HomeMy WebLinkAboutContract 59079-A1CSC No. 59079-A1 AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 59079 WHEREAS, the City of Fort Worth (CITY) and GEI Consultants, Inc., (ENGINEER) made and entered into City Secretary Contract No. 59079, (the CONTRACT) which was authorized by M&C 23-0026 on the loth day of January, 2023 in the amount of $ 324,529.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Alta Mesa Drive at Woodway Drive Intersection Improvements, CPN 103306; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $38,889.00. (See Attached Funding Breakdown Sheet, Page -3-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $363,418.00. OFFICIAL RECORD CITY SECRETARY 3. FT. WORTH, TX All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth, Texas Altamesa at Woodway Intersection Prof Services Agreement Amendment Template CPN 103306 Revision Date: 03/08/2024 Page 1 of 3 EXECUTED and EFFECTIVE as designated Assistant City Manager. APPROVED: City of Fort Worth cp�� Jesica McEachern Assistant City Manager DATE: Oct 9, 2024 ATTEST: Jannette Goodall City Secretary 4gpUv"gT �bo� FORroaa 0�-+a �o Pvo 0 ° o*�d a rezA54aa nbnuauod APPROVED AS TO FORM AND LEGALITY: Douglas Black (Oct 3, 202414:05 CDT) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: 03/08/2024 Page 2 of 3 of the date subscribed by the City's ENGINEER GET Consultants, Inc. Joe Garcia, P.E. Project Manager DATE: Sep 26, 2024 M&C No.#: N/A M&C Date: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Altamesa at Woodway Intersection CPN 103306 FUNDING BREAKDOWN SHEET City Secretary No. 59079 Amendment No. 1 Fund Dept ID Account Project CF1- CF2 - Bond Amount ID Activity Reference 34027 0200431 5330500 103306 003930 22010204 $38,889.00 Total: $38,889.00 City of Fort Worth, Texas Altamesa at Woodway Intersection Prof Services Agreement Amendment Template CPN 103306 Revision Date: 03/08/2024 Page 3 of 3 March 26, 2024 Project 2301325 Seth Cooksey, P.E. Consulting Project Manager, City of Ft. Worth Engineers and Transportation and Public Works 200 Texas Street Scientists Ft. Worth, TX 76102 RE: Design Contract — Altamesa and Woodway Budget Amendment City Project No. 103306 City Secretary Contract No. 59079 Dear Seth, GL I Consultants During the constructability review meeting of the Altamesa at Woodway Project, the City of Ft. Worth has determined the need for additional scope for the project. GEI is requesting additional budget for these modifications. - Task 1 Project Management o GEI Design — $7,290.00 - Task 3 Preliminary Design (60 Percent) o GEI Design — $19,956.00 o LEE Engineering — $2,500.00 0 3% subcontractor markup — $75.00 - Task 4 Final Design o GEI Design — $3,918.00 - Task 5 ROW/Easement Services o Criado — $5,000.00 0 3% subcontractor markup — $150.00 Total additional fee — $38,889.00 The above amended budget includes the scope for the items listed below: 60% submittal and final design - The design of the sidewalks and ADA ramps o The Northwest corner needs to be graded for adequate drainage at the ramp. o The Southeast and the Southwest corners need to be redesigned to allow the location of the pedestrian poles to be PROWAG compliant. - The replacement of the pavement o The pavement at the Southwest corner of Woodway is cracked and needs a full depth replacement. - The illumination of the intersection The traffic control plans Two additional documents for City of Fort Worth and ONCOR electrical company. GEI appreciates the opportunity to continue to service the City of Fort Worth. Please let me know if you have any questions about GEI's proposal. Sincerely, /os'e Garcia P.E. Senior Project Manager www.geiconsultants.com GEI Consultants, Inc. 5646 Milton Street, Suite 500, Dallas, TX 75206 214.753.8100 NORTHWEST CORNER -REDESIGN THE SIDEWALK AND RAMPS -ADD ILLUMINATION SOUTHWEST CORNER -REDESIGN THE SIDEWALK AND RAMPS -ADD ILLUMINATION -CLOSE DRIVEWAY I i SOUTHWEST CORNER EXHIBIT 1 -GLU5L UK1VLWAT ATTACHMENT "A" Scope for Enaineerina Desian Related Services for Alta Mesa Boulevard at Woodwav Drive Intersection Improvements — CN 103306 The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. OBJECTIVE The objective of the Alta Mesa Boulevard at Woodway Drive Intersection Project (CN 103306) is to improve capacity of the intersection by reconstructing medians to allow for overlapping NB and SIB left turn movements, improving traffic signal operations, upgrading pedestrian ramps for accessible compliance, removing driveways, revising signing, revising striping, and utility adjustments. WORK TO BE PERFORMED Task 1. Design Management Taslc 2. GGRGoptwl Ll,—,o Task 3. Preliminary Design Task 4. Final Design Task 5. ROW/Easement services Task 7. SE1 iRd .ci6��Utility tility CnniReeFinn SeFviGes ��iJ Tcsk 2, R TASK 1. DESIGN MANAGEMENT. ENGINEER will manage the work outlined in this scope to ensure efficient and effective use of ENGINEER's and CITY's time and resources. ENGINEER will manage change, communicate effectively, coordinate internally and externally as needed, and proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. 1.1. Managing the Team • Lead, manage and direct design team activities • Ensure quality control is practiced in performance of the work • Communicate internally among team members • Task and allocate team resources 1.2. Communications and Reporting 4tteRd a ppe design nrejeGt kiGkGff/nhaFteFiRg meeting With CITY Ot&ff toGeRfOFM CITY Gar�i ersaR d nhieGti�s�d eRswe er.9 nminal and a-�dIcrifr r, t, fUnntinnal �,no the moot CITY Feq uirements • Conduct and document monthly project update virtual meetings with CITY Project Manager. City of Fort Worth, Texas Altamesa at Woodway Intersection Attachment CPN 103306 PMO Release Date: 07.23.2012 Page 1 of 12 • Conduct review meetings with the CITY at the end of each design phase — 3010X�, 60%, and 90%. The 60% review meeting shall be held in the field, all others to be held at Traffic Management. • Conduct and document biweekly design team meetings. • Prepare invoices, in accordance with Attachment B to this Standard Agreement and submit monthly in the format requested by the CITY. • Prepare and submit monthly progress reports in the format provided by the respective CITY Department. • Prepare and submit baseline Project Schedule initially, and Project Schedule updates with a schedule narrative monthly, as required in Attachment D to this Standard Agreement and according to the City of Fort Worth's Schedule Guidance Document. • Prepare and submit a preliminary Project Risk Register, preliminary Stakeholder Register, and preliminary Project Communications Plan. CITY to modify and finalize. • Prepare monthly updates to the Total Project Budget Estimate (TPBE) spreadsheet and the Project Risk Register. • Complete Monthly M/WBE Report Form and Final Summary Payment Report Form at the end of the project. • Coordinate with other agencies and entities as necessary for the design of the proposed infrastructure, and provide and obtain information needed to prepare the design. • Prepare for and attend up to two (2) PEER review meetings. The ENGINEER will prepare the presentations, attend the meetings, and prepare meeting summaries. • With respect to coordination with permitting authorities, ENGINEER shall communicate with permitting authorities such that their regulatory requirements are appropriately reflected in the designs. ENGINEER shall work with regulatory authorities to obtain approval of the designs, and make changes necessary to meet their requirements, as part of the design scope. ASSUMPTIONS • ilnc (1) nrc_idesign nrnicnt kiGkGff/nhaFtering mccfinn irtua-1 meetiR96 with GITY PFejeet MaRageF. -tea-(Y) Klan r., . 0 TweRty (20) biweekly rdesigR beam rvmeetiRgG Project design phase is anticipated to take Ten (10) months. • Prepare Ten (10) monthly updates of project status reports, MWBE forms, TPBE, risk register, and project schedule. City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 2 of 12 Altamesa at Woodway Intersection CPN 103306 DELIVERABLES A. Meeting summaries with action items B. Monthly invoices C. Monthly progress reports D. Baseline design schedule E. Monthly schedule updates with schedule narrative describing any current or anticipated schedule changes F. Monthly M/WBE Report Form and Final Summary Payment Report Form G. Monthly TPBE spreadsheet updates H. Monthly Project Risk Register updates I. Preliminary Project Risk Register, Stakeholder Register, and Project Communications Plan. The -vvntio ptw�l PeGinn shall be oubmitted to rITV per the nnnrGyed Drninnt Qnhed iln The purpose of the nnpneptual design is far the CAI%'INEER tq identifydevelop to through the d n deliverables, apd repnmm d design GGRGep+ that eo m m u n i;�azc-mrvuc�ri�a�Irr��eilvcn�rnco-anurccvmnT�ricrn3n cvrrccprcrrcrc si iooessfi illy, addresses the design problem, andto &in the GITV's endorsement of this ENGINEER Will develop the sonsepti ial design of the infrastn Intl ire as fellews 2.1. n&,�-- C;oIIvvrIeG iE)R In addition to data obtained from the CITY, CI IG3 NCCC ��,ill research and mahe efforts to obtain pertinent informatinp to aid in nnnrdinatinn of the proposed imnrn"ements with any planned future improvements that may 'nfluepne the ppr_-;eGt. EN INEER Will also identify, and seek to obtain data far existing GGRdit enc the m&y 'mpast the nrniest ipnli iding; utilities, agenoies (TxDQT and 0 -a railroads\ f ity Master ,�ter-and-PFePeFty-owe r:Jh i r sv cv-ailable from Tax Assessor r� 's offine f nllent nee, 24 h3Nr tNrning movement nog rots at the one (1 ) prnien+ iptersen+inps 2.2. The GGRG ti gal DesigR Pa a�Tnli ode bUt Rat he limited in the fall n�n,ipn murac��3'-' a�-S�i cr�� Rat be cv , cr�a_ Gffin Trainrosnft Cxnel spreadsheet of Darn, ��ount eta: � Acur TNrn�4g M E)VeFn�e� i nt Gent data gather ast 15 minL`e�rv: !s s minimum en all ra'u data GGlIiFe Gted. Provide ,.Daily ✓immsries by Appraanh apd Peak_Deried C by Apprna Cpreadshee pload d 1N .. � m m a ri ����c�c�-i. t s h a be to � per `TPA Tra�v6'lt�nt (oi irrently RIBA `if- 0) City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 3 of 12 Altamesa at Woodway Intersection CPN 103306 TraffiG Engineering study te suppert the reGGMrnended des'gR alternative. Study nnA Ants anrd rdnrA Ament evicting IeVels of serVine fnr AAA aR d PIVI peak pericAs Analysis will utilize existing signal timing CITY. ENGINEER will analyze one (1) pFepeserd intersentinn lane nnnfigurationo uoing the existing AAA/PEAvolumes. A draft m e will he prepay an tt fnr review. A rn ��-r -Aar -Aare C ��► m � cr �vrrcrrc.�v : ri final memo inrnrnnrating minor erditerial rnmments will he prepared anrd sigRedisealed by a linenserd Texas DC 1Of • T,.affin signal existiRg rditions d ovals layout sheet FtAa-n-i'�.n �rA'crrcnrscirr� ��='rc`rcrvrA�--a'rrcrTcnv�� ccr signal poles and moot orm3, G9 RtF9Iler GabiR tc , aR drCt813tFiGal service-m ett Fm • IionA Amentatinn of Levi design rdenisions ASSUMPTIONS r sets of 1 '110 1 701 si �. I s still he d fnr the 3004 i-design - ThTee{�}s�r—�,-,—�,»c Win.. ��Qeti�e�c� • PDF files nreaterd from design CAD drawings will he A Aplearderd to the designated nroieot folder in RIMS •NICER ch&II not nrnneerd with Prellminary Resign artiVities without Written anprGyal by the CITY of the GGRGentA Aal Design PaGkage • Attend one (1) plan review DELIVERABLES A. GGyer, General NGtes 'Rdex Q\-.K;.ntlty 3Nmmarym table, Traf� gRaal GORGeptuaall design Isr--n, Exii& Ang and Proposed Typinal Certinn GGRG &�u&I InterSeGtiOR Plan/ Paving Layout R Traffin rc�nt ../\C t ��o& Traffin Study Report v . Dm npininn of prebahle eeRStrACAGtiGrnyOst /�T Em Meeting cummcry of plan reVieW meeting TASK 3. PRELIMINARY DESIGN (60 PERCENT). Preliminary plans and specifications shall be submitted to CITY per the approved Project Schedule. ENGINEER will develop the preliminary design of the infrastructure as follows. City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 4 of 12 Altamesa at Woodway Intersection CPN 103306 3.1. Development of Preliminary Design Drawings and Specifications shall include, but not be limited to, the following: • Cover Sheet • Sheet Index • Quantity Summary • General Notes • Traffic Signal Existing Conditions and Removals Sheet • Traffic Signal Layout Sheet • Traffic Signal Equipment Detail Sheets (1 sheet per corner,1" = 10' scale) • Traffic Signal Summary Charts • Proposed illumination • Illumination technical specifications • Paving Removal Sheet • Paving Layout Sheet • Paving Detail Sheets (1 sheet per corner, 1" = 10' scale) • Pavement Markings Removal Sheet • Pavement Markings Installation Sheet • Signing Removal Sheet • Signing Installation Sheet • Traffic Control Plan for paving work including all construction signage and pavement markings which will be in accordance with the latest edition of the Texas Manual on Uniform Traffic Control Devices. Traffic control for signal equipment installation will be covered by the CITY's standard details D660 and D661. • Applicable CITY and/or TxDOT standard details, 1 per sheet. • All design sheets shall include project control data. The following information shall be indicated for each Control Point: Identified (existing City Monument #8901, PK Nail, 5/8" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on City Datum only; descriptive location (i.e. set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). • Opinion of probable construction cost (OPCC). 3.2. Geotechnical Investigation/Pavement Design • Soil investigations, including field work City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 5 of 12 Al-�amcsa at woocway -rtcrscc`.'or CPN "C33C6 Total of two (2) pavement cores will be taken. • The ENGINEER shall prepare a geotechnical engineering study. 2.3. Constructability Review • Prior to the 60 percent review meeting with the CITY, the ENGINEER shall schedule and attend a project site visit with the CITY Project Manager and Construction personnel to walk the project. The ENGINEER shall summarize the CITY's comments from the field visit and submit this information to the CITY in writing. 2.4. Utility Clearance The ENGINEER will consult with the CITY's Transportation and Public Works Department, Water Department, and other CITY departments, public utilities, private utilities and government agencies to determine the approximate location of above and underground utilities, and other facilities (current and future) that have an impact or influence on the project. ENGINEER will design CITY facilities to avoid or minimize conflicts with existing utilities, and where known and possible consider potential future utilities in designs. The ENGINEER shall upload individual PDF files for each plan sheet of the approved preliminary plan set to the designated project folder in BIMS for forwarding to all utility companies which have facilities within the limits of the project. ASSUMPTIONS --Y!Ijmin.S.+i9R GR traffiG cigRal r'nl.v i"1ifrfiGient fer Rt se GtiGR No stag aleRe tttl�rrrei��cccrvrr—rav-vrui-rcrurvnc ills imiRatinn poles er phetemetrir deSigR +hi. pleni'., • Three (3) sets of 11" x 17" size plans will be delivered for the 60% design. • PDF files created from design CAD drawings will be uploaded to the designated project folder in BIMS. • One (1) set of full size drawings will be delivered for Utility Clearance. • ENGINEER shall not proceed with Final Design activities without written approval by the CITY of the Preliminary Design plans. • One (1) plan review meeting with the CITY. DELIVERABLES A. Preliminary Design drawings and specifications B. Utility Conflict Matrix C. Estimates of probable construction cost D. Meeting summary from plan review meeting TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT). City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 A1._amesa al_ woonway--i._ersec._-or_ Page 6of12 C N 1C33C6 Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as follows: • Final draft construction plans (90%) shall be submitted to CITY per the approved Project Schedule. • Following a 90% construction plan review meeting with the CITY, the ENGINEER shall submit Final Plans (100%) to the CITY per the approved Project Schedule. Each plan sheet shall be stamped, dated, and signed by a Professional Engineer registered in State of Texas. • The ENGINEER shall submit a final design estimate of probable construction cost with both the 90% and 100% design packages. This estimate shall use ONLY standard CITY bid items. • Prior to final design plans (90%) obtain a file number for the project, contact the Department of Transportation and Public Works Vault at telephone number (817) 392-8426. File numbers will not be issued to a project unless the appropriate project numbers and fund codes have been assigned and are in the Department of Transportation and Public Works database, coordinate with CITY Project Manager. ASSUMPTIONS • Three (3) sets of 11" x 17" size drawings will be delivered for the 90% Design package. • A PDF file for the 90% Design will be created from design CAD drawings and will be uploaded to the project folder in BIMS. • Three (3) sets of 11" x 17" size drawings will be delivered for the 100% Design package. • A PDF file for the 100 % Design will be created from design CAD drawings and will be uploaded to the project folder in BIMS. DELIVERABLES A. 90% construction plans. B. 100% construction plans. C. Detailed estimates of probable construction costs including summaries of bid items and quantities using the CITY's standard bid items and format. TASK 5. ROW/EASEMENT SERVICES. ENGINEER will support and perform activities related to ROW and land as outlined below, per scoping direction and guidance from the CITY's Project Manager. 5.1. Right -of -Way Research • The ENGINEER shall determine rights -of -way and easements needs for construction of the project. Required temporary and permanent easements will be identified based on available information and recommendations will be made for approval by the CITY. City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 7 of 12 Altamesa at Woodway Intersection CPN 103306 ASSUMPTIONS Right -of -Way research includes review of property/right-of-way records based on current internet based Tarrant Appraisal District (TAD) information available at the start of the project and available on -ground property information (i.e. iron rods, fences, stakes, etc.). It does not include effort for chain of title research, parent track research, additional research for easements not included in the TAD, right-of-way takings, easement vacations and abandonments, right-of-way vacations, and street closures. TASK 7. SURVEY AND S 13SURF CE LITIL ITY ENGINEERING SERVICE €I4GINEER ` . =N INCCR Will nerfGrrvm field surveys to GGIIeGt hnrizontsl andyertiGel eleVatinns anrd other information needed by ENGINEEP in design and preparation of plans fer the PrGjeGt. InfermatiOR gathered during the survey shall inGlude tepegraphiG data, eleyatinnc of &II acnitsry and adjaGept E;tGFFF1 sewers rim(i Fl vert eleyatiGR �I,GQatiGn G�rried utilities, m stn UGfi gyres trees (measure Geliper, identify Gverell GaRepy, and have qualified arberist ideRtify SpeGieS of trees), and other features relevaRt��.,.t��o tho final plan I ,` he+1e^ts Cvistinn draiRage at �i rn'ters+e^ntinns will heverified by field surveys. elevatoGRc will i1'Iln�ni CerseG OGn layG'uts with GFGGG slope to fit interseGting grade lines The minimNm ourVey infnrmatiGR tG he nrayirderd Gn the p1wis iFlGlude, but net he limited to the fellewinn• 0 A PrOjeGt GGRtrGI Sheet, 17n�nvcTvv Rg ALL Gentrel Pointsused er set c gathering data. Generally G a sGele of not -33 tpw. i referred bearing base Z GGnr,dinate Gn''ITY PatNm 94�- G. DesGriptnwe I GGetiGR (Cv get in the n nterline of the inlet in the CGi nth Gi irb line of North Side Drive at the Cast end of rears a the Se sit GGnrv-linetes ('` nhGles Valves the on a P....'o, P.T.'�^s,/�'-P��.,,��.,,'�ya�M,��,,,1I114a����, ef�i�� saaim�Georrdinate system, ac the Gentt�. — NeccE thL\i gown horizontal bench mvarks per Iine nr InGatien Clearings given on all pr^ ed Centerlines r baselines Ct&ltlGp env atinns relating utilities to pawing when apprappi-ate.. 7 0 empnrenv Right of Cntnv Dreneretinp ep C' b T„ . ►r.mittc Drier to entering property, the ENGINEEP. shall prepa-ro, aril cr.-' attempt obtain Tompnrary Right of F=RtPy from up to 2 land GWpers City of Fort Worth, Texas Attachment Altamesa at Woodway Intersection PMO Release Date: 02.06.2015 CPN 103306 Page 8 of 12 The &Gl Imentatien shsll p9 previded in Genfermanoe with the nheddists and templates available on the''ITY o 7.3. CNhsl Irfaoe I Itility I=poipeeripn Prevmdo S/ibourf&Ge Utility Engineering (SUE)upto Quality Level A as deGGribe bcAy,- ho gLr shallbe pCti"Ted in aGGG dAtGe with GI/AC(`C 3Q0-2-m Q lalifir Level D • C;c)ndUGt appFepFiate inye.stigationsr-(}er FeGGds, GnI IntyGITV FeGeFds, personal interviews v,susl inslseotiens eto ) to help identify utility owners tha gi t mahave facilities Within the pPrnie3t IlmltO or the msy he affected by the prnieGt • GGI!eGt appI+Eable-rec-erds{e-g., Utility erne mspo, "as bsilt"�,d drawings, permit records, field notes, opyec)grahic information sstem data oral 0 histories etc.) on the existence and approximate location of existing involved utmimtmes.. • Reymew records for evidence or indication of additional available records- dl (plicate er conflicting information• need for clarification o • ied& C IE .s.e plan. E)cercise professional judgment to resohie Cpflin g information Per iRfnrma R depl di to h RGWRm Utility -e,Trrrct+Fly-I rvrl'rn-vrrn-crt+e„-crcpre�e��rr' p arEa cc=vvrTe�e�4rry wrr. -amrcp type and ewnership• date of depiction; quality level(s)• end points of any utility data; 1' &cP wC (e P'1_ a/+ti v, okAn denea, Oldt Gf SerViGe\, line and TGendll-fQl ion; Rrcmrh erof inipt1y buried Gables; a,nd-ePlEaseme-Rr Quarlorty�LeveI G rnn 'destasks as desclbed for Q aalrorty�I=evel �l\ • Identify surface features, from project topographicntm land from field .� Gbserva# ins, that are surfaGO appurtanan,.es of sl Ibs Irface utilities. • IRG Idle survey apd nnrrelatinn of aerial nr nrnl Ind mnl Inted utility facilities i i-v-c9--cal-rcrcvrrcrta�vrrvrucn c��-crrrcy�ucrrrcrc ��i=r Q lal'ty Level 1 tcslcs, • Survey surface feat) Fes of ck our{ace I Itllity facilities or Systems, I Iif Och features ieusly have pot already beep surveyed by a prnfessi3nal ssrveyGcr. If pre" surveyed, yed check survey y data for anal Iracy and cnmpleteFless s anal dam t to rr�te data from diff t sal Ir apd to - €�ce�c vQG-�eS$n�rrarJ"a'agnTe�lrco-Gorr cc-crcr �rvrrrarrrere�lrvvurC-eS-ancrcv resohie conflicting information y,,� ,., ,., ����y�.., • ReGem�mrend felln,e,_I up in„estigaati�;e g., a sr&I curve ,-G'�rsd l' \ir1n with Utility nWners et.J.l QJ ms�r be needed to further resnhre dis nrn Pape;-- , PpGymde Quality Level G Jto ideRtify Gverhead (Utilities GR the prnicct-and provide the everhead utility information in the CLIC f • ge!eGt and apply apprGpriate surfaGe g rFGaI rmrethad search for a-nd detect subsurface utilities within the prole � p d/or to tram+ c pertiG1�}ar s. units, Qn QrGrZG-<T�i h Utility lien ar system • Base d iodination- of utilities OR the grnl Ind �Id �n an interpretatiOR of�fiats, mark th..a surface for sl Ibseq e-A ourvey. Utilize paint er ether methed hle aGGeptafro marking of lines "f•' �, msrk -- City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 9 of 12 Altamesa at woodway Intersection CPN 103306 • Reselve d'fferenGes between designated utilities and utility reGGrds and surveyed appurtenances. • Recommend additional measures to resolve differences if they still exist Recommendatmenc mr, inrli fide additional or different surface geephysinal methods evplaratnry ar upgrade to Quality Level A data terpatnve to the physical marking of lines the CAIr_I ICCR �Asn sl. ��" . mays CITY's &Kreal, atslize ether rreaRS a GGllleGtinn storage, retrieval, redd,U Gt,�iion, that enables the nnrrnlatinn of su Ffann gnnnhvsinal data to the nrninnt's si FVey control ni ialitv Level A • Cvpnse and Innate utilities at s cifk; la..at.'ans • Time hero ntsl and VertiGal Inratien of utility to si irVe y control • Previde utility size and configi iratinn • Previde pawing thiirk��ness a vTpe where applicable. • Provide general sail type and site GGnd4iens and GUGh other p8FtOR8Rt as is reasonably a nC1rtGirvM9 TomreaSh test hetle�.'te. ASSUMPTIONS -Quality Level WE ee� 9900 IteC- • Up to Fe it (4) Level A test holes are .'gal ided for the one (1 ) intersection Test holes a nat intended for nlearing proposed signal pales • Assn ime up to twG () TRnC letters • ARY permit fees will hewaived and handipg Will pot he required. • The budget estimate is to provide all serxvices on a nne_tim C I-xsi irfare 6 �'S�S, re\ylslans will he additional servires billed under a separate negotiated fee • This pra-lacvcal &,aaumec thPt all e•ark aTeac a e S, iffiniently cleared of ,vegetation Oc a ms)cimum height of C."\ such thfa; all &r9as are traversable en feet �,ferl �the i i prpese of performing designating Additinnall) this prop"d PCEUM?-S Glea-r aRy teSt44cc.LEE reserves the right to seek additional compensation for work intern Uptinns due to property access a..d clear.'..' issi yes • Test hGles wmil be baGkfilled with e)(Gavated Flative material and Will RGt require flew foil • Test holes --within pavement will he repaired Ucing cold patch and Will ..nt require permanent replacement • Test holes wmthon sidewalk paRels, GGRGpete paRels, and GUPWguttep paRelswill not require replacement of the entire papel Gonarete will he placed for they extend of the test hale diameter • nnsite i..spectin..s and material testing Will ..nt he required City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 10 of 12 Altamesa at Woodway Intersection CPN 103306 • Storm sewer(�ani�3r�, sewer systems will he depinted up to Quality Level G • All wc)rk willbeperfcr n�� fie h� ed dring daytime �hT�Gcrt�require weekend work �' • CAI(_IAICCR will he Retifiedo pgrier to mehiliZipto the Rrelent of any spenial � requi. iirements fnr anness and the serf..... a of the werL A Genies of field survey y data and notes sinned and sealed by a Registered prn�s"end Land Ci irye yc)r /RDI 9) registered in the State of Texas .. avcrrvc�vr-� � . � .. i B. Drawing ef he qrGyent Iayc) it with dimension GGerdinate list. C. SUE e file & Utility Genflint Matrix SNbmit napstF Gtinp dnnUmepts t3 S TEN-F! linepsed Registered Annessihility SpeGianist (RAC) fnr revF q. This nR1y applies if the nrrGcnGpedest�relementt_os (side �Gurl rcrrb, criJ puoI. i✓,r`nnsl nest evneed $tin non TT1I�� 0 Gernple4n5 ell T^! R forms/applinations nenessary. The ENGINEER I p inepsed RAC pn ��ol��" ,shall r�" insl ina am s Tom.. I later than gn nalendar days after nenstrUntien s, L tcntiel semple4vn. Fins.l i nsm6peG ionOl .hall b8 nnndi Gted 3n all prnients with pedestrian elements' regardless of the nest of the it ms. The !ECp " . 3hs9-3btain the i nspentien report from the RAC and cu mit to the CITY. ASSUMPTIONS •--Fermlt preparation will beginter approval of the 90% design - F=Nalncco TREN-F! p on, plsn review, and-finsl inspeGtME)R n nv�s • CITY will pay all nV&s mCEoniated with TxDQT and/or Railroad permits • One /1 \ meeting is accum rith Tnl p fnr the Annessihility Inspentlen Arse City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 11 of 12 Altamesa at Woodway Intersection CPN 103306 ddiit+e,lvervmGes,not mnG!udedmn the exc;: t nci SGove of Qer mGes —CITY -J e. ENONEED cgFee that the fellcming eryiGes�� ynnd the —SGOpe—Of SerVie.S rdesrriherd in +ht. ac4s oboyc rewey��INEED ran nrnvide these SerVircc needed upen the—CITY's written request Any additi3n&I SmnUntc paid to the result of an" material change to the Crane of the Prole II��" EEP . � a r.,est shall be agreed i roan in writing by bOh pruties b re the SerViGes are perferrmed. Theesse additional ser"ires iRGIu le the fello�n,ing """ `^�" • iVeptiation of easements or property, aGq .siting Rid phase sen,ires - vn�rrcrvc�c��-rc�.r. • Cer"ines relater) to rde"elonment of the CITY's prajert finanninn andk)p budget. • Cer"ines relater) to disputes ever pre q ialifinatinn bid protests hid r ertion aR d re_bidding of the rontrart far rnnstri irtion • GORSt en mrnrgemen+ aR d inspection sen,ires • Perfermanre of materials testing or spenialty testing ser"ines • Cer"ines n,�enessar" due to the default of the Gentrantnr • SeFViGes related to damages eased by fire floor) earthquake or other ants of • Cer"ires related to warranty olaims enforcement aR d inspection after final nnmpletign G'pTIT�iC'CTi G1T • SeFViGes to support,prepare, dOGUman+ bFiRg, defeR d,�nr aae3i3t In litiga#GH4 i R dertaken er rdefeR derd by the CITY as requested by the f ITV Additional environmental field werk er Terhnlral Reports Ctan'dalaaIGRe it NminatiaR ,design / photometric ides p, of iIINminatien i mproVements 0 I aR dsrape aR d Irrigation Plans + LlWity 0 P(l=Easement Cer\,Ires Drainage Phas--#sr Trsffi s Gonstn Gtisn Phase comes City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 12 of 12 Altamesa at Woodway Intersection CPN 103306 ATTACHMENT B COMPENSATION Design Services for Alta Mesa Drive and Woodway Drive Intersection City Project No. 103306 Time and Materials with Rate Schedule Project Compensation A. The ENGINEER shall be compensated for personnel time, non -labor expenses, and subcontract expenses in performing services enumerated in Attachment A as follows: i. Personnel Time. Personnel tim hall be compensated based upon hours worked directly in performing the PROJECT multiplied by the appropriate Labor Cateaory Rate for the ENGINEER's team member performing the work. Labor Cateaory Rate as presented in the rate schedule table below is the rate for each labor category performing the work and includes all direct salaries, overhead, and profit. Labor Category <2023> Rate <2024> Rate ($/hour) ($/hour) Project Director $241 $272 Project Manager $204 $230 Project Engineer $171 $193 CADD $105 $110 Administrative $75 $85 EIT $123 $140 Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct Expenses at invoice or internal office cost. Direct Expenses (non -labor) include, but are not limited to, mileage, travel and lodging expenses, mail, supplies, printing and reproduction services, other direct expenses associated with delivery of the work; plus applicable sales, use, value added, business transfer, gross receipts, or other similar taxes. iii. Subcontract Expenses. Subcontract expenses and outside services shall be reimbursed at cost to ENGINEER plus a m rkup of ten percent (10%). City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 1 of 4 Altamesa at woodway Intersection CPN 103306 B-1 ATTACHMENT B COMPENSATION iv. Budgets. ENGINEER will make reasonable efforts to complete the work within the budget and will keep the City informed of progress toward that end so that the budget or work effort can be adjusted if found necessary. ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be adjusted, nor is the City obligated to pay ENGINEER beyond these limits. If ENGINEER projects, in the course of providing the necessary services, that the PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether by change in scope of the project, increased costs or other conditions, the ENGINEER shall immediately report such fact to the City and, if so instructed by the City, shall suspend all work hereunder. When any budget has been increased, ENGINEER's excess costs expended prior to such increase will be allowable to the same extent as if such costs had been incurred after the approved increase. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment A. The ENGINEER shall be paid by the City based upon an invoice created on the basis of statements prepared from the books and records of account of the ENGINEER, based on the actual hours and costs expended by the ENGINEER in performing the work. B. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. C. ENGINEER shall prepare and submit invoices in the format and including content as presented in Exhibit B-1. D. Payment of invoices will be subject to certification by the City that such work has been performed. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the [Transportation of Public Works Department] m nthly progress reports and schedules in the format required by the City. City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 2 of 4 Altamesa at woodway Intersection CPN 103306 B-2 ATTACHMENT B COMPENSATION IV. Summary of Total Project Fees — Amendment #1 Firm Primary Responsibility Prime Consultant GEI Consultants, Inc Design, Construction, ROW, Survey and Subsurface, and permitting Proposed MWBE Sub -Consultants HVJ Associates Geotechnical, Pavement Design Criado Survey and SUE, ROW Non-MWBE Consultants Civil Associates, Inc Lee Engineering Fee Amount % $31,164.00 80.14 $5,150.00 13.24 Environmental Signal Design, Illumination $2,575.00 6.62 Project Number & Name Alta Mesa Drive and Woodway Drive Intersection TOTAL $38,889.00 100% Total Fee MWBE Fee MWBE % $38,889.00 $5,150.00 13.24% City of Fort Worth, Texas Attachment B Altamesa at Woodway Intersection Revised Date: 12/9/2022 Cent 103306 Page 3 of 4 B-3 EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) Insert required invoice format following this page, including negotiated total budget and allocations of budgets across desired work types and work phases. City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 4 of 4 Altamesa at Woodway Intersection CPN 103306 B-4 Professional Services Invoice Project Manager: ISethCooksey Summary Project: 1Alta Mesa Drive and Woodway Drive Intersection Impr# City Project #: 1103306 City Sec Number: IC-59079 I Supplier Instructions: Fill in green cells including Invoice Number, From and To Dates and the included worksheets. Company Name: IGEI Consultants, Inc I When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. Supplier's PM: James Allen email: Jallen@geiconsultants.com Supplier Invoice #: Office Address:5646 Milton St. Suite 500 Dallas, TX 75206 Payment Request #: 8 Telephone: (214)753-8100 Service Date:From 3/30/2024 Fax: fax Service Date:To 4/26/2024 Invoice Date: 5/20/2024 Remit Address: PO Box 23916, New York, NY 10087-3916 Sheet FID and Work Type Description Work Type 1 Project Management Work Type 2 Conceptual Design(30 % ) Work Type 3 Preliminary Design(60 % ) Work Type 4 Final Design(90&100 % )and Bid Phase Work Type 5 ROW/Easement, Survey, SUE Work Type 6 Permitting Totals This Invoice Agreement LTD Agreement Amendment Amount to Completed Amount Amount Date Amount $45,356.00 $7,290.00 $52,646.00 $28,126.00 $28,126.00 $65,074.00 $22,531.00 $87,605.00 $37,627.35 $3,918.00 $41,545.35 $130,876.95 $5,150.00 $136,026.95 $17,468.70 $17,468.70 $324,529.00 $38,889.00 $363,418.00 Overall Percentage Spent: Percent ($) Invoiced Current Remaining Spent Previously Invoice Balance GEI Consultants, Inc 5646 Milton St. Suite 500 Dallas, PO Box 23916, New York, NY 10087- TX 75206 3916 CFW Project Manager Seth Cooksey Supplier's Project Manager: JJames Allen Supplier's PM email: iJallen@geiconsultants.com Name of Project: Alta Mesa Drive and Woodway Drive Intersection Improvements I ah- r vit-- Alamo Invoice Supplier Project No. 1 2301325.11 Proj. Invoice No.1 8 Invoice date: 1 05/20/24 Period Service Date:From 3/30/2024 Service Date:To 4/26/2024 City Secretary Contract #: C-59079 P.O. Number: W-u- Ra4a /4/hr1 Project Director Joe Garcia 241.00 Project Manager James Allen 204.00 Project Engineer Nelly Doumbia 171.00 EIT Rebecca Hardwick 123.00 CADD Carley Jones 105.00 CADD Tony Herrera 105.00 Administrative Kennedy Lewis 75.00 Project Engineer Rasa na Pillamari 171.00 Total Labor Subcontract Service Bartlet & West HVJ Associates Lee Engineering Criado & Associates Subcontractor Subtotal 3 Percent Markup on Subcontract Services NonlaborExnenses Travel Reproduction SW3P TxDOT TDLR Nonlabor Expense Subtotal 0.0 Total Expenses (Subcontract Services+Markup+Nonlabor Expenses) Amount $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTAL DUE THIS INVOICE $0.00 Professional Services Invoice Project Manager: Seth Cooksey Project: Alta Mesa Drive and Woodway Drive Intersecti City Project #: 103306 Work Type Desc: 1 Project Management supplier Instructions: FID: City Sec Number: C-59079 Fill in green cells including Percent Complete and Invoiced Previously Quanities Purchase Order: 103306 I When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. Name: GEI Consultants, Inc Supplier's PM: James Allen Supplier Invoice #: James Allen Payment Request #: 8 Service Date:From 3/30/2024 Service Date:To 4/26/2024 Invoice Date: 5/20/2024 Pay Items DescriQtion email: Jallen@geiconsultants.com Office Address 5646 Milton St. Suite 500 Dallas, TX 75206 Telephone: (214)753-8100 Fax: fax Remit Address) PO Box 23916, New York, NY 10087-3916 Agreement Amendment Amendment Amount Number Amount GEI CONSULTANTS $29,877.36 1 $7,290.00 LEE ENGINEERING $11,175.00 BARTLETT & WEST $3,113.00 HVJ $400.00 GEI CONSULTANTS $440.64 GEI CDC $350.00 Agreement LTD Amountto Completed Date Amount $37,167.3 $11,175.013 $3,113.0 $400.0 $440.6 $350.0 Totals This Unit: $45,356.00 $7,290.00 $52,646.00 Overall Percentage Spent: Percent ($) Invoiced Spent Previously Current Remaining Invoice Balance Professional Services Invoice Project Manager: Seth Cooksey Project: Alta Mesa Drive and Woodway Drive Intersectior City Project #: 103306 Work Type Desc: lConceptual De si n 30 % Supplier Instructions: FID: City Sec Number: C-59079 Fill in green cells including Percent Complete and Invoiced Previously Quanities Purchase Order: I When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. Company Name: GEI Consultants, Inc Supplier's PM: James Allen Supplier Invoice #: Payment Request #: 8 Service Date:From 3/30/2024 Service Date:To 4/26/2024 Invoice Date: 5/20/2024 Pay Items 31 - Conceptual Desiqn 31 - Conceptual Desiqn Description email: Jallen@geiconsultants.com Office Address: 5646 Milton St. Suite 500 Dallas, TX 75206 Telephone: (214)753-8100 Fax: fax Remit Address: PO Box 23916, New York, NY 10087-3916 GEI CONSULTANTS LEE ENGINEERING GEI SUB MARKUP Totals This Unit: Agreement Amendment Amendment Amount Number Amount $14,560.90 $13,170.00 $395.10 $28,126.00 Agreement LTD Amount to Complete Date Amount $14,560.90 $13,170.00 $395.10 $28,126.00 Overall Percentage Spent Percent ($)Invoiced Spent Previously Current Remaining Invoice Balance Professional Services Invoice Project Manager: Seth Cooksey Project: Alta Mesa Drive and Woodway Drive Intersectior City Project #: 103306 Work Type Desc: IlPreliminary De si n 60% Supplier Instructions: FID: City Sec Number: C-59079 Fill in green cells including Percent Complete and Invoiced Previously Quanities Purchase Order: I When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. Company Name: GEI consultants, Inc Suppliers PM: James Allen email: Jallen@geiconsultants.com Supplier Invoice #: Office Address: 5646 Milton St. Suite 500 Dallas, Tx 75206 Payment Request #: 8 Telephone: (214)753-8100 Service Date:From 3/30/2024 Fax: fax Service Date:To 4/26/2024 Invoice Date: 5/20/2024 Remit Address: PO Box 23916, New York, NY 10087-3916 Pay Items Agreement LTD Agreement Amendment Amendment Amount to Completed Description Amount Number Amount Date Amount 32 - Preliminary Design GEI CONSULTANTS $44,239.45 1 $19,956.00 $64,195.45 32- Preliminary Design LEE ENGINEERING $14,025.00 1 $2,500.00 $16,525.00 32 - Geotech Report HVJ $5,960.00 $5,960.00 GEI CDC $250.00 $250.00 GEI SUB MARKUP $599.55 1 $75.00 $674.55 Totals This Unit: $65,074.00 $22,531.00 $87,605.00 Overall Percentage Spent Percent ($)Invoiced Spent Previously Current Remaining Invoice Balance Professional Services Invoice Project Manager: Seth Cooksey Project: Alta Mesa Drive and Woodway Drive Intersection City Project #: 103306 Work Type Desc: IFinal Desi n 90&100% and Bid Supplier Instructions: FID: City Sec Number: C-59079 Fill in green cells including Percent Complete and Invoiced Previously Quanities Purchase Order: I When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. Company Name: GEI consultants, Inc Suppliers PM: James Allen email: Jallen@geiconsultants.com Supplier Invoice #: Office Address: 5646 Milton St. Suite 500 Dallas, Tx 75206 Payment Request #: 8 Telephone: (214)753-8100 Service Date:From 3/30/2024 Fax: fax Service Date:To 4/26/2024 Invoice Date: 5/20/2024 Remit Address: PO Box 23916, New York, NY 10087-3916 Pay Items Agreement LTD Agreement Amendment Amendment Amount to Completed Description Amount Number Amount Date Amount 33 - Final Design GEI -FINAL DESIGN $17,317.78 1 $3,918.00 $21,235.78 33 - Final Design LEE ENGINEERS -FINAL DESIGN $9,619.00 $9,619.00 GEI -BID PHASE $9,702.00 $9,702.00 GEI SUB MARKUP $288.57 $288.57 GEI ODC $700.00 $700.00 Totals This Unit; $37,627.35 $3,918.00 $41,545.35 Overall Percentage Spent Percent ($)Invoiced Spent Previously Current Remaining Invoice Balance Professional Services Invoice Project Manager: Seth Cooksey Project: Alta Mesa Drive and Woodway Drive Intersectio City Project #: 103306 Work Type Desc: ROW/Easement; Survey; SUE Supplier Instructions: FID: City Sec Number: C-59079 Fill in green cells including Percent Complete and Invoiced Previously Quanities Purchase Order: I When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. Company Name: GEI consultants, Inc Supplier's PM: James Allen Supplier Invoice #: Payment Request #: 8 Service Date:From 3/30/2024 Service Date:To 4/26/2024 Invoice Date: 5/20/2024 Pay Items Description email: Jallen@geiconsultants.com Office Address: 5646 Milton St. Suite 500 Dallas, TX 75206 Telephone: j214j753-8100 Fax: fax Remit Address: PO Box 23916, New York, NY 10087-3916 Agreement LTD Agreement Amendment Amendment Amount to Completed Percent ($) Invoiced Current Remaining Amount Number Amount Date Amount Spent Previously Invoice Balance CRIADO-DESIGN SURVEY $54,740.00 1 $5,000.00 $59,740.00 CRIADO - SUE $47,985.00 $47,985.00 CRIADO- BOUNDARY $24,340.00 $24,340.00 GEI SUB MARKUP $3,811.95 1 $150.00 $3,961.95 Totals This Unit; $130,876.95 $5,150.00 $136,026.95 Overall Percentage Spent Professional Services Invoice Project Manager: Seth Cooksey Project: Alta Mesa Drive and Woodway Drive Intersectior City Project #: 103306 Work Type Desc: lPermitting supplier Instructions: FID: City Sec Number: 0-59079 Fill in green cells including Percent Complete and Invoiced Previously Quanities Purchase Order: When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. Company Name: GEI Consultants, Inc Supplier's PM: James Allen Supplier Invoice #: Payment Request #: 8 Service Date:From 3/30/2024 Service Date:To 4/26/2024 Invoice Date: 5/20/2024 Pay Items Descrietion email: Jallen@geiconsultants.com Office Address: 5646 Milton St. Suite 500 Dallas, TX 75206 Telephone: (214)753-8100 Fax: fax Remit Address: PO Box 23916, New York, NY 10087-3916 BARTLER & WEST GEI CDC GEI SUB MARKUP Totals This Unit: Agreement LTD Agreement Amendment Amendment Amount to Completed Amount Number Amount Date Amount $14,290.00 $14,290.00 $2,750.00 $2,750.00 $428.70 $428.70 $17,468.70 $17,468.70 Overall Percentage Spent: Percent Spent ($) Invoiced Previouslv_ Current Remaining Invoice Balance Task No. Task Description Rat 1.0 Protect Manngqement 1.1 Managir�p the "I"earn 1.1.1 Internal Team Meetings 1.1.2 Qi 1.2 Communications a P ppo (rig Poonina 1 2.1 Pre-DesleG�n ion Meetinq 1.2.2 Month)`( Proiect y to Moo 5 Moo Cc. 1.2.3 Design Sulo—tta Mee 1.2.4 Prepare Baseline Schedule Prepare Monthly Progress Reports with 1.2.5 Schedule 1.2.6 Pret)Ate Monthly MBE/SBE Reports 1.2.7 Invoicing 1.3 LEE - Proiect Manaqement 1.4 CAI - Pro act Mana ant 3.0 Preliminary Desirin Percent) 3.1 Preliminary Uess�gn Drawings 3.1.1 Cover, Index, CIuanbties Utility Plan (Surface Appertenance 33.1..2 3.15 pdlustments ot Sheet 1.6 Uctr Typical Sections 3.1.7 Removals 3 1.8 Roadway Intersection Layout/ Paving Plan 3.1.9 Grading Flan 3.1.13 Signi,�pI Stripi.% Plan Pre -Final Specifications, Project Manual, and 31.14 Checklists 3.3 Constructability Review 3.4 public Meeting Criado - Utility Clearance, Coordination and 3.5 Conflict Matrix; SUE Plan Sheet 3.6 --raffic Control Plan 3.7 Proiect Decision LQ 3.8 Construction Estimate 3.8 l),glive�ayJe/review comments 3.10 E--- ummaion 3.11 LEE - SiTal Design 4.0 Final Des Final Draf( (90%) Construction Plans and 4.1 Specifications 4.2 Final (100%) Plans and Specifications 4.3 Proiect Decision LQQP (90 % and 100 % 4.5 Construction Est i akes (90% and 100°0) Criado - Right-of-Way/Easement Preparation 5.2 and Submittal City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date 8.09.2012 Level of Effort Spreadsheet : Amendment 1 TASK/HOUR BREAKDOWN Design Services for Alta Mesa at Woodway Drive City Project No. 103306 Labor hours) E4 nse Project Pro'ect Proiect Total Labor Total Expense 7irector I Manager I Engineer EIT CADD Administrative Cost Subconsultant Travel Reproduction Cot Task Sub Total $241 $204 $171 $123 $105 $7511 MWBE INon-MWBEI I 2 4 4 8 8 12 4 4 4 4 2 6 4 8 4 8 12 4 4 1 4 2 bYilrlf Project Summq y Total Hours 190 Total Labor $31,164 Total Expense $7,500 Non-MR(7.5 �QF SITMarkup $$225 MBE/SBE Particigton 0.0% Total Proiecf Cost $38,889 1 Of ID Task Task Name Dumhon Star) Finish Resou-1, 2, 2023 11,213 1 1142023 prt, 2024 112, 201 Ra 3, 2p24 111214 pr t, 2025 e Made Name, 4n. M, u M,. M 4 u I 2 Al Data Collection 5.4 wks Thu 4/6/23 Fri 5/12/23 3 10, Kick Off Meeting 1 day Thu 4/6/23 Thu 4/6/23 11 4 ar Site Visit 1 day Thu 4/6/23 Thu 4/6/23 117 5 ar Obtain As -Built 1 day Thu 4/6/23 Thu 4/6/23 11 Information 6 ar Topographic Survey 3wks Mon 4/10/23 Fri 4/28/23 7 { Environmental 3wks Mon 4/10/23 Fri 4/28/23� Review 8 '0, Subsurface Utility 3 wks Mon 4/10/23 Fri 4/28/23 Engineering w. Traffic Counts 1 wk Mon 4/10/23 Fri 4/14/23 i 10 { Conceptual Plans 30% 7.6 wks Mon 5/1/23 Fri 6/23/23 11 N. Traffic Counts 1wk Mon 5/1/23 Fri 5/5/23 12 Traffic5tudy 2wks Mon 5/8/23 Fri 5/19/23 13 Ri Design Report 4.8 wks Mon 5/22/23 Mon 6/26/23 14 { Intersection 7.6 wks Mon 5/1/23 Fri 6/23/23 Schematic 15 W. Initial OPCC 0.8 wks Wed 6/21/23 Mon 6/26/23 16 It City Review 3 wks Mon 6/26/23 Fri 7/14/23 17 Preliminary PS&E 60% 115 days Mon 7/17/23 Fri 12/22/23 18 { Geotechnical Survey 6 wks Mon 7/17/23 IFri 8125/23 19 W. PS&E Plans 11 wks Mon 10/9/23 Fri 12/22/23 20 ae QA/QC 2 wks Mon 12/11/23 Fri 12/22/23 21 0: �. Construction 2 wks Mon 12/11/23 Fri 12/22/23 Estimate 22 . City Review 3 wks Wed 2/21/24 Tue 3/12/24 23 10 Amendment #1 73 days Wed 3/13/24 Fri 6/21/24 24 10 Modify Preliminary 3 wks Mon 6/24/24 Fri 7/12/24 Plans 25 Pre -Final Plans 90% 35 days Mon 7115/24 Fri 8/30/24 26 . Disposition Review 1 wk Mon 7/15/24 Fri 7/19/24 Comments 2 aii Update PS&E Plans 5 wks Mon 7/22/24 Fri 8/23/24 28 . Boundary 6 wks Mon 7/15/24 Fri 8/23/24 Documents 29 ain. QA/QC 1 wk Mon 8/26/24 Fri 8/30/24 30 w. Update Construction 1 wk Mon 8/26/24 Fri 8/30/24 Estimae 31 . City Review 3 wks Men 9/2/24 Fri 9/20/24 32 . Final Plans 100% 30 days Mon 9/23/24 Fri 11/1/24 33 . Disposition Review 1 wk Mon 9/23/24 Fri 9/27/24 Comments 34 . Update PS&E Plans 4 wks Mon 9/23/24 Fri 10/18/24 35 W. QA/QC 1 wk Mon 10/21/24 Fri 10/25/24 36 a: n Update Construction 1 wk Mon 10/21/24 Fri 10/25/24 Estimae 37 { Submit Plans for 1 wk Mon 10/28/24 Fri 11/1/24 Construction 38 10 Bid Phase Services 46 days Mon 11/4/24 Mon 1/6/25 39 { Pre -Bid Meeting 1 day Mon 11/4/24 Mon 11/4/24 4g jW] W. Respond to 1 wk Tue 11/5124 Mon 11/11/24 Questions 41 . Addendum If 3 wks Tue 11/5/24 Mon 11/25/24 needed 42 Pre Construction 1 day Wed 12/18/24 Wed 12/18/24 Meeting Pro c2 Pr ject2 Tazk summary �1 Inactive Milestone Duration -Doty J— start -only Date: 4/04/2024 Spirt ................ P'-Summary r1 laanire Summary 0 I Maaual summary ltollup Finish -only Milestone ♦ Inactive Tazk Manual Task Manual summary r -----1 —rnal Tasks Page 1 E Ertemal Milestone ♦ Manual Progress ] Deadline -on ss 103306-EPAM-Altamesa and Woodway Professional Services Agreement Amendment #1 Final Audit Report 2024-09-26 Created: 2024-09-14 By: Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) Status: Signed Transaction ID: CBJCHBCAABAAzIDDOQAtYl5R8K5r11U-tV8xRHkoKZdN "103306-EPAM-Altamesa and Woodway Professional Services Agreement Amendment #1" History Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2024-09-14 - 0:44:31 AM GMT- IP address: 204.10.90.100 Form filling automatically delegated to Jaylyn Harrelson (Jaylyn.Harrelson@fortworthtexas.gov) by Wendi Hedlund (wendi.hedlund@fortworthtexas.gov) 2024-09-16 - 7:36:06 PM GMT Document emailed to Wendi Hedlund (wendi.hedlund@fortworthtexas.gov) for filling 2024-09-16 - 7:36:06 PM GMT Document emailed to Jaylyn Harrelson (Jaylyn.Harrelson@fortworthtexas.gov) for filling 2024-09-16 - 7:36:06 PM GMT 0o Form filled by Wendi Hedlund(wendi.hedlund@fortworthtexas.gov) Form filling Date: 2024-09-17 - 2:20:11 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Seth Cooksey (seth.cooksey@fortworthtexas.gov) for filling 2024-09-17 - 2:20:13 PM GMT Email viewed by Seth Cooksey (seth.cooksey@fortworthtexas.gov) 2024-09-17 - 5:09:39 PM GMT- IP address: 104.28.97.22 &6, Form filled by Seth Cooksey (seth.cooksey@fortworthtexas.gov) Form filling Date: 2024-09-20 - 3:48:47 PM GMT - Time Source: server- IP address: 166.198.250.61 Document emailed to Joe Garcia (jgarcia@geiconsultants.com) for signature 2024-09-20 - 3:48:50 PM GMT FoRTWORTH, I P—e'b' Adobe Acrobat Sign " j Email viewed by Joe Garcia Qgarcia@geiconsultants.com) 2024-09-20 - 4:25:04 PM GMT- IP address: 107.77.197.112 i Email viewed by Joe Garcia Qgarcia@geiconsultants.com) 2024-09-26 - 2:09:41 PM GMT- IP address: 185.251.47.81 Document e-signed by Joe Garcia agarcia@geiconsultants.com) Signature Date: 2024-09-26 - 2:11:16 PM GMT - Time Source: server- IP address: 216.201.234.122 Agreement completed. 2024-09-26 - 2:11:16 PM GMT FoRTWORTH, I P—e'b' Adobe Acrobat Sign FORTWORTH, '11"Ir Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE : Altamesa and Woodway Professional Services Agreement Amendment #1 M&C:23-0026 CPN:103306 CSO: 59079 DOC#: DATE: 7-16-2024 TO: NAME INITIALS DATE OUT 1 Wendi Hedlund - Review Sep 17,2024 2 Seth Cooksey - Review °' Sep 20, 2024 3 Joe Garcia - Signature Sep 26, 2024 4 Lissette Acevedo - Review Arrvrl v;a Agjloft m• 1412 5 Patricia Wadsack - Review 6 Lauren Prieur - Review 7 Doug Black - Signature °g oct3,2024 8 Jesica McEachern -Signature cv- Oct9,2024 9 Jannette Goodall - Signature 7 - Oct9,2024 10 Chad Allen - Review DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: YES ❑ NO RUSH: YES 0 SAME DAY: YES ❑ NO ® NEXT DAY: YES ❑ NO ROUTING TO CSO: YES ® NO ❑ Action Required: ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File Attach Signature, Initial and Notary Tabs Return To: seth.cooksey@FortWorthTexas.gov for pick up when completed. Thank you! Page of Amendment Purnose Statement: The purpose of this engineering amendment is to provide additional design services to account for significant scope changes that have been incorporated into the project after the project scope was finalized. This effort includes the additional project management, design and ROW/easement services required to implement the design of the sidewalks and ADA ramps in the northwest, southeast and southwest corners of the intersection for adequate grading and PROWAG compliance. It also includes the replacement of the pavement at the southwest corner of the intersection to address the existing cracks in the pavement, along with the appropriate traffic control plans. Lastly, the amendment incorporates adding illumination to the intersection and the required documentation to transfer ownership of the ONCOR easement and ROW to the City of Fort Worth. Altamesa at Woodway Intersection CPN 103306