HomeMy WebLinkAboutContract 62097CSC No. 62097
CITY OF FORT WORTH
JOB ORDER CONTRACT (JOC) SERVICES CONTRACT
HOME REPAIR SERVICES
This Contract, made and effective as of the last date executed by a Party hereto ("Effective Date"), is by
and between the CITY OF FORT WORTH, a Texas home -rule municipal corporation ("City") and Pinnacle
Project Partners, LLC, authorized to do business in the State of Texas ("Contractor"). City and
Contractor may be referred to herein individually as a Party and collectively as the Parties.
WITNESSETH: That for and in consideration of the payments and agreements to be performed by the
City, Contractor hereby agrees with City to commence and complete the Job Order Contract Services
described herein.
ARTICLE 1. DEFINITIONS
"Abatement" means a measure or set of measures designed to permanently eliminate lead -based
hazards or lead -based paint. Abatement strategies include the removal of lead -based paint, Enclosure,
Encapsulation, replacement of building components coated with lead -based paint, removal of lead -
contaminated dust, and removal of lead -contaminated soil or overlaying of soil with a durable covering
such as asphalt (grass and sod are considered Interim Control measures). All of these strategies require
preparation; cleanup; waste disposal; post -Abatement clearance testing; recordkeeping; and, if applicable,
monitoring.
"Building Code" means the City's Building Code as amended from time to time.
"Building Permit" means any permit received from the City's Planning and Development Department to
perform the Work on a Housing Unit.
"Business Diversity Enterprise Ordinance" or "BDE" means the City's Business Diversity Ordinance,
Ordinance No. 20020-12-2011.
"CDBG" means Community Development Block Grant. OFFICIAL RECORD
CITY SECRETARY
"CDBG Regulations" means regulations found at 24 CFR Part 570 et seq. FT. WORTH, Tx
"Contract Documents" means, collectively, this document, the Compliance Provisions (Attachment A),
Program -Specific Conditions (Attachment A-1), Sample Job Order/Work Write Up (Attachment B), Bid
Price Worksheet (Attachment C), and all other Attachments and documents that are attached or
incorporated herein by reference. The Contract Documents shall be construed in the order of precedence
in which they are listed.
"Contractor Personnel" means employees, staff or subcontractors employed or hired by Contractor to
perform Work under this Contract.
"Encapsulation" means any covering or coating that acts as a barrier between lead -based paint and the
environment, the durability of which relies on adhesion and the integrity of the existing bonds between
multiple layers of paint and between the paint and the substrate.
"Enclosure" means the use of rigid, durable construction materials that are mechanically fastened to the
substrate to act as a barrier between the lead -based paint and the environment.
"EPA" means the United States Environmental Protection Agency.
"EPA's Renovation, Repair and Paint Rule" or "RRP Rule" means 40 CFR Part 745, as amended from
time to time.
"Housing Unit" means a residential unit occupied by a household eligible for services under any of the City's
Home Repair Services Programs and includes the real property on which the Housing Unit is located.
Page
"HUD" means the United States Department of Housing and Urban Development.
"HUD Guidelines" means the U.S. Department of Housing and Urban Development Guidelines for the
Evaluation of Lead -Based Paint Hazards in Housing, Second Edition, July 2012, as may be amended from
time to time.
"Interim Controls" means a set of measures designed to temporarily reduce human exposure or possible
exposure to lead -based paint hazards. Such measures include, but are not limited to, specialized cleaning,
repairs, maintenance, painting, temporary containment, and the establishment and operation of
management and resident education programs. Monitoring, conducted by owners, and reevaluations,
conducted by professionals, are integral elements of Interim Control. Interim Controls include dust removal;
paint film stabilization; treatment of friction and impact surfaces; installation of soil coverings, such as grass
or sod; and land use controls. Interim Controls that disturb painted surfaces are renovation activities under
EPA's Renovation, Repair and Painting Rule.
"Job Order Contract" or "JOC"" is a Firm Fixed Price, Indefinite Delivery/Indefinite Quantity governing
agreement for the Work ("Project").
"Job Order" means an itemized list of the Work which contains sufficient detail to determine quantities and
quality, and the time for performance. It includes any specifications and drawings required by City together
with any change orders approved by City and Contractor. Work on a Housing Unit will be authorized by an
individual Job Order on an as -needed basis. The term "Work Order" is synonymous with Job Order for the
purposes of this contract. See sample Work Order/Job Order in Attachment B.
"Lead Safe Housing Rule" means the regulations found at 24 CFR Part 35 subparts B-R.
"LIHEAP" means Low Income Heating and Energy Assistance Program, funded with grant funds from the
United States Department of Health and Human Services.
"Owner" means the owner of the Housing Unit to be serviced.
"Request for Proposals" or "RFP" means the Request for Proposals for Home Repair Services, RFP
No. 24-0151, issued April 24, 2024.
"TDHCA" means Texas Department of Housing and Community Affairs, which administers the WAP and
LIHEAP programs.
"Texas Administrative Code" means regulations of the State of Texas that govern the administration of
LIHEAP and DOE weatherization grant programs.
"Texas Environmental Lead Reduction Rule" or "TELRR" means 25 TAC 295.201-220, as amended
from time to time.
"WAP" means Weatherization Assistance Program, funded with grant funds from the United States
Department of Energy.
"Work" means the Home Repair Services provided by contractor under this contract, including any
Weatherization, HVAC, Plumbing, Electrical, Roofing, Lead Hazard Reduction, or related rehabilitation and
repair work performed on a Housing Unit required by a Job Order and the Contract Documents, whether
completed or partially completed, and which includes all labor, materials, equipment, and services provided
or to be provided by the Contractor to fulfill the Contractor's obligations under the Contract Documents.
ARTICLE 2. SCOPE OF SERVICES
A. Contractor agrees to provide the City with Lead Hazard Reduction, HVAC, Plumbing, Electrical,
Roofing, Flooring, Bathroom Repairs, Foundation Repairs, Insulation, Kitchen Repairs,
General Carpentry, and/or Construction Management services for the purpose of assisting
income -eligible and otherwise qualified residents with Home Repair Services in a Housing Unit. All
Page 2
Work shall be performed in accordance with the TELRR, HUD Guidelines, the Lead -Safe Housing
Rule, DOE WAP or DHHS LIHEAP regulations, and/or any other applicable regulations regarding
performance of these home repair services with the use of the specified funds.
B. Contractor acknowledges that the Project is assisted in whole or in part with Federal and State Grant
funds awarded to the City and that any Job Order and Work performed shall be performed in strict
accordance with all requirements of the grant and affiliated Regulations as more particularly set out
in Attachment A.
C. Contractor shall do everything required by the Contract Documents for each Job Order including
furnishing all of the labor, materials and equipment necessary to perform the Work. As applicable for
the particular job assigned, all Work shall be performed by workers qualified for the activities
according to HUD's Lead Safe Housing Rule, and who are trained and certified by the Texas
Department of State Health Services, Environmental Lead Branch, or by workers trained and certified
under the EPA Renovation and Repair Rule.
D. Contractor must perform the Work in accordance with the Building Code and all other relevant City,
State and Federal building codes and any other applicable laws, ordinances and regulations. To the
extent of conflict between any of the foregoing codes and standards, the more restrictive shall apply.
Inconsistencies or conflicts between the Building Code and this Contract shall be resolved in favor of
the Building Code. If it is necessary to modify this Contract to comply with the Building Code, then
the Parties shall execute a written modification.
E. City will inspect all completed Work before payment to the Contractor is approved. Contractor must
repair or replace all Work and materials that do not pass inspection. Such repair or replacement of
Work shall be completed within 2 working days from written notification of the need for such repair
or replacement by City. If the Work fails to pass final inspection, Contractor will be responsible for
any fees associated with the re -inspection as well as any other fees or costs resulting from the failure
of the Work to pass final inspection. For work performed on the Lead Hazard Reduction program,
Contractor will be responsible for any fees associated with an additional clearance test, such as
testing of dust wipes, as well as other associated costs; such costs may include the cost of lodging
or any other additional relocation expenses for the Housing Unit's occupants.
F. Contractor shall not solicit or contract with occupants or Owners to perform additional work on the
Housing Unit for minimum of 6 months after the Work is complete.
G. Contractor shall be responsible for moving furniture and/or safe storage of the occupants' furniture
and personal belongings if necessary to perform the Work. Contractor is required to provide proof of
insurance and adequate, safe storage of the occupant's furniture and personal belongings when
applicable for the duration of the Work
ARTICLE 3. INSURANCE REQUIREMENTS
Contractor shall not commence Work until it has obtained all insurance coverage described in Article 36 of
this contract and proof of such coverage has been received and approved by City.
ARTICLE 4. TIME OF COMPLETION
City shall provide Contractor a written Notice to Proceed for each Job Order which states a date for
commencement and a date for completion of the Work. Contractor shall complete the Work within the number
of calendar days specified in the Job Order. Approved change orders may extend the completion date. The
time for completion of the Work is an essential element of this Contract. Contractor acknowledges that failure
to complete the Work within the stated number of calendar days may result in suspension or termination of
this Contract.
ARTICLE 5. TERM OF CONTRACT
This Contract shall commence as of the Effective Date and shall automatically expire 5 years from the Effective
Date (the "Expiration Date"), if not terminated sooner or extended as described below. No Job Order shall
be issued after the Expiration Date. However, any Job Order with Work still in progress, Contractor's
Page 3
obligation to cure or remedy defective Work, and Contractor's warranty and indemnification obligations shall
survive the Expiration Date or earlier termination of this Contract.
CONTRACTOR ACKNOWLEDGES AND AGREES THAT THERE IS NO GUARANTEE THAT A SPECIFIC
DOLLAR AMOUNT WILL BE SPENT UNDER THIS CONTRACT.
ARTICLE 6. PAYMENT FOR SERVICES
A. City shall pay Contractor for each Job Order based on the prices in Attachment C upon City's
acceptance of the completed Work and submission by Contractor of a detailed invoice.
B. City shall have the unconditional right to withdraw a Job Order at any time so long as it has not
issued a Notice to Proceed. If a Job Order is withdrawn, Contractor shall not be entitled to any
compensation or reimbursement of any costs incurred by the Contractor for the withdrawn Job
Order so long as the City has not yet issued a Notice to Proceed.
C. For a Job Order to become effective, it must (1) be signed by City and Contractor, (2) be for a fixed
price, lump sum for the Work, (3) be based on the prices in Attachment C, and (4) include a Notice
to Proceed. City shall pay Contractor within 30 days of acceptance of Work.
D. Contractor will not be compensated for any Work outside of the scope of a Job Order or this
Contract that is not authorized by City in writing.
ARTICLE 7. LIENS
Contractor shall not place a lien on the Housing Unit and will only look to the City for payment for Work.
Placement of a lien on a Housing Unit by Contractor or any subcontractor will be grounds for termination of
this Contract for cause.
ARTICLE 8. PERMITS AND INSPECTIONS
Contractor shall apply for all Building Permits and for any other permits required by a Job Order. Separate
Building Permits shall be required for each Housing Unit. Contractor shall be responsible for scheduling all
City inspections.
All necessary inspections by the City's Development Services Department for Building Permits must have
occurred in order for final inspection of the Work by the City's Neighborhood Services Department
inspectors to be scheduled. Work must pass final inspection by both Development Services Department
inspectors for Building Permits and Neighborhood Services Department inspectors for all Contract and
federal requirements for the Work.
ARTICLE 9. CITY INSPECTION AND ACCEPTANCE OF WORK
Inspection and acceptance of any Work shall be as stated in a Job Order in accordance with the Contract
Documents. Work must pass visual inspection and/or any applicable Lead Hazard Control clearance test as
required by federal and state laws and be approved by inspectors from both the Planning and Development
Department for Building Permits and the City's Neighborhood Services Department for all Contract and federal
and state law requirements. For work performed under the Lead Hazard Reduction Program, final inspection
may include inspection by the Texas Department of State Health Services, Environmental Lead Branch.
City reserves the right to perform inspections of the Work at any time, and any inspections performed by City
or by others on behalf of City shall be for City's sole benefit. The presence or absence of a City inspector
does not relieve Contractor from any Contract requirement, and no inspector is authorized to change any term
or condition of the Job Order or of the Contract Documents without the City's written authorization. Quality
control for the Work is the responsibility of Contractor. Contractor shall, without charge, replace or correct
Work found by City not to conform to the Job Order or Contract requirements unless City consents to accept
the Work with an appropriate adjustment in the Job Order price.
ARTICLE 10. WARRANTY OF CONSTRUCTION AND MATERIALS
Page 4
Contractor shall warrant that Work conforms to the Job Order and is free of any defect in material, design
furnished, or workmanship performed by the Contractor or any of its design professionals, subcontractors
or suppliers at any tier. All Work shall be warranted for a minimum of 1 year from the date of final
acceptance of the Work.
All repairs or replacement shall be at no cost or charge to City or the Owner or occupant, whether or not
the materials are guaranteed by the manufacturer or supplier.
The warranty shall not be construed to limit or in any way modify any warranties or guarantees placed
upon any materials, fixtures or devices by their manufacturers, or any components for which a longer period
of warranty is required in this Contract.
Contractor shall furnish the Owner with all manufacturers' and suppliers' written guarantees, warranties
and operating instructions covering materials furnished under this Contract, together with any
documentation required for validation.
ARTICLE 11. DELAYS AND EXTENSION OF TIME
Contractor may be granted an extension of time because of change orders, or because of unforeseeable
conditions that are deemed by City in its sole discretion as being beyond Contractor's control and which
constitute a justifiable delay. Requests for extensions of time must be made in writing no later than 2
calendar days after the occurrence of the delay. Any additional time allowed shall be at no cost to City. Any
additional expenses incurred because of Contractor error as deemed by City in its sole discretion, including
but not limited to, additional occupant relocation expenses and clearance sampling analysis, will be paid by
Contractor.
ARTICLE. 12. SUBCONTRACTING WITH SMALL AND MINORITY FIRMS, WOMEN'S BUSINESS
ENTERPRISES AND LABOR SURPLUS AREAS
For procurement contracts $50,000.00 or larger, Contractor agrees to abide by City's policy to involve
Minority Business Enterprises ("MBE") and Small Business Enterprises ("SBE") and to provide them equal
opportunity to compete for contracts for construction, provision of professional services, purchase of
equipment and supplies and provision of other services required by City. Contractor agrees to incorporate
the City's BIDE Ordinance, and all amendments or successor policies or ordinances thereto, into all
contracts and subcontracts for procurement $50,000.00 or larger, and will further require all persons or
entities with which it so contracts to comply with said ordinance.
Contractor acknowledges the MBE goals established for this Contract and Contractor's commitment to meet
that goal. Any misrepresentation of facts (other than a negligent misrepresentation) and/or the commission
of fraud by Contractor may result in the termination of this Contract for cause and debarment from participating
in any City contracts for not less than 3 years.
THE MBE GOAL FOR THIS CONTRACT IS 25%. Analysis of whether such MBE goal is met will be
measured on an aggregate basis for the entire term of the Contract. Contractor is responsible for contacting
the City's M/WBE Office to obtain lists of certified MBE firms in order to meet this goal.
The MBE firm(s) must be located or doing business in the City's geographic market area at the time of the
issuance of al Job Order. The City's geographic market includes Tarrant, Parker, Johnson, Collin, Dallas,
Denton, Ellis, Kaufman and Rockwall counties. The MBE firm(s) must also be currently certified or in the
process of being certified by the North Central Texas Regional Certification Agency or the Texas
Department of Transportation Highway Division.
Contractor shall deliver the monthly MBE reports and supporting documentation to the M/WBE Office which
will verify that payments have been made to MBE subcontractors on each completed Job Order. On Job
Orders that extend over 30 days in duration, the M/WBE Office will verify that payments have been made
to the MBE subcontractors for work in -place.
In addition, it is national policy to award a fair share of contracts to disadvantaged business enterprises
("DBEs"), small business enterprises ("SBEs"), minority business enterprises ("MBEs"), and women's
Page 5
business enterprises ("WBEs") as defined by federal statutes and regulations. Accordingly, affirmative
steps must be taken to assure that DBEs, SBEs, MBEs, and WBEs are utilized when possible as sources
of supplies, equipment, construction and services.
ARTICLE 13. RELATIONSHIP OF PARTIES
Contractor shall perform all work and services hereunder as an independent contractor, and not as an
officer, agent, servant or employee of City. Contractor shall have exclusive control of, and the exclusive
right to control the details of the work and services performed hereunder, and all persons performing same,
and shall be solely responsible for the acts and omissions of its officers, agents, employees and
subcontractors. Nothing herein shall be construed as creating a partnership or joint venture between City
and Contractor, its officers, agents, employees and subcontractors, and the doctrine of respondeat superior
has no application as between City and Contractor.
ARTICLE 14. NO THIRD PARTY BENEFICIARIES
This Contract shall inure only to the benefit of City and Contractor and third persons not privy hereto shall not,
in any form or manner, be considered a third party beneficiary of this Contract. Each Party shall be solely
responsible for the fulfillment of its own contracts or commitments.
ARTICLE 15. SUSPENSION AND TERMINATION
A. Suspension
1. City may suspend the Contract for 30 days and no new Job Orders will be assigned if the
following occur 3 or more times:
a. Contractor fails to provide adequate supervision at the Housing Unit.
b. Contractor fails to obtain appropriate permits and inspections.
c. Contractor fails to meet all safety requirements herein, in particular Attachment A-1.
d. Contractor fails to correct deficient work within 2 days as required in Article 2.
e. Contractor fails to comply with any term of the Contract Documents.
2. City shall provide Contractor written notice of each occurrence in which Contractor has failed
to comply with the terms of this Contract. After Contractor has been sent 3 written notices, City
may send a notice of 30-day suspension or termination of this Contract to Contractor.
B. Termination for Convenience
City may terminate this Contract without cause with 30 days written notice to Contractor.
Termination of this Contract and receipt of payment for services rendered up to the date of notice
of termination are Contractor's only remedies for the City's termination for convenience. Contractor
waives any claim (other than its claim for payment for services rendered up to the date of notice) it
may have now or in the future for financial losses or other damages resulting from the City's
termination for convenience.
C. Termination for Cause
City may terminate this Contract for cause for Contractor's default, failure or inability to perform,
failure to comply with any of the terms herein, or for other good cause including substandard
work. Substandard work shall be defined as material or workmanship that deviates from or
falls short of construction standards and practices.
Contractor shall be given written notice specifying the portions of the Contract in which
Contractor is in default and will be given 15 days to cure the default. The notice of default shall
also state the effective date of termination if the default is not cured.
If Contractor has not cured the default by the date specified, then City shall terminate the
Contract on the date of termination. Contractor shall stop work on the date of termination.
Contractor shall not receive any compensation for any Work performed after the date of
termination.
Page 6
D. Termination does not terminate any provisions of this Contract that have been expressly noted as
surviving the Contract's term or termination. Termination shall not affect or terminate any of City's
existing rights against Contractor or which may thereafter accrue because of Contractor's default.
E. Unless otherwise specified elsewhere in this Contract, the rights and remedies contained herein
are not exclusive, but are cumulative of all rights and remedies which exist now or in the future.
ARTICLE 16. WAIVER
No waiver by either Party of any default or breach of any term, covenant or condition of this Contract shall
operate as a waiver of any future breach or other default, whether of a like or different character or nature.
ARTICLE 17. SEVERABILITY
If any part of this Contract is for any reason found to be unenforceable, all other parts remain enforceable
unless the result materially prejudices either Party.
ARTICLE 18. WRITTEN AGREEMENT ENTIRE CONTRACT
This written instrument and the Attachments and Exhibits attached hereto, which are incorporated by
reference and made a part of this Contract for all purposes, constitutes the entire agreement by the Parties
concerning the work and services to be performed under this Contract. Any prior or contemporaneous oral
or written agreement which purports to vary the terms of this Contract shall be void. Any amendments to
the terms of this Contract must be in writing and must be executed by each Party to this Contract.
ARTICLE 19. GOVERNING LAW AND VENUE
This Contract shall be governed by and construed and enforced in accordance with the laws of the State of
Texas. The Parties agree that any action with respect to this Contract may only be brought in a court of
competent subject matter jurisdiction located in Tarrant County, Texas.
/_1:iI[NI Iki117:1►yil0ll1[ey_NI[*701
CONTRACTOR COVENANTS AND AGREES TO AND DOES HEREBY INDEMNIFY, HOLD HARMLESS
AND DEFEND, AT ITS OWN EXPENSE, CITY, ITS OFFICERS, AGENTS, SERVANTS AND
EMPLOYEES, FROM AND AGAINST ANY AND ALL CLAIMS OR CAUSES OF ACTION ARISING OUT
OF THE PERFORMANCE OF THIS CONTRACT, WHETHER SUCH CLAIMS ARISE OUT OF
CONTRACT OR TORT, SUITS FOR PROPERTY, WHETHER REAL OR PERSONAL, LOSS OR
DAMAGE, PERSONAL INJURY, INCLUDING DEATH, TO ANY AND ALL PERSONS, OF
WHATSOEVER KIND OF CHARACTER, WHETHER REAL OR ASSERTED, ARISING OUT OF OR IN
CONNECTION WITH, DIRECTLY OR INDIRECTLY, THE WORK AND SERVICES TO BE PERFORMED
HEREUNDER BY CONTRACTOR, ITS OFFICERS, AGENTS, EMPLOYEES, SUBCONTRACTORS,
LICENSEES OR INVITEES, WHETHER OR NOT CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED
NEGLIGENCE OF THE OFFICERS, AGENTS, SERVANTS, EMPLOYEES, CONTRACTORS,
SUBCONTRACTORS, LICENSEES AND INVITEES OF THE CITY; AND CONTRACTOR DOES
HEREBY COVENANT AND AGREE TO ASSUME ALL LIABILITY AND RESPONSIBILITY OF THE
CITY, ITS OFFICERS, AGENTS, SERVANTS AND EMPLOYEES FOR ANY AND ALL CLAIMS OR
SUITS FOR PROPERTY LOSS OR DAMAGE AND/OR PERSONAL INJURY, INCLUDING DEATH, TO
ANY AND ALL PERSONS, OF WHATSOEVER KIND OF CHARACTER, WHETHER REAL OR
ASSERTED, ARISING OUT OF OR IN CONNECTION WITH, DIRECTLY OR INDIRECTLY, THE WORK
AND SERVICES TO BE PERFORMED HEREUNDER BY CONTRACTOR, ITS OFFICERS, AGENTS,
EMPLOYEES, SUBCONTRACTORS, LICENSEES OR INVITEES, WHETHER OR NOT CAUSED, IN
WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE OFFICERS, AGENTS, SERVANTS,
EMPLOYEES, CONTRACTORS, SUBCONTRACTORS, LICENSEES AND INVITEES OF THE CITY.
CONTRACTOR LIKEWISE COVENANTS AND AGREES TO, AND DOES HEREBY, INDEMNIFY AND
HOLD HARMLESS CITY FROM AND AGAINST ANY AND ALL INJURIES, DAMAGE, LOSS OR
DESTRUCTION TO PROPERTY OF CITY DURING THE PERFORMANCE OF ANY OF THE TERMS
AND CONDITIONS OF THIS CONTRACT, WHETHER ARISING OUT OF OR IN CONNECTION WITH
OR RESULTING FROM, IN WHOLE OR IN PART, ANY AND ALL ALLEGED ACTS OR OMISSIONS
OFFICERS, AGENTS, SERVANTS, EMPLOYEES, CONTRACTORS, SUBCONTRACTORS,
Page 7
LICENSEES, INVITEES OF CITY.
IT IS THE EXPRESS INTENTION OF THE PARTIES, BOTH CONTRACTOR AND CITY, THAT THE
INDEMNITY PROVIDED FOR THIS SECTION INCLUDES INDEMNITY BY CONTRACTOR TO
INDEMNIFY AND PROTECT CITY FROM THE CONSEQUENCES OF CITY'S OWN NEGLIGENCE,
WHETHER THAT NEGLIGENCE IS ALLEGED TO BE THE SOLE OR CONCURRING CAUSE OF THE
INJURY, DAMAGE OR DEATH.
CONTRACTOR AGREES TO AND SHALL RELEASE CITY, ITS AGENTS, EMPLOYEES, OFFICERS
AND LEGAL REPRESENTATIVES FROM ALL LIABILITY FOR INJURY, DEATH, DAMAGE OR LOSS
TO PERSONS OR PROPERTY SUSTAINED IN CONNECTION WITH OR INCIDENTAL TO
PERFORMANCE UNDER THIS CONTRACT, EVEN IF THE INJURY, DEATH, DAMAGE OR LOSS IS
CAUSED BY CITY'S SOLE OR CONCURRENT NEGLIGENCE.
CONTRACTOR SHALL REQUIRE ALL OF ITS SUBCONTRACTORS TO INCLUDE IN THEIR
CONTRACTS AND SUBCONTRACTS A RELEASE AND INDEMNITY IN FAVOR OF CITY IN
SUBSTANTIALLY THE SAME FORM AS ABOVE.
ARTICLE 21. SURVIVAL
Contractor shall remain obligated to City under all clauses of this Contract that expressly or by their nature
extend beyond termination of this Contract, including but not limited to the warranty and indemnity provisions.
ARTICLE 22. LITIGATION AND CLAIMS
Contractor shall give City immediate notice in writing of any action, including any proceeding before an
administrative body, filed against Contractor in conjunction with this Contract. Contractor shall immediately
furnish to City copies of all pertinent papers received by Contractor with respect to such action or claim.
Contractor shall provide a notice to City within 10 days upon filing under any bankruptcy or financial
insolvency provision of law.
ARTICLE 23. CHANGES AND AMENDMENTS TO LAW
Any changes in the terms of this Contract which are required by a change instate or federal law or regulation
is automatically incorporated herein effective on the date designated by such law or regulation. Except as
otherwise specifically provided herein, any other changes to the terms of this Contract shall be by amendment
hereto in writing executed by the Parties.
ARTICLE 24. PARAGRAPH HEADINGS FOR REFERENCE ONLY; NUMBER
The paragraph headings contained herein are for convenience in reference to this Contract and are not
intended to define or to limit the scope of any provision of this Contract. When the context requires, singular
nouns and pronouns include the plural.
ARTICLE 25. CONTRACT CONSTRUCTION
The Parties acknowledge that each Party and, if it so chooses, its counsel have reviewed and revised this
Contract and that the normal rule of construction to the effect that any ambiguities are to be resolved against
the drafting party shall not be employed in the interpretation of this Contract or any amendments or exhibits
hereto.
ARTICLE 26. CONTRACTOR HAS LEGAL AUTHORITY TO ENTER INTO CONTRACT
Contractor represents that it possesses the legal authority, pursuant to any proper, appropriate and official
motion, resolution or action passed or taken, to enter into this Contract and to perform the responsibilities
herein required.
ARTICLE 27. NO BOYCOTT OF ISRAEL
If Contractor has fewer than 10 employees or this Agreement is for less than $100,000, this section
does not apply. Contractor acknowledges that in accordance with Chapter 2270 of the Texas Government
Code, the City is prohibited from entering into a contract with a company for goods or services unless the
contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not
boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the
meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this
contract, Contractor certifies that Contractor's signature provides written verification to the City
that Contractor: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the
contract.
ARTICLE 28. IMMIGRATION NATIONALITY ACT
Contractor shall verify the identity and employment eligibility of its employees who perform work under this
Agreement, including completing the Employment Eligibility Verification Form (1-9). Upon request by City,
Contractor shall provide City with copies of all 1-9 forms and supporting eligibility documentation for each
employee who performs work under this Agreement. Contractor shall adhere to all Federal and State laws
as well as establish appropriate procedures and controls so that no services will be performed by any
Contractor employee who is not legally eligible to perform such services.
CONTRACTOR SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY CONTRACTOR,
CONTRACTOR'S EMPLOYEES, SUBCONTRACTORS, AGENTS,
OR LICENSEES.
City, upon written notice to Contractor, shall have the right to immediately terminate this Agreement for
violations of this provision by Contractor.
ARTICLE 29. PROHIBITION ON BOYCOTTING ENERGY COMPANIES
Contractor acknowledges that in accordance with Chapter 2276 of the Texas Government Code, City is
prohibited from entering into a contract for goods or services that has a value of $100,000 or more that is
to be paid wholly or partly from public funds of the City with a company with 10 or more full-time employees
unless the contract contains a written verification from the company that it: (1) does not boycott energy
companies; and (2) will not boycott energy companies during the term of the contract. To the extent that
Chapter 2276 of the Government Code is applicable to this Agreement, by signing this Agreement,
Contractor certifies that Contractor's signature provides written verification to City that Contractor: (1) does
not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement.
ARTICLE 30. PROHIBITION ON DISCRIMINATION AGAINST FIREARM AND AMMUNITION
INDUSTRIES.
Contractor acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government
Code, City is prohibited from entering into a contract for goods or services that has a value of $100,000 or
more that is to be paid wholly or partly from public funds of the City with a company with 10 or more full-
time employees unless the contract contains a written verification from the company that it: (1) does not
have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade
association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm
trade association. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement,
by signing this Agreement, Contractor certifies that Contractor's signature provides written verification to
City that Contractor: (1) does not have a practice, policy, guidance, or directive that discriminates against
a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm
trade association during the term of this Agreement.
ARTICLE 31: CONTRACTOR AND SUBCONTRACTOR QUALIFICATIONS
A. Contractor shall familiarize themselves with the quality and quantity of work to be performed
and the materials and equipment required.
Page 9
B. Contractor certifies that both Contractor and any subcontractors are licensed, certified and
trained to perform the Work. Contractor shall provide proof of all applicable licenses and
certificates for itself and for any subcontractors.
C. Contractor and any subcontractors may not be debarred or suspended from performing work
by any local, state or federal If Contractor or any subcontractors have been debarred,
suspended or are not properly licensed or certified, this Contract shall automatically terminate.
D. All necessary licenses and certificates shall be maintained throughout the Contract term. City
shall have no responsibility or liability to determine the legitimacy, quality ability or good standing
of any subcontractor.
E. If specified in the work order, all Work must be performed using Lead Safe Work Practices, and
with appropriately trained and certified staff, as defined by HUD and EPA under the Lead -safe
Housing Rule and the EPA Renovation and Repair Rule.
ARTICLE 32: SECURITY AND INDENTIFICATION
A. All Contractor Personnel shall be legally authorized to work in the United States of America. If
requested, Contractor shall provide 1-9 forms for each individual assigned to the Contract, and
documentation supporting the submission of said forms. If requested, Contractor shall provide
any "No -Match" letters from the Social Security Administration.
B. If requested, a complete list of the Contractor's Personnel, including driver's license and social
security numbers, will be provided to City. The same information shall be provided prior to the
assignment of a new employee if requested by City.
C. Contractor shall issue an identification badge to Contractor Personnel identifying the worker
and such identification badge shall be visibly worn at all times during the performance of Work.
In addition, Contractor Personnel shall wear uniforms which identify their employer.
ARTICLE 33: INTOXICANTS AND ILLEGAL DRUGS
The use of any kind of intoxicants or illegal drugs by Contractor Personnel while performing Work or
Contractor Personnel bringing intoxicants or illegal drugs onto the Work site shall constitute grounds
for termination of this Contract for cause by City.
ARTICLE 34: BACKGROUND INVESTIGATIONS
Contractor shall perform a criminal background check on all Contractor Personnel prior to them entering
a Housing Unit or performing any Work. Contractor shall ensure that no Contractor Personnel with
criminal convictions, felonies or pending criminal hearings will be assigned to perform Work under this
Contract. If requested, Contractor shall provide copies of background checks on Contractor Personnel.
ARTICLE 35: DRUG SCREENING
Contractor shall perform drug screenings of all Contractor Personnel and if requested, shall provide
certification that all Contractor Personnel are drug free prior to their assignment. Additional drug
screening may be requested by City and Contractor, at Contractor's cost shall have such testing
performed.
ARTICLE 36: INSURANCE REQUIREMENTS
A. Basic Coverage Lines and Applicable Policy Limits. Insurance coverage(s) required herein are
intended to respond to occurrences which may arise from services and/or goods related to
this Contractor shall carry insurance in the types and amounts for the duration of this Contract
as listed below, and furnish certificates of insurance along with copies of policy declaration
pages and policy endorsements as evidence thereof:
Commercial General Liabilitv ("CGL") Insurance
Page 10
$1,000,000 Each Occurrence
$2,000,000 Aggregate Limit
The CGL policy shall be the primary insurance with respect to any other insurance
afforded the City. It shall have no exclusions or endorsements that would alter or
nullify premises/operations, products/completed operations, contractual, personal
injury or advertising injury which are normally contained within the policy unless
City approves such exclusions in writing.
ii. Automobile Liabilitv
$1,000,000 each accident on a combined single -limit basis, or
$100,000 Property Damage and
$250,000 Bodily injury per person and
$500,000 Bodily Injury per person per occurrence.
Coverage shall be a commercial business policy which provides coverage on "Any
Auto", defined as any vehicle owned, hired or non -owned. Specifically, this means
coverage on any vehicle used by Contractor Personnel in the course of the
providing services under this Contract.
iii. Pollution Insurance
$1,000,000.00 Pollution Insurance
iv. Workers' Compensation Insurance
Statutory Limits
Employer's Liability
$100,000 Each accident/occurrence
$100,000 Disease - each employee
$500,000 Disease - policy limit
This coverage may be written as follows:
Workers' Compensation and Employers' Liability coverage with limits consistent
with statutory benefits outlined in the Texas Workers' Compensation Act (Art. 8308
— 1.01 et seq. Tex. Rev. Civ. Stat.) and minimum policy limits for Employers'
Liability of $100,000 each accident/occurrence, $500,000 bodily injury disease
policy limit and $100,000 per disease per employee.
Note: Such insurance shall cover employees performing Work including but not
limited to construction, demolition, and rehabilitation. Contractor or its
subcontractors shall maintain coverages, if applicable. In the event the respective
subcontractors do not maintain coverage, Contractor shall maintain the coverage
on such subcontractor, if applicable, for each subcontract.
V. Contractor is responsible for providing City a 30-day notice of cancellation or non -
renewal of any insurance policy and may not change the terms and conditions of any
policy that would limit the scope or coverage, or otherwise alter or disallow coverage
as required herein.
B. Certificates of Insurance and Endorsements effecting coverage required by this Section
shall be forwarded to both of the following:
City of Fort Worth Purchasing Division
100 Fort Worth Trail
Fort Worth, Texas 76102
City of Fort Worth
Page 11
Neighborhood Services Department, Home Improvement & Construction
Division
100 Fort Worth Trail
Fort Worth, TX 76102
C. Additional Insurance Requirements
i. The City, its officers, employees and volunteers shall be named as an Additional
Insured. This requirement does not apply to Workers' Compensation or Automobile
policies.
ii. Waiver of rights of recovery (subrogation) in favor of the City of Fort Worth.
iii. The insurers for all policies must be licensed and/or approved to do business in the
State of Texas. Except for workers' compensation, all insurers must have a minimum
rating of A: VII in the current A. M. Best Key Rating Guide or have reasonably
equivalent financial strength and solvency to the satisfaction of City's Risk
Management Division. If the rating is below that required, written approval of Risk
Management is required.
iv. If insurance policies are not written for specified coverage limits, an Umbrella or Excess
Liability insurance for any differences is required. Excess Liability shall follow form of
the primary coverage.
V. Unless otherwise stated, all required insurance shall be written on the occurrence basis.
If coverage is underwritten on a claims -made basis, the retroactive date shall be
coincident with or prior to the date of the Contract and the certificate of insurance shall
state that the coverage is claims -made and the retroactive date. The insurance coverage
shall be maintained for the duration of the Contract and for 5 years following completion
of the service provided under the Contract or for the warranty period, whichever is longer.
An annual certificate of insurance submitted to City shall evidence such insurance
coverage.
vi. Policies shall have no exclusions by endorsements which nullify the required lines of
coverage, nor decrease the limits of said coverage unless such endorsements are
approved by City. In the event a contract has been bid or executed and the exclusions
are determined to be unacceptable or the City desires additional insurance coverage,
and the City desires Contractor to obtain such coverage, the Contract price shall be
adjusted by the cost of the premium for such additional coverage plus 10%.
vii. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance
coverage shall be acceptable to and approved bythe City's Risk Management Division
in regards to asset value and stockholders' equity. In lieu of traditional insurance,
alternative coverage maintained through insurance pools or risk retention groups must
also be approved by Risk Management.
viii. Any deductible in excess of $5,000.00 for any policy that does not provide coverage
on a first -dollar basis must be acceptable to and approved by the City's Risk
Management Division.
ix. City, at its sole discretion, reserves the right to review the insurance requirements of
this Section during the term of the Contract and to modify insurance coverages and
their limits when deemed necessary and prudent by the Risk Management Division
based on economic conditions, recommendations of professional insurance advisors,
changes in statutory law, court decisions, claims history of the industry as well as of
the Contractor to the City of Fort Worth or other relevant factors. City shall provide 90
days prior notice of changes to these insurance requirements.
X. The City shall be entitled, upon request and without expense, to receive copies of
policies and endorsements thereto and may make any reasonable requests for
deletion or revision or modification of particular policy terms, conditions, limitations,
or exclusions except where policy provisions are established by law or regulations
binding upon either of the party or the underwriter on any such policies.
Page 12
xi. Any failure on City's part to request certificates of insurance shall not be construed as
a waiver of such requirement or as a waiver of the insurance requirements themselves.
xii. In conjunction with the aforementioned requirements, Contractor must provide the
same insurance coverage for any subcontractors employed within the scope of this
Contract.
ARTICLE 37: COST FOR WORK PERFORMED
Contractor will perform the Work for the cost shown on the Bid Tabs or Bid Price Worksheet
(Attachment C).
ARTICLE 38: GENERAL WARRANTY
Contractor warrants that all labor and materials are of the type and grades specified in the ITB and that
labor has been performed in a standard manner. Contractor shall, without cost to the property owner
or to City, remedy any defect due to faulty material or workmanship and pay for all damage to other
work resulting therefrom, which appears within 1 year from final payment. Contractor shall furnish to
occupant all manufacturers' and suppliers' written warranties covering items furnished under this
Contract prior to release of the final payment.
ARTICLE 39: NONDISCRIMINATION
A. Contractor, in the execution, performance or attempted performance of this Contract, shall comply
with all non-discrimination requirements of 24 CFR 570.607 and the ordinances codified at
Chapter 17, Article 111, Division 4 — Fair Housing of the City Code. Contractor may not discriminate
against any person because of race, color, sex, gender, religion, national origin, familial status,
disability or perceived disability, sexual orientation, gender identity, gender expression, or
transgender, nor will Contractor permit its officers, agents, employees, or clients to engage in such
discrimination.
B. This Contract is made and entered into with reference specifically to the ordinances codified at
Chapter 17, Article III, Division 3 - Employment Practices of the City Code, and Contractor hereby
covenants and agrees that Contractor, its officers, agents, employees and subcontractors, have
fully complied with all provisions of same and that no employee, or applicant for employment has
been discriminated against under the terms of such ordinances by either or its officers, agents,
employees or subcontractors.
During the performance of this Contract, Contractor agrees to the following provision, and will
require that its subcontractors also comply with such provision by including it in all contracts with
its subcontractors:
Contractor and any subcontractor will not unlawfully discriminate against any employee
or applicants for employment because of race, color, sex, gender, religion, national origin,
familial status, disability or perceived disability, sexual orientation, gender identity, gender
expression or transgender. Contractor and any Subcontractor will take affirmative action
to ensure that applicants are hired without regard to race, color, sex, gender, religion,
national origin, familial status, disability or perceived disability, sexual orientation, gender
identity, gender expression or transgender and that employees are treated fairly during
employment without regard to their race, color, sex, gender, religion, national origin,
familial status, disability or perceived disability, sexual orientation, gender identity, gender
expression or transgender. Such action shall include, but not be limited to, the following:
employment, upgrading, demotion or transfer, recruitment or recruitment advertising,
layoff or termination, rates of pay or other forms of compensation, and selection for
training, including apprenticeship. Contractor and any Subcontractor agrees to post in
conspicuous places, available to employees and applicants for employment, notices
setting forth the provisions of this nondiscrimination clause.
Contractor and any Subcontractor will, in all solicitations or advertisements for employees
placed by or on behalf of Contractor and any Subcontractor, state that all qualified
Page 13
applicants will receive consideration for employment without regard to race, color, sex,
gender, religion, national origin, familial status, disability or perceived disability, sexual
orientation, gender identity, gender expression or transgender.
iii. Contractor and any Subcontractor covenants that neither it nor any of its officers,
members, agents, employees, or contractors, while engaged in performing this Contract,
shall, in connection with the employment, advancement or discharge of employees or in
connection with the terms, conditions or privileges of their employment, discriminate
against persons because of their age or because of any disability or perceived disability,
except on the basis of a bona fide occupational qualification, retirement plan or statutory
requirement.
iv. Contractor and any Subcontractor further covenants that neither it nor its officers,
members, agents, employees, contractors, or persons acting on their behalf, shall
specify, in solicitations or advertisements for employees to work on this Contract, a
maximum age limit for such employment unless the specified maximum age limit is based
upon a bona fide occupational qualification, retirement plan or statutory requirement.
V. Contractor covenants that neither it nor any of its officers, agents, employees, or
subcontractors, while engaged in performing this Contract, shall, in connection with the
employment, advancement or discharge of employees or in connection with the terms,
conditions or privileges of their employment, discriminate against persons because of their
age except on the basis of bona fide occupational qualification, retirement plan or statutory
requirement.
vi. Contractor further covenants that neither it nor its officers, agents, employees,
subcontractors, or persons acting on their behalf, shall specify, in solicitations or
advertisements for employees to work on this Contract, a maximum age limit for such
employment unless the specified maximum age limit is based upon a bona fide
occupational qualification, retirement plan or statutory requirement.
vii. In accordance with the provisions of the Americans With Disabilities Act of 1990 ("ADA"),
Contractor warrants that it and any and all of its subcontractors will not unlawfully
discriminate on the basis of disability in the provision of services to the general public, nor
in the availability, terms and/or conditions of employment for applicants for employment
with Contractor, or employees of Contractor or any of its subcontractors. CONTRACTOR
WARRANTS IT WILL FULLY COMPLY WITH ADA'S PROVISIONS AND ANY OTHER
APPLICABLE FEDERAL, STATE AND LOCAL LAWS CONCERNING DISABILITY AND
WILL DEFEND, INDEMNIFY AND HOLD CITY HARMLESS AGAINST ANY CLAIMS OR
ALLEGATIONS ASSERTED BY THIRD PARTIES OR SUBCONTRACTORS AGAINST
CITY ARISING OUT OF CONTRACTOR'S AND/OR ITS SUBCONTRACTORS'
ALLEGED FAILURE TO COMPLY WITH THE ABOVE -REFERENCED LAWS
CONCERNING DISABILITY DISCRIMINATION IN THE PERFORMANCE OF THIS
CONTRACT
ARTICLE 40: PERFORMANCE
Failure of the City to insist in any one or more instances upon performance of any of the terms and
conditions of this Contract shall not be construed as a waiver or relinquishment of the future performance
of any terms and conditions, but the Contractor's obligation with respect to such performance shall
continue in full force and effect.
ARTICLE 41: CHANGE IN COMPANY NAME OR OWNERSHIP
Contractor shall notify City in writing of a company name, ownership, or address change for the purpose
of maintaining updated City records. The president of the company or authorized agent must sign the
letter. Failure to do so may adversely impact future invoice payments.
Page 14
ARTICLE 42: REPAIR OF DAMAGE AND DEBRIS REMOVAL
A. Contractor is responsible for repairing any damage to utility lines that may occur during the course
of performing its duties under this Contract. Contractor shall repair and/or replace damaged sod,
shrubbery, sidewalks, driveways, etc. that are damaged during its performance of this Contract.
Sod and shrubbery must be replaced with the same type that was damaged.
B. Under no circumstances shall the Contractor leave construction debris (paint chips, nails,
shingles, etc.) on the property on which the Housing Unit is located. Contractor is responsible
for properly disposing of these items.
ARTICLE 43: SAFETY
Contractor shall be thoroughly familiar with all prevailing safety measures pertinent to its operations.
This shall include, but not be limited to EPA regulations, City Ordinances, and Occupational Safety and
Health Administration (OSHA) regulations. In addition, Contractor shall be wholly responsible for
instructing its employees and subcontractors in these safety measures and seeing that they are in full
compliance.
ARTICLE 44: HAZARDS
Contractor shall not permit the placement or use of equipment or materials in such manner as to block
traffic lanes or to create safety hazards. Contractor Personnel shall provide appropriate warning devices
when necessary and cooperate in the fullest in allowing through passage of other vehicles and
personnel, even to the point of interrupting the Work, if necessary.
ARTICLE 45: DEFECTIVE WORK AND DAMAGES
A. Contractor shall be wholly responsible for and shall promptly correct or restore all defective work
or damage to any Housing Unit caused by its activities at no cost to the City or occupant.
Restoration and correction shall be to City's complete satisfaction in its sole discretion. This shall
apply to any part of a Housing Unit, its appurtenances, the adjacent yard or grounds, or any other
tangible damage incurred in the performance of the Contract.
B. Failure by Contractor to proceed promptly with corrective actions shall be cause for termination of
this Contract with amount(s) necessary to correct defective Work and/or damage being withheld
from payments due or to become due to the Contract.
ARTICLE 46: INSPECTIONS AND PERMITS
Contractor shall apply for and obtain all permits prior to performing the Job Order with the City's
Development Services Department for all Work requiring a permit. Contractorshall arrange for inspections
and inform the City's Neighborhood Services Department as to the date and time of any inspection. All
permits shall be billed as a pass -through cost with no mark-up and listed as a separate line item on
invoice. Contractor must provide proper documentation with each invoice in order to support payment of
cost of the permit. Failure to provide the supporting proof documentation will result in non-payment of
permit expenditure.
[SIGNATURES APPEAR ON THE FOLLOWING PAGE]
Page 15
ACCEPTED AND AGREED:
CITY OF FORT WORTH:
By: o Jv
Name: Jesica McEachern
Title: Assistant City Manager
Date: Oct 9, 2024
APPROVAL RECOMMENDED:
By: K"
Name: Kacey Bess
Title: Director, Neighborhood Services
ATTEST:
By:
Name: Janette S. Goodall
Title: City Secretary
CONTRACTOR:
4,64vvann�
000
*-0
Voo=4
as a
� o.EXA5o4b
�bbnavoa
Pinnacle Project Partners, LLC
By: Jan sn(Sep 25,202413:33 CDT)
Name: Jannsen Brown
Title: Owner
CONTRACT COMPLIANCE MANAGER:
By signing I acknowledge that I am the person
responsible for the monitoring and administration
of this contract, including ensuring all performance
and reporting requirements.
By:
Name: John Cain
Title: Neighborhood Development Manager
APPROVED AS TO FORM AND LEGALITY:
Gr/�"�
By; JeVAaWilliams(Oct 3, 202410:11 CDT)
Name: Jessika J. Williams
Title: Assistant City Attorney
CONTRACT AUTHORIZATION:
M&C: 24-0817
Form 1295: 2024-1187659
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page 16
ATTACHMENT A: COMPLIANCE
COMPLIANCE
Any program under this contract that is funded with federal funds, such as CDBG, CSBG, or Department
of Energy, is subject to the Contract Work Hours Safety Standards Act (CWHSSA), and the Fair Labor
Standards Act (FLSA) as supplemented by Department of Labor regulations at 29 CFR Part 5. FLSA sets
out the requirements for payment of minimum wages, overtime pay, child labor standards and prohibit wage
discrimination on the basis of sex. CWHSSA sets a uniform standard of 40-hour workweek with time and a
half the basic rate of pay for all work in excess of 40-hours per week.
FAILURE TO COMPLY WITH THE LABOR STANDARDS REQUIREMENTS CAN RESULT IN THE
ESCROW OF FUNDS.
The program may be assisted in whole or in part by Community Development Block Grant ("CDBG') funds.
Should the project be assisted with CDBG funds, any work orders will be subject to the following applicable
federal laws including, but not limited to:
- Regulations at 24 CFR Part 570 pertaining to CDBG ("CDBG Regulations").
- Title I of the Housing and Community Development Act of 1974 as amended (42 USC 5301 et seq.).
- Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (42 USC 4601 et
seq.) and its related regulations at 49 CFR Part 24.
- Title VI of the Civil Rights Act of 1964 (42 USC 2000d et seq.).
- Title VII I of the Civil Rights Act of 1968 (42 USC 3601 et seq.).
- Executive Orders 11063, 11246, as amended by Executive Orders 11375 and 12086 and as
supplemented by 41 CFR Part 60.
- The Age Discrimination in Employment Act of 1967 (29 USC 621 et seq.).
- The Age Discrimination Act of 1975 (42 USC 6101 et seq.).
- Section 504 of the Rehabilitation Act of 1973 (29 USC 794 et seq.) and 24 CFR Part 8 where
applicable.
- The Americans with Disabilities Act of 1990 (42 USC 12101 et seq.).
- National Environmental Policy Act of 1969, as amended, 42 USC 4321 et seq. ("NEPA") and
the related authorities listed 24 CFR Part 58.
- The Clean Air Act, as amended (42 USC 7401 et seq.), the Clean Water Act of 1977, as amended
(33 USC 1251 et seq.) and the related EPA regulations at 40 CFR Part 15, as amended from time
to time, and Executive Order 11738. In no event shall any amount of the CDBG funds provided
under this Contract be utilized with respect to a facility that has given rise to a conviction under the
Clean Air Act or the Clean Water Act.
- The Immigration Reform and Control Act of 1986 (8 USC 1101 et seq.), specifically including the
provisions requiring employer verification of the legal status of its employees.
- Drug Free Workplace Act of 1988 (41 USC 701 et seq.) and 24 CFR Part 23, Subpart F.
- Regulations at 24 CFR Part 87 related to lobbying, including the requirement that
certifications and disclosures be obtained from all covered persons.
- Executive Order 12549 and 24 CFR Part 5.105 (c) pertaining to restrictions on participation
by ineligible, debarred, or suspended persons or entities.
- Copeland "Anti -Kickback "Act (18 USC 874 et seq.) as supplemented in 29 CFR Part 5
- Mandatory standards and policies relating to energy efficiency which are contained in the state
energy conservation plan issued in compliance with the Energy Policy and Conservation Action
(Pub. L. 94A 163, 89 Stat. 871), (53 FIR 8068, 8087, Mar. 11,1988, as amended at 60 FR 19639,
19642, Apr. 19, 1995).
- Lead -Based Paint Poisoning Prevention Act (42 U.S.C. 4801 et seq.), as amended by the
Page 17
ATTACHMENT A: COMPLIANCE
Residential Lead -Based Paint Hazard Reduction Act of 1992 (42 U.S.C. 4851 et seq.) and
implementing regulations at 24 CFR Part 35, subparts A, B, M, and R
EPA RULE
TELRR RULE
Requirement that Law Be Quoted in Covered Contracts. — Certain Requirements Pertaininq to
Section 3 of the Housing and Urban Development Act of 1968 as amended (12 U.S.C. Sections
1701 et secy.) and its related reaulations at 24 CFR Part 135
If the work performed under this Contract is on a project assisted under a program providing direct
Federal financial assistance from the United States Department of Housing and Urban
Development ("HUD"), Section 3 of 24 CFR 135.38 ("Section 3") requires that the following clause,
shown in italics, be inserted in all covered contracts ("Section 3 Clause"):
Section to be quoted in covered contracts begins:
`A. The work to be performed under this contract is subject to the requirements of Section 3
of Housing and Urban Development Act of 1968, as amended, 12 U.S.C. section 1701u
(Section 3). The purpose of Section 3 is to ensure that employment and other economic
opportunities generated by HUD assisted or HUD -assisted projects covered by Section 3,
shall to the greatest extent feasible, be directed to low- and very -low income persons,
particularly persons who are recipients of HUD assistance for housing.
B. The parties to this contract agree to comply with HUD's regulations in 24 CFR Part 135,
which implement Section 3. As evidenced by their execution of this contract, the parties
to this contract certify that they are under no contractual or other impediment that would
prevent them from complying with the Part 135 regulations.
C. The contractor agrees to send to each labor organization or representative of workers with
which it has a collective bargaining agreement or other understanding, if any, a notice
advising the labor organization or workers' representatives of the contractor's
commitments under this Section 3 clause and will post copies of the notice in conspicuous
places at the work site where both employees and applicants for training and employment
positions can see the notice. The notice shall describe the Section 3 preference, shall set
forth minimum number and job titles subject to hire, availability of apprentice and training
positions, the qualifications for each; and the name and location of the person(s) taking
applications for each of the positions; and the anticipated date the work shall begin.
D. The contractor agrees that it will include this Section 3 clause in every subcontract to
comply with regulation in 24 CFR Part 135, and agrees to take appropriate action, as
provided in an applicable provision of the subcontract or in this Section 3 clause, upon
finding that the subcontractor is in violation of the regulations in 24 CFR Part 135. The
contractor will not subcontract with any subcontractor where it has notice or knowledge
that the subcontractor has been found in violation of regulations in 24 CFR 135.
E. The contractor will certify that any vacant employment positions, including training
positions that are filed: (1) after the contractor is selected but before the contract is
executed, and (2) with persons other than those to whom the regulations of 24 CFR Part
135. The contractor will not subcontract with any subcontractor where it has notice or
knowledge that the subcontractor has been found in violation of regulations in 24 CFR
135
F. Noncompliance with HUD's regulation in 24 CFR Part 135 may result in sanctions,
termination of this contract for default, and debarment or suspension from future HUD
assisted contracts.
G. With respect to work performed in connection with Section 3 covered Indian housing
assistance, section 7(b) of the Indian Self -Determination and Education Assistance Act
(25 U.S.C. section 450e) also applies to the work to be performed under this Contract.
Section 7(b) requires that to the greatest extent feasible (i) preference and opportunities
for training and employment shall be given to Indians, and (ii) preference in the award of
contracts and subcontracts shall be given to Indian organizations and Indian- owned
Economic Enterprises. Parties to this contract that are subject to the provisions of Section
Page 18
ATTACHMENT A: COMPLIANCE
3 and Section 79b) agree to comply with Section 3 to the maximum extent feasible, but
not in derogation of compliance with Section 7(b)."
Section to be quoted in covered contracts ends.
City and Contractor understand and agree that, if applicable to the Program, compliance with the
provisions of Section 3, the regulations set forth in 24 CFR Part 135, and all applicable rules and
orders of HUD shall be a condition of the Federal financial assistance provided to the Project binding
upon City and Contractor, and their respective successors, assigns and subcontractors. Failure to
fulfill these requirements shall subject Contractor and its subcontractors and their respective
successors and assigns to those sanctions specified by the grant agreement through which Federal
assistance is provided and to such sanctions as are specified by 24 CFR Part 135.
Work projects assigned under this contract may be assisted with Weatherization Assistance Program
(WAP) funds from the U.S. Department of Energy, or Low Income Heating and Energy Assistance
Program (LIHEAP) from the U.S. Department of Health and Human Services. WAP and LIHEAP are
pass -through funds from the Texas Department of Housing and Community Affairs. (TDHCA). To
the extent that any project assigned under this contract is funded through WAP or LIHEAP,
Contractor shall comply with all applicable federal regulations as well as any applicable provisions of
the Texas Administrative Code and requirements of TDHCA related to these programs.
Contractor covenants and agrees that its officers, agents, employees and subcontractors shall abide
by and comply with all other laws, Federal, state and local, relevant to the performance of this
Contract, including all applicable City ordinances, rules and regulations and Title I of the Housing and
Community Development Act of 1974 (42 USC 5301 et seq.), as amended, and the CDBG
Regulations, as amended, (24 CFR Part 570 et seq.), and the Texas Administrative Code, and federal
regulations of the Department of Energy related to WAP, and federal regulations of the Department
of Health and Human Services related to LIHEAP. Contractor further promises and agrees that it has
read, and is familiar with, the terms and conditions of the above -mentioned federal and state
regulations.
All information and data arising from the work performed under this Contract shall be the property of
the City and may be subject to disclosure to third parties and additionally may be subject to release
to the public under the provisions of the Texas Open Records Act. Contractor shall release and
provide to City or its authorized designee all information and data related to performance under this
Contract. Contractor shall not limit or attempt to limit access to information or data by the City nor
shall Contractor obtain or attempt to obtain a copyright to such information or data. Contractor
understands and agrees that data may be released to third parties, including but not limited to HUD at
the sole discretion of City.
In the event a patentable invention is created as part of this Contract and a patent is obtained,
Contractor shall notify City of the patent and the patent shall, at the sole discretion of the City, be
assigned to City upon demand. City retains all rights to intellectual property developed in the course of
this Contract.
In the event any copyright arises with respect to any data or other copyrightable work developed in
the course of or under this Contract, Contractor shall notify City of the copyright and the copyright
shall, at the sole discretion of City, be assigned to City upon demand.
City, HUD, DOE, DHHS, TDHCA, and the United States Comptroller General, or their respective
representatives, shall have access for 4 years following the termination of this Contract to any books,
documents, records and papers relating to the operations of Contractor under this Contract for the
purpose of audit, examination, exception and transcription at all of Contractor's offices at all
reasonable hours. This provision shall survive the termination or expiration of this Contract.
All records pertaining to Contract, including but not limited to any books, documents, and papers,
shall be retained for 4 years following the termination of this Contract. Contractor may destroy Project
records at the end of this 4 year period if no outstanding audit finding exists. This provision shall
survive the termination or expiration of this Contract.
Page 19
ATTACHMENT A-1
PROGRAM -SPECIFIC CONDITIONS
PRIORITY REPAIR PROGRAM
A. The program provides assistance for home repairs which, if neglected, pose immediate
threats to the health and safety of the homeowner.
B. All work shall be done in accordance with the standards of all trades known as a
"workmanship like manner" and in accordance with the City's approved minimal acceptable
standards documents.
C. The work shall include all labor, materials, equipment, permit, drawings and services
necessary for the completion of the rehabilitation of the property in accordance with the
acceptable building standards.
D. All work shall comply with the existing Building, Plumbing, Electrical and Mechanical Codes
of the existing Neighborhood Services Specifications and the City of Fort Worth.
E. The contractor shall take all precautions necessary to protect existing trees, plants,
sidewalks, buildings, vehicles, et., in the areas where work is being done. The contractor
shall repair, rebuild and make good at his own expense, any injuries and damage to the
same which may result from work being carried on under their contract. Clean up and
removal from the site of all debris and waste materials resulting from this work shall be the
responsibility of the contractor.
F. Permits -The Contractor must apply for and obtain all permits prior to beginning work with
the appropriate jurisdiction for all work performed under this contract that requires a permit.
The Contractor shall arrange for inspections with appropriate local inspectors and City
technicians. All permits shall be billed as pass through costs and listed Priority Repair with
the appropriate jurisdiction for all work performed under this Contract that requires a permit.
The Contractor shall arrange for inspections with appropriate local inspectors. All permits
shall be billed as pass through costs and listed as a separate line item on any invoices.
When applicable, the Contract shall indicate the charge to be paid by City for overhead
costs related to obtaining any building permit required by the work items related to the
services being provided. The Contractor must provide proper documentation with each
client invoice in order to support payment of a permit. Failure to provide the supporting
proof of documentation will result in non-payment.
G. Contractor shall comply with the requirements of the Environmental Protection Agency
(EPA), including the Lead -Based Paint Renovation, Repair and Painting Program Rule
(RRP) and applicable HUD and CDBG regulations. Contractor must follow the
requirements of the RRP Rule when performing renovation, repair, and painting programs
in houses built before 1978, including using lead- safe work practices. Contractor and any
subcontractors performing renovation repair, and painting projects that disturb lead -based
paint in pre-1978 houses must be certified by the EPA. Contractor shall also abide by any
laws, regulations or rules pertaining to lead remediation promulgated by the State of Texas
or any agency thereof.
LEAD BASED PAINT HARZARD REDUCTION AKA LEADSAFE AND HEALTHY
HOMES PROGRAM
H. All Work must be performed using Lead Safe Work Practices, and with appropriately
trained and certified staff, as defined by HUD and EPA under the Lead -safe Housing Rule
and the EPA Renovation and Repair Rule.
I. Cleaning methods during and following lead hazard reduction work must follow HUD
guidelines under the Lead Safe Housing Rule, to include but not be limited to, use of wet
mops, High Efficiency Particulate Air (HEPA) vacuums, and other specific methods to
control and eliminate lead -based paint dust and ensure passage of final clearance tests.
J. LeadSafe Program work may be performed with CDBG funds, therefore all requirements
cited in Attachment A regarding the Compliance with Federal funds regulations, are also
applicable to the LeadSafe Program.
K. Work must pass visual inspection and/or any applicable Lead Hazard Control clearance
test as required by federal and state laws. For work performed under the Lead Hazard
Page 20
ATTACHMENT A-1
PROGRAM -SPECIFIC CONDITIONS
Reduction Program, final inspection may include inspection by the Texas Department of
State Health Services, Environmental Lead Branch.
Supervision: For all assigned projects involving Lead -Based Paint Hazard Reduction,
Contractor shall, during all periods of Contract performance, provide competent
supervision of Contractor's employees and subcontractors by a state certified Lead
Supervisor to assure complete and satisfactory fulfillment of the Work and the terms of this
Contract. A Lead Supervisor must be present on the job site at all times. An exception will
be allowed only if the Lead Supervisor leaves for no more than 2 hours a day and the
absence is directly related to the lead hazard work being performed on the job site and the
Lead Supervisor is immediately available during all Work activities. If the Lead Supervisor
is required to be absent from the job site for more than 2 hours in a work day, City must be
notified prior to exceeding the time limit. Failure to provide competent supervision, as
determined the City, shall be an event of default under this Contract.
III. WEATHERIZATION PROGRAM
A. Contractor must read and understand energy audits and weatherization program work
orders.-
B. Permits -The Contractor must apply for and obtain all permits prior to installation of
weatherization measures with the appropriate jurisdiction for all work performed under this
Contract that requires a permit. The Contractor shall arrange for inspections with
appropriate local inspectors. All permits shall be billed as pass through costs and listed as
a separate line item on any invoices. When applicable, the Contract shall indicate the
charge to be paid by City for overhead costs related to obtaining any building permit
required by the work items related to the services being provided. The Contractor must
provide proper documentation with each client invoice in order to support payment of a
permit. Failure to provide the supporting proof of documentation will result in non-payment
permit expenditure.
C. Air Exchange -Using blower door guided air -sealing approaches, the Contractor must
perform blower door test before submitting the unit for payment to NSD (Neighborhood
Services Department) and record a final blower door reading for each unit. The Contractor
shall install weather-stripping, caulking and bypass sealing to reduce air exchange rates in
eligible dwellings; and program measures designed to preserve the integrity of the home's
thermal envelope, reduce appliance energy consumption, and ensure resident's health and
safety.
D. Contractor shall provide all labor, material, supplies, and equipment to perform the
following energy conservation measures on program -eligible dwellings, which includes,
without limitation, the following:
a. Blower door and duct blaster testing
b. Air bypass sealing attic and crawl space with spray foam
c. Blown in fiberglass attic insulation, dense pack wall insulation, and floor insulation
d. Caulking and weather-stripping
e. Window and door repair and replacement
f. Duct leakage sealing
g. Insulation of water heater and water heater pipes
h. Attic ventilation
i. Solar screens
j. Minor home repairs
k. Minor plumbing repairs, gas, water, drain and waste
I. Water savers
m. Kitchen and bathroom exhaust fans
n. Carpentry
o. LED light bulbs, and retrofit kits
p. Smoke and Carbon Monoxide Detectors
q. Roofing Services (i.e. minor repair, installation, decking, removal)
Page 21
E.
F
G.
H.
1.
J.
K.
L.
ATTACHMENT A-1
PROGRAM -SPECIFIC CONDITIONS
r. Repair or remove broken glass and install new glass with glazing
s. Duct repair or replacement
t. High/low combustion venting
u. Foundation underpinning
v. Mobile home modification energy measures (door repair and replacement, siding,
interior vents, exhaust fans, skirts, etc.)
w. Remove & Replace burglar bars
x. Repair, retrofit, and replace inefficient home heating/cooling systems, water
heaters, and refrigerators
y. Service, clean, and adjust heaters, including un-vented space heaters, cook
stoves, ovens, water heaters, and lower carbon monoxide levels per specifications
stated in the Texas Department of Housing and Community Affairs CTDHCX)
Weatherization and Mechanical Field Guides and A-1 OCFR440
z. Materials and/or equipment purchased can be inspected by a NSD's
representative to determine conformity with the quality requirements of the call for
bids when necessary, NSD may require documentation detailing the product
specifications for the purposes of determining whether the material conforms, in
all aspects, to the required standard work specifications.
aa. Contractor shall be fully responsible for the removal and proper disposal of all
chemicals, material equipment, units, appliances, and component parts associated
with repair and/or replacement services.
bb. All appliances and equipment used for retrofit, repair, and/or replacement shall be
energy star rated, unless otherwise approved.
cc. All weatherization measures installed must have an approved State of Texas
Energy Audit savings -to -investment ration ("SIR") of one or greater unless
otherwise indicated as health and safety or incidental repair items. Weatherization
measures installed shall begin with those having the greatest SIR (on approved
State of Texas Energy Audit) and proceed in descending order to the measures
with the smallest SIR or until the maximum allowable per unit expenditures are
achieved. Contractor shall weatherize eligible dwelling units using only
weatherization materials which meet or exceed the standards prescribed by the
United States Department of Energy ("DOE") in Appendix A to Part 440 of the W
AP Regulations, State of Texas adopted International Residential Code ("IRC") or
jurisdiction authorized by State law to adopt later editions.
dd. Services performed shall meet or exceed the latest standards and procedures of
the National Electrical Code, American Society of Heating, Refrigerating and Air -
Conditioning Engineers, Uniform Plumbing Code, International Plumbing Code
and Fuel Gas Code and Department of Energy Weatherization guidelines.
The product of labor and skill executed, and quality of materials must be in accordance
with City, State, and Federal building codes and regulations and/or according to the
Weatherization Installation Standards for the State of Texas. A copy of this manual may be
obtained by writing the Weatherization Assistance Program, Attention: James Armstrong,
Neighborhood Services Department, 818 Missouri Ave. Fort Worth, TX 76104 Suite 245.
Contractor shall arrange and schedule all work with the homeowner/occupant in
accordance with City -designated orders, if applicable.
Contractor shall provide all transportation of tools, materials, and personnel to job sites.
Contractor shall provide adequate, trained on -site supervision of all Services.
Contractor shall follow all Texas Administration Code regulations as indicated at
https://www.tdhca.texas.gov/weatherization-assistance-program-wap-program-guidance
In addition to the training or certification requirements required by law, the Contractor and
all associated crew members will be required to attend mandatory training prior to
commencement of any services. The training will include, without limitation, the following:
a. Lead Safe Weatherization (LSW) / Environmental -Protection Agency (EPA)
requirements.
b. OSHA 10 for crew members and 30 for supervisors
c. Material Installation Standards.
The Contractor is responsible for maintaining and submitting necessary documents and
Page 22
ATTACHMENT A-1
PROGRAM -SPECIFIC CONDITIONS
reports as may be required by the City, in its sole discretion, on weatherization projects.
The Contractor shall comply with the record keeping requirements set forth in section
440.24 of the WAP Regulations, any record keeping requirements set forth in any
applicable funding agreements between the City and TDHCA (including Fort Worth City
Secretary Contract Number 43428, Section 9: Record Keeping Requirements), all of which
shall be incorporated herein by reference as if fully reproduced herein, and with other such
additional record keeping requirements as set forth herein, including, but not limited to, the
following:
a. Unit Completion Form, (request for a final inspection);
b. Invoice for material, labor, and total charge for each home weatherized in
accordance all required standards and specifications, including, but not limited to,
Billing Instructions, Number 16 of the Standard Specifications and Conditions, and
a form that will be e-mailed from NSD.
c. Itemized materials invoice; and
d. Building permit, when applicable, that indicates acceptance of work by the City's
Planning and Development Department; these documents must be submitted with
the invoices.
M. Contractor shall comply with the requirements of the Environmental Protection Agency
(EPA), including the Lead -Based Paint Renovation, Repair and Painting Program Rule
(RRP). Contractor must follow the requirements of the RRP Rule when performing
renovation, repair, and painting programs in houses built before 1978, including using lead -
safe work practices. Contractor and any subcontractors performing renovation repair, and
painting projects that disturb lead -based paint in pre-1978 houses must be certified by the
EPA. Contractor shall also abide by any laws, regulations or rules pertaining to lead
remediation promulgated by the State of Texas or any agency thereof.
N. Additional Cost for Lead Safe Weatherization (LSW). For jobs involving LSW, Contractor
may charge if more than 6 continuous square feet inside the house and 10 continuous
linear feet on the exterior of the house is disturbed.
O. The Contractor is required to provide at least one valid e-mail address to which the City
may send or receive the following:
a. Program Correspondence
b. Notification of Assignments
c. Invoices
d. Client Complaints
e. Status Reports on Unit Completion
f. Request for Inspection
g. Other Critical Documents / Memos
IV. HOUSEHOLD CRISIS PROGRAM
A. The awarded vendor, hereinafter referred to as "Contractor," shall furnish all equipment,
materials, repair personnel, parts, permits, and all tools required to perform assessments,
maintenance, and repair services on heating, ventilation & air cooling (HVAC) electrical
systems (assessment and repair only) as requested and directed by the City of Fort Worth
Community Action Partners (CAP). The home must be owned by the applicant, if the
participant's rents/leases the home, the landlord must provide written approval to allow the
recommended work. CAP staff will provide the form for the landlord to complete.
B. The Program is designed to aid CAP participants in achieving energy self-sufficiency by
addressing inefficient HVAC electrical/gas systems in the participants' homes.
a. CAP staff will inform Contractor the amount allowed for each participant.
C. Contractor shall:
a. Properly operate a Freon Reclaim unit
b. Properly assess and install window air conditioners and seal according to
specifications set forth by the Texas Department of Housing and Community
Affairs
Page 23
ATTACHMENT A-1
PROGRAM -SPECIFIC CONDITIONS
c. Have the resources to communicate in writing and verbally (in person and by
phone) with participants who speak other languages (primarily Spanish)
d. Have appropriate dress attire and proper identification, to assure the City's
participants can readily identify technicians providing services at the participants'
homes
e. Perform assessments within ten (10) business days after receiving a work order
and a Blanket Purchase Order Release Number
f. Under normal circumstances all work orders shall be completed within one (1)
month of receipt of work orders.
g. Exceptions to this requirement shall be allowed only in the event an eligible
participant is unavailable for scheduled service delivery.
h. Not alter any work order without authorization from CAP staff
i. Provide program staff with documentation of the number of contact attempts per
participant.
j. The Contractor shall assess and complete assessment forms, provided by CAP,
on all appliances [window units, electric space heaters and electric/gas HVAC
systems).
k. Assessment forms are to be completely filled out or, where not applicable, "N/A"
is to be reflected. (EXHIBIT ONE).
I. Signature of technician(s) performing the work and the participant must be on all
forms provided.
m. Under normal conditions, Contractor shall contact the participant to schedule a
time to survey and perform each assigned jobsite assessment within ten (10)
business days of notification by an authorized CAP employee.
n. Contractor shall complete the assessment form(s) for each jobsite and submit
overall assessment to CAP staff to receive authorization to proceed with
completing the work order (EXHIBIT TWO) within ten (10) business days of
completing the assessment.
o. Unless otherwise instructed, Contractor shall contact the participant to schedule
a time and to complete the work order within ten (10) business days after
receiving authorization to proceed from CAP.
p. Contractor shall submit the invoice for payment electronically within ten (10)
business days of completing the assignment. Invoices shall be dated the day of
submission.
q. If CAP specifies the work order as an energy crisis, Contractor(s) shall survey
jobsite within 24 business hours and complete all work within 48 business hours
of the receipt of authorization to proceed.
r. If CAP specifies a work order to present a life -threatening situation, Contractor(s)
shall complete all work at the jobsite within 18 business hours of the receipt of
authorization to proceed.
s. The Contractor must provide the participant with a one (1) year warranty for all
worked performed.
t. The Contractor must provide before and after photos (which include the serial
numbers) of all HVAC system repairs.
V. HEALTHY HOMES FOR HEROES
A. The awarded vendor, hereinafter referred to as "Contractor," shall furnish all equipment,
materials, repair personnel, parts, permits, and all tools required to perform assessments,
maintenance, critical home repairs, home modifications, and weatherization as requested
and directed by the City of Fort Worth Community Action Partners (CAP). Program
provides assistance to low -moderate income veterans, disabled veterans and surviving
spouses. The homeowner must reside in Tarrant County, be their primary residence and
must provide written approval to allow the recommended work.
B. The Program is designed to aid CAP participants in achieving healthy home and energy
self-sufficiency by addressing problematic issues that impact the integrity of the home
Page 24
ATTACHMENT A-1
PROGRAM -SPECIFIC CONDITIONS
that may have made it difficult for the participants to maintain independent living
a. CAP staff will inform Contractor the amount allowed for each participant.
C. The program aids with home repairs which, if neglected, pose immediate threats to the
health and safety of the homeowner.
D. The program provides assistance with home modifications, that will aid the homeowner in
maintaining independent living.
E. All work shall be done in accordance with the standards of all trades known as a
"workmanship like manner".
F. The work shall include all labor, materials, equipment, permit, drawings and services
necessary for the completion of the rehabilitation of the property in accordance with the
acceptable building standards.
G. All work shall comply with the existing Building, Plumbing, Electrical and Mechanical
Codes of the existing Neighborhood Services Specifications and the City of Fort Worth.
H. The contractor shall take all precautions necessary to protect existing trees, plants,
sidewalks, buildings, vehicles, et., in the areas where work is being done. The contractor
shall repair, rebuild and make good at his own expense, any injuries and damage to the
same which may result from work being carried on under their contract. Clean up and
removal from the site of all debris and waste materials resulting from this work shall be
the responsibility of the contractor.
I. Permits -The Contractor must apply for and obtain all permits prior to beginning work with
the appropriate jurisdiction for all work performed under this contract that requires a
permit. The Contractor shall arrange for inspections with appropriate local inspectors and
City technicians. All permits shall be billed as pass through costs and listed Priority
Repair with the appropriate jurisdiction for all work performed under this Contract that
requires a permit. The Contractor shall arrange for inspections with appropriate local
inspectors. All permits shall be billed as pass through costs and listed as a separate line
item on any invoices. When applicable, the Contract shall indicate the charge to be paid
by City for overhead costs related to obtaining any building permit required by the work
items related to the services being provided. The Contractor must provide proper
documentation with each client invoice in order to support payment of a permit. Failure to
provide the supporting proof of documentation will result in non-payment.
J. Contractor shall comply with the requirements of the Environmental Protection Agency
(EPA), including the Lead -Based Paint Renovation, Repair and Painting Program Rule
(RRP) and applicable HUD and CDBG regulations. Contractor must follow the
requirements of the RRP Rule when performing renovation, repair, and painting
programs in houses built before 1978, including using lead- safe work practices.
Contractor and any subcontractors performing renovation repair, and painting projects
that disturb lead -based paint in pre-1978 houses must be certified by the EPA. Contractor
shall also abide by any laws, regulations or rules pertaining to lead remediation
promulgated by the State of Texas or any agency thereof.
Page 25
Note to Contractor:
ATTACHMENT B
SAMPLE JOB ORDER/WORK WRITE-UP
Work Write -Up
PRP -Electrical-Floor-Siding
Dated: 01 /01 /2024
CUSTOMER INFORMATION
Last Name, First Name
Street Address
Phone Number
PREPARED BY
email@fortworthtexas.gov
* NOTE *
THE CUSTOMER AND CONTRACTOR MUST SIGN THE BOTTOM OF EACH PAGE ONLY IF
1) THIS WORK WRITE-UP BECOMES PART OF A CONSTRUCTION CONTRACT
2) THE UNDERSIGNED CUSTOMER AND CONTRACTOR HAVE REVIEWED, APPROVED AND
AGREED TO THE WORK AND PRICES DESCRIBED IN THIS WORK WRITE-UP
Customer:
Contractor:
Prepared By: email@fortworthtexas.gov on 0110112024
ImNeighborly Software
ATTACHMENT B
SAMPLE JOB ORDER/WORK WRITE-UP
Location: Middle Bedroom
Electrical Quantity Units t Total
1 - ELECTRIC SERVICE--200 AMP PANEL 1
(Specification ID: 0 Estimated Qty:1)
Replace existing electrical service with a residential, 200-amp, single phase, 3 wire electric service. Dispose
of old electric service to code legal dump. Include a main disconnect, I I0/220-volt, 40 circuit panel board,
meter socket, weather head, service cable, and ground rod and cable. Seal all exterior service penetration.
Location: All Bedrooms and Hallway
Electrical Quantity Units Total
2 - SMOKE DETECTOR -HARD WIRED 4 EA
(Specification ID: 0 Estimated Qty: 4)
Install a UL approved, ceiling mounted smoke and heat detector permanently wired into a ceiling mounted
receptacle box.
Location: Hallway
[Electrical Quantity Units Total
3 - LIGHT FIXTURE AND WALL SWITCH
(Specification ID: 0 Estimated Qty:1)
EA
Install a ceiling mounted, UL approved, 2 LED bulb light fixture controlled by an ivory switch with an ivory
cover located at the strike side of the door. Fish wire and repair all tear out to match existing, tape and bed
and make ready for texture and paint.
Customer:
Contractor:
Prepared By: email@fortworthtexas.gov on 0110112024
NNeighborly Software
ATTACHMENT B
SAMPLE JOB ORDER/WORK WRITE-UP
Location: Kitchen
Electrical Quantity Units Total
4 - GFCI - WALL PLUG/NEW CIRCUIT 1 EA
(Specification ID: 0 Estimated Qty:1)
Remove existing duplex receptacle; install one new ground fault circuit interrupter GFCI outlet, match
existing amp and color for each home run circuit per manufactures instructions. Note: It's not required to
install a GFCI outlet for each receptacle if wired in series. ALL NEW GFCI OUTLETS MUST PASS A
TEST BUTTON SIMULATED ARC TEST, WITH A GFCI TESTING DEVISE TO MEET CITY OF
FORT WORTH CODE. RUN NEW 12/2 ROMEX IF NECESSARY TO PASS THE ARC TEST BUTTON
TEST. Repair all tear out to match existing, tape and bed and make ready for texture and paint.
This callout is to update or remove and replace the plug in the kitchen to the left hand side of the sink, which
at this time is not a GFCI plug.
5 - LIGHT FIXTURE AND WALL SWITCH ( Over Sink)
(Specification ID:0 Estimated Qty:1)
EA
Install a ceiling mounted, UL approved, 2 LED bulb light fixture controlled by an ivory switch with an ivory
cover located at the strike side of the door. Fish wire and repair all tear out to match existing, tape and bed
and make ready for texture and paint.
Location: Living Room Ceiling
Electrical
6 - LIGHT FIXTURE
(Specification ID:0 Estimated Qty:1)
Subtotal for- Electrical
Quantity I Units I Total
EA
Replace the light fixture with a new UL approved 2-bulb L.E.D. light fixture controlled by the present wall
switch.
There will be two ceiling lights installed in the living room so space them out.
Customer:
Contractor:
Prepared By: email@fortworthtexas.gov on 0110112024
ImNeighborly Software
ATTACHMENT B
SAMPLE JOB ORDER/WORK WRITE-UP
7 - LIGHT FIXTURE AND WALL SWITCH 1
(Specification ID:0 Estimated Qty:1)
Install a ceiling mounted, UL approved, 2 LED bulb light fixture controlled by an ivory switch with an ivory
cover located at the strike side of the door. Fish wire and repair all tear out to match existing, tape and bed
and make ready for texture and paint.
There will be two ceiling lights installed in the living room so space them out.
Location: Master Bedroom
Subtotal for -Electrical
Quantity I Units I Total
8 - 15 AMP -RECEPTACLE / PLUG, REPLACE 1 EA
(Specification ID:0 Estimated Qty:1)
Install an ivory, duplex, 15 amp plug receptacle and ivory cover plate at least 15" above floor level replacing
the old nonfunctioning wall plug.
For plug by exterior door
9 - INSTALL CEILING FAN WITH LIGHT KIT
(Specification ID:0 Estimated Qty:1)
Install a new ceiling fan with light kit to the existing electric on ceiling.
Location: Main Bathroom
Electrical
1 1EA
Subtotal for -Electrical
Quantity Units Total -1
10 - GFCI - WALL PLUG/NEW CIRCUIT 1 EA
(Specification ID:0 Estimated Qty:1)
Remove existing duplex receptacle; install one new ground fault circuit interrupter GFCI outlet, match
existing amp and color for each home run circuit per manufactures instructions. Note: It's not required to
install a GFCI outlet for each receptacle if wired in series. ALL NEW GFCI OUTLETS MUST PASS A
TEST BUTTON SIMULATED ARC TEST, WITH A GFCI TESTING DEVISE TO MEET CITY OF
FORT WORTH CODE. RUN NEW 12/2 ROMEX IF NECESSARY TO PASS THE ARC TEST BUTTON
TEST. Repair all tear out to match existing, tape and bed and make ready for texture and paint.
Customer:
Contractor:
Prepared By: email@fortworthtexas.gov on 0110112024
NNeighborly Software
ATTACHMENT B
SAMPLE JOB ORDER/WORK WRITE-UP
11 -HEAT, VENT EXAUST FAN
(Specification ID:0 Estimated Qty:1)
Install a ceiling mounted fixture containing a 1200 watt, forced air heater, and an exterior ducted vent fan
with damper, capable of 60 cfm, controlled by 2 manufacturer -supplied switches on an independent 20-amp
circuit, using #14 copper Romex. Fish all wire and patch all tear out.
General and Carpentry
Subtotal for Electrical
Quantity Units
12 - FLOOR ASSEMBLY —BATHROOM 33 SF
(Specification ID.•0 Estimated Qty:33)
Total
Remove all fixtures not built-in. Remove floor covering and old subfloor underlayment. Replace sub floor
and any bad joists to restore floor to sound and level condition. Replace any sewer piping needed. Install
insulation under floor. Install 3/4" underlayment and one-piece vinyl sheet goods. Install 1" X 4" molding or
colonial molding against walls at floor painted and caulked. Install threshold. Reinstall fixtures. Check for
leaks. Correct all damage to walls, and fixtures caused by removing/reinstalling.
13 - HARDIE BACKER -CEMENT BOARD %" 82 SF
(Specification ID: 0 Estimated Qty: 82)
Install Hardie Backer cement board to all tub/shower walls after removal of any old drywall; break/cut each
piece to end over a wall stud so all edges are secure. Install using the manufacturer's approved adhesive or
fasteners. Carefully fit around all faucet components before installing FRP board.
14 - INSTALL PRE -HUNG INTERIOR DOOR 32" 1 EA
(Specification ID: 0 Estimated Qty:1)
Remove the door going into the main bathroom and replace it so the door opens into the bedroom. Includes
all hardware prime and paint.
15 - LAMINATE - WATER PROOF- FRP BOARD 96 SF '
(Specification ID: 0 Estimated Qty: 96)
Install fiberglass reinforced board (FRP) to tub/shower area, prepare substrate surface and install using the
manufacturer's approved adhesive and trim. Carefully fit around all faucet components. Clean all surfaces
and caulk all seams and penetrations with one continuous bead of 100% silicone caulk.
Customer:
Contractor:
Prepared By: email@fortworthtexas.gov on 0110112024
NNeighborly Software
ATTACHMENT B
SAMPLE JOB ORDER/WORK WRITE-UP
16 - TUB/SHOWER HANDICAP GRAB BAR — LARGE 36" 1 EA
(Specification ID:0 Estimated Qty:1)
Install tub/shower grab bar per general requirement. Be sure to attach to blocking in the wall. Get homeowner
input on position.
17 - TUB/SHOWER HANDICAP GRAB BAR — SMALL 24" 1 EA
(Specification ID:0 Estimated Qty:1)
Install tub/shower grab bar per general requirement. Be sure to attach to blocking in the wall. Get homeowner
input on position.
Subtotal for -General and Carpentry
PLUMBING Quantity Units Total
18 - BATHROOM DRAIN LINES AND P-TRAP 1 EA
(Specification ID:0 Estimated Qty:1)
Replace all of the drain lines including the p-trap under the sink from wall stub out to the sink fixture with all
new PVC drain lines and p-trap.
19 - FIBERGLASS SHOWER STALL HANDICAP ACCESSIBLE 1 EA
PAN
(Specification ID:0 Estimated Qty:1)
Remove the tub and install a 60"x 32" fiberglass shower stall molded base (pan), including PVC waste line
and P-trap tied back into the main sewer line for the house.
20 - NEW COMMODE--REPLACE--1.6 GPF
(Specification ID:0 Estimated Qty:1)
1 1 EA
Install a 2-piece, close coupled, white, vitreous china, elongated commode with a maximum water usage per
flush of 1.6 Gallons. Include plastic or pressed wood white seat, stainless steel supply line, shut-off valve,
tank parts and wax ring.
21 - ROD AND CLEAN DRAINS 1 EA
(Specification ID: 0 Estimated Qty:1)
Rod and clean drain lines at each fixture to clear lines from fixtures to main sewer line. This will include the
washer area, kitchen and bathroom, make sure the main sewer line in the yard is clear.
This is for just the main bathroom tub drain line.
Customer:
Contractor:
Prepared By: email@fortworthtexas.gov on 0110112024
Neighborly Software
ATTACHMENT B
SAMPLE JOB ORDER/WORK WRITE-UP
22 - TANKLESS GAS WATER HEATER 6-7 GPM 150K-180K 1 EA
BTU
(Specification ID:0 Estimated Qty:1)
Verify gas pipe sizing to feed BTU's, install tankless gas water heater including all new fittings.
Location: Master Bathroom
Electrical
23 - HEAT, VENT EXAUST FAN
(Specification ID:0 Estimated Qty:1)
Subtotal for -PLUMBING
Quantity I Units I Total
Install a ceiling mounted fixture containing a 1200 watt, forced air heater, and an exterior ducted vent fan
with damper, capable of 60 cfm, controlled by 2 manufacturer -supplied switches on an independent 20-amp
circuit, using # 14 copper Romex. Fish all wire and patch all tear out.
24 - GFCI - WALL PLUG/NEW CIRCUIT
(Specification ID:0 Estimated Qty:1)
EA
Remove existing duplex receptacle; install one new ground fault circuit interrupter GFCI outlet, match
existing amp and color for each home run circuit per manufactures instructions. Note: It's not required to
install a GFCI outlet for each receptacle if wired in series. ALL NEW GFCI OUTLETS MUST PASS A
TEST BUTTON SIMULATED ARC TEST, WITH A GFCI TESTING DEVISE TO MEET CITY OF
FORT WORTH CODE. RUN NEW 12/2 ROMEX IF NECESSARY TO PASS THE ARC TEST BUTTON
TEST. Repair all tear out to match existing, tape and bed and make ready for texture and paint.
25 - LIGHT FIXTURE OVER MIRROR
(Specification ID:0 Estimated Qty:1)
EA
Replace the light fixture with a new UL approved 2-bulb L.E.D. light fixture controlled by the present wall
switch.
Subtotal for -Electrical
Customer:
Contractor:
Prepared By: email@fortworthtexas.gov on 0110112024
NNeighborly Software
ATTACHMENT B
SAMPLE JOB ORDER/WORK WRITE-UP
General and Carpentry Quantity Units Total
26 - FLOOR ASSEMBLY —BATHROOM 44 SQ
(Specification ID: 0 Estimated Qty: 44)
Remove all fixtures not built-in. Remove floor covering and old subfloor underlayment. Replace sub floor
and any bad joists to restore floor to sound and level condition. Replace any sewer piping needed. Install
insulation under floor. Install 3/4" underlayment and one-piece vinyl sheet goods. Install I" X 4" molding or
colonial molding against walls at floor painted and caulked. Install threshold. Reinstall fixtures. Check for
leaks. Correct all damage to walls, and fixtures caused by removing/reinstalling.
27 - SHOWER WALL KIT 3 PIECE PLUS SLIDING GLASS DOOR 1 EA
(Specification ID:0 Estimated Qty.• 1)
Install a 3-piece fiberglass or acrylic 36 "pan and 2 sides, shower wall kit - Textured or smooth finish on pan
and walls. Include a shower glass door, two stationary panels on the sides to create a corner walk through, in
chrome, satin or black/bronze finish. Remove old kit and dispose/replace with new according to local code
requirements.
28 - TUB/SHOWER HANDICAP GRAB BAR — SMALL 24" 2 EA
(Specification ID.•0 Estimated Qty:2)
Install tub/shower grab bar per general requirement. Be sure to attach to blocking in the wall. Get homeowner
input on position.
29 - VANITY--36" COMPLETE
(Specification ID:0 Estimated Qty.• 1)
EA
Install a 36" vanity complete with plywood cabinet, cultured marble sink top, faucet, supply risers, shut-off
valves and all required waste connectors to complete the installation. All work to be level, plumb and true.
Seal all holes and openings where pipes, wires, supply lines and any other materials come through cabinet
with a removable material such as "Thumb Gum" to keep out any rodents. Caulk all seams where countertop
meets walls.
Subtotal for -General and Carpentry
Customer:
Contractor:
Prepared By: email@fortworthtexas.gov on 0110112024
NNeighborly Software
ATTACHMENT B
SAMPLE JOB ORDER/WORK WRITE-UP
PLUMBING
30 - NEW COMMODE--REPLACE--1.6 GPF
(Specification ID: 0 Estimated Qty:1)
Quantity Units
VS
Total
Install a 2-piece, close coupled, white, vitreous china, elongated commode with a maximum water usage per
flush of 1.6 Gallons. Include plastic or pressed wood white seat, stainless steel supply line, shut-off valve,
tank parts and wax ring.
Location: Exterior - Al
General and Carpentry MIM Quantity Units Total
31 - TRUWOOD TWELVE 6 COTTAGE LAP WOOD SIDING 88 LF
(Specification ID.•0 Estimated Qty:88)
Remove any old siding and prepare the surface to accept the new siding. Install the siding according to
manufacturer instructions. Lap the siding courses a minimum of I", butt joints should be staggered over
successive courses. Make sure butt joints terminate over a wall stud.
32 - WOOD LUMBER 1X4 (SIDE & HEAD
CASING/WINDOW TRIM)
(Specification ID:0 Estimated Qty:19)
19 LF
Remove the IX4 lumber and prepare the area, removing old rotten pieces, nails etc. to be replaced with the
new IX4 lumber. Caulk the new lumber and prepare to paint.
33 - WOOD LUMBER 2X4 (Window Sill)
(Specification ID.•0 Estimated Qty:9)
9 LF
Remove the 2x4 lumber and prepare the area, removing old rotten pieces, nails etc. to be replaced with the
new 2x4 lumber. Caulk the new lumber and prepare to paint.
Subtotal for -General and Carpentry
Customer:
Contractor:
Prepared By: email@fortworthtexas.gov on 0110112024
NNeighborly Software
ATTACHMENT B
SAMPLE JOB ORDER/WORK WRITE-UP
Location: Exterior - A2
General and Carpentry Quantity Units Total
34 - TRUWOOD TWELVE 6 COTTAGE LAP WOOD SIDING 40 LF
(Specification ID: 0 Estimated Qty: 40)
Remove any old siding and prepare the surface to accept the new siding. Install the siding according to
manufacturer instructions. Lap the siding courses a minimum of 1", butt joints should be staggered over
successive courses. Make sure butt joints terminate over a wall stud.
35 - WOOD LUMBER 1X6 (SIDE & HEAD
CASING/WINDOW TRIM)
(Specification ID: 0 Estimated Qty:13)
13 LF
Remove the 1X6 lumber and prepare the area, removing old rotten pieces, nails etc. to be replaced with the
new1X6 lumber. Caulk the new lumber and prepare for paint.
36 - WOOD LUMBER 2X4 (WINDOW SILL)
(Specification ID: 0 Estimated Qty: 4)
4 LF
Remove the 2x4 lumber and prepare the area, removing old rotten pieces, nails etc. to be replaced with the
new 2x4 lumber. Caulk the new lumber and prepare for paint.
Subtotal for -General and Carpentry
Location: Exterior - B1
General and Carpentry Quantity Units Total
37 - TRUWOOD TWELVE 6 COTTAGE LAP WOOD SIDING 72 LF
(Specification ID: 0 Estimated Qty: 72)
Remove any old siding and prepare the surface to accept the new siding. Install the siding according to
manufacturer instructions. Lap the siding courses a minimum of 1", butt joints should be staggered over
successive courses. Make sure butt joints terminate over a wall stud.
Customer:
Contractor:
Prepared By: email@fortworthtexas.gov on 0110112024
NNeighborly Software
ATTACHMENT B
SAMPLE JOB ORDER/WORK WRITE-UP
Location: Exterior - B2
General and Carpentry Quantity Units Total
38 - TRUWOOD TWELVE 6 COTTAGE LAP WOOD SIDING 117 LF
(Specification ID: 0 Estimated Qty:117)
Remove any old siding and prepare the surface to accept the new siding. Install the siding according to
manufacturer instructions. Lap the siding courses a minimum of 1", butt joints should be staggered over
successive courses. Make sure butt joints terminate over a wall stud.
39 - WOOD LUMBER 1X4 (SIDE & HEAD
CASING/WINDOW TRIM)
(Specification ID: 0 Estimated Qty:1 S)
15 LF
Remove the 1X4 lumber and prepare the area, removing old rotten pieces, nails etc. to be replaced with the
new1X4 lumber. Caulk the new lumber and prepare for paint.
This is for the left hand side of house that has the 1 double window.
40 - WOOD LUMBER 1X6 (SIDE & HEAD
CASING/WINDOW TRIM)
(Specification ID: 0 Estimated Qty:25)
25 LF
Remove the IX6 lumber and prepare the area, removing old rotten pieces, nails etc. to be replaced with the
new1X6 lumber. Caulk the new lumber and prepare for paint.
This is for the two smaller windows
41 - WOOD LUMBER 2X4 (WINDOW SILL)
(Specification ID: 0 Estimated Qty:13)
13 LF
Remove the 2x4 lumber and prepare the area, removing old rotten pieces, nails etc. to be replaced with the
new 2x4 lumber. Caulk the new lumber and prepare for paint.
This is for the left hand side of house that has the 3 windows.
Subtotal for -General and Carpentry
Customer:
Contractor:
Prepared By: email@fortworthtexas.gov on 0110112024
Neighborly Software
ATTACHMENT B
SAMPLE JOB ORDER/WORK WRITE-UP
Location: Exterior - C1
General and Carpentry Quantity Units Total
42 -WOOD LUMBER 1X4 (CORNER TRIM BOARDS) 32 LF
(Specification ID: 0 Estimated Qty: 32)
Remove the 1X4 lumber and prepare the area, removing old rotten pieces, nails etc. to be replaced with the
new1X4 lumber. Caulk the new lumber and prepare for paint.
Two back corners closect to the garage.by door off the bedroom
43 - WOOD SIDING 107
(Specification ID: 0 Estimated Qty: 80)
80 LF
Remove rotten and deteriorated wood siding and replace with new 107 wood siding. Make sure butt joints
terminate over a wall stud. Any butt joints should be staggered over successive courses. Caulk and paint.
Back wall area with the back door off bedroom closest to the garage.
Subtotal for -General and Carpentry
Location: Exterior - C2
[General and Carpentry Quantity Units Total
44 - WOOD LUMBER 1X4 (SIDE & HEAD 10 LF
CASING/WINDOW TRIM)
(Specification ID: 0 Estimated Qty:10)
Remove the 1X4 lumber and prepare the area, removing old rotten pieces, nails etc. to be replaced with the
new1X4 lumber. Caulk the new lumber and prepare for paint.
45 - WOOD LUMBER 2X4 (WINDOW SILL)
(Specification ID: 0 Estimated Qty: 3)
3 LF
Remove the 2x4 lumber and prepare the area, removing old rotten pieces, nails etc. to be replaced with the
new 2x4 lumber. Caulk the new lumber and prepare for paint.
Subtotal for -General and Carpentry
Customer:
Contractor:
Prepared By: email@fortworthtexas.gov on 0110112024
NNeighborly Software
ATTACHMENT B
SAMPLE JOB ORDER/WORK WRITE-UP
Location: Exterior - D1
General and Carpentry
46 - WOOD LUMBER 1X4 (SIDE & HEAD
CASING/WINDOW TRIM)
(Specification ID: 0 Estimated Qty:9)
Quantity Units
I
9 LF
Total
Remove the IX4 lumber and prepare the area, removing old rotten pieces, nails etc. to be replaced with the
new1X4 lumber. Caulk the new lumber and prepare for paint.
47 - WOOD LUMBER 2X4 (WINDOW SILL)
(Specification ID.•0 Estimated Qty:3)
3 LF
Remove the 2x4 lumber and prepare the area, removing old rotten pieces, nails etc. to be replaced with the
new 2x4 lumber. Caulk the new lumber and prepare for paint.
Location: Exterior - D2
General and Carpentry
48 - WOOD LUMBER 1X4 (SIDE & HEAD
CASING/WINDOW TRIM)
(Specification ID:0 Estimated Qty:14)
Subtotal for -General and Carpentry
Quantity Units Total
14 LF
Remove the 1X4 lumber and prepare the area, removing old rotten pieces, nails etc. to be replaced with the
new1X4 lumber. Caulk the new lumber and prepare for paint.
49 - WOOD LUMBER 2X4 (WINDOW SILL)
(Specification ID: 0 Estimated Qty: 3)
3 LF
Remove the 2x4 lumber and prepare the area, removing old rotten pieces, nails etc. to be replaced with the
new 2x4 lumber. Caulk the new lumber and prepare for paint.
Subtotal for -General and Carpentry
Customer:
Contractor:
Prepared By: email@fortworthtexas.gov on 0110112024
NNeighborly Software
ATTACHMENT B
SAMPLE JOB ORDER/WORK WRITE-UP
Location: Whole House
Lead Certified & Lead Hazard Reduction Work Quantity Units Total
50 - SET UP INTERIOR LEAD CONTAINMENT
(Specification ID: 0 Estimated Qty:1)
EA
Post job site signage and secure site where work is being performed. Final clean floors, window sills, window
troughs and other areas of dust build-up with a HEPA vacuum. Seal all floors with two continuous layers of 6
milligram polyethylene sheeting 4' beyond door openings with 2" wide, easy release masking tape. Close and
seal HVAC registers with polyethylene sheeting when present. Wrap all built-in furniture, cabinetry and
fixed appliances with polyethylene sheeting and tape to create an airtight seal. Contain entire exterior work
area according to Lead Safe Work Practices.
Customer:
Contractor:
Prepared By: email@fortworthtexas.gov on 0110112024
Neighborly Software
ATTACHMENT B
SAMPLE JOB ORDER/WORK WRITE-UP
Location: General Requirements
General Requirements
51 - GENERAL REQUIREMENTS
(Specification ID.•0 Estimated Qty:)
Quantity Units Total
PLUMBING GENERAL REQUIREMENTS
Unless otherwise specified, all materials shall be pex, pvc or copper. All items shall operate without leakage,
noise, vibration or hammering. All penetration of building components shall be neat, sleeved, & fire stopped.
No solder containing lead shall be used in any pipe or fixture. Damage to structural members from drilling or
notching shall be repaired to the acceptance of the owner and the City of Fort Worth.
CODES AND ORDINANCES
In the execution of the itemized scope of work, the contractor shall facilitate inspection and comply with all
governing codes and ordinances of The City of Fort Worth, The County of Tarrant, and the State of Texas
pertaining to building construction, zoning, environmental protection, energy efficiency and worker safety.
FINAL CLEAN
Remove from site all construction materials, tools and debris. Sweep clean and rake all exterior work areas.
Vacuum all interior work areas, removing all visible dust, stains, labels and tags. Final clean must pass a
visible clearance inspection and in some cases a dust wipe laboratory tested lead clearance.
1 YEAR WARRANTY
Contractor shall remedy any defect due to faulty material or workmanship and pay for all damage to other
work resulting therefrom, which appear within one year from final payment. Further, contractor shall furnish
owner with all manufacturers' and suppliers' written warranties covering items furnished under this contract
prior to release of the final payment.
GRAB BAR --GENERAL REQUIREMENTS
Install the bar on the frame wall so it is secured tightly to studs. If studs cannot be located, open the wall,
install blocking and repair wall to original condition. Installation must be capable of withstanding stress and
weight of a person pulling him/herself up. Install all stainless steel, 18 gauge, 1 1/4" outside diameter as made
by Tubular Specialties Manufacturing Inc. or equal.
FLOOR COVER -GENERAL REQUIREMENTS
Unless otherwise specified, all materials shall be new and shall match existing as to size, style, color and
method of installation. All subfloors and underlayment shall be well secured, dry, clean, level, and free of
cracks, depressions, voids, bumps and squeaks before installation of finish floor covering of vinyl or ceramic
tile.
Customer:
Contractor:
Prepared By: email@fortworthtexas.gov on 0110112024
NNeighborly Software
ATTACHMENT B
SAMPLE JOB ORDER/WORK WRITE-UP
Location: Permits
BUILDING Quantity Units L Total
52 - PERMITS REQUIRED -BUILDING 1 EA
(Specification ID: 0 Estimated Qty:1)
The contractor shall apply for, pay for, obtain and forward copies of the following indicated permits to the
City of Fort Worth upon completion of the job.
Plumbing_ HVAC Electric Building _x_ _
PLUMBING , Quantity Units Total
53 - PERMITS REQUIRED -PLUMBING 1 EA
(Specification ID:0 Estimated Qty:1)
The contractor shall apply for, pay for, obtain and forward copies of the following indicated permits to the
City of Fort Worth upon completion of the job.
Plumbing _X_ HVAC Electric Building
Customer:
Contractor:
Prepared By: email@fortworthtexas.gov on 0110112024
NNeighborly Software
ATTACHMENT B
SAMPLE WORK ORDER/JOB ORDER
OWNER ACCEPTS SCOPE OF WORK
I have read the contents of this work write up and received a copy. I fully understand the repairs to be made to
my property.
x
Owner:
Date
CONTRACTOR ACCEPTS SCOPE OF WORK
I have read the contents of this work write up and agree to perform all work called for in accordance with the
bid submitted on
x
Contractor
x
Date
Construction Specialist Date
Customer:
Contractor:
Prepared By: email@fortworthtexas.gov on 0110112024
NNeighborly Software
APPROVED BID PRICE WORKSHEETS GO HERE
Customer:
Contractor:
Prepared By: email@fortworthtexas.gov on 0110112024
NNeighborly Software
Responses
Success: All data is valid!
General Construction & Carpentry
N= -
Success: All values provided #1-1 Carpentry rate per hour
Carpentry
services and
related work not
specified or
mentioned under
the bid contract:
Note: Rate shall
Hour
1
include trip
charge, travel
time, mileage,
transportation
cost and parking
fees
Bore under
sidewalk to run
Success: All values provided #1-2 Boring under sidewalk new water supply Linear Foot
line from city
water meter to
the unit
Bore under
driveway to run
Success: All values provided
#1-3
Boring under driveway
newter upply
linee from city
ty
water meter to
the unit
Cut, remove and
Success: All values provided
#1-4
Cut Concrete driveway
replace driveway
with rebar and
concrete
Cut, remove and
Success: All values provided
#1-5
Cut Concrete sidewalk
replace sidewalk
with rebar and
concrete
Cut, remove and
Success: All values provided
#1-6
Concrete slab -cut, remove replace
replace concrete
,
slab with rebar
and concrete
Including caulk
and paint
Success: All values provided #1-7 Replace / install plywood shelving
II
Numeric I Numeric
$0.00 $81.25
$50.00
$0.00 $81.25 $81.25
$187.50 $ 50.00 $ 187.50 $ 237.50
Linear Foot
1
$50.00
$187.50
$ 50.00
$ 187.50
$ 237.50
Square Foot
1
$4.50
$8.13
$ 4.50
$ 8.13
$ 12.63
Square Foot
1
$4.50
$8.13
$ 4.50
$ 8.13
$ 12.63
Square Foot
1
$4.50
$12.25
$ 4.50
$ 12.25
$ 16.75
Linear Foot
1
$3.50
$6.25
$ 3.50
$ 6.25
$ 9.75
Success: All values provided #1-8
Success: All values provided #1-9
Success: All values provided #1-10
Drywall 1/2" board
Drywall texture
Prime & Paint Interior Drywall
Hang, tape and
bed with 3 coats
finish 1/2"
drywall. Apply a
3/8 bead of
adhesive to each
framing member
and screw or nail Square Foot 1
8"on center. Run
boards with long
dimension
horizontal. Wet
sand ready for
paint, excludes
application of
texture
Match the texture
in the room or
area as close as
possible to the
surrounding
texture in that
area where
drywall was
replaced on wall
or ceiling. This Square Foot 1
includes all
styles. Popcorn,
Orange Peel,
Splatter
Drag/Knockdown,
Slap Brush, Sand
Swirl, Comb and
Slap Brush
Knockdown
Set up the interior
room to protect
paint from
damaging any
other surfaces in
the room. Prime
and paint the Square Foot 1
entire surface to
cover. Use a
stain blocker if
necessary to
cover any spots
visible after
painting
$3.25 $5.31 $ 3.25 $ 5.31 $ 8.56
$1.85
$2.81
$ 1.85
$ 2.81
$ 4.66
$2.25
$5.63
$ 2.25
$ 5.63
$ 7.88
fixtures not built-
in. Remove floor
covering and old
subfloor. Replace
sub floor and any
bad joists to
restore floor to
sound and level
condition.
Replace any
sewer piping
needed. Install
Success: All values provided
#1-11
Floor assembly 3/4" subfloor remove/replace
insulation under
Square Foot
floor. Install 3/4"
underlayment
and one piece
vinyl sheet
goods. Install 1" X
4" molding or
colonial molding
against walls at
floor painted and
caulked. Install
threshold.
Reinstall fixtures.
Check for leaks.
r r oar �u
Includes door
hardware, knobs,
Success: All values provided
#1-12
Install pre -hung interior door 18"
locks etc., finish
Each
trim around door
inside and out
and caulk
Includes door
hardware, knobs,
Success: All values provided
#1-13
Install pre -hung interior door 24"
locks etc., finish
Each
trim around door
inside and out
and caulk
Includes door
hardware, knobs,
Success: All values provided
#1-14
Install pre -hung interior door 30"
locks etc., finish
Each
trim around door
inside and out
and caulk
Includes door
hardware, knobs,
Success: All values provided
#1-15
Install pre -hung interior door 32"
locks etc., finish
Each
trim around door
inside and out
and caulk
Includes door
hardware, knobs,
Success: All values provided
#1-16
Install pre -hung interior door 36"
locks etc., finish
Each
trim around door
inside and out
and caulk
1 1 $45.00 1 $37.50 1 $ 45.00 1 $ 37.50 1 $ 82.50
1 $250.00 $200.00 $ 250.00 $ 200.00 $ 450.00
1 1 $250.00 1 $200.00 1 $ 250.00 1 $ 200.00 1 $ 450.00
1 $250.00 $200.00 $ 250.00 $ 200.00 $ 450.00
1 1 $250.00 1 $200.00 1 $ 250.00 1 $ 200.00 1 $ 450.00
1 $250.00 $200.00 $ 250.00 $ 200.00 $ 450.00
This includes all
hardware, door
knob, dead bolt,
hinges etc. Also
Success: All values provided
#1-17
Install new exterior door pre -hung 32" wood
includes all wood
Each
trim on inside and
outside and paint
and caulking to
complete finished
product
This includes all
hardware, door
knob, dead bolt,
hinges etc. Also
Success: All values provided
#1-18
Install new exterior door pre -hung 36" wood
includes all wood
Each
trim on inside and
outside and paint
and caulking to
complete finished
product
This includes all
hardware, door
knob, dead bolt,
hinges etc. Also
Success: All values provided
#1-19
Install new exterior door pre -hung 32" metal
includes all wood
Each
trim on inside and
outside and paint
and caulking to
complete finished
product
This includes all
hardware, door
knob, dead bolt,
hinges etc. Also
Success: All values provided
#1-20
Install new exterior door pre -hung 36" metal
includes all wood
Each
trim on inside and
outside and paint
and caulking to
complete finished
product
This includes all
hardware, door
knob, dead bolt,
hinges etc. Also
Success: All values provided
#1-21
Remove and replace interior doorjamb
includes all wood
Each
trim on inside and
outside and paint
and caulking to
complete finished
product
This includes all
hardware, door
knob, dead bolt,
hinges etc. Also
Success: All values provided
#1-22
Remove and replace exterior doorjamb
includes all wood
Each
trim on inside and
outside and paint
and caulking to
complete finished
product
1 $1,800.00 $812.50 $ 1,800.00 $ 812.50 $ 2,612.50
1 $2,100.00 $812.50 $ 2,100.00 $ 812.50 $ 2,912.50
1 $1,500.00 $812.50 $ 1,500.00 $ 812.50 $ 2,312.50
1 $1,800.00 $812.50 $ 1,800.00 $ 812.50 $ 2,612.50
1 $322.00 $250.00 1 $ 322.00 1 $ 250.00 1 $ 572.00
1 $350.00 $250.00 $ 350.00 $ 250.00 $ 600.00
Use a metal
threshold cut to
Success: All values provided
#1-23
Replace threshold
proper length andnailed
Each
150.00
$156.25
$ 150.00
$ 156.25
$ 306.25
into place
with no gaps on
each side
Success: All values provided
#1-24
Remove and replace baseboard up to 4"
Including caulk
Linear Foot 1
$3.50
$8.13
$ 3.50
$ 8.13
$ 11.63
and paint
Success: All values provided
#1-25
Remove and replace baseboard 6"
Including caulk
Linear Foot 1
$3.50
$8.13
$ 3.50
$ 8.13
$ 11.63
and paint
Success: All values provided
#1-26
Paint baseboard
Including caulk
Linear Foot 1
$2.25
$4.06
$ 2.25
$ 4.06
$ 6.31
and paint
Remove and
replace window
Success: All values provided
#1-27
Remove and replace vinyl windows per U.I.
unit according to
United Inch
1.75
$3.19
$ 1.75
$ 3.19
$ 4.94
manufacturer and
industry
standards
Remove and
replace window
Success: All values provided
#1-28
Remove and replace matching wood windows
unit according to
United Inch
4.00
$6.38
$ 4.00
$ 6.38
$ 10.38
manufacturer and
industry
standards
Remove and
replace window
Remove and replace window unit with safety
unit according to
Success: All values provided
#1-29
glass
manufacturer and
United Inch
2.00
$3.44
$ 2.00
$ 3.44
$ 5.44
industry
standards
Includes caulking,
Success: All values provided
#1-30
Remove and install window sill interior
prime and paint
Each
100.00
$156.25
$ 100.00
$ 156.25
$ 256.25
application
Includes caulking,
Success: All values provided
#1-31
Remove and install window sill exterior
prime and paint
Each
150.00
$156.25
$ 150.00
$ 156.25
$ 306.25
application
according to
Success: All values provided
#1-32
Remove and replace storm windows
manufacturer
Each
440.00
$531.25
$ 440.00
$ 531.25
$ 971.25
recommendation
Includes caulking,
Success: All values provided
#1-33
Replace door trim
prime and paint
Each
70.00
$125.00
$ 70.00
$ 125.00
$ 195.00
application
Includes caulking,
Success: All values provided
#1-34
Remove and replace wood siding
prime and paint
Linear Foot 1
$7.00
$13.75
$ 7.00
$ 13.75
$ 20.75
application
Includes caulking,
Success: All values provided
#1-35
Remove and replace cementitious fiber siding
prime and paint
Each
6.00
$12.50
$ 6.00
$ 12.50
$ 18.50
application
Remove, replace,
Success: All values provided
#1-36
Install vinyl siding
caulk, prime and
Linear Foot 1
$4.45
$5.63
$ 4.45
$ 5.63
$ 10.08
paint
Remove, replace,
Success: All values provided
#1-37
Replace wood trim up to 1x4
caulk, prime and
Linear Foot 1
$5.50
$5.94
$ 5.50
$ 5.94
$ 11.44
paint
Remove, replace,
Success: All values provided
#1-38
Replace wood trim 1x6
caulk, prime and
Linear Foot
paint
Remove and
replace flooring
Success: All values provided
#1-39
Remove deteriorated flooring on porch
according to
Square Foot
manufacturer
Basket Total
recommendation
S.
Lumber
Install/Remove,
All values provided
#2-1
Lumber 1x2
replace, caulk,
Linear Foot
prime and paint
,Success:
Install/Remove,
Success: All values provided
#2-2
Lumber 1x4
replace, caulk,
Linear Foot
prime and paint
Install/Remove,
Success: All values provided
#2-3
Lumber 1x6
replace, caulk,
Linear Foot
prime and paint
Install/Remove,
Success: All values provided
#2-4
Lumber US
replace, caulk,
Linear Foot
prime and paint
Install/Remove,
Success: All values provided
#2-5
Lumber 1x10
replace, caulk,
Linear Foot
prime and paint
Install/Remove,
Success: All values provided
#2-6
Lumber 1x12
replace, caulk,
Linear Foot
prime and paint
Install/Remove,
Success: All values provided
#2-7
Lumber 2x4
replace, caulk,
Linear Foot
prime and paint
Install/Remove,
Success: All values provided
#2-8
Lumber 2x6
replace, caulk,
Linear Foot
prime and paint
Install/Remove,
Success: All values provided
#2-9
Lumber 2x8
replace, caulk,
Linear Foot
prime and paint
Install/Remove,
Success: All values provided
#2-10
Lumber 2x10
replace, caulk,
Linear Foot
prime and paint
Install/Remove,
Success: All values provided
#2-11
Lumber 2x12
replace, caulk,
Linear Foot
prime and paint
Includes caulking
Success: All values provided
#2-12
Replace door trim
and paint
Linear Foot
application
Install/Remove,
Success: All values provided
#2-13
Wood siding 105
replace, caulk,
Linear Foot
prime and paint
1 $6.50 $5.94 $ 6.50 $ 5.94 $ 12.44
1 $15.00 $19.38 $ 15.00 $ 19.38 $ 34.38
$ 10,262.80 $ 6,513.69 $ 16,776.49
1 $1.05
$3.94
$1.05
$3.94
$4.99
1 $ 1.62
$ 6.08
$ 1.62
$ 6.08
$ 7.70
1 $ 1.40
$ 5.25
$ 1.40
$ 5.25
$ 6.65
1 $ 1.70
$ 4.25
$ 1.70
$ 4.25
$ 5.95
1 $ 1.95
$ 4.88
$ 1.95
$ 4.88
$ 6.83
1 $2.40
$6.00
$2.40
$6.00
$8.40
1 $ 1.22
$ 4.58
$ 1.22
$ 4.58
$ 5.80
1 $1.35
$5.06
$1.35
$5.06
$6.41
1 $ 1.50
$ 5.63
$ 1.50
$ 5.63
$ 7.13
1 $1.55
$5.81
$1.55
$5.81
$7.36
1 $2.44
$6.10
$2.44
$6.10
$8.54
1 $ 2.50
$ 6.25
$ 2.50
$ 6.25
$ 8.75
1 $ 6.50
$ 5.00
$ 6.50
$ 5.00
$ 11.50
Success: All values providec
Success: All values providec
Success: All values providec
Success: All values providec
Success: All values providec
Success: All values providec
Success: All values providec
Success: All values providec
Success: All values providec
Success: All values providec
Success: All values providec
Success: All values providec
Success: All values providec
Success: All values providec
Success: All values providec
Install/Remove,
#2-14 Wood siding 107 replace, caulk,
Linear Foot
1
$ 6.50
$ 5.00
$ 6.50
$ 5.00
$ 11.50
prime and paint
Install/Remove,
#2-15 Wood siding 117 replace, caulk,
Linear Foot
1
$ 6.50
$ 5.00
$ 6.50
$ 5.00
$ 11.50
prime and paint
Install/Remove,
#2-16 TruWood Twelve 6 Cottage Lap Wood Siding replace, caulk,
Linear Foot
1
$ 13.50
$ 5.00
$ 13.50
$ 5.00
$ 18.50
prime and paint
Install/Remove,
#2-17 TruWood Twelve 4 Cottage Lap Wood Siding replace, caulk,
Linear Foot
1
$ 13.50
$ 5.00
$ 13.50
$ 5.00
$ 18.50
prime and paint
Install/Remove,
#2-18 1/2" plywood replace, caulk,
Square Foot
1
$ 1.58
$ 3.95
$ 1.58
$ 3.95
$ 5.53
prime and paint
Install/Remove,
#2-19 3/4" plywood replace, caulk,
Square Foot
1
$ 1.10
$ 4.50
$ 1.10
$ 4.50
$ 5.60
prime and paint
Install/Remove,
#2-20
1/2" OSB
replace, caulk,
Square Foot
1
$ 1.62
$ 6.08
$ 1.62
$ 6.08
$ 7.70
prime and paint
Install/Remove,
#2-21
Replace vinyl Soffit
replace, caulk,
Linear Foot
1
$ 2.25
$ 3.75
$ 2.25
$ 3.75
$ 6.00
prime and paint
Install/Remove,
#2-22
Replace wood soffit
replace, caulk,
Square Foot
1
$ 2.50
$ 3.75
$ 2.50
$ 3.75
$ 6.25
prime and paint
Primer and
#2-23
Kilz Primer and Sealer 13oz can
sealer, brand:
Each
1
$ 11.89
$ 0.00
$ 11.89
$ 0.00
$ 11.89
Kilz (13 oz. can)
Install and secure
according to
manufacturer
#2-24 4"x 4" treated wooden porch posts recommendation
Each
1
$ 18.00
$ 118.75
$ 18.00
$ 118.75
$ 136.75
s. Including
painting of posts
where applicable
Install and secure
according to
manufacturer
#2-25 4"x 6" treated wooden porch posts recommendation
Each
1
$ 45.00
$ 118.75
$ 45.00
$ 118.75
$ 163.75
s. Including
painting of posts
where applicable
Install and secure
#2-26 Remove and replace burglar bars according to
manufacturer
Each
1
$ 300.00
$ 562.50
$ 300.00
$ 562.50
$ 862.50
recommendation
Remove, replace,
#2-27 Replace all exterior window trim per If caulk, prime and
Linear Foot
1
$ 6.00
$ 5.63
$ 6.00
$ 5.63
$ 11.63
paint
Remove and
replace new
#2-28 Remove and install wooden screen door wooden screen
door per
Each
1
$ 150.00
$ 112.50
$ 150.00
$ 112.50
$ 262.50
manufacturer
recommendation
Replace all of the
drain lines
including the p-
Replace dual kitchen sink drain lines under
trap under the
Success: All values provided
#2-29
sink from wall
Each
cabinet
stub out to the
sink fixture with
all new PVC drain
lines and p-trap
Remove all of the
furniture in room
Success: All values provided
#2-30
Moving and covering furniture
being worked in
Hour
or cover wrap
and tape securely
with plastic
Upgrade the
existing water
heater closet.
This will include
Success: All values provided
#2-31
Modify combustion closet to be sealed
hi/low venting,
Each
weather stripping
and sealing the
door (include
door hardware
Where necessary)
Construct new
exterior
combustion
closet to house
water heater
Success: All values provided
#2-32
Construct new water heater closet outside
according to local
Each
code
requirements.
Will include
weather stripping
and hi/low vents if
required by code
Remove the
shingle siding on
the wall above
the roof in order
to replace the
step flashing.
After installing the
step flashing
replace the
shingle siding so
Success: All values provided
#2-33
Cementous shingle siding remove and replace
the step flashing
Each
is covered on the
wall. Install the
roof shingles and
then run a bead
of sealant the
entire length
where the roof
deck butts into
the wall to
prevent any water
penetration
1 $ 150.00 $ 375.00 $ 150.00 $ 375.00 $ 525.00
1 $ 150.00 $ 93.75 $ 150.00 $ 93.75 $ 243.75
$ 400.00 $ 750.00 $ 400.00 1 $ 750.00 $ 1,150.00
1 $ 1,000.00 $ 1,875.00 $ 1,000.00 $ 1,875.00 $ 2,875.00
1 1 $ 1,000.00 1 $ 1,875.00 1 $ 1,000.00 1 $ 1,875.00 $ 2,875.00
Success: All values provided #2-34
Access Cover
Success: All values provided #3-1
Success: All values provided #3-2
Remove the
siding on the wall
above the roof in
order to replace
the step flashing.
After installing the
step flashing
replace the siding
so the step
flashing is
Siding removal and replacement covered on the Linear Foot 1 $ 5.00
wall. Install the
roof shingles and
then run a bead
of sealant the
entire length
where the roof
deck butts into
the wall to
prevent any water
enetration
New attic access
New hinged knee wall door
Create an attic
access — new,
where none
previously
existed (install in
closet where
possible) Install
painted wood trim
for a finished
appearance for
new access. 3/4"
plywood painted
panel; to include
insulation barrier,
eye hooks,
weather-stripping
and R-30 or
greater foam
insulation
previouslyv
existed (install
out of the way
area) Install
painted wood trim
for a finished
appearance %"
plywood panel, 2
hinges, 1 barrel
bolt, weather-
stripping and R-
30 or greater
$ 6.88 $ 5.00 $ 6.88 S 11.88
$ 3,312.12 $ 6,004.59 $ 9,316.71
Each 750.00 $1,500.00 $ 750.00 $ 1,500.00 $ 2,250.00
Each 750.00 $1,250.00 $ 750.00 $ 1,250.00 $ 2,000.00
Success: All values provided #3-3
Success: All values provided #3-4
Success: All values provided #3-5
Success: All values provided #3-6
Success: All values provided #3-7
Install crawlspace
access — new,
where none
existed
previously''/<"
treated plywood,
New Crawlspace Access
2x4 treated
Each
1
lumber for
framing, 2 zinc
barrel bolts,
weather stripping,
R-19 or foam
insulation
Install new attic
access panel only
Attic access panel only 3/4" plywood
3/4" inch plywood
Each
1
primed white with
R-30 or greater
foam insulation
Improve existing
attic or
crawlspace
access panel by
adding weather -
Improve existing attic access
stripping and R-
Each
1
30 or greater
foam insulation,
stops, eye hooks
and weather
stripping
Use 2"x 4" pine
_
lumber to build an
attic stairway
opening where
none existed
which includes
installing a new
Frame attic stairway opening to include attic
aluminum attic
stairs.
ladder. Include
the 1 "x 4" wood
Each
1
trim around the
stairway door
opening caulked
and painted,
install weather
stripping around
door.
Install a new attic
ladder to existing
opening including
the 1 "x 4" wood
trim on ceiling
Pull down aluminum attic stairs fits 8-10-foot
around the
ceiling height
stairwayopening,
Each
1
trim should be
caulked and
painted, and
weather stripping
installed around
door opening.
$600.00
$1,000.00
$ 600.00
$ 1,000.00
$ 1,600.00
$250.00
$437.50
$ 250.00
$ 437.50
$ 687.50
$200.00 $312.50 $ 200.00 $ 312.50
$ 512.50
$750.00 1 $1,500.00 $ 750.00 $ 1,500.00 $ 2,250.00
$550.00 $937.50 $ 550.00 $ 937.50 $ 1,487.50
Success: All values provided #3-8
Basket Total
Pest Control
Success: All values provided
#4-1
Success: All values provided
#4-2
Success: All values provided
#4-3
Tree Services
Success: All values provided #5-1
Success: All values provided #5-2
access box —
new, where none
previously
existed Install
3/4" plywood
painted panel; to
Attic access box for pull downstairs include insulation Each
barrier, eye
hooks, handle,
weather-stripping,
lumber for
framing and R-30
or greater foam
1 $750.00 $937.50 $ 750.00 $ 937.50 $ 1,687.50
im$ 4,600.00 $ 7,875.00 $ 12,475.00
Spray house
Spray house
Each 1
$ 75.00
$ 156.25
$ 75.00
$ 156.25
$ 231.25
Bed Bug Treatment
Bed Bug
Each 1
$ 350.00
$ 312.50
$ 350.00
$ 312.50
$ 662.50
Treatment
Termite Treatment
Termite
Treatment
Each 1
$ 900.00
$ 1,000.00
$ 900.00
$ 1,000.00
$ 1,900.00
'
JMJ$11,168
.75
$ 2,793.75
Remove larger trees
Remove larger
Yard 1
$ 78.00
$ 231.25
$ 78.00
$ 231.25
$ 309.25
trees
Seamless
Gutter Installations
Seamless Gutter
Linear Foot 1
$ 3.50
$ 3.13
$ 3.50
$ 3.13
$ 6.63
Installations
$ 31.50
$ 19,581.42
$ 22,096.40
$ 41,677.82
Responses
Success: All data is valid!
Bathroom
W,
Success: All values provided #1-1
Success: All values provided #1-2
Numeric I Numeric
50 SF of floor
surface. Remove
all fixtures not
built-in. Remove
floor covering and
old subfloor
underlayment.
Replace sub floor
and any bad
joists to restore
floor to sound
and level
Complete bathroom upgrade condition. Each 1 $9,500.00 $10,625.00 $ 9,500.00 $ 10,625.00 $ 20,125.00
Replace any
sewer piping
needed. Install
insulation under
floor. Install 3/4"
underlayment
and one-piece
vinyl sheet
goods. Install 1" X
4" molding or
colonial molding
against walls at
floor painted and
Fiberglass tub & wall kit Fiberglass tub & Each 1 $1,800.00 $1,500.00 $ 1,800.00 $ 1,500.00 $ 3,300.00
wall kit
Success: All values provided #1-3
Success: All values provided #1-4
Success: All values provided #1-5
Fiberglass shower wall kit
Handicap accessible shower stall
Sliding glass shower door
fiberglass or
acrylic 36 "pan
and 2 sides,
shower wall kit -
Textured or
smooth finish on
pan and walls.
Install trim to
match around top
of surround.
Caulk all joints
with white,
mildew resistant
silicone caulk.
Include a shower
glass door, two
stationary panels
on the sides to
create a corner
walk through, in
chrome, satin or
black/bronze
finish. Remove
old kit and
dispose then
replace with new
nrv1— fn 1-1
Install a 60"x36"
fiberglass shower
stall including
PVC waste,
molded base,
metal shower
diverter, shower
rod and shower
head (handicap
shower head
were applicable)
Install a framed
sliding glass
shower door kit in
chrome or satin
finish. Glass to be
clear or frosted,
smooth or
pebbled glass
finish, get
1 $2,500.00
$ 3,625.00 $ 6,125.00
Each 1 $3,650.00 $4,125.00 $ 3,650.00 $ 4,125.00 $ 7,775.00
1 $1,000.00 $600.00 $ 1,000.00 $ 600.00
$ 1,600.00
Install a 18"
vanity complete
with plywood
cabinet, cultured
marble sink top,
faucet, supply
risers, shut-off
valves and all
required waste
Remove and replace bathroom vanity base
connectors to
Success: All values provided #1-6 wlsink 18"
complete the
installation. All
work to be level,
plumb and true.
Seal all holes and
openings (pipes,
wires, supply
lines, etc.). Caulk
all seams where
countertop meets
walls
Install a 24"
vanity complete
with plywood
cabinet, cultured
marble sink top,
faucet, supply
risers, shut-off
valves and all
required waste
Remove and replace bathroom vanity base
connectors to
Success: All values provided #1-7 wlsink 24"
complete the
installation. All
work to be level,
plumb and true.
Seal all holes and
openings (pipes,
wires, supply
lines, etc.). Caulk
all seams where
countertop meets
walls
Install a 30"
vanity complete
with plywood
cabinet, cultured
marble sink top,
faucet, supply
risers, shut-off
valves and all
required waste
Remove and replace bathroom vanity base
connectors to
Success: All values provided #1-8 wlsink 30"
complete the
installation. All
work to be level,
plumb and true.
Seal all holes and
openings (pipes,
wires, supply
lines, etc.). Caulk
all seams where
countertop meets
walls
Each 1 $260.00 $600.00 $ 260.00 $ 600.00 $ 860.00
Each 1 $300.00 $600.00 $ 300.00 $ 600.00 $ 900.00
Each 1 $469.00 $600.00 $ 469.00 $ 600.00 $ 1,069.00
Install a 36"
vanity complete
with plywood
cabinet, cultured
marble sink top,
faucet, supply
risers, shut-off
valves and all
required waste
Remove and replace bathroom vanity base
connectors to
Success: All values provided
#1-9
complete the
Each
w/sink 36"
installation. All
work to be level,
plumb and true.
Seal all holes and
openings (pipes,
wires, supply
lines, etc.). Caulk
all seams where
countertop meets
walls
Install a 48"
vanity complete
with plywood
cabinet, cultured
marble sink top,
faucet, supply
risers, shut-off
valves and all
required waste
Remove and replace bathroom vanity base
connectors to
Success: All values provided
#1-10
complete the
Each
w/sink 48'
installation. All
work to be level,
plumb and true.
Seal all holes and
openings (pipes,
wires, supply
lines, etc.). Caulk
all seams where
countertop meets
walls
_
Remove and
reinstall the
Success: All values provided
#1-11
Remove and remount same bath sink
bathroom sink to
Each
perform work on
the floor
Remove the old
pedestal sink and
install the new
Success: All values provided
#1-12
Install new Pedestal bathroom sink
pedestal sink,
Each
new drain lines,
supply lines and
shut off valves
Remove the old
wall sink and
install new wall
Success: All values provided
#1-13
Install new wall hung sink
sink with new
Each
drain lines,
supply lines and
shut off valves
1 $649.00 $600.00 $ 649.00 $ 600.00 $ 1,249.00
1 $699.00 $600.00 $ 699.00 $ 600.00 $ 1,299.00
1 $50.00 $250.00 $ 50.00 $ 250.00 $ 300.00
1 $260.00 $250.00 $ 260.00 $ 250.00 $ 510.00
1 $360.00 $250.00 $ 360.00 $ 250.00 $ 610.00
Install new sink
top including
bowl, includes
Remove and replace damaged bathroom sink
caulking and
Success: All values provided
#1-14
top including bowl.
reinstalling all
Linear Foot
drain lines, faucet
etc. Labor
included
Hang, tape and
bed with 3 coats
finish 1/2"
drywall. Apply a
3/8" bead of
adhesive to each
framing member
Success: All values provided
#1-15
Drywall 1/2" green board
and screw or nail
Square Foot
8"on center. Run
boards with long
dimension
horizontal. Wet
sand ready for
paint, excludes
application of
texture
Install cement
backer board to
all tub/shower
walls; break/cut
each piece to end
over a wall stud
Success: All values provided
#1-16
Cement backer board 1/2"
so all edges are
Square Foot
secure. Install
using the
manufacturer's
approved
adhesive or
fasteners
Install fiberglass
reinforced board
(FRP) to
tub/shower area,
prepare substrate
surface and
install using the
manufacturer's
approved
Success: All values provided
#1-17
FRP board
adhesive and
Square Foot
trim. Carefully fit
around all faucet
components.
Clean all surfaces
and caulk all
seams and
penetrations with
one continuous
bead of 100
silicone caulk
1 $9.00
0
0
$4.50
$3.25
$11.88
$5.31
$5.31
$ 9.00
$ 4.50
$ 3.25
$ 11.88 $ 20.88
$ 5.31
$ 5.31
$ 9.81
$ 8.56
1 $10.50 $22.50 $ 10.50 $ 22.50 $ 33.00
Success: All values provided #1-18 Install handicap grab bar 24"
Success: All values provided #1-19 Install handicap grab bar 36"
Success: All values provided #1-20 Replace bathroom wall tile
Success: All values provided #1-21 Remove ceramic wall tile
Success: All values provided #1-22 Gas flexible supply lines
Success: All values provided #1-23 Bonding and grounding -water
the frame wall so
it is secured
tightly to studs.
Installation must
be capable of
withstanding
stress and weight Each 1 $40.00 $187.50
of a person
pulling
him/herself up.
Install all
stainless steel, 18
gauge, 1 1/4"
the frame wall so
it is secured
tightly to studs.
Installation must
be capable of
withstanding
stress and weight Each 1 $60.00 $187.50
of a person
pulling
him/herself up.
Install all
stainless steel, 18
gauge, 1 1/4"
Including
adhesive,
grouting and any
damaged Square Foot 1 $5.00 $10.00
materials
resulting from
replacement
Including
adhesive,
grouting and any
damaged Square Foot 1 $3.50 $6.25
materials
resulting from
replacement
Install an epoxy
coated, flexible
metal gas line
with brass Each 1 $35.00 $687.50
compression
fittings from gas
stop valve to
appliance
Install adequate
electric/water
service grounding
per the current
National Electric
Code. Run 10 LF
of copper pipe in Each 1 $175.00 $312.50
the supply trench
and ground wire
per Code when
bonding PEX
water lines to
ground
$ 40.00 $ 187.50 $ 227.50
$ 60.00 $ 187.50 $ 247.50
$ 5.00
$ 10.00
$ 15.00
$3.50
$6.25
$9.75
$ 35.00
$ 687.50
$ 722.50
$ 175.00
$ 312.50
Chrome -finished
faucet with pop-
up assembly and
drain. Include
shutoff valves
Success: All values provided
#1-24
Install bathroom sink faucet single handle lever
and flex braided
Each
stainless supply
lines. Test for
leaks on valves,
drain and supply
lines
Install high/low
vent tubing in the
water heater
closet. The high
provided
Success: All values p
#1-25
Install Hi-Lo venting
gin combustion closet
tubing vent will
Each
extend 12" into
closet from the
ceiling and the
low vent tubing to
12" off floor
Includes new
Success: All values provided
#1-26
Replace washing machine bibs and drain box
bibs, drain box
Each
and face plate
Includes all parts,
plumbers putty to
Success: All values provided
#1-27
Strainer basket for bath sink (1)
make a water
Each
tight seal and
labor included
Cut and remove
wall tile and
Success: All values provided
#1-28
Cut and remove wall the
drywall in the
Square Foot
bath tub area to
access shower
Basket Total
diverter
Bathroom Exhaust Fans
90.00 $187.50 $ 90.00 $ 187.50 $ 277.50
250.00 $625.00 $ 250.00 $ 625.00 $ 875.00
200.00
1 $375.00
$ 200.00
$ 375.00
$ 575.00
15.00
1 $31.25
I $ 15.00
$ 31.25
$ 46.25
1 $3.50 $6.25 $ 3.50 $ 6.25 $ 9.75
$ 22,401.25 $ 26,886.25 $ 22,401.25 $ 26,886.25 $ 49,287.50
venuiaung ran
shall be of the
ceiling mount,
ENERGY STAR
rated type, with
no less than (see
below for size)
CFM and no
more than (see
below for size)
some as certified
by the Home
Ventilating
Success: All values provided
#2-1
Bathroom Exhaust Fans
Institute (HVI).
N/A 1
$220.00
$156.25
$ 220.00
$ 156.25
$ 376.25
The motor shall
be totally
enclosed, four
pole condenser
types engineered
to run
continuously.
Power rating shall
be 120v/60Hz.
Duct diameter
shall be no less
than (see below).
Fan shall be UL
ri a fi-d
-.
No greater than 3
Success: All values provided
#2-2
Ventilation exhaust fan 50cfm
Sones: Duct size:
Each 1
$135.00
$156.25
$ 135.00
$ 156.25
$ 291.25
4"
No greater than 3
Success: All values provided
#2-3
Ventilation exhaust fan 70cfm
Sones: Duct size:
Each 1
$155.00
$156.25
$ 155.00
$ 156.25
$ 311.25
4"
No greater than 3
Success: All values provided
#2-4
Ventilation exhaust fan 100cfm
Sones: Duct size:
Each 1
$215.00
$156.25
$ 215.00
$ 156.25
$ 371.25
4"
No greater than 3
Success: All values provided
#2-5
Ventilation exhaust fan 150cfm
Sones: Duct size:
Each 1
$220.00
$156.25
$ 220.00
$ 156.25
$ 376.25
4"
Install rigid
ducking and
Success: All values provided
#2-6
Rigid ducting per foot
make sure there
Linear Foot
18.00
$50.00
$ 18.00
$ 50.00
$ 68.00
are no gaps or
leaks
The
SmartExhaust-
(must use this
brand) is a bath
fan and light
switch that also
Success: All values provided
#2-7
SmartExhaustT" switch
serves as a
Each 1
$150.00
$312.50
$ 150.00
$ 312.50
$ 462.50
ventilation
controller and fan
delay timer. For
use with
ASHRAE 62.2
compliant fans
Basket Total
$ 1,113.00
$ 1,143.75
$ 1,113.00
$ 1,143.75
$ 2,256.75
$ 23,514.25 $ 28,030.00 $ 23,514.25 $ 28,030.00 $ 51,544.25
Responses
Success: All data is valid!
Flooring
Install a one-
piece vinyl floor
covering. Clean
floor before
installation to
insure there are
no air pockets,
bubbles, ridges or
voids when floor
covering is
Success: All values provided #1-1 Install flooring vinyl sheet finished. Install Square Foot 1
according to
manufacturer
recommendations
and insure
adhesion of vinyl
flooring to the sub
floor. Make sure
there are no gaps
and seal with 1/4
round at the walls
Remove the
cracked, broken,
and loose
ceramic floor tile
from the entire
Success: All values provided #1-2 Remove ceramic floor tile floor. Sand off the Square Foot 1
entire old
adhesive and
make ready for
new floor
covering.
Install ceramic
flooring tile to
cover the entire
Success: All values provided #1-3 Install ceramic flooring tile floor. Install Square Foot 1
according to
manufacturer
recommendations
Remove and
replace flooring
Success: All values provided #1-4 Repair wood flooring according a Square Foot 1
manufacturer
recommendations
Numeric I Numeric
$ 2.00 1
$ 3.06
$ 2.00 $ 3.06 $ 5.06
$ 1.79 $ 3.23 $ 1.79 $ 3.23 $ 5.02
$ 3.70 1 $ 6.62 1 $ 3.70 1 $ 6.62 1 $ 10.32
$3.19 $4.81 $3.19 $4.81 $8.00
Success: All values provided #1-5
Success: All values provided #1-6
Install vinyl flooring planks
Install new carpet and pad
Install vinyl plank
flooring. Clean
floor before
installation to
insure there are
no air pockets,
bubbles, ridges or
voids when floor
covering is
finished. Install
according to Square foot 1
$ 2.20 $ 2.37 $ 2.20
$ 2.37
$ 4.57
manufacturer
recommendations
and insure
adhesion of vinyl
floor planks to the
sub floor. Make
sure there are no
gaps and seal
with 1/4 round at
the walls
Install pad and
carpeting to cover
the entire floor. Square Yard 1
$ 2.25 $ 0.85 $ 2.25
$ 0.85
$ 3.10
Install according
to manufacturer
recommendations
$ 15.13
$ 20.94
$ 36.07
$ 15.13
$ 20.94
$ 36.07
Responses
Success: All data is valid!
Labor
Success: All values provided #1-1
Basket Total A
Preventive Maintenance And Tune Ups
®®
Service Requested Scone of UOM Service Quantity Cost of Cost of Labor Total Cost of Total Cost Total Cost
HVAC Tech Hourly Rate
Success: All values provided #2-1 Tune Up/Clean Air Condition System
Specify labor rate
for HVAC
services and
related work not
specified or
mention under
the bid contract.
Note: rate shall
include trip
charge, travel
time, mileage,
transportation
cost, parking and
toll fees. The
labor rate shall
start upon arrival
at client home or
worksite.
Contractor is
responsible for
securing permit
Air conditioning
system (cooling) -
PM and tune-up
services, include
all labor,
chemicals
materials and
supplies required
to perform the
services. This
includes cleaning
the evaporator
coil and outside
condenser
Hour 1 $ 0.00 $ 187.50 $ 0.00 $ 187.50 $ 187.50
Each 1 $ 55.00 $ 187.50 $ 55.00 $ 187.50 $ 242.50
Success: All values provided #2-2
Success: All values provided #2-3
Success: All values provided #2-4
Basket Total
Udean, uispea ou
and adjust
heating
equipment and
controls. Clean
burner and heat
exchanger.
Adjust flame if
necessary.
Check pilot
assembly. Check
and adjust
primary relay and
Tune Up/Clean Heat/Furnace System
flue. Adjust Each
blower assembly
if necessary.
Replace filter.
Tune-up to
include all labor,
materials and
supplies required
to perform
service. Report
any
recommended
part replacement
or repairs. Call
Conduct an on -
site inspection of
the AC system to
diagnose any
problems with the
AC Clean and
inspect the
outside unit, this
will include all
Condenser Coil Cleaning Service
labor, chemicals,
Each
materials and
supplies to
perform the
service. Level the
pad if necessary,
and cut and trim
any shrubs within
18" of the sides of
the unit
Conduct an on -
site inspection of
the AC system to
diagnose any
problems with the
AC system.
Inspect and clean
Evaporator/Cooling Coil Cleaning Service
evaporator coil, Each
service will
include all labor,
chemicals,
materials and
supplies required
to perform the
1 $ 65.00 $ 187.50 $ 65.00 $ 187.50 $ 252.50
1 1 $ 50.00 1 $ 187.50 1 $ 50.00 1 $ 187.50 1 $ 237.50
1 $ 60.00 $ 525.00 $ 60.00 $ 525.00 $ 585.00
$ 230.00 M $1,317.50
Alternative Heating Units
Complete install
of a gas fired,
wall mounted
heater including
Success: All values provided
#3-1
Alternative Heating Units Considerations
new gas flex -line,
N/A
low voltage
wiring, flue piping
complete through
the roof, including
ventcap
Vented wall
furnace with wall
mounted
Success: All values provided
#3-2
35,000 BTU Vented Wall Furnace W/T-Stat
thermostat, size:
Each
35,000 BTU
(min.) EER rating:
80 %(AFUE) or
higher
Vented wall
furnace with wall
mounted
Success: All values provided
#3-3
50,000 BTU Vented Wall Furnace W/T-Stat
thermostat, Size:
Each
50,000 BTU
(min.) EER
Rating: 80 %
(AFUEI or higher
Double sided
vented wall
furnace with wall
50,000 BTU Vented Wall Furnace W/T-Stat,
mounted digital
Success: All values provided
#3-4
thermostat, size:
Each
Double Side
50,000 BTU
(min.) EER rating:
80% (AFUE) or
higher
Basket Total
1
Central Air Conditioner - Exterior Condenser and Matching Coil
1 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00
1 $ 2,552.00 $ 2,160.00 $ 2,552.00 $ 2,160.00 $ 4,712.00
1 $ 2,658.00 $ 2,160.00 $ 2,658.00 $ 2,160.00 $ 4,818.00
1 $ 3,888.00 $ 2,160.00 $ 3,888.00 $ 2,160.00 $ 6,048.00
$ 9,098.00 $ 6,480.00 $ 15,578.00
Includes all labor,
materials,
supplies required
to install new unit
in accordance to
manufacturer(s)
requirements,
removal of
existing unit and
properly dispose
all in accordance
Central Air Conditioner - Exterior Condenser
with EPA
Success: All values provided
#4-1
and Matching Coil -Considerations
regulation.
N/A
Installation shall
also include
condenser power
disconnect/whip,
liquid line dryer,
suction, line
dryer, refrigerant,
condenser slab
and 12 pleated air
filters, flush
copper lines
Central air
conditioner unit
and matching
1.5 Ton, Seer Rating 15 Seer 2 14.3 W/Matching
evaporative coil,
Success: All values provided
#4-2
Coil
size: 1.5 Tons,
Each
SEER rating: 15
minimum Seer 2
14.3
Central air
conditioner unit
and matching
1.5 Ton, Seer Rating 16 Seer 2 14.3 W/Matching
evaporative coil,
Success: All values provided
#4-3
Coil
Size: 1.5 Tons,
Each
SEER rating: 16
minimum Seer 2
14.3
Central air
conditioner unit
and matching
2 Ton, Seer Rating 15 Seer 2 14.3 W/Matching
evaporative coil,
Success: All values provided
#4-4
Coil
size: 2 Tons,
Each
SEER rating: 15
minimum Seer 2
14.3
Central air
conditioner unit
and matching
2 Ton, Seer Rating 16 Seer 2 14.3 W/Matching
evaporative coil,
Success: All values provided
#4-5
Coil
size: 2 Tons,
Each
SEER rating: 16
minimum Seer 2
14.3
Central air
conditioner unit
and matching
2.5 Ton, Seer Rating 15 Seer 2 14.3 W/Matching
evaporative oil,
Success: All values provided
#4-6
Coil
size: 2.5 Tons,
Each
SEER rating: 15
minimum Seer 2
14.3
1 $0.00 $0.00 $0.00 $0.00 $0.00
1 $ 4,440.00 $ 2,160.00 $ 4,440.00 $ 2,160.00 $ 6,600.00
1 $ 4,440.00 $ 2,160.00 $ 4,440.00 $ 2,160.00 $ 6,600.00
1 $ 4,845.00 $ 2,160.00 $ 4,845.00 $ 2,160.00 $ 7,005.00
1 $ 4,845.00 $ 2,160.00 $ 4,845.00 $ 2,160.00 $ 7,005.00
1 $ 5,011.00 $ 2,160.00 $ 5,011.00 $ 2,160.00 $ 7,171.00
Central air
conditioner unit
and matching
2.5 Ton, Seer Rating 16 Seer 2 14.3 W/Matching
evaporative oil,
Success: All values provided
#4-7
Coil
size: 2.5 Tons,
Each
1
SEER rating: 16
minimum Seer 2
14.3
_
Central air
conditioner unit
and matching
3 Ton, Seer Rating 15 Seer 2 14.3 W/Matching
evaporative oil,
Success: All values provided
#4-8
Coil
size: 3 Tans,
Each
1
SEER rating: 15
minimum Seer 2
14.3
Central air
conditioner unit
and matching
3 Ton, Seer Rating 16 Seer 2 14.3 W/Matching
evaporative oil,
Success: All values provided
#4-9
Coil
size: 3 Tons,
Each
1
rating: 16
JSEER
minimumSeer 2
14.3
Central air
conditioner unit
and matching
3.5 Ton, Seer Rating 15 Seer 2 14.3 W/Matching
evaporative oil,
Success: All values provided
#4-10
Coil
size: 3.5 Tons,
Each
1
SEER rating: 15
minimum Seer 2
14.3
Central air
conditioner unit
and matching
3.5 Ton, Seer Rating 16 Seer 2 14.3 W/Matching
evaporative oil,
Success: All values provided
#4-11
Coil
size: 3.5 Tons,
Each
1
SEER rating: 16
minimum Seer 2
14.3
_
Central air
conditioner unit
and matching
4 Ton, Seer Rating 15 Seer 2 14.3 W/Matching
evaporative oil,
Success: All values provided
#4-12
Coil
size: 4 Tans,
Each
1
SEER rating: 15
minimum Seer 2
14.3
Central air
conditioner unit
and matching
4 Ton, Seer Rating 16 Seer 2 14.3 W/Matching
evaporative oil,
Success: All values provided
#4-13
Coil
size: 4 Tons,
Each
1
SEER rating: 16
minimum Seer 2
14.3
_
Central air
conditioner unit
and matching
5 Ton, Seer Rating 15 Seer 2 14.3 W/Matching
evaporative oil,
Success: All values provided
#4-14
Coil
size: 5 Tans,
Each
1
SEER rating: 15
minimum Seer 2
14.3
$ 5,011.00 $ 2,160.00 $ 5,011.00 $ 2,160.00 $ 7,171.00
$ 5,497.00 $ 2,160.00 $ 5,497.00 $ 2,160.00 $ 7,657.00
$ 5,497.00 1 $ 2,160.00 1 $ 5,497.00 1 $ 2,160.00 $ 7,657.00
$ 6,010.00 $ 2,160.00 $ 6,010.00 $ 2,160.00 $ 8,170.00
$ 6,010.00 $ 2,160.00 $ 6,010.00 $ 2,160.00 $ 8,170.00
$ 6,521.00 $ 2,160.00 $ 6,521.00 $ 2,160.00 $ 8,681.00
$ 6,521.00 $ 2,160.00 1 $ 6,521.00 1 $ 2,160.00 1 $ 8,681.00
$ 7,192.00 $ 2,160.00 $ 7,192.00 $ 2,160.00 $ 9,352.00
Central air
conditioner unit
and matching
5 Ton, Seer Rating 16 Seer 2 14.3 W/Matching evaporative oil,
Success: All values provided #4-15 Each
Coil size:5 Tons,
SEER rating: 16
minimum Seer 2
14.3
Basket Total
Complete Central HVAC System Install w/gas furnace
mauues all iauor,
materials,
per and
supplies required
to install new unit
in accordance to
manufacturer
requirements and
removal of
existing unit and
proper disposal in
accordance with
EPA regulation.
Complete Central HVAC System Install w/gas
Installation shall
Success: All values provided
#5-1
furnace Considerations
also include
N/A
condenser, gas
furnace, and
evaporator coil. If
needed or
existing piece is
not working or
functional install
drain pans with
working drain
lines, duct and
flue modification,
filter enclosure,
2 Tons, 16 SEER
Seer 2 14.3 rating
Success: All values provided
#5-2
2 Ton
and t AFUEpes:
Each
e
up furnace ty
flow, down -flow
and horizontal
2.5 Tons, 16
SEER Seer 2
14.3 rating and
Success: All values provided
#5-3
2.5 Ton
90% AFUE
Each
furnace types: up
flow, down -flow
and horizontal
3 Tons, 16 SEER
Seer 2 14.3 rating
Success: All values provided
#5-4
3 Ton
and t AFUEpes:
Each
furnace tye up
flow, down -flow
and horizontal
1 $ 7,192.00 $ 2,160.00 $ 7,192.00 $ 2,160.00 $ 9,352.00
$ 79,032.00 $ 30,240.00 $ 109,272.00
1 $0.00 $0.00 $0.00 $0.00 $0.00
1 $ 7,731.00 $ 2,160.00 $ 7,731.00 $ 2,160.00 $ 9,891.00
1 $ 7,898.00 $ 2,160.00 $ 7,898.00 $ 2,160.00 $ 10,058.00
1 $ 8,794.00 $ 2,160.00 $ 8,794.00 $ 2,160.00 $ 10,954.00
3.5 Tons, 16
SEER Seer 2
14.3 rating and
Success: All values provided
#5-5
3.5 Ton
90% AFUE
Each
furnace types: up
flow, down -flow
and horizontal
4 Tans, 16 SEER
Seer 2 14.3 rating
Success: All values provided
#5-6
4 Ton
and t AFUEpes:
Each
e
up furnace ty
flow, down -flow
and horizontal
5 Tans, 16 SEER
rating and 90
Success: All values provided
#5-7
5 Ton
AFUE furnace
Each
types: up -flow,
down -flow and
IL
horizontal
Mini Split System
Complete fully
functioning install
including
Success: All values provided
#6-1
Mini Split System
mounting and
Each
penetrations with
2 multi outlet mini
splits
1 ton 16 Seer
complete fully
functioning install
Success: All values provided
#6-2
1 Ton 16 Seer
including
mounting and
Each
penetrations with
2 multi outlet mini
splits
1.5 ton 16 Seer
complete fully
functioning install
Success: All values provided
#6-3
1.5 Ton 16 Seer
including
mounting and
Each
penetrations with
2 multi outlet mini
splits
2 ton 16 Seer
complete fully
functioning install
Success: All values provided
#6-4
2 Ton 16 Seer
including
mounting and
Each
penetrations with
2 multi outlet mini
splits
1 9,469.00 $ 2,160.00 $ 9,469.00 $ 2,160.00 $ 11,629.00
1 10,296.00 $ 2,160.00 $ 10,296.00 $ 2,160.00 $ 12,456.00
1 10,958.00 $ 2,160.00 $ 10,958.00 $ 2,160.00 $ 13,118.00
$ 55,146.00 $ 12,960.00 $ 68,106.0
1 0.00 $0.00 $0.00 $0.00 $0.00
1 5,626.00 $ 2,160.00 $ 5,626.00 $ 2,160.00 $ 7,786.00
1 5,626.00 $ 2,160.00 $ 5,626.00 $ 2,160.00 $ 7,786.00
1 6,120.00 $ 2,160.00 $ 6,120.00 $ 2,160.00 $ 8,280.00
Success: All values provided #6-5
Success: All values provided #6-6
Basket Total
Central Heat/Furnace Units
Success: All values provided #7-1
Success: All values provided #7-2
3 Ton 16 Seer
4 Ton 16 Seer
3 ton 16 Seer
complete fully
functioning install
including
Each
1
$ 7,683
mounting and
penetrations with
2 multi outlet mini
splits
4 ton 16 Seer
complete fully
functioning install
including Each
mounting and
penetrations with
2 multi outlet mini
up -now, uown-
flow or horizontal
installation cost
shall include all
labor, material,
permit(s) and
supplies required
to install new unit
in accordance
with manufacturer
requirements,
and removal of
existing unit and
Central Heat/Furnace Units Considerations proper disposal in N/A
accordance with
EPA regulation.
Installation shall
also include, vent
flue, new gas flex
line if applicable
and duct
modification as
needed. Unit
shall be properly
vented, insulated
and/or sealed in
accordance to
36,000 BTU
(minimum), EER
rating: 80 %
annual fuel
utilization
36,000 BTU Central Furnace 80% EER efficiency or
higher
configuration
types: up -flow,
down -flow and
horizontal
00 $ 2,160.00 $ 7,683.00 $ 2,160.00 $ 9,843.00
1 $ 10,351.00 $ 2,160.00 $ 10,351.00 $ 2,160.00 $ 12,511.00
$ 10,800.00 $ 46,206.00
1 $0.00 $0.00 $0.00 $0.00 S0.00
Each 1 $ 2,291.00 $ 1,800.00 $ 2,291.00 $ 1,800.00 $ 4,091.00
Success: All values provided #7-3 42,000 BTU Central Furnace 80% EE
Success: All values provided #7-4 50,000 BTU Central Furnace 80% EE
Success: All values provided #7-5 60,000 BTU Central Furnace 80% EE
Success: All values provided #7-6 70,000 BTU Central Furnace 80% EE
Success: All values provided #7-7 75,000 BTU Central Furnace 80% EE
42,000 BTU
(minimum), EER
rating: 80%
annual fuel
utilization
R efficiency or
higher
configuration
types: up -flow,
down -flow and
horizontal
50,000 BTU
(minimum), EER
rating: 80%
annual fuel
utilization
R efficiency or
higher
configuration
types: up -flow,
down -flow and
horizontal
60,000 BTU
(minimum), EER
rating: 80%
annual fuel
utilization
R efficiency or
higher
configuration
types: up -flow,
down -flow and
horizontal
70,000 BTU
(minimum), EER
rating: 80%
annual fuel
utilization
R efficiency or
higher
configuration
types: up -flow,
down -flow and
horizontal
75,000 BTU
(minimum), EER
rating: 80%
annual fuel
utilization
R efficiency or
higher
configuration
types: up -flow,
down -flow and
horizontal
Each 1 $ 2,291.00 $ 1,800.00 $ 2,291.00 $ 1,800.00 $ 4,091.00
Each 1 $ 2,408.00 $ 1,800.00 $ 2,408.00 $ 1,800.00 $ 4,208.00
Each 1 $ 2,408.00 $ 1,800.00 $ 2,408.00 $ 1,800.00 $ 4,208.00
Each 1 $ 2,718.00 $ 1,800.00 $ 2,718.00 $ 1,800.00 $ 4,518.00
Each 1 $ 2,718.00 $ 1,800.00 $ 2,718.00 $ 1,800.00 $ 4,518.00
100,000 BTU
(minimum), EER
rating: 80 %
annual fuel
utilization
Success: All values provided #7-8 100,000 BTU Central Furnace 80% EER efficiency or
higher
configuration
types: up -flow,
down -flow and
horizontal
36,000 BTU
(minimum), EER
rating: 90%
annual fuel
utilization
Success: All values provided #7-9 36,000 BTU Central Furnace 90% EER efficiency or
higher
configuration
types: up -flow,
down -flow and
horizontal
42,000 BTU
(minimum), EER
rating: 90%
annual fuel
utilization
Success: All values provided #7-10 42,000 BTU Central Furnace 90% EER efficiency or
higher
configuration
types: up -flow,
rating: 90%
annual fuel
utilization
Success: All values provided #7-11 50,000 BTU Central Furnace 90% EER efficiency or
higher
configuration
types: up -flow,
down -flow and
horizontal
60,000 BTU
(minimum), EER
rating: 90%
annual fuel
utilization
Success: All values provided #7-12 60,000 BTU Central Furnace 90% EER efficiency or
higher
configuration
types: up -flow,
down -flow and
horizontal
Each
Each
Each
0
$ 2,804.00 ' 9
1,800.00 $ 2,804.00 $ 1,800.00 $ 4,604.00
1 $ 2,815.00 $ 1,800.00 $ 2,815.00 $ 1,800.00 $ 4,615.00
1 1 $ 2,815.00 $ 1,800.00 1 $ 2,815.00 1 $ 1,800.00 1 $ 4,615.00
1 $ 2,930.00 $ 1,800.00 $ 2,930.00 $ 1,800.00 $ 4,730.00
75,000 BTU
(minimum), EER
rating: 90%
annual fuel
utilization
Success: All values provided #7-13 75,000 BTU Central Furnace 90% EER efficiency or Each
higher
configuration
types: up -flow,
down -flow and
horizontal
100,000 BTU
(minimum), EER
rating: 90%
annual fuel
utilization
Success: All values provided #7-14 100,000 BTU Central Furnace 90% EER efficiency or Each
higher
configuration
types: up -flow,
down -flow and
horizontal
Basket Total M
Heat Pumps Complete Up Flow/Horizontal
—miianon cost
shall include all
labor,
materialand
supplies required
to install new
complete
systems (new air
handler and
matching coil) in
accordance with
manufacturer
requirements,
Heat Pumps Complete Up Flow/Horizontal
removal of
Success: All values provided #8-1
Considerations
N/A
existing unit and
proper disposal in
accordance with
EPA regulation.
Installation shall
includenew
plastic or
concrete slab,
disconnect box,
(new five -wire for
the new
programmable t-
stat), 12 pleated
it Filfnrc nifrnnn.�
Complete system
- heat pump with
electric air
1.5 Ton Seer Rating 15 Seer 2 14.3 & 7.5 HSPF
2 handler, Size: 1.5
Success: All values provided #8-2
Matched System
Each
Ton, SEER
rating: 15 Seer 2
14.3 & 7.5 HSPF
2
1 $ 3,445.00 $ 1,800.00 $ 3,445.00 $ 1,800.00 $ 5,245.00
1 $ 3,645.00 $ 1,800.00 $ 3,645.00 $ 1,800.00 $ 5,445.00
$ 36,218.00 $ 23,400.00 $ 59,618.00
1 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00
1 $ 6,544.00 $ 2,700.00 $ 6,544.00 $ 2,700.00 $ 9,244.00
Complete system
- heat pump with
2 Ton Seer Rating 15 14.3 & 7.5 HSPF 2 Matched
electric air
Success: All values provided
#8-3
System
handler, Size: 2
Each
Ton, SEER
rating: 15 Seer 2
4.3&7.5HSPF 2
Complete system
- heat pump with
electric air
2.5 Ton Seer Rating 15 14.3 & 7.5 HSPF 2
handler, Size: 2.5
Success: All values provided
#8-4
Matched System
Ton, SEER
Each
rating: 15 Seer 2
14.3 & 7.5 HSPF
2
Complete system
- heat pump with
electric air
3 Ton Seer Rating 15 14.3 & 7.5 HSPF 2 Matched
handler, Size: 3
Success: All values provided
#8-5
System
Ton, SEER
Each
rating: 15 Seer
214.3 & 7.5
HSPF 2
Complete system
- heat pump with
electric air
3.5 Ton Seer Rating 15 14.3 & 7.5 HSPF 2
handler, Size: 3.5
Success: All values provided
#8-6
Matched System
Ton, SEER
Each
rating: 15 Seer
214.3 & 7.5
HSPF 2
Complete system
- heat pump with
electric air
4 Ton Seer Rating 15 14.3 & 7.5 HSPF 2 Matched
handler, Size: 4
Success: All values provided
#8-7
System
Ton, SEER
Each
rating: 15 Seer 2
14.3 & 7.5 HSPF
2
Complete system
- heat pump with
electric air
4.5 Ton Seer Rating 15 14.3 & 7.5 HSPF 2
handler, Size: 4.5
Success: All values provided
#8-8
Matched System
Ton, SEER
Each
rating: 15 Seer 2
14.3 & 7.5 HSPF
2
Complete system
- heat pump with
electric air
5 Ton Seer Rating 15 14.3 & 7.5 HSPF 2 Matched
handler, Size: 5
Success: All values provided
#8-9
System
Ton, SEER
Each
rating: 15 Seer 2
14.3 & 7.5 HSPF
2
Heat Pumps Complete Ceiling Mount
1 $ 6,705.00 $ 2,700.00 $ 6,705.00 $ 2,700.00 $ 9,405.00
1 $ 7,300.00 $ 2,700.00 $ 7,300.00 $ 2,700.00 $ 10,000.00
1 $ 7,713.00 $ 2,700.00 $ 7,713.00 $ 2,700.00 $ 10,413.00
1 $ 8,287.00 $ 2,700.00 $ 8,287.00 $ 2,700.00 $ 10,987.00
1 $ 8,812.00 $ 2,700.00 $ 8,812.00 $ 2,700.00 $ 11,512.00
1 $ 10,121.00 $ 2,700.00 $ 10,121.00 $ 2,700.00 $ 12,821.00
1 $ 10,121.00 $ 2,700.00 $ 10,121.00 $ 2,700.00 $ 12,821.00
$ 65,603.00 $ 21,600.00 $ 87,203.00
i nese uniu are
most commonly
found apartment
units. Installation
cost shall include
all labor,
materials,
permit(s) and
supplies required
to install new
complete
systems (with
new air handler
Heat Pumps Complete Ceiling Mount
and matching
Success: All values provided
#9-1
Considerations
coil) in
N/A
accordance with
manufacturer
requirements,
removal of
existing unit and
proper disposal in
accordance with
EPA regulation.
Installation, new
condenser
slab/pad,
disconnect box,
Complete system
- heat pump with
ceiling mount
1.5 Ton Seer Rating 15 Matched System Seer 2
electric air
Success: All values provided
#9-2
14.3 and HSPF 2 7.5
handler, size: 1.5
Each
Tons, SEER
rating: 15 Seer 2
14.3 and HSPF 2
7.5
Complete system
- heat pump with
ceiling mount
2 Ton Seer Rating 15 Matched System Seer 2
electric air
Success: All values provided
#9-3
14.3 and HSPF 2 7.5
handler, size: 2
Each
Tons, SEER
rating: 15 Seer 2
14.3 and HSPF 2
7.5
Complete system
- heat pump with
ceiling mount
2.5 Ton Seer Rating 15 Matched System Seer 2
electric air
Success: All values provided
#9-4
14.3 and HSPF 2 7.5
handler, size: 2.5
Each
Tons, SEER
rating: 15 Seer 2
14.3 and HSPF 2
7.5
Complete system
- heat pump with
3 Ton Seer Rating 15 Matched System Seer 2
ceiling mount
Success: All values provided
#9-5
14.3 and HSPF 2 7.5
electric air
Each
handler, size: 3
Tons, SEER
rating: 15 v
1 $0.00 $0.00 $0.00 $0.00 $0.00
1 $ 6,157.00 $ 2,700.00 $ 6,157.00 $ 2,700.00 $ 8,857.00
1 $ 6,318.00 $ 2,700.00 $ 6,318.00 $ 2,700.00 $ 9,018.00
1 $ 6,913.00 $ 2,700.00 $ 6,913.00 $ 2,700.00 $ 9,613.00
1 $ 7,326.00 $ 2,700.00 $ 7,326.00 $ 2,700.00 $ 10,026.00
Install a 7-day
programmable
thermostat,
include batteries
Success: All values provided
#9-6
7 Day Programmable Thermostat (Only)
if needed and
Each
then program it
for homeowner
and leave them
the instructions
Install a non -
programmable
digital thermostat
capable of
adjusting the heat
temperature up or
down as apposed
to the actual
Success: All values provided
#9-7
Digital Thermostat Wall Furnace
temperature
Each
inside the house.
Do not install it
right next to the
wall furnace unit,
space according
to manufacturer
recommendation
s
Run new proper
size wiring from
the furnace unit
Success: All values provided
#9-8
Low voltage wiring for unit
to the thermostat,
Each
seal any hole
penetrations with
caulk
Build and install a
new supply
plenum capable
of supplying all
the ducts to the
home including
mastic to seal all
Success: All values provided
#9-9
Replace supply plenum
seams of plenum
Each
and around all
ducts and
attachments.
Dispose to code
legal dump the
old plenum if
present
Construct, attach
and properly seal,
transition box
Install / replace transition box for evaporator
from top of
Success: All values provided
#9-10
coil
evaporator coil to
Each
attach at bottom
of supply plenum
in the attic
1 $ 165.00 $ 187.50 $ 165.00 $ 187.50 $ 352.50
1 1 $ 85.00 1 $ 187.50 1 $ 85.00 i $ 187.50 i $ 272.50
1 $ 60.00 $ 187.50 $ 60.00 $ 187.50 $ 247.50
$ 350.00 $ 900.00 $ 350.00 $ 900.00 $ 1,250.00
1 $ 175.00 $ 781.25 $ 175.00 $ 781.25 $ 956.25
Success: All values provided #9-11 Duct repair and replacement 6-8"
Per run of 20'
Includes new
boot, new register
grille and saddles
plus removal of
Each
1
$ 450.00
old duct, boot,
and grille if
replacing, labor
included
$ 718.75 1 $ 450.00 1 $ 718.75 $ 1,168.75
Per run of 20'
Includes new
boot, new register
grille and saddles
Success: All values provided #9-12 Duct repair and replacement 10-12" plus removal of Each 1 $ 475.00 $ 718.75
old duct, boot,
and grille if
replacing, labor
included
Per run of 20'
Includes new
boot, new register
grille and saddles
Success: All values provided #9-13 Duct repair and replacement 14-16" plus removal of Each 1 $ 495.00 $ 718.75
old duct, boot,
and grille if
replacing, labor
included
New lines from
condensorto
evaporator coil at
furnace,
Success: All values provided #9-14
Success: All values provided #9-15
Success: All values provided #9-16
Success: All values provided #9-17
$ 475.00 $ 718.75 $ 1,193.75
$ 495.00 1 $ 718.75 $ 1,213.75
New copper line set
suc ion re urn ine
Each
1 $ 1,080.00
$ 1,812.50
$ 1,080.00
$ 1,812.50
$ 2,892.50
and liquid line.
Insulate the
suction line with
armaflex pipe
insulation
Install a metal line
set cover over
the exposed
Line set cover metal
suction and liquid
Each
1 $ 125.00
$ 400.00
$ 125.00
$ 400.00
$ 525.00
lines from the
condenserto
where they enter
into the attic
Cover the
exposed suction
line from the
Suction line set cover UV material
cr
Each
1 $ 75.00
$ 312.50
$ 75.00
$ 312.50
$ 387.50
t cover
the line setv er
with the UV
protective pipe
insulation
Install pipe
insulation with no
Refrigerant Line Set insulation
gaps showing
Each
1
$ 75.00
$ 312.50
$ 75.00
$ 312.50
$ 387.50
exposed pipping,
includes all labor
and materials
Frame in a return
box and use fiber
board and mastic
Success: All values provided
#9-18
Frame in return box
to seal and make
Each
ready for return
air filter grille and
return plenum
duct
Clean and seal
up the return
Success: All values provided
#9-19
Seal return area with fiberboard and mastic
plenum chamber,
Each
all sides, top and
bottom with fiber
board and mastic
Success: All values provided
#9-20
Additional R-410 refrigerant per pound
Add per standard
LB/Pound
hvac procedures
Success: All values provided
#9-21
Additional R-22 refrigerant per pound
Add per standard
LB/Pound
hvac procedures
Shield shall be of
galvanized sheet
metal with a
screen metal
Success: All values provided
#9-22
Install attic shield at flue penetrations
cloth wire mesh
LB/Pound
on top around
flue pipe to keep
debris from falling
in
Use to cover the
suction line in
ArmaFlex or simular foam tubular pipe
attic area to keep
Success: All values provided
#9-23
insulation. 0.50 x 6 foot
pipe from
Each
sweating. Make
sure there are no
uncovered gaps
Use to cover the
suction line in
ArmaFlex or simular foam tubular pipe
attic area to keep
Success: All values provided
#9-24
insulation. 0.75 x 6 foot
pipe from
Each
sweating. Make
sure there are no
uncovered gaps
Use to cover the
suction line in
ArmaFlex or simular foam tubular pipe
attic area to keep
Success: All values provided
#9-25
insulation. V x 6 foot
pipe from
Each
sweating. Make
sure there are no
uncovered gaps
1 $ 50.00 $ 312.50 $ 50.00 $ 312.50 $ 362.50
1 $ 45.00
$ 312.50
$ 45.00
$ 312.50
$ 357.50
1 $ 120.00
$ 437.50
$ 120.00
$ 437.50
$ 557.50
1 $ 250.00
$ 437.50
$ 250.00
$ 437.50
$ 687.50
1 $ 75.00 $ 312.50 $ 75.00 $ 312.50 $ 387.50
1 $ 65.00 $ 312.50 $ 65.00 $ 312.50 $ 377.50
1 $ 75.00 $ 312.50 $ 75.00 $ 312.50 $ 387.50
1 $ 85.00 $ 312.50 $ 85.00 $ 312.50 $ 397.50
Dig a hole for a
10" diameter
bucket at least 12
inches deep. Drill
holes in bottom
and fill with rocks.
Position PVC
condnsation line
Success: All values provided
#9-26
Condensation line french drain
over top of the
Each
french drain
bucket and rocks.
Install a cover
over french drain
bucket and rocks
to keep any
debris from
covering the
rocks.
Multi -pleat air
filters, or similar
brand, MERV 7
Success: All values provided
#9-27
Multi -Pleat Air Filters or Compatible
(Minimum
Each
Efficiency
Reporting Valve)
_ or higher
Place the unit
and run all
electric lines.
Success: All values provided
#9-28
Condensate Pump
Hook up suction
Each
tubes/lines to the
unit and run them
to the outside of
the house
_
Place the unit
and run all
electric lines.
120V Condensate pump w/a minimum 1/50 HP
Hook up suction
Success: All values provided
#9-29
high performance moter
tubes/lines to the
Each
unit and run them
to the outside of
the house.
Clear the
Success: All values provided
#9-30
Clear condensate line
condensate line
Each
from drain pan to
the exterior
Remove and
replace if present
Success: All values provided
#9-31
Return air filter grille ceiling
the air filter return
Each
grille to the
ceiling return box
Remove the old
return grille cover
if present and
Success: All values provided
#9-32
Return grille cover furnace closet
install new return
Each
grille cover to the
bottom of the
furnace closet
return
1 $ 450.00 $ 812.50 $ 450.00 $ 812.50 $ 1,262.50
1 $ 30.00
$ 150.00
$ 30.00
$ 150.00
$ 180.00
1 $ 225.00
$ 525.00
$ 225.00
$ 525.00
$ 750.00
1 $ 375.00 i
$ 525.00
$ 375.00
$ 525.00
$ 900.00
1 $ 45.00 $ 187.50 $ 45.00 $ 187.50 $ 232.50
1 $ 150.00 $ 312.50 $ 150.00 $ 312.50 $ 462.50
1 $ 75.00 $ 312.50 $ 75.00 $ 312.50 $ 387.50
Duct blaster test
Duct Sealing and Repair
Perform duct
blaster test to
insure there are
no leaks in the
ducts and they
meet energy
code standards Each
and
requirements.
Find and seal any
leaks and Include
report with
invoice
submission
Seal joints and
any tears in the
Success: All values provided
#10-1
Seal duct with mastic
duct with mastic
Each
making sure
there are no
voids.
Seal any holes,
cracks or voids
Success: All values provided
#10-2
Seal plenum with mesh tape and mastic
with mesh tape
Each
and apply mastic
to seal the
plenum
Clean out any
dirt, debris, webs,
Success: All values provided
#10-3
Seal return with duct board and mastic
etc and then seal
Each
the return plenum
area with duct
board and mastic
Include all labor,
material,
supplies, and
equipment to
Success: All values provided
#10-4
Replace register
install new
Each
adjustable,
curved blade,
with shutter
damper register
Include all labor,
Success: All values provided
#10-5
Register boots
material,
Each
supplies, and
equipment
Include all labor,
Success: All values provided
#10-6
Replace return grill
material,
Each
supplies, and
equipment
ilclude all labor,
material,
supplies, and
Success: All values provided
#10-7
Replace duct wlboots and register
equipment to seal
Linear Foot
and install new R-
8 value or better
duct run
1 $ 75.00 $ 812.50 $ 75.00 $ 812.50 $ 887.50
$ 32,514.00 $ 24,425.00 $ 56,939.00
1 $ 65.00 $ 312.50 $ 65.00 $ 312.50 $ 377.50
1 $ 65.00 $ 312.50 $ 65.00 $ 312.50 $ 377.50
1 $ 65.00 $ 312.50 $ 65.00 $ 312.50 $ 377.50
1 $ 75.00 $ 312.50 $ 75.00 $ 312.50 $ 387.50
1 $ 125.00
$ 437.50
$ 125.00
$ 437.50
$ 562.50
1 $ 75.00
$ 312.50
$ 75.00
$ 312.50
$ 387.50
1 $ 621.00
$ 900.00
$ 621.00
$ 900.00
$ 1,521.00
Include all labor,
material,
supplies, and
Success: All values provided
#10-8
Replace duct only
equipment to seal
Linear Foot
1
$ 485.00
$ 718.75
$ 485.00
$ 718.75
$ 1,203.75
and install new R-
8 value or better
duct run
Include all labor,
material,
supplies, and
Success: All values provided
#10-9
Relocate return air
equipment seal
Each
1
$ 648.00
$ 968.75
$ 648.00
$ 968.75
$ 1,616.75
and install new R-
8 value or better
return duct
Success: All values provided
#10-10
Duct wrap
Fiberglass Seal
Linear Foot
1
$ 175.00
$ 312.50
$ 175.00
$ 312.50
$ 487.50
Basket Total
with mastic
Air Sealing
Seal all areas
Success: All values provided
#11-1
Seal duct with mastic
where ducts are
Each
1
$ 75.00
$ 312.50
$ 75.00
$ 312.50
$ 387.50
joined togheter or
to duct boots.
On returns under
furnace closet
Success: All values provided
#11-2
Seal return with duct board and mastic
clean out and
Each
1
$ 175.00
$ 437.50
$ 175.00
$ 437.50
$ 612.50
vacuum before
installing duct
board and mastic.
I
Latex Caulk with
silicone, 35 years
durability, must
meet or exceed
Success: All values provided
#11-3
Latex caulk with silicone 35 year
ASTM C834
Each
1
$ 75.00
$ 312.50
$ 75.00
$ 312.50
$ 387.50
requirements
Size: 10.1 Tube,
Brand: Dap or
equal
100 % Silicone
Caulk, 35 years
durability, must
meet or exceed
Success: All values provided
#11-4
100% Silicone caulk 35 year
ASTM 920-86
Each
1
$ 75.00
$ 312.50
$ 75.00
$ 312.50
$ 387.50
requirements
Size: 10.1 Tube,
Brand: GE or
equal
Weaher-seal
Foam Tape,
Closed Cell, UV
Success: All values provided
#11-5
Foam tape closed cell 3/8X3/16x17'
Resistant,
Each
1
$ 150.00
$ 312.50
$ 150.00
$ 312.50
$ 462.50
Adhesive
Backing, 318 X
3/16 X17.
Brown PVC Door
Bottom
Success: All values provided
#11-6
Concealed door bottom
Replacement for
Each
Stanley Steel
Doors
Premium
Success: All values provided
#11-7
Door sweep
Aluminum and
Each
Vinyl Door Sweep
Success: All values provided
#11-8
Dual ridge gasket weather stripping
Vinyl -Clad Foam
Each
Kerf Door Seal
Doorjamb
Success: All values provided
#11-9
Silicone heavy duty weather strip
weather stripping,
Each
must be thick not
thin
Success: All values provided
#11-10
Spray foam (cans)
Closed cell, for
Each
gaps and cracks
To be used on
doors that do not
Success: All values provided
#11-11
Door adjustment
close and seal
Each
correctly.
Includes labor
and material
To include all
materials icluding
4 ft. x 8 ft. white
Success: All values provided
#11-12
Fiberglass tub & wall kit
FRP wall
Each
boaardnd in order to
repair or replace
the exisitng tub or
shower wall
Primed finger -
Success: All values provided
#11-13
Baseboard/door trim
jointed base
Each
moulding
Materials and
Success: All values provided
#11-14
Door aill
laborbuild or
Each
rebuildd the door
sill
5 in. white
Success: All values provided
#11-15
Door stop
adhesive -backed
Each
textured wall
protector
Materials and
Success: All values provided
#11-16
Doorjamb
laborbuild or
Each
rebuildd the door
jamb
Satin aluminum
Success: All values provided
#11-17
Door threshold
and oak
Each
adjustable
threshold
Use concrete to
secure metal
Success: All values provided
#11-18
Add metal cage to secure outside condensor
cage around
Each
condensor to the
ground.
Electrical outlet
Success: All values provided
#11-19
Receptacle and switch gaskets
and switch
Each
sealing energy
saving gasket
1
$ 175.00
$ 312.50
$ 175.00
$ 312.50
$ 487.50
1
$ 125.00
$ 312.50
$ 125.00
$ 312.50
$ 437.50
1 $ 65.00
$ 312.50
$ 65.00
$ 312.50
$ 377.50
1 $ 125.00
$ 312.50
$ 125.00
$ 312.50
$ 437.50
1 $ 75.00
$ 312.50
$ 75.00
$ 312.50
$ 387.50
1 $ 45.00
$ 312.50
$ 45.00
$ 312.50
$ 357.50
1
1
1
1
1
1
$ 2,400.00 $ 2,687.50 $ 2,400.00 $ 2,687.50 $ 5,087.50
$ 75.00
$ 350.00
$ 35.00
$ 375.00
$ 125.00
$ 437.50
$ 75.00
$ 437.50
$ 512.50
$ 468.75
$ 350.00
$ 468.75
$ 818.75
$ 281.25
$ 35.00
$ 281.25
$ 316.25
$ 1,187.50
$ 375.00
$ 1,187.50
$ 1,562.50
$ 531.25
$ 125.00
$ 531.25
1 $ 656.25
1 $ 1,175.00 $ 1,000.00
1 $ 30.00 $ 218.75
$ 1,175.00
$ 30.00
$ 1,000.00 $ 2,175.00
$ 218.75 $ 248.75
Success: All values provided #11-20 Receptacle and switch plates Switch/receptacle Each 65.00 $ 218.75
plates
Basket Total
$ 65.00 $ 218.75
$ 5,790.00 $ 10,593.75
$ 283.75
$ 16,383.75
$ 321,436.00 $ 146,673.75 $ 468,109.75
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 09/17/24 M&C FILE NUMBER: M&C 24-0817
LOG NAME: 13P RFP 24-0151 HOME REPAIR SERVICES MC NS
SUBJECT
(ALL) Authorize Execution of Non -Exclusive Agreements with Six Identified Vendors to Provide Specified Home Repair Services in an
Initial Cumulative Five -Year Amount Up to $44,787,500.00 Using Various Federal and State Grants and City Funds for a Five -Year Term and
Authorize Rollover of Remaining Purchase Contracts for the Neighborhood Services Department
RECOMMENDATION:
It is recommended that City Council:
1. Authorize execution of non-exclusive agreements for identified home repair services in an initial cumulative five-year amount up
to $44,787,500.00, which consists primarily of grant revenues, with the following vendors: GTO1 Construction Corporation; HVAC
ServicePro, LLC; Camelot Roofing, LLC; G. A. Miller Enterprises, Inc; Angler's Insulation, LLC; and Pinnacle Project Partners, LLC for a five-
year term for the Neighborhood Services Department; and
2. Authorize rollover of remaining purchase contracts for the Neighborhood Services Department.
DISCUSSION:
The Neighborhood Services Department approached the Purchasing Division to solicit a bid for home repair services by category, which included
installation, repair and services for: general construction and carpentry; bathrooms; electrical; flooring; foundation; heating; ventilation and air
conditioning (HVAC); insulation; kitchen; lead hazard control; plumbing; roofing; and weatherization services. Purchasing issued Request for
Proposal (RFP) No. 24-0151 for Home Repair Services which consisted of detailed specifications of the City's standards and expectations for all
categories in order to provide the services to eligible Fort Worth residents.
The Neighborhood Services Department administers a number of home repair programs that assist low-income residents; the primary funding
sources are a variety of state and federal grants as well as City general fund money. The various grants and the anticipated funding amounts are
included below. These programs include the Priority Repair, Lead Hazard Reduction Program, Healthy Homes Initiatives, Household Crisis Repair,
Healthy Homes for Heroes, and Weatherization Assistance and are collectively referred to as the department's "Home Repair Program."
Acceptance of the grants and budgeting of the City's Home Repair Program are handled in separate Mayor and Council Communications
(M&Cs); the most recent being M&C 24-0113 (which authorized an increase in the program's contract authority to $37,823,303.53). The purpose
of this M&C is to authorize agreements with the contractors who will provide home repair services under the Home Repair Program utilizing the
federal, state, and city funding that has been or will be appropriated.
The RFP was advertised in the Fort Worth Star -Telegram on April 24, 2024, May 1, 2024, May 8, 2024, May 15, 2024 and May 22, 2024. The
Diversity & Inclusion Department set a 25% Business Equity Goal for this solicitation and provided a list of 323 firms to notify of this bid
opportunity. Invites to these firms were submitted via the Bonfire platform.
The City received a total of seven (7) responses: Fathul Flooring LLC; GTO1 Construction Corporation; HVAC ServicePro, LLC; Camelot Roofing,
LLC; G. A. Miller Enterprises, Inc; Angler's Insulation, LLC; and Pinnacle Project Partners, LLC.
Fathul Flooring LLC, was deemed non -responsive for failing to submit all required documentation. It was also determined that self -performance
was not sufficient due to the contractor not being a certified M/WBE firm.
An evaluation panel, consisting of representatives from the Neighborhood Services, Diversity & Inclusion, and Property Management Departments
evaluated and scored the remaining submittals using Best Value criteria. The individual scores were averaged for each of the criteria for each
category included in the bid, and the final scores are listed in the bid matrix included as an attachment. Once the technical evaluation was
completed, Purchasing staff allocated points associated with pricing to each vendor for each category for which the vendor submitted.
The bid document specified the use of the following Best Value Criteria:
a. Proposer's qualifications, experience and references
b. Project approach and methodology to perform services
c. Financial History
d. Ability to meet the City's needs
e. Cost, points allocated individually to each of the services by category.
Based on the evaluation, it is recommended that awards be made to each of the listed vendors for the service(s) identified in the chart below. No
guarantee was made that a specific amount of these services will be purchased. Staff certifies that the recommended contractors' bids meet
specifications for the service(s) for which award is recommended.
Home Repair
Service Type
Awarded
General
Construction
Bathroom
Electrical
Flooring
Foundation
�HVAC
Insulation
Kitchen
Lead Hazard
Control
Plumbing
Roofing
l eatherization
GTO1
HVAC
Camelot
Construction
ServicePro,
Roofing,
Corporation
LLC
LLC
G. A. Miller Angler's I Pinnacle
Enterprises, Insulation, Project
Inc LLC Partners,
LLC
Under these non-exclusive agreements, the Neighborhood Services Department will request services on a priority basis within each category
based on the lowest unit prices, availability, and contractor's proximity to the designated work site. Prior to each requested service being
executed, a funds availability verification confirming that funding is available and appropriated will be performed by the Neighborhood Services
Department.
CONTRACT AMOUNT AND FUNDING AVAILABILITY: The Home Repair Program is funded through different state and federal grants awarded to
the City as well as City General Funds. The estimated current and future total amount of all grants and City funds under the Home Repair Program
is $44,787,500.00 across a period of five years, FY24-FY29. The City funds represent 22.33% of the total funds available for this program. The
allocation of funding will vary by program year and grant source.
Additional grant funds are allocated to the City from time to time based on emergencies, availability, and various other reasons. Although an initial
up to amount has been approved through this M&C, this amount is not intended to serve as a maximum amount that can be used by the Home
Repair Program in the event additional grant funds are received. In the event that additional grant funds are received, an M&C will be brought to the
City Council for approval to include those funds for the Home Repair Program.
In order to ensure the City has contractor capacity to fully utilize these variable grant sources and make repairs as quickly as possible, the contract
authorization requested under this M&C is tied to the cumulative available funding each year as reflected in the adopted and amended Home
Repair Program budget. Staff will monitor services based on grant funding source, applicable limitations, and allowable services to ensure funds
are expended in accordance with the terms of the grants at issue.
Program & Funding
Year 1 Year
Sources
(2024-2025) (2025-2026)
LEAD: Community
Development Block grant
Match
$ 187,500.00 $ 187,500.00
LEAD: U.S. Department of
Housing and Urban
$ 1,250,000.00 $ 1,250,000.00
Development grant
LEAD: Healthy Homes
grant
$ 175,000.00 $ 175,000.00
Priority Repair:
Community Development
$ 2,100,000.00 $ 2,100,000.00
Block grant
Priority Repair: City of
Fort Worth - General Fund
$ 1,600,000.00 $ 2,000,000.00
Healthy Homes for
Heroes: Texas Veterans
$ - $ 300,000.00
Commission grant
Healthy Homes for
Heroes: Community
$ 300,000.00 $ -
Development Block grant
eatherization : Texas
Association of
Community Action
$ 1,050,000.00 $ 1,050,000.00
Agencies grant
eatherization: Texas
Department of Housing
and Community Affairs -
Low Income Housing
$ 700,000.00 $ 700,000.00
Energy Assistance
Program grant
eatherization: Texas
Department of Housing
and Community Affairs -
U.S. Department of
$ 350,000.00 $ 350,000.00
Energy grant
eatherization: Texas
Department of Housing
and Community Affairs -
U.S. Department of
Energy Bipartisan
$ 1,225,000.00 $ -
Infrastructure Law grant
eatherization: City of
Fort Worth - General Fund
$ 400,000.00 $ -
Household Crisis: Texas
Department of Housing
and Community Affairs -
Comprehensive Energy
$ 600,000.00 $ 600,000.00
Assistance Program grant
Year 3 Year 4 Year 5
5-Year Total
(2026-2027) (2027-2028) (2028-2029)
$ 187,500.00 $ 187,500.00 $ 187,500.00 $ 937,500.00
$ 1,250,000.00 $ 1,250,000.00 $ 1,250,000.00 $ 6,250,000.00
$ 175,000.00 $ 175,000.00 $ 175,000.00 $ 875,000.00
$ 2,100,000.00 $ 2,100,000.00 $ 2,100,000.00 $10,500,000.00
$ 2,000,000.00 $ 2,000,000.00 $ 2,000,000.00 $ 9,600,000.00
$ 300,000.00 $ 300,000.00 $ 300,000.00 $ 1,200,000.00
$ 300,000.00
$ 1,050,000.00 $ 1,050,000.00 $ 1,050,000.00 $ 5,250,000.00
$ 700,000.00 $ 700,000.00 $ 700,000.00 $ 3,500,000.00
$ 350,000.00 $
350,000.00 $
350,000.00 $
1,750,000.00
$ - $
- $
- $
1,225,000.00
$ 400,000.00
$ 600,000.00 $ 600,000.00 $ 600,000.00 $ 3,000,000.00
(Total $ 9,937,500.00 $ 8,712,500.001$ 8,712,500.001$ 8,712,500.00I $ 8,712,500.00I $ 44,787,500.00
Since Fort Worth has historically been efficient in getting these types of grant funds put to work and expended quickly, the City periodically is
awarded additional funding to utilize dollars that might otherwise sit dormant.
Because additional funding sources and/or additional dollars from a previously identified source may become available during the life of the
agreements, it is recommended that City Council authorize the City Manager or their designee to increase the initial agreements with the
contractors up to the amount allowed by relevant law and the Fort Worth City Code, not requiring specific City Council approval, as long as
sufficient funds have been appropriated.
FUNDING ROLLOVER: This variation in awards, costs and expenditures for the various programs and home repair service types creates difficulty
in forecasting exact amounts needed for each program and each contractor for future years. Therefore, staff requests that Council authorize the
transfer and rollover of remaining Purchase Order balances to new Purchase Order allocations based on total current funding levels in order to
ensure effective continuation of the Home Repair Program across fiscal and grant funding program years. This approach will allow staff to utilize
purchasing authority remaining from completed years, as well as accommodate for future variations in funding awards from the multiple funding
sources.
M/WBE OFFICE: The Business Equity Division placed a 25% business equity goal on this solicitation/contract. Angler's Insulation, LLC, Camelot
Roofing, LLC, Glenn's A/C & Heating, HVAC ServicePro, Pinnacle Project Partners, and GTO1 Construction Corp, have all agreed/committed to
utilize 25% business equity subcontractor participation for the scope of work, meeting the City's Business Equity Ordinance. Any changes in
subcontractors will be reviewed by the Business Equity Division.
AGREEMENT TERMS: Upon City Council approval, the non-exclusive agreements will begin upon execution and shall expire five years from that
date.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that upon approval of the recommendations, funds are and will be available in the current and future capital &
operating budgets for the various Home Repair Program projects within the Grants Operating Federal, Grants Operating State and General
Capital Projects Funds to support the approval of the above recommendations and execution of the agreements. Prior to an expenditure being
incurred, the Neighborhood Services Department has the responsibility to validate the availability of funds.
Submitted for Citv Manaaer's Office by
Oriainatina Business Unit Head
Additional Information Contact:
Reginald Zeno
8517
Fernando Costa
6122
Reginald Zeno
8517
Kacey Bess
8187
Jo Ann Gunn
8525
Maria Canoura
2526
CERTIFICATE OF INTERESTED PARTIES
FORM 1295
1 of 1
Complete Nos. 1- 4 and 6 if there are interested parties. OFFICE USE ONLY
Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties. CERTIFICATION OF FILING
1 Name of business entity filing form, and the city, state and country of the business entity's place Certificate Number:
of business. 2024-1187659
Pinnacle Project Partners
Allen, TX United States Date Filed:
2 Name of governmental entity or state agency that is a party to the contract for which the form is 07/15/2024
being filed.
City of Fort Worth Date Acknowledged:
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a
description of the services, goods, or other property to be provided under the contract.
24-0151 - RFP Home Repair Sery
Project Management and General Home Repair
Nature of interest
4
Name of Interested Party City, State, Country (place of business) (check applicable)
Controlling Intermediary
Pinnacle Project Partners Allen, TX United States X
5 Check only if there is NO Interested Party. ❑
6 UNSWORN DECLARATION
My name is Jannsen Brown and my date of birth is 12-2-67
My address is 825 Watters Creek Blvd, Suite 250, Office 241 Allen TX 75013 USA
(street) (city) (state) (zip code) (country)
I declare under penalty of perjury that the foregoing is true and correct
Executed in Collin TX State of TX on the 15 day of July 20 24
(month) (year)
Signature of authorized agent of contracting business entity
(Declarant)
Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V4.1.0.d378abaC