed areas or easements. Within assigned areas, these utilities should be staked with an accuracy producing no more than 0.1 ft tolerance from a specified location. e. The accuracy required for the vertical location of utilities varies widely. Many underground utilities require only a minimum cover and a tolerance of 0.1 ft. should be maintained. Underground and overhead utilities on planned profile, but not depending on gravity flow for performance, should not exceed 0.1 ft. tolerance. B. Surveying instruments shall be kept in close adjustment according to manufacturer's specifications or in compliance to standards. The City reserves the right to request a calibration report at any time and recommends regular maintenance schedule be performed by a certified technician every 6 months. 1. Field measurements of angles and distances shall be done in such fashion as to satisfy the closures and tolerances expressed in Part 3.1.A. 2. Vertical locations shall be established from a pre -established benchmark and checked by closing to a different bench mark on the same datum. 3. Construction survey field work shall correspond to the client's plans. Irregularities or conflicts found shall be reported promptly to the City. 4. Revisions, corrections and other pertinent data shall be logged for future reference. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised February 14, 2018 017123-7 CONSTRUCTION STAKING AND SURVEY Page 7 of 8 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION 3.5 REPAIR / RESTORATION A. If the Contractor's work damages or destroys one or more of the control monuments/points set by the City, the monuments shall be adequately referenced for expedient restoration. 1. Notify City if any control data needs to be restored or replaced due to damage caused during construction operations. a. Contractor shall perform replacements and/or restorations. b. The City may require at any time a survey "Field Check" of any monument or benchmarks that are set be verified by the City surveyors before further associated work can move forward. 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. It is the Contractor's responsibility to maintain all stakes and control data placed by the City in accordance with this Specification. This includes easements and right of way, if noted on the plans. B. Do not change or relocate stakes or control data without approval from the City. 3.8 SYSTEM STARTUP A. Survey Checks 1. The City reserves the right to perform a Survey Check at any time deemed necessary. 2. Checks by City personnel or 3' party contracted surveyor are not intended to relieve the contractor of his/her responsibility for accuracy. 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised February 14, 2018 017123-8 CONSTRUCTION STAKING AND SURVEY Page 8 of 8 DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson Added instruction and modified measurement & payment under 1.2; added 8/31/2017 M. Owen definitions and references under 1.3; modified 1.6; added 1.7 closeout submittal requirements; modified 1.9 Quality Assurance; added PART 2 — PRODUCTS ; Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup. Removed "blue text"; revised measurement and payment sections for Construction Staking and As -Built Survey; added reference to selection compliance with TGC 2/14/2018 M Owen 2254; revised action and Closeout submittal requirements; added acceptable depth measurement criteria; revised list of items requiring as -built survey "during" and "after" construction; and revised acceptable digital survey file format CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised February 14, 2018 FORT WORTH, Section 01 71 23.01 - Attachment A Survey Staking Standards February 2017 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 1 of 22 These procedures are intended to provide a standard method for construction staking services associated with the City of Fort Worth projects. These are not to be considered all inclusive, but only as a general guideline. For projects on TXDOT right-of-way or through joint TXDOT participation, adherence to the TXDOT Survey Manual shall be followed and if a discrepancy arises, the TXDOT manual shall prevail. (http://onlinemanuals.txdot.gov/txdotmanuals/ess/ess.13df) If you have a unique circumstance, please consult with the project manager, inspector, or survey department at 817-392-7925. Table of Contents I. City of Fort Worth Contact Information II. Construction Colors III. Standard Staking Supplies IV. Survey Equipment, Control, and Datum Standards V. Water Staking VI. Sanitary Sewer Staking VI I. Storm Staking VIII. Curb and Gutter Staking IX. Cut Sheets X. As -built Survey 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 2 of 22 I. Survev Department Contact Information Physical and mailing address: 8851 Camp Bowie West Boulevard Suite 300 Fort Worth, Texas 76116 Office: (817) 392-7925 Survey Superintendent, direct line: (817) 392-8971 II. Construction Colors The following colors shall be used for staking or identifying features in the field. This includes flagging, paint of laths/stakes, paint of hubs, and any identification such as pin flags if necessary. Utility Color PROPOSED EXCAVATION WHITE ALL ELECTRIC AND CONDUITS POTABLE WATER GAS OR OIL YELLOW TELEPHONE/FIBER OPTIC I ORANGE SURVEY CONTROL POINTS, BENCHMARKS, PROPERTY CORNERS, RIGHT-OF-WAYS, AND PINK ALL PAVING INCLUDING CURB, SIDEWALK, BUILDING CORNERS SANITARY SEWER &NA IRRIGATION AND RECLAIMED WATER III. Standard Staking Supplies Item Minimum size Lath/Stake 36" tall Wooden Hub (2"x2" min. square preferred) 6" tall Pin Flags (2.5" x 3.5" preferred) 21" long Guard Stakes Not required PK or Mag nails 1" long Iron Rods (1/2" or greater diameter) 18" long Survey Marking Paint Water -based Flagging 1" wide Marking Whiskers (feathers) 6" long Tacks (for marking hubs) 3/4" long 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 3 of 22 IV. Survev Equipment, Control, and Datum Standards A. City Benchmarks All city benchmarks can be found here: htto://fortworthtexas.gov/itsolutions/GIS/ Look for 'Zoning Maps'. Under 'Layers' , expand 'Basemap Layers', and check on 'Benchmarks'. B. Conventional or Robotic Total Station Equipment I. A minimum of a 10 arc -second instrument is required. II. A copy of the latest calibration report may be requested by the City at any time. It is recommended that an instrument be calibrated by certified technician at least 1 occurrence every 6 months. C. Network/V.R.S. and static GPS Equipment I. It is critical that the surveyor verify the correct horizontal and vertical datum prior commencing work. A site calibration may be required and shall consist of at least 4 control points spaced evenly apart and in varying quadrants. Additional field checks of the horizontal and vertical accuracies shall be completed and the City may ask for a copy of the calibration report at any time. Network GPS such as the Western Data Systems or SmartNet systems may be used for staking of property/R.O.W, forced -main water lines, and rough -grade only. No GPS staking for concrete, sanitary sewer, storm drain, final grade, or anvthing that needs vertical grading with a tolerance of 0.25' or less is allowed. D. Control Points Set All control points set shall be accompanied by a lath with the appropriate Northing, Easting, and Elevation (if applicable) of the point set. Control points can be set rebar, 'X' in concrete, or any other appropriate item with a stable base and of a semi -permanent nature. A rebar cap is optional, but preferred if the cap is marked 'control point' or similar wording. Datasheets are required for all control points set. Datasheet should include: A. Horizontal and Vertical Datum used, Example: N.A.D.83, North Central Zone 4202, NAVD 88 Elevations B. Grid or ground distance. — If ground, provide scale factor used and base point coordinate, Example: C.S.F.=0.999125, Base point=North: 0, East=O C. Geoid model used, Example: GEOID12A 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 4 of 22 E. Preferred Grid Datum Although many plan sets can be in surface coordinates, the City's preferred grid datum is listed below. Careful consideration must be taken to verify what datum each project is in prior to beginning work. It is essential the surveyor be familiar with coordinate transformations and how a grid/surface/assumed coordinate system affect a project. Proiected Coordinate System: NAD_1983_StatePlane_Texas_North_Central_FIPS_4202_Feet Projection: Lambert_ Conformal —Conic Fa Ise_Easti ng: 1968500.00000000 False —Northing: 6561666.66666667 Central Meridian:-98.50000000 Standard Parallel 1: 32.13333333 Standard Parallel 2: 33.96666667 Latitude —Of —Origin: 31.66666667 Linear Unit: Foot US Geographic Coordinate System: GCS_North_American_1983 Datum: D North American 1983 Prime Meridian: Greenwich Angular Unit: Degree Note: Regardless of what datum each particular project is in, deliverables to the City must be converted/translated into this preferred grid datum. 1 copy of the deliverable should be in the project datum (whatever it may be) and 1 copy should be in the NAD83, TX North Central 4202 zone. See Preferred File Namina Convention below F. Preferred Deliverable Format txt csv dwg .job G. Preferred Data Format P,N,E,Z,D,N Point Number, Northing, Easting, Elevation, Description, Notes (if applicable) H. Preferred File Naming Convention This is the preferred format: City Project Number_Description_Datum.csv Example for a Droiect that has surface coordinates which must be translated: File 1: C1234 As -built of Water on Main Street Grid NAD83 TXSP 4202.csv 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 5 of 22 File 2: C1234_As-built of Water on Main Street —Project Specific Datum.csv Example Control Stakes 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 6 of 22 J W W m w m W V U7 U7 w J m D 0 CJ 71 CD W J W 1016 EL.= 100.aa' CP N=5000.00 E=5000.00 a W � W �U 0 0 7' = 0 � W LL ~ W W X ❑3 IW E[ ry Q V. Water Staking Standards 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 7 of 22 A. Centerline Staking— Straight Line Tangents I. Offset lath/stakes every 200' on even stations II. Painted blue lath/stake only, no hub is required III. Grade is to top of pipe (T/P) for 12" diameter pipes or smaller IV. Grade to flow line (F/L) for 16" and larger diameter pipes V. Grade should be 3.50' below the proposed top of curb line for 10" and smaller diameter pipes VI. Grade should be 4.00' below the proposed top of curb line for 12" and larger diameter pipes VI I. Cut Sheets are required on all staking and a copy can be received from the survey superintendent Optional: Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking - Curves I. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval II. Same grading guidelines as above III. Staking of radius points of greater than 100' may be omitted C. Water Meter Boxes I. 7.0' perpendicular offset is preferred to the center of the box II. Center of the meter should be 3.0' behind the proposed face of curb III. Meter should be staked a minimum of 4.5' away from the edge of a driveway IV. Grade is to top of box and should be +0.06' higher than the proposed top of curb unless shown otherwise on the plans D. Fire Hydrants I. Center of Hydrant should be 3.0' behind proposed face of curb II. Survey offset stake should be 7.0' from the center and perpendicular to the curb line or water main III. Grade of hydrants should be +0.30 higher than the adjacent top of curb E. Water Valves & Vaults I. Offsets should be perpendicular to the proposed water main II. RIM grades should only be provided if on plans Example Water Stakes 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 8 of 22 FRONT N {SIDE FACING �) FRONT NO FLAGGING REQUIRED c G IN LIEU OF BLUE PAINTED LATH (SIDE FACING } c o BALK f iD FRONT (SIDE FACING R_0_W.} Io ( a (SIDE FACING , P r rD 3 OFFSET DISTANCE IDENTIFY ANY p CONTINUE STAKING EVERY 200' BACK FH' TEES, METERS + rD (SIDE FACING RA) GATE VALVES, 0 � O i CRQSSES, ETG. — POINT ICI CENTERLINE OFrD Ln TD _0 WATER LINE + I fD w o O T� HLIR ELEVATION m Ln N v 0 T/P n STATIONING v O�q 4 W rNr N 4 C2 X Q 0 P IDENTIFIES TOP OF PIPE �5� LSP a ggt5 � 2 n gT I~O 0-m O n IDENTIFIES CUT y OR FILL +a f X 6 (D HUB PAINTER BLUE, FLUSH 'NTH }� <--4* GROUND, WITH TACK OR BLACK DOT G < Q O o (OPTIONAL) N HUB PAINTED BLUE WITH v BLUE WHISKERS OR 60❑ NAIL WITH BLUE WHISKER A. Centerline Staking — Straight Line Tangents I. Inverts shall be field verified and compared against the plans before staking II. Painted green lath/stake WITH hub and tack or marker dot, no flagging required III. 1 offset stake between manholes if manholes are 400' or less apart IV. Offset stakes should be located at even distances and perpendicular to the centerline V. Grades will be per plan and the date of the plans used should be noted VI. If multiple lines are at one manhole, each line shall have a cut/fill and direction noted VI I. Stakes at every grade break VIII. Cut sheets are required on all staking Optional: Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking — Curves I. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval II. Staking of radius points of greater than 100' may be omitted C. Sanitary Sewer Manholes I. 2 offset stakes per manhole for the purpose of providing alignment to the contractor II. Flowline grade should be on the lath/stake for each flowline and direction noted III. RIM grade should only be on the stake when provided in the plans 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 10 of 22 FRONT (SIDE FACING) 0 tail 2nd OFFSET STAKE "a FOR ALIGNMENT 0 FOR SSMH'S ul FRONT FRONT {SIDE FACING) (SIDE FACING) 2nd OFFSET STAKE —'" NO FLAGGING IN LIEU OF GREEN REQUIREDIT PAINTED LATH MH — gat OFFSET STAKE W FORF RGSSMH ALT 4{Y�� 5 FCR ALIGNMENT FOR SSMH'S n � fD O FRONT w UT ,�n D rD j I U,n7 L (SIDE FACING) NO 2ND OFFSET STAKE F� _ FOR CENTERLINE S MH y NEEDED 3 ( MH tat OFFSET STAKE I p �R (1 Cl T 1.4 I { lI FOR PIJGNFAENT ON fD p � ' v SSMH'S {SIDE FACING ) NE j D�q ID '< SAME STATIONING AS FIRST OFFSET 5TAKE O-i N N N SANITARY SEVE}i LINE � n FfL O N n F S n `G T IDENTIFIES MANHOLE RIM N LA fD N JH j171 STATIONINGNE V F/L rF r O- rD /L IDENTIFIES FLOWIJNE OF II ' 4 I. CL N N NORTH PIPE GRADE n cn RIM BECAUSE STATIONING . n O RIM N IDENTIFIES CUT - BETWEEN 5SMH'S WAS \ O 17 I OR FILL +FOR NORTH PIPE F A LESS THAN 400'. SPLIT S THE DIFFERENCE AND SET x -a.i 0 IDENTIFIES FLOWLINE OF s SOUTH PIPE GRADE 1 STAKE IN THE MIDDLE . <I I IDENTIFIES GIJT - �ORS�` '' OR FILL + FOR SOUTH PIPE � R A P y O RDA IDENTIFIES RIM GRADE G p i HUB PAINTED GREEN, FLUSH WITH GROUND, WITH TACK OR BLACK DOT IDENTIFIES CUT - + OR FILL + TO � a OF MANHOLE RHvF� V a� (OFTIONPLj HUB PAINTED GREEN V1TH BLUE WHISKERS OR DOD NAL WITH BUJE WWHISKERS m x fD N a� 3 V1 m m N r+ Iy pr Nf VII. Storm Sewer & Inlet Staking A. Centerline Staking — Straight Line Tangents I. 1 offset stake every 200' on even stations II. Grades are to flowline of pipe unless otherwise shown on plans III. Stakes at every grade break IV. Cut sheets are required on all staking Optional: Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking — Curves I. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval II. Staking of radius points of greater than 100' may be omitted C. Storm Drain Inlets I. Staking distances should be measured from end of wing II. Standard 10' Inlet = 16.00' total length III. Recessed 10' Inlet = 20.00' total length IV. Standard double 10' inlet = 26.67' total length V. Recessed double 10' inlet = 30.67' total length D. Storm Drain Manholes I. 2 offset stakes per manhole for the purpose of providing alignment to the contractor II. Flowline grade should be on the lath/stake for each flowline and direction noted III. RIM grade should only be on the stake when provided in the plans 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 12 of 22 BACK C30E FAahr- R.ELW.) POINT # I .I HIA ELEVATION Example Storm Inlet Stakes FRONT (SIDE FACING NQ FLAGGING REQUIRED IN LIEU OF PINK PAINTED LATH n M m 0 m r 1 IDENTIFIES MICH END OF THE WING BEING STAKED II INLET STATION + [IF NOTED ON PLANS] eIDENTIFIES GRADE �I T6 TOP OF CURB 0 P. IDENTIFIES GRADE TO FLO4NNE c7 I DISTANOFS FO� INL STANDARD 10 - 16' RECESSED W - 2d STANDARD DUJBLE 10' - 2&67 BACK {SUE FA13NG R.QW_) POINT 0 14P HUB ELEVATUN o FRONT (SIDE FACING rn IDENTIFIES WHICH END OF THE YdNG BEING STAKED I HUB %MTH TACK - - RECESSED DUJBLE 10' - 30-67 - - - - - - - - - ------------- - I I BACK OF INLET � µ~j al BACK OF CURB BACK OF CURB --------- MNG..'�:� { .`k. G'. .. ' °1. ,''4�1MG,— — — — — — — — — FLOYLINE FACE GF INLET FACE OF INLET FLOWLINE EDGE OF PAVEMENT EDGE OF PAVEMENT EDGE OF PAVEMENT EDGE OF PAVEMENT 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01—Attachment A_Survey Staking Standards.docx Page 13 of 22 VIII. Curb and Gutter Staking A. Centerline Staking— Straight Line Tangents V. 1 offset stake every 50' on even stations VI. Grades are to top of curb unless otherwise shown on plans VI I. Stakes at every grade break VIII. Cut sheets are required on all staking Optional: Actual stakes shall consist of a 60D nail or hub set with a whisker B. Centerline Staking — Curves III. If arc length is greater than 100', POC (Point of Curvature) offset stakes should be set at a 25' interval IV. Staking of radius points of greater than 100' may be omitted 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 14 of 22 Example Curb & Gutter Stakes FRONT (SIDE FACING GL) v o FRONT IOWnFlES E71D FRONT {SOE FACING Co POINT OF ,al . FRONT T GENT (SIDE FACING] PONT OF CURVATURE Pi (SIDE FACING} W ac. PT + r BACK OENTIFlES OFFSET 13 TO (SIDE FACING R.O.W.) I � FACE DIF°UROFC UREI TIr n POINT li g0. III I N III I — III I GRADE G TOPEOF CURS Is 6 III I NO 1R ON I II HUB ELEVATION o + RAPIDS NO FLAGGING REQUIRED f � IN LIEU QF PINK PAINTED LATH � f r TOP OF CURB _ � �r �l' x I T •• BACK OF CURB FACE OF CURB L — --�— --max FLO VuLI N E EDGE OF PAVEMENT Example Curb & Gutter Stakes at Intersection 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 15 of 22 O 7 N � W � n I.- fD Ol -v O F- O I n rD !v � !7 N s3 3 -, O O 7 � � � v °1 D OU m ILn cn C ffDD < c� O� rD Tl N LA CID n 7 � OU '6 N rr � � v 11 IT CL rD V) O v X -a v fD 10' O/S STAKE 1D' O/S STAKE W/GRADE AT W/GRADE AT EVEN STATION EVEN STATION ii ] TI I-ti W MAX. DISTANCE 50' MAX. DISTANCE I 50' MAX. DISTANCE 50' MAX. DISTANCE I 56' MAX. DISTANCE I 50' MAX. DISTANCE I - 0I I I I l a BACK OF CURB BACK OF CURB I T— O 50' MAY. DISTANCE O r r10' C/S STAKE W/GRADE / 10' O/S AT PC STAKE EVEN R DE AT J f IF ARC LENGTH IS GREATER THAN 1W, I BACK OF CURB _- A POC OFFSET STAKE SHOULD BE SET Q I 50' MAX. DISTANCE CD r f f/ 10. O/5 r I STAKE L u \ W/GRADE AT PT mod' \'p 10' 0/S STAKE W/GRADE AT EVEN STATION I0. STAKE / W/GRADE f AT PT l o' 30' RADIUS w POINT WINO GRADE F m� d V x Q i y u d ff 10' 0/5 m STAKE — — - W/GRADE AT I� EWN STATION 7 O/S 10' \9Qf�S STAKE \ W/GRADE \ W AT PC \ 30' RADIUS w POINT = W/NO GRADE � F N V O 4 4 y2 V � m o 1 D' ❑/S rl STAKE — T q- W/GRADE AT EVEN STATION TYP FRONT (SIDE FACINGIDENTIFIES oll 4 OFFSET IS TO BACK RE] OF P 9 T/C 0 IX. Cut Sheets A. Date of field work B. Staking Method (GPS, total station) C. Project Name D. City Project Number (Example: C01234) E. Location (Address, cross streets, GPS coordinate) F. Survey company name G. Crew chief name H. A blank template can be obtained from the survey superintendent (see item I above) Standard Citv Cut Sheet City Project Date: Number: Project Name: ❑ TOTAL Staking Method: ❑ GPS STATION ❑ OTHER LOCATION: CONSULTANT/CONTRACTOR SURVEY CREW INITIALS ALL GRADES ARE TO FLOWLINE OR TOP OF CURB UNLESS OTHERWISE NOTED. PT # STATION OFFSET DESCRIPTION PROP. STAKED _ CUT + FILL -LT/+RT GRADE ELEV. 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 17 of 22 X. As -built Survey A. Definition and Purpose The purpose of an as -built survey is to verify the asset was installed in the proper location and grade. Furthermore, the information gathered will be used to supplement the City's GIS data and must be in the proper format when submitted. See section IV. As -built survey should include the following (additional items may be requested): Manholes Top of pipe elevations every 250 feet Horizontal and vertical points of inflection, curvature, etc. (All Fittings) Cathodic protection test stations Sampling stations Meter boxes/vaults (All sizes) Fire lines Fire hydrants Gate valves (rim and top of nut) Plugs, stub -outs, dead-end lines Air Release valves (Manhole rim and vent pipe) Blow off valves (Manhole rim and valve lid) Pressure plane valves Cleaning wyes Clean outs Casing pipe (each end) Inverts of pipes Turbo Meters 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 18 of 22 B. Example Deliverable A hand written red line by the field surveyor is acceptable in most cases. This should be a copy of the plans with the point number noted by each asset. If the asset is missing, then the surveyor should write "NOT FOUND" to notify the City. 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 19 of 22 y p5p 9Z�Z-X dq wl�Y.ttsR/ NdC OC61O roq I03NHd AUO l}WSM A9 LWYJYM * 7IMMY7d3N N3MM 1WY WS OPT 7'31TM d x u 4 I 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 20 of 22 7A D000 _ A?wL 01tAM � STA U9]'L(7 - irk MWD-DR) STAt�Am ` lrwL LRCM M REWVE i S ME EXIST L PRDr OWdEA GATE YkYE a REDNCFR �af1G E �;m BLK 6 LILT P J.OQ wi.V- ftl— LM REL40VE EXIST.—\ erWATCR ap. W 'Taff *fiW %M0E%TEWY �JMM O 4/ r TL3�11 •, i F &-M.& SWD 51 FEVE 57 LF OF 12WER PA-E acwNErr TO EMT. rr WX"V? N-6W145-R79 ■J LP. O �.w.+ewn Mr x.tvr xan k L7/T Yyv, A�ln R Gc� bed A E�630.4.9PDp EtEV. TP3..7P] 161a�� y g h LE' 45•VERT. 9EM0 ;:zw $w E m B av N�J472iSSF4J N+�gOS296.53 E-22%�R37B13 � 22,ti701B3I0 PROPOSED 5ANrrARY S SEE SHEET 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 21 of 22 9Z62•x 7ur•�wr�v � rvda s s all Na 5 ii"- N 0F&O IN 1.73PONd )X,J '}/GSM AX 1r4 Y= 1d303JV7d3N &WS 1WJJ NS Qi'd 231Vh Q � 0. — �,t F I )L-" -L-i)nSJ� C2 23.16.01_Attachment A_Survey Staking Standards.docx Page 22 of 22 8LK 29 T TPJ c'yeai Ao w, FoYWwi� jZ -� eSANITARY SEWER SERVKCE W/ CLEANOYT / o ra wwm.n �' w �LAYTON RD. W. a y iV) � E E{ � e.� NrVJ % Q- w v� v CO 2-WN IZ WATER O MS wuT_w U) 1GU�R --' A rus w� 1 or're w �' V ^ cns J LU I �cu REMOVE � ��i, 3O P'I �SPIkSENER P w};' V rya � STAhS/-Y7 ^ 85S UXE A - car I! EXIST. STA0'00.L-3A1• m• G-s+.�r e.r�w.m EXST. STAHU-3654 R5M7VE "IST sw l cofisTRwr 5 IF OF 6' SS UXE COXSr FMASSUH IHCCUDIti 11'' Caw -COLLAR S MX INSERT W1 CaTiOSX.W PR7TECTM WNNECI- PROP. 8rSS (NW) CONNECT PRO? B'SS AVEB6W1 TO PRG'.SSMN. Ni'W66f5£252 E-2296658z3! CITY MAP NO. 2A18-380, 2018-3, MAPSCO PAGE NO.74N, S, T, W - 7. "! ----- —�„— 71 —.---'_�•- �--is--1�—� --I,r i_�—i f . - -- r 0:\Spec 2•00 1-00 23.16.01_Attachment A_Survey Staking Standards.docx Page 23 of 23 6 b1\01 71 Obviously the .csv or .txt file cannot be signed/sealed by a surveyor in the format requested. This is just an example and all this information should be noted when delivered to the City so it is clear to what coordinate system the data is in. POINT NO. NORTHING EASTING ELEV. DESCRIPTION 1 6946257.189 2296079.165 726.09 S5MH RIM _ q-1 it�I�J 2 6946260,893 2296062.141 725.668 GV RIM l�j 3 6946307.399 2296038306 726.85 GV RIM CC�iLDlt�s 4 6946220.582 2296011,025 723.359 SSMH RIM 5 6946195.23 2296015,116 722.123 GV RIM 1 /J 6 6946190.528 2296022.721 722.325 FH 7 6946136.012 2295992.115 719.448 WM RIM 8 6946002.267 2295919.133 713.331 WM RIM 7 (-Ef-W l T +zT 9 6946003,056 2295933.418 713,652 CO RIM 10 6945984.677 2295880,52 711.662 SSMH RIM 11 6945986.473 2295869.992 710.046 WM RIM 12 6945895.077 2295860.962 707.72 WM RIM 13 6945896.591 2295862.188 708.205 WM RIM V 14 6945934.286 2295841.925 709.467 WM RIM 15 6945936.727 2295830.441 710.084 CO RIM CC 16 6945835.678 2295799.707 707.7)4 SSMH RIM r 17 6945817.488 2295827.011 708.392 SSMH RIM 18 6945759,776 2295758,643 711.218 SSMH RIM 19 6945768.563 2295778.424 710.096 GV RIM 20 6945743.318 2295788.392 710.631 GV RIM 21 6945723.219 2295754,394 712,849 GV RIM 22 6945682.21 2295744.22 716.686 WM RIM C 23 6945621.902 2295669.471 723.76 WM RIM 24 6945643.407 2295736.03 719.737 CO RIM �I k'n 1, 7 _� CA(-( 1�T 25 6945571.059 2295655.195 727.514 SSMH RIM 26 6945539.498 2295667.803 729.123 WM RIM 27 6945519.834 2295619.49 732.689 WM RIM 28 6945417.979 2295580.27 740.521 WM RIM t Sly 29 6945456.557 2295643.145 736.451 CO RIM 30 6945387.356 2295597.101 740.756 GV RIM 31 6945370.688 2295606.793 740,976 GV RIM S SvR C 32 6945383.53 2295610.559 740.408 FH 33 6945321.228 2295551.105 746.34 WM RIM 34 6945319,365 2295539.728 746.777 CO RIM 35 6945242.289 2295570,715 748.454 WM RIM 36 6945233.624 2295544.626 749.59 SSMH RIM 37 6945206.483 2295529.305 751.058 WM RIM �- 38 6945142.015 2295557.666 750.853 WM RIM 39 6945113.445 2295520.335 751.871 WM RIM 40 6945049.02 2295527.345 752.257 SSMH RIM 6945041,024 2295552.675 751.79 WM RIM 42 6945038.878 2295552.147 751.88 WM RIM )f741 f 43 6945006.397 2295518.135 752.615 WM RIM 44 6944944382 2295520.635 752.801 WM RIM 45 6944943.432 2295556.479 752.156 WM RIM 46 6944860.416 2295534.397 752.986 SSMH RIM 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 24 of 24 C. Other preferred as -built deliverable Some vendors have indicated that it is easier to deliver this information in a different format. Below is an example spreadsheet that is also acceptable and can be obtained by request from the survey superintendent. 0:\Specs-Stds Governance Process\Temporary Spec Files\Capital Delivery\Cap Delivery Div 01\01 71 23.16.01_Attachment A_Survey Staking Standards.docx Page 25 of 25 O tv W I--s Ol O I� D r) n S 3 I'D 7 � r-r °1 D a° I (D Vf fV cn C OrD N N cn 7 11q (n w N IZ V) IZ O (9 X Home I Insert Page Layout Formulas Data Rev- View Acrobat [ut Calkbn • 11 • A A =n- V/• 2wrap Text General Normal u Bad Good Neutral Calculation L'�'�' JJJ %I C-py - --.. Paste g I q . 'i fg1 • A • -Ci = _- t- Merge &Center • $ % f ,Contl¢rona{ +Alignment Format Exolonotory,,, Followed Hy... Hyperlink Input _ Fnsert Delete JFarmat Painter - Formatting -as Table-. Clipb.rd Font r: Number r; Styes Ce1h N31 A B C D E F G H I J % L M N 1 project Name and Number- (Street Name] Water Meter Boxes Fire Hydrants 2 GPSEGr'rd) Laor'Itlnates,Terras 1, GPSEGridl Cxridnatesjimm GPS(Gudl Caarldnates,Teiias GYSEGr'Ml Coar'Wnates,Texas Sta.M Nut Elevation IGPStGxitl}[oor} a[es,Texas TIP ales 3ta.11 flevation(II Sta.9 i SMA Hvtran WW 1 Nut Elevators 3 NC 4202 NC 4202 NC 4202 1, NC 4202 NC 4202 1, NfY1�934779.6510' NIY1=6954784.3970'1 NIY1=5934790.8950' NIY1=i934791.0300'1, 4 --- 0.20.05 711.10E 0«25.00 1 0«3122 0«31.42 1 718.35.5 E(x1-2320950.1450' EI%)-23209245750' 1, E(X1-2320959.7660' E(X1-2320951.9690' 1, 5 N(YI-5935913.4620' NEYI=6934849.4310' 1, N(YI=5935979.3410' NIY)- 9S5979.IW' 6 - 11+5389 716838 0«90 RS 1 12+1971 12+1958 1 714431 E(x1=2320942.4850' E1x)=2320922.5840' 1, E(x(=2320949.6250' E(%)=6935979.1580' 1, 7 N(Y(-5935952.6340' N(Y)�934849A250' 1, N(YI=6936859.5980' NIY)- 936849.7M0' 8 --- 11+9281 717k84 0+90.15 1 20«99.76 2019075 1 704.241' E(X1=2320956.6290' E(x)=2320960.141& EiX1-23211950 4fi50' F(%143211960A250' I 9- N(Y1�9359521510' N(Y)-6934854875[P N(YI-59374922430' NIYI-93749185W 10 -- 11+92.93 715.]44 0r9520 1 27+32.65 27+32.33 1 596.56 E(X1=232089782611' E(x)=23201 S990811' I E(x1=2320938.8970' F(y1=232119315950' I 11 N(Y1�69359747400' N(Y)-934855.453[P 12 12+15.17 715.001 0-96.07 1 EIx1=2320942.3110' E1x1=23209225780' 13 NIYI=6935a112340' NEYI=6934959.5300' 14 20+51.69 704.111 1+99A6 1 EIx1=2320935.9070' E1x1=2320959.0250'1,1, 75 NIY1�9374945290' 'I NEY1=69349621570' 16. 17-15.00 117,071 2.01.7a lEI%1=2320930.5430' Ely)=2320921.8750' 1, 1, 17 SECTION 0174 23 CLEANING PART1- GENERAL 1.1 SUMMARY 017423-1 CLEANING Page 1 of 4 A. Section Includes: 1. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fall on newly painted surfaces. 2. Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.- 103413 Revised July 1, 2011 01 74 23 - 2 CLEANING Page 2 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site. 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.- 103413 Revised July 1, 2011 017423-3 CLEANING Page 3 of 4 6. Handle materials in a controlled manner with as few handlings as possible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. 8. Remove all signs of temporary construction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do not burn on -site. B. Intermediate Cleaning during Construction 1. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 3. Confine construction debris daily in strategically located container(s): a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haul from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transported by flowing water during the storm. C. Interior Final Cleaning 1. Remove grease, mastic, adhesives, dust, dirt, stains, fingerprints, labels and other foreign materials from sight -exposed surfaces. 2. Wipe all lighting fixture reflectors, lenses, lamps and trims clean. 3. Wash and shine glazing and mirrors. 4. Polish glossy surfaces to a clear shine. 5. Ventilating systems a. Clean permanent filters and replace disposable filters if units were operated during construction. b. Clean ducts, blowers and coils if units were operated without filters during construction. 6. Replace all burned out lamps. 7. Broom clean process area floors. 8. Mop office and control room floors. D. Exterior (Site or Right of Way) Final Cleaning Remove trash and debris containers from site. a. Re -seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.- 103413 Revised July 1, 2011 01 74 23 - 4 CLEANING Page 4 of 4 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 SUMMARY OF CHANGE WATER AND SANITARY SEWER REPLACEMENT CPN.- 103413 01 77 19 -1 CLOSEOUT REQUIREMENTS Page 1 of 3 1 SECTION 0177 19 2 CLOSEOUT REQUIREMENTS 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedure for closing out a contract 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1— General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 A. Guarantees, Bonds and Affidavits 19 1. No application for final payment will be accepted until all guarantees, bonds, 20 certificates, licenses and affidavits required for Work or equipment as specified are 21 satisfactorily filed with the City. 22 B. Release of Liens or Claims 23 1. No application for final payment will be accepted until satisfactory evidence of 24 release of liens has been submitted to the City. 25 1.5 SUBMITTALS 26 A. Submit all required documentation to City's Project Representative. 27 28 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 29 30 1.7 CLOSEOUT SUBMITTALS [NOT USED] 31 PART 2 - PRODUCTS [NOT USED] 32 CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised March 22, 2021 01 77 19 -2 CLOSEOUT REQUIREMENTS Page 2 of 3 1 PART 3 - EXECUTION 2 3.1 INSTALLERS [NOT USED] 3 3.2 EXAMINATION [NOT USED] 4 3.3 PREPARATION [NOT USED] 5 3.4 CLOSEOUT PROCEDURE 6 A. Prior to requesting Final Inspection, submit: 7 1. Project Record Documents in accordance with Section 0178 39 8 2. Operation and Maintenance Data, if required, in accordance with Section 0178 23 9 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 10 01 74 23. 11 C. Final Inspection 12 1. After final cleaning, provide notice to the City Project Representative that the Work 13 is completed. 14 a. The City will make an initial Final Inspection with the Contractor present 15 b. Upon completion of this inspection, the City will notify the Contractor, in 16 writing within 10 business days, of any particulars in which this inspection 17 reveals that the Work is defective or incomplete. 18 2. Upon receiving written notice from the City, immediately undertake the Work 19 required to remedy deficiencies and complete the Work to the satisfaction of the 20 City. 21 3. The Right-of-way shall be cleared of all construction materials, barricades, and 22 temporary signage. 23 4. Upon completion of Work associated with the items listed in the City's written 24 notice, inform the City that the required Work has been completed. Upon receipt of 25 this notice, the City, in the presence of the Contractor, will make a subsequent Final 26 Inspection of the project. 27 5. Provide all special accessories required to place each item of equipment in full 28 operation. These special accessory items include, but are not limited to: 29 a. Specified spare parts 30 b. Adequate oil and grease as required for the first lubrication of the equipment 31 c. Initial fill up of all chemical tanks and fuel tanks 32 d. Light bulbs 33 e. Fuses 34 f. Vault keys 35 g. Handwheels 36 h. Other expendable items as required for initial start-up and operation of all 37 equipment 38 D. Notice of Project Completion 39 1. Once the City Project Representative finds the Work subsequent to Final Inspection 40 to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). 41 E. Supporting Documentation CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised March 22, 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 01 77 19 - 3 CLOSEOUT REQUIREMENTS Page 3 of 3 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) f. Contractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED 1 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 3/22/2021 M Owen 3.4 C. Addcd languagc to clarify and emphasize requirement to "Clearing ROW" CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 22, 2021 WATER AND SANITARY SEWER REPLACEMENT CPN.• 103413 017823-1 OPERATION AND MAINTENANCE DATA Page 1 of 5 SECTION 0178 23 OPERATION AND MAINTENANCE DATA PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Product data and related information appropriate for City's maintenance and operation of products furnished under Contract 2. Such products may include, but are not limited to: a. Traffic Controllers b. Irrigation Controllers (to be operated by the City) c. Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Schedule 1. Submit manuals in final form to the City within 30 calendar days of product shipment to the project site. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00 . All submittals shall be approved by the City prior to delivery. 1.6 INFORMATIONAL SUBMITTALS A. Submittal Form 1. Prepare data in form of an instructional manual for use by City personnel. 2. Format a. Size: 8 %2 inches x I I inches b. Paper 1) 40 pound minimum, white, for typed pages 2) Holes reinforced with plastic, cloth or metal c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.- 103413 Revised December 20, 2012 01 78 23 - 2 OPERATION AND MAINTENANCE DATA Page 2 of 5 d. Drawings 1) Provide reinforced punched binder tab, bind in with text 2) Reduce larger drawings and fold to size of text pages. e. Provide fly -leaf for each separate product, or each piece of operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. f. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subject matter covered in the manual 3. Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupings. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content 1. Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify each product byproduct name and other identifying symbols asset forth in Contract Documents. 2. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable information 3. Drawings a. Supplement product data with drawings as necessary to clearly illustrate: 1) Relations of component parts of equipment and systems 2) Control and flow diagrams b. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. c. Do not use Project Record Drawings as maintenance drawings. 4. Written text, as required to supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures. b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.- 103413 Revised December 20, 2012 01 78 23 - 3 OPERATION AND MAINTENANCE DATA Page 3 of 5 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel giving: 1) Proper procedures in event of failure 2) Instances which might affect validity of warranties or bonds C. Manual for Materials and Finishes 1. Submit 5 copies of complete manual in final form. 2. Content, for architectural products, applied materials and finishes: a. Manufacturer's data, giving full information on products 1) Catalog number, size, composition 2) Color and texture designations 3) Information required for reordering special manufactured products b. Instructions for care and maintenance 1) Manufacturer's recommendation for types of cleaning agents and methods 2) Cautions against cleaning agents and methods which are detrimental to product 3) Recommended schedule for cleaning and maintenance 3. Content, for moisture protection and weather exposure products: a. Manufacturer's data, giving full information on products 1) Applicable standards 2) Chemical composition 3) Details of installation b. Instructions for inspection, maintenance and repair D. Manual for Equipment and Systems 1. Submit 5 copies of complete manual in final form. 2. Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts 1) Function, normal operating characteristics and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Operating procedures 1) Start-up, break-in, routine and normal operating instructions 2) Regulation, control, stopping, shut -down and emergency instructions 3) Summer and winter operating instructions 4) Special operating instructions c. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Alignment, adjusting and checking d. Servicing and lubrication schedule 1) List of lubricants required e. Manufacturer's printed operating and maintenance instructions f. Description of sequence of operation by control manufacturer 1) Predicted life of parts subject to wear 2) Items recommended to be stocked as spare parts g. As installed control diagrams by controls manufacturer h. Each contractor's coordination drawings 1) As installed color coded piping diagrams CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.- 103413 Revised December 20, 2012 01 78 23 - 4 OPERATION AND MAINTENANCE DATA Page 4 of 5 i. Charts of valve tag numbers, with location and function of each valve j. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage k. Other data as required under pertinent Sections of Specifications 3. Content, for each electric and electronic system, as appropriate: a. Description of system and component parts 1) Function, normal operating characteristics, and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards 1) Electrical service 2) Controls 3) Communications c. As installed color coded wiring diagrams d. Operating procedures 1) Routine and normal operating instructions 2) Sequences required 3) Special operating instructions e. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking f. Manufacturer's printed operating and maintenance instructions g. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage h. Other data as required under pertinent Sections of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Provide operation and maintenance data by personnel with the following criteria: 1. Trained and experienced in maintenance and operation of described products 2. Skilled as technical writer to the extent required to communicate essential data 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.- 103413 Revised December 20, 2012 01 78 23 - 5 OPERATION AND MAINTENANCE DATA Page 5 of 5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME 8/31/2012 D. Johnson CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 SUMMARY OF CHANGE 1.5.A.1 — title of section removed WATER AND SANITARY SEWER REPLACEMENT CPN.- 103413 017839-1 PROJECT RECORD DOCUMENTS Page 1 of 4 SECTION 0178 39 PROJECT RECORD DOCUMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Work associated with the documenting the project and recording changes to project documents, including: a. Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to City's Project Representative. 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Accuracy of Records 1. Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. 2. Accuracy of records shall be such that future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.- 103413 Revised July 1, 2011 01 78 39 - 2 PROJECT RECORD DOCUMENTS Page 2 of 4 3. To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 4. Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modification of the Work to proceed without lengthy and expensive site measurement, investigation and examination. 1.10 STORAGE AND HANDLING A. Storage and Handling Requirements 1. Maintain the job set of Record Documents completely protected from deterioration and from loss and damage until completion of the Work and transfer of all recorded data to the final Project Record Documents. 2. In the event of loss of recorded data, use means necessary to again secure the data to the City's approval. a. In such case, provide replacements to the standards originally required by the Contract Documents. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED] 2.2 RECORD DOCUMENTS A. Job set 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no charge to the Contractor, 1 complete set of all Documents comprising the Contract. B. Final Record Documents 1. At a time nearing the completion of the Work and prior to Final Inspection, provide the City 1 complete set of all Final Record Drawings in the Contract. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set 1. Immediately upon receipt of the job set, identify each of the Documents with the title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.• 103413 Revised July 1, 2011 017839-3 PROJECT RECORD DOCUMENTS Page 3 of 4 2. Preservation a. Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. b. Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. c. Maintain the job set at the site of work. 3. Coordination with Construction Survey a. At a minimum, in accordance with the intervals set forth in Section 01 71 23, clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4. Making entries on Drawings a. Record any deviations from Contract Documents. b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c. Date all entries. d. Call attention to the entry by a "cloud" drawn around the area or areas affected. e. In the event of overlapping changes, use different colors for the overlapping changes. Conversion of schematic layouts a. In some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b. Show on the job set of Record Drawings, by dimension accurate to within 1 inch, the centerline of each run of items. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in ceiling plenum", "exposed", and the like). 3) Make all identification sufficiently descriptive that it may be related reliably to the Specifications. c. The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. B. Final Project Record Documents Transfer of data to Drawings a. Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. b. Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS WATER AND SANITARY SEWER REPLACEMENT Revised July 1, 2011 CPN.- 103413 01 78 39 - 4 PROJECT RECORD DOCUMENTS Page 4 of 4 c. Call attention to each entry by drawing a "cloud" around the area or areas affected. d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 SUMMARY OF CHANGE WATER AND SANITARY SEWER REPLACEMENT CPN: 103413 31 10 00 -1 SITE CLEARING Page 1 of 6 1 SECTION 31 10 00 2 SITE CLEARING 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Preparation of right-of-way and other designated areas for construction operations 7 by removing and disposing of all obstructions including clearing and grubbing and 8 trees, when removal of such obstructions is not specifically shown on the Drawings 9 to be paid by other Sections. 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include but are not necessarily limited to 13 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1— General Requirements 15 3. Section 02 41 13 — Selective Site Demolition 16 4. Section 02 41 14 — Utility Removal/Abandonment 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Site Clearing 20 a. Measurement 21 1) Measurement for this Item shallbe by lump sum, square yard, or per acre. 22 b. Payment 23 1) The work performed and the materials furnished in accordance with this 24 Item shall be paid for at the lump sum, square yard, or per acre price bid for 25 "Site Clearing". 26 c. The price bid shall include: 27 1) Pruning of designated trees and shrubs 28 2) Removal and disposal of structures and obstructions (unless separate bid 29 item is provided under 02 41 13 "Selective Site Demolition or 02 41 14 30 "Utility Removal/Abandonment"). 31 3) Removal and disposal of trees under 6-inch in diameter when bidding by 32 lump sum or square yard 33 4) Removal of ALL trees when bidding by acre. 34 5) Backfilling of holes 35 6) Clean-up 36 2. Tree Removal (for trees 6-inch or larger in diameter when Site Clearing is bid by 37 lump sum or square yard) 38 a. Measurement 39 1) Measurement for this Item shall be per each. 40 2) Measurement of diameter for tree removal shall be at standard "Diameter at 41 Breast Height" or DBH, where Breast Height shall be 54" above grade. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS WATER AND SANITARY SEWER REPLACEMENT Revised March 22, 2021 CPN.• 103413 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 31 10 00 -2 SITE CLEARING Page 2 of 6 3) b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the unit price bid per each "Tree Removal' for: a) Various diameter ranges c. The price bid shall include: 1) Removal and disposal of tree, including removal of root to a depth at least 2 foot below grade 2) Grading and backfilling of holes 3) Excavation 4) Clean-up 3. Tree Removal and Transplantation a. Measurement 1) Measurement for this Item shallbe per each. b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the unit price bid per each "Tree Transplant" for: a) Various diameter ranges c. The price bid shall include: 1) Pruning of designated trees and shrubs 2) Moving tree with truck mounted tree spade 3) Grading and backfilling of holes 4) Replanting tree at temporary location (determined by Contractor) 5) Maintaining tree until Work is completed 6) Replanting tree into original or designated location 7) Excavation 8) Fertilization 9) Mulching 10) Watering 11) Clean-up 12) Warranty period 4. Tree Protection a. Measurement 1) Measurement for this Item shallbe per each as designated on Construction Drawings for protection b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the unit price bid per each "Tree Protection" for: a) Various caliper ranges c. The price bid shall include: 1) Protection of tree utilizing measures designated on Construction Drawings 2) Installation of work of barriers as designated on Construction Drawings 3) Maintenance of protection measures throughout construction completed 4) Replanting tree into original or designated location 5) Excavation 6) Fertilization 7) Mulching 8) Clean-up including removal on constriction completion of protection measures CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.- 103413 Revised March 22, 2021 31 10 00 - 3 SITE CLEARING Page 3 of 6 1 5. 2 1.3 REFERENCES [NOT USED] 3 1.4 ADMINSTRATIVE REQUIREMENTS 4 A. Permits 5 1. Contractor shall obtain Tree Removal Permits and Urban Forestry Permits as 6 required by the City's Tree Ordinance. PARD-Forestry details can be found here: 7 Forestry — Welcome to the Citv of Fort Worth (fortworthtexas.Rov). Urban Forestry 8 Compliance's ordinance and requirements are within Zoning and can be found here: 9 Zoniniz — Welcome to the City of Fort Worth (fortworthtexas.gov). 10 B. Preinstallation Meetings 11 1. Hold a preliminary site clearing meeting and include the Contractor, City Forester 12 (if City owned tree) or representative of Urban Forestry if privately owned trees), 13 City Inspector, and the Project Manager for the purpose of reviewing the 14 Contractor's tree removal plan. Clearly mark all trees to remain on the project site 15 prior to the meeting. 16 2. The Contractor will provide the City with a Disposal Letter in accordance to 17 Division 01. 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 24 1.11 FIELD CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 PART 2 - PRODUCTS [NOT USED] 27 PART 3 - EXECUTION 28 3.1 INSTALLERS [NOT USED] 29 3.2 EXAMINATION [NOT USED] 30 3.3 PREPARATION 31 A. All trees identified to be protected and/or preserved should be clearly flagged with 32 survey tape as per Construction Drawings. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS WATER AND SANITARY SEWER REPLACEMENT Revised March 22, 2021 CPN.• 103413 31 10 00 -4 SITE CLEARING Page 4 of 6 1 B. Following taping and prior to any removals or site clearing, the Contractor shall meet 2 with the City, the Engineer and the Landowner, if necessary, to confirm trees to be 3 saved. 4 3.4 INSTALLATION 5 A. Protection of Trees 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 1. Protect designated trees and prune trees and shrubs as shown on the Drawings. Refer to the Drawings for tree protection details. 2. If the Drawings do not provide tree protection details, protected trees shall be fenced by placing 6-foot tall metal T-posts in a square around the tree trunk with the corners located on the canopy drip line, unless instructed otherwise. 3. When site conditions do not allow for the T-posts to be installed at the drip line, the T-posts maybe installed no less than 8 feet from the tree trunk. 4-foothigh 12'/2 gauge stock fencing or orange plastic snow fence shall be attached to the T-posts to form the enclosure. 4. For city -owned trees, PARD-Forestry permission required to install protective fencing inside of canopy dripline (Critical Root Zone). 5. Additional trunk protection (cladding) is required when protective fencing is approved within the Critical Root Zone. 6. Do not park equipment, service equipment, store materials, or disturb the root area under the branches of trees designated for preservation. 7. When shown on the Drawings, treat cuts on trees with an approved tree wound dressing within 30 minutes of making a pruning cut or otherwise causing damage to the tree. 8. Trees and brush shall be mulched on -site. a. Burning as a method of disposal is not allowed. B. Hazardous Materials 1. The Contractor will notify the Engineer immediately if any hazardous or questionable materials not shown on the Drawings are encountered. This includes; but not limited to: a. Floor tiles b. Roof tiles c. Shingles d. Siding e. Utility piping 2. The testing, removal, and disposal of hazardous materials will be in accordance with Division 1. C. Site Clearing 1. Clear areas shown on the Drawings of all obstructions, except those landscape features that are to be preserved. Such obstructions include, but are not limited to: a. Remains of buildings and other structures b. Foundations c. Floor slabs d. Concrete e. Brick f. Lumber CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised March 22, 2021 31 10 00 - 5 SITE CLEARING Page 5 of 6 1 g. Plaster 2 h. Septic tank drain fields 3 i. Abandoned utility pipes or conduits 4 j. Equipment 5 k. Trees 6 1. Fences 7 in. Retaining walls 8 n. Other items as specified on the Drawings 9 2. Remove vegetation and other landscape features not designated for preservation, 10 whether above or below ground, including, but not limited to: 11 a. Curb and gutter 12 b. Driveways 13 c. Paved parking areas 14 d. Miscellaneous stone 15 e. Sidewalks 16 f. Drainage structures 17 g. Manholes 18 h. Inlets 19 i. Abandoned railroad tracks 20 j. Scrap iron 21 k. Other debris 22 3. Remove culverts, storm sewers, manholes, and inlets in proper sequence to 23 maintain traffic and drainage in accordance with Section 02 41 14. 24 4. In areas receiving embankment, remove obstructions not designated for 25 preservation to 2 feet below natural ground. 26 5. In areas to be excavated, remove obstructions to 2 feet below the excavation level. 27 6. In all other areas, remove obstructions to 1 foot below natural ground. 28 7. When allowed by the Drawings or directed by the Engineer, cut trees and stumps 29 off to ground level. 30 a. Removal of existing structures shall be as per Section 02 41 13. 31 D. Disposal 32 1. Dispose of all trees within 24 hours of removal at an approved off -site facility. 33 2. All materials and debris removed becomes the property of the Contractor, unless 34 otherwise stated on the Drawings. 35 3. The Contractor will dispose of material and debris off -site in accordance with local, 36 state, and federal laws and regulations. 37 3.5 REPAIR [NOT USED] 38 3.6 REINSTALLATION [NOT USED] 39 3.7 FIELD QUALITY CONTROL [NOT USED] 40 3.8 SYSTEM STARTUP [NOT USED] 41 3.9 ADJUSTING [NOT USED] 42 3.10 CLEANING [NOT USED] 43 3.11 CLOSEOUT ACTIVITIES [NOT USED] CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.- 103413 Revised March 22, 2021 1 3.12 PROTECTION [NOT USED] 2 3.13 MAINTENANCE [NOT USED] 3 3.14 ATTACHMENTS [NOT USED] 4 5 6 31 10 00 - 6 SITE CLEARING Page 6 of 6 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1 A.A Permits: Removed ordinance number and added City's website address 3/22/2021 M Owen 1.2 Clarified measurement and payment. 1.4. Clarified administrative requirements. 3.4 Clarified additional installation requirements for tree protection and disposal. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 22, 2021 CPN. 103413 330310-1 BYPASS PUMPING OF EXISTING SEWER SYSTEMS Page 1 of 5 SECTION 33 03 10 BYPASS PUMPING OF EXISTING SEWER SYSTEMS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Bypass pumping of the existing sewer system, required on 18-inch and larger sewer lines unless otherwise specified in the Contract Documents B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Measurement a. Measurement for this Item will be by lump sum. 2. Payment a. The work performed and materials furnished in accordance with this Item will be paid for at the lump sum price bid for "Bypass Pumping". 3. The price bid shall include: a. Mobilization b. Development of bypass plans c. Transportation and storage d. Setup e. Confined space entry f. Plugging g. Pumping h. Clean up i. Manhole restoration j. Surface restoration 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Occupational Safety and Health Organization (OSHA). 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN.- 103413 Revised December 20, 2012 3303 10 - 2 BYPASS PUMPING OF EXISTING SEWER SYSTEMS Page 2 of 5 1. Schedule meeting with City to review sewer shutdown prior to replacing or rehabilitating any facilities. 2. City reserves the right to delay schedule due to weather conditions, or other unexpected emergency within the sewer system. 3. Review bypass pumping arrangement or layout in the field with City prior to beginning operations. Facilitate preliminary bypass pumping run with City staff present to affirm the operation is satisfactory to the City. 4. After replacement or rehabilitation of facilities, coordinate the reestablishment of sewer flow with City staff. 5. Provide onsite continuous monitoring during all bypass pumping operations using one of the following methods: a. Personnel on site b. Portable SCADA equipment 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 0133 00. B. All submittals shall be approved by the City prior to delivery. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS A. For 18-inch and larger sewer lines, submit a detailed plan and description outlining all provisions and precautions that will be taken with regard to the handling of sewer flows. Submit the plan to the City for approval a minimum of 7 days prior to commencing work. Include the following details: 1. Schedule for installation and maintenance of the bypass pumping system 2. Staging areas for pumps 3. Pump sizes, capacity, number of each size, and power requirements 4. Calculations for static lift, friction losses, and velocity 5. Pump curves showing operating range and system head curves 6. Sewer plugging methods 7. Size, length, material, joint type, and method for installation of suction and discharge piping 8. Method of noise control for each pump and/or generator, if required 9. Standby power generator size and location 10. Suction and discharge piping plan 11. Emergency action plan identifying the measures taken in the event of a pump failure or sewer spill 12. Staffing plan for responding to alarm conditions identifying multiple contacts by name and phone numbers (office, mobile) 13. A contingency plan to implement in the event the replacement or rehabilitation has unexpected delays or problems CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS WATER AND SANITARY SEWER REPLACEMENT Revised December 20, 2012 CPN.• 103413 3303 10 - 3 BYPASS PUMPING OF EXISTING SEWER SYSTEMS Page 3 of 5 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED] 2.2 EQUIPMENT A. Pumping 1. Provide equipment that will convey 100 percent of wet weather peak flow conditions. 2. Provide fully automatic self -priming pumps. Foot -valves or vacuum pumps are not permitted for priming the system. 3. Pumps must be constructed to allow dry running for periods of time to account for the cyclical nature of sewer flow. 4. Provide 1 stand-by pump for each size to be maintained on site. Place backup pumps on line, isolated from the primary system by valve. 5. If multiple pumps are required to meet the flow requirements, provide the necessary fittings and connections to incorporate multiple discharges. 6. Noise levels of the pumping system must follow the requirements of the City noise ordinance for gas wells. B. Piping 1. Install pipes with joints which prevent the incident of flow spillage. C. Plugs or Stop Logs 1. Plugs a. Select a plug that is made for the size and potential pressure head that will be experienced. b. Provide an additional anchor, support or bracing to secure plug when back pressure is present. c. Use accurately calibrated air pressure gauges for monitoring the inflation pressure. d. Place inflation gauge at location outside of confined space area. Keep the inflation gauge and valve a safe distance from the plugs. e. Never over inflate the plug beyond its pressure rating. 2. Stop Logs a. Use stop log devices designed for the manhole or sewer vault structure in use. b. If applicable, obtain stop logs from City that may be used on specific structures. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised December 20, 2012 3303 10 - 4 BYPASS PUMPING OF EXISTING SEWER SYSTEMS Page 4 of 5 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION A. Locate the bypass pipelines in area to minimize disturbance to existing utilities and obtain approval of those locations from the City. B. Make preparations to comply with OSHA requirements when working in the presence of sewer gases, oxygen -deficient atmospheres and confined spaces. C. Do not begin bypass preparation and operation until City approval of the submittals requested per this Specification. 3.4 INSTALLATION A. Install and operate pumping and piping equipment in accordance to the submittals provided per this Specification. B. Sewer flow stoppage 1. Plugging a. Use confined space procedures and equipment during installation when necessary. b. Thoroughly clean the pipe before insertion of the plug. c. Insert the plug seal surface completely so it is fully supported by the pipe. d. Position the plug where there are not sharp edges or protrusions that may damage the plug. e. Use pressure gauges for measuring inflation pressures. f. Minimize upstream pressure head before deflating and removing. C. Sewer flow control and monitoring 1. Take sufficient precautions to ensure sewer flow operations do not cause flooding or damage to public or private property. The Contractor is responsible for any damage resulting from bypass pumping operations. 2. Begin continual monitoring of the sewer system as soon as the sewer is plugged or blocked. Be prepared to immediately start bypass pumping if needed due to surcharge conditions. 3. Sewer discharge may be into another sewer manhole or appropriate vehicle or container only. Do not discharge sewer into an open environment such as an open channel or earthen holding facility. 4. Do not construct bypass facilities where vehicular traffic may travel over the piping. a. Provide details in the suction and discharge piping plan that accommodate both the bypass facilities and traffic without disrupting either service. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS WATER AND SANITARY SEWER REPLACEMENT Revised December 20, 2012 CPN. 103413 3303 10 - 5 BYPASS PUMPING OF EXISTING SEWER SYSTEMS Page 5 of 5 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Field [OR] Site Tests and Inspections 1. Perform leakage and pressure tests of the bypass pumping pipe and equipment before actual operation begins. Have City staff on site during tests. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES A. Once plugging or blocking is no longer necessary, remove in such a way that permits the sewer flow to slowly return to normal — preventing surge, surcharging and major downstream disturbance. 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.6 — Clarified submittals required for 18" and larger lines CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS WATER AND SANITARY SEWER REPLACEMENT Revised December 20, 2012 CPN: 103413 SECTION 33 04 30 TEMPORARY WATER SERVICES PART1- GENERAL 1.1 SUMMARY A. Section Includes: 330430-1 TEMPORARY WATER SERVICES Page 1 of 4 1. Temporary Water Service needed to maintain service during water main replacement project B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Products Installed But Not Furnished Under This Section 1. Fire Hydrant Meters D. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 — General Requirements 3. Specification 32 12 16 — Asphalt Paving 4. Specification 33 05 10 — Utility Trench Excavation, Embedment and Backfill 5. Specification 33 04 40 — Cleaning and Acceptance Testing of Water Mains 6. Specification 33 12 10 — Water Services 1-inch to 2-inch 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Measurement a. Measurement for Temporary Water Services will be measured by: 1) Lump sum or 2) Per linear foot of Temporary Water Main for Miscellaneous Projects only 2. Payment a. The work performed and materials furnished in accordance with this Item and measured under "Measurement" will be paid for at the unit price bid for "Temporary Water Service" of the type specified. 3. The price bid shall include: a. Temporary water service line b. Connections c. Fittings d. Valves e. Corporation stops f. Temporary asphalt for crossings g. Traffic Control h. Disinfection i. Removal of temporary services CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS WATER AND SANITARYSEWER REPLACEMENT Revised July 1, 2011 CPN. 103413 330430-2 TEMPORARY WATER SERVICES Page 2 of 4 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. NSF International a. 61, Drinking Water System Components — Health Effects 3. ASTM International (ASTM): a. D3035, Standard Specification for Polyethylene (PE) Plastic Pipe (DR -PR) Based on Controlled Outside Diameter 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Provide advance notice for service interruption and meet requirements of Division 1. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER -FURNISHED PRODUCTS A. Fire Hydrant Meters 2.2 EQUIPMENT, PRODUCT TYPE, AND MATERIALS A. Description 1. Regulatory Requirements a. All Temporary Water Service components in contact with potable water shall conform to the requirements of NSF 61. B. Materials 1. Service Couplings, Fittings, and Corporation Stops a. Conform to Section 33 12 10. 2. Service lines a. Polyethylene tubing b. Conform to ASTM D3035 and SDR 11 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS WATER AND SANITARY SEWER REPLACEMENT Revised July 1, 2011 CPN.• 103413 330430-3 TEMPORARY WATER SERVICES Page 3 of 4 3. Temporary Water Service Main a. Galvanized steel pipe b. Conform to Schedule 40. 4. Driveway Approach a. Asphalt 1) Type B Asphalt in accordance with Section 32 12 16 C. Design Criteria 1. Service lines a. 3/4-inch minimum pipe size b. Minimum flow rate of 5 GPM at a dynamic pressure of 35 psi 2. Temporary Water Service Main a. 2-inch minimum pipe size 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. General 1. Install Temporary Water Services in accordance with provisions herein and in accordance with City Standard Details. 2. Perform disinfection test of temporary water service main and water services in accordance with Section 33 04 40. B. Temporary Water Service Installation 1. Connect to existing water supply a. Fire hydrant 1) Connect to fire hydrant with hydrant meter and 2-inch gate valve. b. If a fire hydrant is not available, tap existing water main. 1) Connect to water main with 2-inch service tap and a corporation stop in accordance with Section 33 12 10. 2) Record water usage with a hydrant meter. 3) Do not tap existing water main, unless approved by the City. 2. Water service a. Connect %-inch water service to 2-inch temporary water service main. b. Remove existing meters, tag with address and provide to City Inspector. c. Connect %-inch temporary water service to existing private service. d. Cover domestic meter box with protective guard or barricade. C. Intersection and Driveway Approach Crossing for Temporary Water Service 1. Crossing for Temporary Water Service Main CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS WATER AND SANITARY SEWER REPLACEMENT Revised July 1, 2011 CPN. 103413 330430-4 TEMPORARY WATER SERVICES Page 4 of 4 a. Cover temporary service line with sufficient asphalt to protect service line and to provide a driveable crossing. b. If required to bury temporary service line due to high volume traffic, or other reasons required by the City, excavate, embed and backfill in accordance with Section 33 05 10. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Field Tests and Inspections 1. Check each water service installation for leaks with full flow through the curb stop at the time the main is tested in accordance with Section 33 04 40. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS WATER AND SANITARY SEWER REPLACEMENT Revised July 1, 2011 CPN.• 103413 APPENDIX GC-4.01 Availability of Lands GC-4.02 Subsurface and Physical Conditions GC-4.04 Underground Facilities GC-4.06 Hazardous Environmental Condition at Site GC-6.06.1) Minority and Women Owned Business Enterprise Compliance GC-6.07 Wage Rates GC-6.09 Permits and Utilities GC-6.24 Nondiscrimination GR-01 60 00 Product Requirements CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN. 103413 Revised July 1, 2011 GC-4.01 Availability of Lands THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised July 1, 2011 D223098470 06/06/2023 12:57 PM Page: 1 of 6 Fee: $39.00 Submitter: City of Fort Worth, TX Electronically Recorded by Tarrant County Clerk in Official Public Records MARY LOUISE NICHOLSON COUNTY CLERK NOTICE OF CONFIDENTIALITY RIGHTS: IF YOU AREA NATURAL PERSON, YOU MAY REMOVE OR STRIKE ANY OR ALL OF THE FOLLOWING INFORMATION FROM THIS INSTRUMENT BEFORE IT IS FILED FOR RECORD IN THE PUBLIC RECORDS: YOUR SOCIAL SECURITY NUMBER OR YOUR DRIVER'S LICENSE NUMBER. CPN 103413 W&SS REPL Contract 2020 WSM-M Parcel No. 1 SSE 852 E Davis Ave HYDE PARK ADDITION Block 14 Lot 398A1 & 398A2 STATE OF TEXAS § COUNTY OF TARRANT § KNOW ALL MEN BY THESE PRESENTS CITY OF FORT WORTH SANITARY SEWER EASEMENT DATE: Mao_ ao_ Z3, ZoZ3 GRANTOR: Holiday Market Inc GRANTOR'S MAILING ADDRESS (including County): 4225 Lake Stone Trl Fort Worth, Tarrant County, TX 76123 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): 200 TEXAS STREET FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged. EASEMENT PROPERTY: BEING a tract of land more particularly described in the attached Exhibit A and Exhibit B. Grantor, for the Consideration paid to Grantor, hereby grants, sells, and conveys to Grantee, its successors and assigns, an exclusive, perpetual easement for the construction, operation, maintenance, replacement, upgrade, inspection and repair of a permanent Sewer Line Facility, hereafter referred to as "Facility." The Facility includes all incidental underground and aboveground attachments, equipment and appurtenances, including, but not limited to manholes, manhole vents, lateral line connections, pipelines, and junction boxes in, upon, SEWER FACILITY EASEMENT FORT ORTH. Rev. 20230329 i D223098470 Page 2 of 6 under and across a portion of the Easement Property, more fully described in Exhibit A and Exhibit B attached hereto and incorporated herein for all pertinent purposes, together with the right and privilege at any and all times to enter Easement Property, or any part thereof, for the purpose of constructing, operating, maintaining, replacing, upgrading, inspecting and repairing said Facility. In no event shall Grantor (1) use the Easement Property in any manner which interferes in any material way or is inconsistent with the rights granted hereunder, or (11) erect or permit to be erected within the Easement Property a permanent structure or building, including, but not limited to, monument sign, pole sign, billboard, retaining walls, brick or masonry fences or walls or other structures that require a building permit. However, Grantor shall be permitted to install and maintain a concrete, asphalt or gravel driveway, road or parking lot across the Easement Property but only to the extent that such surface improvements do not materially interfere with the rights granted hereunder. Grantee shall be obligated to restore the surface of the Easement Property at Grantee's sole cost and expense, including the restoration of any sidewalks, driveways, or similar surface improvements located upon or adjacent to the Easement Tract which may have been removed, relocated, altered, damaged, or destroyed as a result of the Grantee's use of the easement granted hereunder. Provided, however, that Grantee shall not be obligated to restore or replace irrigation systems or other improvements installed in violation of the provisions and intended use of this Easement. Under Chapter 21, Subchapter E of the Texas Property Code, as amended, the Grantor or the Grantor's heirs, successors, or assigns may be entitled before the 10th anniversary of the date of this acquisition to repurchase or request certain information about the use and any actual progress made toward the use for which this property interest was acquired through eminent domain, and the repurchase price will be the price the Grantee pays Grantor in this acquisition. The person signing this document on behalf of the Grantor warrants that he or she has the legal authority to execute this permanent easement for the purposes and consideration therein expressed, and in the capacity therein stated, and that such binding authority has been granted by proper order, resolution, ordinance or other authorization of the Grantor. Grantee is fully entitled to rely on this warranty and representation in accepting this permanent easement. TO HAVE AND TO HOLD the above -described permanent easement, together with, all and singular, the rights and appurtenances thereto in anyway belonging unto Grantee, its successors and assigns, forever; and Grantor does hereby bind itself, its heirs, successors and assigns, to warrant and forever defend, all and singular, the said easement unto Grantee, its successors and assigns, against every person whomsoever lawfully claiming or to claim the same or any part thereof. This document may be executed in multiple counterparts, each of which will be deemed an original, but which together will constitute one instrument. When the context requires, singular nouns and pronouns include the plural. [SIGNATURES APPEAR ON THE FOLLOWING PAGE] SEWER FACILITY EASEMENT Rev. 20230329 FOR D223098470 Page 3 of 6 GRANTOR: Holiday Market Inc., a Texas For -Profit Corporation By: i Abdul Ghayas Wafayee, President ACKNOWLEDGMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared Abdul Ghavas Wafavee, President of Holidav Market, Inc., known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of Holidav Market, Inc. and that they executed the same as the act of said Holdav Market. Inc. for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this date of JFW [SEAL] AUSTIN LEE STREET a4 '� Notary Pubk - State of Texas * Tarrant County Notary ID 0134262204 Commiselon Exp. MARCH 21, 9021 SEWER FACILITY EASEMENT Rev. 20230329 Notary Public, State of Texas Eo_ w- D223098470 Page 4 of 6 ACCEPTED BY: GRANTEE: City of Fort Worth Dana uarghdoff By: Dana Burghdoff (Ma 5, 202315:27 CDT) (Name) Dana Burghdoff (Title) Assistant City Manager APPROVED AS TO FORM AND LEGALITY By: (Name) Matt Murray (Title) Assistant City Attorney ACKNOWLEDGMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared Dana Burghdoff Assistant City Manager of the City of Fort Worth, a Texas home rule municipal corporation, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of the City of Fort Worth and that they executed the same as the act of the City of Fort Worth for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this date of May 25, 2023 [SEAL] r NIELS BROWN 2 L� Notary Public *®+► STATE OF TEXAS Notary I.D. 13180512-6 op My Comm. Exp. Nov. 26, 2026 SEWER FACILITY EASEMENT Rev. 20230328 Notary Public, State of Texas FOR�ORTH. D223098470 Page 5 of 6 EXHIBIT "A" SANITARY SEWER EASEMENT HYDE PARK ADDITION J.B. MCDERMONT SURVEY, ABSTRACT NO. 1064 CITY OF FORT WORTH, TARRANT COUNTY, TEXAS BEING a 1,800 square foot (0.041 acre) tract of land out of the J.B. McDermont Survey, Abstract No. 1064, Tarrant County, Texas, and being out of Lot 398, Block 14 of Hyde Park Addition, an addition to the City of Fort Worth, Tarrant County, Texas, according to the plat recorded in Volume 63, Page 9 of the Plat Records of Tarrant County, Texas (P.R.T.C.T.), and also being out of a tract of land conveyed to Holiday Market, Inc. by Special Warranty Deed recorded in Instrument Number D215252103 of the Official Public Records of Tarrant County, Texas (O.P.R.T.C.T.) and being more particularly described by metes and bounds as follows: BEGINNING at a'/z-inch iron rod set with a yellow plastic cap stamped "LIM ASSOC" at the northwesterly corner of said Lot 398, said point also being the northeasterly corner of Lot 397, of said Block 14 and said point also being in the southerly right-of-way line of East Davis Avenue (a 60-foot right-of-way); THENCE South 76°36'50" East, along the northerly line of said Lot 398 and the southerly right-of-way line of said East Davis Avenue, a distance of 15.00 feet to a'/2-inch iron rod set with yellow plastic cap stamped "LIM ASSOC" for corner; THENCE South 13°38'35" West, over and across said Lot 398, a distance of 120.00 feet to a'/2-inch iron rod set with yellow plastic cap stamped "LIM ASSOC" for corner, said point being in the southerly line of said Lot 398 and said point also being in the northerly line of a 13-foot wide Alley; THENCE North 76°36'50" West, along the southerly line of said Lot 398 and the northerly line of said 13-foot Alley, a distance of 15.00 feet to a'/2-inch iron rod set with yellow plastic cap stamped "LIM ASSOC" at the southwesterly corner of said Lot 398, said point also being the southeasterly corner of said Lot 397; THENCE North 13°38'35" East, along the common line of said Lots 397 and 398, a distance of 120.00 feet to the POINT OF BEGINNING and containing 1,800 square feet or 0.041 acres of land, more or less. BASIS OF BEARING: Bearings are based on the Texas State Plane Coordinate System, North Central Zone (4202), North American Datum of 1983. NOTE: All distances are surface projection, using a scale factor of 1.00012. Feb. 10, 2023 D223098470 Page 6 of 6 1" IRF_ EXHIBIT "B" (CM) N 76e36,5p„ W LOT 395 �y �O 1S0.00� 0 4PP.O.B. OfG 97LOT 396 HYDE PARK ADDITION VOL. 63, PG. 9 P.R.T.C.T. 0 0 10, 20' SANITARY SEWER EASEMENT W SCALE: 1"-20' 1,800 SQUARE FEET , (0.041 ACRE) AI / e ' 2 BLOCK 14 IR LOT374 , _ N 76' 36' 50" W LOT 373 BLOCK 14 LOT 372 HYDE PARK ADDITION LOT 3 VOL. 63, PG. 9 P.R.T.C.T. LEWD: P.O.B. - POINT OF BEGINNING CM - CONTROLLING MONUMENT 0 IRS - 1/2-INCH IRON ROD SET WITH YELLOW PLASTIC CAP STAMPED "LIM ASSOC" O CIRF - CAPPED IRON ROD FOUND OIRF - IRON ROD FOUND VOL. - VOLUME PG. - PAGE R.O.W.- RIGHT-OF-WAY P.R.T.C.T. - PLAT RECORDS, TARRANT COUNTY,TEXAS O.P.R.T.C.T.- OFFICIAL PUBLIC RECORDS, TARRANT COUNTY,TEXAS en ASSOCIATES, inc. engineering d: surveying consultants Ll M T21M.9 SurveyingF7rm Reg.101236.00 1112 N. Zang Boulevard, Suile 200 Dallas, Texas 75203 Tel. (214) 942-iaw Fax (214) 942-9551 0 0 E4SToq GIs (60W/pTh,R 0. �EN(/F T i S 76.36'50" E 15.00' LOCK 14T 398A2 _ HOLIDAY MARKET INC INST. NO. D215252103 O.P.R.T.C.T. 3 M M LOT 398A1c HOLIDAY MARKET INC H INST. NO. D215252103 � O.P.R.T.C.T. j /OLAJLAT INST.WISSAMN A. 16102160`(JINST. N0. D216102160O.P.R.T.C.T. ' ' ` LOT 398B 1121, S03' CIRF _ I 155g=,� I LOT 2 1 l P.M. WATERS SUBDIVISION (REV OF HYDE PARK 1/2" CIRF LOTS 370 & 371, BLOCK 14) VOL. 902, PG. 335 P.R.T.C.T. Feb. 10, 2023 PAGE 2 OF 2 NOTEt Q U BASIS OF BEARING is the State Plane Coordinate System, Texas North Central Zone 4202, North American Datum of 1983. SANITARY SEWER EASEMENT 1800 SQUARE FEET (0.041 ACRE) IN LOT 398, BLOCK 14 CITY OF DALLAS. DALLAS COUNTY, TEXAS LIM JOB GRESM4M-SMI"U SSE -I GC-4.02 Subsurface and Physical Conditions THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACE.LIENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised July 1, 2011 GC-4.04 Underground Facilities THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised July 1, 2011 GC-4.06 Hazardous Environmental Condition at Site THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACE.LIENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised July 1, 2011 GC-6.06.1) Minority and Women Owned Business Enterprise Compliance THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACE.LIENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised July 1, 2011 FOR-" REQUEST FOR BUSINESS EQUITY GOAL DEPARTMENT OF DIVERSITY AND INCLUSION -BUSINESS EQUITY DIVISION (DVIN-BE) Check type of contract: Construction CMAR Design/Build ITB C/SIP Professional (A&E) Professional (RFQ/RFP) CFA Dept./Div. Name: First Advertise Date: IS THIS CONTRACT ASSOCIATED WITH TRV? Yes Dollar value of TRV contract portion $ No Bid Date : Date Sent to DVIN-BE: IS THIS A FEDERALLY FUNDED CONTRACT? Yes No IS THIS A CIP CONTRACT? Yes No Grant Fiscal Year If yes, what year THIS A BOND FUNDED CONTRACT? Yes No Construction: IS THIS A LUMP SUM CONTRACT? Yes No Professional: IS THIS A FIXED FEE NOT -TO -EXCEED CONTRACT? Yes No IS THIS A HOURLY NOT -TO -EXCEED CONTRACT? Yes No IS THIS A COMBINED PROJECT? Yes No Is this a Job/Task Order Contract? Yes No IS THIS A REVISION? Yes No If yes, enter the revision number IS THIS A CHANGE ORDER? Yes ❑ No ❑ Enter # ❑ Contractor: IS THIS AN AMENDMENT? Yes No Enter # ❑ Design Firm: If this is not the initial change order/amendment, submit copies of all previous change order/amendments regardless of whether a M&C was required for funding. BID/PROJECT NAME (Description Including Street Names: Check applicable boxes: Concrete Paving Asphalt Paving Drainage Water Sewer Other Alternates Capital/Bid Project# Other Project# TOTAL CONTRACT ESTIMATE: $ (Please ATTACH individual sub -totals for contracts with multiple units/sections including contingency. If the documentation is not clear and concise, it will be returned to the department.) Buyer/Project Manager (PRINTED) EXT. Point of Contact of Other than Buyer/PM: Buyer/Project Manager (SIGNATURE) DATE: EXT. Check here to acknowledge that if pay item quantities are added to the proposal section after an Business Equity goal has been provided by DVIN-Business Equity Division, revised proposal must be submitted to DVIN -Business Equity Division for review. A compliance review will not be performed if additional pay items or quantities, which will potentially impact the Business Equity goal, are added to the proposal section after the issuance of the goal. THIS PORTION TO BE COMPLETED BY BUSINESS EQUITY DIVISION BUSINESS EQUITY M/wBE Goal DBE Goal MBE or SBE Goal (Project under previous GOAL: U BDE Ordinance) �0 % % Comments: DVIN-BE Staff: EXT: DATE: Business Equity Division Effective 01-01-2021 Email: DVIN BEOffice(Z�fortworthtexas.gov City of Fort Worth ATTACHMENT 1A FORT WORTH Business Equity Utilization Form Page 1 of Disadvantaqed Business Enterprise Utilization Form (Applicable if Federally -Funded) PRIME/OFFEROR/OWNER COMPANY NAME: PROJECT NAME: PROJECT NUMBER: BID DATE: City's Business Equity Goal: Offeror's Business Equity (or DBE) (Check if addressing DBE Goal) % Commitment: % Check all applicable boxes to describe Not Certified MBE WBE DBE HUB VOSB Section 3 Prime/Offeror/Owner's Classification: Certifying Agency: NCTRCA D/FW MSDC TX DOT WBCS Other: Ethnicity: African American Hispanic Caucasian Asian Native American Gender: Male Female Non -Binary Definitions: Business Equity Firm: Certified MBE Minority Business Enterprise or WBE Women Business Enterprise DBE: Disadvantaged Business Enterprise HUB: Historically Under Utilized Business VOSB: Veteran Owned Small Business Section 3: Certified Housing Urban Development Vendors ALL BUSINESS EQUITY FIRMS MUST BE CERTIFIED BEFORE CONTRACT AWARD Failure to complete this form, in its entirety, and received by the Purchasing Division no later than 2:00 p.m. on the third City business day after bid opening, exclusive of bid opening date, will result in the bid being considered non -responsive to bid specifications. Exception: CFA, ICA, and CDBG proiects, documents will be submitted to the Citv Project Manager if up blicly bid or to the Developer if privately bid. The undersigned Prime/Offeror agrees to enter into a formal agreement with the Business Equity firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth (Exception: Developer proiects). The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non -responsive to bid specifications. Business Equity firms listed toward meeting the project goal must be located in the City's marketplace at the time of bid or the business has a Significant Business Presence in the Marketplace. The marketplace is the Citv of Fort Worth including portions of Denton. Parker. Wise. and all of Tarrant. Dallas. and Johnson counties. Certified means those Business Equity Firms, located within the Marketplace, that have been determined to be a bona -fide minority or women business enterprise by the North Central Texas Regional Certification Agency (NCTRCA), Dallas/Fort Worth Minority Supplier Development Council (D/FW MSDC) and Women's Business Council -Southwest (WBCS). If hauling services are utilized, the Prime/Offeror will be given credit as long as the Business Equity firm listed owns and operates at least one fully licensed and operational truck to be used on the contract. The Business Equity firms may lease trucks from another Business Equity firm, including Business Equity owner -operated, and receive full Business Equity credit. The Business Equity firm may lease trucks from non -Business Equity firms, including owner -operated, but will only receive credit for the fees and commissions earned by the Business Equity as outlined in the lease agreement. Federally -funded Projects (ONLY), Counting DBE Participation: If materials or supplies are obtained from a DBE manufacturer, count 100 percent of the cost of the materials or supplies towards the goal. If the materials or supplies are purchased from a DBE regular dealer, count 60 percent of the cost of the materials and supplies toward the DBE goal. When materials or supplies are purchased from a DBE neither a manufacturer nor a regular dealer, count the entire amount of fees or commissions charged for assistance in the procurement of the materials and supplies or fees or transportation charges for the delivery of the materials or supplies delivered to the job site. In all cases, the Prime/Offeror is responsible to identify the amounts to be used toward the committed DBE goal. Note: For DBE Goals, 60% of the services count towards the goal. Effective 01/01/2021 Updated 03/24/2022 FORT WORTH ATTACHMENT 1A Business Equity Utilization Form Page 2of4 Please note that only certified Business Equity firms will be counted to meet the Business Equity goal. Prime/Offerors are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Business Equity firms and non -Business Equity firms. Prime/Offerors must identify by tier level all subcontractors/suppliers. Tier: means the level of subcontracting below the Prime/Offeror i.e. a direct payment from the Prime/Offeror to a subcontractor is considered 1 st tier, a payment by a subcontractor to its supplier is considered 2nd tier. Business Equity firms are to be listed before non -Business Equity firms. The Prime/Offeror is responsible to provide proof of payment of all tiered sub-contractors/suppliers identified as a Business Equity firm and counting those dollars towards meeting the contract committed goal. Certified Business Equity Prime/Offeror Contractors counting their self -performance towards meeting the contract goal, must be certified within those NAICS commodity codes with a certifying agency acceptable by the City of Fort Worth. Certified Business Equity Prime/Offeror counting self -performing services towards the goal, the service(s) to be performed should be listed first on the Utilization form. Check this box if certified Prime Contractor services will be counting towards the Business Equity contracting goal. Please list services first below. Please list certified Business Equitv firm names as listed on their certification, includinq DBA names. NAMES AND ADDRESSES OF TYPE OF SERVICES/SUPPLIES Specify Tier Certification Agency Gender and Ethnicity: CONTRACTORS/SUPPLIERS PROVIDED (NAICS Required) Name 1st Tier Type of Service/Supplies: Certified B Business Name: y: Male Female Non -Binary Address: D/FW MSDC African American Hispanic NCTRCA Phone: Asian Email: NAICS Code: TXDOT 'WBCS Other: Caucasian Native Contact Person: $ AMOUNT: American Business Name: Type of Service/Supplies: Certified By: Male Female Non -Binary DFW MSDC Address: African American Hispanic NCTRCA Phone: NAICS Code: TXDOT WBCS Asian Email: Other: Caucasian Native $ AMOUNT: American Contact Person: Business Name: Type of Service/Supplies: Certified By: Male Female Non -Binary Address: DFW MSDC African American Hispanic NCTRCA Phone: NAICS Code: TXDOT WBCS Asian Email: Other: Caucasian Native Contact Person: $ AMOUNT: American Effective 01/01/2021 Updated 03/24/2022 FORT WORTH ATTACHMENT1A Page 3 of 4 Business Equity Utilization Form Please include multiple copies of this page if needed to list all contractors and suppliers. NAMES AND ADDRESSES OF TYPE OF SERVICES/SUPPLIES Specify Tier Certification Agency Gender and Ethnicity: CONTRACTORS/SUPPLIERS PROVIDED NAICS Required) � q ) Name 1st Tier Business Name: Type of Service/Supplies: By: Certified B Male Female Non -Binary Address: D/FW MSDC African American Hispanic NCTRCA Phone: NAICS Code: TXDOT � WBCS Asian Email: Caucasian Native Other: American Contact Person: $ AMOUNT: Business Name: Type of Service/Supplies: Certified By: Male Female Non -Binary Address: DFW MSDC African American Hispanic NCTRCA Phone: NAICS Code: TXDOT WBCS Asian Email: Other: Caucasian Native Contact Person: $ AMOUNT: American Business Name: Type of Service/Supplies: Certified By: Male Female Non -Binary Address: DFW MSDC African American Hispanic NCTRCA Phone: NAICS Code: TXDOT WBCS Asian Email: Other: Caucasian Native Contact Person: $ AMOUNT: American Business Name: Type of Service/Supplies: Certified By: Male Female Non -Binary Address: DFW MSDC African American Hispanic NCTRCA Phone: NAICS Code: TXDOT WBCS Asian Email: Other: Caucasian Native Contact Person: $ AMOUNT: American Effective 01/01/2021 Updated 03/24/2022 FORT WORTH Business Equity Utilization Form Total Dollar Amount of Certified Prime/Offeror Services towards contract goal $ Total Dollar Amount of Business Equity (or DBE if applicable) Subcontractors/Suppliers $ Total Dollar Amount of Non -Business Equity Subcontractors/Suppliers $ TOTAL DOLLAR AMOUNT OF CERTIFIED PRIME/ALL SUBCONTRACTORS/SUPPLIERS $ ATTACHMENT 1A Page 4 of 4 The Prime/Offeror will not make additions, deletions, or substitutions to this certified list without the prior approval of the Business Equity Division through the submittal of a Request for Approval of Change/Addition online. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The Prime/Offeror shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed Business Equity goal. If the detail explanation is not submitted, it will affect the final compliance determination. By affixing a signature to this form, the Prime/Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including non -Business Equity firms. The Prime/Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The Prime/Offeror agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers participating on the contract that will substantiate the actual work performed by the Business Equity firms on this contract, by an authorized officer or employee of the City. A Prime/Offerer who intentionally and/or knowingly misrepresents material facts shall be Debarred for a period of time of not less than three (3) years. Authorized Signature Title Company Name Address City/State/Zip Code Printed Signature Contact Name and Title (if different) Phone Number Email Address Date Department of Diversity and Inclusion - Business Equity Division Email: DVIN_BEOffice@fortworthtexas.gov Ph: 817-392-2674 Effective 01/01/2021 Updated 03/24/2022 City of Fort Worth Request for Waiver of Business Equity Goal DEPARTMENT/DIVISION NAME: ESTIMATED COST (Please select the appropriate circle) O ITB RFQ RFP O Sole Source Amendment/Change Order Emergency Other: NOTE: All support documentation needs to be attached to this request. NAME OF BID/PROJECT BID/PROJECT NO. SIGNATURE OF BUYER/PROJECT MANAGER EXTENSION DATE NAICS CODE Prior to advertisement, the contracting/managing department shall determine whether the bid/proposal is one which Business Equity requirements should not be applied. Business Equity requirements may be waived upon written approval of the Department of Diversity and Inclusion (DVIN) Business Equity Assistant Director. If one of the conditions listed below exists, the contracting/managing department shall notify the Assistant Director via this form, stating the specific reason(s) for requesting a waiver. If the contracting/managing department and the Assistant Director are in conflict over the granting of a waiver, contracting/managing department or the Assistant Director may appeal to the City Manager, or designee, whose decision is final. Please Check Applicable Reason: A DVIN: A waiver of the goal for Business Equity subcontracting requirements was requested, and approved by the DVIN, in accordance with the applicable Ordinance, because a public or administrative emergency exists which requires the goods or services to be provided with unusual immediacy; or B. DVIN: A waiver of the goal for Business Equity subcontracting requirements was requested, and approved by the DVIN, in accordance with the applicable Ordinance, because the purchase of goods or services is from sources where subcontracting or supplier opportunities are negligible; or C. DVIN: A waiver of the goal for Business Equity subcontracting requirements was requested, and approved by the DVIN, in accordance with the applicable Ordinance, because the application of the provisions of this ordinance will impose an economic risk on the City or unduly delay acquisition of the goods or services; or D. DVIN: A waiver of the goal for Business Equity subcontracting requirements was requested, and approved by the DVIN, in accordance with the applicable Ordinance, because the waiver request is based on the sole source information provided. E. OTHER (Specify): Justify Commodity or Service Waiver Request: Please use additional sheets. if reprierl DVIN USE ONLY: Approved Signature of DVIN Authorized Personnel Date Not Approved Signature of DVIN Authorized Personnel Date Business Equity Division Effective 01-01-2021 Email: DVIN_BEOfficeafortworthtexas.gov FORT WORTH,,, City Of Fort Worth ATTACHMENT 1C Business Equity Division Page 1 of 4 Good Faith Effort Form PRIME/OFFEROR COMPANY NAME: PROJECT NAME: Business Equity Goal: Offeror's Business Equity Goal Commitment: Check applicable box to describe Prime/Offeror's Certification Business Equity Non -Business Firm Equity Firm BID DATE PROJECT NUMBER I If the Offeror did not meet or exceed the Business Equity Goal for this project, the Prime/Offeror must complete I !I this form. 11 If the Prime/Offeror's method of compliance with the Business Equity Goal is based upon demonstration of a "Good Faith Effort", the Prime/Offeror will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 10 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation of the facts or intentional discrimination by the Prime/Offeror. Failure to complete this form, in its entirety with supporting documentation, and received by the Purchasing Division no later than 2:00 p.m. on the third City business day after bid opening, exclusive of bid opening date, will result in the bid being considered non -responsive to bid specifications. Exception: CFA, ICA, and CDBG projects, documents will be submitted to the City Project Manager if publicly bid or to the Developer if privately bid. 1.) Please list each and every subcontracting and/or supplier opportunity for the completion of this project, regardless of whether it is to be provided by a Business Equity firm or non -Business Equity firm. (DO NOT LIST NAMES OF FIRMS). On all projects, the Prime/Offeror must list each subcontracting and or supplier opportunity regardless of tier. (Use additional sheets, if necessary) List of Subcontracting Opportunities List of Supplier Opportunities Effective 03/15/2022 ATTACHMENT 1C Page 2 of 4 2.) Obtain a current (not more than two (2) months old from the bid open date) list of Business Equity subcontractors and/or suppliers from the City's Business Equity Division. Yes No Date of Listing 3.) Did you solicit bids from Business Equity firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened? Yes (If yes, attach list to include name of Business Equity firm, person contacted, phone number and date and time of contact.) No 4.) Did you solicit bids from Business Equity firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by fax, exclusive of the day the bids are opened? Yes (If yes, attach list to include name of Business Equity firm, fax number and date and time of contact. In addition, if the fax is returned as undeliverable, then that "undeliverable confirmation" received must be printed directly from the facsimile for proper documentation. Failure to submit confirmation and/or "undeliverable confirmation" documentation may render the NO GFE non -responsive.) 5.) Did you solicit bids from Business Equity firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by email, exclusive of the day the bids are opened? Yes (If yes, attach email confirmation to include name of Business Equity firm, date and time. In addition, if an email is returned as undeliverable, then that "undeliverable message" receipt must be printed directly from the NO email system for proper documentation. Failure to submit confirmation and/or "undeliverable message" documentation may render the GFE non -responsive.) NOTE: The three methods identified above are acceptable for soliciting bids, and each selected method must be applied to the applicable contract. The Prime/Offeror must document that either at least two attempts were made using two of the three methods or that at least one successful contact was made using one of the three methods in order to deemed responsive to the Good Faith Effort requirement. NOTE: The Prime/Offeror must contact the entire Business Equity list specific to each subcontracting and supplier opportunity to be in compliance with questions 3 thru 5. 6.) Did you provide plans and specifications to potential Business Equity firms? Yes M 7.) Did you provide the information regarding the location of plans and specifications in order to assist the Business Equity firms? Yes No Effective 03/15/2022 ATTACHMENT 1C Page 3 of 4 8.) Did you prepare a quotation for the Business Equity firms to bid on goods/services specific to their skill set? Yes (If yes, attach all copies of quotations.) No 9.) Was the contact information on any of the listings not valid? Yes (If yes, attach the information that was not valid in order for the Business Equity Division to address the corrections needed.) No 10.) Submit documentation if Business Equity firms quotes were rejected. The documentation submitted should be in the firms forms of an affidavit, include a detailed explanation of why the Business Equity firms was rejected and any supporting documentation the Prime/Offeror wishes to be considered by the City. In the event of a bona fide dispute concerning quotes, the Prime/Offeror will provide for confidential in -camera access to an inspection of any relevant documentation by City personnel. (Please use additional sheets, if necessary, and attach.) Company Name Telephone Contact Person Scope of Work Reason for Rejection ADDITIONAL INFORMATION: Please provide additional information you feel will further explain your good and honest efforts to obtain Business Equity firm participation on this project. The Prime/Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The Prime/Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. A Prime/Offeror who intentionally and/or knowingly misrepresents material facts shall be Debarred for a period of time of not less than three (3) years. Effective 03/15/2022 ATTACHMENT 1C Page 4 of 4 The undersigned certifies that the information provided and the Business Equity firms listed was/were contacted in good faith. It is understood that any Business Equity firms listed in Attachment 1C will be contacted and the reasons for not using them will be verified by the City's Business Equity Division. Authorized Signature Title Company Name Address City/State/Zip Business Equity Division Email: DVIN_BEOffice@fortworthtexas.gov Phone: (817) 392-2674 Printed Signature Contact Name and Title (if different) Phone Number Email Address Date Effective 03/15/2022 GC-6.07 Wage Rates THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised July 1, 2011 2013 PREVAILING WAGE RATES (Heavy and Highway Construction Projects) CLASSIFICATION DESCRIPTION Wage Rate Asphalt Distributor Operator $ 15.32 Asphalt Paving Machine Operator $ 13.99 Asphalt Raker $ 12.69 Broom or Sweeper Operator $ 11.74 Concrete Finisher, Paving and Structures $ 14.12 Concrete Pavement Finishing Machine Operator $ 16.05 Concrete Saw Operator $ 14.48 Crane Operator, Hydraulic 80 tons or less $ 18.12 Crane Operator, Lattice Boom 80 Tons or Less $ 17.27 Crane Operator, Lattice Boom Over 80 Tons $ 20.52 Crawler Tractor Operator $ 14.07 Electrician $ 19.80 Excavator Operator, 50,000 pounds or less $ 17.19 Excavator Operator, Over 50,000 pounds $ 16.99 Flagger $ 10.06 Form Builder/Setter, Structures $ 13.84 Form Setter, Paving & Curb $ 13.16 Foundation Drill Operator, Crawler Mounted $ 17.99 Foundation Drill Operator, Truck Mounted $ 21.07 Front End Loader Operator, 3 CY or Less $ 13.69 Front End Loader Operator, Over 3 CY $ 14.72 Laborer, Common $ 10.72 Laborer, Utility $ 12.32 Loader/Backhoe Operator $ 15.18 Mechanic $ 17.68 Milling Machine Operator $ 14.32 Motor Grader Operator, Fine Grade $ 17.19 Motor Grader Operator, Rough $ 16.02 Off Road Hauler $ 12.25 Pavement Marking Machine Operator $ 13.63 Pipelayer $ 13.24 Reclaimer/Pulverizer Operator $ 11.01 Reinforcing Steel Worker $ 16.18 Roller Operator, Asphalt $ 13.08 Roller Operator, Other $ 11.51 Scraper Operator $ 12.96 Servicer $ 14.58 Small Slipform Machine Operator $ 15.96 Spreader Box Operator $ 14.73 Truck Driver Lowboy -Float $ 16.24 Truck Driver Transit -Mix $ 14.14 Truck Driver, Single Axle $ 12.31 Truck Driver, Single or Tandem Axle Dump Truck $ 12.62 Truck Driver, Tandem Axle Tractor with Semi Trailer $ 12.86 Welder $ 14.84 Work Zone Barricade Servicer $ 11.68 The Davis -Bacon Act prevailing wage rates shown for Heavy and Highway construction projects were determined by the United States Department of Labor and current as of September 2013. The titles and descriptions for the classifications listed are detailed in the AGC of Texas' Standard Job Classifications and Descriptions for Highway, Heavy, Utilities, and Industrial Construction in Texas. Page 1 of 1 2013 PREVAILING WAGE RATES (Commercial Construction Projects) CLASSIFICATION DESCRIPTION Wage Rate AC Mechanic $ 25.24 AC Mechanic Helper $ 13.67 Acoustical Ceiling Installer $ 16.83 Acoustical Ceiling Installer Helper $ 12.70 Bricklayer/Stone Mason $ 19.45 Bricklayer/Stone Mason Trainee $ 13.31 Bricklayer/Stone Mason Helper $ 10.91 Carpenter $ 17.75 Carpenter Helper $ 14.32 Concrete Cutter/Sawer $ 17.00 Concrete Cutter/Sawer Helper $ 11.00 Concrete Finisher $ 15.77 Concrete Finisher Helper $ 11.00 Concrete Form Builder $ 15.27 Concrete Form Builder Helper $ 11.00 Drywall Mechanic $ 15.36 Drywall Helper $ 12.54 Drywall Taper $ 15.00 Drywall Taper Helper $ 11.50 Electrician (Journeyman) $ 19.63 Electrician Apprentice (Helper) $ 15.64 Electronic Technician $ 20.00 Floor Layer $ 18.00 Floor Layer Helper $ 10.00 Glazier $ 21.03 Glazier Helper $ 12.81 Insulator $ 16.59 Insulator Helper $ 11.21 Laborer Common $ 10.89 Laborer Skilled $ 14.15 Lather $ 12.99 Metal Building Assembler $ 16.00 Metal Building Assembler Helper $ 12.00 Metal Installer (Miscellaneous) $ 13.00 Metal Installer Helper (Miscellaneous) $ 11.00 Metal Stud Framer $ 16.12 Metal Stud Framer Helper $ 12.54 Painter $ 16.44 Painter Helper $ 9.98 Pipefitter $ 21.22 Pipefitter Helper $ 15.39 Plasterer $ 16.17 Plasterer Helper $ 12.85 Plumber $ 21.98 Plumber Helper $ 15.85 Reinforcing Steel Setter $ 12.87 Page 1 of 2 Reinforcing Steel Setter Helper $ 11.08 Roofer $ 16.90 Roofer Helper $ 11.15 Sheet Metal Worker $ 16.35 Sheet Metal Worker Helper $ 13.11 Sprinkler System Installer $ 19.17 Sprinkler System Installer Helper $ 14.15 Steel Worker Structural $ 17.00 Steel Worker Structural Helper $ 13.74 Waterproofer $ 15.00 Equipment Operators Concrete Pump $ 18.50 Crane, Clamsheel, Backhoe, Derrick, D'Line Shovel $ 19.31 Forklift $ 16.45 Foundation Drill Operator $ 22.50 Front End Loader $ 16.97 Truck Driver $ 16.77 Welder $ 19.96 Welder Helper $ 13.00 The prevailing wage rates shown for Commercial construction projects were based on a salary survey conducted and published by the North Texas Construction Industry (Fall 2012) Independently compiled by the Lane Gorman Trubitt, PLLC Construction Group. The descriptions for the classifications listed are provided on the TEXO's (The Construction Association) website. www.texoassociation.org/Chapter/wagerates.asp Page 2 of 2 GC-6.09 Permits and Utilities THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised July 1, 2011 GC-6.24 Nondiscrimination THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised July 1, 2011 GR-01 60 00 Product Requirements THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN: 103413 Revised July 1, 2011 FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 IApproval Spec No. IClasssification I Manufacturer I Model No. I National Spec I Size Water & Sewer - Manholes & Bases/Comnonents 33-39-10 (Rev 2/3/161 I 07/23/97 3305 13 Urethane Hvdroohilic Wumtoo, Asahi Ko"n K.K. Adeka Ultra -Seal P-201 ASTM D2240/D412/D792 I I 04/26/00 3305 13 Offset Joint for 4' Dim. MH Hanson Concrete Products Drawing No. 35-0048-001 I I 04/26/00 3305 13 Profile Gasket for 4' Diam. MH. Press -Seal Gasket Coro. 250-4G Gasket ASTM C-443/C-361 SS MH I I 1/26199 3305 13 HOPE Manhole Admannent Rings Ladtech, Inc HDPE Atli --enI Rim, Traffic and Non -traffic area I I 5/13105 3305 13 Manhole External Wrap Canusa - CPS WramdSesl Manhole Encapsulation System I I & Sewer - Manholes & Bases/Fiberglass 33-39-13 (1/8/131 I I 1/26199 (Water 33 39 13 Fiberglass Manhole Fluid Containment, Inc. Flowtite ASTM 3713 Non -traffic area I 08/30/06 I 33 39 13 Fiberglass Manhole L.F. Manufacturing Non -traffic arcs I Water & Sewer - Manholes & Bases/Frames & Covers/Rectangular 33-05-13 (Rev 2/3/16) I * I 3305 13 IManhole Frames and Covcrs I Western Iron Works. Bass & Hays Foundry ( 1001 24"x40" WD I I Water & Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13 (Rev 2/3/16) I I3305 13 Manhole Frames and Covers Western Iron Works, Bass & Hays Foundry 30024 24" Dia. I I * 3305 13 Manhole Frames and Covers MclGnIev Iron Works Inc. A 24 AM 24" Dia. I I 08/24/18 3305 13 Manhole Frames and Covers Neenah Foundry R-1272 ASTM A48 & AASFITO M306 24" Dia. I I 08/24/18 3305 13 Manhole Frames and Covers Neenah Foundry NF 1274 ASTM A48 & AASFITO M306 30" Dia. I I 3305 13 Manhole Frames and Covers Sigma Comorum MH-144N I I 3305 13 Manhole Frames and Covers Sigma Comorum MH-143N I I 3305 13 Manhole Frames and Covers Pont-A-Mousson GTS-STD 24" dia. I I 3305 13 Manhole Frames and Covers Neenah Casting 24" dia. I I 10/31/06 3305 13 Manhole Frames and Covers (Hinged) Powerseal Hinged Ductile Iron Manhole ASTM A536 24" Dia. I I 7/25/03 3305 13 Manhole Frames and Covers Saint-Gobain Pipelines (Pamrex/rexus) RE32-R8FS 30" Dia. I 01/31/06 3305 13 30" Dia. MH Ring and Cover East Jordan Iron Works V 1432-2 and V 1483 Designs AASHTO M306-04 30" Dia. I 11/02/10 3305 13 30" Dia. MH Ring and Cover Sigma ComMation MH1651FWN & MH16502 30" Dia I 07/19/11 3305 13 30" Dia. MH Ring and Cover Star Pipe Products MH32FTWSS-DC 30" Dia I 08/10/11 3305 13 30" Dia. MH Ring and Cover Accucast 220700 Heavy Dutv with Gasket Rine 30" Dia 30" ERGO XL Assembly .14/13 3305 13 30" Dia. MH Ring and Cover (Hinged & Lockable) East Jordan Iron Works with Cam Lock/MPIC/T-Gasket ASSHTO M105 & ASTM A536 30" Dia 06/01/17 3405 13 30" Dia. MH In and Cover Lockable CI SIP Industries 2280 32" ASTM A 48 30" Dia. 12/05/23 3405 13 30" Dia. MH Rfn and Cover (Hinged & Lockable CI SIP Industries 4267WT - Hin ed 32" ASTM A 48 30" Dia. CAP-ONE-30-FTW, Composite, w/ Lock 09/16/19 3305 13 30" Dia. MH Ring and Cover Composite Access Products, L.P. w/o Hmg 30" is. I 10/0791 34 05 13 30" Dia. MH R on and Cover Trumbull Manufacturing 32"(30'S Frame and Cover 30" Dia. I Water & Sewer - Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight 33-05-13 Bev 2/3/16) I I* 3305 13 Manhole Frames and Covers Pont-A-Mousson Pamtight 24" Dia. I I3305 13 Manhole Frames and Covers Neenah Casting 24" Dia. I I3305 13 Manhole Frames and Covers Western Iron Wmks,Bass & Hays Foundry 300-24P 24" Dia. I I 3305 13 Manhole Frames and Covers McKinley Iron Works Inc. WPA24AM 24" Dia. I I 03/08/00 3305 13 Manhole Frames and Covers Accucast RC-2100 ASTM A 48 24" Dia. I I 04/20/01 I 3305 13 Manhole Frames and Covers (SIP)Serampore Industries Private Ltd. 300-24-23.75 Ring and Cover ASTM A 48 24" Dia. I Water & Sewer - Manholes & Bases/Precast Concrete Bev 1/8/131 I * 33 39 10 Manhole, Precast Conc e e Hydro Conduit Cum SPL Item 949 ASTM C 478 48" I 33 39 10 Manhole, Precast Concrete Wall Concrete Pipe Co. Inc. ASTM C-443 48" 09/23/96 33 39 10 Manhole, Precast Concrete Concrete Product Inc. 48" I.D. Manhole w/ 32" Cone ASTM C 478 48" w/32" cone 1.513 33 39 10 Manhole, Precast Concrete The Turner Company 72" I D. Manhole w/ 32" Cone ASTM C 478 72" 05/08/18 33 39 10 Manhole, Precast Concrete The Turner Company 48", 60" I.D. Manhole w/ 32" Cone ASTM C 478 48", 60" I 10/27/06 33 39 10 Manhole, Precast Concrete Oldcastle Precast Inc. 48" I.D. Manhole w/ 24" Cone ASTM C 478 48" Darn w 24" Ring I I 06/09/10 33 39 10 Manhole, Precast (Reinforced Polymer)Concrete US Composite Pipe Reinforced Polymer Concrete ASTM C-76 48" to 72" I I 09/06/19 33 3920 Manhole, Precast Concrete Forterra Pipe and Precast 60" & 72" I.D. Manhole w/32" Cone ASTM C-76 60" & 72" I I 10/07/21 32 39 20 Manhole, Precast Concrete Forterra Pipe and Precast 48" I.D. Manhole w/32" Cone ASTM C-77 48" I I 10/07/21 33 3920 Manhole, Precast (Reinforced Polymer) Concrete Armorock 48" & 60" I.D. Manhole w/32" Cone 48" & 60" I I 10/07/21 33 3920 Manhole, Precast (Hybrid) Polvmer & PVC Predl Systems 48" & 60" I.D. Manhole w/32" Cone 48" & 60" Non Traffic Areas I ASTM C-478; ASTM C-923; 03/07/23 33 3920 Manhole, Precast Concrete AmeriTex Pipe and Products. LLC 48" & 60" I.D. Manhole w/32" Cone ASTM C-443 I 03/07/23 33 3920 Manhole. Precast (Reinforced Palmer) Concrete P3 Polymers. RockHardsto 48" & 60" I.D. Manhole w/32" Cone I I 04/28/07 I Manhole. Precast (Reinforced Polymer) Concrete Amitech USA Mever Polvcrete Pipe I I Sewer -(WACI Wastewater Access Chamber 33 39 40 For use when Sid. MH cannot be 1.9123 1 33 39 20 Wastewater Access Chamber Quickstrem Solutions, Inc. Type 8 Mamtenace Shaft Poo it installed due to d th Water & Sewer - Manholes & Bases/Rehab Svstems/Cementitious I E1-14 Manhole Rehab Systems Quad- I I 04/23/01 E1-14 Manhole Rehab Systems Standard Cement Materials, Inc. Refiner MSP E1-14 Manhole Rehab Systems AP/M Pennakum I 4/20/01 E1-14 Manhole Rehab System Strom Company Strong Seal MS2A Rehab System I 5/12/03 E1-14 Manhole Rehab System (Liner) Tnplex Lining System MH repair product to stop infiltration ASTM D5813 I08/30/06 I General Concrete Repair FlexKrete Technologies Vinyl Polyester Repair Product Misc. Use I * From Original Standard Products List 1 CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 (Approval Spec No. IClasssification I Manufacturer Model No. National Spec Size Water & Sewer - Manholes & Bases/Rehab Svstems/NonCementitious 05/20/96 E1-14 Manhole Rehab Systems Spravrou, Spray Wall Polyurethane Coating ASTM D639/D790 12/14/01 Coating for Corrosion protection(Exterion) ERTECH Series 20230 and 2100 (Asphatic Emulsion) Structures Only 01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1HB, Sl, S2 Acid Resistance Test Sewer Applications 8/28/2006 I Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications 33 01 16, 33 39 10, RR&C Dampprooflng Non-Fibered Spray For Exterior Coating of Concrete 03/19/18 33 39 20 Coating for Corrosion proteetion(Exterior) Sherwin Williams Grade (Asphatic Emulsion) Structures Only Water & Sewer - Manhole Inserts - Field Onerations Use Only (Rev 2/3/164 * 3305 13 Manhole Insert Knutson Entemrises Made to Order - Plastic ASTM D 1248 For 24" dia. * 3305 13 Manhole Insert South Western Packaging Made to Order - Plastic ASTM D 1248 For 24" dia. * 3305 13 Manhole Insert Nollm-Inflow Made to Order - Plastic ASTM D 1248 For 24" dia. 09/23/96 3305 13 Manhole Insert Southwestern Packing & Seals. Inc. Lifesaver - Stainless Steel For 24" dia. 09/23/96 3305 13 Manhole Insert Southwestem Packing & Seals. Inc. TetherLok - Stainless Steel For 24" dia Water & Sewer - Pine Casine Snacers 33-05-24 (07/01/13) 11/04/02 Steel Hand Casing Spacers Advanced Products and Systems, Inc. Carbon Steel Spacers, Model SI 02/02/93 Stainless Steel Casing Spacer Advanced Products and Systems, Inc. Stainless Steel Spacer, Model SSI 04/22/87 Casing Spacers Cascade Waterworks Manufacturing Casing Spacers 09/14/10 Stainless Steel Casing Spacer Pipeline Seal and Insulator Stainless Steel Casing Spacer Up to 48" 09/14/10 Coated Steel Casin Spacers Pipeline Seal and Insulator Coated Steel Casin Spacers Up to 48" 05/10/11 Stainless Steel Casing Spacer Powerseal 4810 Powerchock Up to 48" 03/19/18 Casing Spacers BWM SS-12 Casing Spacer(Stainless Steel) FB-12 Casing Spacer (Coated Carbon Steel) 03/19/18 Casing Spacers BWM for Non pressure Pipe and Grouted Casing 03/29/22 3305 13 Casing Spacers CCI Pipeline Systems CSC12, CSS12 Water & Sewer - Pioes/Ductile Iron 33-11-10(1/8/13) * 33 11 10 Duchle Iron Ptpe Griffin Pipe Products, Co. Super Bell-Trte Ductile Iron Pressure Pipe, AW WA C150, C151 3" thru 24" 08/24/18 33 11 ]0 Ductile Iron Pipe American Ductile Iron Pipe Co. American Fastite Pipe (Bell Spigot) AW WA C150, C151 4" thru 30" 08/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co. American Flex Ring (Restrained Joint) AW WA C150, C151 4" thou 30" * 33 11 10 Ductile Iron Pipe U.S. Pipe and Foundry Co. AW WA C150, C151 * 33 11 10 Ductile Iron Pipe McWane Cast Iran Pipe Co. AW WA C150, C151 I Water & Sewer - Utility Line Marker (08/24/20181 I Sewer - Coatlnms/Epoxv 33-39-60 (01/08/131 02/25/02 Eppxy Lining System Sauereisen, Inc Se —Gard 21ORS LA County #210-1.33 12/14/01 Epoxv Lining Svstem Ertech Technical Coatings Ertech 2030 and 2100 Series 04/14/05 Interior Ductile Iron Pipe Coating Induron Protecto 401 ASTM B-117 Ductile Iron Pipe Only 01/31/06 Coatings for Corrosion Protection Chesterton Are 791, S1HB, Sl, S2 Acid Resistance Test Sewer Applications 8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications � (Sewer - Coatinps/Polvurethane l Sewer - Combination Air Valves 05/25/18 33-31-70 Air Release Valve A.R.J. USA, Inc. D02511W(Composite Bodv) 2" Sewer - Pines/Concrete * E I-04 Conc. Pipe. Reinforced Wall Concrete Pipe Co. Inc. ASTM C 76 * E I-04 Can Pipe. Reinforced Hydro Conduit Comoration Class III T&G, SPL Item #77 ASTM C 76 * E I-04 Conc. Pipe. Reinforced Hanson Concrete Products FPL iteienhele, #98 Piog ASTM C 76 * E I-04 Conc. Pipe. Reinforced Concrete Pipe & Products Co. Inc. ASTM C 76 Sewer - Pine Enlarement Svstem (Method)33-31-23 (01/18/13) PIM Svstem PIM Comoration Polyethylene PIM Com.. Piscata Wav, N.J. Approved Previously McConnell Systems McLat Construction Polyethylene Houston, Texas Approved Previously TRS Svstems Trenchless Replacement Svstem Polyethylene Calgary, Canada Approved Previously * From Original Standard Products List 2 FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 (Approval Spec No. lClasssification Manufacturer Model No. National Spec Size Sewer - PiDe/Fiber¢lass Reinforced/ 33-31-13(1/8/13) 7/21/97 33 31 13 Cent. Cast Fiberglass (FRP) Hobas Pipe USA, Inc. Hoban Pipe (Non -Pressure) ASTM D3262/D3754 03/22/10 33 31 13 Fiberglass Pipe (FRP) Ameron Bondstrand RPMP Pipe ASTM D3262/D3754 04/09/21 33 31 13 Glass -Fiber Reinforced Polymer Pipe (FRP) Thompson Pipe Group Thompson Pipe (Flowtue) ASTM D3262/D3754 03/07/23 33 31 13 Fiberglass Pipe (FRP) Future Pipe Industries Fiberstrong FRP ASTM D3262, ASTM D3681, ASTM D4161, AW WA M45 Sewer - PiDe/Polvmer PiDe 4/14/05 Polymer Modified Concrete Pipe A-- USA Meyer Polycrete Pipe ASTM C33, -76. F471 8" to HIT , Class V 06/09/10 El-9 Reinfrced Polymer Concrete Pipe US Composite Pipe Readmiced Polymer Concrete Pipe ASTM C-76 Sewer - PiDes/HDPE 33-31-23(1/8/13) * High -density polyethylene pipe Phillips Dnscopir e, Inc. Opticore Duchle Polyethylene Pipe ASTM D 1248 8" * High -density polyethylene pipe Plexce Inc. ASTM D 1248 8" * High -density polyethylene pipe Polly Pipe, Inc. ASTM D 1248 8" High -density polyethylene pipe CSR Hydro Conduit/Pipeline Systems McConnell Pipe Enlargement ASTM D 1248 - PiDes/PVC (Pressure Sewer) 33-11-12 (4/1/13) 12/02/11 (Sewer 33-11-1� DR-14 PVC Pressure Pipe Pipelif Ietalremn PVC Pressure Pipe AW WA C900 4" thru 12" 10/22/14 33-11-12 DR-14 PVC Pressure Pipe Royal Building Products Royal Seal PVC Pressure Pipe AW WA C900 4" thou 12" Sewer - PiDes/PVC* 33-31-20 (7/1/13) * 33-31-20 PVC Sewer Pipe J-M Manufacturing Co., Inc. OM Eagle) SDR-26 (PS 115) AST- D 3034 4" - 15" 12/23/97* 33-31-20 PVC Sewer Pipe Diamond Plastics Corporation SDR-26 (PS115) ASTM D 3034 4" thou 15" * 33-31-20 PVC Sewer Pipe Lamson Vvlon Pipe SDR-26 (PSI 15) ASTM. D 3034 I 4" than 15" 12/05/23 33-31-20 IPVC Sewer Pie Vin ltech PVC Pie SDR-26 (PSI 15) ASTM D3034 4" thru 15" 12/05/23 33-31-20 PVC Sewer Pie Vin tech PVC Pie GmA Sewer PS 115 ASTM F 679 18" * 33-31-20 PVC Sewer PiJje J-M ManufacmriroyCo, Inc. OM Eagle) PS 115 ASTM F 679 18" - 28" 05/06/05 33-31-20 PVC Solid Wall Pipe Diamond Plastics Corporation PS 115 ASTM F-679 1811 to 48" 04/27/06 33-31-20 PVC Sewer Finings Ha— SDR-26 PS 115 Gasket Fittings ASTM D-3034, D-1784, etc 4" - 15" * 33-31-20 PVC Sewer Fillings Plastic Trends, Inc.(Westlake) Gasketed PVC Sewer Main Fittings ASTM D 3034 1 3/19/2018 33 3120 PVC Sewer Pipe Pipelife Jet Stream SDR 26 (PS 115) ASTM F679 18"- 24" 1 3/19/2018 33 3120 PVC Sewer Ppe Pipelif Jet Stream SDR 26 ASTM D3034 4"- 11" 1 3/29/2019 33 3120 Gasketed Fillings (PVC) GPK Products, Inc. SDR 26 ASTM D3034 4"- 15" 1 10/21/2020 33 31 20 PVC Sewer Pipe NAPCO(Westlak) SDR 26 ASTM D3034 4" - 15" 1 10/22/2020 33 31 20 PVC Sewer Pipe Sanderson Pipe Corp. SDR 26 ASTM D3034 4"- 11" 1 10/21/2020 33 31 20 PVC Sewer Pipe NAPCO(Wesdak) I SDR 26 PS I15 ASTM F-679 I8"- 36" Sewer - PiDes/Rehab/CIPP 33-31-12 (01/18/131 * in Place Pipe Insituform Texark, Inc ASTM F 1216 05/03/99 �Cured Ctired in Place Pipe National Envirotech Group National Liner, (SPQ Item #27 ASF-1216/D-5813 05/29/96 Cured in Place Pipe Reynolds Indlnhner Technoogv (Inliner USA) Inliner Technology ASTM F 1216 Sewer - PiDes/Rehab/Fold & Form * Fold and Form Pipe Cullum Pipe Systems, Inc. 11/03/98 Fold and Form Pipe Insiff Technologies, Inc. Insiff "NuPipe" ASTM F-1504 Fold and Form Pipe American Pipe & Plastics, Inc. Demo. Purpose Only 12/04/00 Fold and Form Pipe Ultraliner Ultrahner PVC Alloy Pipehner ASTM F-1504, 1871, 1867 06/09/03 Fold and Form Pipe Miller Pipeline Com. EX Method ASTM F-1504, F-1947 Up to 18" diameter Sewer - PiDes/Onen Profile Large Diameter 09/26/91 E100-2 PVC Sewer Pipe, Ribbed Lamson Vvlon Pipe Carlon Vvlon H.C. Closed Profile Pipe, ASTM F 679 18" to 48" 09/26/91 E100-2 PVC Sewer Pipe, Ribbed Extrusion Technologies, Inc. Ultra -Rib Open Profile Sewer Pipe ASTM F 679 18" to 48" E100-2 PVC Sewer Pipe, Ribbed Uponor ETI Company 11/10/10 (E100-2) Polypropylene (PP) Sewer Pipe, Double Wall Advanced Drainage Systems (ADS) SaniTite HP Double Wall (Corrugated) ASTM F 2736 24"-30" 11/10/10 (E100-2) Polypropylene (PP) Sewer Pipe, Triple Wall Advanced Drainage Systems (ADS) SaniTite HP Triple Wall Pipe ASTM F 2764 30" to 60" * From Original Standard Products List 3 FORT WORTH. (Approval Spec No. IClasssification Water - Auuur enances 33-12-10 (07/01/13) 01/18/18 33-12-10 Double Strap Saddle 08/28/02 Double Strap Saddle 07/23/12 33-12-10 Double Strap Service Saddle 03/07/23 33-12-10 Double Strap Service Saddle 10/27/87 Curb Stops -Ball Meter Valves 10/27/87 Curb Stops -Ball Meter Valves 1/25/2018 33-12-10 Curb Stops -Ball Meter Valves 111/2.1. 33-12-10 Curb Stops -Ball Meter Valves 111/2.1. 33-12-10 Curb Stops -Ball Meter Valves 5/25/2018 33-12-10 Curb Stops -Ball Meter Valves 111/2.1. 33-12-10 Curb Stops -Ball Meter Valves 111/2.1. 33-12-10 Curb Stops -Ball Meter Valves 01/26/00 Coated Tapping Saddle with Double SS Straps 0/5/21/12 33-12-25 Tapping Sleeve (Coated Steel) 03/29/22 33-12-25 Tapping Sleeve (Coated or Stainless Steel) 05/10/11 Tapping Sleeve (Stainless Steel) 02/29/12 33-12-25 Tapping Sleeve (Coated Steel) 02/29/12 33-12-25 Tapping Sleeve (Stainless Steel) 02/29/12 33-12-25 Tapping Sleeve (Stainless Steel) 05/10/11 Joint Repair Clamp Plastic Meter Box w/Composite Lid Plastic Meter Box w/Composite Lid 08/30/06 Plastic Meter Box w/Composite Lid Concrete Meter Box Concrete Meter Box Concrete Meter Box Water - Bolts. Nuts. and Gaskets 33-11-05 (01/08/13) Water - Combination Air Release 33-31-70 (01108113) * EI-11 Air Release ValveE1-11 [ooanation ombination Air Release ValvE1-11 ombination Air Release Valve Water - Dry Barrel Fire Hvdrants 33-12-40 (01/15/14) 10/01/87 E-1-12 Dry Barrel Fire Hydrant 03/31/88 E-1-12 Dry Barrel Fire Hydrant 09/30/87 E-1-12 Dry Barrel Fire Hydrant 01/12/93 E-1-12 Dry Barrel Fire Hydrant 08/24/88 E-1-12 Dry Barrel Fire Hydrant E-1-12 Dry Barrel Fire Hydrant 09/24/87 E-1-12 Dry Barrel Fire Hydrant l0/14/87 E-1-12 Dry Barrel Fire Hydrant 01/15/88 E1-12 Dry Barrel Fire Hydrant 10/09/87 E-1-12 Dry Barrel Fire Hydrant 09/16/87 E-1-12 Dry Barrel Fire Hydrant 08/12/I6 33-12-40 Dry Barrel Fire Hydrant Water - Meters 02/05/93 E101-5 Detector Check Meter 08/05/04 Magnetic Drive Vertical Turbine CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 Manufacturer Model No. National Spec Size Romac 202NS Nylon Coated AWWA C800 1"-2" SVC, up to 24" Pipe Smith Blau #317 Nylon Coated Double Strap Saddle Mueller Company DR2S Double (SS) Strap DI Saddle AWWA C800 1"-2" SVC, up to 24" Pipe Poweracid 3450AS, Incl. Con'. Stop, Dbl Strap, Stainless NSF ANSI 372 1"-2" SVC, up to 24" Pipe McDonald 6100M,6100MT & 61OMT 3/4" and 1" McDonald 4603B, 4604B, 6100M, 610OTM and 6101M IVY' and 2" FB600-7NL, FB1600-7-NL, FV23-777-W-NL, Ford Meter Box Co., Inc. L22-77NL AWWA C800 2" FB600-6-NL, FB1600-6-NL, FV23-666-W- Ford Meter Box Co., Inc. NL, L22-66NL AWWA C800 1-1 -' FB600-4-NL, FB1600-4-NL, B11444-WR- Ford Meter Box Co., Inc. NL, B22444-WR-NL, L2844NL AWWA C800 I" B-25000N, B-24277N-3, B-20200N-3, H- AWWA C800, ANSF 61, Mueller Co., Ltd. 15000N, , H-1552N, H142276N ANSI/NSF 372 2" B-25000N, B-20200N-3, B-24277N-3,H- AWWA C800, ANSF 61, Mueller Co., Ltd. 15000N, H-14276N, H-15525N ANSI/NSF 372 1-1/2" B-25000N, B-20200N-3,H-15000N, H- AWWA C800, ANSF 61, Mueller Co., Ltd. 15530N ANSI/NSF 372 1" JCM Industries, Inc. 9406 Double Band SS Saddle 1"-2" Taps on up to 12" JCM Industries, Inc. 412 Tapping Sleeve ESS AWWA C-223 Up to 30" w/12" Out JCM Industries, Inc. 415 Tapping Sleeve AWWA C-223 Concrete Pipe Only Powerseal 3490AS (Flange) & 3490MJ 4"-8" and 16" Romac FTS 420 AWWA C-223 U p to 42" w/24" Out Romac SST Stainless Steel AWWA C-223 Up to 24" w/12" Out Romac SST III Stainless Steel AWWA C-223 Up to 30" w/12" Out Powerseal 3232 Bell Joint Repair Clamp 4" to 30" DFW Plastics Inc. DFW37C-12-IEPAF FTW DFW Plastics Inc. DFW39C-12-IEPAF FTW DFW Plastics Inc. DFW65C-14-IEPAF FTW Class "A" Bass & Hays CMB37-B12 1118 LID-9 Bass & Hays CMB-18-Dual 1416 LID-9 Bass & Hays CMB65-B65 1527 LID-9 GA Industries, Inc. Empire Air and Vacuum Valve, Model 935 ASTM A 126 Class B, ASTM A V & 2" Multiplex Manufacturing Co. Crispin Air and Vacuum Valves, Model No. 1/2", 1" & 2" Valve and Primer Com. APCO #143C, #145C and 9147C 1", 2" & 3" American -Darling Valve Drawing Nos. 90-18608, 94-18560 AWWA C-502 American Darling Valve Shop Drawing No. 94-18791 AWWA C-502 Clow Corporation Shop Drawing No. D-19895 AWWA C-502 American AVK Company Model 2700 AWWA C-502 Clow Corporation Drawings D20435, D20436, B20506 AWWA C-502 ITT Kennedy Valve Shop Drawing No. D-80783FW AWWA C-502 M&H Valve Company Shop Drawing No. 13476 AWWA C-502 Shop Drawings No. 6461 Mueller Companv A-423 Centurion AWWA C-502 Shop Drawing FH-12 Mueller Company A-423 Super Centurion 200 AWWA C-502 U.S. Pipe & Foundry Shop Drawing No. 960250 AWWA C-502 American Flow Control (AFC) Waterous Pacer WB67 AWWA C-502 EJ (East Jordan Iron Works) WaterMaster 5CD250 Ames Company Model 1000 Detector Check Valve AW WA C550 4" - 10" Hersey Magnetic Drive Vertical AWWA C701, Class 1 3/4" - 6" * From Original Standard Products List 4 CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 IApprovall Spec No. IClasssification I Manufacturer I Model No. I National Spec I Size Water - Pioes/PVC (Pressure Water) 33-31-70 (01/08/13) 1 AWWA C900, AWWA C605, 12/05/23 33-11-12 PVC Pressure Pie Vin ltech PVC Pie DR14 ASTM D1784 V-16" AWWA C900, AWWA C605, 12/OS/23 33-11-12 PVC Pressure Pipe Vmyltech PVC Pipe DR18 ASTM D1784 16"-18" 3/19/2018 331112 PVC Pressure Pipe Prpelife Jet Stream DR14 AWWA C900 4"-12" 3/19/2018 33 11 12 PVC Pressure Pipe Prpelife Jet Stream DR18 AWWA C900 16"14" 5/25/2018 33 11 12 PVC Pressure Pipe Diamond Plastics Corporation DR 14 AWWA C900 4"-12" 5/25/2018 33 11 12 PVC Pressure Pipe Diamond Plastics Comoration DR 18 AWWA C900 16"-24" AWWA C900-16 UL 1285 12/6/2018 33 11 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/b/a JM Eagle DR 14 ANSI7NSF 61 4"-28" FM 1612 12/6/2018 33 11 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/b/a JM Eagle DR 18 .rt ° 16"-24" 9/6/2019 33 11 12 PVC Pressure Pipe Underground Solutions Inc. DR14 Fusible PVC AWWA C900 4" - 8" 9/6/2019 33 11 12 PVC Pressure Pipe NAPCO(Westlake) DR18 AWWA C900 16"-24" 9/6/2019 33 11 12 PVC Pressure Pipe NAPCO(Westlake) DR14 AWWA C900 4"- 12" 9/6/2019 33 11 12 PVC Pressure Pipe Sanderson Pipe Corp. DR14 AWWA C900 4"- 12" Water - Pioes/Valves & Fittings/Ductile Iron Fittims 33-11-11 (01/08/13) 07/23/92 E1-07 Ductile Iron Finings star Pipe Products, Inc. Mechanical Joint Fittings AWWA C153 & C110 * E1-07 Ductrle Iron Fitts as Griffin Pipe Products, Co. Mechanical Joint Fittin,°� AWWA C 110 * E1-07 Ductile Iron Finings McWane/Tyler Pipe/ Union Utilities Division Mechanical Joint Fittings, SSB L'lass 350 AWWA C 153, C 110, C 111 08/11/98 E1-07 Ductile Iron Fittings Sigma, Co. Mechanical Joint Fittings, SSB Class 351 AWWA C 153, C 110, C 112 02/26/14 E1-07 MJ Fillings A —cast Class 350 C-153 MJ Fittings AWWA C153 4"-12" 05/14/98 E1-07 Ductile Iron Joint Restraints Ford Meter Box Co./Um-Flange Uni-Flange Series 1400 AW WA C111/C153 4" to 36" 05/14/98 E1-24 PVC Joint Restraints Ford Meter Box Co./Um-Flange Uni-Flange Series 1500 Circle -Lock AW WA C111/C153 4" to 24" 11/09/04 E1-07 Ductile Iron Joint Restraints One Bolt, Inc. One Bolt Restraned Joint Fitting AWWA C111/C116/C153 4" to 12" 02/29/12 33-11-11 Ductile Iron Pipe Mechanical Joint Restraint EBAA Iron, Inc. Megalug Series 1100 (for DI Pipe) AWWA C111/C116/C153 4" to 42" 02/29/12 33-11-11 PVC Pipe Mechanical Joint Restraint EBAA Iron, Inc. Megalug Series 2000 (for PVC Pipe) AWWA C111/C116/C153 4" to 24" 08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLC4 - SLC10 AW WA C111/C153 4" to 10" 03/06/19 33-11-11 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLCS4 - SLCS12 AW WA C111/C153 4" to 12" 08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLCE AW WA C111/C153 12" to 24" 08/10/98 E1-07 MJ Fithngs(DIP) Sigma, Co. Sigma One-Lok SLDE AWWA C153 4" - 24" 10/12/10 E1-24 Interior Restrained Joint System S & B Techncial Products Bulldog System ( Diamond Lok 21 & JM ASTM F-1624 4" to 12" 08/16/06 E1-07 Mechanical Joint Fittings SIP Industnes(Serampore) Mechanical Joint Fittings AWWA C153 4" to 24" 11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. PVC Stargrip Series 4000 ASTM A536 AW WA CI I I 11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. DIP Stargrip Series 3000 ASTM A536 AW WA CI I I EZ Grip Joint Restraint (EZD) Black For DIP 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Seramnore) ASTM A536 AW WA CI I I 3"48" EZ Grip Joint Restraint (EZD) Red for C900 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Serampore) DR14 PVC Pipe ASTM A536 AW WA CI I I 4"-12" EZ Grip Joint Restraint (EZD) Red for C900 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Serampore) DRI8 PVC Pipe ASTM A536 AW WA CI I I 16"-24" Water - Pines/Valves & Fittint,"esilient Seated Gate Valve* 33-12-20 (05/13/151. Resilient Wedeed Gate Valve w/no Gears American Flow Control Series 2500 Drawinc # 94-20247 16" 12/13/02 Resilient Wedee Gate Valve American Flow Control Series 2530 and Series 2536 AWWA C515 30" and 36" 08/31/99 Resilient WedEe Gate Valve American Flow Control Series 2520 & 2524 (SO 94-20255) AWWA C515 20" and 24" 05/18/99 Resilient Wedee Gate Valve American Flow Control Series 2516 (SD 94-20247) AWWA C515 16" 10/24/00 E1-26 Resilient Wedee Gate Valve American Flow Control Series 2500 (Ductile Iron) AWWA C515 4" to 12" 08/05/04 Resilient WedEe Gate Valve American Flow Control 42" and 48" AFC 2500 AWWA C515 42" and 48" 05/23/91 E1-26 Resilient Wedee Gate Valve American AVK Company American AVK Resilient Seaded GV AWWA C509 4" to 12" 01/24/02 E1-26 Resilient Wedee Gate Valve American AVK Company 20" and smaller * E1-26 Resilient Seated Gate Valve Kennedy 4'- 12" * E1-26 Resilient Seated Gate Valve M&H 4" - 12" * E1-26 Resilient Seated Gate Valve Mueller Co. 4" - 12" 11/08/99 Resilient Wedee Gate Valve Mueller Co. Series A2361 (SD 6647) AWWA C515 16" 01/23/03 Resilient Wedee Gate Valve Mueller Co. Series A2360 fur 18"-24" (SD 6709) AWWA C515 24" and amaller 05/13/05 Resilient Wedee Gate Valve Mueller Co. Mueller 30" & 36", C-515 AWWA C515 30" and 36" 01/31/06 Resilient WedEe Gate Valve Mueller Co. Mueller 42" & 48", C-515 AWWA C515 42" and 48" 01/28/88 E1-26 Resilient WedEe Gate Valve Clow Valve Co. AWWA C509 4" - 12" 10/04/94 Resilient Wedee Gate Valve Clow Valve Co. 16" RS GV (SO D-20995) AWWA C515 16" 11/08/99 E1-26 Resilient Wedee Gate Valve Clow Valve Co. Clow RW Valve (SD D-21652) AWWA C515 24" and smaller 11/29/04 Resilient Wedee Gate Valve Clow Valve Co. Clow 30" & 36" C-515 AWWA C515 30" and 36" (Note 3) 11/30/12 Resilient Wedge Gate Valve Clow Valve Co. Clow Valve Model 2638 AWWA C515 24" to 48"3) 05/08/91 E1-26 Resilient Seat Gate Valve Stockham Valves & Fillings AWWA C 509, ANSI 420 -stem, rote 4" - 2" * E1-26 Resilient Seated Gate Valve U.S. Pipe and Foundry Co. Metmaeal 250, requirements SPL #74 3" to 1611 10/26/16 33-12-20 Resilient Seated Gate Valve EI (East Jordan Iron Works) EJ F1owMaster Gate Valve & Boxes 08/24/18 Mateo Gate Valve Matco-Norca 225 MR AWWA/ANSI C115/An21.15 4" to 16" * From Original Standard Products List 5 FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 (Approval Spec No. �Classsification Manufacturer Water Pioes & Fittings/Rubber Seated Butter Valve 33-12-21 (07/10/141 Model No. National Spec Size * - alves Y E1-30 Rubber Seated Butterfly Valve Henry Pratt Co. AW WA C-504 24" * E1-30 Rubber Seated Butterfly Valve Mueller Co. AW WA C-504 24"and smaller 1/11/99 E1-30 Rubber Seated Butterfly Valve Dezmik Valves Co. AW WA C-504 24" and larder 06/12/03 E1-30 Valmatic American Butterfly Valve Valmatic Valve and Manufacturing Coro. Valmatic American Butterfly Valve. AW WA C-504 Up to 84" diameter 04/06/07 E1-30 Rubber Seated Butterfly Valve M&H Valve M&H Style 4500 & 1450 AW WA C-504 24" to 48" 03/19/18 33 1221 Rubber Seated Butterfly Valve G. A. Industries (Golden Anderson) AW WA C504 Butterfly Valve AW WA C-504 30"-54" Water - Polvethvlene Encasement 33-11-10 401/08/13) 05/12/05 E1-13 Polyethylene Encasment Flexsol Packaging Fulton Enterprises AW WA C105 8 it LLD 05/12/05 E1-13 Polyethylene Encasment Mountain States Plastics (MSP) and AEP Ind. Standard Hardware AW WA C105 8 mil LLD 05/12/05 E1-13 Polyethne yleEncasment AEP Industries Bullstrong by Cowtown Bolt & Gasket AW WA C105 8 mil LLD 09/06/19 33-11-11 IPolyethylerse Encasment Northtown Products Inc. PE Encasement for DIP AW WA C105 8 mil LLD Water - SamDling Station 03/07/23 331250 l Water Sampling Station Eclipse Number 88 , 12-inch Demo of Bury As shown in spec. 33 12 50 Water - Automatic Flusher HG6-A-IN-2-BRN-LPRR(Portable) 1.110 Automated Flushing System Mueller Hydrosmard HG2-A-IN--2-PVC-OI8-LPLG(Permanent) 04/09/21 Automated Flushing System Kupferle Foundry Company Eclipse #9800wc 04/09/21 Automated Flushing System Kupferle Foundry Company Eclipse #9700 (Portable) The Fort Worth Water Department's Standard Products List has been developed to minimize the submittal review of products which meet the Fort Worth Water Department's Standard Specifications during utility construction projects. When Technical Specifications for specific products, are included as part of the Construction Contract Documents, the requirements of the Technical Specification will override the Fort Worth Water Department's Standard Specifications and the Fort Worth Water Department's Standard Products List and approval of the specific products will be based on the requirements of the Technical Specification whether or not the specific product meets the Fort Worth Water Department's Standard Specifications or is on the Fort Worth Water Yellow Highlight indicates recent changes * From Original Standard Products List 6