HomeMy WebLinkAboutContract 59910-CO1CSC No. 59910-COI
FORT WORTH.,
Project Namel New Main Street Outfall Storm Drain
City of Fort Worth
Change Order Request
I City Sec # I 59910
Client Project #(s)l 103666
Project Description) This project will reroute existing storm drain systems and install a new outfall, at 8th St. and Calhoun in preparation for the USACE North Bypass Channel
Contractorl
City Project Mgr.I
Circle C Construction
Max Aransen, P.E.
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
TPW
$9,242,595.00
I� Change Order #I
I
Datel 9/18/2024
City Inspector James Ruiz
$9,242,595.00
$25,275.00
$9,267,870.00
$0.00
$25,275.00
Contract Time
Totals (CD)
$9,242,595.00 365
$9,242,595.00 365
$25,275.00 128
$9,267,870.00 493
$0.00
$25,275.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 0.27%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) 1 $11,553,243.75
JUSTIFICATION (REASONS) FOR CHANGE ORDER
This change order will account for the need to change all of the proposed 18" PVC Sanitary Sewer Pipe to 18" DIP Sanitary Sewer Pipe. Originally the plans called out for DIP,
however the city chose to move forward with pressure pipe under the alternate bid instead. This info was not updated in the plans, so the contractor assumed we still were to
install DIP. With this in mind, the alternate bid included a price for DIP pipe which appears reasonable and will be used for the for this change. This change order will also be to
add days to the contract time for the delay caused by the multiple revisions of the USACE package submittal. The original package was submitted 1/16/2024 and the package
was approved with permission to mobilize on 7/22/2024. The total calendar days between the original package and their approval to mobilize is 188 calendar days. We are
granting 128/188 days as Circle C was not allowed to mobilize on the project without the approved USACE package. We are only adding 128 days now and will reassess
granting the additional 60 days if necessary to complete the project at a later date. The need for the extra days was caused by the multiple revisions and rounds of comments
supplied by TRWD/USACE before TRWD/USACE allowed Circle C to mobilize. The 113-day period between the NTP (9/25/2023) to the first USACE package submittal
(1/16/2024) is considered charged days under the current contract, and is accounted for as part of their contract per city spec 0133 00 Submittals. The intent is to add these
extra days in order to proceed with pay applications, however days may still be added to this project in the future pending discussions between the city and the contractor.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Nam Fentractor
Circle C Construction
Name
Keegan Jonkers
Contract Si natu
Kea 9—
Sep 26, 2024
In ctor/Inspection Supervisor
Date
Pro'ec and Contract Comp iance Manager
Date
Sep 26, 2024
Sep 26, 2024
Program Manager
Date
Senior Ca p ital Project Officer
Date
Sep 26, 2024
Sep 27, 2024
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
�Gt�lu6t L. WaG(faGlf
Sep 30, 2024
'i—Z.
Oct 1, 2024
tant Cit Attorn Assise
Date
Assistant City Mana er
Oct 2, 2024 (qr�
ction if required)
M&C Number I I M&C Date Approved
Oct 9, 2024
ATTEST -A � d FOR.*
f,o
Jannette Goodall, City Secretary°oy =v
PPa F * J.
ad4��nEXp?o`
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORa
Project Name New Main Street Outfall Storm Drain
Client Project# 103666
Contractorl Circle C Construction
I I EM UtSURIP I IUN
1 b 3331.422b 18" UIP Sewer
City of Fort Worth
Change Order Additions
City Sec # 59910
1
PMI Max Aransen, P.E. Inspectorl James Ruiz l
Change Order Submittal # O1 Date j 9/18/2024
ADDITIONS
DEP I City Unit Unit Cost I otal
IPW 33/.000UUUUU Lh $b2b.UU $1/b,92b.UUI
TPW $176,925.00
Sub Total Additions $176,925.00
Change Order Additions Page 2 of 4
Foxe City of Fort Worth
Change Order Deletions
Project Name I New Main Street Outfall Storm Drain I City Sec # 1 59910
Client Project # 1 103666 1
Contractorl Cirde C Construction I PMI Max Aransen, P.E. I Inspectorl James Ruiz
Change Order Submittal # 0 Date 1 9/18/2024 1
DELETIONS
IILM ULSGRIPIION ULPI uty Unit Unit lost total 1
1 9999.UU 1418" RVU AS I M F6/9 Sewer Pipe IPW 33/.0000U0UU LF $4bU.UU $1bl,bbU.001
TPW $151,650.001
1
1
Sub Total Deletions $lbl,650.001
Change Order Deletions Page 3 of 4
MISBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
Co # DATE I AMOUNT
Total I $0.00 I
103666 Main St Outfall CO 1-Updated
Final Audit Report 2024-10-01
Created: 2024-09-26
By: Sadie Ishmael (Sadie.Ishmael@fortworthtexas.gov)
Status: Signed
Transaction ID: CBJCHBCAABAADT-y-FD_G9KOFBaxPnHjgcfueloOVGYd
"103666 Main St Outfall CO 1-Updated" History
Document created by Sadie Ishmael (Sadie.Ishmael@fortworthtexas.gov)
2024-09-26 - 4:15:15 PM GMT- IP address: 204.10.90.100
Document approved by Sadie Ishmael (Sadie.Ishmael@fortworthtexas.gov)
Approval Date: 2024-09-26 - 4:23:28 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to Keegan Jonkers (k.jonkers@circlecconstruction.com) for signature
2024-09-26 - 4:23:30 PM GMT
'i Email viewed by Keegan Jonkers (k.jonkers@circlecconstruction.com)
2024-09-26 - 4:29:34 PM GMT- IP address: 107.116.185.68
,. Document e-signed by Keegan Jonkers (k.jonkers@circlecconstruction.com)
Signature Date: 2024-09-26 - 4:29:53 PM GMT - Time Source: server- IP address: 107.116.185.68
Document emailed to James Ruiz (james.ruiz@fortworthtexas.gov) for signature
2024-09-26 - 4:29:55 PM GMT
Email viewed by James Ruiz (james.ruiz@fortworthtexas.gov)
2024-09-26 - 8:23:17 PM GMT- IP address: 166.198.250.69
E . Document e-signed by James Ruiz Qames.ruiz@fortworthtexas.gov)
Signature Date: 2024-09-26 - 8:23:35 PM GMT - Time Source: server- IP address: 166.198.250.69
Document emailed to Max Aransen(max.aransen@fortworthtexas.gov) for signature
2024-09-26 - 8:23:38 PM GMT
Email viewed by Max Aransen (max.aransen@fortworthtexas.gov)
2024-09-26 - 8:25:40 PM GMT- IP address: 166.199.246.50
,. Document e-signed by Max Aransen (max.aransen@fortworthtexas.gov)
Signature Date: 2024-09-26 - 8:25:55 PM GMT - Time Source: server- IP address: 166.199.246.50
FoRTWORTH, I P—e'b'
Adobe
Acrobat Sign
Document emailed to Thanaa Maksimos (Thanaa.Maksimos@fortworthtexas.gov) for signature
2024-09-26 - 8:25:57 PM GMT
Email viewed by Thanaa Maksimos (Thanaa.Maksimos@fortworthtexas.gov)
2024-09-26 - 8:26:53 PM GMT- IP address: 204.10.90.100
f,. Document e-signed by Thanaa Maksimos (Thanaa.Maksimos@fortworthtexas.gov)
Signature Date: 2024-09-26 - 8:27:14 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) for signature
2024-09-26 - 8:27:16 PM GMT
Email viewed by Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov)
2024-09-27 - 2:52:45 PM GMT- IP address: 204.10.90.100
cs. Document e-signed by Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov)
Signature Date: 2024-09-27 - 2:53:57 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to Patricia Wadsack (patricia.wadsack@fortworthtexas.gov) for signature
2024-09-27 - 2:53:59 PM GMT
;, Email viewed by Patricia Wadsack (patricia.wadsack@fortworthtexas.gov)
2024-09-30 - 7:43:12 PM GMT- IP address: 35.150.23.58
Signer Patricia Wadsack (patricia.wadsack@fortworthtexas.gov) entered name at signing as Patricia L.
Wadsack
2024-09-30 - 8:11:03 PM GMT- IP address: 35.150.23.58
Document e-signed by Patricia L. Wadsack (patricia.wadsack@fortworthtexas.gov)
Signature Date: 2024-09-30 - 8:11:05 PM GMT - Time Source: server- IP address: 35.150.23.58
Document emailed to Lauren Prieur (Lauren.Prieur@fortworthtexas.gov) for signature
2024-09-30 - 8:11:07 PM GMT
Email viewed by Lauren Prieur (Lauren.Prieur@fortworthtexas.gov)
2024-10-01 - 12:47:30 PM GMT- IP address: 76.227.105.128
;Q. Document e-signed by Lauren Prieur (Lauren.Prieur@fortworthtexas.gov)
Signature Date: 2024-10-01 - 12:48:22 PM GMT - Time Source: server- IP address: 76.227.105.128
Document emailed to tpw_sw_contracts@fortworthtexas.gov for approval
2024-10-01 - 12:48:24 PM GMT
Email viewed by tpw_sw_contracts@fortworthtexas.gov
2024-10-01 - 2:04:36 PM GMT- IP address: 75.139.251.69
FoRTWORTH, I P—e'b'
Adobe
Acrobat Sign
;Q. Signer tpw_sw_contracts@fortworthtexas.gov entered name at signing as Sadie Ishmael
2024-10-01 - 2:05:12 PM GMT- IP address: 75.139.251.69
=- ;. Document approved by Sadie Ishmael (tpw_sw_contracts@fortworthtexas.gov)
Approval Date: 2024-10-01 - 2:05:14 PM GMT - Time Source: server- IP address: 75.139.251.69
r4 Agreement completed.
2024-10-01 - 2:05:14 PM GMT
FoRTWORTH, I P—e'b'
Adobe
Acrobat Sign
FORT WDRTH,..
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: New Main St. Outfall Construction Change
Order Request
M&C:
Date:
To: Name
CPN: 103666 CSO: 59910
Keegan Jonkers
1 '
k.jonkers@circlecconstruction.com
2.
James Ruiz
3.
Max Aransen
4.
Thanaa H. Maksimos
5.
Lissette Acevedo
6.
Patricia Wadsack
7.
Lauren Prieur
g.
Doug Black
9.
Jesica McEachern
10.
Jannette Goodall
11.
Allison Tidwell
Department Initials
Contractor x- .
DOC#:
Date Out
Sep 26, 2024
Sep 26, 2024
Sep 26, 2024
Sep 26, 2024
Sep 27, 2024
Sep 30, 2024
Oct 1, 2024
Oct 2, 2024
Oct 9, 2024
Oct 9, 2024
Oct 1, 2024
12. Tpw_SW_Contract TPW Stormwater " si Oct 9, 2024
TPW - Inspector
TPW - Project Manager
TPW — Program Manager
TM1-71-1
TPW — Sr. CPO
C4
TPW — Assistant Director
TPW - Director
-
Legal - Assistant City Attorney
oB 25
CMO — Assistant City Manager
a`
CSO — City Secretary
G
CSO — City Secretary
>'1L
CC: Program Manager — Thanaa Maksimos, Sr. CPO — Lissette Acevedo, TPW BSPAP Recon
Team — Cindy Sengathith
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: []YES ®No
RUSH: []YES ®No SAME DAY: []YES ®No NEXT DAY: ❑YES ®No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return to: tuw sw contracts(&,fortworthtexas.gov Call 817-229-3283 with questions. Thank you!