HomeMy WebLinkAboutContract 59416-A1CSC No. 59416-A1 AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 59416 WHEREAS, the City of Fort Worth (CITY) and TranSystems Corporation dba TranSystem Corporation Consultants, (ENGINEER) made and entered into City Secretary Contract No. 59416, (the CONTRACT) which was authorized M&C 23-0374 on the 9th day of May, 2023, in the amount of $604,944.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Combined Water, Sanitary Sewer, Stormwater and Street Paving Improvements for 2022 Bond Year 3-Contract 16, CPN 104317; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $54,655.00.(Water: $11,386.00 ; Sewer: $43,269.00) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $659,599.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas 2022 Bond Year 3 Contract 16 Prof Services Agreement Amendment Template CPN 104317 Revision Date: 12/08/2023 Page 1 of 2 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth William Johnson (0 t 3, 202415:36 CDT) William Johnson Assistant City Manager 10/03/2024 DATE: 00 ATTEST: Jannette Goodall City Secretary APPROVAL RECOMMENDED: CGc�l�rtD,�Gce� �GiYG�G�Y Christopher Harder (Oct 2, 2024 07:34 CDT) Christopher Harder, P. E. Director, Water Department Contract Compliance Manager: ENGINEER TranSystems Corporation dba Tr Systems Corporation Consultants r ad G r ner, P.E Principal/Sr Vice President DATE: 10-01-2024 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Dena Johnson, P.E. Project Manager M&C No . #k : N/A APPROVED AS TO FORM AND LEGALITY: M&C Date: N/A Douglas Black (Oct 3, 2024 14:01 CDT) Douglas W. Black Form 1295: N/A Sr. Assistant City Attorney OFFICIAL RECORD City of Fort Worth, Texas CITY SECRETARY 2022 Bond Year 3 Contract 16 Prof Services Agreement Amendment Template FT. WORTH, TX CPN 104317 Revision Date: 12/08/2023 Page 2 of 2 GANNETT Gannett Fleming I TranSystems FLEMING TRANSYSTEMS 500 West 7'h Street, Suite 1100 Fort Worth, TX 76102 Tel 817 339 8950 www.transystems.com Date: September 30, 2024 Dena Johnson Project Manager Water Department City of Fort Worth 200 Texas St. Fort Worth, TX 76102 RE: Amendment 1 — 2022 Bond Year 3 Contract 16 City Project No. 104317 CSC No. 59416 Dear Mrs. Johnson, TranSystems appreciates the opportunity to provide this fee for additional services for the 2022 Bond Year 3, Contract 16 Project. The scope changes include the following: • Additional water replacement along Airport Freeway between Shadow Ln. and Wayne St., shown in the attached Exhibit A • Relocate the sanitary sewer line between Dell St. and Bird St., into Dell St., shown in the attached Exhibit A. • Relocate sanitary sewer services for houses that front Dell St., into the new sanitary sewer line in Dell St. • Deduct 22 easements from original scope. Additional survey will be required to complete the sanitary sewer relocation tasks. Twenty-two (22) easements that were required to keep the sanitary sewer line at the existing location will be deducted from the scope. The Exhibit B Level of Effort Spreadsheet, attached to this letter, provides a breakdown of the added cost to complete the work. Fee Additional Water Replacement $4,835.00 Relocate Sanitary Sewer Line $18,500.00 Sewer Service Relocation (Design) $35,520.00 Sewer Service Relocation (Survev) $58,800.00 Amendment 1 Total $117,655.00 Available Funds Additional City Directed Services $30,000.00 Deduct 22 Easements $33,000.00 Total Additional Required $54,655.00 Water: $11,386.00 Sewer: $43,269.00 Upon approval of the additional services fee of $54,655.00, TranSystems will proceed with incorporating the changes into the design. Contract Cost to Date Original Contract Amount $604,944.00 Amendment No. 1 Amount $54,655.00 Revised Contract Amount $659,599.00 Sincerely, TranSystems Corporation Consultants AJD VJIV.-- Michael Hobbs, PE Project Manager Ill Task N. Task Description 1.0 V¢eMVLemmont 2.0 Conceptual Design (30-Percent) 3.0 Preliminar`(De%ph (60 Percent) 3.1 PreliminY Des 9n Drawing^. 3,1.5 Water Plon View Sheets (1) 3.1.7 Sanitalewer Plan & Profile Sheets (3)) Dell Relocate 3.1.9 Sanitary Sewer Service Layout Sheets (9) Dell Relocate 3.6 Estimate 4.0 Final Des�yjl 4.2 Fi"N Draff I90%j ConsWctlpn Plans and Specifications 4.2.4 Water Plan View Sheets 1 4.2.6 Sanita Sewer Plan 8 ro ile She (3)) Dell Relocate 4.2.8 Sanitr�r bower Sol cc Layout Shects (91 DalI Relocate 4.2.9 Specfications 4.3 Fnat 100%) Plans and Specifications 4.2.4 Wa r Plan View Sheets (1)) 4.2.6 Sanitar'(Sewer Plen 8 Profile Sheets (3) Dell Relocate 4.2.8 Sanitayry Newer Service Layout Sheets (9) Dell Relocate 4.2.9 Spoa cotionz 4.4 Construction Estimates (90%and 100%) 5.a IBid Phase J6,0 !Construction Phase Services h.0 IROW/Easement Services 6.0 lSurvo`�(( 1 8.1 !Design 'UNey and Temporary ROE for Dell St Sanitary Relocation I9.a !{Permuting 110.0 IArldmonal ally oil. Sell.. City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8.09.2012 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Water Department Design Services for 2022 Bond Year 3 Contract 16 - Amendment 1 City Project No. 104317 Labor (hours) I Principal Project Man aapp Project EIT CADD RPLS Enalneer Survey Tech Survey Adminlst Tot11 Wbar Gast Crew rativo Rat*' $380 D 0 $155 $120 $14 J $19 0 U 0 $115 D $19 U $110 d $0.00 $ 1 1 1 1 so 01 D1 0 01 0 0 01 D o $0.00 $ 01 131 45 801 115 0 01 0 D $35.535.00 $ 1 1 1 $0 I 11 3 6 11 $2.945 I 41 22 261 34 $12.170 e 20I 461 70l I 520.420 I I I $D 0 10 201 51: 351 DI 01 01 0 $23.320.001 I I I I $0: I 11 21: 41 $1.0751 I 21 41 el i61 $4,2601 I 31 7I 241 40l 51 O.zzsl I $01 I I sot 1 11 21 31 I I 1 58151 21 21 41 61 I 1 $2.0701 31 5 10 161 I I 54.8751 I $01 I I I I Sol 01 DI DI DI of of of 01 of 50.001 $ 01 DI 01 OI 01 01 01 01 0l s0.001s$ D 01 0l DI DI of of of o: $0.Dol $ 01 01 0l 01 DI 01 01 01 0l $0.001 $ I I I I 501E of 01 DI of of 01 01 of DI so.00l s I I I I I I I I I II Totalsl 01 231 651 1311 2001 01 01 01 01 $58,8551s I Water and Sewer Design Breakdown IFoo[aae I%Foe Desian Fee I tafpl Water S'mum'Sewer Waterl 2501 9� $77,386 Footage: %I 5 LF % Sewer: 9501 5 43,269 Contract 16I 2501 21 %l5 11,386 950 79%J $ Total: 12001 100 1 S 54,655 TOTALI 2501 21%I 11.386 9sa 79 :5 Subconsultant p se Subeonsuimnt Tobl Expense Task Sub Total %Complete Remaining Reproduction Cost Budget MWBE Non401WBE s s f so �� E so so sj $o - 1 SO 1$0 $0 535,53E 1 $0 so $0 S2.945 50 $12.170 $0 $20,420 1 $0 $0 SD $23.320 I 50 $(1 I I so S1.075 I SO $4.260 $0 $10.2205 1 I $0 $ol I I SD Sol I I I $0 $6151 I 1 1 50 $2.0701 1 1 1 50 54.875 501 $0 I I $01 $01 I - SD! so l so; $0! I - 1 $01 $01 $01 $01 1 - so; so' sot so; ' 56.000.00 SDI $01 $56.000; $56.000; I 56,000.DD I $56,000! $56.000! I - $01 $01 $0! $01 I sol S01 Eal $01 I 56,ODD 1 SDI S01 $SB,0001 5114,8551 0%I $0 IPraj¢ct Summary Total Cast Remainina Buticetl Total Hours 419 51 1 Total Labor S58.855 �..wnpld. 43,269 S 54.65E 0 f S 54.6551 Toth Exponze $S6.000 43,2691E 54,65E 0 1S 546551 MWBE Subcans" j $56.000 I Non-MWBE Subconsuftan' So 5% Sub Markup $2.800.00 MWBE Participation I Total Project Cost' $117,655.00 Deduct Additional City Directed Services hem Dimino] LOE S 11,111,11 Deduct 22 Easements from Original LOE $ 33,000.00 TotalAdditional Project Cost, $54.60.00 2D22 Bond Year 3 Contract 16 CPN 1D4317 1 of 1 TPW PROPOSED BOND 2022 CIP Year 3 Contract 16 NEIGHBORHOOD STREETS SHAPEFILE Proposed Water Line Replacement (Map 1 of 2) CIP WATER . Proposed Sewer Line Replacement EXHIBIT A uuu y. W E sit- 41 -. - < rnrr rrrnrrrl rrrrr�yrrrrO- rrrr-rFF-FFTnrrr; L��I����T{ {C{�{C {{{{`�{C{ ._{ { {{{- C {{a rr { jC j�{t_tl {,_{[ - - - - __►_ .._ WH _ ERSTa 77- _ .- _ _ EEL F. S �i♦r. {ti .>~. - - r• ��".' '' :-s L ' y _ '� I z 4_ 4.. 3 - FAINST— .•. .. Nil',. - Z : a. /�• ,I 12� -, _ p ` . /' - �� _'•y, z - � ; ,' ,. � �'� . +":» Sp,\E f- - y� r ¢ I���T w _ ,,P +_+ ' c�- `� � r � - v.�''+�. ':. ' � _� �--•' I,�l11 t•t " PCHRPMe ��p°�S 1. -. V ^ :, W - t � ' . J r � : ' / '< ,� �< d i I _� t� SPtEN�,2� e .!1 _ i' � '.F' l 1 - F �► r f_ V, - ` � � c � � s i yyrry�e,, _N0�` •�� F ,�'.." - i•G f .4, TPW PROPOSED ND 2022 CIP Year 3 Contract 16 NEIGHBORHOOD SO EXHIBIT A TREETS SHAPEFILE Proposed Water Line Replacement (Map 2 of 2) 11 CIP WATER Proposed Sewer Line Replacement