Loading...
HomeMy WebLinkAboutContract 60707-FP2FORT WORTHa -FP2 City Secretary Contract No. 60707 Date Received 10/03/2024 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Frye Road Industrial City Project No.: 105219 Improvement Type(s): Water x❑ Sewer ❑x Original Contract Price: $60,995.70 Amount of Approved Change Order(s): $24,175.80 Revised Contract Amount: $85,171.50 Total Cost of Work Complete: $85,171.50 Ekent Siwlwwol2T Brent Simmons (Oct 3. 202415:12 CDT) Contractor Project Manager Title Rockport Construction Group Company Name Carlos (fafccla (Oct 3, 202415:23 CDT) Project Inspector #1011-1— Project Manager Rebecca Owen (Oct 3. 202416:04 CDT) CFA Manager _ P Lauren Prieur (Oct 3, 202416:15 CDT) TPW Director Asst. City Manager Oct 3, 2024 Date Oct 3, 2024 Date Oct 3, 2024 Date Oct 3, 2024 Date Oct 3, 2024 Date Oct 7, 2024 Date OFFICIAL RECORD CITY SECRETARY Page 1 of 2 FT. WORTH, TX Notice of Project Completion Project Name: Frye Road Industrial City Project No.: 105219 City's Attachments Final Pay Estimate x❑ Change Order(s): ❑x Yes ❑ N/A Pipe Report: x❑ Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety L Statement of Contract Time Contract Time: 45 WD Days Charged: 76 WD Work Start Date: 3/6/2024 Work Complete Date: 7/12/2024 Completed number of Soil Lab Test: 52 Completed number of Water Test: 2 Page 2of2 FoRTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name FRYE ROAD INDUSTRIAL, Contract Limits Project Type WATER & SEWER City Project Numbers 105219 DOE Number 5219 Estimate Number 1 Payment Number 1 For Period Ending 7/12/2024 WD City Secretary Contract Number Contract Time 4WD Contract Date Days Charged to Date 76 Project Manager NA Contract is 100.00 Complete Contractor ROCKPORT CONSTRUCTION 1900 SOUTH 18TH AVENUE WEST BEND, W1 53095 Inspectors G. DEYON / C. GARCIA Friday, September 20, 2024 Page 1 of 5 City Project Numbers 105219 DOE Number 5219 Contract Name FRYE ROAD INDUSTRIAL Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER & SEWER For Period Ending 7/12/2024 Project Funding UNIT I: WATER IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 CONNECTION TO EXISTING 4-12 WATER MAIN 1 EA $10,800.00 $10,800.00 1 $10,800.00 2 8" PVC WATER PIPE 101 LF $68.00 $6,868.00 101 $6,868.00 3 FIRE HTDRANT 1 EA $6,500.00 $6,500.00 1 $6,500.00 4 1" WATER SERVICE 2 EA $3,800.00 $7,600.00 2 $7,600.00 5 8" GATE VALVE 3 EA $2,800.00 $8,400.00 3 $8,400.00 6 4" SLD PVMY MARKING HAS (W) 57 LF $32.38 $1,845.66 57 $1,845.66 7 24" SLD PVMY MARKING HAS (W) 48 LF $32.38 $1,554.24 48 $1,554.24 8 SALVAGE 2" WATER METER 1 EA $5,400.00 $5,400.00 1 $5,400.00 9 WATER LINE GROUTING 0.14 CY $1,000.00 $140.00 0.14 $140.00 10 3" WATER ABANDONMENT PLUG 2 EA $398.00 $796.00 2 $796.00 11 REMOVE CONC PVMT 103 SY $10.50 $1,081.50 103 $1,081.50 12 7"CONCPVMT 103 SY $10.50 $1,081.50 103 $1,081.50 13 TRAFFIC CONTROL 1 MO $5,200.00 $5,200.00 1 $5,200.00 14 DUCTILE IRON FITTINGS W/ RESTRAINT 0.28 TN $410.00 $114.80 0.28 $114.80 15 TRENCH SAFETY 132 LF $2.00 $264.00 132 $264.00 Sub -Total of Previous Unit $57,645.70 $57,645.70 ------------- UNIT III: SEWER IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 MANHOLE ADJUSTMENT, MINOR 1 EA $1,600.00 $1,600.00 1 $1,600.00 2 6" SEWER PIPE 3 LF $48.00 $144.00 3 $144.00 3 TRENCH SAFETY (CO#1) 16 LF $2.00 $32.00 16 $32.00 4 MANHOLE VACUUM TESTING 1 EA $1,000.00 $1,000.00 1 $1,000.00 5 POST - CCTV INSPECTION 3 LF $200.00 $600.00 3 $600.00 6 REMOVE 6" SEWER LINE (CO#1) 13 LF $68.00 $884.00 13 $884.00 7 6" SEWER ABANDONMENT PLUG (CO#1) 1 EA $380.00 $380.00 1 $380.00 8 REMOVE 4' SEWER MANHOLE (CO#1) 1 EA $9,752.90 $9,752.90 1 $9,752.90 9 4' MANHOLE (CO#1) 1 EA $9,752.90 $9,752.90 1 $9,752.90 10 TRAFFIC CONTROL (CO#1) 0.65 MO $5,200.00 $3,380.00 0.65 $3,380.00 Friday, September 20, 2024 Page 2 of 5 City Project Numbers 105219 DOE Number 5219 Contract Name FRYE ROAD INDUSTRIAL Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER & SEWER For Period Ending 7/12/2024 Project Funding Sub -Total of Previous Unit $27,525.80 $27,525.80 Friday, September 20, 2024 Page 3 of 5 City Project Numbers 105219 Contract Name FRYE ROAD INDUSTRIAL Contract Limits Project Type WATER & SEWER Project Funding Contract Information Summary Original Contract Amount Change Orders Change Order Number 1 Change Order Number 2 Total Contract Price DOE Number 5219 Estimate Number 1 Payment Number 1 For Period Ending 7/12/2024 $60,995.70 $1,290.00 $22,885.80 $85,171.50 Total Cost of Work Completed $85,171.50 Less % Retained $0.00 Net Earned $85,171.50 Earned This Period $85,171.50 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $85,171.50 Friday, September 20, 2024 Page 4 of 5 City Project Numbers 105219 Contract Name FRYE ROAD INDUSTRIAL Contract Limits Project Type WATER & SEWER Project Funding Project Manager NA Inspectors G. DEYON / C. GARCIA Contractor ROCKPORT CONSTRUCTION 1900 SOUTH 18TH AVENUE WEST BEND, WI 53095 DOE Number 5219 Estimate Number 1 Payment Number 1 For Period Ending 7/12/2024 City Secretary Contract Number Contract Date Contract Time 45 WD Days Charged to Date 76 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $85,171.50 Less % Retained $0.00 Net Earned $85,171.50 Earned This Period $85,171.50 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $85,171.50 Friday, September 20, 2024 Page 5 of 5 DocuSign Envelope ID: 3653F39F-56CF40BF-SF5B-BD9809CC1115 (PROJECT NAME: CONTRACT: ICFA # CITY PROJECT # IDOE # WATER PROJECT # SEWER PROJECT # FILE # INSPECTOR: PROJECT MANAGER IORIGINAL CONTRACT IEXTRAS TO DATE ICREDITS TO DATE ICONTRACT TO DATE (AMOUNT OF PROP. CHANGE ORDER IREVISED CONTRACT AMOUNT TOTAL REVISED CONTRACT AMOUNT PER UNIT REVISED COST SHARE TOTAL REVISED CONTRACT DEVELOPER -AWARDED -PROJECT CHANGE ORDER WATER, SEWER AND STREET LIGHTING TO SERVE FRYE ROAD INDUSTRIAL SEWER CFA23-0163 I CITY PARTICIPATION: No 105219 N/A N/A N/A K-3217 Phone No: SANDIP ADHIKARI Phone No: (817) 392-8424 REVIEWED By Sandip Adhikari at 10:42 am, Jan 16, 2024 CHANGE ORDER No: 1 CONTRACT UNIT WATER SEWER PAVING DRAINAGE STREET LIGHTS Developer Developer Cost City Cost Cost City Cost Developer Cost $57,645.70 1 $0.00 $3,350.00 $0.00 $0.00 $57,645.70 $0.00 $3,350.00 $0.00 $0.00 $ 1,290.00 $57,645.70 1 $0.00 $4,640.00 $0.00 $0.00 Developer City Cost Developer Cost City Cost Cost City Cost $0.00 $0.00 $0.00 $4,015.00 $0.00 $0.00 $0.00 $0.00 $4,015.00 $0.00 $0.00 $0.00 $0.00 $4,015.00 $0.00 $57,645.70 $4,640.00 $0.00 $0.00 $4,015.00 Dev. Cost: $66,300.70 City Cost: $66, 300.70 CONTRACT DAYS 45 45 45 Revised: 10-12-2011 Page 1 DocuSign EnvelopeIl 3653F39F56CF-40BF-8F5B-BD9809CC1115 You are directed to make the following changes in the contract documents UNIT II: SEWER IMPROVEMENTS CITY BID ITEM PAY ITEM # # QUANTITY 3 3305.0109 13 6* 241.2012 13 7* 241.2102 1 *New Pay Item Added REASONS FOR CHANGE ORDER Existing 6" sewer tap removaL RECOMMENDED: Kimle -Horn and Associates, Inc. By: Name: Jeffrey Landon Title: Project Engineer UNIT ITEM DESCRIPTION UNIT PRICE TOTAL LF Trench Safety $ 2.00 $ 26.00 LF Remove 6" Sewer Line $ 68.00 $ 884.00 EA 6" Sewer Abandonment Plug $ 380.00 $ 380.00 TOTAL $ 1,290.00 APPROVED: OBS Orlando, LLC By: l K"". E4wu 16.1 Name: Randall Blumenthal APPROVED: Rockport tCConstruction Group By: l Name: Brent Simmons Title: Authorized Signatory Title: Proiect Manager REVIEWED By Sandip Adhikari at 10:42 am, Jan 16, 2024 Revised: 10-12-2011 Page 2 PROJECT NAME: CONTRACT: CFA # CITY PROJECT# DOE # WATER PROJECT # SEWER PROJECT# FILE # INSPECTOR: PROJECT MANAGER: ORIGINAL CONTRACT EXTRAS TO DATE CREDITS TO DATE CONTRACT TO DATE AMOUNT OF PROP. CHANGE ORDER REVISED CONTRACT AMOUNT TOTAL REVISED CONTRACT AMOUNT PER UNIT REVISED COST SHARE TOTAL REVISED CONTRACT DEVELOPER -AWARDED -PROJECT CHANGE ORDER WATER, SEWER AND STREET LIGHTING TO SERVE FRYE ROAD INDUSTRIAL CHANGE SEWER ORDER No: CFA23-0163 CITY PARTICIPATION:' No 105219 NIA 2 NIA N/A K-3217 Carlos Garcia Phone No: SANDIP ADHIKARI Phone No: WATER SEWER Developer Developer Cost City Cost Cost City Cost Developer Cost $57,645.70 $0.00 $3,350.00 $0.00 $0.00 $1,290.00 $57,645.70 $0.00 $4,640.00 $0.00 $0.00 $57,845,70 $0.00 $57,645.70 Dev. Cost: S 22,885.80 $27.625.80 $0.00 $27, 525.80 $89,186.50 817-925-4381 (817)392-8424 CONTRACT UNIT PAVING DRAINAGE STREET LIGHTS CONTRACT DAYS Developer City Cost Developer Cost City Coat Cost City Cos $0.00 $0.00 $0,00 $4,015.00 $0.00 45 Mond $0.00 $0.00 $0.00 $4,015.00 $0.00 45 $0.00 $0.00 $0.00 $0.00 $4,015.00 $0.00 45 $0,00 ` $0.00 $4,015.00 City Cost $0.00 $89,186.50 REVIEWED By Sandip Adhikari at 8:56 am, Sep 30, 2024 Revised: 10-12-2011 Page 1 You are directed to make the following changes in the contract documents, CITY BID ITEM PAY ITEM # # QUANTITY UNIT ITEM 4EJCRIPr ON UNIT PRICE TOTAL 8' 241.2201 1 EA Remove 4 ewer anhole $ 9,752.90 $ 952.80 9' 3339.1001 1 EA 4' Manhole $ 9,752.90 $ N2.90 10' 3471.0001 0,65 MO Traffic Control $ 5,200.00 $ 3.380.00 TOTAL $ 22.885.80 New Pay Items Added REASONS FOR CHANGE ORDER Existing 4'servermanhole to be remove and replace NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. RECOMMENDED: Kimley-Horn and Associates. Inc By: Al Name: Jeffrey Landon Title: Project Engineer APPROVED: APPROVED: OBS do. LLLC Rockport C struction Group By: By:� +1� Name: Randall Blumenthal Name: Brent Simmons Title: Authorized Signatory Title: Project Manager REVIEWED By Sandip Adhikari at 8:56 am, Sep 30, 2024 Revised: 10-12-2011 Page 2 FORT WORTH, TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Frye Road Industril CITY PROJECT NUMBER: 105219 1 WATER PIPE LAID SIZE TYPE OF PIPE C900 8 PVC FIRE HYDRANTS: 1 VALVES (16" OR LARGER) PIPE ABANDONED SIZE TYPE OF PIPE DENSITIES: NEW SERVICES: I SEWER PIPE LAID SIZE TYPE OF PIPE SDR26 6 PVC PIPE ABANDONED SIZE TYPE OF PIPE DENSITIES: NEW SERVICES: TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 LF LF LF LF 101 3 FORTWORTH. M, TRANSPORTATION AND PUBLIC WORKS July 12, 2024 Rockport Construction Group 8400 Belleview Drive Suite 140 Plano, TX 75024 RE: Acceptance Letter Project Name: Frye Road Industrial Project Type: Water, Sewer, Street Lighting City Project No.: 105219 To Whom It May Concern: On July 12, 2024 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on August 30, 2024. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on August 30, 2024, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at Sandip Adhikari 817-392-8424. Sandip Adhikari, Project Manager Cc: Carlos Garcia, Inspector Gary Deyon, Inspection Supervisor Lorrie Pitts, Senior Inspector Andrew Goodman, Program Manager Kimley Horn, Consultant Rockport Construction Group, Contractor Orlando Bathing Suit LLC, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19 BILLS PAID AFFIDAVIT FOR CONTRACTOR State of Texas § County of Rockwall § BEFORE ME, the undersigned authority, on this day personally appeared Yuri Ibarra known to. me to be a credible person and officer of Ibarra Underground LLC and who, being duly sworn, upon his oath declares and acknowledges as follows: 1. I am a duly authorized agent of Ibarra Underground LLC , which has authorized me to make this affidavit, and all of the recitations herein are true and correct. 2. Pursuant to Private Development Contract No. 14174166 between Rockport Construction Group and Ibarra Underaround LLC for Everything But Water, Ibarra Underground LLC has supplied materials and performed labor in connection with the construction of improvements on real property owned by Orlando Bathing Suit LLC in the City of Fort Worth. 3. Ibarra Underground LLC has actual knowledge that all bills owed by Rockport Construction Group to Ibarra Underground LLC for materials supplied or labor performed in connection with the improvements have been fully paid and satisfied. 4. Ibarra Underground LLC has actual knowledge that all bills owed by Ibarra Underground LLC to others for materials supplied or labor performed in connection with the improvements have been fully paid and satisfied. 5. Ibarra Underground LLC has actual knowledge that there are no claims or liens for materials supplied or labor performed in connection with the Private Development Contract. 6. Ibarra Underground LLC further warrants that should any claim or lien be filed for material supplied or labor performed in connection with the Private Development Contract, Ibarra Underground LLC will immediately furnish a bond pursuant to Texas Property Code Sections 53.236 through 53.238 for release of each the claim or lien, obtain settlement of any claim or lien, and furnish the City of Fort Worth written full release. Ibarra Underground LLC agrees to fully indemnify and hold harmless the City of fort Worth from any and all costs that may occur by reason of such claims or liens. EXECUTED this _r)"� day of hl kt^��ri.t 20V I a Underarou//ndyy��LL NA � YU ►'� ��"ma TITLE: fi�lG�",o e✓ STATE OF TEXAS COUNTY OF DALLAS This instrument was acknowledged before me on-(rITI�o e r by v r-�o.v►Y�- Pair % c.-c of Z�nerro. �L (, L(" corporation, on behalf of saiV corporation. [NOTARY PUBLIC STAMP] NOTARY4BLIC MA Eli3ARRA '! My Notary lu # 13119740E ,rr f,`�.4�,_ .E, Expires July 6, 2025 d -- CONSENT OF SURETY COMPANY TO FINAL PAYMENT Owner ❑ Architect ❑ Contractor ❑ S urety ❑ Other ❑ Project: Water, Sanitary Sewer and Lighting Improvements to Serve Frye Road Industrial (name, address) 15250 Frye Road, Fort Worth, TX 76155 TO (Owner) —1 OSA Orlando, LLC Applicable Bond Piumher:2297342 Contract For: Construction and City of Fort Worth, Texas L J Contract Date: September 20, 2023 Contractor: Ibarra Underground, LLC, 120 Nicole Drive, Rockwall, TX 78032 In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the West Bend Insurance Company 1900 South 18th Avenue, West Bend, WI 53095 Surety Company, On bond of Ibarra Underground, LLC 120 Nicole Drive, Rockwall, TX 75032 Contractor, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to OBA Orlando, LLC and City of Fort Worth, Texas Owner as set forth in the said Surety Companyl bond. IN WITNESS WHEREOF, The Surety Company has hereunto set its hand this Ist day of October, 2024. Attest: (Seal): West Bend Insurance Company Surety Company Sig tore of Ant ized Representative Amber ]ones. Attornev-in-Fact Title rWESTBEND' POWER OF ATTORNEY Bond No. 2297342 Know all men by these Presents, that West Bend Insurance Company (formerly known as West Bend Mutual Insurance Company prior to 11112024), a corporation having its principal office in the City of West Bend, Wisconsin does make, constitute and appoint, Julie Baumberger, Amber Jones, Doreen Mack, April Penny, Darrin J Weber lawful Adomey(s)-in-fact, to make, execute, seal and deliver for and on its behalf as surety and as its act and deed any and all bonds, undertakings and contracts of suretyship, provided that no bond or undertaking or contract of suretyship executed under this authority shall exceed in amount the sum of: Thirty Million Dollars ($30,000,000) This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of West Bend Insurance Company by unanimous consent resolution effective the 1m day of January 2024. Appointment ofAttorney-In-Fact. The president or any vice president or any other officer of West Bend Insurance Company may appoint by written certificate Attorneys -in -Fact to act on behalf of the company in the execution of and attesting of bands and undertakings and other written obligatory Instruments of like nature. The signature of any officer authorized hereby and the corporate seal may be affixed by facsimile to any such power of attorney or to any certificate relating therefore and any such power of attorney or certificate bearing such facsimile signatures or facsimile seal shall be valid and binding upon the company, and any such power so executed and certified by facsimile signatures and facsimile seal shall be valid and binding upon the company in the future with respect to any bond or undertaking or other writing obligatory in nature to which it is attached. Any such appointment may be revoked, for cause. or without cause, by any said officer at any time. Any reference to West Bend Mutual Insurance Company in any Bond and all continuations thereof shall be considered a reference to West Bend Insurance Company. In witness whereof, West Bend Insurance Company has caused these presents to be signed by its president undersigned and its corporate seal to be hereto duly attested by its secretary this 1st day of January 2024. +L liY. Attest h / 1 4 L Christopher C. Zwygart `m : D -_ Robert j. jacques (Jn Secretary eP�'trsti ..a` President State of Wisconsin ''�.�,+r+�r�r,r+�,■.� County of Washington On the 1st day of January 2024, before me personally came Robert Jacques, to me known being by duly swom, did depose and say that he is the President of West Bend Insurance Company, the corporation described in and which executed the above instrument; that he knows the seal of the said corporation; that the seal affixed to said instrument is such corporate seal; that is was so affixed by order of the board of directors of said corporation and that he signed his name thereto by like order. ++,, =. 7• 'OUBLtC :,? bead Corporate Attorney `p' r- Notary Public Washington Co_ W1 My Commission is Permanent The undersigned, duty elected to the office stated below, now the incumbent in West Bend Insurance Company, a Wisconsin corporation authorized to make this certificate. Do Hereby Certify that the foregoing attached Power of Attorney remains in full force effect and has not been revoked and that the Resolution of the Board of Directors, set forth in the Power of Attorney is now in force. Signed and sealed at West Bend, Wisconsin this 1 St day of October 2024 y,�,tilf lr 11 r 0fl/�1 .� �.SU....... _ m _ S Christopher C. Zwygart X Z Secretary 1900 S 18th Avenue I West Bend, WI 53095 1 Phone: (800) 236-5010 1 Fax: (877) 674-2663 1 www.lhesiIveriining.com < WEST BEND IMPORTANT NOTICE To obtain information or make a complaint: You may contact West Bend Insurance Company: 1-800-760-9250 You may also write to West Bend Insurance Company at Attn: Claims/Surety Department 1900 S. 18th Avenue West Bend, WI 53095 1-800-252-3439 You may write the Texas Department of Insurance: P. ❑. Box 149104 Austin, TX 78714-9104 Fax: (512) 490-1007 Web: www.tdi.texas.gov E-mail: ConsumerProtectionCa7tdi.texas.gov PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent or the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR BOND: This notice is for information only and does not become a part or condition of the attached document. AVISO IMPORTANTE Para ❑btener informacion o para presentar una queja: Usted puede comunicarse con su West Send Insurance Company: 1-800-760-9250 Usted tambien puede escribir a West Bend Insurance Company at: Attn: Claims/Surety Department 1900 S. 18th Avenue West Bend, WI 53095 1-800-252-3439 Puede escribir al ❑epartamento de Seguros de Texas: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 490-1007 Web: www.td!.texas.Qov E-mail: ConsumerProtectiona-tdi-texas .gov DISPUTAS SOBRE PRIMAS ❑ RECLAMOS: Si tiene una disputa concerniente a su prima o a un reclamo, debe comunicarse con el agente ❑ is compania primero. Si no se resuelve la d+sputa, puede entonces comunicarse con el departamento (TDI). UNA ESTE AVISO A SU FIANZA DE GARANTiA: Este aviso es solo para proposito de informacion y no se convierte en parte o condicion del documento adjunto. NB 1671 08 23 Page 1 of 1 1900 S 18th Avenue I West Bend, WI 53095 1 Phone: (800) 236-5010 1 Fax: (877) 674-2663 1 www.thesilverlining.corn