HomeMy WebLinkAboutContract 61360-CO2CSC No. 61360-0O2
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
(PROJECT NAME:
(Long Horn Estates Phase 1
(CONTRACT:
(Water/ Sewer/Drainage/Pavement/Street lights
! CHANGE
(ORDER No:
ICFA#
ICFA24-0041 CITY PARTICIPATION:(
YES
CITY PROJECT #
1105087
CITY SECRETARY CONTRACT #
161369
FID #
130114-0200431-105087-EO7685
2
IX #
IX-27933
IFILE #
IW-3002
INSPECTOR:
Michael Perkins Phone No:
682-715-7010
PROJECT MANAGER:
Khal Jaafari Phone No:
817-392-7872
CONTRACT UNIT
WATER
SEWER
DRAINAGE
PAVING
STREET LIGHTS
Developer
Developer
1cost
Developer
Cost
city Cost
City Cost
Developer Cost
City Cost
Developer Cost
City Cost
Cost
City Cost
IORIGINAL CONTRACT
I $2,289,949.98
$1,249,149.69 I $2,739,064.00
$0.00
$4,384,347.00
$0.00
$5,323,325.70
$0.00
$605,993.06
$0.00
EXTRAS TO DATE
I $0.00
$0.00 I $0.00
$0.00
I $0.00
$0.00
$0.00
$0.00
I $44,136.70
$0.00
CREDITS TO DATE
I $0.00
$0.00 I $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
I $0.00
$0.00
CONTRACT TO DATE
I $2,289,949.98 I
$1,249,149.69 I $2,739,064.00
$0.00
$4,384,347.00 I
$0.00
I $5,323,325.70
$0.00
I $650,129.76
$0.00
(AMOUNT OF PROP. CHANGE ORDER
I $58,464.00 $0.00 I $0.00 I
$0.00
I $0.00 I $0.00
I $0.00
$0.00
I $0.00
$0.00
REVISED CONTRACT AMOUNT
I $2,348,413.98 I $1,249,149.69 I $2,739,064.00 I $0.00
I $4,384,347.00 I $0.00
I $5,323,325.70 I
$0.00
I $650,129.76 I
$0.00
TOTAL REVISED CONTRACT AMOUNT PER
UNIT
$3,597,563.67
$2,739.064.00
$4,384,347.00
$5,323,325.70
$650,129.76
REVISED COST SHARE
IDev. Cost: $15,445,280.44
City Cost:
$1,249,149.69
TOTAL REVISED CONTRACT
I
$16,694,430.13
iCONTRACT
i DAYS
275
275
0
275
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Revised: 12-17-2018 Page 1
You are directed to make the following changes in the contract documents:
UNIT is WATER IMPROVEMENTS
CITY BID ITEM
CFW Unit
I Developer
PAY ITEM 11 /i QUANTITY UNIT
ITEMPESC(t(PTION I Pdce
UNIT PRICE J Cosl City Cost TOTAL
2 0241.1100 1218 SY
Remove sphallf pavomonl NIA
$24.0 $29.232.00 $0.00 $29.232.00
26' 3201.0400 1044 LF
Temporary Asphalt Pavement Rapair (2" Type B) I NIA
$28.00 $29,232.00 $0.00 $29.232.00
TOTAL UNIT I: WATER IMPROVEMENTS
$58,464.00 $0.00 $58,464.00
Asterisk (') Indicates New Pay Item
REASONS FOR CHANGE ORDER Removal and replacement of asphalt on W Cleburne Crowley for proposed 24" water line Installation. Asphalt replacement will be removed prior to the construction
of paving and storm drain proposed with (his project.
I
RECOMMENDED:
APPROVED:
APPROVED:
%rofG�W
_ --
-�— -
n
By. Eric Day.,,,,r,,.,,..,:
By: oL
By,
Name: Michelle Lasa
Name: Justin Bosworth
Name: Eric Day
Vice Presidonl - Project Managamanl. Wright
Tillie: Senior Prolocl Manager, Papo-Doi Englnenm
Tille: Assislent Socrelarv, D.R. HoAon -Texas. Ltd.
Title: Construclt Co.. Inc.
Mil
MH
APPROVAL RECOMMENDED:
APPROVED:
APPROVED AS TO FORM AND LEGALITY:
6
BY
s"" P,
V
Dana BUi'G1i
By Dan a Burgh doff (Oct 5, 2412'.59 CDT)
By: Richard McCracken tOct2,202420:50CDO
Name: SIIhV VarughP.sP
Name: Dana Burandoff
Name: Richard McCracken
Title:
Enaineerina Manager
Title: Assitant City MaJlagPr Title: Sr Assistant City Attorney
RECOMMENDED:
0�FOfl>°jc
4,oa,eo„
eIYG°d
ATTEST ;�o° ,�<
Contract Compliance Manager (Protect Manager):
By signing I acknowledge that I am the person responsible
By:
°Pdn rx[sa^tl
for the monitoring and administration or this contract, Include
Khal Jaafari
ensuring all performance and reporting requirements.
Name;
Jannette S. Goodall
City Secretary
❑ There are NO City Funds associated with this Contract
Title:
Professional Engineer
There are City Funds associated with this Contract
M&C Number, 24-0224
M&C Dale Approved: 3119/2024
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Revised: 12-17-2018 Page 2
FORTWORTH
MATTIE PARKER
MAYOR
DAVID COOKE
CITY MANAGER
MICHAEL OWEN, P.E.
CITY ENGINEER, TRANSPORTATION AND
PUBLIC WORKS DEPARTMENT
THE CITY OF FORT WORTH, TEXAS
PLANS FOR THE CONSTRUCTION OF
WATER, SEWER, PAVING, DRAINAGE
& STREET LIGHT IMPROVEMENTS
CHRISTOPHER P. HARDER, P.E.
DIRECTOR, WATER DEPARTMENT
IPRC RECORD NO. IPRC 23-0129
CITY PROJECT NO. 105087
FID NO. 30114-0200431-105087-EO7685
FILE NO. W-3002
LONGHORN ESTATES
PHASE 1
X-27933
CURRENT CONSTRUCTION STANDARDS FOR DEVELOPMENTS 25
DATED: OCTDRER e. 2023 SHALL GOVERN ON THIS
PROJECT
u
0
U
a
LOTS 1-44,1 OX, BLOCK 1 - LOTS 1-22, BLOCK 2 - LOTS 1-22, BLOCK 3 - LOTS 1-23, BLOCK 4 - LOTS 1-29, BLOCK 5 -LOTS 1 X, BLOCK 6
LOTS 1-20, BLOCK 7 - LOTS 1-10, 1X, BLOCK 8 - LOTS 1-14, BLOCK 9 - LOTS 1-8,1 X, BLOCK 10 - LOTS 1-16,1 X, BLOCK 11 0
LOTS 1-8, 1X, BLOCK 15 - LOTS 1, BLOCK 16 -LOTS 1-24, BLOCK 17 - LOTS 1-5, BLOCK 18 ^ LOTS 1-18, 1X, BLOCK 19
LOTS 1-12, 1X, BLOCK 20 — LOTS 1-8,1X, BLOCK 21 — LOTS 1-16, BLOCK 22 — LOTS 1,2,11 -16, BLOCK 23 — LOTS 1, 1X, BLOCK 25
LOTS 18-24, BLOCK 26 - LOT 1 X, BLOCK 55
0
CITY OF
PORT WORTH - - SHEET INDEX ON SHEET 2
w
� I
ij
`sluu.exw------ —..---i_II I4
CROW EV
I R
r_f J
SITE Nr
I �
0
............
L.r— I
j
i >
_ I
I N
ARRAN
COUNTY
LOCATION MAP
MAPSCO NO. 117E & 117J S2
COUNCIL DISTRICT 6 W
H
f4l.`•....%f+\1 •'�EOF iEy. ti. i
JANUARY 2024 tEOR 14 ^—_ Jan 18,2024
.r._.,f.
DEVELOPED BY: �, MCMELLE L ueA ; + DIRECTOR'S DESIGNEE FOR CONSTRUCTION DATE
PREPARED BY: f 133Y39 °to C Z
DR 6751
NORT FREEWAY
FORT I+ t 4'i'I , lCka�GtG11 L APPROVAL
za
., o�% PLAN APPRO
FOR NORTH FREEWAY I LLF'" 01-10-2020 dw
TX,PNGINE RSON Jan 17, 2024
FORT WORTH, BO WOR rJ ENGINEERS yyy��� { ¢ lz
CONTACT: JUSTIN BOSWORTH „/ vxm - y i
*xx.a xxaixTx
exx.xo r,xu xeoix_Tiox ..00 CONTACT: MICHELLE L LASA, P.E. REVIEWED DATE
PROJECT MANAGER O
MLASA®PAPE-DAWSON.COM X-27933 ; a
SHEETINDEX
Sheet Description
COVER SHEET
SHEETINDEX
DRAFT HORIZONTAL CONTROL PLAN (1)
DRAFT HORIZONTAL CONTROL PLAN (2)
COFW GENERAL NOTES(1)
COFW GENERAL NOTES (2)
GENERAL CONSTRUCTION NOTES T)
GENERAL CONSTRUCT ON NOTES (2)
DEMOLITION PLAN
OVERALL WATER LAYOUT (1I
WATER
3;. .
WATER PLAN (4)
WATER PLAN (5)
WATER PLAN (6)
WATER PLAN (])
WATER PLAN (8)
WATER PLAN (9)
WATER PLAN (10)
WATER LINE PLAN & PROFILE- 241N W-8 (1)
WATER LINE PLAN & PROFILE- 241N W-8 (2)
WATER LINE PLAN & PROFILE- 241N W-8 (3)
WATER LINE PLAN & PROFILE- 241N W-13 (1)
WATER LINE PLAN & PROFILE- 241N W-13 (2)
WATER LINE PLAN & PROF LE 121NW- 15 (1)
WATER LINE PLAN & PROFILE- 121N W-15 (2)
WATER LINE PLAN & PROFILE- 721N W-75 (3)
WATER LINE PLAN & PROFILE - 121N W-15 (4)
OVERALL SANITARY SEWER LAYOUT (1)
OVERALL SANITARY SEWER LAYOUT (2)
SANITARY SEWER PLAN & PROFILE - SS-1 (1)
SANITARY SEWER PLAN & PROFILE- SS-1 (2)
SANITARY SEWER PLAN &PROFILE- SS-1 (3)
SANITARY SEWER PLAN & PROFILE - SS-2
SANITARY SEWER PLAN & PROFILE - SS-2B (1)
SANITARY SEWER PLAN & PROFILE - SS- 2B (2) & 3
SANITARY SEWER PLAN & PROFILE - SS -4
SANITARY SEWER PLAN & PROFILE -SS-5
SANITARY SEWER PLAN & PROFILE - SS-6 (1)
SANITARY SEWER PLAN & PROFILE - SS-6 (2)
SANITARY SEWER PLAN & PROFILE - SS-7 & 8
SANITARY SEWER PLAN & PROFILE - SS-9 (1)
SANITARY SEWER PLAN & PROFILE - SS-9 (2)
SANITARY SEWER PLAN & PROFILE - SS-9B
SANITARY SEWER PLAN & PROFILE - SS-10 & 20
SANITARY SEWER PLAN & PROFILE - SS-11
SANITARY SEWER PLAN & PROFILE - SS-12 & 13 8,26
SANITARY SEWER PLAN & PROFILE - SS-14 & 15
SANITARY SEWER PLAN & PROFILE - SS-16 & 21
SANITARY SEWER PLAN & PROFILE - SS-18 &19
SANITARY SEWER PLAN & PROFILE - SS-22 & 24
SANITARY SEWER PLAN & PROFILE - SS-23 (1)
SANITARY SEWER PLAN & PROFILE - SS-23 (2)
SANITARY SEWER PLAN & PROFILE- SS-25 & Stubs 1 & 2
WATER DETAILS (1)
WATER DETAILS (2)
WATER DE TA
ILLS (3)
WATER DETAS (4)
WATER DETAILS (5)
WATER DETAILS (6)
SANITARY SEWER DETAILS (1)
SANITARY SEWER DETALS (2)
SANITARY SEWER DETAILS (3)
EROSION CONTROL PLAN
EROSION CONTROL PLAN 12)
EROSION CONTROL DETAILS
Sheet No
.............
SHEET INDEX
Sheet Description
COFW GENERAL NOTES (1)
COFW GENERAL NOTES (2)
GENERAL CONSTRUCTION NOTES (1)
GENERAL CONSTRUCT ON NOTES (2)
GRADING PLAN (1)
GRADING PLAN (2)
GRADNG PLAN (3)
GRADING PLAN (4)
GRADNG PLAN (5)
GRADING PLAN (6)
GRADING PLAN (7)
GRADING PLAN (8)
GRADING PLAN (9)
GRADNG PLAN (10)
GRADING PLAN (11)
PLAN & PROFILE - W CLEBURNE-CROWLEY RD (1)
PLAN & PROFILE - W CLEBURNE-CROWLEY RD (2)
PLAN & PROFILE - S HULEN STREET (1)
PLAN & PROFILE - S HULEN STREET (2)
PLAN & PROFILE - S HULEN STREET (3)
PLAN & PROFILE - LONGHORN TR (1)
PLAN & PROFILE - LONGHORN TR (2)
PLAN & PROFILE - LONGHORN TR (3)
PLAN & PROFILE - STREET 2
PLAN & PROFILE - STREET 3 (1)
PLAN & PROFILE - STREET 4
PLAN & PROFILE _STREET 5 (1)
PLAN & PROFILE - STREET 5 (2)
PLAN & PROFILE - STREET 6 (1)
PLAN & PROFILE - STREET 6 (2)
PLAN & PROFILE - STREET 7 (1)
PLAN & PROFILE -STREET 7 (2)
PLAN & PROFILE - STREET 8
PLAN & PROFILE - STREET 9
PLAN & PROFILE - STREET 10
PLAN & PROFILE - STREET 12 (1)
PLAN & PROFILE - STREET 12 (2)
PLAN & PROFILE _STREET 13
PLAN & PROFILE _STREET 14
PLAN & PROFILE - STREET 15 (1)
PLAN & PROFILE - STREET 15 (2)
PLAN & PROFILE - STREET 16
PLAN & PROFILE - STREET 17
PAVEMENT DETAILS (1)
PAVEMENT DETAILS (2)
PAVEMENT DETAILS (3)
PAVEMENT DETAILS (4)
PAVEMENT DETAILS (5)
PAVEMENT DETAILS (6)
DRAINAGE AREA MAP -EXISTING
DRAINAGE AREA MAP -PROPOSED
DRAINAGE AREA MAP - ULTIMATE
HYDRAULIC CALCULATIONS (1)
HYDRAULIC CALCULATONS (2)
HYDRAULIC CALCULATIONS (4)
HYDRAULIC CALCULATIONS (3)
STORM DRAIN PLAN & PROFILE- LINE SD-A(1)
STORM DRAIN PLAN &PROFILE- LINE SD-A(2)
STORM DRAIN PLAN & PROFILE- LINE SD-A(3), C8A & C99
STORM DRAIN PLAN & PROFILE - LINE SD-A3A, A313, A4A & A413
STORM DRAIN PLAN & PROFILE- LINE SD-A5A A A6A & A613
STORM DRAIN PLAN & PROFILE- LINE SD -ABA & A86
STORM DRAIN PLAN & PROFILE- LINE SD-B1(1)
STORM DRAIN PLAN & PROFILE- LINE SD-81(2)
STORM DRAIN PLAN & PROFILE- LINE SD-B1(3), 32A
STORM DRAIN PLAN & PROFILE- LNE SD-B3 & B5
STORM DRAIN PLAN & PROFILE- LINE SD-C7 A(1)
STORM DRAIN PLAN & PROFILE- LINE SD-C7 A(2) 8 D8
STORM DRAIN PLAN & PROFILE- LINE SD-C4A, C4B,C5A & CSB
STORM DRAIN PLAN & PROF LE LINE SD-C10A, C10B & C71
STORM DRAIN PLAN & PROFILE - LINE SO DI A (1)
STORM DRAIN PLAN & PROFILE- LINE SD-D1A (2)
STORM DRAIN PLAN & PROFILE - LINE SD-D2A, D2B, D3A & D3B
STORM DRAIN PLAN & PROFILE - LINE SD-F1 & D6
STORM DRAIN PLAN & PROFILE - LINE SD -El
STORM DRAIN PLAN & PROFILE- LINE SD-OSA1, OSA3, & OSD2
STORM DRAIN PLAN & PROFILE- LNE SO-0S61
STORM DRAIN PLAN & PROFILE- LINE SD-OSD3, 4, 5, & 6
STORM DRAIN PROFILE LATERALS (1)
STORM DRAIN PROFILE LATERALS (2)
STORM DRAIN PROFILE LATERALS (3)
STORM DRAIN PROFILE LATERALS (4)
Sheet No.
DETENTION POND -A 151
DETENTION POND -BC 152
DETENTION POND-D 153
DETENTION POND-D (2) 154
STORM DRAIN DETAILS (1) 155
STORM DRAIN DETAILS (2) 156
STORM DRAIN DETAILS (3) 157
STORM DRAIN DETAILS (4) 158
STORM DRAIN DETAILS (5) 159
STREET LIGHT PLAN (1)
11
STREET LIGHT PLAN (2) 161
STREET LIGHT PLAN (3) 162
I STREET SGNAGE PLAN (1) 163
STREET SGNAGE PLAN (2) 164
PAVEMENT MARKING PLAN -S HULEN STREET 165
PAVEMENT MARKING PLAN -LONGHORN TRAIL 166
PAVEMENT MARKING PLAN- W CLEBURNE CROWLEY 161
STREET LIGHT DETAILS (1) 168
STREET LIGHT DETAILS (2) 169
STREET SIGN DETAILS 170
PAVEMENT MARKING DETAILS (1) 1 ]1
PAVEMENT MARK NG DETALS (2) 1 ]2
TRAFFIC CONTROL PLAN (TPWI 1]3
SWCONSTRUCTION PLAN (1) 174
iSWM CONSTRUCTION PLAN (2) 175
ISWM CONSTRUCTION DETAILS 176
RENSONS
M0. anm Icowz-nsaxacT rnvsusrvr aExo�vw�awnla roawcirvsTwwnory
I
I
I
I
PAPE-DAWSON
IM ENGINEERS
LONGHORN ESTATES PHASE 1
INDEX SHEET
aEcrcm snc I D'.E xo.DaEd I CP�10508J I ten.
'�z/zz/za 2 OF 176
M
NOTE
REFER TO SHEETS 25-26
_
-W�13 PUN 8 PROFILE eFoCoMPLETEINFO
G
--�000
Z— — -- — --
—I
RE"
RE.LT. ZT"" " A—
< IF I AnT,
E ElIRO—I
REPAIR --
OIARI —.AIT RAI.INT
PPORARY A`- TO BE REM—D .... G� .... . All
All 110��El *0 OR4LIEl'. COM"ADO.—
I E— 2 1 . . . . . 7A T —.I, RE
I G'R CT
I
SHEET 12 (B)
SHEET 12 (A)
mom
BENCHMARKS
OR 1/2?"0-- PRO G' A. A I L
*=I. GAP EV G SS
E —
�2880
—EN TRAIS P.0
A.ITIC.
2AR 597 AO T"ACT 280 597 AG TRAG 2AS 597 AC TRACT SL ... PRO HOME,.
L, 'LOGA"L . ..... ER """R HOPES L,
APPRG.".='LZAT.� OR
—21' TUNDERGOROU'N�UR TIES, OR El L X��
PER CETAIL 33 Sic
2 25 D-161
E"W _y C I,
216898243 41
1 —7 41
y
;0 1,
ft4l IS
&4' 11"Y11 P. P'r
8RE242 PI R— 1218 EY OF NOTE:
N 6 -24- .1 EEND I- �ITRA TOR
1 2"'A2 1 NATION A R/ S— PA—T I RE'Al R
Al VAG— RELEASE ZT REFER TO SHEETS 25-26 clj
1 E 2-112 Ill � 1 2 TOPPIPARY —ALT 1-1— -W-13PU &PROFILE
"TA .,A, So I E I I ST 1 A�`.A 4 N�1� IN —'E-4 TERPOPARY A�QALI_ RE 1E.— 24'
I PER OCTAL 31 z . E-1 0 2.E2GC . 'R'GR I CO. UG al'I
6 96242 1. 14%41" TR S 11LE1 ST DR-14'-VITA111 PROPOSE FOR COMPLETE INFO
8 " i r_)
E 2-5 21 DRINAIE E I.El. �7 ES'T LU
' j 21' 1 1 PSEPT — PIG PIE) RE) LU
ACI I � I 1,1-C EDUIEI
A . EGI
I E All . 12 21 —61 1 E
'NSERT POLY PIG 119(E) E.
E 21. 1 GATE
LT LU
A IIS TA 'L 12 PI z
"`.
P
167
E 2— '1
ITAI+1791=
TO EAST
I-S. P.,
TO I11NETA+ I G..NEG— < '_E�E'l LU
ii
1 8 CLE 'NE.R R-TETPA.Y�P31�1121(1-1-1-9(E) RE—
POP— P. Ill 1 689011.87 23E_ E4
E 2SEER13,11
15"�IATER
OSPT ..R ESPT
.1 AG TRAC
2 T NOTE
8 REFER TO SHEETS 22-24
24" W-8 PUN & PROFILE
FOR COMPLETE INFO
-A
1 21 4 * I
N E
E
'7
N
- — — — — — — — — — — — — — —
8G
— — — — — — — — — — — — — — — — — — — r KTA,.cF;7L 71 MATCH LINE- SHEET 13 IWE7�H ET
.A
E o El I J.—ASPHAI—E.— =PA— P-1-
E— EC7 M
f
12
LEGEND
ATE
t T AEEG..
mow slaw on .ssn
IR-- DRA.
1-1. RATE —
EOISIP. TGE —1
" 1.1.AE
7
�.POPR :
NOTES
1- E-TNG �T OCATON1 ME APRR—
CON
AG I R� C
2 CONTRACTOR SHALL PROTECT ALL EXI— -11, TIN
'ALLS AN,
3 .71/11AEl IT111 11-1 ...PER NS-
12 RADIUS Or CURIAIREOPRIT EEIJEGI
UTILITY NOTE
—PILED O'S SOURCES AND ARE 'TINDEO TOsxow "PRAL 'X"" T`E "' " 'RGA", '61 . vmz�'
UT- I'LA'S
-1 11TIT A 11— 11AT11
SERICE 4 1-1 PRIOR TO ANI 1—OP
A1111 IE 11NIAIT11 11 EXACT LOGA_ ANG E, _ 'A".
G J1— AN l
D . E L u
'ERDRP E IF ARG All I.-TS GROI �% T`E "'TRACT" S"' �K'T 3 ' 3 - 9
'Aa
P.Ol - E—ECI I _1 GOITICTS
ARE DISCO—)
�'.'AN`.AGTG1'.EA'LL
— 1. —11 — TO Exuv.nxc AT — LG'A"
T:V1'E1D GREIATINS 81�1) 1 (S
T — .11 (."» 392-S-
THE CITY OF FORT WORTH, TEXAS
WATER DEPARTMENT
PfPAPE-DAWSON
ENGINEERS
'Al" ST. ITE "' I " "'T" TE.A . ... . EESI— I — :."'TRAT: 1'1"
LONGHORN ESTATES PHASE 1
WATER PLAN (1)
.'R.. P. G,o 'SAP, ;;8, T
... ATE Eppo of111,
G_P. 12, 1 "' 12