Loading...
HomeMy WebLinkAboutContract 51820-FP1-FP1 FORT WORTH. City Secretary 51820 Contract No. Date Received 10/2/2024 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: American Airlines Headquarters City Project No.: 101314 Improvement Type(s): ❑x Paving ❑x Drainage ❑x Street Lights ❑x Traffic Signals City Cost City Cost City Cost Developer Trinity Blvd / RTR Cost American Blvd / Total Cost Impact Fee Funds Trinity Blvd Trinity Blvd Y Transformation Way Original Contract Price: Paving $0.00 $128,154.00 $388,454.30 $1,553,817.20 $0.00 $2,070,425.50 Original Contract Price: Storm Drain $0.00 $0.00 $24,864.00 $99,456.00 $0.00 $124,320.00 Original Contract Price: Street Lights $0.00 $0.00 $129,048.30 $516,193.20 $0.00 $645,241.50 Change Order 1 $0.00 $0.00 $0.00 $0.00 $409,083.80 $409,083.80 Change Order 2 $0.00 $0.00 $47,997.60 $191,990.40 $55,612.30 $295,600.30 Change Order 3 $0.00 $0.00 -$3,300.00 -$13,200.00 $15.00 -$16,485.00 Revised Contract Amount $0.00 $128,154.00 $587,064.20 $2,348,256.80 $464,711.10 $3,528,186.10 Total Cost of Work Complete $0.00 $128,154.00 $587,064.20 $2,348,256.80 $464,711.10 $3,528,186.10 Sep 30, 2024 Marco�� Rey�ep30' O'1413:36CDT) Contractor Date President Title Reyes Group, LTD Company Name Sep 30, 2024 Project Inspector Date 4 uJ��L o Oct 2 2024 Project Manager Date n Rebecca Owen (Oct 2,202409:55 CDT) OCt 2, 2024 CFA Manager Date Lauren Prieur(� 2, 202409:58 CDT) Oct 2, 2024 TPW Dire for Date Oct 7, 2024 Asst. City Manager Date OFFICIAL RECORD CITY SECRETARY Page 1 of 2 FT. WORTH, TX Notice of Project Completion Project Name: American Airlines Headquarters City Project No.: 101314 City's Attachments Final Pay Estimate x❑ Change Order(s): ❑x Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time 117 WD Days Charged: 568 WD Work Start Date: 2/11/2019 Work Complete Date: 8/31/2020 Completed number of Soil Lab Test: 0 Completed number of Water Test: 0 Page 2 of 2 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name AMERICAN AIRLINES HEADQUARTERS Contract Limits Project Type PAVING, DRAINAGE, STREELIGHTS, SIGNALS City Project Numbers 101314 DOE Number 1314 Estimate Number I Payment Number 1 For Period Ending 8/31/2021 WD City Secretary Contract Number Contract Time I IWD Contract Date Days Charged to Date 568 Project Manager NA Contract is 100.00 Complete Contractor REYES GROUP LTD. 1520 PARKER ROAD GRAND PRAIRIE, TX 75050 Inspectors WATSON / YBARRA Friday, September 27, 2024 Page I of 13 City Project Numbers 101314 DOE Number 1314 Contract Name AMERICAN AIRLINES HEADQUARTERS Estimate Number I Contract Limits Payment Number 1 Project Type PAVING, DRAINAGE, STREELIGHTS, SIGNALS For Period Ending 8/31/2021 Project Funding UNIT I: PAVING - TRINITY BLVD Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 0 17 1.0 101 Construction Staking 1 LS $54,000.00 $54,000.00 1 $54,000.00 2 0241.0100 Remove Sidewalk (CO #2) 1808 SF $2.50 $4,520.00 1808 $4,520.00 3 0241.0300 Remove ADA Ramp (CO #2) 7 EA $745.00 $5,215.00 7 $5,215.00 4 0241.0500 Remove Fence 1700 LF $4.00 $6,800.00 1700 $6,800.00 5 0241.0900 Remove Misc Conc Structure 1 LS $1,000.00 $1,000.00 1 $1,000.00 6 0241.1000 Remove Conc Pvmt (CO #2) 1985 SY $19.00 $37,715.00 1985 $37,715.00 7 0241.1300 Remove Conc Curb&Gutter 5851 LF $9.00 $52,659.00 5851 $52,659.00 8 3110.0101 Site Clearing 1 LS $11,800.00 $11,800.00 1 $11,800.00 9 3123.0101 Unclassified Excavation by Plan (CO #2) 5492.5 CY $17.00 $93,372.50 5492.5 $93,372.50 10 3124.0101 Embankment by Plan (CO #2) 4199 CY $11.00 $46,189.00 4199 $46,189.00 11 3201.0302 3" Extra Width Asphalt Pavement Repair 2194.94 SY $24.00 $52,678.56 2194.94 $52,678.56 (CO #2) 12 3211.0401 Commercial Lime Slurry (CO #2) 0 TN $214.00 $0.00 0 $0.00 13 3211.0502 8" Lime Treatment (CO #2) 0 SY $8.00 $0.00 0 $0.00 14 3213.0104 9" Conc Pvmt (CO #2) 4456.33 SY $86.00 $383,244.38 4456.33 $383,244.38 15 3213.0312 5" Conc Sidewalk, Adjacent to Curb (CO 22763 SF $8.00 $182,104.00 22763 $182,104.00 #2) 16 3213.0321 Conc Sidewalk, Adjacent to Ret Wall 4920 SF $8.00 $39,360.00 4920 $39,360.00 (CO #2) 17 3213.0503 Barrier Free Ramp, Type M-1 1 EA $2,670.00 $2,670.00 1 $2,670.00 18 3213.0505 Barrier Free Ramp, Type M-3 1 EA $2,670.00 $2,670.00 1 $2,670.00 19 3213.0506 Barrier Free Ramp, Type P-1 (CO #2) 17 EA $2,500.00 $42,500.00 17 $42,500.00 20 3217.0003 4" BRK Pvmt Marking HAS (W) (CO #2) 1972 LF $1.00 $1,972.00 1972 $1,972.00 21 3217.0201 8" SLD Pvmt Marking HAS (W) (CO #2) 2162 LF $2.00 $4,324.00 2162 $4,324.00 22 3217.0501 24" SLD Pvmt Marking HAE (W) (CO 1847 LF $6.00 $11,082.00 1847 $11,082.00 #2) 23 3217.1002 Lane Legend Arrow (CO #2) 32 EA $127.00 $4,064.00 32 $4,064.00 24 3217.1004 Lane Legend Only (CO #2) 19 EA $140.00 $2,660.00 19 $2,660.00 25 3217.2102 REFL Raised Marker TY I-C (CO #2) 89 EA $5.00 $445.00 89 $445.00 26 3217.2104 REFL Raised Marker TY II-C-R (CO #2) 151 EA $5.00 $755.00 151 $755.00 27 3217.4301 Remove 4" Pvmt Marking (CO #2) 2042 LF $1.00 $2,042.00 2042 $2,042.00 28 3217.4306 Remove 24" Pvmt Marking (CO #2) 453 LF $2.50 $1,132.50 453 $1,132.50 29 3217.4307 Remove Raised Marker (CO #2) 20 EA $1.00 $20.00 20 $20.00 Friday, September 27, 2024 Page 2 of 13 City Project Numbers 101314 DOE Number 1314 Contract Name AMERICAN AIRLINES HEADQUARTERS Estimate Number I Contract Limits Payment Number 1 Project Type PAVING, DRAINAGE, STREELIGHTS, SIGNALS For Period Ending 8/31/2021 Project Funding 30 3232.0100 Cone Ret Wall Adjacent to Sidewalk (CO 1653 SF $19.00 $31,407.00 1653 $31,407.00 #2) 31 3291.0100 Topsoil 48 CY $55.00 $2,640.00 48 $2,640.00 32 3292.0100 Block Sod Placement (CO #2) 3895 SY $5.00 $19,475.00 3895 $19,475.00 33 3292.0400 Seeding, Hydromulch (CO #2) 9880 SY $1.00 $9,880.00 9880 $9,880.00 34 3305.0103 Exploratory Excavation of Existing 4 EA $2,900.00 $11,600.00 4 $11,600.00 Utilities (CO #2) 35 3471.0001 Traffic Control (CO #2) 9 MO $10,500.00 $94,500.00 9 $94,500.00 36 3471.0002 Portable Message Sign (CO #2) 4 WK $212.00 $848.00 4 $848.00 37 360-6003 CONC PVMT (CONT REINF - CRCP) 0 SY $175.00 $0.00 0 $0.00 (9") (CO #2) 38 360-6027 CURB (TYPE In (CO #2) 0 LF $11.00 $0.00 0 $0.00 39 400-6005 CEM STABILBKFL (CO #2) 16 CY $120.00 $1,920.00 16 $1,920.00 40 403-6001 TEMPORARY SPL SHORING (CO #2) 4520 SF $32.00 $144,640.00 4520 $144,640.00 41 423-6001 RETAINING WALL (MSE) 4444 SF $66.00 $293,304.00 4444 $293,304.00 42 432-6046 RIPRAP (MOW STRIP)(5IN) (CO #2) 52.33 CY $520.00 $27,211.60 52.33 $27,211.60 43 450-6031 RAIL (TY C221)(HPC) 601 LF $233.00 $140,033.00 601 $140,033.00 44 450-6048 RAIL (HANDRAIL) (TY B) (CO #2) 0 LF $68.00 $0.00 0 $0.00 45 531-6005 CURB RAMPS (TY 2) 2 EA $2,600.00 $5,200.00 2 $5,200.00 46 531-6017 CURB RAMPS (TY 22) 1 EA $2,600.00 $2,600.00 1 $2,600.00 47 Exploratory Excavations (Shallow) (CO 92) 20 EA $500.00 $10,000.00 20 $10,000.00 48 Truck Detour (CO #2) 5 MO $6,389.00 $31,945.00 5 $31,945.00 49 Prime Coat (CO #2) 279 SY $2.00 $558.00 279 $558.00 50 Hot Mix Asphalt TY B (20") (CO #2) 279 SY $165.00 $46,035.00 279 $46,035.00 51 Hot Mix Asphalt TY C (2") (CO #2) 279 SY $20.50 $5,719.50 279 $5,719.50 52 Curb & Gutter JxDOT TY Il) (CO #2) 1323 LF $27.00 $35,721.00 1323 $35,721.00 53 8" Flexible Base, Type A, GR-1 or 2 (CO #2) 4962 SY $10.75 $53,341.50 4962 $53,341.50 54 Tree Well Slope Protection (CO #2), (CO#3) 0 LS $16,500.00 $0.00 0 $0.00 55 Remove Guardrail (CO #2) 103 LF $11.00 $1,133.00 103 $1,133.00 56 Small Roadway Sign Assemblies (CO #2) 1 LS $4,305.00 $4,305.00 1 $4,305.00 57 Work Zone Pavement Markings (CO #2) 1 LS $4,910.00 $4,910.00 1 $4,910.00 58 Modification to Retaining Wall RWWB 106 (CO #2) 1 LS $2,150.00 $2,150.00 1 $2,150.00 59 Modification to Retaining Wall RWEB 105 (CO #2) 1 LS $2,450.00 $2,450.00 1 $2,450.00 60 Furnish/histall Alum Sign GND MNT City STD (CO 1 EA $550.00 $550.00 1 $550.00 #2) Friday, September 27, 2024 Page 3 of 13 City Project Numbers 101314 Contract Name AMERICAN AIRLINES HEADQUARTERS Contract Limits Project Type PAVING, DRAINAGE, STREELIGHTS, SIGNALS Project Funding 61 REF PAV MRK TY I (W) (YLD TRI) (I00MIL) (CO #2) 62 Rail (TY C221)(HPC) - Raise 6" (CO #2) 63 RWWB 106 - Epoxy Repair Gap (CO #2) 64 RWWB 108 - Concrete Repair Gap (CO #2) 65 RW-Repair - Monolithic Pour (CO #2) 66 Tunnel Bore under Colored Stamped Concrete (CO #2) 67 Remobilization Fee - Slaton Bros (CO #2) 68 Remobilization Fee - Oscar Orduno (CO #2) 69 F&I Delineators (D-SW SZ 2 FLX SRF) (CO #2) 70 Furnish & Install Sign Panel and Post (CO #2) 71 Traffic Control - Striping (CO #2) 72 Remobilization - Striping & Pavement Repair (CO #2) 73 Chain Link Fence (6') Steel (CO #2) 74 C221 Rail Repair - Remove & Replace (CO #2) 75 Remove & Replace Handrail Section (CO #2) 76 Rail Repair Emergency Traffic Control (CO #2) 77 Traffic Control (Conc Repair American/Trinity) (CO #2) 78 9" Conc Pvmt (HES) (CO #2) 79 Remove Delineators (D-SW SZ 2 FLX SFR) (CO #2) 80 Plan REV7 - Traffic Control for Removal & Striping (CO #2) 81 Plan REV7 - Remobilization - Striping (CO #2) 82 Plan REV8 - TxDOT 540-6001 MFGF (CO #2) 83 Plan REV8 - TxDOT 540-6009 Trans Thrie Beam (CO #2) 84 Plan REV8 - TxDOT 544-6001 SKT MASH (CO 42) 85 Plan REV8 - Remobilization Guardrail Crew (CO #2) 86 Plan REV8 - Traffic Control for MBGF (CO #2) 87 Plan REV8 - Remobilization Traffic Control Crew (CO #2) 88 Plan REV8 - Site Clearing for MBGF (CO #2) 89 Plan REV8 - Embankment for MBGF (CO #2) 90 Plan REV8 - TxDOT 4" MOW Strip (CO #2) DOE Number 1314 Estimate Number I Payment Number 1 For Period Ending 8/31/2021 31 EA $45.00 $1,395.00 31 $1,395.00 601 LF $15.50 $9,315.50 601 $9,315.50 338 LF $46.50 $15,717.00 338 $15,717.00 130 LF $14.50 $1,885.00 130 $1,885.00 133 LF $2.87 $381.71 133 $381.71 1 EA $448.00 $448.00 1 $448.00 1 EA $4,000.00 $4,000.00 1 $4,000.00 1 EA $3,000.00 $3,000.00 1 $3,000.00 59 EA $79.50 $4,690.50 59 $4,690.50 2 EA $375.00 $750.00 2 $750.00 1 LS $950.00 $950.00 1 $950.00 2 EA $1,600.00 $3,200.00 2 $3,200.00 1200 LF $29.50 $35,400.00 1200 $35,400.00 1 LS $3,750.00 $3,750.00 1 $3,750.00 10 LF $295.00 $2,950.00 10 $2,950.00 3 DY $950.00 $2,850.00 3 $2,850.00 1 LS $4,700.00 $4,700.00 1 $4,700.00 70 SY $120.65 $8,445.50 70 $8,445.50 60 LF $15.50 $930.00 60 $930.00 1 LS $1,150.00 $1,150.00 1 $1,150.00 1 LS $1,600.00 $1,600.00 1 $1,600.00 37.5 LF $37.50 $1,406.25 37.5 $1,406.25 1 EA $3,525.00 $3,525.00 1 $3,525.00 1 EA $3,750.00 $3,750.00 1 $3,750.00 1 LS $1,800.00 $1,800.00 1 $1,800.00 1 W K $10,500.00 $10,500.00 1 $10,500.00 1 LS $1,050.00 $1,050.00 1 $1,050.00 1 LS $3,450.00 $3,450.00 1 $3,450.00 190 CY $11.00 $2,090.00 190 $2,090.00 18 CY $520.00 $9,360.00 18 $9,360.00 Friday, September 27, 2024 Page 4 of 13 City Project Numbers 101314 DOE Number 1314 Contract Name AMERICAN AIRLINES HEADQUARTERS Estimate Number I Contract Limits Payment Number 1 Project Type PAVING, DRAINAGE, STREELIGHTS, SIGNALS For Period Ending 8/31/2021 Project Funding 91 Plan REV8 - Exploratory Utility Excavation for 1 EA $2,900.00 $2,900.00 1 $2,900.00 MBGF (CO #2) 92 Plan REV8 - Block Sod Frontage Road (CO #2) 200 SY $5.00 $1,000.00 200 $1,000.00 93 Plan REV8 - Remobilization Landscape Crew (sod) 1 LS $400.00 $400.00 1 $400.00 (CO #2) Sub -Total of Previous Unit $2,179,810.00 $2,179,810.00 UNIT H. STORM DRAIN - TRINITY BLVD Item Description of Items Unit Unit it Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- 1 Remove 10' Curb Inlet 3 EA $4,000.00 $12,000.00 3 $12,000.00 2 SWPPP > 1 acre 1 LS $12,300.00 $12,300.00 1 $12,300.00 3 Trench Safety 3200 LF $2.00 $6,400.00 3200 $6,400.00 4 18" RCP, Class III (CO #2) 36 LF $114.00 $4,104.00 36 $4,104.00 5 24" RCP, Class III (CO #2) 65 LF $208.00 $13,520.00 65 $13,520.00 6 30" RCP, Class III (CO #2) 0 LF $240.00 $0.00 0 $0.00 7 3349.6001 10' Recessed Inlet 2 EA $17,100.00 $34,200.00 2 $34,200.00 8 465-6197 INLET (COMPL)(CURB)(TY 11)(5') 2 EA $14,000.00 $28,000.00 2 $28,000.00 9 465-6207INLET (COMPL)(CURB)(TYI)(10') 1 EA $15,000.00 $15,000.00 1 $15,000.00 10 2 1 " RCP, Class III (CO #2) 30 LF $175.00 $5,250.00 30 $5,250.00 11 36" RCP, Class III (CO #2) 26 LF $270.00 $7,020.00 26 $7,020.00 12 Construction Staking (New RCP & Headwall) (CO 1 LS $600.00 $600.00 1 $600.00 #2) 13 Site Clearing (New Culvert Extension) (CO #2) 1 LS $2,500.00 $2,500.00 1 $2,500.00 14 Remove Existing Headwall (CO #2) 1 EA $1,500.00 $1,500.00 1 $1,500.00 15 Install 24" Flared Headwall, 1 Pipe (CO #2) 1 EA $11,500.00 $11,500.00 1 $11,500.00 16 Rock Riprap (6in) (CO #2) 2 CY $520.00 $1,040.00 2 $1,040.00 Sub -Total of Previous Unit $154,934.00 $154,934.00 ------------------- UNIT III: LIGHTING, SIGNALS -TRINITY BLVD Item Description of items No. 1 2605.0111 Furnish/Install Elec Sery Pedestal (CO #2) 2 2605.3013 2" CONDT RM (T) (CO #2) 3 2605.3015 2" CONDT PVC SCH 80 (T) (CO #2) Estimated Unit Unit Cost Estimated Completed Completed Quanity Total Quanity Total 3 EA $6,700.00 $20,100.00 3 $20,100.00 35 LF $25.00 $875.00 35 $875.00 3070 LF $14.50 $44,515.00 3070 $44,515.00 Friday, September 27, 2024 Page 5 of 13 City Project Numbers 101314 Contract Name AMERICAN AIRLINES HEADQUARTERS Contract Limits Project Type PAVING, DRAINAGE, STREELIGHTS, SIGNALS Project Funding 4 2605.3016 2" CONDT PVC SCH 80 (B) (CO #2) 5 2605.3025 3" CONDT PVC SCH 80 (T) (CO #2) 6 2605.3026 3" CONDT PVC SCH 80 (B) (CO #2) 7 2605.3033 4" CONDT PVC SCH 80 (T) (CO 92) 8 3441.1001 3-Sect Signal Head Assmbly (CO #2) 9 3441.1002 4-Sect Signal Head Assmbly 10 3441.1003 5-Sect Signal Head Assmbly (CO #2) 11 3441.1004 Relocate Signal Head 12 3441.1011 Ped Signal Head Assmbly (CO #2) 13 3441.1021 2" Ped Push BTN Station W/ Sign (CO #2) 14 3441.1031 Audible Pedestrian Pushbutton Station (CO #2) 15 3441.1215 Furnish/Install Hybrid Detection System 16 3441.1217 Furnish/histall Hybrid Detection Cable (CO #2) 17 3441.1224 Furnish/histall Preemption Cable (CO #2) 18 3441.1226 Furnish/histall Model 722 Preemption Detector 19 3441.1310 4/C 14 AWG Multi -Conductor Cable (CO #2) 20 3441.1311 5/C 14 AWG Multi -Conductor Cable 21 3441.1312 7/C 14 AWG Multi -Conductor Cable (CO #2) 22 3441.1315 20/C 14 AWG Multi -Conductor Cable (CO #2) 23 3441.1322 31C 14 AWG Multi -Conductor Cable (CO #2) 24 3441.1402 NO 6 Duplex OH insulated Elec Condr (CO #2) 25 3441.1408 NO 6 Insulated Elec Condr (CO #2) 26 3441.1409 NO 8 Insulated Elec Condr (CO #2) 27 3441.1414 NO 8 Bare Elec Condr (CO #2) 28 3441.1501 Ground Box Type B (CO #2) 29 3441.1601 Fumish/Install 5' Pedestrian Push Button Pole 30 3441.1603 Furnish/histall 10' - 14' Ped Pole Assmbly (CO #2) 31 3441.1611 Furnish/histall Type 41 Signal Pole DOE Number 1314 Estimate Number I Payment Number 1 For Period Ending 8/31/2021 1225 LF $20.00 $24,500.00 1225 $24,500.00 725 LF $18.00 $13,050.00 725 $13,050.00 650 LF $22.00 $14,300.00 650 $14,300.00 25 LF $30.00 $750.00 25 $750.00 29 EA $1,150.00 $33,350.00 29 $33,350.00 3 EA $1,300.00 $3,900.00 3 $3,900.00 4 EA $1,500.00 $6,000.00 4 $6,000.00 3 EA $500.00 $1,500.00 3 $1,500.00 18 EA $900.00 $16,200.00 18 $16,200.00 0 EA $403.00 $0.00 0 $0.00 18 EA $1,520.00 $27,360.00 18 $27,360.00 6 AP $9,600.00 $57,600.00 6 $57,600.00 965 LF $3.00 $2,895.00 965 $2,895.00 1226 LF $1.25 $1,532.50 1226 $1,532.50 5 EA $2,700.00 $13,500.00 5 $13,500.00 1144 LF $2.00 $2,288.00 1144 $2,288.00 2495 LF $2.00 $4,990.00 2495 $4,990.00 905 LF $2.00 $1,810.00 905 $1,810.00 1490 LF $5.00 $7,450.00 1490 $7,450.00 4759 LF $1.00 $4,759.00 4759 $4,759.00 1585 LF $2.00 $3,170.00 1585 $3,170.00 12131 LF $1.50 $18,196.50 12131 $18,196.50 1905 LF $1.50 $2,857.50 1905 $2,857.50 2514 LF $1.50 $3,771.00 2514 $3,771.00 25 EA $900.00 $22,500.00 25 $22,500.00 5 EA $1,030.00 $5,150.00 5 $5,150.00 10 EA $1,150.00 $11,500.00 10 $11,500.00 2 EA $5,500.00 $11,000.00 2 $11,000.00 Friday, September 27, 2024 Page 6 of 13 City Project Numbers 101314 Contract Name AMERICAN AIRLINES HEADQUARTERS Contract Limits Project Type PAVING, DRAINAGE, STREELIGHTS, SIGNALS Project Funding 32 3441.1612 Furnish/Install Type 42 Signal Pole 33 3441.1614 Furnish/histall Type 44 Signal Pole 34 3441.1615 Furnish/histall Type 45 Signal Pole 35 3441.1623 Fumish/histall Mast Arm 16' - 36' 36 3441.1624 Fumish/histall Mast Arm 40' - 48' 37 3441.1625 Furnish/histall Mast Arm 52' - 60' 38 3441.1633 Install Type 33B Arm 39 3441.1701 TY 1 Signal Foundation (CO #2) 40 3441.1703 TY 3 Signal Foundation 41 3441.1704 TY 4 Signal Foundation 42 3441.1705 TY 5 Signal Foundation 43 3441.1713 Signal Cabinet Foundation - 352i 44 3441.1741 Furnish/Install 352i Controller Cabinet Assembly 45 Furnish/Install. 240-480 Volt Single Phase Transocket Metered Pedestal 46 3441.2001 Salvage Traffic Signal 47 Furnish/Install LED Lighting Fixture (70 watt ATBO Cobra Head) 48 Fumish/Install LED Lighting Fixture (187 watt ATB2 Cobra Head) (CO #2) 49 3441.3302 Rdwy Ilium Foundation TY 3,5,6, and 8 (CO #2) 50 3441.3342 Rdwy Ilium TY 18 Pole (CO #2) 51 3441.4001 Fumish/histall Alum Sign Mast Arm Mount (CO #2) 52 3441.4108 Remove Sign Panel and Post 53 3441.4109 Remove Sign Panel 54 3441.4110 Remove and Reinstall Sign Panel and Post 55 3441.XXXX Furnish/Install VIVDS Cable (CO #2) 56 3441.XXXX Furnish/Install VIVDS System 57 3441.XXYX Remove and Salvage Illumination Fixture (CO #2) 58 416-6018 DRILLED SHAFT (SIGN MTS) (24 IN) 59 685-6005 RELOCT RDSD FLSH BCN AM (SOLAR PWRD) (CO #2) 60 Traffic Control during Signal Switch (CO #2) DOE Number 1314 Estimate Number I Payment Number 1 For Period Ending 8/31/2021 2 EA $4,700.00 $9,400.00 2 $9,400.00 2 EA $5,900.00 $11,800.00 2 $11,800.00 1 EA $9,600.00 $9,600.00 1 $9,600.00 4 EA $2,800.00 $11,200.00 4 $11,200.00 2 EA $4,000.00 $8,000.00 2 $8,000.00 1 EA $5,600.00 $5,600.00 1 $5,600.00 14 EA $370.00 $5,180.00 14 $5,180.00 14 EA $1,200.00 $16,800.00 14 $16,800.00 5 EA $2,900.00 $14,500.00 5 $14,500.00 2 EA $3,650.00 $7,300.00 2 $7,300.00 1 EA $4,300.00 $4,300.00 1 $4,300.00 2 EA $6,500.00 $13,000.00 2 $13,000.00 2 EA $24,400.00 $48,800.00 2 $48,800.00 1 EA $8,000.00 $8,000.00 1 $8,000.00 2 EA $730.00 $1,460.00 2 $1,460.00 15 EA $500.00 $7,500.00 15 $7,500.00 19 EA $850.00 $16,150.00 19 $16,150.00 13 EA $1,500.00 $19,500.00 13 $19,500.00 13 EA $1,700.00 $22,100.00 13 $22,100.00 17 EA $550.00 $9,350.00 17 $9,350.00 2 EA $140.00 $280.00 2 $280.00 1 EA $140.00 $140.00 1 $140.00 3 EA $250.00 $750.00 3 $750.00 690 LF $3.00 $2,070.00 690 $2,070.00 2 EA $2,750.00 $5,500.00 2 $5,500.00 11 EA $120.00 $1,320.00 11 $1,320.00 6 LF $465.00 $2,790.00 6 $2,790.00 2 EA $5,000.00 $10,000.00 2 $10,000.00 1 LS $1,900.00 $1,900.00 1 $1,900.00 Friday, September 27, 2024 Page 7 of 13 City Project Numbers 101314 DOE Number 1314 Contract Name AMERICAN AIRLINES HEADQUARTERS Estimate Number I Contract Limits Payment Number 1 Project Type PAVING, DRAINAGE, STREELIGHTS, SIGNALS For Period Ending 8/31/2021 Project Funding 61 Install Oncor Provided Pull Box (CO #2) 1 EA $950.00 $950.00 1 $950.00 62 Fumish/Install 35' Wood Light Pole (CO #2) 5 EA $1,500.00 $7,500.00 5 $7,500.00 63 Fumish/Install 8' Wood Light Pole Arm (CO #2) 5 EA $800.00 $4,000.00 5 $4,000.00 64 Electrical Connection (Wood Poles) (CO #2) 6 EA $250.00 $1,500.00 6 $1,500.00 65 Hydro -Vac Rdwy Illum Foundation TY 3,5,6, and 8 4 EA $2,750.00 $11,000.00 4 $11,000.00 (CO #2) 66 Fumish/Install 40' Class 2 Wood Pole (CO #2) 1 EA $1,650.00 $1,650.00 1 $1,650.00 67 ELC SRV TY D 120/240 060(NS) GS (N) SP (0) 1 EA $5,574.00 $5,574.00 1 $5,574.00 SERVICE (CO #2) 68 Conduit (RM)(2") (CO #2) 20 LF $47.50 $950.00 20 $950.00 69 Condt (Pvc) (Sch 40) (3") (CO #2) 110 LF $13.00 $1,430.00 110 $1,430.00 70 Condt (Pvc) (Sch 40) (3") (Bore) (CO #2) 90 LF $20.00 $1,800.00 90 $1,800.00 71 Elec Condr (No. 4) hisulated (CO #2) 1760 LF $3.25 $5,720.00 1760 $5,720.00 72 Elec Condr (No. 4) Bare (CO #2) 560 LF $3.25 $1,820.00 560 $1,820.00 73 Remove Existing Cables (CO #2) 1760 LF $1.25 $2,200.00 1760 $2,200.00 74 Security for TxDOT Pull Box (CO #2) 24 HR $135.00 $3,240.00 24 $3,240.00 75 Re-Mobilication (ITS Layout) (CO #2) 1 LS $2,000.00 $2,000.00 1 $2,000.00 76 Traffic Control (ITS Layout) (CO #2) 1 LS $850.00 $850.00 1 $850.00 77 Temporary Traffic Signals (CO #2) 1 LS $5,995.00 $5,995.00 1 $5,995.00 78 Trinity - Furnish/Install PTZ Camera (CO #2) 2 EA $6,780.00 $13,560.00 2 $13,560.00 79 Trinity - Furnish/Install PTZ Cable (CO #2) 205 LF $6.50 $1,332.50 205 $1,332.50 Sub -Total of Previous Unit $728,731.00 $728,731.00 UNIT IV: PAVING - AMERICAN BLVD/TRANSFORMAT Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 Construction Staking (American Blvd/Bldg 6) (CO 1 LS $17,500.00 $17,500.00 1 $17,500.00 #1) 2 Remove Concrete Drive (CO #1) 321 SF $6.35 $2,038.35 321 $2,038.35 3 Remove Guardrail (CO #I & 2) 300 LF $11.00 $3,300.00 300 $3,300.00 4 Remove Cone Curb & Gutter (CO #1) 710 LF $9.00 $6,390.00 710 $6,390.00 5 Unclassified Excavation by Plan (CO #1 & 2) 428 CY $17.00 $7,276.00 428 $7,276.00 6 Hydrated Lime (CO #1 & 2) 0 TN $214.00 $0.00 0 $0.00 7 8" Lime Treatment (CO #1 & 2) 0 SY $8.00 $0.00 0 $0.00 8 11" Cone Pvmt (CO #1) 720 SY $105.00 $75,600.00 720 $75,600.00 9 Barrier Free Ramp, Type P-1 (CO #1) 4 EA $2,500.00 $10,000.00 4 $10,000.00 Friday, September 27, 2024 Page 8 of 13 City Project Numbers 101314 DOE Number 1314 Contract Name AMERICAN AIRLINES HEADQUARTERS Estimate Number I Contract Limits Payment Number 1 Project Type PAVING, DRAINAGE, STREELIGHTS, SIGNALS For Period Ending 8/31/2021 Project Funding 10 Remove 4" Pvmt Marking (CO #1 & 2) 1277 LF $1.00 $1,277.00 1277 $1,277.00 11 Topsoil (CO #1) 33 CY $55.00 $1,815.00 33 $1,815.00 12 Surface Restoration Sodding (CO #1 & 2) 504 SY $5.00 $2,520.00 504 $2,520.00 13 Exploratory Excavation of Existing Utilities (CO #1 3 EA $2,900.00 $8,700.00 3 $8,700.00 & 2) 14 Metal Beam Guard Fence (Steel Post) (CO #1 & 2) 225 LF $37.50 $8,437.50 225 $8,437.50 15 Downstream Terminal Anchor Section (CO #1 & 2) 2 EA $1,700.00 $3,400.00 2 $3,400.00 16 Single Guard Terminal (MASH) SKT (CO #1 & 2) 2 EA $3,750.00 $7,500.00 2 $7,500.00 17 Riprap (Conc)(4in) (CO #1 & 2) 0 CY $520.00 $0.00 0 $0.00 18 Flexible Base, Type A, GR-1 or 2 (CO #2) 720 SY $10.75 $7,740.00 720 $7,740.00 Sub -Total of Previous Unit $163,493.85 $163,493.85 - - - - - - - - - - - - - - - - - - - UNIT V: STORM DRAIN - AMERICAN BLVD/TRANSFO Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- 1 Remove 10' Recessed Inlet (CO #1) 1 EA $4,000.00 $4,000.00 1 $4,000.00 2 Trench Safety (CO #1) 86 LF $2.00 $172.00 86 $172.00 3 2 1 " RCP, Class III (CO #1) 121 LF $175.00 $21,175.00 121 $21,175.00 4 4' Storm Junction Box (CO #1) 1 EA $8,500.00 $8,500.00 1 $8,500.00 5 10' Type 2 Inlet (CO #1 & 2) 0 EA $17,100.00 $0.00 0 $0.00 6 10' Type 2 Inlet (CO #2) 1 EA $19,450.00 $19,450.00 1 $19,450.00 7 Concrete Encasement for 16" WL (CO #2) 185 LF $22.00 $4,070.00 185 $4,070.00 ------------------- Sub -Total of Previous Unit $57,367.00 $57,367.00 UNIT VI: LIGHTING,SIGNALS-AMER. BLVD Item Description of Items No. 1 Furnish/Install Elec Sery Pedestal (CO #1) 2 2" CONDT RM (Riser) (CO #1 & 2) 3 2" CONDT PVC SCH 80 (T) (CO #1 & 2) 4 3" CONDT PVC SCH 80 (T) (CO #1 & 2) 5 3" CONDT PVC SCH 80 (B) (CO #1 & 2) 6 4" SLD Pvmt Marking HAS (Y) (CO #1 & 2) 7 4" BRK Pvmt Marking HAS (W) (CO #1 & 2) 8 8" SLD Pvmt Marking HAS (W) (CO #1 & 2) Estimated Unit Unit Cost Estimated Quanity Total 1 EA $6,700.00 $6,700.00 0 LF $47.50 $0.00 350 LF $14.50 $5,075.00 225 LF $18.00 $4,050.00 255 LF $22.00 $5,610.00 0 LF $1.75 $0.00 1097 LF $1.00 $1,097.00 244 LF $2.00 $488.00 Completed Completed Quanity Total 1 $6,700.00 0 $0.00 350 $5,075.00 225 $4,050.00 255 $5,610.00 0 $0.00 1097 $1,097.00 244 $488.00 Friday, September 27, 2024 Page 9 of 13 City Project Numbers 101314 DOE Number 1314 Contract Name AMERICAN AIRLINES HEADQUARTERS Estimate Number I Contract Limits Payment Number 1 Project Type PAVING, DRAINAGE, STREELIGHTS, SIGNALS For Period Ending 8/31/2021 Project Funding 9 8" SLD Pvmt Marking HAS (Y) (CO #1 & 2) 116 LF $3.25 $377.00 116 $377.00 10 24" SLD Pvmt Marking HAE (W) (CO #1 & 2) 283 LF $6.00 $1,698.00 283 $1,698.00 11 Lane Legend Arrow (CO #1) 4 EA $127.00 $508.00 4 $508.00 12 Lane Legend Only (CO #1) 4 EA $140.00 $560.00 4 $560.00 13 REFL Raised Marker TY I-C (CO #1 & 2) 0 EA $5.00 $0.00 0 $0.00 14 REFL Raised Marker TY H-A-A (CO #1 & 2) 10 EA $9.00 $90.00 10 $90.00 15 3-Sect Signal Head Assembly (CO #1) 9 EA $1,150.00 $10,350.00 9 $10,350.00 16 Ped Signal Head Assembly (CO #1) 4 EA $900.00 $3,600.00 4 $3,600.00 17 Audible Pedestrian Pushbutton Station (CO #1) 4 EA $1,520.00 $6,080.00 4 $6,080.00 18 Furnish/Install BBU System (CO #1) 1 EA $9,050.00 $9,050.00 1 $9,050.00 19 Furnish/histall Hybrid Detection System (CO #1) 3 AP $9,600.00 $28,800.00 3 $28,800.00 20 Install Hybrid Detection Cable (CO #1 & 2) 505 LF $3.00 $1,515.00 505 $1,515.00 21 Furnish/Install Model 711 Preemption Detector (CO 3 EA $7,500.00 $22,500.00 3 $22,500.00 #1) 22 Furnish/Install Preemption Cable (CO #1 & 2) 505 LF $1.25 $631.25 505 $631.25 23 5/C 14 AWG Multi -Conductor Cable (CO #1 & 2) 615 LF $2.00 $1,230.00 615 $1,230.00 24 7/C 14 AWG Multi -Conductor Cable (CO #1) 60 LF $2.00 $120.00 60 $120.00 25 20/C 14 AWG Multi -Conductor Cable (CO 91 & 2) 380 LF $5.00 $1,900.00 380 $1,900.00 26 3/C 14 AWG Multi -Conductor Cable (CO #1 & 2) 410 LF $1.00 $410.00 410 $410.00 27 No 6 Insulated Elec Condr (CO #1), (CO#3) 0 LF $1.50 $0.00 0 $0.00 28 No 8 Insulated Elec Condr (CO #1 & 2) 475 LF $1.50 $712.50 475 $712.50 29 No 8 Bare Elec Condr (CO #1) 560 LF $1.50 $840.00 560 $840.00 30 Ground Box Type D, w/Apron (CO #1) 5 LF $1,148.00 $5,740.00 5 $5,740.00 31 Furnish/Install 10' -14' Ped Pole Assembly (CO #1) 3 EA $1,150.00 $3,450.00 3 $3,450.00 32 Furnish/histall Type 41 Signal Pole (CO #1) 1 EA $5,500.00 $5,500.00 1 $5,500.00 33 Furnish/Install Type 42 Signal Pole (CO #1) 2 EA $4,700.00 $9,400.00 2 $9,400.00 34 Fumish/Install Mast Arm 16' - 36' (CO #1) 3 EA $2,800.00 $8,400.00 3 $8,400.00 35 TY 3 Signal Foundation (CO #1) 3 EA $2,900.00 $8,700.00 3 $8,700.00 36 Light Pole Spread Footing (American/B6) (CO #1 & 4 EA $1,340.00 $5,360.00 4 $5,360.00 2) 37 Signal Cabinet Foundation - 352i & BBU (CO #1) 1 EA $7,765.00 $7,765.00 1 $7,765.00 38 Fumish/Install 352i Controller Cabinet Assembly I EA $24,400.00 $24,400.00 1 $24,400.00 (CO #1) 39 LED Lighting Fixture (American / 136) (CO #1) 1 EA $945.00 $945.00 1 $945.00 40 Fumish/Install Alum Sign Mast Arm Mount (CO #1 4 EA $550.00 $2,200.00 4 $2,200.00 & 2) Friday, September 27, 2024 Page 10 of 13 City Project Numbers 101314 DOE Number 1314 Contract Name AMERICAN AIRLINES HEADQUARTERS Estimate Number I Contract Limits Payment Number 1 Project Type PAVING, DRAINAGE, STREELIGHTS, SIGNALS For Period Ending 8/31/2021 Project Funding 41 Traffic Control (American / 136) (CO #1 & 2) 5 MO $7,000.00 $35,000.00 5 $35,000.00 42 Temporary Stop Signs with Flags (CO #2) 3 MO $297.00 $891.00 3 $891.00 43 2" CONDT PVC SCH 80 (B) (CO #2) 255 LF $20.00 $5,100.00 255 $5,100.00 44 Furnish/Install PTZ Camera (American) (CO #2) 1 EA $6,780.00 $6,780.00 1 $6,780.00 45 Fumish/Install PTZ Cable (American) (CO #2) 35 LF $6.50 $227.50 35 $227.50 Sub -Total of Previous Unit $243,850.25 $243,850.25 Friday, September 27, 2024 Page 11 of 13 City Project Numbers 101314 Contract Name AMERICAN AIRLINES HEADQUARTERS Contract Limits Project Type PAVING, DRAINAGE, STREELIGHTS, SIGNALS Project Funding Contract information Summary Original Contract Amount Change Orders Change Order Number 1 Change Order Number 2 Change Order Number 1 Change Order Number 2 Change Order Number 1 Change Order Number 2 Change Order Number 2 Change Order Number 2 Change Order Number 2 Change Order Number 3 Change Order Number 3 DOE Number 1314 Estimate Number I Payment Number 1 For Period Ending 8/31/2021 $3,249,070.80 $144,405.55 $19,088.30 $50,947.00 $6,420.00 $213,731.25 $30,434.00 $125,884.50 $30,614.00 $83,489.50 ($16,500.00) $15.00 Total Contract Price $3,528,186.10 Total Cost of Work Completed $3,528,186.10 Less % Retained $0.00 Net Earned $3,528,186.10 Earned This Period $3,528,186.10 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $3,528,186.10 Friday, September 27, 2024 Page 12 of 13 City Project Numbers 101314 Contract Name AMERICAN AIRLINES HEADQUARTERS Contract Limits Project Type PAVING, DRAINAGE, STREELIGHTS, SIGNALS Project Funding Project Manager NA Inspectors WATSON / YBARRA Contractor REYES GROUP LTD. 1520 PARKER ROAD GRAND PRAIRIE, TX 75050 DOE Number 1314 Estimate Number I Payment Number 1 For Period Ending 8/31/2021 City Secretary Contract Number Contract Date Contract Time 117 WD Days Charged to Date 568 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $3,528,186.10 Less % Retained $0.00 Net Earned $3,528,186.10 Earned This Period $3,528,186.10 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $3,528,186.10 Friday, September 27, 2024 Page 13 of 13 DEVELOPER - AWARDED - PROJECT CHANGE ORDER PROJECT NAME: (American Airlines Headquarteers - Trinity Blvd, SBFR 360, American Blvd CONTRACT: Paving, Drainage, Street Lighting, Signals ICFA II CS-51820 I CITY PARTICIPATION: I YES I CITY PROJECT # 101314 [DOE It NIA IWATER PROJECT # NIA ISEWERPROJECT It NIA (FILE # K-2966 INSPECTOR: Aaron Ybarra Phone No: 682-213-0382 PROJECT MANAGER: Debbie J. Willhelm Phone No: 817-392-2481 I PAVING (IMPACT FEE REVENUE) CITY COST ORIGINAL CONTRACT $ 128,164.00 EXTRAS TO DATE CREDITS TO DATE CONTRACT TO DATE $ 128,154.00 AMOUNT OF PROP. CHANGE ORDER $ - :REVISEDCONTRACTAMOUNT $ 128,154.00 !TOTAL REVISED CONTRACT AMOUNT` $ 128,164.00 !PER UNIT :REVISED COST SHARE DEVELOPER TOTAL REVISED CONTRACT COST CONTRACT UNIT PAVING I STORM DEVELOPER CITY TXDOT DEVELOPER C COST COST CP,5T COST C $ - $ 308,454.30 $ 1,663,017.20 $ - $ 2 $ - $ 380,454.30 $ 1,663,817.20 $ - $ 2 $ 144,405.55 $ - $ 6 $ $ 632,859.86 $ 1,563,817.20 $ - $ 7 $2,006,677.06 $176, $0.00 I OST ITY $1,079,804.40 $3,249,070.80 I CHANGE I ORDER No: 0 CSC No. 51820-COI DRAIN STREET LIGHTS, SIGNS, SIGNALS I CONTRACT - DAYS Page 1 of 4 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENTS: PAY ITEM 9I CITY BID ITEM I QUANTITY I UNIT I ITEM DESCRIPTION I UNIT PRICE I CITY COST I� Tlt�9'�O0/$.!'21 COST PAVING (IMPACT FEE REVENUES) t $ $ L I I 1 $ $ $ PAVING SUBTOTAL (IMPACT REVENUES) $ - $ $ I PAVING I 115 3292.0100 1 LS Construction Slaking /American Blvd I Bldg 6) $ 17,500.00 $ 17,500.00 $ - $ 17,500.00 I 116 0241.0401 321 SF Remove Concrete Drive $ 6.35 $ 2,038.35 $ $ 203835 I 117 0241.0560 100 LF Remove Guardrail $ 11.00 $ 1,100.00 $ $ 1:100:00 I 118 0241.1300 710 LF Remove Cone Curb&Guller $ 9.00 $ 6.390.00 $ $ 6.390.00 I 120 3123.0101 _ _ 268 CY Unclassified Excavation by Plan $ 17.00 $ 4,556,00 $ 1 $ 4,556.00 I I 121 3211.0400 10.8 TN Hydrated Lime $ 214.00 $ 2,311.20 $ $ 2.311.20 I 122 3211.0502 720 SY V Lime Treatment $ 8.00 $ 5,760.00 $ $ 5760.001 I 123 3213.0106 720 SY 11" Cone Pvmt $ 105.00 $ 75,600.00 $ - $ 75:600,00 1 I 124 3213.0506 4 EA Barrier Free Ramq, TyGe P-1 $ 2.500.00 $ 10,000.00 $ $ 10,000.001 I 125 3217.4301 1400 LF Remove 4" Pvml Marking $ 1.00 $ 1.400.00 $ - $ 1,400.00 I 128 3291.0100 33 CY Topsoil $ 55.00 $ 1.815.00 $ $ 1,815.001 I 127 3292.0101 295 SY Surface Restoration Sodding $ 5.00 $ 1.475.00 $ - $ 1,475.00 I 128 3305.0103 2 EA EkQloralory Excavation of Exlslip Utilities $ 2.900.00 $ 5.800.00 $ $ 5.800.00 1 I 133 TX 540-8002 44 LF Me+al Beam Guard Fence (Slee(Posl) $ 37.50 $ 1.650.00 $ - $ 1,650.00 1 I 134 TX 540-6016 1 EA Downstream Terminal Anchor Section $ 1.700.00 $ 1.700.00 $ - $ 1.700.00 1 I 135 TX 544.6002 1 EA Single Guard Terminal (MASH) SKT $ 3,750.00 $ 3,750.00 $ - $ 3,750.001 I 136 TX 432-6001 3 CY Riorap (Conc)(4 In) $ 520.00 $ 1.660.00 $ $ 1.560.00 1 PAVNG SUBTOTAL $ 144,405.56 $ - $ 144.405.65 STORM DRAIN I 119 0241,4111 1 EA 10241.4101 Remove 10' Recessed Inlet $ 4,000.00 $ 4,000.00 $ $ 4,000.00 I 129 3305.o109 86 LF 3305.0109 Trench Safely $ 2.00 $ 172.00 $ $ 172.00_1 I 130 3341.0201 121 LF 3341.0201 21" RCP, Class III 13349.800, $ 176.00 $ 21.175.00 $ $ 21.176.001 131 3349.0001 1 EA 3349.0001 4' Storm Junction Box $ 8.500.00 $ 8.500.00 $ $ 8500.00 132 3349.8001 1 EA IV Type 2 Inlet $ 17.100.00 $ 17.100.00 $ - 1 $ 17:100.00 1 STORM D AIN SUBTOTAL $ 50.947.00 $ $ 50,947.00 1 I LIGHTING, SIGNS SIGNALS I 137 2605.0111 1 EA Furnishllnslall Else Sery Kdestal $ 6,700.00 $ 6.700.00 $ $ 6700.00 I 138 2605.3014 25 LF 2" CONDT RM (Riser) $ 47.50 $ 1.187.50 $ $ 1:187.50 1 I 139 2605.30,5 40 LF 2"/t�f}1,NDT PYfr; SC`FI' 80 T) $ 14.60 $ 580.00 $ - $ 680.001 I 140 2605.3025 385 LF 3"' CCOiN�0 PVC SC�H 80/S)TI $ 18.00 $ 6.930.00 $ $ 6.930.00 1 6 2605.3026 136 LF 1" 21.76 2 2 ,970.00 I 142 510 LF S�D PvmlV as in.9 HAS �11 $ $ 892,50 $ - $ 892.501 I 143 3217.003 220 LF 4" BRK Pvmt Marking HAS Wj $ 1.00 $ 220.00 $ - $ 220.00 j I 144 3217.0201 199 LF 8" SLD Pvmt Marking HAS W) $ 2.00 $ 398.00 $ - $ 398.001 I 145 3217.0202 107 LF e" SLD Pvml Markinp HAS Y $ 3.25 $ 347.75 $ - $ 347.75 1 I 146 3217.0501 329 LF 24" SLD Pvmt Marking HAE (L $ 6,00 $ 1,974.00 $ - $ 1,974.00 1 I 147 3217.1002 4 EA Lane Legend Arrow $ 127.00 $ 508.00 $ $ 508.00 I 148 3217.1004 4 EA Lane Legend Only $ 140.00 $ 660.00 $ $ 560.00 I 149 3217.21002 28 EA REFL Raised Marker TY I-C $ 5.00 $ 140.00 $ $ 140.00 I 150 3217.2103 9 EA REFL Raised Marker TY II -A -A $ 9.00 $ 81.00 $ $ 81.00 I 151 3441.1001 9 EA 3-Sect Signal Head Assmbly $ 1.150.00 $ 10.350.00 $ - $ 10,350.00 I 152 3441.1011 4 EA Ped S� pal Head Assmblyy $ 900.00 $ 3.600.00 $ - $ 3,600.00 I 153 3441.1031 4 EA Audibr Pedesld.n Pushbullon Station $ 1,520.00 $ 6,000.00 $ $ 6:080.00 1 I 154 3441,1210 1 EA Furnish/Install BBU System $ 9.050.00 $ 9,050.00 $ - $ 9,050.001 I 155 3441.1216 3 APR Furnishllnslall Hybrid Detection System $ 9,600.00 $ 28,800.00 $ $ 28,800.00 1 Page 2 of 4 156 3441.1217 510 LF Install Hybrid Detection Cable $ 3.00 $ 1.530.00 $ - $ 1,530.00 I 167 3441.1220 3 EA Furnlsh/Install Model 711 Preemption Detector $ 7,500.00 $ 22,500.00 $ - $ 22,500.00 150 3441.1224 510 LF Furnishllnstall Preemption Cable $ 1.25 $ 637.50 $ - $ 637.50 1 159 3441.1311 670 LF 51C 14 AWG Mulll-Conductor Cable $ 2.00 $ 1,340.00 $ - $ 1,340.00 160 3441.1312 60 LF 71C 14 AWG Mulll-Conductor Cable $ 2.00 $ 120.00 $ $ 120.00 JJ 161 3441.1316 385 LF 201C 14 AWG Mulll-Conduc(or Cable $ 5.00 $ 1.925.00 $ - $ 1,926.001 162 3441.1322 415 LF 3IC 14 AWG Multi -Conductor Cable $ 1.00 $ 415.00 $ - $ 415.00 163 3441.1408 210 LF NO 6 Insulated Else Condr $ 1.50 $ 315.00 $ - $ 316.00 164 3441,1409 80 LF NO 8 Insulated Elec Condr $ 1.50 $ 120.00 $ - $ 120.00 165 3441.1414 660 LF NO 8 Bare Else Condr $ 1.50 $ 840.00 $ - $ 840.00 166 3441.1503 5 LF Ground Box TypPe D, W/Apron $ 1.148.00 $ 5.740.00 $ - $ 6,740.00 i 167 3441.1603 3 EA Furnishllnstall 10' - 14' Ped Pole Assmbly $ 11150.00 $ 3.450.00 $ - $ 3,450.00 168 3441.1611 1 EA Furnish/Install Type 41 S al Pole $ 5.500.00 $ 5,500.00 $ - $ 5:500.00 ` 169 3441.1612 2 EA Fufn:sh/Install Type 42 Sral Pole $ 4.700.00 $ 9,400.00 $ $ 9,400.00 J 170 3441.1623 3 EA Furnlshllnslall Mast Arm 6' - 36' $ 2,800.00 $ 8,400.00 $ - $ 8.400.00 I 171 3441.1703 3 EA TY 3 Signal Foundation $ 2.900.00 $ 8,700.00 $ - $ 8,700.00 f 172 3441.XXXX 3 EA Lt Pole �Hread Foolinq (American I B6) $ 1.340.00 $ 4.020.00 $ - $ 4:020.00 i 173 3441.1715 1 EA Slignal Cabinet Foundation - 352i 8 BBU $ 7.765.00 $ 7.765.00 $ - $ 7,765.00 174 3441,1741 1 EA Furnlshllnslall 3521 Controller Cabinet Assembly $ 24.400.00 $ 24.400.00 $ - $ 24.400.00 175 3441.3201 1 EA LED LI htinq Fixture (American / 136) $ 946.00 $ 945,00 $ - $ 946.001 176 3441.4001 6 EA Furnislnslall Alum Sign Mast Arm Mount $ 550.00 $ 3,300.00 $ - $ 3,300.001 177 3471.0001 3 MO Traffic Control (American 1136) $ 7000.00 $ 21,000.00 $ - $ 21.000.00 1 LIGHTING, SIGNS, SIGPALS SLINTAL $ 213,731.26 $ $ 213,731.25 f TOTAL $ 409,083.80 1 $ - $ 409,083.80 j [ SIGNATURES APPEAR ON THE FOLLOWING PAGE Page 3 of 4 REASONS FOR CHANGE ORDER: Scope for the Enhanced CFA with American Airlines, Inc. (CS-51820) was expanded (adding CPN 101828) to Include paving, storm drain, and signals in the vicinity of American Boulevard and it's Intersection with Transformation Way. Changes correspond to the construction plans prepared by Dunaway Associates and dated January 2, 2019 for CP 101828 American Blvd Paving and Traffic Signal Improvements to serve American Airlines Headquarters. This Change Order only amends the CPIJ 101314 portion of CS- 51820. This change order requires 90 calendar days added to the contract. This change order corresponds with Contractor's Request PCO01 Reviewed May 6, 2019. This change order is not eligible for RTR Funding; therefore, this change order is 100% City -Funded. CITY AND TXDOT FUNDS INVOLVED IN THIS CONTRACT. REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. � MryI��F�! Pp APPROVAPPROVAL . Consuullanl soheco Koch tinl-Aar Developer American Airlines, Inc. Contractorc- Reyes Group, Ltd CFW Sponsoring Department M?4aw . S Cry k�k ✓ Ho'� ` MakuHeubauer(Aug 28,2019) Kir E Hotelling(Aug 29,2019 aoGReyes(Aug3121 ,Steve Cooko(Aug30,2019) Markus D. Neubauer, PE Kirk Holelling Marcos G. Reyes Steve Cooke Associate Principal Managing Director - Campus & Airport Affairs President Interim Director, Transportation and Public Works Dept APPROVED: APPROVED AS TO FORM AND LEGALITY: �f�.MME�Ilf ' Contract Compliance Manager (Project Manager) �W compliance CFW - Assistant City Manager CFW - Assistant City Attorney - Contract Manager By signing, I acknowledge that I am the person responsible Richard A NcCraakon for the monitoring and administration of this contract, J`���^l-'��'�//� —�� including ensuring all performance and reporting Dal,a Ourr;hdo fl (S p m /,J/ Dana Burghdo , AIC /�u aichmd A. Mccracken (Sep 1, 2019) D •�� ����+�•+.,�^• . i� �, .,��"� re lrements. Richard A. McCracken Debbie J. Willhelm, PE M Q Number: C-28098 C-29166 Acting Assistant City Manager Assistant City Attorney Project Manager M&C Date Appr.: 10/16/2018 6/25/2019 Form 1296: NIA ATTEST: Jannette S. Goodall City Secretary Page 4 of 4 IPROJECT NAME: (CONTRACT: ICFA # ICITY PROJECT # IDOE # I WATER PROJECT # ISEWER PROJECT # (FILE# INSPECTOR: PROJECT MANAGER DEVELOPER - AWARDED - PROJECT CHANGE ORDER American Airlines Headquarteers -Trinity Blvd, SBFR 360, American Blvd CHANGE Paving, Drainage, Street Lighting, Signals ORDER No: CS-51820 I CITY PARTICIPATION: I YES 101314 N/A 2 N/A N/A K-2965 Aaron Ybarra Debbie J. Willhelm Phone No: 682-213-0382 Phone No: 817-392-2481 CSC No. 51820-CO2 I(IPAVING MPACT E)E I PAVING I STORM DRAIN I STREET LIGHTS, SIGNS, SIGNALS ORIGINAL CONTRACT EXTRAS TO DATE CREDITS TO DATE CONTRACT TO DATE AMOUNT OF PROP. CHANGE ORDER REVISED CONTRACT AMOUNT TOTAL REVISED CONTRACT AMOUNT PER UNIT COST $ 128,154.00 COST COST $ - $ 388,454.30 $ - $ 144,405.55 $ - $ - $ - $ 532,859.85 $ - $ 44,265.20 $ - $ 577,125.05 $2,231,649.85 COST $ 1,553,817.20 COST COST COST $ - $ 24,864.00 $ 99,456.00 $ - $ 50,947.00 $ - $ - $ - $ - $ - $ 75,811.00 $ 99,456.00 $ - $ 12,542.80 $ 24,491.20 $ - $ 88,353.80 $ 123,947.20 $212,301.00 COST I COST $ - I $ 129,048.30 $ - I $ 213,731.25 $ - I $ - $ - I $ 342,779.55 $ - I $ 46,801.90 $ - I $ 389,581.45 $972,566.25 COST $ 516,193.20 $ - $ - $ - $ - $ - $ - $ 128,154.00 $ 1,553,817.20 $ 516,193.20 $ - $ 100,707.60 $ 66,791.60 $ 128,154.00 $ 1,654,524.80 $ 582,984.80 $ 128154.00 REVISED COST SHARE TOTAL REVISED CONTRACT DEVELOPER COST $0.00 CITY COST $1 183 214 30 $3,544,671.10 COST COST $2,361,456.80 CONTRACT DAYS 117 90 207 180 387 Page 1 of 6 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENTS: PAY ITEM # CITY BID ITEM QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE CITY COST TXDOT COST TOTAL # COST PAVING (IMPACT Fj EVENUES) 100% 0% 1 $ $ $ I $ - $ - $ I PAVING SUBTOTAL (IMPACT FEE REVENUES) $ - $ - $ - PAVING (,Pmerican Blvd I Transformation Way) I 100% I 0% 11111110111 117 0241.0550 200 LF Remove Guardrail $ 11.00 $ 2,200.00 $ - $ 2,200.00 120 3123.0101 160 CY Unclassified Excavation by Plan $ 17.00 $ 2,720.00 $ - $ 2,720.00 1 121 3211.0400 -10.8 TN Hydrated Lime $ 214.00 $ (2,311.20) $ - $ (2,311.20)1 122 3211.0502 -720 SY 8" Lime Treatment $ 8.00 $ (5,760.00) $ - $ (5,760.00)1 125 3217.4301 -123 LF Remove 4" Pvmt Marking $ 1.00 $ (123.00) $ - $ (123.00)1 127 3292.0101 209 SY Surface Restoration Sodding $ 5.00 $ 1,045.00 $ - $ 1,045.00 1 128 3305.0103 1 EA Exploratory Excavation of Existing Utilities $ 2,900.00 $ 2,900.00 $ - $ 2,900.00 1 133 TX 540-6002 181 LF Metal Beam Guard Fence (Steel Post) $ 37.50 $ 6,787.50 $ - $ 6,787.50 1 134 TX 540-6016 1 EA Downstream Terminal Anchor Section $ 1,700.00 $ 1,700.00 $ - $ 1,700.001 135 TX 544-6002 1 EA Single Guard Terminal (MASH) SKT $ 3,750.00 $ 3,750.00 $ - $ 3,750.00 1 136 TX 432-6001 -3 CY Riprap(Conc)(4 In) $ 520.00 $ (1,560.00) $ - $ (1,560.00)1 178 3211.0113 720 SY Flexible Base, Type A, GR-1 or 2 $ 10.75 $ 7,740.00 $ - $ 7,740.00 1 PAVING SUBTOTAL (American Blvd I Transformation Way)l $ 19,088.30 1 $ - I $ 19,088.30 1 STORM DRAIN (American Blvd I Transformation Way) 100 6 0% 1 (14,070.00)1 I 19422.00 �4,070. 9,450.00 184 3305.OX196 185 LF Concrete Encasement for 16" WL $ 00 $ $ - $ ' STORM DRAIN SUBTOTAL (American Blvd I Transformation Way) $ 6,420.00 $ - $ 6,420.00 1 M LIGHTING, SIGNS, SIGNALS (American Blvd / Transformation Way) I 100% I 0% I 1 138 2605.3014 -25 LF 2" CONDT RM (Riser) $ 47.50 $ (1,187.50) $ - $ (1,187.50)1 139 2605.3015 310 LF 2" CONDT PVC SCH 80 $ 14.50 $ 4,495.00 $ - $ 4,495.00 1 140 2605.3025 -160 LF 3" CONDT PVC SCH 80 {,T) $ 18.00 $ (2,880.00) $ - $ (2,880.00)1 141 2605.3026 120 LF 3" CONDT PVC SCH 80 (�Bjj $ 22.00 $ �,640.00 $ - $ 2,640.00 1 142 3217.001 -510 LF 4" SLID Pvmt Marking HAS (Y) $ 1.75 $ (892.50) $ - $ (892.50)1 143 3217.003 877 LF 4" BRK Pvmt Marking HAS (W) $ 1.00 $ 877.00 $ - $ 877.00 1 144 3217.0201 45 LF 8" SLID Pvmt Marking HAS (W) $ 2.00 $ 90.00 $ - $ 90.00 1 145 3217.0202 9 LF 8" SLID Pvmt Marking HAS (Y) $ 3.25 $ 29.25 $ - $ 29.25 1 146 3217.0501 -46 LF 24" SLD Pvmt Markin HAE (W) $ 6.00 $ ((276.00) $ - $ (276.00)1 149 3217.2102 -28 EA REFL Raised Marker I-C $ 5.00 $ (140.00) $ - $ (140.00)1 150 3217.2103 1 EA REFL Raised Marker TY II -A -A $ 9.00 $ 9.00 $ - $ 9.00 1 156 3441.1217 -5 LF Install Hybrid Detection Cable $ 3.00 $ (15.00) $ - $ (15.00)1 158 3441.1224 -5 LF Fumish/Install Preemption Cable $ 1.25 $ (6.25) $ - $ (6.25)1 159 3441.1311 -55 LF 5/C 14 AWG Multi -Conductor Cable $ 2.00 $ (110.00) $ - $ (110.00)1 161 3441.1315 -5 LF 20/C 14 AWG Multi -Conductor Cable $ 5.00 $ (25.00) $ - $ (25.00)1 162 3441.1322 -5 LF 3/C 14 AWG Multi -Conductor Cable $ 1.00 $ I5.001 $ - $ (5.00)1 163 3441.1408 -220 LF NO 6 Insulated Elec Condr $ 1.50 $ `330.00) $ - $ (330.00)1 164 3441.1409 395 LF NO 8 Insulated Elec Condr $ 1.50 $ 592.50 $ - $ 592.50 I 172 3441.XXXX 1 EA Light Pole Spread Footing (American / B6) $ 1,340.00 $ 1,340.00 $ - $ 1,340.00 1 176 3441.4001 -2 EA Fumish/Install Alum Sign Mast Arm Mount $ 550.00 $ (1,100.00) $ - $ (1,100.00)1 177 3471.0001 2 MO Traffic Control (American / B6 $ 7,000.00 $ 14,000.00 $ - $ 14,000.00 1 179 3471.XXXX 3 MO Temporary Stop Signs with Fags $ 297.00 $ 891.00 $ - $ 891.00 1 180 2605.3016 255 LF 2" CONDT PVC SCH 80 (B) $ 20.00 $ 5,100.00 $ - $ 5,100.00 1 181 3441.XXXX 1 EA FURNISH / INSTALL PTZ CAMERA AMERICAN) $ 6,780.00 $ 6,780.00 $ - $ 6,780.00 1 182 3441.XXXX 35 LF FURNISH / INSTALL PTZ CABLE (,MERICAN` $ 6.50 $ 227.50 $ - $ 227.50 1 LIGHTING, SIGNS, SIGNALS SUBTOTAL (American Blvd I Transformation Way)1 $ 30,104.00 1 $ - I $ 30,104.00 1 Page 2 of 6 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENTS: PAY ITEM # I CITY BID ITEM I QUANTITY 2 3 6 17 18 20 21 22 23 24 25 28 29 30 31 32 33 34 35 36 37 38 39 41 42 43 99 100 101 102 103 104 107 109 187 191 194 195 196 197 198 200 217 219 220 221 222 223 224 225 226 227 228 229 241.0100 241.0300 241.1000 3123.0101 3124.0101 3201.0302 3211.0401 3211.0502 3213.0104 2313.0312 2313.0321 3213.0506 3217.0003 3217.0201 3217.0501 3217.1002 3217.1004 3217.2102 3217.2104 3217.4301 3217.4306 3217.4307 3232.0100 3292.0100 3292.0400 3305.0103 3471.0001 3471.0002 360-6003 360-6027 400-6005 403-6001 432-6046 450-6048 3305.XXXX 3471-0001 310-6001 341-6008 341-6021 360-6008 3211.0113 TxDOT 644 TxDOT 662 TxDOT 423 TxDOT 423 3441.4003 TxDOT Pv Mk 450-6031 TxDOT 423 TxDOT 423 TxDOT 423 755 3 70 1379.5 992 261.94 -84 5241 41.33 -2492 -1080 1 -1964 1013 564 17 4 31 53 -1894 -47 -38 557 1981 6774 3 3 -20 -279 -450 15 352 40.33 -3575 20 5 279 279 279 1323 4962 1 103 1 1 1 1 1 31 601 338 130 133 1 UNIT I ITEM DESCRIPTION I UNIT PRICE CITY COST TOL COST LAVING (Trinity Boulevard) 20% 80% 1 SF Remove Sidewalk $ 2.50 $ 377.50 $ 1,510.00 $ 1,887.50 I EA Remove ADA Ramp $ 745.00 $ 447.00 $ 1,788.00 $ 2,235.00 I SY Remove Conc Pvmt $ 19.00 $ 266.00 $ 1,064.00 $ 1,330.00 1 CY Unclassified Excavation by Plan $ 17.00 $ 4,690.30 $ 18,761.20 $ 23,451.50 1 CY Embankment by Plan $ 11.00 $ 2,182.40 $ 8,729.60 $ 10,912.00 1 SY 3" Extra Width Asphalt Pavement Repr $ 24.00 $ 1,257.31 $ 5,029.25 $ 6,286.56 1 TN Commercial Lime Slurry $ 214.00 $ (3,595.20) $ (14,380.80) $ (17,976.00)1 SY 8" Lime Treatment $ 8.00 $ (8,385.60) $ (33,542.40) $ (41,928.00)1 SY 9" Concrete Pavement $ 86.00 $ 710.88 $ 2,843.50 $ 3,554.38 1 SF 5' Conc Sidewalk, Adjacent to Curb $ 8.00 $ (3,987.20) $ (15,948.80) $ (19,936.00)1 SF Conc Sidewalk, Adjacent to Ret Wall $ 8.00 $ (1,728.00) $ (6,912.00) $ (8,640.00)1 EA LF Barrier Free Ramp, Type P-1 4" BRK Pvmt Markin. HAS W) $ $ 2,500.00 1.00 $ 500.00 $ $ (392.80) $ 2,000.00 $ (1,571.20) $ 2,500.00 1 (1,964.00)1 LF 8" SLID Pvmt Markinp HAS�W) $ 2.00 $ 405.20 $ 1,620.80 $ 2,026.00 1 LF 24" SLD Pvmt Marking HA ( $ 6.00 $ (676.80) $ (2,707.20) $ �3,384.00)1 EA Lane Legend Arrow $ 127.00 $ 431.80 $ 1,727.20 $ 2,159.00 1 EA Lane Legend Onl $ 140.00 $ 112.00 $ 448.00 $ 560.00 I EA REFL Raised MaLr TY I-C $ 5.00 $ 31.00 $ 124.00 $ 155.00 I EA REFL Raised Marker TY II-C-R $ 5.00 $ 53.00 $ 212.00 $ 265.00 I LF Remove 4" Pvmt Marking $ 1.00 $ (378.80) $ (1,515.20) $ (1,894.00)1 LF Remove 24" Pvmt Marking $ 2.50 $ (23.50) $ (94.00) $ (117.50)1 EA Remove Raised Marker $ 1.00 $ (7.60) $ (30.40) $ (38.00)1 SF Conc Ret Wall Adjacent to Sidewalk $ 19.00 $ 2,116.60 $ 8,466.40 $ 10,583.00 I SY Block Sod Placement $ 5.00 $ 1,981.00 $ 7,924.00 $ 9,905.00 1 SY Seedin_q, Hydromulch $ 1.00 $ 1,354.80 $ 5,419.20 $ 6,774.00 I EA Explorafor��( Excavation of Existing Util $ 2,900.00 $ 1,740.00 $ 6,960.00 $ 8,700.00 MO Traffic Control I $ 10,500.00 $ 6,300.00 $ 25,200.00 $ 31,500.00 WK Portable Message Sign $ 212.00 $ (848.00) $ (3,392.00) $ (4,240.00)1 SY Conc Pvmt (Cont Remf CRCP 9") $ 175.00 $ (9,765.00) $ (39,060.00) $ (48,825.00)I LF Curb (TV p1' I $ 11.00 $ (990.00) $ (3,960.00) $ 4,950.00)1 �,800.00 CY Cam Stabil B loring $ 120.00 $ 360.00 $ 1,440.00 $ I SF Temporary Spl $ 32.00 $ 2,252.80 $ 9,011.20 $ 11,264.00 I CY R� Strip)(5 In) $ 520.00 $ 4,194.32 $ 16,777.28 $ 20,971.601 LF rap(Mow Rail111111Handrail)(TY B) $ 68.00 $ (48,620.00) $ (194,480.00) $ (243,100.00)1 EA �cpatory Excav tions (Shallow) $ 500.00 $ 2,000.00 $ 8,000.00 $ 10,000.00 1 MO Tru a our $ 6,389.00 $ 6,389.00 $ 25,556.00 $ 31,945.00 1 SY Prime Coat $ 2.00 $ 111.60 $ 446.40 $ 558.00 I SY HOT MIX ASP ALT TY B (20") $ 165.00 $ 9,207.00 $ 36,828.00 $ 46,035.00 I SY HOT MIX ASPHALT TY C (2") $ 20.50 $ 1,143.90 $ 4,575.60 $ 5,719.50 I LF CURB & GUTTER (TXDOT TY II) $ 27.00 $ 7,144.20 $ 28,576.80 $ 35,721.00 I SY 8" Flexible Base, Tyne A, GRA or 2 $ 10.75 $ 10,668.30 $ 42,673.20 $ 53,341.50 LS Tree Well Slope Protection $ 16,500.00 $ 3,300.00 $ 13,200.00 $ 16,500.00 1 LF Remove Guardrail $ 11.00 $ 226.60 $ 906.40 $ 1,133.00 LS Small Roadway Sign Assemblies $ 4/305.00 $ 861.00 $ 3,444.00 $ 4,305.00 I LS Work Zone Pavement Markin�%s $ 4.910.00 $ 982.00 $ 3,928.00 $ 4,910.00 I LS Modification to Retaining Wall RWWB 106 $ 2,150.00 $ 430.00 $ 1,720.00 $ 2,150.00 I LS Modification to Retaining Wall RWEB 105 $ 2,460.00 $ 490.00 $ 1,960.00 $ 2,450.00 I EA FURNISH/INSTALL ALUM SIGN GND MNT CITY STD $ 550.00 $ 110.00 $ 440.00 $ 550.00 I EA REF PAV MRK TY I (YLD TRI)(100MIL) $ 45.00 $ 279.00 $ 1,116.00 $ 1,395.00 I LF RAIL (TY C221)(HPC��ISE 6" $ 15.50 $ 1,863.10 $ 7,452.40 $ 9,315.50 I LF RVWt1B 106 - Epoxy eRair Ga& $ 46.50 $ 3,143.40 $ 12,573.60 $ 15,717.00 LF RWWB 108- Concrete Repair Gap $ 14.50 $ 377.00 $ 1,508.00 $ 1,885.001 LF RW - Repair - Monolithic Pour $ 2.87 $ 76.34 $ 305.37 $ 381.71 I EA Tunnel bore under Colored Stamped Concrete $ 448.00 $ 89.60 $ 358.40 $ 448.00 I Page 3 of 6 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENTS: PAY ITEM # CITY BID ITEM QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE CITY COST TOTAL COST 230 1 EA Re -Mobilization Fee-Slaton Bros $ 4,000.00 $ 800.00 $ 3,200.00 $ 4,000.001 231 1 EA Re -Mobilization Fee - Oscar Orduno $ 3,000.00 $ 600.00 $ 2,400.00 $ 3,000.001 234 658-6004 59 EA F&I Delineators JD -SW SZ 2 FLX SRF) $ 79.50 $ 938.10 $ 3,752.40 $ 4,690.50 I 235 3441.41XX 2 EA Furnish & Install Sign Panel and Post $ 375.00 $ 150.00 $ 600.00 $ 750.00 I 236 1 LS Traffic Control - Stnpi�p $ 950.00 $ 190.00 $ 760.00 $ 950.00 I 237 2 EA Remobilization - St n in_qq & Payment Repair $ 1,600.00 $ 640.00 $ 2,560.00 $ 3,200.00 238 1200 LF Chain Link Fence J6�S1ee1 $ 29.50 $ 7,080.00 $ 28,320.00 $ 35,400.00 I 239 1 LS C221 RAIL REPAIIR - emove & Replace $ 3,750.00 $ 750.00 $ 3,000.00 $ 3,750.00 I 240 10 LF Remove & Replace Handrail Section $ 295.00 $ 590.00 $ 2,360.00 $ 2,950.00 I 241 3 DAY Rail Repair Emergency Traffic Control $ 950.00 $ 570.00 $ 2,280.00 $ 2,850.00 I 242 3471.0001 1 LS Traffic Control fConc Repair American/Trinity) $ 4,700.00 $ 940.00 $ 3,760.00 $ 4,700.001 243 3213.0104 70 SY 9" Cone Pvmt HES) $ 120.65 $ 1,689.10 $ 6,756.40 $ 8,445.50 I 244 658-6004 60 LF Remove Delineators (D-SW SZ 2 FLX SFR) $ 15.50 $ 186.00 $ 744.00 $ 930.00 I 245 1 LS Plan REV7 -Traffic Control for Removal & Stripinq $ 1,150.00 $ 230.00 $ 920.00 $ 1,150.00 I 246 1 LS PlanREV7 - Remobilization - Stri�in$ $ 1,600.00 $ 320.00 $ 1,280.00 $ 1,600.00 I 247 37.5 LF Plan REVS - TxDOT 540-600130 $ 37.50 $ 281.25 $ 1,125.00 $ 1,406.251 248 1 EA Plan REVS - TxDOT 540-6009 TRANS THRIE Beam $ 3,525.00 $ 705.00 $ 2,820.00 $ 3,525.00 I 249 1 EA Plan REVS - TxDOT 544-6001 SKT MASH $ 3,750.00 $ 750.00 $ 3,000.00 $ 3,750.00 I 250 1 LS Plan REVS - Remobilization Guardrail Crew $ 1,800.00 $ 360.00 $ 1,440.00 $ 1,800.00 I 251 1 WK Plan REV8 - Traffic Control for MBGF $ 10,500.00 $ 2,100.00 $ 8,400.00 $ 10,500.00 I 252 1 LS Plan REV8 - Remobilization Traffic Control Crew $ 1,050.00 $ 210.00 $ 840.00 $ 1,050.00 I 253 1 LS Plan REV8 - Site Clearinq for MBGF $ 3,450.00 $ 690.00 $ 2,760.00 $ 3,450.00 I 254 190 CY Plan REVS - Embankment for MBGF $ 11.00 $ 418.00 $ 1,672.00 $ 2,090.00 I 255 18 CY Plan REVS -TxDOT 4" MOW STRIP $ 520.00 $ 1,872.00 $ 7,488.00 $ 9,360.001 256 1 EA Plan REVS - Explorato�(Utility Excavation for MBGF $ 2,900.00 $ 580.00 $ 2,320.00 $ 2,900.00 I 257 200 SY Plan REVS - Block Sad Frontage Road $ 5.00 $ 200.00 $ 800.00 $ 1,000.00 I 258 1 LS Plan REV8 - Remobilization Landscape Crew (sod) $ 400.00 $ 80.00 $ 320.00 $ 400.00 I I PAVING SUBTOTAL (Trinity Blvd) $ 25,176.90 $ 100,707.60 $ 125,884.501 1 STORM DRAIN (Trini y Boulevard) 20 % 80% 1 1 45 3341.0103 -14 LF 18" RCP, Class III $ 114.00 $ f319.20) $ (1276.80) $ (1,596.00)1 46 3341.0205 40 LF 24" RCP, Class III $ 208.00 $ 664.00 $ 6:656.00 $ ,320.00 1 1 47 3341.0302 -23 LF 30" RCP, Class III $ 240.00 $ (1,104.00) $ (4,416.00) $ (5,520.00)1 1 192 3341.0201 30 LF 21" RCP, Class III $ 175.00 $ 1,050.00 $ 4,200.00 $ 5,250.00 1 1 193 3341.0309 26 LF 36" RCP, Class III $ 270.00 $ 1,404.00 $ 5,616.00 $ 7,020.00 1 1 201 0171.0102 1 LS Construction Staking (New RCP & Headwall) $ 600.00 $ 120.00 $ 480.00 $ 600.00 1 1 202 3110.0101 1 LS Site Clearing (New Culvert Extension) $ 2,500.00 $ 500.00 $ 2,000.00 $ 2,500.00 1 1 203 0241.4002 1 EA Remove Existin,Q Headwall $ 1,500.00 $ 300.00 $ 1,200.00 $ 1,500.00 1 204 3349.1003 1 EA Install 24" Flared Headwall, 1 Pipe S 11,500.00 $ 2,300.00 $ 9,200.00 $ 11,500.00 I 205 TX 432-6046 2 CY Rock Riprap (bin) S 520.00 $ 208.00 $ 832.00 $ 1,040.00 STORM DRAIN SUBTOTAL (Trinity Bouleva 6,122.80 $ 24,491.20 $ 30,614.00 1 LIGHTING SIGNS, SIGNALS (Trini Boulevard) 20% 80 % 1 1 9 2605.0111 1 EA Fumish/Install Elec Sery Pedestal $ 6,700.00 $ 1,340.00 $ 5,360.00 $ 6,700.00 1 1 10 2605.3013 20 LF 2" CONDT RM (T) $ 25.00 $ 100.00 $ 400.00 $ 500.00 1 11 2605.3015 476 LF 2" CONDT PVC SCH 80 (T) $ 14.50 $ 1,380.40 $ 5,521.60 $ 6,902.00 I 12 2605.3016 740 LF 2" CONDT PVC SCH 80 (B) $ 20.00 $ 2,960.00 $ 11,840.00 $ 14,800.00 I 1 13 3605.3025 -25 LF 3" CONDT PVC SCH 80 (T) $ 18.00 $ (90.00) $ (360.00) $ (450.00)1 1 14 2605.3026 5 LF 3" CONDT PVC SCH 80 (B) $ 22.00 $ 22.00 $ 88.00 $ 110.00 1 1 15 2605.3033 20 LF 4" CONDT PVC SCH 80 (T) $ 30.00 $ 120.00 $ 480.00 $ 600.00 1 1 49 3441.1001 -2 EA 3-Sect Signal Head Assmbly $ 1,150.00 $ (460.00) $ (1,840.00) $ (2,300.00)1 1 51 3441.1003 2 EA 5-Sect Signal Head Assmbly $ 1,500.00 $ 600.00 $ 2,400.00 $ 3,000.00 1 1 53 3441.1011 -6 EA Ped Signal Head Assmbly $ 900.00 $ 1,080.00) $ (4,320.00) $ 5,400.00 1 54 3441.1021 -24 EA 2" Ped Push BTN Station W/ Sign $ 403.00 $ 11934.40) $ (7,737.60) $ 9,672.00 I 1 55 3441.1031 -6 EA Audible Pedestrian Pushbutton Station $ 1,520.00 $ 1,824.00) $ (7,296.00) $ 9,120.00 1 Page 4 of 6 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENTS: CITY BID ITEM PAY ITEM # QUANTITY UNIT 57 3441.1217 -190 LF 58 3441.1224 6 LF 60 3441.131 -271 LF 62 3441.1312 90 LF 63 3441.1315 -45 LF 64 3441.1322 -256 LF 65 3441.1402 1200 LF 66 3441.1408 1155 LF 67 3441.1409 270 LF 68 3441.1414 54 LF 69 3441.1501 1 EA 71 3441.1603 -5 EA 80 3441.1701 -6 EA 89 3441.3052 5 EA 90 3441.3302 -1 EA 91 3441.3342 -1 EA 92 3441.4001 10 EA 96 3441.XXXX 5 LF 98 3441.XXXX 1 EA 114 685-6005 1 EA 185 1 LS 186 1 EA 188 5 EA 189 5 EA 190 6 EA 199 3441.33XX 4 EA 206 1 EA 207 1 EA 208 20 LF 209 110 LF 210 90 LF 211 1760 LF 212 560 LF 213 1760 LF 214 24 HR 215 1 LS 216 1 LS 218 TxDOT 681 1 LS 232 2 EA 233 205 LF ITEM DESCRIPTION UNIT PRICE CITY COST TOTAL COST Furnish/Install Hybrid Detection Cable $ 3.00 $ (114.00) $ (456.00) $ (570.00)1 Furnish/Install Preemption Cable $ 1.25 $ 1.50 $ 6.00 $ 7.50 1 4/C 14 AWG Multi -Conductor Cable $ 2.00 $ (108.40) $ (433.60) $ (542.00)1 7/C 14 AWG Multi -Conductor Cable $ 2.00 $ 36.00 $ 144.00 $ 180.00 1 20/C 14 AWG Multi -Conductor Cable $ 5.00 $ (45.00) $ (180.00) $ (225.00)1 3/C 14 AWG Multi -Conductor Cable $ 1.00 $ (51.20) $ (204.80) $ (256.00)1 NO 6 Duplex OH insulated Else Condr $ 2.00 $ 480.00 $ 1,920.00 $ 2,400.00 NO 6 Insulated Elec Condr $ 1.50 $ 346.50 $ 1,386.00 $ 1,732.50 NO 8 Insulated Elec Condr $ 1.50 $ 81.00 $ 324.00 $ 405.00 NO 8 Bare Elec Condr $ 1.50 $ 16.20 $ 64.80 $ 81.00 Ground Box Type B $ 900.00 $ 180.00 $ 720.00 $ 900.00 Furnish/Install 10'- 14' Ped Pole Assmbly $ 1,150.00 $ (1,150.00) $ (4,600.00) $ (5,750.00)1 TY 1 Signal Foundation $ 1,200.00 $ (1,440.00) $ (5,760.00) $ (7,200.00)1 Furnish/Install LED Lighting Fixture (ATB2 cobra) (187 watt ATB2 Cobra Head) $ 850.00 $ 850.00 $ 3,400.00 $ 4,250.00 Rdwy Ilium Foundation TY 3,5,6, and 8 $ 1,500.00 $ (300.00) $ (1,200.00) $ (1,500.00)1 Rdwy Ilium TY 18 Pole $ 1,700.00 $ J340.00) $ (1,360.00) $ <1,700.00)1 Furnish/Install Alum Sign Mast Arm Mount $ 550.00 $ 1,100.00 $ 4,400.00 $ 500.00 Furnish/Install VIVDS Cable $ 3.00 $ 3.00 $ 12.00 $ 15.00 Remove and Salvage Illumination Fixture $ 120.00 $ 24.00 $ 96.00 $ 120.00 Relocate Rdsd Fish BCN AM (Solar Pwrd) $ 5,000.00 $ 1,000.00 $ 4,000.00 $ 5,000.00 Traffic Control During Signal Switch $ 1,900.00 $ 380.00 $ 1,520.00 $ 1,900.00 Install Oncor Provided Pull Box $ 950.00 $ 190.00 $ 760.00 $ 950.00 Furnish & Install 35' Wood Light Pole $ 1,500.00 $ 1,500.00 $ 6,000.00 $ 7,500.00 Furnish & Install 8' Wood Light Pole Arm $ 800.00 $ 800.00 $ 3,200.00 $ 4,000.00 Electrical Connection (Wood Poles) $ 250.00 $ 300.00 $ 1,200.00 $ 1,500.00 Hydro -Vac Rdwy Ilium Foundation TY 3,5,6, and 8 $ 2,750.00 $ 2,200.00 $ 8,800.00 $ 11,000.00 Furnish/Install 40' Class 2 Wood Pole $ 1,650.00 $ 330.00 $ 1,320.00 $ 1,650.00 ELC SRV TY D 1201240 060(NS) GS (N) SP (0)SERVICE $ 5,574.00 $ 1,114.80 $ 4,459.20 $ 5,574.00 Conduit (RM)(2") $ 47.50 $ 190.00 $ 760.00 $ 950.00 Conch (Pvc) (Sch 40) (3") $ 13.00 $ 286.00 $ 1,144.00 $ 1,430.00 Conch (Pvc) (Sch 40) (3") (Bore) $ 20.00 $ 360.00 $ 1,440.00 $ 1,800.00 Elec Condr (No. 4) Insulated $ 3.25 $ 1,144.00 $ 4,576.00 $ 5,720.00� Elec Condr (No. 4) Bare $ 3.25 $ 364.00 $ 1,456.00 $ 1,820.00� Remove Existing Cables $ 1.25 $ 440.00 $ 1,760.00 $ 2,200.00 Security for TxDOT Pull Box $ 135.00 $ 648.00 $ 2,592.00 $ 3,240.00� Re-Mobilzation (ITS Layout) $ 2,000.00 $ 400.00 $ 1,600.00 $ 2,000.00 Traffic Control (ITS Layout) $ 850.00 $ 170.00 $ 680.00 $ 850.00 Temporary Traffic Signals $ 5,995.00 $ 1,199.00 $ 4,796.00 $ 5,995.00 TRINITY - FURNISH/INSTALL PTZ CAMERA $ 6,780.00 $ 2,712.00 $ 10,848.00 $ 13,560.00� TRINITY - FURNISH/INSTALL PTZ CABLE $ 6.50 $ 266.50 $ 1,066.00 $ 1,332.50� LIGHTING, SIGNS, SIGNALS SUBTOTAL (Trinity Boulevardil $ 16,697.90 1 $ 66,791.60 1 $ 83,489.50 TOTAL CHANGE ORDER 021 $ 103,609.90 I $ 191,990.40 1 $ 295,600.301 [ SIGNATURES APPEAR ON THE FOLLOWING PAGE ] Page 5 of 6 REASONS FOR CHANGE ORDER: Changes correspond to multiple sheets in the REVI through REV9 revised construction plans for Trinity Boulevard as prepared by Pacheco Koch and multiple sheets in the REV1 through REW revised construction plans for American Blvd / Transformation Way as prepared by Dunaway Associates. This change order requires 180 calendar days added to the contract. This change order corresponds with Contractor's Request PCO #2-21 and 23-28. The change order amounts for Trinity Boulevard infrastructure is eligible for 80% RTR Funding and 20% City Funding. The change order amounts for American Blvd / Transformation Way infrastructure is 100% City Funded. CITY AND TXDOT FUNDS INVOLVED IN THIS CONTRACT. REIMBURSEMENT FROM THE CITY WILL BESOUGHT BY THE DEVELOPER. RECOMMENDED: APPROVED: Consultant - Pacheco Koch Developer - American Airlines, Inc. a Westwood Company trtk—c Chns Colhzon (M—, 20241743 CDT) Brian O'Neill, PE, CFM Chris Collison Director, Public Infrastructure Director, Corporate Real Estate APPROVED: APPROVED AS TO FORM AND LEGALITY: CFW - Assistant City Manager CFW --)Assistant City Attorney %l YCDT) Da tt)Apr',2 0 2 4 R.IhA M,Cn,ze Apr 5, 20240728 CDT) Dana Burghdoff, AICP Richard A. McKracken Assistant City Manager Assistant City Attorney ATTEST: CFW - City Secretary �m,.rwK A ..iguo Jannette S. Goodall City Secretary APPROVED: APPROVAL RECt2M MENDED: Contractor/- Reyes Group, Ltd CFW-Sponsoring epa ment AIR& Marcos R s4.—, 20241—MDT) Lauren�(�,20241233 CDT) Marcos G. Reyes Lauren Prieur, PE President Director, Transportation and Public Works Dept NMEJJDP: * Contract Compliance Manager (Project Manager) n((ract Compliance Manager By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, 8.66.:.Q U/.W.A. including ensuring all performance and reporting a requirements. Debbie J. Willhelm, PE M&C Number: MC22-0735 Project Manager M&C Dale Appr" 09/27/22 Form 1295, N/A Page 6 of 6 City of Fort Worth, Texas Mayor and Council Communication DATE: 09/27/22 M&C FILE NUMBER: M&C 22-0735 LOG NAME: 06AAECFAI7-0192AMEND3 SUBJECT (CD 5) Authorize Execution of Amendment No. 3 to City Secretary Contract No. 51820, an Enhanced Community Facilities Agreement with American Airlines, Inc. for the Construction of Road Improvements on Trinity Boulevard, American Boulevard and US Highway 360 Frontage Road Increasing City Participation by $103,609.90, City Participation with Regional Toll Revenue by $191,990.40, and Extending the Completion Deadline to January 30, 2022, Authorize Execution of Change Order No. 2 to City Secretary Contract No. 51820 for a Revised Contract Amount of $3,544,671.10, Adopt Appropriation Ordinances, and Amend the Fiscal Years 2022-2026 Capital Improvement Program RECOMMENDATION: It is recommended that City Council: 1. Authorize the execution of Amendment No. 3 to City Secretary Contract No. 51820, an Enhanced Community Facilities Agreement with American Airlines, Inc. for the construction of road improvements on Trinity Boulevard, American Boulevard and US Highway 360 Frontage Road, increasing City Participation by $103,609.90 and City Participation with Regional Toll Revenue by $191,990.40, and extending the completion deadline to January 30, 2022; 2. Adopt the attached appropriation ordinance adjusting appropriations in the 2014 Bond Program Fund in the amount of $487,703.00 by increasing appropriations in the CFA-AA Headquarters P & TSign project (City Project No. 101828) and by decreasing appropriations in the CFA-American Airlines Pvn & SG project (City Project No. 101314) by the same amount; 3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Government Community Facilities Agreement Fund in the amount of $14,473.39 for the purpose of funding development fees for the CFA-AA Headquarters P&T Sign project (City Project No. 101828); and 4. Amend the Fiscal Years 2022-2026 Capital Improvement Program. DISCUSSION: On November 10, 2015, the City Council adopted Ordinance No. 21968-11-2015, Mayor and Council Communication (M&C) G- 18605, designating Tax Abatement Reinvestment Zone No. 91, and approved execution of a Tax Abatement Agreement with American Airlines, Inc., (Developer), and the Dallas/ Fort Worth International Airport Board for development of a corporate headquarters facility (Headquarters Project) on property at Dallas -Fort Worth International Airport located within the City of Fort Worth, City Secretary Contract No. 47341, as amended. Under the Tax Abatement Agreement, the City agreed to abate a maximum of between 75 to 90 percent of the incremental real and personal property taxes from the site for a period of one year provided that Developer expended at least $200 million in real property improvements by December 31, 2019 on property in the reinvestment zone and consider up to $2,000,000.00 in enhanced community facility funds for public infrastructure projects associated with the Headquarters Project. As part of the project, the Developer anticipated expending approximately $1,650,000.00 for the construction of road improvements including deceleration lanes, turn lanes, signaling, sidewalks and street light improvements on Trinity Boulevard, American Boulevard, US Highway 360 Frontage Road Public Infrastructure. On June 13, 2017, the City Council authorized execution of an Enhanced Community Facilities Agreement (ECFA), M&C C-28274, under which the City would reimburse Developer up to $950,000.00 of construction costs. The Developer proposed to expand the scope of the Public Infrastructure project to include widened roadways and turn lanes on Trinity Boulevard, US Highway 360 Frontage Road, and American Boulevard to accommodate the planned additional employee traffic at a total approximate cost of $7,000,000.00. On June 12, 2018, by M&C C- 28730, the City Council rescinded M&C C-28274 to cancel the 2017 ECFA that was never executed and authorized execution of a new ECFA with City participation in an amount not to exceed $1,700,000. 00. After further design and discussions with the Developer, through approval of M&C C-28898, the City Council rescinded M&C C-28730 and authorized entering into a new agreement increasing the City's participation in the Public Infrastructure project to $2,000,000.00 representing the entire commitment in the original tax abatement agreement. The M&C authorized execution of an Advance Funding Agreement (AFA) between the City and the State of Texas, acting through Texas Department of Transportation, for Regional Toll Revenue (RTR) for the public infrastructure improvements along Trinity Boulevard, American Boulevard and US Highway 360 Frontage Road. The M&C also authorized the execution of one or more ECFAs with the Developer consisting of the RTR funds as well as Non- RTR Funds comprised of ECFA funds and Transportation Impact Fee funds in an amount not to exceed $2,000,000.00 for the Public Infrastructure. The AFA (City Secretary Contract No. 82071), provided the City with RTR funds in an amount not to exceed $4,170,491.00, with a twenty percent local match requirement of $1,042,623.00. The ECFA, (City Secretary Contract No. 51820) was executed on January 31, 2019. The Developer is responsible for all costs exceeding the RTR funds received by the City under the AFA and the City's participation with Non-RTR funds. On June 3, 2019, the ECFA was amended to include the construction of additional public infrastructure improvements in the vicinity of American Blvd. that are were not funded by the AFA. On June 25, 2019 through M&C C-29166, the City Council authorized execution of an amendment to the ECFA and the Tax Abatement Agreement to extend the completion deadlines under the agreements pursuant to the force majeure provisions due to delays in the Texas Transportation Commission not approving the Regional Toll Revenue funding until January 31, 2019. The purpose of this M&C is to authorize the execution of Amendment No. 3 to the ECFA in order to finalize the amount of City Participation owed to the Developer and close out the projects (City Project Nos. 101314 and 101828). The public infrastructure improvements were substantially completed on October 22, 2020. The final inspection was conducted on March 11, 2021. City staff have been working with the Developer, contractor and TxDOT on the final close out of the projects. Approval of this M&C, will authorize City staff to close out the projects and make the final payments to the Developer for all work that was completed. Upon approval of this M&C, City staff will execute Amendment No. 3 to the ECFA with the Developer and execute the corresponding Change Order No. 2 between the Developer and the contractor. Funding for the CFA-American Airlines Pvn project is summarized in the table below: Fund Existing Budget Change Project Total Funding (Increase/Decrease) 30106- $5,600,000.00 $0.00 $5,600,000.00 Intergovernmental Contribution 34014 2014 Bond $1,275,000.00 $(487,703.00) $787,297.00 Program Fund 31002 Grants $5,095,491.00 $0.00 $5,095,491.00 Capital Project State 39001 2007 Critical $725,000.00 $0.00 $725,000.00 Capital Projects 39008 Trans Impact $200,000.00 $0.00 $200,000.00 Fee Cap Legacy Project Total $12,895,491.00 $(487,703.00) $12,407,788.00 Funding for the CFA-AA Headquarters P & TSign project is summarized in the table below: Fund Existing Budget Change Project Total Funding (Increase/Decrease) 30111 Govt Community Facilities $14,473.39 $0.00 $14,473.39 Agmt 34014 2014 Bond $0.00 $487,703.00 $487,703.00 Program Fund Project Total $14,473.39 $487,703.00 $502,176.39 Funding for Enhanced Community Facilities Agreements was included in the 2014 Bond Program. Available resources within the General Fund will be used to provide interim financing until debt is issued. Once debt associated with the project is sold, bond proceeds will reimburse the General Fund in accordance with the statement expressing official Intent to Reimburse that was adopted as part of the ordinance canvassing the bond election (Ordinance No. 21241-05-2014) and subsequent actions taken by the Mayor and Council. Funding for the CFA-AA Headquarters P&T Sign project was not included in the FY2022-2026 Capital Improvement Program. Funding in the amount of $502,176.39 ($14,473.39 from developer fees and $487,703.00 from 2014 Bond Funds) is needed to cover construction fees and pay the final amount of City Participation owned to the Developer to close out the Project. This action in this M&C will amend the Fiscal Years 2022- 2026 Capital improvement Program as approved in connection with Ordinance 25073-09-2021. The CFA-AA Headquarters P&T Sign project previously received funding from the Government Community Facilities Agreement Fund in the amount of $14,473.39 for developer fees that were previously paid by the Developer. Recommendation #3 will formalize the appropriation of these funds from the Government Community Facilities Agreement Fund, as the funds were transferred from the Unspecified project through former delegated authority, which is no longer recognized. The Project is located in COUNCIL DISTRICT 5. A Form 1295 is not required because: This contract will be with a publicly -traded business entity or a wholly -owned subsidiary of a publicly -traded business entity: American Airlines FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the CFA-American Airlines Pvn & SG project within the 2014 Bond Program Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the 2014 Bond Program Fund for the CFA-AA Headquarters P & TSign project to support the approval of the above recommendations and execution of the amendment and change order. Prior to an expenditure being incurred, the Transportation and Public Works department has the responsibility of verifying the availability of funds. Submitted for Citv Manaaer's Office bv: Dana Burghdoff 8018 Oriainatina Business Unit Head: D.J. Harrell 8032 Additional Information Contact: Debbie Willhelm 2481 Jennifer Ezernack 8423 PROJECT NAME: CONTRACT: ICFA # ICITY PROJECT # IDOE # IWATER PROJECT # ISEWER PROJECT # IFILE # INSPECTOR: PROJECT MANAGER DEVELOPER -AWARDED - PROJECT CHANGE ORDER American Airlines Headquarters - Trinity Blvd, SBFR 360, American Blvd CHANGE Paving, Drainage, Street Lighting, Signals ORDER No: CS-51820 I CITY PARTICIPATION: I YES 101314 I N/A I 3 N/A N/A K-2965 Aaron Ybarra Debbie J. Willhelm PAVING (IMPACT FEE REVENUE) CITY DEVELOPER COST COST ORIGINAL CONTRACT $ 128,154.00 $ - EXTRAS TO DATE $ - $ - CREDITS TO DATE $ - $ - CONTRACT TO DATE $ 128,154.00 $ - AMOUNT OF PROP. CHANGE ORDER $ - $ - REVISED CONTRACT AMOUNT $ 11�4$ - TOTAL REVISED CONTRACT AMOUNT PER UNIT $ DEVELOPER REVISED COST SHARE $0.00 COST TOTAL REVISED CONTRACT Phone No: 682-213-0382 Phone No: 817-392-2481 CSC No. 51820-CO3 PAVING STORM DRAIN STREET LIGHTS, SIGNS, SIGNALS CITY COST TXDOT COST DEVELOPER CITY COST COST $ - $ 24,864.00 $ - $ 63,489.80 $ $ _ $ - $ 88,353.80 $ - $ - $ - $ 88,353.80 $212,301.00 TXDOT COST DEVELOPER CITY COST COST $ - I $ 129,048.30 $ - I $ 260,533.15 $ Is _ $ - I $ 389,581.45 $ - I $ 15.00 $ - I $ 389,596.45 $972,581.25 TXDOT COST $ 388,454.30 $ 1,553,817.20 $ 99,456.00 $ 516,193.20 $ 188,670.75 $ 100,707.60 $ 24,491.20 $ 66,791.60 $ _ $ _ $ 577,125.05 $ 1,654,524.80 $ 123,947.20 $ 582,984.80 $ (3,300.00) 1 $ (13,200.00) $ - $ - $ 573,825.05 $ 1,641,324.80 $ 123,947.20 $ 582,984.80 $2,215,149.85 CITY $1 17B 929 30 :DST TXDOT $2,348,256.80 COST $3,528,186.10 CONTRACT DAYS 117 270 387 0 387 Pagel of 2 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENTS: CITY BID ITEM PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE CITY COST TXDOT COST TOTAL COST LIGHTING, SIGNS, SIGNALS (American Blvd I Transformation Way) 100% 0% 27 3441.1408 1 10 LF INO 6 Insulated Elec Condr 1$ 1.50 $ 15.00 $ - S 15.00 LIGHTING, SIGNS, SIGNALS SUBTOTAL American Blvd I Transformation Way) $ 15.00 Is $ 15.00 PAVING (Trinity Boulevard) 1 20% 1 80% 54 -1 1 LS ITree Well Slope Protection $ 16,500.00 1 $ (3,300.00) $ (13,200.00) $ (16,500.00) PAVING SUBTOTAL (Trinity Blvd) $ 3,300.00 $ (13,200.00) $ (16,500.00) TOTAL CHANGE ORDER 031 $ (3,285.00)1 $ (13,200.00)1 $ (16,485.00)1 REASONS FOR CHANGE ORDER: Tree Well Slope Protection is an improvement made to the private site and is not a public asset, therefore, it was removed from this contract. Other changes were made to reconcile final quantities. RECOMMENDED: Consultant - Pacheco Koch a West—ol Company Brian O'Neill, PE, CFM Director, Public Infrastructure APPROVED: CFW - Assistant City Manager Dana BurandoFF Dana Burghdoff(Ju19, 241049 CDT) Dana Burghdoff, AICP Assistant City Manager ATTEST: CFW - City Secretary ).m .. h ..LiaSz Jannette S. Goodall City Secretary The change order amounts for Trinity Boulevard infrastructure is eligible for 80 % RTR Funding and 20 % City Funding. The change order amounts for American Blvd / Transformation Way infrastructure is 100% City Funded. CITY AND TXDOT FUNDS INVOLVED IN THIS CONTRACT. REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. APPROVED: Developer -American Airlines, Inc. C�)Yl�f C1GLfONul,LfoN rn,C�m,en„ - 11,1119111TI Chris Collison Director, Corporate Real Estate APPROVED: Contractor - Reyes Group, Ltd Marcos G. Reyes President CFWAPPROVED City FOR M a AND LEGALITY: [?E.�9 ontract Compliance Manager d _�� D.66.a ad.6O,U Poc ar cC cken lJul 1, ]O1C 09:i0 CRT) Richard A. McKracken Debbie J. Willhelm, PE Assistant City Attorney Project Manager APPROVAL REC( MMENDED: CFW - Sponsoring Department �,ee9�e,vn .,Ra�oT( Lauren Prieur, PE Director, Transportation and Public Works Dept " Contract Compliance Manager (Project Manager) By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. M&C Number: N/A M&C Dale Appr.. N/A Form 1295 N/A Page 2 of 2 FORTWORTH. TRANSPORTATION AND PUBLIC WORKS April 1, 2021 Reyes Group Ltd, 1520 Parker Road Grand Prairie, Texas RE: Acceptance Letter Project Name: American Airlines Headquarters Project Type: Paving, Signal and Street Light Improvements City Project No.: 101314 To Whom It May Concern: On March 11, 2021 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on April 1, 2021. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on April 1, 2021, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-2481. Sincerely, Debbie Willhelm P.E., Project Manager Cc: Aaron Ybarra, Inspector Mark Owen, Inspection Supervisor Edwin Rodriguez, Senior Inspector Victor Tornero, Program Manager Pacheco Kock , Consultant Reyes Group Ltd, Contractor American Airlines, Inc., Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19 AFFIDAVIT STATE OF Texas COUNTY OF Dallas Before me, the undersigned authority. a notary public in the; state and county aforesaid, on this day personally appeared Marcos G. Reyes. President Of Reyes Group Ltd., known to the to be a credible person, who being by me duly sworn. upon his oath deposed and said; That all persons, firms. associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; I'hat there are no clairns pending for personal injury and/or property damages, On Contract described as; American Airlines Headquaters Trinity Bid, SH 360 Frontage. American Blvd City Project No. 101314 BY Marcos G. R !CS - PI'CSIdCnt Subscribed and sworn before me on this date 17th of September, 2024. &OWLO14j-->- Notary Public Dallas, TX CtAUDETTE I REYES �n Notary iQ #134Commission Expires 1 My Commisslan Expires '? of October 17, 2026 CONSENT OF SURETY TO FINAL PAYMENT ALA Document G707 Bond No.106997589 TO OV1`IER: (Namaw dad,fim) American Airlines, Inc. and the City of Fort Worth OWNER ❑ ARCHITECT COIITRACIDR SllRM Y ❑ OTHER ❑ ARCMTECT'S PROJECT NO.: COAITRACr FOR: American Airlines Paving & Signal Improvements PROJECT: COI•tTRACTIDATM November 8, 2018 {NdN:eazrdodrharcs} American Airlines Paving, Signals, & Street Lights City Project No. 101314 City of Fort Worth In accordance with the provisions of tie Compact between the Owner and ttse Contractoc as indicted above, the (}NS61"1 r2dNkN diiLt #�Y� df �7J7'[�} Travelers Casualty and Surety Company of America One Tower Square Hartford, CT 06183 , SURETY, on bond of f&ten name and addmsa(CoY:nwaur) Reyes Group, Ltd. 1520 Parker Road Grand Prairie, TX 75050 , CONMCT'OR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety of any of im obligations to ((Yz�rrrr Nctnteurzd ad<<'Y�.ra a�QtrmcTJ American Airlines, Inc. and the City of Fort Worth , OWNEP, as set forth in said Surety's lxmd. IN WTNESS NMIEREOF, the Surety im hereunto set its land tin this date: August 29, 2024 (GtmIYfnxvftlrzgt!xnroYrtbjnllauefi?vdvwan rwdawmndl clanj Travelers Casualtv and Suretv Companv of America -'44e-4-1127 4---; (S�ratturaj rzrbarz�p�ruratizrJ Attest: {8eal}; le�. aku- William Reidinqer, Attorney -in -Fact Rebecca R. Alves (PrinrNdwarm uzrdtitle) �•�r'*�.•'•f -'� �'��� Hj K� s G707---1994 Travelers Casualty and Surety Company of America A1111111111r Travelers Casualty and Surety Company TRAVELERS J St. Paul Fire and Marine Insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint William Reidinger of SCHAUMBURG , Illinois , their true and lawful Attorney(s)-in-Fact to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 21st day of April, 2021. w 'R ZT4� TY R/yG 8 41 t'riIRMM ClP LA w a WiRTFORD. t 4wwR COti�l } CONN. o4 Ph State of Connecticut City of Hartford ss. By: a < Robert L. Raney, Senior Vice President On this the 21st day of April, 2021, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of each of the Companies, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of said Companies by himself as a duly authorized officer. IN WITNESS WHEREOF, I hereunto set my hand and official seal. My Commission expires the 30th day of June, 2026 66iA'AY cba Anna P. Nowik, Notary Public This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of each of the Companies, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in - Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I, Kevin E. Hughes, the undersigned, Assistant Secretary of each of the Companies, do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which remains in full force and effect. Dated this 29th day of August , 2024 N ���pjY yyQLSY 4N� G cv j �rwarwwa. �. a NaRTFORo, � �' �R WHg CONN. 4o A i • 'd' b1 ��'� �F ?'�, �` Kevin E. Hughes, Assistant Secretary To verifythe authenticity of this Power of Attorney, please call us at 1-800-421-3880. Please refer to the above -named Attorney(s)-in-Fact and the details of the bond to which this Power of Attorney is attached.