Loading...
HomeMy WebLinkAboutContract 59675-A2CSC No. 59675-A2 AMENDMENT No . 2 TO CITY SECRETARY CONTRACT No. 59675 WHEREAS, the City of Fort Worth (CITY) and Mas-Tek Engineering & Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 59675, (the CONTRACT) which was administratively authorized on the 29th day of June, 2023 in the amount of $ 99,237.50; and WHEREAS, the CONTRACT was subsequently revised by Amendment Number 1 in the amount of $70,462.50 which was authorized by M&C # 24-0050 January 23, 2024; and WHEREAS, the CONTRACT involves engineering services for the following project: Future City Hall Council Chambers, Phase I, CPN 103133; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $63,410.00. (See Attached Funding Breakdown Sheet, Page -4-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $233,110.00. OFFICIAL RECORD CITY SECRETARY 3 • FT. WORTH, TX City of Fort Worth, Texas Future City Hall Council Chambers, Phase I Prof Services Agreement Amendment 103133 Revision Date: 12/08/2023 Page 1 of 8 All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth balm l�P(o� Dana Burghdoff (Sep 202411i14 C Dana Burghdoff, AICP Assistant City Manager DATE: Sep 20, 2024 4ggq004� °° FORr'�oa°o ATTEST: d!`o o89�d Ov8 o=d Ppa * .o. oog*�d Jannette Goodall City Secretary ENGINEERING FIRM Mas-Tek Engineering & Associates, Inc. Stephen Mason Stephen Mason (Sep 16, 2024 11:27 CDT) Stephen Mason President DATE: Sep 16, 2024 APPROVAL RECOMMENDED: �7�j— Maril_yn Marvin Interim Director, Property Management Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. &-ow. 4• 64--ov Brian R. Glass City of Fort Worth, Texas Prof Services Agreement Amendment Revision Date: 12/08/2023 Page 2 of 8 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Future City Hall Council Chambers, Phase I 103133 Senior Capital Projects Officer APPROVED AS TO FORM AND LEGALITY: Douglas Black (Sep 19, 202414:54 CDT) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Revision Date: 12/08/2023 Page 3 of 8 M&C No.#: N/A M&C Date: N/A Future City Hall Council Chambers, Phase I 103133 FUNDING BREAKDOWN SHEET City Secretary No. 59675 Amendment No. 2 Project Fund Dept ID Account ID 30100 0210410 5330102 103133 30100 0210410 5330102 103133 30100 0210410 5330102 103133 Total: CF1- CF2 - Bond Activity Reference CAPEXP 9999 CAPEXP 9999 CAPEXP 9999 Amount $99,237.50 $70,762.50 $63,410.00 $233,110.00 City of Fort Worth, Texas Future City Hall Council Chambers, Phase I Prof Services Agreement Amendment 103133 Revision Date: 12/08/2023 Page 4 of 8 August 15, 2024 ATHENIAN 420 Throckmorton, Suite 200 Fort Worth Tx 76102 Attention: Tanyan Farley Vice President 713-839-5978 IB: tfarley@atheniangroup.us RIB, Construction Material Testing City Fort Worth City Hall Garage and Site 100 Energy Way Fort Worth Tx 76102 Mas-Tek Proposal No. 04-08-C Mas-Tek Engineering & Associates is delighted to submit this proposal for Construction Material Testing (CMT) Services for the above referenced project. Attached unit rates are based on providing the following services: • Observation and testing of Civil earthwork preparation. • Sampling and Testing of Structural and Civil concrete placements. Proposed Estimate for Garage and Site ........................ $63,410.00 We value the opportunity to serve you. if you have any questions do not hesitate to contact our office. Sincerely yours, lYMas-Tek Engineering & Associates, Inc. �r�1k S y e & A—A—h ffi—e d, P.E Project Engineer Geotechnical Engineering Services -Construction Material Engineering Inspection & Testing Services 10625 Newkirk Street Suite 800 Dallas, TX 75220 Ph. 972-709-7384 FX. 972-709-7385 City of Fort Worth, Texas Future City Hall Council Chambers, Phase I 103133 Prof Services Agreement Amendment Revision Date: 12/08/2023 Page 5 of 8 PROPOSED UNIT FEES FOR CONSTRUCTION MATERIALSTESTINGSERVlCES CIVVIIVCCf�IIVV FORT WORTH CITY HALL (GARAGEAND SITE) 100 ENERGY WAY FORTWORTH TX 76102 SERVICE Proposal 04-08-C IInit Rate Units Unit Cost SOILS (Structural & Civil) Soil Testing (hourly) $65.00 40 $2,600.00 Soil Testing (Overtime) (hourly) $97.50 4 $390.00 Moisture Density Relations ASTM D-698 (each) $225.00 3 $675.00 Moisture Density Relations ASTM D-1557 (each) $245.00 0 $0.00 Atterberg Limits (each) $85.00 3 $255.00 Minus 200 $65.00 3 $195.00 Field Gradations (each, min 3 tests) $25.00 0 $0.00 Lime Depth Test (each, min 3 tests) $25.00 0 $0.00 In Place Density ASTM D-6938 (each, min 3 tests) $25.00 30 $750.00 POST TENSIO (PTI) Post Tension (hourly) $65.00 70 $4,550.00 Concrete Testing (hourly) $65.00 40 $2,600.00 Concrete Testing Overtime (hourly) $97.50 4 $390.00 Concrete Cylinders (each) $25.00 30 $750.00 CONCRETE (Structural & Civil) Concrete Testing (hourly) $65.00 180 $11,700.00 Concrete Testing Overtime (hourly) $97.50 18 $1,755.00 Concrete Cylinders (each) $25.00 290 $7,250.00 Rebar Inspection $60.00 40 $2,400.00 STRUCTURALSTEEL Structural Steel Inspection (hourly) (4 hour min) $75.00 80 $6,000.00 Ultrasonic Inspection (hourly) (4 hour min) $80.00 50 $4,000.00 MASONRY Mortar/ Grout Sampling (hourly) $65.00 40 $2,600.00 Mortar Cubes (each) (6 per set) $20.00 40 $800.00 Grout Units (each) (4per set) $25.00 40 $1,000.00 INTUTAESCENT PAINT Paint Inspection $80.00 20 $1,600.00 TRAVEL Trip Charge (each) $55.00 160 $8,800.00 concrete Cylinder Pick Up Included PROJECT MANAGEMENT Project Manager (hourly) $110.00 10 $1,100.00 Senior Engineer, P.E. $175.00 4 $700.00 Clerical (hourly) $55.00 10 $550.00 PROPOSED QUOTE: $63,410.00 NOTES: Project Management time Is billed as time for reviewing reports, coordina tion, and cons ultation. I) This proposal quote is based on an anticipated construction schedule. Invoices will be based on actual time spent on the project and charged at thequoted unit price. 2) Overtime rates of 1.5 times theregular hourly rate will be charged for hours worked over eight (8) hours per day Monday thru Friday between 6:00pm and 7:00am or on Saturdays Services performed on Sundays andrecognized holidays will be billed at 2.0 times the regular hourly rate 3) All services billed at a hourly rate and charged at the applicable rate, portal-to-portal. 4) Additional test not specified in this proposal will be quoted upon request. 5) Standby time due to contractor delay and re -tests due to Ih1lure will becharged ro the Contractor Page 2of2 1"itiia1s City of Fort Worth, Texas Mayor and Council Communication DATE: 01/23/24 M&C FILE NUMBER: M&C 24-0050 LOG NAME: 21GEOTECH AND MATERIAL TESTING SERVICES FUTURE CITY HALL SUBJECT (CD 9) Authorize Execution of Amendment #1 for the Contract with Mas-Tek Engineering & Associates, Inc. for Geotechnical and Material Services in the Amount of $70,762.50, for a Total Contract Value of $170,000.00, and Authorize Amendment #3 to the Professional Servi Agreement with Athenian Group, LLC for Program Management Services for the Future City Hall Move 100 Energy Way Project in the Arr $107,032.00 RECOMMENDATION: It is recommended that the City Council: 1. Authorize the execution of amendment #1 to the contract with Mas-Tek Engineering & Associates, Inc. for geotechnical and materic services in the amount of $70,762.50 for a total contract amount of $170,000.00; and 2. Authorize the execution of amendment #3 to the professional services agreement with Athenian Group, LLC for program managem, services for the Future City Hall Move 100 Energy Way project (City Project No. 103133) in the amount of $107,032.00. DISCUSSION: The purpose of this Mayor and Council Communication (M&C) is to recommend that the City Council authorize execution of amendment contract with Mas-Tek Engineering & Associates, Inc. for geotechnical and materials testing services in the amount of $70,762.50 for a to contract amount of $170,000.00. A Request for Qualifications (RFQ) was published for these services in the Fort Worth Star -Telegram on March 27, 2023. Property Mana! Department received written Statements of Qualifications (SOQ) on April 24, 2023 from the following 10 firms: • Alliance Geotechnical Group, Inc. • Alpha Testing, Inc • Braun Intertec Corporation • Geotex Enginneering, LLC (formally D&S Engineering) • ECS • ETTL Engineers & Consultants • Henley -Johnson & Associates • Mas-Tek Engineering & Associates, Inc • Tolunay Wong Engineers, Inc • Raba Kistner, Inc. Each firm's SOQ was evaluated based upon pre -established selection criteria such as qualification of personnel, experience, and availat testing equipment. An inter -departmental committee determined Mas-Tek Engineering & Associates, Inc. was the most qualified to provic services. On June 29, 2023 staff administratively executed a contract for $99,237.50 with Mas-Tek Engineering & Associates, Inc. Staff recommends execution of amendment #1 to the contract for geotechnical and materials testing services with Mas-Tek Engineering & Ass Inc. Braun Henley Mas Tolunay Raba Alliance Alph: Intertec Geote- EC: ETTL Johnson Tek Wong Kistne Cover Page 5 4 4 5 5 4 5 5 5 4 Relevant Experience 27 22 24 25 27 24 25 27 25 26 Staffing & Qualifications 31 29 30 30 31 32 30 33 31 30 References 20 15 18 16 18 15 16 20 18 18 Supplemental Information 9 7 7 8 9 8 7 9 7 6 Diveristy& Inclusion N/A N/A N/A N/A N/A N/A NIA NIA N/A NIA Overal Score 92 77 83 84 9 83 83 94 86 84 The purpose of recommendation # 2 of this ll is to authorize the execution of Amendment No. 3, in the amount of $107,032.00, to correct a mathematical error in Amendment No. 2 (Il 23-0111) to professional services agreement with Athenian Group. LLC., for program management services for the Future City Hall Relocation Program, for a total contract amount of $6,215,775.00. At this time, no additional funds are requested and this M&C will simply serve to allocate already budgeted funds. Funding Sources — This project is funded from a mix of funds, including Tax Note 2021 A, Tax Nate 2022, ARPA, PEG, and Operational Funds. Available resources within the General Fund will be used to provide interim financing until debt is issued. Once debt associated with the project is sold, proceeds will reimburse the General Fund. Funding is budgeted in the Property Management Department's Tax Note 2021 A and General Capital Project Funds for the purpose of funding the amendments to the contracts for the Future City Hall Move 100 Energy Way project, as appropriated. Waiver of Building Permit Fees - In accordance with the City Code of Ordinances, Part 11, Chapter 7-1 Fart Worth Building Administrative Code, Section 1 D9.2.1, Exception 2; "Work by non -City personnel on property under the control of the City of Fort Worth shall be exempt from the permit fees only if the work is for action under a contract that will be or has been approved by City Council with notes in the contract packages stating the fee is waived." DIVERSITY AND INCLUSION BUSINESS EQUITY OFFICE: The program has several contracts that each have individual business equity goals: MasTek has submitted a waiver of the goal for Business Equity subcontracting requirements was requested, and approved by the DVIN, because the work is self -performed and therefore no opportunities to subcontract portions of the work are available. Athenian Group, LLC is in compliance with the City's Business Equity Ordinance by committing to 100% MWBE participation on this project. The Future City Hall is to be located in COUNCIL DISTRICT 9 but will benefit all council districts. lJf-100gI1 I;Ce)NJJ_rIIs] r Ill=1:411I;1W_r11[•]►A The Director of Finance certifies that funds are available in the current capital budgets, as previously appropriated, in the Tax Nate 2021 A and General Capital Project Funds for the All City Hall Move project to support the approval of the above recommendations and execution of the amendments. Prior to any expenditure being incurred, the Property Management Department has the responsibility of verifying the availability of funds. Submitted for City Manaaer's Office bv: Dana Burghdoff 8018 Oriainatina Business Unit Head: Ricardo Salazar 8379 Additional Information Contact: Brian Glass 8088 City of Fort Worth, Texas Future City Hall Council Chambers, Phase I Prof Services Agreement Amendment 103133 Revision Date: 12/08/2023 Page 8 of 8