Loading...
HomeMy WebLinkAboutContract 42354-CO1 r CITY SEC 0, Lo" ne. Il"'ZLI orc a FoRTWORTH.", C rte° of Fort Worth CONTRACT woos ...............191111110111111?% Charge Order Request - ct,Dame "u""'�ul'way CAM11:510117XVIUME101 I ODOM Day Mum=13 itr Sec# 4234 Client Project#(s)LCity Project Number 00960,GR74 541200 055218451800 DOE"6774 Project Description� Paving,Drainage and Street light Improvements Contractor l" ario Sinacola&Sons Excavating Inc. Change Order# late 8/2,/2013 City Project Mgr. Patrick Buckled,P'.E. City Inspector s Bowers Dept. TPW T ' Water Sewer Sold Day Totals Type Original Contract Amount $5,104$789.1 11041 ' 91.18 Soo Extras to Date Credits to Date Pending Change Orders(in M&C PIrocess Contract Cost to Date $5, o41 g. $5,104,789.18 89.1 30 JAmount of Proposed Change carder $0.1100, $0A0 . 1170 Revised Contract Amount $5110417891.18 $5J04,789.18 470 Original Fends Available for Change Orders $0.09 $0.00 Remaining Funds Available for thin CO, $0.00 Additional Funding if necessary CHANGE ORDERS to DATE(INCLUDING THIS NE AS F ORIGINAL CONTRACT 0.001% MAX ALL II ABLE CONTRA CT AMOUNT(ORIGINAL CONTRA ACT COST+ $ r ,. / r r r / r / r / / / i � Dario,Sinacola was given notice to proceed for John Day Road and Keller Haslet Road on 1211412011. Work progressed until 08115/2012, when utilities were determined to be in the way of father construction. utilities kept work from being performed until 0610312013. Mario Sinacola°s cost have increased over the last year and they have requested an increase to these items. Mario,Sinacola has also asked to close Keller Haslet Road and John Day Road for 4 months whlich will help reduce the construction time for the whole project. To allow closure of Keller Haslet Road the City of Haslet requested)the City of Fart Worth to make improvements to 775 foot of Keller Haslet Road just south of the project. City of Haslet is providing$35,000.00 to make the ments. Cost savings from the project by not haaving,to a. provide tempor,ay road through Keller Haslet will provide the fund to exhibits supports the rnatedal increase. Also Mario Sinacola hs requested that they co the conastructi 1p in the timeframe also,. A7700 nu All F J 0 0 ay �� � LO-0� q It is understood and agreed that the acceptance of this Change order a astitutes an accord i and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Chan Dario Sinacola&Sons(Excavating Inc. 9Q44Y= . " AN ill 00" r r r . I AiLL ,ME/ //// f t / ?Zl;Z, 3 .......... --------------- tit I &C Number Ar 11 C late Approved j RECEIVED SEP 12 201 FowrWORTH City of Fort Worth Change O�rd'er Deletions Pr.ect Name Alliance Ai Runway Extension-Relocation of John Day Road and(relocation of Koller-Halle Ko:ad City Sec# � 423 !Client Prciect 4 City Project Number ,GR74 541200,055218451800 DOE 6774 Project Description Paving, r n a and Street Light Improvements Contractor Dario Sinacola&Sons Excavating Inc. Change Order 4 Date 8/212'013 City Project Mgr. Patrick Buckley,P.F. City In or �l'a Bowers DELETIONS F ITEM 10CRIPTION DEPT Qty Unit un Cost a - .-nta 1 J a -A, A air Ramp 1 , 12 i' �eway TPW 14,3776 J P'�ernent ete- ns I 1 In I - 32,407. SY $11.66 $11 14 Jb �P rent inch 9 �Course-Type , J war wt ! -Ins�l 5 y� H n -9 RU M 90 EM-Install TPW 33,310.2U SY P.M $66,740-40 Z han n n ate' ' FaZ ion:Reame TPW 3,500.00 N U00 $17,500-00 29 JD Rip--R p<Than 19 inch rock,12 Inch depth-Instal 1 In n%pRap Far in r , JD RipRap<Than 2415 0 Inch depth-Inst 32 J5 ip a Tian 24 Inch rock,36,Ind depth-Ineta 33 JD,l p is rook,Id l in nth 1,020. CY p p a Inch rock,Install ing-61nch ept P P< 7fian 19 Inch rock,I � k 47 J5 aI ,H undrail,Pedestrian Handrail T 01F TPW -1,056.0n $781750. ib du it, M N656er 4AM 9 1 Number 8G,,Sdvdule 96 TPW 8,160.00 $68"W-001 I i n- arr" Routing 1 5, .. p 1 Pavement ete n 1 Dinai ReinUE5a KH P Tenwt in urse- ix , „ , 11 RR � P' av nt 6 in In I 5 rnffi Type B 1,883. . , 14 KH P nt-OndassiW@ 5:5R Excavation:,Remove ,7 uSubgm& IncH OFw Stabili"zW-15E 11 W 5, w 00” 97 $4.00 $23,MM 16 KH rade-Lime 5 Stabilization,instaIll TPW IN T5 $140.00 , H Bridge--Temporary Shoring 6,020. 7 Km 1,100T 22 RR Pipe-24 Inch-CL 111,install IF $42.00 $2,058-M ipe-36 Inch-CE III,Install H RipRap<18inch,Install VInch , 'ipRawp<181nch,In 11 bediding Ind epth W 212 $1,27M H lnlot, t, H , i 2,0 5. , Inlet Foot,Instal, 11,001, . H e>ffia—n 4 Foot,Install TPW EA , 0.0011 $4,600-00 KH vnduu t,Anch W13 NuR—w AW Numbef 8G,Schediule R, TPW 465.00 LF $8.40 $3,9 Baia Pull Box,Install $577.72 , M RR t Marking-4 inch-White I_,F $1.00 $2,400.00 36 KH au nt Marking inch-Yellow H Miscellaneous ors nt-Iun t i l T FA $50,MM u . �n s Utilities + ' A5nt- �r�s cis 0 MD MiscellOREes Forte nt- 5I, A V.00 0.000.001 05 ME@1 a�an s A nt-Install TPW 249,998. , Payment by City of slFt U 5adifl5n-al-w—Z on Keller Haslet TPW I W JES M1000-00 i TPA 3,0 8,327.18 Water . $10.00 T59 dons , , Change Order Deletions Page 1 of 1 FORTWORTH City of Fart Worth Changle Order Additions Pmoct Name AiIlliarroe Airport Runway Extension-Reloeat an of John Day Road'and Relocation of Keller-Haslet Road City Sec# 42354 Client Prot# City Project Number 00960,GIIR74 541200 055218451800 DOE 6774 Project Description Paving,Drainage and Street light Improvements Contractor Mario Sinacola&Sons Excavating Inc. Change Order# Bate 8/212013 City Project Mgr. j tt Buckley,P'.E. Cq Inspector James Bowers ADDIT IONS Unit OF3 ro"sT 1,otal Oa JID alk-5iFt.-Install 30,350.00 SF $111,812.50 11a aik-ADA Wheelchair Ramp N a JD1 Driveway TPW 14,338.70 SF $3.70 N 13a JD �avement Cncrete-Install 11 Inch, 32,407.90' , ,, Pavement 2 inch Suffke_Course-Type D Mix avernen i 61'RMA—C-InstallYType B HMAC 1,525.90 , 17aJD u rade Inc Lime 9tabilized-Install , x , 22a JD TT5_n_ne_MndassiW caiv ton-Re"—move 7.50 $26w x a� ip Than n rock, inch depth-Install 5 a p p< an rock, Inch depth-li . a 315 RipRap<Than 24 Inch rte,30 Inch depth i n 0, 32a.JD Rip-Rap<Than 24 Inch rock,36 Inch depth-Install TPW 1,055.00 33a JI) RpRF9, nI rock,Install in' ep , , JI p� ban Inch ,,Install inIg-6-Inch Depth w . 5a p apC an Inch roc Install rng- nch Depth, 310.00 W-00 $19,840.00 a J01 Walk, an rar,Pedestrian Handrail TX0?57 TPW 1,550-M 7 , , v 51 a JD1 Nn—duit, nc uim 4AWG&1 NunI N u , l 7'1 JD Prep.Project am es,l ten ea $17'2,450.00 $172,450.00: la KH 9rg6-8arricaaes K Traffic outing TPW N N a avement Concrete-n�sta 11 lnc eimor Concrete , 1251 KH Pavement 2 inch SUI Course-Type D Mix Y . 13a KH aaremerd 6 inc Install n Ype BI TPW 2,400.00'----ST ,I 1!4a KH Pavement- Nt vaFn, moe 33,3013-00 , 15a KH 'I u r e-81 InEfi Eiime E FA-Install 16a KH u iiai-Gme ror NSIF5657n,Install an w N x 225 - Inch -CL 111,Install w tl r ' Inch 1 545.00 LF $55.00 N w a KH RipRap<181nch,InFt7al 121nch t 7. w 5a RR RipRap,<181nc,Install nc p , 26a nl et,Drop 4 toot,install M a Inlet,Recessed,10 Foot,Install , . 28a KH Manhole}than t, nstail w N N 33a KH u, Inc -umber 4AWG&1 Number 8G,Schedule 80 TPW' 465-00 LF $10.76 34a KH Electrical Pull Box,Install I TV EA $627.00, ,I 35a KH rreren a ring, nc a TPW 3,,300.00 N 36a KH Pavement our ing,4 Ind rte ,I 40,KH Mill and dispose 41Inch to 6 Inch Asp haft a'vement TPW1 21400.00 $335 $9,00U,00 41 KH rgn,BarTicade&Traffic outing, l onrc Message Boards TPW 4Y , nstruction Survey ,I , T' W' $3,018,327.1118 Water $0.00 Sewer $0.00 Sub otal Additio n's , Change Order Adldiltions Page 1 of 1 ffh 1III N'MB E Breakdown for this Change Order nj U 'mrthis, MWBE Sub Type of Servi Arno t"t r Total Previous Change Orders DATE AMOUNT Total uity o Fort Worth, Texas 0 N Ma%Affor and' Council Co unication DATE Tuesday,, August 20, 20113 REFERENCE NO.. **G-17979 LOG NAMES 551LA-KELLER HAS,LET'ROAD (00960) SUBJECTO a Authorize Execution of an Interlocal Agreement with the City of Haslet in the Amount Not to Exceed $135,:000.0O to Reconstruct a Portion of Keller-Haslet Road as Part of the Runway Extension Project at Fort Worth Alliance Airport, Authorize Acceptance in the Amount of$35,000.00 from City of Haslet and Adopt Appropriation Ordinance (COUNCIL, DISTRICT 7) .............. ............... ......... RECOMMENDATION: It is recommended that the City Council.* 1. Authorize the execution of an Interlocal Agreement with the City of Haslet in the amount not to exceed $35,000.00 to reconstruct a portion of Keller-Haslet Road as, part of the Runway Extension, project at Fort Worth Alliance Airport; 2. Authorize the acceptance of a contribution from City of Haslet in the amount not to exceed $35,000.00 to reconstruct a portion of Keller-Haslet Road as part of the Runway Extension Project at Fort Woft Alliance Airport; and 3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Municipal Airports Fund in the amount of$35,000.00,, contingent upon the receipt o I f the contribution from City of Haslet. .........-,."................. .............. ............................ ..... DISCUSSION';, At the request of the City of Haslet, the City of Fort Worth, has agreed' to enter into an Interlocal Agreement to reconstruct a portion of Keller-Haslet Road as part of the,Alliance,Airport Runway Extension. Keller- Haslet Road is being reconstructed to relocate the Burlington Northern Santa Fe mainline, which needs to, be, moved to allow for the extension of the runway at Alliance Airport. The reconstruction of the: road was already part of the project. However, the City of Haslet desires to pay for an additional 775 feet from the intersection of Main Street and Second, Street in Old Town Haslet, north to the south limits of the Fort Worth project's limi-t of Keller Haslet Road., The City of Haslet has agreed to allow for the closure of Keller-Ha�ls,leit, Road which created a saving to the overall project. Under the Agreement, the City of Fort Worth will be responsible for the design, construction and inspection, of Keller-Haslet Road:. The City of Haslet will be responsible for the cost of this project up to the amount,of$315,1000.00. The City of Fort Worth will utilize savings realized by the contractor,, due to the closure of Keller-Haslet Road, for any additional costs. Logname: 551LA-KELLER HASLET ROAD (00960) Page 1 of 2 ....A i Estimated Cost Reconstruct Keller�H'aslet Road $121 202. ww................... ........ �Reduction in Contract Due to Road C�losure (Project Credit) -$ 86,378-41 t .... ...H.N Remaining Amount to be Paid by the City .. ......., ... .w..., ....... Funds Provided by City of Haslet .. ,.. ..o„... Estimated Cost to Reconstruct Keller-Haslet Road 3, This project is being funded by grants,from,the Federal Aviation Ad minis ra i n. This project is located in CO,UNC1L DISTRICT 7, Maps,co 6B, 6F, 6K 6L and 6Q. FISCAL INFORMATION /CERTIFICATION, The Financial Managemen Services Director certifies,that upon approval of the, above recommendations, recelipt of the contribution and d p ion �of the appropriation ordi uance, or s will be available in the current operating bud�get,, as appropriated, f the Airport Greats Fund. FUND CENTER�S IO� TO and Account/Cennteirs FROM Fund'/Account/Centers 2 PE401 491412 0551002 $35000-� 0 � PE,4 5391201 65 2 ��0.00:11 2) PE4,0 5391120 0551002 35 O 0 0 CERTIFICAT�IONS8 Submitted for!qtt Manager's Off c Ferna,nd C sti (6122) Ori fina De. aent Head: Bill esta ' l era' neon (5407) � Pat suckle (2443) Additional Information ATTACHMENTS 1. 5151LA,-KELLER HASLET 'u� lIic 2 exhibit, 5151 E L 'E c Logy e: 551LA- LL T R (00:960:) Page 2 of 2 PROJECT SU,MM'ARY SHIEET (Change Order Attachment) PROJECT NSA . iin� A u� wExtension 11"I I PROJECT LI ITS. Rellocaflon of John Day Rd and Keller Haslet CS. Nio.. CS42354 D.OE N' .. 6774 Attachment to CO o.. 1 Today's Date. 91012013 TOTAL, T 'Water Sewer pLays Original m e mount: 1 Il 041789,18 5110:41789.18 3 0.00 Extras Date. $ *a $ Credits Date. Contract Amount to Date: $ 57, 04,7'89. 8 $5t104789.18 300. Amount of Proposed C ian e Order. TIME ONLY $ 17 Mx01 Revised Contract Amount: $ 511104,789.1118 $511041789.,789.18 470.0 Contingency Funds Avail. for Admin. COs. $ w $ - Remaining Funs Available for COs. $ $ , ddi i nal Funding (if necessary): $ $ � _