Loading...
HomeMy WebLinkAboutContract 56846-A2CSC No. 56846-A2 AMENDMENT No . 2 TO CITY SECRETARY CONTRACT No. 56846 WHEREAS, the City of Fort Worth (CITY) and Teague Nall & Perkins, Inc., (ENGINEER) made and entered into City Secretary Contract No. 56846, (the CONTRACT) which was authorized by M&C 21-0875 on the 9th day of November, 2021, in the amount of $188,066.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No.l in the amount of $329,198.00 authorized by M&C 23-0912 on October 31, 2023; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2019 WSM-K, CPN 103416; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $78,440.00(Water). 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $595,704.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas W/SS Repl Contract 2019 WSM-K Prof Services Agreement Amendment Template CPN 103416 Revision Date: 12/08/2023 Page 1 of 2 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth P. C. wx-4j William Johnson (C t 11, 202410:26 CDT) William Johnson Assistant City Manager Oct ll) 2024 DATE: gQovoup q4 FDRT�ad O��OF00000 000OpldO Fo ATTEST: 000 oxd aa�p lr z4d bnaaa49' Jannette Goodall City Secretary APPROVAL RECOMMENDED: Christooher- Hiatder Christopher Harder (Oct 8, 202414:17 CDT) Christopher Harder, P. E. Director, Water Department Contract Compliance Manager: ENGINEER Teague Nall & Perkins, Inc. Andrew Luce, P.E. Director of Engineering Services, Associate Principal DATE: 9- 26 - 202 T By signing, I acknowledge that I am the person responsible for the mpnitnri-g and administration of this contract, including ensuring all performance and reporting requirements. �QN.CL �.Ld/LiZQb/I�i Dena JohnsOson, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: Dou glas tllack ;0 ct 1U. 2:;241� 08 CJ I � Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: 12/00/2023 Page 2 of 2 M&C No.#: 24-0836- Funding M&C Date: September 17, 2024 Form 1295: N/A 11/SS Repl Contract 2019 VISM-K CPIJ 103416 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Contract Amendment No. 2 To: Dena Johnson, PE — City of Fort Worth CC Tony Sholola, PE — City of Fort Worth From: Taylor Gunderman, PE REV Date: July 31, 2024 Mtn www.tnpinccom engineers surveyors landscape architects RE: Additional Professional Services Water and Sewer Replacements Contract 2019, WSM-K (Project No. 103416) TEXAS FORT WORTH DENTON ALLEN HEATH KATY Per the City's request, we offer this contract amendment for additional water design services associated with the WSM-K Water and Sewer Replacement contract. The City has requested that TNP expand the scope of the project to include additional water line as shown in the tables below: WATER IMPROVEMENTS Street Name Notes Size (in) Length (LF) James Avenue, Butler Street 8" Proposed Water Line 8 710 Ripy Street 12" Water Line to be Replace 4 & 12 230 Total 940 The addition of the water lines shown above will include the following additional services: • Design of 940 LF of Water Line • Re -Design of 150 LF of 8" Water Line and 3,335 of 24" Water Line on Biddison Street, Ryan Avenue and Dickson Street required due to TPW approving the removal of the new asphalt constructed on Ripy St. to complete construction of the water and sewer improvements. Originally directed to design to avoid any damage to the new pavement. This new directive requires multiple revisions to the proposed alignments, connections, stationing, etc. of the 24", 12" and 8" water lines along Ripy St. and Ryan Ave. • Design Surveys • SUE Level A for 2 gas lines, a RR gate communication/electric line and ex 24" water line crossing/conn. • SUE Level B for a duct bank crossing Summary of Contract Fee: Original Contract Amount: $ 188,066.00 Amendment No. 1 $ 329,198.00 Amendment No. 2 $ 78AA0.00 Revised Contract Amount $ 595,704.00 Please find attached the following contract documents: • Attachment B Compensation • Exhibit B-1 Engineer Invoice • Exhibit B-2 Level of Effort Spreadsheet • Attachment E Project Map Sincerely, tnp teague nail & perkins O J. Taylor Gunderman, P.E. TNP Firm ^ Registrations Texas Board of Professional Engineers and Land Surveyors I Engineering Firm No. F-230 I Surveying Firm No. 10011600 1 10194381 1 1001 1601 Texas Board of Ardhitectural Examiners Firm No. BR 2673 Professional Services Invoice Project Manager:IDena Johnson Project: I Water and Sanitary Sewer Replacements Contract 2019, WSM-K City Project #: 1103416 1 City Sec Number: 156846 Company Name Teague Nall & Perkins. Inc. Consultant's PM: Andrew Luce, P.E. Supplier Invoice #: Payment Request* Service Date:From Service Date:To Invoice Date: Summary Supplier Instructions: Fill in green cells including Invoice Number, From and To Dates and the included worksheets. When your Invoice is complete, save and close, start Buasaw and Add your invoice to the consultant folder within Projects folder. email: lalucercDtnoinacom 1 Office Address 15237 N. Riverside Dr., Suite 100, Fort Worth, TX 76137 Telephone: 1817-66 5-8217 1 Fax: 1817-336-2813 1 Remit Address:15237 N. Riverside Dr., Suite 100, Fort Worth, TX 76137 1 Sheet FID and Work Type Description Work Type 1 Water -Amendments 1 & 2 Work Type 2 Sewer -Amendments 1 & 2 Work Type 3 Water -Original Scope Work Type 4 Sewer -Original Scope Work Type 5 Work Type 6 Totals This Invoice Agreement LTD Agreement Amendment Amountto Completed Amount Amount Date Amount $384.632.00 $384,632.00 $23,006.00 $23,006.00 $127,269.00 $127.269.00 $60,797.00 $60,797.00 S188.066.00 S407.638.00 S595.704.00 Overall Percentage Complete: Percent ($) Invoiced Current Remaining Spent Previously Invoice Balance $384.632.00 $23,006.00 $127,269.00 $60,797.00 S595 704.00 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for CONTRACT AMENDMENT NO. 1 - WATER AND SANITARY SEWER REPLACEMENTS CONTRACT 2019, WSM-K City Project No. 103416 Task Task Description Principal I Project No. Director Manager Rate $2901 $270 17.0 09gI jnePt Services 01 0 Ig -o -Way research and Boundary 1 7.1 (Office and Field Work Right -of -Way Researc & Boundary Survey 1 7.1.1 (Office and Field Work) 1 Right -of --Way Research & Boundary Survey 7.1.2 Office and Field Work), Subconsultant 1 fight-of-Way/Easement Preparation and 7.2 Submittal 0) Right-of-Way/Easement Preparation and 7.2.1 Submittal Right-of-Way/Easement Preparation and 7.2.2 Submittal - Subconsultant 7.3 Temporary Riqht of Entry Submittal (0) I 8.0 Surveyantl SUE OI 8.1 Design Survey 8.2 Temporary R��I!!`iht of E(1nt Sub@mittal 0) fa1'er (SUE 86.3.1 ISSUE Level C/I Cr1R s2) 8.3.2 1 SUE Level B ( I I 8.3.3 I SUE Level A () 9.0 �Permittinp I 01 9.1 li9as P,c 2,r a Crossing Permits (up to 2) I I 9.2 (Tortoni! County Pennks (0) I 1 1 9.3 ITxDOT Permit J0) I I 1 9.4 (Railroad Permits I I 94.NSF 9.4PRR I I e) 9.5 nviron ntal Cultural Resources Pedestrian Survey and 9.5.1 1 Ageqp Coordination 1 9.5.2 I Arch Site Recordir)y 9.5.3 I Waters of U.S. Defineation I I NWP 58 Pre -Construction Notification (not 9.5.4I included) 9.5.5 1 USACE Coordination mm atnoc erotection systeUeslgn Services I 10.0 (C 1 �WltlOpal Jery,ces tas requested anct 11.0 lauthorized by City) Totalsl 81 Water Line Footage `F Sewer Line Footage Total Footage Labor (hours) I I Ex ense Project Senior 2-Man Total Labor Total EIT Administrative I Subconsultant Expense Engineer Designer Surv. Crew Cost Travel Reproduction Cost $1801 $160 $12 I $190 $85 MWBE Non-MWBE 01 D 0 0 $0.00 $0.l)l1 $0.00 $0.00 $ 0.00 $0.00 1 I So.00 $0.00 S0.00 I I $0.00 01 481 931 1371 01 01 940 100% 1 0% 940t/1 100% 1 01 I I I I 01 I 1 Fee Breakdown Amendments Amendment2 AlsA2 ungm., Agreement T-1Co1act Task 1 (Design Management): $19,320.00 $0.00 $19.320.00 $14.990.00 $34,310 Task 2 (Concept Design): $48,240.00 $0.00 $48,240.00 $20,590.00 $68.830 Task 2a(Geotech): $21.000.00 $2.075.00 $23.075.00 $0.00 $23,075 Task 3 (Prelim Design): $66.040.00 sel.380.00 $107.420.00 $23.970.00 $131.390 Task 4 (Final Design): $73.560.00 $12.560.DO $86.120.00 $28.090.Do $114,210 Task 5 (Bidding): $8,720.00 $0.00 seT20.00 57.210.00 $15.930 Task Surve&SUE`: $52.918.00 $22.425.00 $75,343.00 549,92eD0 $125,269 .)eslgn & Surve Fee subtotal. $281.798.00 s76,44oxit S366,238.00 $144,776.00 $513,014.00 Task 7 (ROW/Easement): $0 $o $0 $0 Task 6(Construction): 51 e.96a $0 $18.960 $11,270 $30.230 Task 9(Permitting): 520,440 so $20.440 $12.020 $32,460 Task 10 (CP Design: SD $o $o So Top: $329,195.00 $76,440.00 $407.636.0$0 $163.066.OD $575.704.00 Additional 5orvicos $0 s0 $0 $20,000 $20.0 0 Coy or Fort Worth, Taws Attachmore 8-I.-I of Effort Supplomont Typiml We -end 3oxer Ropbrnmmlt Total with Add. Services: $329.198.00 $78.440.00 $407,638.00 $188,066.00 $595,704.00 FVJNTR , fidal Raleaeo Date: 8.092012 $0.001 1 1 1 1 $0.00 $0.001 1 1 $0.00 $0.001 I I 1 $0.00 $22.425.001 $0.001 $0.001 $0.001 $0.001 $0.001 $8.925.00 I I I $0.001 $0.001 I I I 1 $0.001 $13.50D.001 I I I 1 $0.001 $0.001 I I $0.00 $0.001 1- I I S0.00 $0.001 $0.00I $0.001 $0.001 $0.001 $0.001 $0.001 I I I I $0.001 $0.001 I I I I $0.001 $0.001 I $0.001 I $0.001 I I S0.001 $0.001 1 I I 1 $0.001 $0.001 I I $0.001 $0.001 I I I ."01 $0.001 1 I I I $0.001 $0.001 1 I I $0.001 Sa.001 I I I 1 $0.001 i$0.001 $76,365.001 $1,976.001 $0.001 $0.001 $0.001 $1,976.001 I Pro'ect Summary l otal Hours 1 Total Labor 1 Total Expense MBE/SBE Subconsultant Non-MBE/SBE Subconsultan 5% Sub Markup MBE/SBE Participation Total Projeft Cost Task Sub Percent Budget Total Complete Remaining $0.00 #DIV101 $0.00 S0.00 0.0% $0.01) 0.0% SO.001 0.0% $0.001 0.0% $0.001 0.0% $22,425.001 0.0% $8,925.00: 0.0% $0.001 0.0% $13.500.001 0.0% S0.001 0.0% S0.D01 0.0% $0.001 #DIV101 $0.001 0.0% $0.001 0.0% $0.001 0.0% S0.001 D.D% $0.001 0.0% $0.001 0.0% $0.00 0.0% $0.001 0.0% $0.001 0.0% $0.001 0.0% $0.001 0.0% $0.001 0.0 $78,341.001 0.0% 1 286 $76,365.00 0.0% $1.976.011 0.0% $1.976.00 D.D% $0.00 0.0% $99.00 0.0% 2.5% $78,440.00 0.0% $0.00 $0.00 S0.00 $0.00 $0.00 $22.425.00 $8,925.00 $0.00 $13,500.00 S0.00 S0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $78,341.00 $76.365.00 $1.976.00 $1.976.00 S0.00 $99.00 2.5% $78,440.00 I MSE/SBE Breakdown total 0""""AmendmentI Amendment A15A2 Agreement Toll Con1-1 MBE/SBE Fee: $60.874 51976 $62850 $20,625 se3475 MBEISBE Commitment: 15.4 . 11.0% 14.0% MBE/SBE Goal: 10.0% 10.0% 10.0% City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, September 17, 2024 LOG NAME: 60WSSC19WSMKA2TNP-FUNDING REFERENCE NO.: **M&C 24-0836 SUBJECT: (CD 9) Adopt Appropriation Ordinance in the Water and Sewer Capital Projects Fund in the Amount of $78,440.00 for Increased Project Cost Associated with the Water and Sanitary Sewer Replacement Contract 2019 WSM-K Project, and Effect a Portion of Water's Contribution to the Fiscal Years 2024-2028 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $78,440.00, transferred from available PayGo funds within the Water and Sewer Fund, for the purpose of funding the Water and Sanitary Sewer Replacement Contract 2019, WSM-K project (City Project No. 103416) and to effect a portion of Water's contribution to the Fiscal Years 2024-2028 Capital Improvement Program. DISCUSSION: On November 9, 2021, Mayor and Council Communication (M&C) 21-0875, the City Council authorized an engineering agreement in the amount of $188,066.00 with Teague Nall and Perkins, Inc., (City Secretary Contract No. 56846) for the Water and Sanitary Sewer Replacement Contract 2019, WSM-K project. The contract was subsequently revised by Amendment No.1 in the amount of $329,198.00 (M&C 23-0912) authorized on October 31,2023, that provided design and survey for the replacement of additional cast iron water mains in close proximity to the project area. Additional project funds in the amount of $78,440.00 are needed for Amendment No. 2 for additional design and survey efforts for the replacement of cast iron water mains on James Street and Butler Street and revisions to the plans for Ripy Street and Ryan Avenue. Additional Subsurface Utility exploration will also be provided. It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2024-2028 Capital Improvement Program, as follows: 60WSSC19WSMKA2TNP-FUNDING Capital Fund project FY2024 CIP Budget Change Revised Authority FY2024 Name Name Appropriations (Increase/Decrease) Budget Fund 1N/SS 56002 - Repl W&S Contract $329,198.00 This M&C $78,440.00 $407,638.00 Capital 2019 Projects WSM-K Funding is budgeted in the Transfer to Water/Sewer account of the Water and Sewer operating budget for the purpose of funding the Water and Sanitary Sewer Replacement Contract 2019, WSM-K project. FY2024 - Water PAYGO Appropriations per City Ordinance 26453-09-2023 FY2024 FY2024 YTD PayGo This M&C FY2024 Original Amended Approved Remaining Adopted PayGo for/Moved to PayGo PayGo (Includes any Capital Projects Balance council actions subsequent to budget adoption) $84,505,035.00 $143,330,035.00 ($92,565,439.38) ($78,440.00) $50,686,155.62 Appropriations for Water/Sanitary Sewer Replacement project are as depicted below: Fund W&S Capital - Fund 56002 Project Total Existing Appropriations $662,252.00 $662,252.0011 Additional Project Appropriations I Total* *Numbers rounded for presentation purposes. This project is located in COUNCIL DISTRICT 9. $78,440.00 $740,692.00 $78,440.001 $740,692.00 FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Water & Sewer Fund and upon adoption of the attached appropriation ordinance, funds will be available in the W&S Capital Projects Fund, for the W/SS REPL Contract 2019 WSM- K project. Prior to any expenditure being incurred, the Water Department has the responsibility to validate the availability of funds. FUND IDENTIFIERS (FIDs),: TO Fund Department ccoun Project Program ctivity Budget Reference # I moun ID ID 1A Year (Chartfield 2) FROM Fund Department Accoun Project Program ctivity Budget Reference # i mount ID ID Year (Chartfield 2) CERTIFICATIONS: Submitted for Citv Manager's Office bv: Fernando Costa (6122) Originating Department Head: Chris Harder (5020) Additional Information Contact: Dena Johnson (7866) ATTACHMENTS 1. 60WSSC19WSMKA2TNP-FUNDING funds availabilitv.pdf (CFW Internal) 2. 60WSSC19WSMKA2TNP-FUNDING Map.pdf (Public) 3. 60WSSC19WSMKA2TNP-FUNDING Updated FID.xlsx (CFW Internal) 4.ORD.APP 60WSSC19WSMKA2TNP-FUNDING_56002_AO24(rl).docx 5. PBS CPN 103416.pdf (CFW Internal) (Public) 60WSSC19WSMKA2TNP-FUNDING FID Table 1 2 56002 0600430 103416 2024 $78,440.00 1 2 56002 0600430 4956001 103416 001730 9999 ($78,440.00) 1 1 56002 0600430 5330500 103416 001730 9999 $78,440.00 To pay contract ATTACHMENT E ORANGESTj; ri E I j ORANGEST I sz}Q BEW_ ICKST, Y o t--=i F-i I J' > w�'�� r\ BEWICKST� w _'. r > Lo $„ W L a � 1 _j J ,WOODU HAVE "yam t r ID ,'BDISO VS [ -+ BIDDISONST,` f t- YAV- MONDAST t� Q R r, j _tJ i } �i •., k r' RIP�YST l s� J r 1 , :Q RIPYST y EXISTING 24" WL oQ a , ' A �- > i r ,• ` TO BE ABANDONED -' w _'[; g" SEWER a lit ` �# 1 . I Af'1 �'}�. -- r•'�r � ,I i. r � � t=4 ), � ' � - � Fiat: ' i ! .M 1 ! - • r � , 8"WL 7 !"BU•TLERS . �_ I �� ;- ; ., ' •, a �i - o ,� s —� o - w Iz '!., 1 PROPOSED ;6 F! }� itti- ,. ; try " C, k�� .i'' s.. 1 / 24" W L J v ' 00 i I0/�1 1 DICKSONSTI' g" WL ` a ! SOU I HSIDE RESERVOIR AND It PUMP STATION i.` 3; . • 11 ZI PROPOSED 1 WAGGOMANST LLI PAFF,ORDST �O QY r w , ^` i H'" `u: 'jl i PAFFORDST , t'k oo ► ^ — h c ft ��' x ATWORT.ii r�, }gy m; '`,'.R,. 7, 3,.,. I', .,ter, t`� ) -'t fF. s t l r _ F,OGGSTt