NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Landing of Creekside Phase 2
City Project No.: 104129
Improvement Type(s): x❑ Paving ❑x Drainage x❑ Street Lights ❑ Traffic Signals
(Original Contract Price:
$1,343,506.50
Amount of Approved Change Order(s):
$17,107.00
(Revised Contract Amount:
$1,360,613.50
�otal Cost of Work Complete:
$1,360,613.50
Z" Aug 29, 2024
Arturo Sancen (Aug29, 202416:50 CDT)
Contractor Date
Superintendent
Title
Conatser Construction TX, LLC
Company Name
Toe silver
Joey Silva Aug 30, 202414:07 CDT)
Aug 30, 2024
Project Inspector
Date
Sep 3, 2024
Project Manager
Date
Se 3 2024
p
Rebecca Owen (Sep 3, 202407:50 CDT)
CFA Manager
Date
Lauren Lauren Prieur(Sep 3, 202408:29 CDT)
Sep 3, 2024
TPW Dire for
Date
Sep 3, 2024
Asst. City Manager
Date
OFFICIAL RECORD
CITY SECRETARY Page 1 of 2
FT. WORTH, TX
Notice of Project Completion
Project Name: Landing of Creekside Phase 2
City Project No.: 104129
City's Attachments
Final Pay Estimate ❑x
Change Order(s): ❑x Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time 160 WD
Work Start Date:8/1/2023
Completed number of Soil Lab Test: 490
Completed number of Water Test: 13
Days Charged: 223 WD
Work Complete Date: 8/26/2024
Page 2of2
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name LANDING AT CREEKSME PHASE 2
Contract Limits
Project Type DRAINAGE, PAVING & STREETLIGHTS
City Project Numbers 104129
DOE Number 4129
Estimate Number 1 Payment Number 1 For Period Ending 8/26/2024
WD
City Secretary Contract Number Contract Time 16WD
Contract Date Days Charged to Date 223
Project Manager NA Contract is 100.00 Complete
Contractor CONATSER CONSTRUCTION TxLP
5327 WICHITA ST
FORT WORTH, TX 76119
Inspectors M. GLOVER / J. DAVIS
Thursday, August 29, 2024 Page 1 of 5
City Project Numbers 104129
Contract Name LANDING AT CREEKSIDE PHASE 2
Contract Limits
Project Type DRAINAGE, PAVING & STREETLIGHTS
Project Funding
UNIT III: DRAINAGE IMPROVEMENTS
DOE Number 4129
Estimate Number 1
Payment Number 1
For Period Ending 8/26/2024
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1
TRENCH SAFETY
1877 LF
$2.00
$3,754.00
1877
$3,754.00
2
SWPPP > 1 ACRE
1 LS
$3,500.00
$3,500.00
1
$3,500.00
3
12" ROCK RIPRAP
85 SY
$145.00
$12,325.00
85
$12,325.00
4
21" RCP, CLASS lII
139 LF
$75.00
$10,425.00
139
$10,425.00
5
24" RCP, CLASS lII
1464 LF
$85.00
$124,440.00
1464
$124,440.00
6
27" RCP, CLASS III
166 LF
$95.00
$15,770.00
166
$15,770.00
7
30" RCP, CLASS III
108 LF
$105.00
$11,340.00
108
$11,340.00
8
4' STORM JUNCTION BOX
5 EA
$7,000.00
$35,000.00
5
$35,000.00
9
10' CURB INLET
8 EA
$4,000.00
$32,000.00
8
$32,000.00
10
15' CURB INLET
1 EA
$5,000.00
$5,000.00
1
$5,000.00
11
20' CURB INLET
1 EA
$6,000.00
$6,000.00
1
$6,000.00
12
27" 4:1 SLOPED END HEADWALL
1 EA
$3,500.00
$3,500.00
1
$3,500.00
13
30" 4:1 SLOPED END HEADWALL
1 EA
$4,000.00
$4,000.00
1
$4,000.00
-------------------
Sub -Total of
Previous Unit
$267,054.00
$267,054.00
UNIT IV: PAVING IMPROVEMENTS
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1
HYDRATED LIME (CO#2)
0 TN
$235.00
$0.00
0
$0.00
2
6" LIME TREATMENT (30#/SY)
14633 SY
$4.00
$58,532.00
14633
$58,532.00
3
6" CONC PVMT
13721 SY
$56.00
$768,376.00
13721
$768,376.00
4
4" CONC SIDEWALK
9501 SF
$4.50
$42,754.50
9501
$42,754.50
5
BARRIER FREE RAMP, RYPE P-1
6 EA
$2,200.00
$13,200.00
6
$13,200.00
6
TOPSOIL
195 CY
$24.00
$4,680.00
195
$4,680.00
7
SEEDING, HYDROMULCH (CO#1)
0 SY
$2.00
$0.00
0
$0.00
8
FURNISH/INSTALL ALUM SIGN GROUND
4 EA
$750.00
$3,000.00
4
$3,000.00
MOUNT CITY STD - NAME BLADES
9
FURNISH/INSTALL ALUM SIGN GROUND
3 EA
$750.00
$2,250.00
3
$2,250.00
MOUNT CITY STD - STOP
10
CONSTRUCT 29' PVMT HEADER
1 EA
$1,000.00
$1,000.00
1
$1,000.00
11
REMOVE BARRICADE & CONNECT TO
4 EA
$1,500.00
$6,000.00
4
$6,000.00
EXISTING
Thursday, August 29, 2024 Page 2 of 5
City Project Numbers 104129
Contract Name LANDING AT CREEKSME PHASE 2
Contract Limits
Project Type DRAINAGE, PAVING & STREETLIGHTS
Project Funding
12 6" UNREINFORCED CONCRETE 323 SY
13 6" COMPACTED SUBGRADE 350 SY
14 SODDING (CO#1) 1167 SY
15 HYDRATED LIME (36#/SY) (CO#2) 262 TN
----------------------
Sub-Total of Previous Unit
UNIT V: STREETLIGHTS
DOE Number 4129
Estimate Number 1
Payment Number 1
For Period Ending 8/26/2024
$52.00
$16,796.00
323 $16,796.00
$4.00
$1,400.00
350 $1,400.00
$8.00
$9,336.00
1167 $9,336.00
$235.00
---------------
$61,570.00
262 $61,570.00
$988,894.50
$988,894.50
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
---------------------------------------
1
2" CONDT PVC 80 (T)
721 LF
$15.00
$10,815.00
721
$10,815.00
2
RDWY ILIUM FOUNDATION TY 1,2, AND 4
21 EA
$1,200.00
$25,200.00
21
$25,200.00
3
RDWY ILIUM TY 11 POLE
21 EA
$1,800.00
$37,800.00
21
$37,800.00
4
INSTALL TYPE 33B ARM
21 EA
$600.00
$12,600.00
21
$12,600.00
5
TYPE R2 LUMINAIRE
17 EA
$850.00
$14,450.00
17
$14,450.00
6
TYPE R4 LUMINAIRE
4 EA
$950.00
$3,800.00
4
$3,800.00
Sub -Total of Previous Unit
$104,665.00
$104,665.00
Thursday, August 29, 2024 Page 3 of 5
City Project Numbers 104129
Contract Name LANDING AT CREEKSIDE PHASE 2
Contract Limits
Project Type DRAINAGE, PAVING & STREETLIGHTS
Project Funding
Contract Information Summary
Original Contract Amount
Change Orders
Change Order Number 1
Change Order Number 2
DOE Number 4129
Estimate Number 1
Payment Number 1
For Period Ending 8/26/2024
$1,343,506.50
$7,002.00
$10,105.00
Total Contract Price $1,360,613.50
Total Cost of Work Completed $1,360,613.50
Less % Retained $0.00
Net Earned $1,360,613.50
Earned This Period $1,360,613.50
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$1,360,613.50
Thursday, August 29, 2024 Page 4 of 5
City Project Numbers 104129
Contract Name LANDING AT CREEKSIDE PHASE 2
Contract Limits
Project Type DRAINAGE, PAVING & STREETLIGHTS
Project Funding
Project Manager NA
Inspectors M. GLOVER / J. DAVIS
Contractor CONATSER CONSTRUCTION TxL,P
5327 WICHITA ST
FORT WORTH, TX 76119
DOE Number 4129
Estimate Number 1
Payment Number 1
For Period Ending 8/26/2024
City Secretary Contract Number
Contract Date
Contract Time 160 WD
Days Charged to Date 223 WD
Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $1,360,613.50
Less % Retained
$0.00
Net Earned
$1,360,613.50
Earned This Period $1,360,613.50
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$1,360,613.50
Thursday, August 29, 2024 Page 5 of 5
DocuSign Envelope I D: 23928985-8542-4E97-BCED-71EF95D51FE6
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
IPROJECT NAME:
Landlno atCreekside Phase 2
CONTRACT:
Water. Sewer. Drainage. Pavina and Street Name Sian Improvements
ICFA #
23-0031 CITY PARTICIPATION:( NO
I CITY PROJECT #
104129
IFID #
30114.0200431-104129-E07685
FILE #
W-2838
INSPECTOR:
Jesse Davis Phone No: 817-863-3705
PROJECT MANAGER:
Sandip Adhikad Phone No: 817-392-8424
WATER
I ORIGINAL CONTRACT
$468.101.00
(EXTRAS TO DATE
$0.00
(CREDITS TO DATE
$0.00
ICONTRACT TO DATE
$468,101.00 10.00
AMOUNT OF PROP. CHANGE ORDER
$5,200.00
19Y9§ffi j
$473,701.00 3000
�(�r] 0UM
P�ERR+oUNIT
$473,301.00
REVISED COST SHARE
Dev. Cost:
TOTAL REVISED CONTRACT
SEWER
$662,210.00
$2,281.354.50
CONTRACT UNIT
PAVING
DovobOer Cost
$911.787.50
REVIEWED
lBy Sandlp Adhlkar! at 11:06 pm, Jan 15, 2024
CHANGE
ORDER No:
f
I
CONTRACT
DAYS
C Cost
I DRAINAGE
Dovolo er Cost CI Cost
i STREETLIGHTS
Dovolo or Cost CI Cost
$267,054.00
50.00
E267,056.00
50.00
50.00
SOAO
5267,050.00
50.00
50.00
50.00
9.50
$287.060.00
50.00
$911.787.50 I
37,002.00 I
$978,789.50 I
$978,78 --�' "
City cost. i0-00
$2,281,354.50
140
0
140
Revised: 10-12-2011 Page 1
DocuSign Envelope ID: 23928985-8542-4E97-BCED-71EF95D51FE6
Asterisk (') indicates a new pay Item number.
You are directed to make the following changes in the contract documents:
CITY EI#D ITEh1
PAY ITEM # I I
QUANTITY I
UNIT
UNJ
R I • WATER
9
I 9999.0001 I
1
I
11
9999,0012
1
EA
UNIT If • SEWER
5 I 3331.3101 I
1 I
EA 1
UNIT IV - PAVING
I I
I
14' 3292.0400
1167
SY
Asterisk (') Indicates New Pay Item
ITEM DESCRIPTION UNIT PRICE TOTAL I
CE $ 1,200.00 $1.200.00
1' Itkffi ICE S 11,500.00 $1'q00.00 J
1.5 IRRIGATION SERVICE $ 2.500.00 $2.5500.00 J
Subtotal Unit] -Water improvements 55.200.00 I
4'SEWERSERVICE I S 9D0.00 $900.00 J
Subtotal Unit 11- Sewer improvements $900.00 J
SEEDING, HYDROMULCH I S 2.00 1'2.334.00)
SODDING $ 8.00 $9.336.00 j
Subtotal Unit 1V • Paving Improvements $7.002.00 i+
GRAND TOTAL $13.102.00
REASONS FOR CHANGE ORDER SERVICES ADDED TO ADJACENTPROPERTYAND IRRIGATION SERVICESADDED. SODDING CHANGE TO REFLECTCITY STANDARDS UPDATE
RECOMMENDED:
INC
L A ENGINEERING,
By: �.�-� U.� �-w-s-
Nam :Jake Thomas
Trile: Prolect Engineer
APPROVED:
Lennar Homes of Texas Land
ox�s�I:� sCr.°nsWclion
By:
euuoo_
Name: JennHer Eller
TIOe: Authorized Anent
APPROVED:
Conatser Construction
TX, LP
By4�
00
Name: Brock Huggins
Mile: President
REVIEWED
Sy Sandip Adhikari of 11:06 pm, Jan 15, 2024
Revised: 10-12-2011
Page 2
DocuSign Envelope ID: OBAC3B724C8B4752-915F-7FCD8EA3E657
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
PROJECT NAME:
Landinq at Creekside Phase 2
CHANGE
CONTRACT:
Water, Sewer. Drainaqe, Pavina and Street Name Sion Improvements
ORDER No:
CFA #
23-0031 CITY PARTICIPATION: NO
CITY PROJECT #
104129
FID #
30114-0200431-104129-EO7685
2
FILE #
W-2838
INSPECTOR:
Jesse Davis Phone No: 817-863-3705
PROJECT MANAGER:
Sandip Adhikari Phone No: 817-392-8424
I CONTRACT UNIT
WATER SEWER PAVING
DRAINAGE STREET LIGHTS
CONTRACT
j
I
DAYS
C1L,��Oevoloper
DeveloperCost l_ 1 Cost �rCoxDoveloDercost ,f.nf, 't
N����
DevelonerCoel c,p Co;:. Dovolo corCoal
ORIGINAL CONTRACT
$468,101.00 _� '"`� $561.310.00 ,_ $971787.50 _ =
.�
$267054.00 __ _ _
EXTRAS TO DATE
S5.200.00 { $900.00 r
$7.002.00Wr
CREDITS TO DATE
-." _-
' $0.00 $0.00 ._. ---
F -
CONTRACTTO DATE
$473,301.00 _ $d.tTp __' 3562,210.00 __ $978,789.50 �9P
`
$267,054.00 n W,
140
AMOUNT OF PROP. CHANGE ORDER
$0.00 $0.00 .. 11D105.00
0
_
Y Q RAC7AMOUNT
5473,301.00 18,00' 1 1.80- 598,89.0 -. _.
5267,04,00 1 .- 50.00 t090ra;„
t2S €N�' 6corrT ACTAMOUNT
ff210.00
PER UNIT
$473,301.00 $562,210.00 $9881891.50
$267.051,00 $0.00
REVISED COST SHARE
DBV. Cost: $2,291,459.50 my(.0 ,i
cn WI
TOTAL REVISED CONTRACT
$2,291,459.50
REVIEWED
By Sandip Adhikari at 9:05 am, Apr 02, 2024
Revised: 10-12-2011 Page 1
DocuSign Envelope ID: 08AC3B72-4C8B-4752.915F-7FCD8EA3E657
Asterisk (') indicates a new pay ltem number.
You are directed to make the fctlowlnc chances In the contract documents
I CITY BI#D ITElA I
I
PAY ITEM #
I
OUAtdT17Y
UNR
REM DESCRIPTION
UNR PRICE
I TOTAL
I 15'
I 32110400 I
262 I
UJT IV - PAVING
Thl
TN I
��))
H rat dUmeated Lime �361#SY1
5 235.00
$ 235.00I
fV1.570 '165 D01
60\\570.00
Su total UnFt IV Pavinq Imwovemants
10)05.00
GRAND TOTAL
10.105.00
Asterisk (') Indicates New Pay Item
REASONS FOR CHANGE ORDER LIME#/SYFOR SUBGRADE UPDATED BASED ON LATESTLIAIE SERIES,
RECOMMENDED:
LJA ENGINEERING, INC
Name: Jake Thomas
Title: Assistant Protect Manaaer
APPROVED:
rnfy � �J KTexas Land
- n o SA*tion
Br. .n»>A,.e .���...
Name: JennRer FJler
Title: Authorized Aaent
APPROVED:
Conatser Construction
TX'LP
By:
UU
Name: Brock Huaains
Title: President
REVIEWED
By Sandip Adhikari at 9:05 am, Apr 02, 2024
Revised: 10-12-2011
Page 2
FORTWORTH.
TRANSPORTATION AND PUBLIC WORKS
August 26, 2024
Conatser Construction, TX, LLC
5327 Wichita St.
Fort Worth, Texas 76119
RE: Acceptance Letter
Project Name: Landing At Creekside Phase 2
Project Type: Drainage, Paving, Street Lights
City Project No.: 104129
To Whom It May Concern:
On August 13, 2024 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on August 26, 2024. The final inspection
and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and
is therefore accepted by the City. The warranty period will start on August 26, 2024, which is the date of
the punch list completion and will extend of two (2) years in accordance with the Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
392-8424.
Sincerely,
Sandip Adhikari, Project Manager
Cc: Joey Silva, Inspector
Mike Glover, Inspection Supervisor
Randy Horton, Senior Inspector
Andrew Goodman, Program Manager
UA Engineering, Consultant
Conatser Construction, Contractor
Lennar Homes of Texas, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANf
Before me, the undersigned authority, a Notary Public in the state and county aforesaid,
on this day personally appeared Brock Huggins, President of Conatser Management Group. Inc..
general partner of Conatser Construction TX. LP, known to me to be a credible person, who
being by me duly swam, upon his oath deposed and said:
That all persons, firms, associations, corporations or other organizations furnishing
labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth, has
been paid in full; and
That there are no claims pending for personal injury and/or property damages;
On Contract described w7
LANDING AT CREESSIDE PH. 2
WATER, SANITARY SEWER, DRAINAGE, PAVING,
& STREET LIGHT IMPROVEMENTS
CFA PRJ #: 23-0031
CITY PROJECT #:104129
CITY OF FORT WORTH
STATE OF TEXAS
CONATSER CONSTRUCTION TX, LP
BrockBrock luggA
Subscribed and sworn to before me this 28TH day of August, 2024.
KQL
1111= =1-1 Notary Public in Tarrant County,
Pbt
MY �m�W�IML�ip4n
CONSENT OF
OWNER ❑
ARCHITECT El
SURETY COMPANY
CONTRACTOR ❑
TO FINAL PAYMENT
SURETY ❑
Conforms with the Am n 1N.61—of
OTHER
Aachltecia, AM Dr,gf T 0707
WO WD2519f7
PROJECT:
{name, dddress)Land,ngat Creekade Phase2
Pon Wonh, TX
TO !Owner)
� Gry Protect
ICIrY OF FORWRTH/wOLENN7rRHOME50F ARCHITECT'S PROJECT NO: No 1Wt29
s EXAS LAND nNC CONBrRUCrAnN CONTRACT FOR:
20C Tana SttaN Vln.c Survtav 5ewe, OrWnge. 8 P..v ImprMrrenu k, Lawn
al f,ree4�rle nuxl
L Woom TX 76102 J CONTRACT RATE:
CONTRACTOR: CONATSER CONSTRUCTION TX. L P
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
sw. — ww ..D.aa... m le— camw..l
BERXLEY INSURANCE COMPANY
e75 Steamboat Road
Grcanwcn CT W6 1,0
. SURETY COMPANY
on hoed of ITN. k,wn n.aw a,a. awat eo—,
CONATSER CONSTRUCTION TX, L.P
5027 Wrhla SI
F. Worm TX 76119,6035
, CONTRACTOR,
booby apprOves of the final payment to the, Crmtraclo7, and agrees fhat final payment to the C'om—tnr shall not relieve
die Surety Company of any of iu oblipLiam to — w min. na .ouw. o o—
CITY OF FORT WORTH AND LENNAR HOMES OF TEXAS LAND AND CONSTRUCTION, LTD
200 Texas Street
Fort Worth TX 75102
OWNER,
as set forth in The said Surety Company's band.
IN 9 rINESS, WHMREOF.
the Surety Company has hereunm se its hand this
Attest:
ISeAl1' ".,Gram cc -w-
27th day of Al gust 2024
BERKLEY INSURANCE COMPANY
Surety Company
Slgnahtre o(AuthOFized Represenutive
Via: AtLzM-InFact
TitIc
Nara IN. r.rm q le N urN n . canwmm a.cumvm ra ILL. DMUME T 4709. CaNTMCTmre AFROAYR OF PAYMENT OF DEBTS Me lVaB li.
Crer.n� Fal�an
ONE PAGE