Loading...
HomeMy WebLinkAboutContract 59115-FP1 (2)-FP1 FORTWORTH. City Secretary Contract No. 59115 Date Received 09/30/2024 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Madero Sendera Ranch Blvd. City Project No.: 103700 Improvement Type(s): Water ❑x Sewer ❑ Developer Costs Original Contract Price $993,505.73 Amount of Approved Changed Order(s): $71,690.00 Revised Contract Amount: $1,065,195.73 Total Cost Work Complete: $1,065,195.73 Sep 25, 2024 Jay rneI (Sep 25, 202408:56 CDT) Contractor Date Project manager Title Conaster Construction TX, LP Company Name 9-6-'t�— Sep 27, 2024 Project Inspector Date #1011-1 Sep 29, 2024 Project Manager Date Se 30 2024 Raharra Owen (Seo 30. 202408:06 CDTI p CFA Manager Date 46.11 Sep 30, 2024 Lauren Prieur (Sep 30, 202408:29 CDT) TPW Director Date C�r� Sep 30, 2024 Asst. City Manager Date City Costs $2,011,209.27 $0.00 $2,011,209.27 $2,011,209.27 Total Costs $3,004,715.00 $71,690.00 $3,076,405.00 $3,076,405.00 OFFICIAL RECORD Page 1 of 2 CITY SECRETARY FT. WORTH, TX Notice of Project Completion Project Name: Madero Sendera Ranch Blvd. City Project No.: 103700 City's Attachments Final Pay Estimate ❑x Change Order(s): ❑x Yes ❑ N/A Pipe Report: ❑x Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety 0 Statement of Contract Time Contract Time: 120 WD Days Charged: 266 Work Start Date: 7/17/2023 Work Complete Date: 8/23/2024 Completed number of Soil Lab Test: 418 Completed number of Water Test: 8 Page 2 of 2 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name MADERO - SENDERA RANCH BOULEVARD Contract Limits Project Type WATER City Project Numbers 103700 DOE Number 3700 Estimate Number 1 Payment Number 1 City Secretary Contract Number Contract Date For Period Ending 8/23/2024 WD Project Manager NA Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH, TX 76119 Inspectors T. GARDNER / J. ROGERS Contract Time 24WD Days Charged to Date 266 Contract is 100.00 Complete Friday, September 6, 2024 Page 1 of 5 City Project Numbers 103700 Contract Name MADERO - SENDERA RANCH BOULEVARD Contract Limits Project Type WATER Project Funding UNIT I: WATER IMPROVEMENTS - COST PARTICIPAT Item No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Description of Items Estimated Unit Quanity TRENCH SAFETY 4890 LF DUCTILE IRON WATER FITTINGS W/ RES 0.81 TN 16" WATER PIPE 162 LF 30" DIP WATER 4728 LF IMPORTED EMBEDMENT/,CLSM 84 CY 16" GATE VALVE W/ VAULT I EA 4" COMBINATION AIR VALVE ASSEMBLY FOR I EA WATER 8" BLOW OFF VALVE 3 EA CONNECTION TO EXISTING 30" WATER MAIN 2 EA FIRE HTDRANT 2 EA AUTOMATIC FLUSHER I EA 30" AWWA BUTTERFLY VALV, W/ VAULT 4 EA 48" CASING BY OPENS CUT 35 LF CATHODIC PRETECTION 1 LF POST CCTV INSPECTION 4890 LF Sub -Total of Previous Unit UNIT IL- WATER IMPROVEMENTS H - DEVELOPER DOE Number 3700 Estimate Number I Payment Number I For Period Ending 8/23/2024 Unit Cost Estimated Completed Completed Total Quanity Total $2.00 $9,780.00 4890 $9,780.00 $9,500.00 $7,695.00 0.81 $7,695.00 $180.00 $29,160.00 162 $29,160.00 $465.00 ;,198,520.00 4728 2,198,520.00 $250.00 $21,000.00 84 $21,000.00 $22,500.00 $22,500.00 1 $22,500.00 $28,500.00 $28,500.00 1 $28,500.00 $14,500.00 $43,500.00 $11,500.00 $23,000.00 $4,500.00 $9,000.00 $6,500.00 $6,500.00 $48,500.00 $194,000.00 $950.00 $33,250.00 $176,000.00 $176,000.00 $3.00 $14,670.00 $2,817,075.00 3 $43,500.00 2 $23,000.00 2 $9,000.00 1 $6,500.00 4 $194,000.00 35 $33,250.00 1 $176,000.00 4890 $14,670.00 $2,817,075.00 Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- 1 DUCTILE IRON WATER FITTINGS WITH RES 3.44 TN $12,500.00 $43,000.00 3.44 $43,000.00 2 8" PVC WATER PIPE 15 LF $66.00 $990.00 15 $990.00 3 12" PVC WATER PIPE 257 LF $86.00 $22,102.00 257 $22,102.00 4 12" PVC WATER PIPE,CLSM BACKFILL 6 LF $96.00 $576.00 6 $576.00 5 12" DIP WATER 159 LF $96.00 $15,264.00 159 $15,264.00 6 12" DIP WATER, CLSM BACKFILL 24 LF $106.00 $2,544.00 24 $2,544.00 7 8" GATE VALVE I EA $116.00 $116.00 1 $116.00 8 12" GATE VALVE 5 EA $2,800.00 $14,000.00 5 $14,000.00 9 16" RING CONNECTION ASSEMBLY INCLUDES 2 EA $7,500.00 $15,000.00 2 $15,000.00 ALL VALVES 10 16" NONPRESSURE SLEEVE PLUGS (CO#1) 0 EA $3,500.00 $0.00 0 $0.00 Friday, September 6, 2024 Page 2 of 5 City Project Numbers 103700 Contract Name MADERO - SENDERA RANCH BOULEVARD Contract Limits Project Type WATER IMPROVEMENTS - DEVELOER Project Funding DOE Number 3700 Estimate Number I Payment Number I For Period Ending 8/23/2024 11 4" IRRIGATION SLEEVE 2502 LF $24.00 $60,048.00 2502 $60,048.00 12 20" NONPRESSURE SLEEVE PLUGS (CO#1) 4 EA $4,000.00 $16,000.00 4 $16,000.00 13 8" GATE VALVE20" STEEL SLEEVES (=3/8) 318 LF $205.00 $65,190.00 318 $65,190.00 (CO# 1) 14 ADJUST 6' BLOW OFF MANHOLE RIM 1 EA $4,500.00 $4,500.00 1 $4,500.00 ELEVATION (CO#2) Sub -Total of Previous Unit -------------------------------------- $259,330.00 $259,330.00 Friday, September 6, 2024 Page 3 of 5 City Project Numbers 103700 Contract Name MADERO - SENDERA RANCH BOULEVARD Contract Limits Project Type WATER IMPROVEMENTS - DEVELOER Project Funding Contract Information Summary Original Contract Amount Change Orders Change Order Number Change Order Number 1 Change Order Number 2 DOE Number 3700 Estimate Number 1 Payment Number 1 For Period Ending 8/23/2024 $3,004,715.00 $67,190.00 $4,500.00 Total Contract Price $3,076,405.00 Total Cost of Work Completed $3,076,405.00 Less % Retained $0.00 Net Earned $3,076,405.00 Earned This Period $3,076,405.00 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $3,076,405.00 Friday, September 6, 2024 Page 4 of 5 City Project Numbers 103700 Contract Name MADERO - SENDERA RANCH BOULEVARD Contract Limits Project Type WATER IMPROVEMENTS - DEVELOER Project Funding Project Manager NA Inspectors T. GARDNER / J. ROGERS Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH, TX 76119 DOE Number 3700 Estimate Number I Payment Number I For Period Ending 8/23/2024 City Secretary Contract Number Contract Date Contract Time 240 WD Days Charged to Date 266 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $3,076,405.00 Less % Retained $0.00 Net Earned $3,076,405.00 Earned This Period $3,076,405.00 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $3,076,405.00 Friday, September 6, 2024 Page 5 of 5 DEVELOPER -AWARDED -PROJECT CHANGE ORDER (PROJECT NAME: SENDERA RANCH BOULEVARD CONTRACT: (UNIT 1) WATER. (UNIT [III StORMWATER. (UNIT ]VI PAVEMENT, & (UNIT V) STREET LIGHTS CFA# 22-0182 I CITY PARTICIPATION:( YES (CITY PROJECT# 103700 (CITY SECRETARY CONTRACT # 59115 IFID # FID # 30114-0200431-103700-EO7685 SEWER PROJECT# NIA FILE # K-2984 INSPECTOR: PROJECT MANAGER: Adam Payan Phone No: Sandip Adhikari Phone No: WATER SEWER Developer Cost City Cost Developer Cost City Cost (ORIGINAL CONTRACT $630,543.35 I $2,374,171.65 $0.00 $0.00 (EXTRAS TO DATE $0.00 $0.00 I $0.00 $0.00 ICREDRs TO DATE $0.00 $0.00 $0.00 $0.00 I CONTRACT TO DATE $630,543.35 $2,374,171.65I $0.00 $0.00 JAMODUUNT OF PROP. CHANGE ORDER $67,100.00 $0.00 I $0.00 $0.00 .TWA�t.A $697,733.35 $2,374,171.65 $0.00 $0.00I;bT LE.0 t MOUNTPER UNIT $3,071,905.00 $0.00 REVISED COST SHARE Dev. Cost: $3,105,270.85 TOTAL REVISED CONTRACT 817-392-8424 CONTRACT UNIT PAVING CSC No. 59115-COI CHANGE ORDER No: a I DRAINAGE STREET LIGHTS CONTRACT .,..,,vi,, 1 1 DAYS $1,404,473.50 $0.00 $0.00 $0.00 $698,585.00 $0.00 1 $0.00 $0.00 $304,479.00 $0.00 1 $0.00 $1100 211 0 $0.00 I $0,00 $0.00 $0.00 $0.00 $0.00 $1,404,473.50 I $0.00 $698,685.00 $0.00 $304,479.00 $0.00 240 $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 0 $1,404,473.50 I $0.00 $698,585.00 $0.00 $304,479.00 $0.00 240 $1,404,473.50 $698.585.00 $304,479.00 City Cost: ?14$2,374,171.65 I $6,479,442.50 REVIEWED l By Sandip Adhikari at 2:04 pm, Jul 28, 2023 i Revised: 12-17-2018 Page 1 You are directed to make the following changes in the contract documents: UNIT II: WATER IMPROVEMENTS —DEVELOPER CITY BID ITEM CFW Unit Developer PAY ITEM # # QUANTITY I UNIT ITEM DESCRIPTION Price UNIT PRICE Cost City Cost TOTAL 10 9999.o003 (4.00) EA 18" Nonpressure Sleeve Plugs $0.00 $3500.00 (E74,000.00) $0.00 ($14,000.00) 12• 9999.0027 4.00 I FA 20" Nonpressure Sleeve Plugs S0.00 I $4000.00 $16,000.00 $0.00 $16,000.00 ) I 13' 9999.0028 318 LF 20"Steel Sleeves (T=318) $0.00 $205.00 $65,190.00 $0.00 $65,190.00 I UNIT II: WATER IMPROVEMENTS - DEVELOPER $67,1190.00 $0.00 $67,190.00 I Asterisk (") indicates New Pay Item REVIEWED 1 l By Sandfp Adhfkarl at 2.04 pm, Jul 28, 2023 J Revised: 12-17-2018 Page 2 REASONS FOR CHANGE ORDER UNIT H., This revision is to adhere to the City of Fort Worth Detail #D106 to include the correct steel encasement sleeve size. Sleeves B & C upsized from 16" Steel Sleeves to 20" Steel Sleeves. 16"Nonpressure Sleeve Plugs upsized to 20" Nonpressure Sleeve Plugs. THERE IS NO IMPACT TO CITY COST PARTICIPATION ON THIS CHANGE ORDER RECOMMENDED: WA Engineering, Inc Beffv- By: o baieie% on Name: Daniel Batten. PE Title: Project Manager Email: dbetten(c)lia.com APPROVAL RECOMMENDED: CFW- Water Department t2rcr T Merr By: con Name: Taylor Gundennan Title: Engineering Manager RECOMMENDED: CFW- "Contract Compliance Manager By: Name: Sandio Adhikari Title: Sr. Professional Engineer M&C Number. 23-0122 M&C Date Approved: 2/14/2023 APPROVED: GBTM Sendera, LLC By: amws.�n�.., w:Hwon Name: Bobby Samuel Title: Director of Land Development Email: bsamuel(a)greenbrickpartners.com APPROVED CFW - Assistant City Manager Daa Burando-FF 8¢ Name: Dana Burghdoff Title: Assistant City Manager APPROVED: Conatser Construction BrooK liva�,�gpns By: Name: Brock Huggins Title: President Email: brock0conatserconstruction.com APPROVED AS TO FORM AND LEGALITY: CFW - Assistant City Attorney By: Name: Richard McCracken Title: Senior Assistant City Attomey ATTEST " Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible A ..Lga3>du for the monitoring and administration of this contract, include ensuring all performance and reporting requirements. Jannette S. Goodall City Secretary ❑There are NO City Funds associated with this Contract ❑' There are City Funds associated with this Contract I REVIEWED 1 l By Sandip Adhikari at 2:04 pm, Jut 28, 2023 J Revised: 12-17-2018 Page 3 (PROJECT NAME: (CONTRACT: I CFA # I CITY PROJECT # ICITY SECRETARY CONTRACT # IFID# ISEWER PROJECT# IFILE # INSPECTOR: PROJECT MANAGER: DEVELOPER -AWARDED -PROJECT CHANGE ORDER SENDERA RANCH BOULEVARD 111I CHANGE (UNIT 1) WATER, (UNIT III) SRMWATER. (UNIT IV) PAVEMENT, & (UNIT V) STREET LIGHTS I ORDER No: 22-0182 I CITY PARTICIPATION: YES 103700 59115 I 2 FID * 30114-0200431-103700-EO7685 I N/A K-2984 Adam Payan Phone No: 682-225-9106 Sandip Adhikad Phone No: 817-392-8424 CONTRACT UNIT WATER SEWER PAVING I Cost I Cio (ORIGINAL CONTRACT $630,543.35 I $2,37 EXTRAS TO DATE $67,190.00 I $ (CREDITS TO DATE $0.00 I $ CONTRACT TO DATE $697,733.35 I $2,37 (AMOUNT OF PROP. CHANGE ORDER $4,500.00 f $ I EDyA�(j�NpT\RAAg AMOUNT $702,233.35 I $2,37 WA TO�L yEVI�E� CONTRACT AMOUNT PER UNIT $3,076,405.00 REVISED COST SHARE Dev. Cost: TOTAL REVISED CONTRACT Cost (Developer Costl CityCost I Developer Costl City Cost 171.66 I $0.00 I $0.00 I $1,404,473.50 I $0.00 00 I $0.00 I $0.00 I $0.00 ( $0.00 00 I $0.00 I $0.00 I $0.00 $0.00 171.6.5 I $0.00 I $0.00 I $1,404,473.50 $0.00 00 I $0.00 I $0.00 I ($89,656.85) $0.00 171.65 I $0.00 1 $0.00 I $1,314,816.65 $0.00 $0.00 I $1,314,816.65 $3,040,074.00 City Cost: $5,414,245.65 CSC No. 59115-0O2 DRAINAGE STREET LIGHTS r Developer City Cost Cost City Co 5.00 $0.00 $304,479.00 $o.00 1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $718,545.00 1 $2,374,171.65 I CONTRACT DAYS 240 0 240 0 Revised: 12-17-2018 Page 1 You are directed to make the following changes in the contract documents UNIT II: WATER IMPROVEMENTS -DEVELOPER CITY BID ITEM CFW Unit I Developer PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION Price UNIT PRICE Cos[ 1 City Cost 1 TOTAL 14" 9999.0026 1 EA Adjust 6' Blow off Manhole Rim Elevation ` $0.00 I S4500.00 $4,500.00 $0.00 $4,500.01, UNIT Ik WATER IMPROVEMENTS -DEVELOPER $4,500.00 $0.00 $4,500.00 _UNIT III: DRAIN_&G_E IMPROVEMENTS CITY BID ITEM CFW Unit Developer PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION Price UNIT PRICE Cost City Cost TOTAL 1 23' 241.3014 38 LF Remove 21" Storm Line $0.00 $30.00 $1,140.00 $0.00 $1,140.00 24" 9999.0027 4 LF Relocate 21" RCP $0.00 $105.00 $420.00 $0.00 1 $420.00 25• 9999.0028 4 EA 10' Recessed Inlets Remove and Relocate $0.00 $4,600.00 $18,400.00 $0.00 I $18,400.00 UNIT III: DRAINAGE IMPROVEMENTS $19,960.00 $0.00 $19,960.00 UNr' IV: PAVING IMPROVEMENTS CITY BID ITEM CFW Unit Developer PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION Price UNIT PRICE Cost City Cost TOTAL 1 1 3211.0400 (17.23) TN Hydrated Lime (36 Ibs/sy) (Sendera Ranch $0.00 $195.00 ($3,359.85) $0.00 ($3,359.85) 3211.0502 (956) BY 8" Lime Treatment (Sendera Ranch Blvd & $4.06 2 Rancho Canyon Ways $0.00 ($3,824.00) $0.00 ($3,624.00) 3213.0105 (957) BY 10" Cone Pvmt (Sendera Ranch Blvd & $72.00 3 Rancho Canyon Way) $0.00 ($68,904.00) $0.00 ($68,904.00) 4 3213 0301 230 Sle 4" Cone Sidewalk $0.00 $3.50 $805.00 $0.00 $805.00 16 9999.0022 1 (1450) LF REFL PAV MRK TY I(W)(6")(SNG)(SLD) $,0.00 $4.00 ($5,800.00) $0.00 ($5,800.00) 19 9999.0023 1 (1429) LF REFL PAV MIRK TY I(W)(8")(SNG)(SLD) $0.00 $6.00 ($8,574.00) $0.00 ($8,574.00) I I I UNITIV. PAVING IMd LOVEMENTS I I I ($89.656.85) I $0.00 ($89,656.85) Asterisk (") indicates New Pay Item Revised: 12-17-2018 Page 2 REASONS FOR CHANGE ORDER This Revision pertains to right turn lane pavement removals with adjustment to storm and water improvements THERE IS NO IMPACT TO CITY COST PARTICIPATION ON THIS CHANGE ORDER FORM RECOMMENDED: APPROVED: APPROVED: LJA EnBgineeeri-/ng,, Inc GBTM Sendera, LLC Conatser Construction �n,16ri )toP4ec: By; o n By...1, m 1-n.1--1cro By:° Name: Daniel Batten, PE Name: Bobby Samuel Name: Brock Huggins Title: Project Manager Title: Director of Land Development Title: President Email: dbetten(o)lia.com Email: bsamuelAcireenbrickpartners.com Email: brockOwnatserconstruction.com APPROVAL RECOMMENDED: APPROVED: APPROVED AS TO FORM AND LEGALITY: CFW- Water Department CFW- Assistant City Manager CFW- Assistant City Attorney �N „g,,,,�,(. gy; .�w•.�.� , rxon vaa can Dana BurandoFF By; By, Name: Suby Varughese Name: Dana Burghdoff Name: Richard McCracken Title: Interim Engineering Manager Title: Assistant City Manager Title: Senior Assistant City Attomey RECOMMENDED: CFW - 'Contract Compliance Manager ATTEST ' Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, include ensuring all performance and reporting requirements. Name: Sandip Adhikari Jannette S. Goodall City Secretary ❑ There are NO City Funds associated with this Contract Title: Sr. Professional Engineer El There are City Funds associated with this Contract M&C Number. 23-0122 M&C Date Approved: 2/14/2023 Revised: 12-17-2018 Page 3 FORTWORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Madero Sendera Ranch Blvd. CITY PROJECT NUMBER: 103700 WATER PIPE LAID SIZE TYPE OF PIPE LF PVC 16" C-900 Ductle Iron 30" ductle Iron PVC 8" C-900 PVC 12" C-900 PVC 'CLSM' 12" C-900 Ductle Iron 12" Ductle Iron Ductle Iron'CLSM' 12" Ductle Iron FIRE HYDRANTS: 2 VALVES (16" OR LARGER) PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: I SEWER PIPE LAID SIZE TYPE OF PIPE LF PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 1 162 4728 15 257 6 159 24 FORTWORTH. TRANSPORTATION AND PUBLIC WORKS September 5, 2024 Conatser Construction TX, L.P. 5327 Wichita Street Fort worth, Texas 76119 RE: Acceptance Letter Project Name: Madera Sendera Ranch Blvd. Project Type: Water,Paving, Drainage & Street Light City Project No.: 103700 To Whom It May Concern: On August 29, 2024 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on September 5, 2024. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on September 5, 2024, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 682- 210-8044. Sincerely, _01�� Sandip Adhikari, Project Manager Cc: John Rogers, Inspector Troy Gardner, Inspection Supervisor Cody Horton, Senior Inspector Andrew Gooman, Program Manager LJ A Engineering, Inc, Consultant Conatser Construction TX, L.P., Contractor GBTM, Sendera,LLC„ Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a Notary Public in the state and county aforesaid, on this day personally appeared Brock FIuggiw% President of Conatser Management Group, Inc., general partner of Conatser Construction TX. LP, known to me to be a erodible person, who being by me duly sworn, upon his oath deposed and said: That all persons, firms, associations, corporations or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth, has been paid in full; and That there are no claims pending for personal injury and/or property darn4ges; On Contract described as: SENDERA RANCH BOULEVARD WATER, SANITARY SEWER, DRAINAGE, PAYING, & STREET LIGHT IMPROVEMENTS CFA PRJ #: 22-00182 CITY PROJECT #: 103700 CITY OF FORT WORTH STATE OF TEXAS CONATSER CONSTRUCTION TX, LP Brock l luggt s Subscribed and sworn to before me this 22d day of April, 2024. KoLk . F'�"N Public in Tarrant Ca Texas � T Notary may► .pn EOM CONSENT OF SURETY COMPANY TO FINAL PAYMENT Conforms with the American Institute of Architects, AIA Document G707 PROJECT. (name, address)Serdera Ranch Boulevard Fort Worth_ TX TO (Owner) IGESTM SENDERA, LLC AND rHF CITY OF FORT VVORTH 2805 N. Dams Parkway, Suite 400 Plano TX 75093 CONTRACTOR. CONATSER CONSTRUCTION TX, L.P_ OWNER ❑ ARCHITECT ❑ CONTRACTOR ❑ SURETY ❑ OTHER Bond No 0249376 ARCHITECT'S PROJECT NO: Cl=A No. 22-Cis2 CONTRACT FOR: Two Year Main',enan-ce `or Senders Ranch Boulevard CONTRACT DATE: In accordance with the provisions of the Contract beMq= the Owner andthe Contractor as indicated atove, tFe (here insert name, end address of Surety Companyl BERKLEY INSURANCE COMPANY 475 Steambom Rced Greenwich CT 06830 SURETY COMPANY on bond of {harm insert nema and oddrmss of Cw4rW1100 CONATSER CONSTRUCTION TX. L P 5327 ► ichita 5:. Fort 1NOnh TX 76119-6035 , CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of Its obligations to [here inset nan+a and addreas of Owrwt GBTM SENDERA, LLC AND THE CITY OF FORT WORTH 2805 N Dallas Parkway, Suite 400 Plano TX 75093 , OWNER. as set forth in the said Surety Company's bond. IN WITNESS, WHEREOF, the Surety Company has hereunto set its hand this Attu (Seal): 191tt day Of April, 2024 BERKLEY INSURANCE COMPANY Surety Company Signature of Authorized Representative Attomev-In-Fact ROTE: This form is to be used as a compar;on documant to AIA DOCUMENT 0706. CONTFlACTOPI'S AFFID"rr OF PAYMENT OF DEBTS AND CLAWS, Cwrent Edition ONE PAGE