Loading...
HomeMy WebLinkAboutContract 61360-CO2CSC No. 61360-0O2 DEVELOPER -AWARDED -PROJECT CHANGE ORDER (PROJECT NAME: (Long Horn Estates Phase 1 (CONTRACT: (Water/ Sewer/Drainage/Pavement/Street lights ! CHANGE (ORDER No: ICFA# ICFA24-0041 CITY PARTICIPATION:( YES CITY PROJECT # 1105087 CITY SECRETARY CONTRACT # 161369 FID # 130114-0200431-105087-EO7685 2 IX # IX-27933 IFILE # IW-3002 INSPECTOR: Michael Perkins Phone No: 682-715-7010 PROJECT MANAGER: Khal Jaafari Phone No: 817-392-7872 CONTRACT UNIT WATER SEWER DRAINAGE PAVING STREET LIGHTS Developer Developer 1cost Developer Cost city Cost City Cost Developer Cost City Cost Developer Cost City Cost Cost City Cost IORIGINAL CONTRACT I $2,289,949.98 $1,249,149.69 I $2,739,064.00 $0.00 $4,384,347.00 $0.00 $5,323,325.70 $0.00 $605,993.06 $0.00 EXTRAS TO DATE I $0.00 $0.00 I $0.00 $0.00 I $0.00 $0.00 $0.00 $0.00 I $44,136.70 $0.00 CREDITS TO DATE I $0.00 $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 I $0.00 $0.00 CONTRACT TO DATE I $2,289,949.98 I $1,249,149.69 I $2,739,064.00 $0.00 $4,384,347.00 I $0.00 I $5,323,325.70 $0.00 I $650,129.76 $0.00 (AMOUNT OF PROP. CHANGE ORDER I $58,464.00 $0.00 I $0.00 I $0.00 I $0.00 I $0.00 I $0.00 $0.00 I $0.00 $0.00 REVISED CONTRACT AMOUNT I $2,348,413.98 I $1,249,149.69 I $2,739,064.00 I $0.00 I $4,384,347.00 I $0.00 I $5,323,325.70 I $0.00 I $650,129.76 I $0.00 TOTAL REVISED CONTRACT AMOUNT PER UNIT $3,597,563.67 $2,739.064.00 $4,384,347.00 $5,323,325.70 $650,129.76 REVISED COST SHARE IDev. Cost: $15,445,280.44 City Cost: $1,249,149.69 TOTAL REVISED CONTRACT I $16,694,430.13 iCONTRACT i DAYS 275 275 0 275 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Revised: 12-17-2018 Page 1 You are directed to make the following changes in the contract documents: UNIT is WATER IMPROVEMENTS CITY BID ITEM CFW Unit I Developer PAY ITEM 11 /i QUANTITY UNIT ITEMPESC(t(PTION I Pdce UNIT PRICE J Cosl City Cost TOTAL 2 0241.1100 1218 SY Remove sphallf pavomonl NIA $24.0 $29.232.00 $0.00 $29.232.00 26' 3201.0400 1044 LF Temporary Asphalt Pavement Rapair (2" Type B) I NIA $28.00 $29,232.00 $0.00 $29.232.00 TOTAL UNIT I: WATER IMPROVEMENTS $58,464.00 $0.00 $58,464.00 Asterisk (') Indicates New Pay Item REASONS FOR CHANGE ORDER Removal and replacement of asphalt on W Cleburne Crowley for proposed 24" water line Installation. Asphalt replacement will be removed prior to the construction of paving and storm drain proposed with (his project. I RECOMMENDED: APPROVED: APPROVED: %rofG�W _ -- -�— - n By. Eric Day.,,,,r,,.,,..,: By: oL By, Name: Michelle Lasa Name: Justin Bosworth Name: Eric Day Vice Presidonl - Project Managamanl. Wright Tillie: Senior Prolocl Manager, Papo-Doi Englnenm Tille: Assislent Socrelarv, D.R. HoAon -Texas. Ltd. Title: Construclt Co.. Inc. Mil MH APPROVAL RECOMMENDED: APPROVED: APPROVED AS TO FORM AND LEGALITY: 6 BY s"" P, V Dana BUi'G1i By Dan a Burgh doff (Oct 5, 2412'.59 CDT) By: Richard McCracken tOct2,202420:50CDO Name: SIIhV VarughP.sP Name: Dana Burandoff Name: Richard McCracken Title: Enaineerina Manager Title: Assitant City MaJlagPr Title: Sr Assistant City Attorney RECOMMENDED: 0�FOfl>°jc 4,oa,eo„ eIYG°d ATTEST ;�o° ,�< Contract Compliance Manager (Protect Manager): By signing I acknowledge that I am the person responsible By: °Pdn rx[sa^tl for the monitoring and administration or this contract, Include Khal Jaafari ensuring all performance and reporting requirements. Name; Jannette S. Goodall City Secretary ❑ There are NO City Funds associated with this Contract Title: Professional Engineer There are City Funds associated with this Contract M&C Number, 24-0224 M&C Dale Approved: 3119/2024 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Revised: 12-17-2018 Page 2 FORTWORTH MATTIE PARKER MAYOR DAVID COOKE CITY MANAGER MICHAEL OWEN, P.E. CITY ENGINEER, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT THE CITY OF FORT WORTH, TEXAS PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, DRAINAGE & STREET LIGHT IMPROVEMENTS CHRISTOPHER P. HARDER, P.E. DIRECTOR, WATER DEPARTMENT IPRC RECORD NO. IPRC 23-0129 CITY PROJECT NO. 105087 FID NO. 30114-0200431-105087-EO7685 FILE NO. W-3002 LONGHORN ESTATES PHASE 1 X-27933 CURRENT CONSTRUCTION STANDARDS FOR DEVELOPMENTS 25 DATED: OCTDRER e. 2023 SHALL GOVERN ON THIS PROJECT u 0 U a LOTS 1-44,1 OX, BLOCK 1 - LOTS 1-22, BLOCK 2 - LOTS 1-22, BLOCK 3 - LOTS 1-23, BLOCK 4 - LOTS 1-29, BLOCK 5 -LOTS 1 X, BLOCK 6 LOTS 1-20, BLOCK 7 - LOTS 1-10, 1X, BLOCK 8 - LOTS 1-14, BLOCK 9 - LOTS 1-8,1 X, BLOCK 10 - LOTS 1-16,1 X, BLOCK 11 0 LOTS 1-8, 1X, BLOCK 15 - LOTS 1, BLOCK 16 -LOTS 1-24, BLOCK 17 - LOTS 1-5, BLOCK 18 ^ LOTS 1-18, 1X, BLOCK 19 LOTS 1-12, 1X, BLOCK 20 — LOTS 1-8,1X, BLOCK 21 — LOTS 1-16, BLOCK 22 — LOTS 1,2,11 -16, BLOCK 23 — LOTS 1, 1X, BLOCK 25 LOTS 18-24, BLOCK 26 - LOT 1 X, BLOCK 55 0 CITY OF PORT WORTH - - SHEET INDEX ON SHEET 2 w � I ij `sluu.exw------ —..---i_II I4 CROW EV I R r_f J SITE Nr I � 0 ............ L.r— I j i > _ I I N ARRAN COUNTY LOCATION MAP MAPSCO NO. 117E & 117J S2 COUNCIL DISTRICT 6 W H f4l.`•....%f+\1 •'�EOF iEy. ti. i JANUARY 2024 tEOR 14 ^—_ Jan 18,2024 .r._.,f. DEVELOPED BY: �, MCMELLE L ueA ; + DIRECTOR'S DESIGNEE FOR CONSTRUCTION DATE PREPARED BY: f 133Y39 °to C Z DR 6751 NORT FREEWAY FORT I+ t 4'i'I , lCka�GtG11 L APPROVAL za ., o�% PLAN APPRO FOR NORTH FREEWAY I LLF'" 01-10-2020 dw TX,PNGINE RSON Jan 17, 2024 FORT WORTH, BO WOR rJ ENGINEERS yyy��� { ¢ lz CONTACT: JUSTIN BOSWORTH „/ vxm - y i *xx.a xxaixTx exx.xo r,xu xeoix_Tiox ..00 CONTACT: MICHELLE L LASA, P.E. REVIEWED DATE PROJECT MANAGER O MLASA®PAPE-DAWSON.COM X-27933 ; a SHEETINDEX Sheet Description COVER SHEET SHEETINDEX DRAFT HORIZONTAL CONTROL PLAN (1) DRAFT HORIZONTAL CONTROL PLAN (2) COFW GENERAL NOTES(1) COFW GENERAL NOTES (2) GENERAL CONSTRUCTION NOTES T) GENERAL CONSTRUCT ON NOTES (2) DEMOLITION PLAN OVERALL WATER LAYOUT (1I WATER 3;. . WATER PLAN (4) WATER PLAN (5) WATER PLAN (6) WATER PLAN (]) WATER PLAN (8) WATER PLAN (9) WATER PLAN (10) WATER LINE PLAN & PROFILE- 241N W-8 (1) WATER LINE PLAN & PROFILE- 241N W-8 (2) WATER LINE PLAN & PROFILE- 241N W-8 (3) WATER LINE PLAN & PROFILE- 241N W-13 (1) WATER LINE PLAN & PROFILE- 241N W-13 (2) WATER LINE PLAN & PROF LE 121NW- 15 (1) WATER LINE PLAN & PROFILE- 121N W-15 (2) WATER LINE PLAN & PROFILE- 721N W-75 (3) WATER LINE PLAN & PROFILE - 121N W-15 (4) OVERALL SANITARY SEWER LAYOUT (1) OVERALL SANITARY SEWER LAYOUT (2) SANITARY SEWER PLAN & PROFILE - SS-1 (1) SANITARY SEWER PLAN & PROFILE- SS-1 (2) SANITARY SEWER PLAN &PROFILE- SS-1 (3) SANITARY SEWER PLAN & PROFILE - SS-2 SANITARY SEWER PLAN & PROFILE - SS-2B (1) SANITARY SEWER PLAN & PROFILE - SS- 2B (2) & 3 SANITARY SEWER PLAN & PROFILE - SS -4 SANITARY SEWER PLAN & PROFILE -SS-5 SANITARY SEWER PLAN & PROFILE - SS-6 (1) SANITARY SEWER PLAN & PROFILE - SS-6 (2) SANITARY SEWER PLAN & PROFILE - SS-7 & 8 SANITARY SEWER PLAN & PROFILE - SS-9 (1) SANITARY SEWER PLAN & PROFILE - SS-9 (2) SANITARY SEWER PLAN & PROFILE - SS-9B SANITARY SEWER PLAN & PROFILE - SS-10 & 20 SANITARY SEWER PLAN & PROFILE - SS-11 SANITARY SEWER PLAN & PROFILE - SS-12 & 13 8,26 SANITARY SEWER PLAN & PROFILE - SS-14 & 15 SANITARY SEWER PLAN & PROFILE - SS-16 & 21 SANITARY SEWER PLAN & PROFILE - SS-18 &19 SANITARY SEWER PLAN & PROFILE - SS-22 & 24 SANITARY SEWER PLAN & PROFILE - SS-23 (1) SANITARY SEWER PLAN & PROFILE - SS-23 (2) SANITARY SEWER PLAN & PROFILE- SS-25 & Stubs 1 & 2 WATER DETAILS (1) WATER DETAILS (2) WATER DE TA ILLS (3) WATER DETAS (4) WATER DETAILS (5) WATER DETAILS (6) SANITARY SEWER DETAILS (1) SANITARY SEWER DETALS (2) SANITARY SEWER DETAILS (3) EROSION CONTROL PLAN EROSION CONTROL PLAN 12) EROSION CONTROL DETAILS Sheet No ............. SHEET INDEX Sheet Description COFW GENERAL NOTES (1) COFW GENERAL NOTES (2) GENERAL CONSTRUCTION NOTES (1) GENERAL CONSTRUCT ON NOTES (2) GRADING PLAN (1) GRADING PLAN (2) GRADNG PLAN (3) GRADING PLAN (4) GRADNG PLAN (5) GRADING PLAN (6) GRADING PLAN (7) GRADING PLAN (8) GRADING PLAN (9) GRADNG PLAN (10) GRADING PLAN (11) PLAN & PROFILE - W CLEBURNE-CROWLEY RD (1) PLAN & PROFILE - W CLEBURNE-CROWLEY RD (2) PLAN & PROFILE - S HULEN STREET (1) PLAN & PROFILE - S HULEN STREET (2) PLAN & PROFILE - S HULEN STREET (3) PLAN & PROFILE - LONGHORN TR (1) PLAN & PROFILE - LONGHORN TR (2) PLAN & PROFILE - LONGHORN TR (3) PLAN & PROFILE - STREET 2 PLAN & PROFILE - STREET 3 (1) PLAN & PROFILE - STREET 4 PLAN & PROFILE _STREET 5 (1) PLAN & PROFILE - STREET 5 (2) PLAN & PROFILE - STREET 6 (1) PLAN & PROFILE - STREET 6 (2) PLAN & PROFILE - STREET 7 (1) PLAN & PROFILE -STREET 7 (2) PLAN & PROFILE - STREET 8 PLAN & PROFILE - STREET 9 PLAN & PROFILE - STREET 10 PLAN & PROFILE - STREET 12 (1) PLAN & PROFILE - STREET 12 (2) PLAN & PROFILE _STREET 13 PLAN & PROFILE _STREET 14 PLAN & PROFILE - STREET 15 (1) PLAN & PROFILE - STREET 15 (2) PLAN & PROFILE - STREET 16 PLAN & PROFILE - STREET 17 PAVEMENT DETAILS (1) PAVEMENT DETAILS (2) PAVEMENT DETAILS (3) PAVEMENT DETAILS (4) PAVEMENT DETAILS (5) PAVEMENT DETAILS (6) DRAINAGE AREA MAP -EXISTING DRAINAGE AREA MAP -PROPOSED DRAINAGE AREA MAP - ULTIMATE HYDRAULIC CALCULATIONS (1) HYDRAULIC CALCULATONS (2) HYDRAULIC CALCULATIONS (4) HYDRAULIC CALCULATIONS (3) STORM DRAIN PLAN & PROFILE- LINE SD-A(1) STORM DRAIN PLAN &PROFILE- LINE SD-A(2) STORM DRAIN PLAN & PROFILE- LINE SD-A(3), C8A & C99 STORM DRAIN PLAN & PROFILE - LINE SD-A3A, A313, A4A & A413 STORM DRAIN PLAN & PROFILE- LINE SD-A5A A A6A & A613 STORM DRAIN PLAN & PROFILE- LINE SD -ABA & A86 STORM DRAIN PLAN & PROFILE- LINE SD-B1(1) STORM DRAIN PLAN & PROFILE- LINE SD-81(2) STORM DRAIN PLAN & PROFILE- LINE SD-B1(3), 32A STORM DRAIN PLAN & PROFILE- LNE SD-B3 & B5 STORM DRAIN PLAN & PROFILE- LINE SD-C7 A(1) STORM DRAIN PLAN & PROFILE- LINE SD-C7 A(2) 8 D8 STORM DRAIN PLAN & PROFILE- LINE SD-C4A, C4B,C5A & CSB STORM DRAIN PLAN & PROF LE LINE SD-C10A, C10B & C71 STORM DRAIN PLAN & PROFILE - LINE SO DI A (1) STORM DRAIN PLAN & PROFILE- LINE SD-D1A (2) STORM DRAIN PLAN & PROFILE - LINE SD-D2A, D2B, D3A & D3B STORM DRAIN PLAN & PROFILE - LINE SD-F1 & D6 STORM DRAIN PLAN & PROFILE - LINE SD -El STORM DRAIN PLAN & PROFILE- LINE SD-OSA1, OSA3, & OSD2 STORM DRAIN PLAN & PROFILE- LNE SO-0S61 STORM DRAIN PLAN & PROFILE- LINE SD-OSD3, 4, 5, & 6 STORM DRAIN PROFILE LATERALS (1) STORM DRAIN PROFILE LATERALS (2) STORM DRAIN PROFILE LATERALS (3) STORM DRAIN PROFILE LATERALS (4) Sheet No. DETENTION POND -A 151 DETENTION POND -BC 152 DETENTION POND-D 153 DETENTION POND-D (2) 154 STORM DRAIN DETAILS (1) 155 STORM DRAIN DETAILS (2) 156 STORM DRAIN DETAILS (3) 157 STORM DRAIN DETAILS (4) 158 STORM DRAIN DETAILS (5) 159 STREET LIGHT PLAN (1) 11 STREET LIGHT PLAN (2) 161 STREET LIGHT PLAN (3) 162 I STREET SGNAGE PLAN (1) 163 STREET SGNAGE PLAN (2) 164 PAVEMENT MARKING PLAN -S HULEN STREET 165 PAVEMENT MARKING PLAN -LONGHORN TRAIL 166 PAVEMENT MARKING PLAN- W CLEBURNE CROWLEY 161 STREET LIGHT DETAILS (1) 168 STREET LIGHT DETAILS (2) 169 STREET SIGN DETAILS 170 PAVEMENT MARKING DETAILS (1) 1 ]1 PAVEMENT MARK NG DETALS (2) 1 ]2 TRAFFIC CONTROL PLAN (TPWI 1]3 SWCONSTRUCTION PLAN (1) 174 iSWM CONSTRUCTION PLAN (2) 175 ISWM CONSTRUCTION DETAILS 176 RENSONS M0. anm Icowz-nsaxacT rnvsusrvr aExo�vw�awnla roawcirvsTwwnory I I I I PAPE-DAWSON IM ENGINEERS LONGHORN ESTATES PHASE 1 INDEX SHEET aEcrcm snc I D'.E xo.DaEd I CP�10508J I ten. '�z/zz/za 2 OF 176 M NOTE REFER TO SHEETS 25-26 _ -W�13 PUN 8 PROFILE eFoCoMPLETEINFO G --�000 Z— — -- — -- —I RE" RE.LT. ZT"" " A— < IF I AnT, E ElIRO—I REPAIR -- OIARI —.AIT RAI.INT PPORARY A`- TO BE REM—D .... G� .... . All All 110��El *0 OR4LIEl'. COM"ADO.— I E— 2 1 . . . . . 7A T —.I, RE I G'R CT I SHEET 12 (B) SHEET 12 (A) mom BENCHMARKS OR 1/2?"0-- PRO G' A. A I L *=I. GAP EV G SS E — �2880 —EN TRAIS P.0 A.ITIC. 2AR 597 AO T"ACT 280 597 AG TRAG 2AS 597 AC TRACT SL ... PRO HOME,. L, 'LOGA"L . ..... ER """R HOPES L, APPRG.".='LZAT.� OR —21' TUNDERGOROU'N�UR TIES, OR El L X�� PER CETAIL 33 Sic 2 25 D-161 E"W _y C I, 216898243 41 1 —7 41 y ;0 1, ft4l IS &4' 11"Y11 P. P'r 8RE242 PI R— 1218 EY OF NOTE: N 6 -24- .1 EEND I- �ITRA TOR 1 2"'A2 1 NATION A R/ S— PA—T I RE'Al R Al VAG— RELEASE ZT REFER TO SHEETS 25-26 clj 1 E 2-112 Ill � ­ 1 2 TOPPIPARY —ALT 1-1— -W-13PU &PROFILE "TA .,A, So I E I I ST 1 A�`.A 4 N�1� IN —'E-4 TERPOPARY A�QALI_ RE 1E.— 24' I PER OCTAL 31 z . E-1 0 2.E2GC . 'R'GR I CO. UG al'I 6 96242 1. 14%41" TR S 11LE1 ST DR-14'-VITA111 PROPOSE FOR COMPLETE INFO 8 " i r_) E 2-5 21 DRINAIE E I.El. �7 ES'T LU ' j 21' 1 1 PSEPT — PIG PIE) RE) LU ACI I � I 1,1-C EDUIEI A . EGI I E All . 12 21 —61 1 E 'NSERT POLY PIG 119(E) E. E 21. 1 GATE LT LU A IIS TA 'L 12 PI z "`. P 167 E 2— '1 ITAI+1791= TO EAST I-S. P., TO I11NETA+ I G..NEG— < '_E�E'l LU ii 1 8 CLE 'NE.R R-TETPA.Y�P31�1121(1-1-1-9(E) RE— POP— P. Ill 1 689011.87 23E_ E4 E 2SEER13,11 15"�IATER OSPT ..R ESPT .1 AG TRAC 2 T NOTE 8 REFER TO SHEETS 22-24 24" W-8 PUN & PROFILE FOR COMPLETE INFO -A 1 21 4 * I N E E '7 N - — — — — — — — — — — — — — — 8G — — — — — — — — — — — — — — — — — — — r KTA,.cF;7L 71 MATCH LINE- SHEET 13 IWE7�H ET .A E o El I J.—ASPHAI—E.— =PA— P-1- E— EC7 M f 12 LEGEND ATE t T AEEG.. mow slaw on .ssn IR-- DRA. 1-1. RATE — EOISIP. TGE —1 " 1.1.AE 7 �.POPR : NOTES 1- E-TNG �T OCATON1 ME APRR— CON AG I R� C 2 CONTRACTOR SHALL PROTECT ALL EXI— -11, TIN 'ALLS AN, 3 .71/11AEl IT111 11-1 ...PER NS- 12 RADIUS Or CURIAIREOPRIT EEIJEGI UTILITY NOTE —PILED O'S SOURCES AND ARE 'TINDEO TOsxow "PRAL 'X"" T`E "' " 'RGA", '61 . vmz�' UT- I'LA'S -1 11TIT A 11— 11AT11 SERICE 4 1-1 PRIOR TO ANI 1—OP A1111 IE 11NIAIT11 11 EXACT LOGA_ ANG E, _ 'A". G J1— AN l D . E L u 'ERDRP E IF ARG All I.-TS GROI �% T`E "'TRACT" S"' �K'T 3 ' 3 - 9 'Aa P.Ol - E—ECI I _1 GOITICTS ARE DISCO—) �'.'AN`.AGTG1'.EA'LL — 1. —11 — TO Exuv.nxc AT — LG'A" T:V1'E1D GREIATINS 81�1) 1 (S T — .11 (."» 392-S- THE CITY OF FORT WORTH, TEXAS WATER DEPARTMENT PfPAPE-DAWSON ENGINEERS 'Al" ST. ITE "' I " "'T" TE.A . ... . EESI— I — :."'TRAT: 1'1" LONGHORN ESTATES PHASE 1 WATER PLAN (1) .'R.. P. G,o 'SAP, ;;8, T ... ATE Eppo of111, G_P. 12, 1 "' 12