Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 62120
Received Date: 10/16/2024 Received Time: 1: Developer and Project Information Cover Sheet: Developer Company Name: GRBK Edgewood LLC Address, State, Zip Code: 5501 Headquarters Drive, Suite 300W, Plano, TX 75025 Phone & Email: 469-573-6755; bsamuel@greenbrickpartners.com Authorized Signatory, Title: Bobby Samuel, Vice President Project Name: Terra Vella Phase 1 Brief Description: Water, Sewer, Paving, Storm Drain, and Street Lights Project Location: North of the Intersection of Rancho Canyon Wy and Equine Trail Plat Case Number: PP-23-024 Plat Name: Terra Vella Mapsco: 05 D Council District: 10 CFA Number: 24-0097 City Project Number: 105405 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Page 1 of 16 Standard Community Facilities Agreement Rev. 9/21 City Contract Number: 62120 STANDARD COMMUNITY FACILITIES AGREEMENT This COMMUNITY FACILITIES AGREEMENT ("Agreement") is made and entered into by and between the City of Fort Worth ("City"), a home -rule municipal corporation of the State of Texas, acting by and through its duly authorized Assistant City Manager, and GRBK Edgewood LLC ("Developer"), a Texas limited liability company, acting by and through its duly authorized representative. City and Developer are referred to herein individually as a "party" and collectively as the "parties." WHEREAS, Developer is constructing private improvements or subdividing land within the corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as Terra Vella Phase 1 ("Project"); and WHEREAS, the City desires to ensure that all developments are adequately served by public infrastructure and that the public infrastructure is constructed according to City standards; and WHEREAS, as a condition of approval of the Project, Developer is required to bear a portion of the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as described in this Agreement ("Community Facilities" or "Improvements"); and WHEREAS, as a condition of approval of the Project, Developer is required to meet the additional obligations contained in this Agreement, and Developer may be required to make dedications of land, pay fees or construction costs, or meet other obligations that are not a part of this Agreement; and WHEREAS, the City is not participating in the cost of the Improvements or Project; and WHEREAS, the Developer and the City desire to enter into this Agreement in connection with the collective Improvements for the Project; NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: 1. CFA Ordinance The Community Facilities Agreements Ordinance ("CFA Ordinance"), as amended, is incorporated into this Agreement by reference, as if it was fully set out herein. Developer agrees to comply with all provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in connection with the work performed by the contractors. If a conflict exists between the terms and conditions of this Agreement and the CFA Ordinance, the CFA Ordinance shall control. City of Fort Worth, Texas Standard Community Facilities Agreement Rev. 9/21 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 2 of 16 2. Incorporation of Engineering Plans The engineering plans for the Improvements that have been approved by the City ("Engineering Plans") are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the Improvements required by this Agreement. 3. Description of Improvements; Exhibits and Attachments The following exhibits describe the general location, nature and extent of the Improvements that are the subject of this Agreement and are attached hereto and incorporated herein by reference: ❑X Exhibit A: Water ❑X Exhibit A-1: Sewer ❑X Exhibit B: Paving X❑ Exhibit B-1: Storm Drain ® Exhibit C: Street Lights & Signs The Location Map and Cost Estimates are also attached hereto and incorporated herein by reference. To the extent that Exhibits A, A-1, B, B-1, C, the Location Map, or the Cost Estimates conflict with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1 — Changes to Standard Community Facilities Agreement, Attachment 2 — Phased CFA Provisions, and Attachment 3 — Concurrent CFA Provisions, are attached hereto and incorporated herein for all purposes. 4. Construction of Improvements Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the Improvements, and this Agreement. Developer acknowledges that City will not accept the Improvements until the City receives affidavits and lien releases signed by Developer's contractors verifying that the contractors, and all subcontractors and material suppliers, have been paid in full for constructing the Improvements, and consent of the surety on payment and performance bonds provided for the Improvements. 5. Financial Guarantee Developer has provided the City with a financial guarantee in the form and amounts set forth in this Agreement which guarantees the construction of the Improvements and payment by Developer of all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee"). Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the CFA Ordinance. City of Fort Worth, Texas Page 3 of 16 Standard Community Facilities Agreement Rev. 9/21 6. Completion Deadline; Extension Periods This Agreement shall be effective on the date this Agreement is executed by the City's Assistant City Manager ("Effective Date"). Developer shall complete construction of the Improvements and obtain the City's acceptance of the Improvements within two (2) years of the Effective Date ("Term"). If construction of the Improvements has started during the Term, the Developer may request that this Agreement be extended for an additional period of time ("Extension Period"). All Extension Periods shall be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement. In no event shall the Term of this Agreement plus any Extension Periods be for more than three years. 7. Failure to Construct the Improvements (a) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements if at the end of the Term, and any Extension Periods, the Improvements have not been completed and accepted by the City. (b) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of the Improvements before the expiration of the Term, and any Extension Period, if the Developer breaches this Agreement, becomes insolvent, or fails to pay costs of construction. (c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers are not paid for construction costs or materials supplied for the Improvements the contractors and suppliers may place a lien upon any property which the City does not have an ownership interest that is the subject of the Completion Agreement. (d) Nothing contained herein is intended to limit the Developer's obligations under the CFA Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's contractors, or other related agreements. 8. Termination If Developer desires to terminate this Agreement before Developer's contractors begin constructing the Improvements, Developer agrees to the following: (a) that Developer and City must execute a termination of this Agreement in writing; (b) that Developer will vacate any final plats that have been filed with the county where the Project is located; and (c) to pay to the City all costs incurred by the City in connection with this Agreement, including time spent by the City's inspectors at preconstruction meetings. 9. Award of Construction Contracts City of Fort Worth, Texas Page 4 of 16 Standard Community Facilities Agreement Rev. 9/21 (a) Developer will award all contracts for the construction of the Improvements and cause the Improvements to be constructed in accordance with the CFA Ordinance. (b) Developer will employ construction contractors who meet the requirements of the City to construct the Improvements including, but not limited, to being prequalified, insured, licensed and bonded to construct the Improvements in the City. (c) Developer will require Developer's contractors to provide the City with payment and performance bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent (100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and performance bonds shall guarantee construction of the Improvements and payment of all subcontractors and material suppliers. Developer agrees to require Developer's contractors to provide the City with a maintenance bond naming the City as an obligee, in the amount of one hundred percent (100%) of the cost of the Improvements, that guarantees correction of defects in materials and workmanship for the Improvements by the contractor and surety for a period of two (2) years after completion and final acceptance of the Improvements by the City. All bonds must be provided to the City before construction begins and must meet the requirements of the City's Standard Conditions, Chapter 2253 of the Texas Government Code, and the Texas Insurance Code. (d) Developer will require Developer's contractors to provide the City with insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City must be named as an additional insured on all insurance policies. The Developer must provide the City with a Certificate of Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's insurance provider, which shall be made a part of the Project Manual. (e) Developer will require the Developer's contractors to give forty-eight (48) hours' advance notice of their intent to commence construction of the Improvements to the City's Construction Services Division so that City inspection personnel will be available. Developer will require Developer's contractors to allow construction of the Improvements to be subject to inspection at any and all times by the City's inspectors. Developer will require Developer's contractors to not install or relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives consent to proceed, and to allow such laboratory tests as may be required by the City. (f) Developer will not allow Developer's contractors to begin construction of the Improvements until a notice to proceed to construction is issued by the City. (g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and service lines have been completed to the satisfaction of the City. 10. Utilities Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project; and (2) to construct the Improvements required herein. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the Improvements to be constructed pursuant to this Agreement. City of Fort Worth, Texas Page 5 of 16 Standard Community Facilities Agreement Rev. 9/21 11. Easements and Rights -of -Way Developer agrees to provide, at its expense, all necessary rights -of -way and easements required for the construction and dedication to the City of the Improvements provided for by this Agreement. 12. Liability and Indemnification (a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT. (b) THE DEVELOPER COVENANTS AND AGREES TO, AND BY THESE PRESENTS DOES HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM ALL SUITS, ACTIONS OR CLAIMS OF ANY CHARACTER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ONACCOUNT OFANYINJURIES OR DAMAGES SUSTAINED BYANYPERSONS, INCL UDING DEATH, OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE CONSTRUCTION, DESIGN, PERFORMANCE OR COMPLETION OF ANY WORK TO BE PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO PROPERLY SAFEGUARD THE WORK, OR ONACCOUNT OFANYACT, INTENTIONAL OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS CONTRACTORS, SUB -CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. (c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY, INCLUDING DEATH, RESULTING FROM, OR INANY WAY CONNECTED WITH, THE CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY FOR ANY LOSSES, DAMAGES, COSTS OR EXPENSES SUFFERED BY THE CITY OR CAUSED AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE MANNER, FREE FROM DEFECTS, IN CONFORMANCE WITH THE CFA ORDINANCE, AND INACCORDANCE WITH ALL PLANS AND SPECIFICATIONS. 13. Right to Enforce Contracts City of Fort Worth, Texas Page 6 of 16 Standard Community Facilities Agreement Rev. 9/21 Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its contractors, along with an assignment of all warranties given by the contractors, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. 14. Estimated Fees Paid by Developer; Reconciliation Prior to execution of this Agreement, Developer has paid to the City the estimated cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the construction of the Improvements, the City will reconcile the actual cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer, the Developer must pay the difference to the City before the Improvements will be accepted by the City. If the actual costs of the fees are less than the estimated payments made by the Developer, the City will refund the difference to the Developer. If the difference between the actual costs and the estimated payments made by the Developer is less than fifty dollars ($50.00), the City will not issue a refund and the Developer will not be responsible for paying the difference. The financial guarantee will not be released by the City or returned to the Developer until reconciliation has been completed by the City and any fees owed to the City have been paid by the Developer. 15. Material Testing The City maintains a list of pre -approved material testing laboratories. The Developer must contract with material testing laboratories on the City's list. Material testing laboratories will provide copies of all test results directly to the City and the Developer. If the Improvements being constructed fail a test, the Developer must correct or replace the Improvements until the Improvements pass all retests. The Developer must pay the material testing laboratories directly for all material testing and retesting. The City will obtain proof from the material testing laboratories that the material testing laboratories have been paid in full by the Developer before the City will accept the Improvements. 16. Notices All notices required or permitted under this Agreement may be given to a party by hand - delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be deemed to have been received when deposited in the United States mail so addressed with postage prepaid: CITY: Development Coordination Office City of Fort Worth 100 Fort Worth Trail Fort Worth, Texas 76102 With conies to: City of Fort Worth, Texas Standard Community Facilities Agreement Rev. 9/21 DEVELOPER: GRBK Edgewood LLC 5501 Headquarters Drive, Ste. 300W Plano, TX 75025 Page 7 of 16 City Attorney's Office City of Fort Worth 100 Fort Worth Trail Fort Worth, Texas 76102 and City Manager's Office City of Fort Worth 100 Fort Worth Trail Fort Worth, Texas 76102 Or to such other address one party may hereafter designate by notice in writing addressed and mailed or delivered to the other party hereto. 17. Right to Audit Developer agrees that, until the expiration of three (3) years after acceptance by the City of the Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to examine any directly pertinent books, documents, papers and records of the Developer involving transactions relating to this Agreement. Developer agrees that the City shall have access during normal working hours to all necessary Developer facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section. The City shall give Developer reasonable advance notice of intended audits. Developer further agrees to include in all contracts with Developer's contractors for the Improvements a provision to the effect that the contractor agrees that the City shall, until the expiration of three (3) years after final payment under the contract, have access to and the right to examine any directly pertinent books, documents, papers and records of such contractor, involving transactions to the contract, and further, that City shall have access during normal working hours to all of the contractor's facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. City shall give Developer's contractors reasonable advance notice of intended audits. 18. Independent Contractor It is expressly understood and agreed that Developer and its employees, representative, agents, servants, officers, contractors, subcontractors, and volunteers shall operate as independent contractors as to all rights and privileges and work performed under this Agreement, and not as agents, representatives or employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement, Developer shall have the exclusive right to control the details of its operations and activities and be solely responsible for the acts and omissions of its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat superior shall not apply as between the City and its officers, representatives, agents, servants and employees, and Developer and its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the City of Fort Worth, Texas Page 8 of 16 Standard Community Facilities Agreement Rev. 9/21 creation of a partnership or joint enterprise between City and Developer. It is further understood that the City shall in no way be considered a co -employer or a joint employer of Developer or any employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer. Neither Developer, nor any officers, agents, servants, employees or subcontractors of Developer shall be entitled to any employment benefits from the City. Developer shall be responsible and liable for any and all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. The City, through its authorized representatives and employees, shall have the sole and exclusive right to exercise jurisdiction and control over City employees. 19. Applicable Law; Venue This Agreement shall be construed under and in accordance with Texas law. Venue shall be in the state courts located in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. 20. Non -Waiver The failure of the City to insist upon the performance of any term or provision of this Agreement or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent of City's right to assert or rely on any such term or right on any future occasion. 21. Governmental Powers and Immunities. It is understood that by execution of this Agreement, the City does not waive or surrender any of its governmental powers or immunities. 22. Headings The paragraph headings contained herein are for the convenience in reference and are not intended to define or limit the scope of any provision of this Agreement. 23. Severability In the event that any clause or provision of this Agreement shall be held to be invalid by any court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the remaining provisions hereof. 24. Review of Counsel City and Developer, and if they so choose, their attorneys, have had the opportunity to review and comment on this document; therefore any rule of contract construction or interpretation that would City of Fort Worth, Texas Page 9 of 16 Standard Community Facilities Agreement Rev. 9/21 normally call for the document to be interpreted as against the drafting party shall not apply in interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be construed solely on the basis of the language contained therein, regardless of who authored such language. 25. Prohibition on Boycotting Israel Developer acknowledges that in accordance with Chapter 2271 of the Texas Government Code, the City is prohibited from entering into a contract with a company with 10 or more full-time employees that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" have the meanings ascribed to those terms by Chapter 2271 of the Texas Government Code. To the extent that Chapter 2271 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of this Agreement. 26. Prohibition on Boycotting Energy Companies Developer acknowledges that in accordance with Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City with a company with 10 or more full-time employees unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meanings ascribed to those terms by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. 27. Prohibition on Discrimination Against Firearm and Ammunition Industries Developer acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City with a company with 10 or more full-time employees unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. City of Fort Worth, Texas Page 10 of 16 Standard Community Facilities Agreement Rev. 9/21 28. Immigration and Nationality Act Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. 29. Amendment No amendment, modification, or alteration of the terms of this Agreement shall be binding unless the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer. 30. Assignment and Successors Developer shall not assign or subcontract all or any part of its rights, privileges, or duties under this Agreement without the prior written consent of City. Any attempted assignment or subcontract without the City's prior written approval shall be void and constitute a breach of this Agreement. 31. No Third -Party Beneficiaries The provisions and conditions of this Agreement are solely for the benefit of the City and Developer, and any lawful assign or successor of Developer, and are not intended to create any rights, contractual or otherwise, to any other person or entity. 32. Compliance with Laws, Ordinances, Rules and Regulations Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed and understood that, if City calls to the attention of Developer any such violation on the part of Developer or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately desist from and correct such violation. 33. Signature Authority City of Fort Worth, Texas Page 11 of 16 Standard Community Facilities Agreement Rev. 9/21 The person signing this Agreement on behalf of Developer warrants that he or she has the legal authority to execute this Agreement on behalf of the Developer, and that such binding authority has been granted by proper order, resolution, ordinance or other authorization of the entity. The City is fully entitled to rely on this warranty and representation in entering into this Agreement. 34. Counterparts This Agreement may be executed in multiple counterparts, each of which will be deemed an original, but which together will constitute one instrument. 35. Entire Agreement This written instrument, together with any attachments, exhibits, and appendices, constitutes the entire understanding between the City and Developer concerning the work to be performed hereunder, and any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall be void. [REMAINDER OF PAGE INTENTIONALLY BLANK] City of Fort Worth, Texas Page 12 of 16 Standard Community Facilities Agreement Rev. 9/21 36. Cost Summary Sheet Project Name: Terra Vella Phase 1 CFA No.: 24-0097 City Project No.: 105405 Items Developer's Cost A. Water and Sewer Construction 1. Water Construction (Residential and Master) r$ 1,211,894.00 2. Sewer Construction (Residential only) $ 828,669.00 Water and Sewer Construction Total $ 2,040,563.00 B. TPW Construction (Residential and Master) 1. Street 2. Storm Drain 3. Street Lights Installed by Developer 4. Signals TPW Construction Cost Total Total Construction Cost (excluding the fees) Estimated Construction Fees: C. Construction Inspection Service Fee D. Administrative Material Testing Service Fee E. Water Testing Lab Fee Total Estimated Construction Fees: Financial Guarantee Options, choose one (Bond = 100% (Completion Aqreement = 100% / Holds Plat (Cash Escrow Water/Sanitary Sewer= 125% (Cash EscrowPavinq/Storm Drain = 125% (Letter of Credit = 125% Escrow Pledqe Aqreement = 125% r $ 2,248,738.75 r$ 963,835.00 r$ 299,510.00 $ 3,512,083.75 $ 5,552,646.75 $67,500.00 $14,210.00 $1,800.00 $ 83,510.00 IPRC No.: 24-0062 Amount $ 5,552,646.75 $ 5,552,646.75 $ 2,550,703.75 $ 4,390,104.69 $ 6,940,808.44 $ 6,940,808.44 Choice (Mark one X City of Fort Worth, Texas Page 13 of 16 Standard Community Facilities Agreement Rev. 9/21 IN WITNESS WHEREOF, the City and Developer have each executed this Agreement by their duly authorized signatories to be effective on the date executed by the City's Assistant City Manager. CITY OF FORT WORTH Tam 3G� C; Dana Burghdoff (Oct 2024 CDT) Dana Burghdoff Assistant City Manager Date: Oct 15, 2024 Recommended by: Bichson Nguyen Contract Compliance Specialist Development Services Approved as to Form & Legality: �Q W jd— Samuel Angel Assistant City Attorney M&C No.: N/A Date: Oct 15, 2024 Form 1295: N/A ATTEST: Jannette S. Goodall City Secretary 4,00vounn� v�'s°� FORt �y�9Ad Pvo 0=4 PPpda°, o ar4, nE�A 54gq DEVELOPER GRBK Edgewood LLC a`Texas �limited liability company Bobby Samuel Vice President Date: Oct 15, 2024 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Rebecca Owen (Oct 15, 2024 08:46 CDT) Rebecca Diane Owen Development Manager OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Page 14 of 16 Standard Community Facilities Agreement Rev. 9/21 The following attachments are incorporated into this Agreement. To the extent a conflict exists between the main body of this Agreement and the following attachments, the language in the main body of this Agreement shall be controlling. Included Attachment © Attachment 1 - Changes to Standard Community Facilities Agreement ❑ Attachment 2 — Phased CFA Provisions ❑ Attachment 3 — Concurrent CFA Provisions X❑ Location Map © Exhibit A: Water Improvements X❑ Exhibit A-1: Sewer Improvements X❑ Exhibit B: Paving Improvements © Exhibit B-1: Storm Drain Improvements © Exhibit C: Street Lights and Signs Improvements © Cost Estimates (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Page 15 of 16 Standard Community Facilities Agreement Rev. 9/21 ATTACHMENT "I" Changes to Standard Community Facilities Agreement City Project No. 105405 None City of Fort Worth, Texas Page 16 of 16 Standard Community Facilities Agreement Rev. 9/21 SONGBIRD LN E 6 C o MADERO PHASE 4 0 CPN 104089 a�E C (L MADERO PHASE 3 CPN 1034BO II T7 04 o RANCHO CANYON WAY N _ oo !D I pt MA ERO PHASE 2 N 7v C� 0 MADERO Q CPN 10It z U Q � a a E IL U v<�O 0 Lo Z g OWNED/DEVELOPED BY: M GRBK EDGEWOOD LLC. 0 0 0 5501 HEADQUARTERS DRIVE g SUITE 30OW PLANO, TX 75024 x BRIAN HUNNICUTT j PHONE: (469)-573-6755 Cri u JOHN DAY RD. PROJECT LOCATION SENDRA RANCH EAST PHASE 24 CPN 103162 SENDRA RANCH EAST PHASE 138 CPN 100664 n SENDRA RANCH EAST PHASE 20 CPN 101922 q. a MG���I 4 RANCHOONI, WAY IJ F MAPSCO NO. 05-D COUNCIL DISTRICT 10 N SCALE: 1 "=2000' VICINITY MAP TERRA VELLA PHASE 1 CITY PROJECT NO.105405 LJA Engineering, Inc. ALA 6060 North Central Expressway Phone 469.621.0710 Suite 400 Dallas, Texas 75206 FRN - F-1386 LEGEND PROP05ED WATER LINE EXISTING WATER LINE LIMITS OF PROJECT — — D SCALE: 1" = 300' NOT EXISTING INFRASTRUCTURE MADERO PH4SE 4 I CPN 104089 3 I —I (PROJECT IN CONSTRUCTION) FUTURE TERRA VELLA ' 2 4 PHASE 4 'X 52X COKIIJL WAY tl"" WL7� `) . 1 i t G �, Ld 6 7 1 U M AD ERO 7 2 z 3 4 s 6 7 s 9 0 11 12 13 0 8 PHASABALONE AVFNUF _ CPN 104089 3 B" wLs - 8"w4� W 9 l 21 4 15 16 17 18 14 15 16 17 18 19 20 3X I 5 5 6 w 14 Gt� 19 13 7 13 20I 2 FUTURE 8 12 21 TERRA VELLA 9 1D PHASE 2 -� 11 22 10 Q 9 ,1 I10 23 a 9 24 O 12 is I 7 1X B 25 w y ix 13 7 26 14 6 Y7 0 5 15 5 21 4 s 16 4 29 2 30 VIA M A D E R 0 17 3 30 1 22 23 24 25 26 27 28 29 -� PHASE 3 18 2 31 \ CPN 103480 ' 6EL MARES STREET ° 8 19 7 8 9 10 1 1 1 2 13 4 15 1 2 3 4 5 6 3 j2 ix BEL MARES STREET 6 7 �� 3 t 2 3 4 5 2 —3� 23 22 21 20 19 18 17 16 17 16 15 14 13 12 11 10 9� 1X 24 ��' W ROCKCLOUD DRIVE d 25 26 27 2B 29 30 31 32 33 341X 35 36 37 k28 39 49 41 42 3 O b EXISTING 30- PVC 1X NS-III WATERLINE CPN 10224D RANCHO CANYON WAY—i WATER EXHIBIT 'A' TERRA VELLA OWNED/DEVELOPED BY: PHASE 1 GRBK EDGEWOOD LLC. CITY PROJECT NO. 105405 HEADQUARTERS DRIVE SUIT ��� SUITE LJA Engineering, Inc. TX 75024 TX PLANO, BRIAN HUNNICUTT 6060 North Central Expressway Phone 469.621.0710 PHONE: (469)-573-6755 Suite 400 Dallas, Texas 75206 FRN - F-1386 MADERO PHASE 4 CPNI 104089 LEGEND PROPOSED SAN SEWER FLOW DIRECTION EXISTING SAN SEWER LIMITS OF PROJECT — — N SCALE:1" = 300' END & PLUG a' UNE F 3 2 i 4 1x 3 2X U 12 13 ;'2 7 5 6 7 8 9 10 11 F 8 ABALONE AVENUE � � 9 • z1 s" v _ 14 15 16 1� 18I 19I20 3X 6 14 19 13 7 z13 20 12 FUTURE 8 W 12 21 3 11 TERRA VELLA 9 Z m 10 PHASE 2 11 22 '—� t0 9 10 23 11 8 s � 9 24 O 12 W 7 1 X dr 25 ix 13 8 7 26 r 5 14 6 27 0 � 4 15 I 5 28 W z 3 16 4 29 2 5 30 MADERO 17 3 3° _ [ 29 a t 22 23 24 25 26 27 28 PHASE J� 18 2 31 B 1 MARES STREET , END & PLUGC P N 103480 1 a` UNE 0 ' , a' UNE C 8 8' UNE C t9 7 G 8 9 10 11 12 13 4 15 1 2 3 4 5 5 BEL MARES STWET a 6 7 z 1x 1 2 3 4 5 = END & PLUG — a' LINE D 2 3X 23 22 21 20 19 18 17 16 3 17 16 15 14 13 12 11 10 9 24 a'• LINE B ROCI- CLO 1D DRIVE m a U E A tX P 25 2 27 28 29 30 31 32 33 34 X 35 3fi 37�1139¢p 41 42END & PLUG W END8"&PWC LINE A 8' UNE 8 O 3 l IX m EXISTING 8" SS SEND RANCH EAST PHASE 24 103 CPN 103162 RANCHO CANYON WAY \ \ 1 WASTEWATER TERRA VELLA OWNED/DEVELOPED BY: PHASE 1 GRBK EDGEWOOD LLC. EXHIBIT 'A-1' CITY PROJECT NO. 105405 HEADQUARTERS DRIVE SUIT ��� SUITE LJA Engineering, Inc. TX 75024 TX PLANO, BRIAN HUNNICUTT 6060 North Central Expressway Phone 469.621.0710 PHONE: (469)-573-6755 Suite 400 Dallas, Texas 75206 FRN - F-1386 END & PLUG 8" LINE E END & PWG CORTI-0 WAY 9' UNE H 2 1 2 3 4 W 3 8" HE H = 3 4 = 15 16 17 18 5 FUTURE TERRA VELLA PHASE 4 LEGEND PROPOSED 29'B—B ROADWAY/50'ROW PROPOSE O'—B ROADWAY 80 ROW ROW PROPOSED 37'B—B ROADWAY/60'ROW PROPOSED SIDEWALK L_ J (BY HOMEBUILDER) PROPOSED SIDEWALK (BY DEVELOPER) PROPOSED ADA RAMPS O (BY DEVELOPER) LIMITS OF PROJECT — — n I FUTURE TERRA VELA PHASE 4 COR112'r, WAY • I I I Imo\ 6 1 MADERO 1 2 3 4 5 6 7 fi l 9 10 11 12 13 2 PHASE 4 C I I I 104089 I 3 ,� AHeLONE AVENUE 20 �J 21 4 15I 16 17 18 14 15 16I 17 18 19 3 5 Ni s 6 14 a 19 13 7 a 13 20 12 w 8 12 21 I 11 s ` 10 10 11 22 I � 9 10 23 Y 11 I y 6 1 9 24 0 12 I 7 1X 1X 8 25 6 13 7 26 � f 14 5 g 27 4 S 5 1 5 26 I 3 � M* 6 14 29 I 2 ' 30 \ MADERO 17 I 3 30 1 22 I 23 24 25 26 I 27 I 28 2 PHASE 3 16 2 31 ti CPN 103480 ' 0E,ESF'"°�� 8 --__11EL ORES STREC� — 6 I1 I2I3 4\5 2 FUTURE TERRA VELLA PHASE 2 �✓ 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 Z 1X 3 /sx 23 22 21 20 19 18 17 16 17 16 15 14l 13 12I 11 10 g ^OCKCLOUD DRI� _ 27 28 29 30 31 32 33 34IIX 35 36 37 38 39 41141 42 i 1 O 1X � � RANCHO CANYON WAY � . PAVING TERRA VELLA OWNED/DEVELOPED BY: PHASE 1 GRBK EDGEWOOD LLC. EXHIBIT B CITY PROJECT NO. 105405 5501 HEADQUARTERS DRIVE SUITE 300W PLANO, TX 75024 BRIAN HUNNICUTT PHONE: (469)-573-6755 LJA Engineering, Inc. 6060 North Central Expressway Suite 400 Dallas, Texas 75206 ZAA Phone 469.621.0710 FRN - F-1386 LEGEND PROPOSED STORM EXISTING STORM DRAIN LINE DRAIN LINE PROPOSED 10' INLET C1;0 EXISTING INLET PROPOSED 15' INLET T LIMITS OF PROJECT PROPOSED 3'x3' 0STORM DRAIN HEADWALL DROP INLET PROPOSED 4'x4' ■ DROP INLET MAD' T ERO PHASE 4 CIP i 104089 L_ IMADEROI PHASE 3 CPN 11I03480 501 2-4'a3' MBC MADERO PRASE 4 III !yCPN 104069 Il�l�^3 LAT_5C — � FUTURE TERRA 21 � 1x � 42x ZT-'A VELLA PHASE 4 1 Y 5 CORTIJO WAY o c w SD I 6 yyy LAT-SA - 21 z1` 1 , Z 7 13 2 1 2 3 4 5 6 7 B 9 10 1, 121 8 3 ABALONE AVENUE SD-5 `� g l 21 5 15 16 17 18 14 15 16 17 ,8 19 20 x 6 Z 14 V 19 13 - L4T-56 L4T-50 21" 21" 7 1, 12 N SCALE:1" = 300' ¢I 13 20 rUIUKt B W 12 21 W TERRA VELLA 9 m 10 ,1 22 1 PHASE 2 10 0' 9 10 23 l o B 5 ad 1, t�y 9 24 O z 12 2D-2 7 ix �6 8 25 ,X 13 21" 6 sP-os 7 2fi 21" 14 L S-' 2D1 ° 3 LAT-6H 6 L 27 LAT LAT_-2A— ¢ ., 15 5 28 Igo 5 4 29 LAT-BB 16 2 24 21" 30 _ 3 30 29 17 LAT-36 1 22 23 LAT-4A 25 26 27 28 _LAT-2C 2 21" 1 21" 41• SD-4 31 21" 18 1 LAT-3D 5^0 LAT-3C �"4 J� BEL MARES STREET 8 19 2Y 21` LAT-48 - 6 7 ur_3e B 9 10 11 12 13 21` , 2 3 a 15 l BEL MARES STREET L LAT-26 21" 14 115 21. 6 7 W �� <. v 3 1 2 3 4�S a U,7 ,6 ' 21* 2," ^,0 2 3 23 22 2, 20 ,9 16 2r, aE -� ,7 16 15 1a 13 12 11 10I g LAT-6E 24 ROCKCLOUD DRIVE 21" ix LAT-4F NNN�+ 25 / 2s 27 26 29 30 312732 33 341''J_:� 37 38 39 40 41 42 II LAT-6H 2 P4. 0 2 1x /. CULVERT A 60" RCP RANCHO CANYON WAY LAT-6A 24" SP-06 24 . LAT-7C 21" LAT-7B 21` SD-7 27" ,X D LAT-6C 21` a LAT-60 21" CULVERT A " 42R� 1� STORM DRAINAGE TERRA VELLA OWNED/DEVELOPED BY: EXHIBIT'B—l' PHASE 1 GRBK EDGEWOOD LLC. CITY PROJECT NO. 105405 HEADQUARTERS DRIVE SUIT ��� SUITE LJA Engineering, Inc. TX 75024 TX PLANO, BRIAN HUNNICUTT 6060 North Central Expressway Phone 469.621.0710 PHONE: (469)-573-6755 Suite 400 Dallas, Texas 75206 FRN - F-1386 LEGEND STOP SIGN WITH STREET NAME BLADES A N STOP SIGN ONLY STREET NAME BLADES ONLY SCALE:1" = 300' PROPOSED STREET LIGHT (TYPE 11 POLE, TYPE 1 FOUNDATION) EXISTING STREET .— LIGHT LIMITS OF PROJECT — — 3 FUTURE TERRA VELLA 2 4 ,x 2X PHASE 4 = CORTIJO WA 1 1 5 MADERO ' 7 PHASE 4 2 1 2 3 4 s 6 7 8 9 10 „ 12 13 8 CPN I 104089r� II 3 ABALONE AVENUE g 21 4 15 16 17 18 14 15 16 1� 1�1 9 I20 3X 5 6 14 1P� 19 13 - 7 a 13 20 12 FUTURE s 12 21 11 TERRA VELLA 9 1 11 22Np. 1D T� PHASE 2 10 1 10 23 I 'a 11 8 O �— 9 24 I v C 12 8 25 7 1X 7 a d� 1X 13 6 7 26 A 14 I 16 5 6 27 4 15 5 28 3 i� 4 29 3 30 2 30 29 MADERO 17 1 22 23 24 25 26 27 28 --� PHASE 3 2 31 18 CPN 11�0 3 48 0 > 1H. 1 19 _ BEl i S,REE< 8 9 10 11 12 13 4 15 1 2 3 ITTI__ a 4 1' 16 7 1X 1 BEL MA MARES STREET � • 7 6 `/ I 3 U 1 2 4 5 I 2 3X 23 22 21 20 19 18 17 16 17 16 15 14 ,3 12 11 10 g Qq ---fROCKCLOUD DRN£ 'i IX ' 25 2 27 28 29I 30I 31 132 33I 34 1 X 35 36 37 3^28 39 40 41 42 O 1X RANCHO CANYON WAY STREET NAME SIGNS & STREET LIGHT TERRA VELLA OWNED/DEVELOPED BY: PHASE 1 GRBK EDGEWOOD LLC. IMPROVEMENTS CITY PROJECT NO.105405 HEADQUARTERS DRIVE EXHIBIT'C' SUIT ��� SUITE LJA Engineering, Inc. TX 75024 TX PLANO, BRIAN HUNNICUTT 6060 North Central Expressway Phone 469.621.0710 PHONE: (469)-573-6755 Suite 400 Dallas, Texas 75206 FRN - F-1386 Pluase I Residmial DAP- HIDPROPOSAL. Page 1 ofb SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Terra Vella, Phase 1, Residential UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal B1dINtoltem Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value UNITI:WAT RIMPROVEMENTS 1 3305.0109 Trench Safety 33 05 10 LF 6205 $1.00 $6,205.00 2 3311.0001 Ductile Iron Water Fittings w/ Restraint 3311 11 TON 5.13 $11,500.00 $58,995.00 3 3311.0241 8" Water Pipe 33 11 10, 33 11 12 LF 5885 $56.00 $329,560.00 4 3311.0254 8" DIP Water, CLSM Backfill 3311 10 LF 320 $86.00 $27,520.00 5 3312.0001 Fire Hydrant 33 12 40 EA 10 $5,000.00 $50,000.00 6 3312.0117 Connection to Existing 4"-12" Water Main 33 12 25 EA 1 $1,500.00 $1,500.00 7 3312.2003 1" Water Service 33 12 10 EA 161 $1,200.00 $193,200.00 8 3312.3003 8" Gate Valve 33 12 20 EA 19 $2,200.00 $41.800.00 9 9999.0001 Flush Point 00 00 00 EA 1 $2,500.00 $2,500.00 10 9999.0002 1" Irrigation Service 00 00 00 EA 2 $1,750.00 $3,500.00 11 19999.0003 1.5" Irrigation Service 00 00 00 EA 2 $2,200.00 $4,400.00 12 9999.0004 2" Irrigation Service 00 00 00 EA 1 $2,500.00 $2,500.00 13 9999.0005 4" PVC Schedule 40 Sleeve 00 00 00 LF 1610 $22.00 $35.420.00 TOTAL UNIT I: WATER IMPROVEMENTS $757,100.001 1 UNIT It: SANITARYe EWER IMPROV:§MLM 1 1 3301.0002 Post -CCTV Inspection 3301 31 LF 5973 $4.00 $23,892.001 2 3301.0101 Manhole Vacuum Testing 3301 30 EA 24 $200.00 $4,800.001 3 3305.0109 Trench Safety 3305 10 LF 5973 $2.00 $11,946.00 4 3305.0113 Trench Water Stops 3305 15 EA 16 $350.00 $5,600.00 5 3305.1003 20" Casing by Open Cut 33 05 22 LF 60 $280.00 $16,800.00 6 3331.3101 4" Sewer Service 3331 50 EA 161 $950.00 $152,950.00 7 3331.4115 8" Sewer Pipe - SDR 26 33 11 10, 33 31 12, 33 31 20 LF 5367 $72.00 $386,424.00 8 3331.4116 8" Sewer Pipe, CSS Backfill 33 11 10, 33 31 12, 33 31 20 LF 554 $82.00 $45,428.00 9 3331.4119 8" DIP Sewer Pipe 33 11 10 LF 52 $132.00 $6,864.00 10 3339.1001 4' Manhole 33 39 10, 33 39 20 E4 22 $4,800.00 $105,600.00 11 3339.1002 4' Drop Manhole 33 39 10, 33 39 20 EA 2 $5,800.00 $11.600.00 12 3339.1003 4' Extra Depth Manhole 33 39 10, 33 39 20 VF 73 $225.06 $16,425.00 13 3339.0003 Epoxy Manhole Liner 33 39 60 VF 64 $485.00 $31,040.00 14 9999.0006 4' Manhole W/ Hydrualic Slide 00 00 00 EA 1 $6,800.00 $6,800.00� 15 9999.0007 Connect to Existing 8" Sewer Main System 00 00 00 E4 1 $2,500.00 $2,500.00 TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS $828,669.00 UNIT III: DRAIP AGE IMPROVEMENTS I 1 3137.0102 Large Stone Type "A" Dry Rip Rap (12" Deep) 31 37 00 SY 502 $145.00 $72,790.001 2 3305.0109 Trench Safety 33 05 10 LF 2259 $2.00 $4,518.001 3 3341.0201 21" RCP, Class 111 3341 10 LF 313 $75.00 $23,475.001 4 3341.0205 24" RCP, Class III 3441 10 LF 569 $85.00 $48,365.001 5 3341.0208 27" RCP, Class III 3341 10 LF 512 $105.00 $53,760.001 6 3341.0302 30" RCP, Class III 3341 10 LF 330 $115.00 $37,950.001 7 3341.0309 36" RCP, Class 111 3341 10 LF 387 $130.00 $50,310.001 8 3341.0402 42" RCP, Class 111 3341 10 LF 148 $160.00 $23,680.001 9 3349.0001 4' Storm Junction Box 33 49 10 EA 6 $5,500.00 $33,000.001 10 3349.0007 5' Storm Junction Box 33 49 10 EA 2 $6,500.00 $13,000.001 11 3349.5001 10' Curb Inlet 33 49 20 EA 13 $4,000.001 $52,000.001 12 3349.5002 15' Curb Inlet 33 49 20 EA 4 $5,000.00 $20,000.001 13 9999.0008 Connect to Existing Storm Drain 00 00 00 EA 1 $1,500.00 $1,500.001 14 9999.0009 Concrete Collar 00 00 00 EA 4 $2,000.00 $8,000.001 15 19999.0010 27" 4:1 Sloped End Headwall 00 00 00 EA 1 $3,500.001 $3,500.001 16 19999.0011 36" 4:1 Sloped End Headwall 00 00 00 EA 1 $4,500.00 $4,500.00 17 19999.0012 42" 4:1 Sloped End Headwall 00 00 00 EA 1 $6,o0o.00[ $6,000.00 18 19999.0013 Inlet Protection 00 00 00 EA 17 $200.001 $3,400.00 TOTAL UNIT III: DRAINAGE IMPROVEMENTS $459,748.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Vcrsion M.7242019 0o 42433idPrW-L Tara Vells_Ph-I SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Terra Vella, Phase 1, Residential UNIT PRICE BID Project Item Infonnation Bidlist Item No. Description Specification Section No. UNIT IV: PAV NG IMPROVEMENTS Phase I Ruid—W DAP -BID PROPOSAL Ngc 2 of6 Bidder's Application Bidder's Proposal Unit of i Bid Quantity Unit Price Bid Value Measure _ 1 3211.0501 6" Lime Treatment 32 11 29 SY 22300 2 3211.0400 Hydrated Lime (30 Ibs/sy) 31 1129 TN 335 3 3213.0302 5' Conc Sidewalk 32 13 20 SF 7422 4 3213.0101 G' Conc Pvmt 32 13 13 SY 20970 I 5 3213.0506 Barrier Free Ramp, Type P-1 32 13 20 EA 14 6 3291.0100 Topsoil 3291 19 CY 105 7 3292.0100 Block Sod Placement 32 92 13 SY 626 9999.0014 Remove Barricade & Connect to Existing Pavement 00 00 00 8 Header 2 9 9999.0015 Remove Non -Reinforced Concrete Pavement 00 00 00 SY 370 10 9999.0016 Remove Existing STOP SIGN (R1-1) 00 00 00 EA 1 11 9999.0017 STOP SIGN (R1-1) 00 00 00 EA 8 12 9999.0018 Street Name Blade Pair (133-1) 00 00 00 EA 8 13 9999.0019 Street Sign Pole 00 00 00 EA 9 TOTAL UNIT IV: PAVING IMPROVEMENTS Bid Summary UNIT I: WATER IMPROVEMENTS j UNIT It: SANITARY SEWER IMPROVEMENTS UNIT III: DRAINAGE IMPROVEMENTS UNIT IV: PAVING IMPROVEMENTS Total Construction Bid This Bid is submitted by the entity named below: BIDDER: Conatser Construction TX, L.P. 5327 Wichita Street Fort Worth, TX 76119 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. END OF SECTION BY: BROCI GGINS TITLE: SIDENT 0417 DATE: 9-26-2024 $4.00 $89,200.00 $275.00 $92,125.00 $4.25 $31.543.50 $52.00 $1,090,440.00 $2,200.00 $30.800.00 $28.00 $2,940.00 $8.00 $5,008.00 $1,000.00 $2 000.00 $18.00 $6,660.00 $200.001 $200.001 $850.001 $6 800.001 $250.00 1 $2,000.00 1 $300.001 $2,700.001 $1,362,416.50 1 1 $757,100.00 1 $828,669.001 $459,748.00 1 $1,362,416.50 1 $3,407,933.50 i 180 working days after the date when the CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22,20I9 OD 42 43Bid Pw p—I_Te Vella_Phasel UNIT PRICE BID SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Terra Vella, Phase 1, Residential - Street Lights Project Item Information Bidlist Item) Description I Specification Section No. IIII No. UNIT V: STREET LIGHTING IMPROVEMENTS Ph —I Residential - Street Lighu DAP -HID PROPOSAL Np 3 d6 Bidder's Application Bidder's Proposal Unit of Bid Quantity Unit Price I Bid Value Measure 1 2605.3015 2" CONDT PVC SCH 80 (T) 26 05 33 LF 2360 $15.00 $35,400.00 2 3441.3201 LED Lighting Fixture (50W) 3441 20 EA 33 $750.00 $24,750.00 j 3 3441.1633 Install Type 336 Arm 34 41 20 EA 33 $600.00 $19,800.00 4 3441.3002 Rdwy Illum Assembly TY 8,11,D-25, and D-30 34 41 20 EA 33 $2,500.00 $82,500.00 5 3441,3301 Rdwy Illum Foundation TY 1,2, and 4 34 41 20 EA 33 $1,200.00 $39.600.00 ` 6 9999.0020 3 - #2 Copper Wire 00 00 00 LF 2360 $6.00 $14,160.00 TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS $216,210.00 Bid Summary UNIT V: STREET LIGHTING IMPROVEMENTS $216,210.00 1 Total Construction Bid $216,210.00 This Bid is submitted by the entity named below: BIDDER: Conatser Construction TX, L.P. 5327 Wichita Street Fort Worth, TX 76119 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. END OF SECTION BY: BR UGGINS TITLE. P S E UD DATE: 9-26-2024 ISO working days after the date when the CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS Foxy Vcr m May 22, 2019 00 42 43 Bid Prg..l_Tetra VOk_Phax 1 UNIT PRICE BID SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Terra Vella, Phase 1, Equinine Trail Master Infrastructure Project Item Information Phase 1 Master DAP - BID PROPOSAL Page 4 of6 Bidder's Application Bidders Proposal Bidliisrtt Iteml Description o.UNIT Specification Section No. Measure Bid Quantity Unit Price 1r WATER IMPROVEMENTS 1 Trench Safety 33 05 10 LF 1891 $2.00 2 �3305.0109 3305.0203 Imported EmbedmentlBackfill, CLSM 3305 10 LF 154 $30.00 3 3311.0001 Ductile Iron Water Fittings w/ Restraint 3311 11 TON 3.06 $11,500.00 4 13311.0441 12" Water Pipe 3211 10,33 1 12 LF 968 $102.00 5 13311.0541 16" Water Pipe 33 11 10, 33 11 12 LF 923 $122.00 6 13312.0001 Fire Hydrant 33 12 40 EA 4 $7,750.001 7 13312.0110 Connection to Existing 36" Water Main 33 12 25 EA 1 $24,500.001 8 13312.3005 12" Gate Valve 34 12 20 EA 4 $5,500.001 9 13312.3006 16" Gate Valve w/ Vault 33 12 20 EA 4 $28,500.00 1 10 13305.1005 30" Casing By Open Cut 33 05 22 LF 22 $380.001 TOTAL UNIT I: WATER IMPROVEMENTS UNIT III: DRAINAGE IMPROVEMENTS 1 13137.0102 Large Stone Type "A" Dry Rip Rap (12" Deep) 31 3700 SY 36 2 3137.0102 Large Stone Type "A" Dry Rip Rap (18" Deep) 31 3700 SY 476 3 3305.0109 Trench Safety 33 05 10 LF 1991 4 3341.0201 21" RCP, Class III 3341 10 LF 445 5 3341,0205 24" RCP, Class III 3441 10 LF 254 6 3341.0206 24" RCP, Class IV 3341 10 LF 54 7 3341.0208 27" RCP, Class III 3341 10 LF 58 8 3341,0302 30" RCP, Class III 3341 10 LF 141 9 3341.0309 36" RCP, Class III 3341 10 LF 93 10 3341.0402 42" RCP, Class III 3341 10 LF 611 11 3341.0409 48" RCP, Class III 3341 10 LF 150 12 3341.0602 60" RCP, Class III 3341 10 LF 75 13 3341.1102 4'x2' Box Culvert 3341 10 LF 110 14 3349.5001 10' Curb Inlet 33 49 20 EA 7 15 3349.5002 15' Curb Inlet 33 49 20 EA 3 16 3349.7001 4' Drop Inlet 33 49 20 EA 1 17 3349.0001 4' Storm Junction Box 33 49 10 EA 2 18 3349.0007 5' Storm Junction Box 33 49 10 FA 2 19 3349.0003 6' Storm Junction Box 33 49 10 EA 1 20 9998.0001 2'x2' Box Culvert 00 00 00 LF 42 21 9999.0002 Concrete Collar 00 00 00 EA 5 22 9999.0003 3' Drop Inlet 00 00 00 EA 3 23 9999.0004 42" 4:1 Sloped End Headwall 00 00 00 ( EA 1 24 9999.0005 24" 4:1 Sloped End Headwall 00 00 00 EA 2 25 9999.0006 60" 4:1 Sloped End Headwall 00 00 00 j EA 1 26 9999.0007 4'x2' 4:1 Sloped End Headwall 00 00 00 EA 1 27 9999.0008 Inlet Protection 00 00 00 j EA 11 TOTAL UNIT III: DRAINAGE IMPROVEMENTS Bid Value $3,782.00 1 $4,620.00 1 $35,190.00 1 $98,736.00 1 $112,606.00 1 $31,000.001 $24,500.001 $22,000.00 1 $114,000.00 $8,360.00 $454,794.00I $145.00 $5,220.001 $155.00 $73,780.001 $2.00 $3,982.001 $75.00 $33,376.001 $85.00 $21,590.001 $95.00 $5,130.001 $106.00 $6,090.001 $115.00 $16,215.001 $120.00 $11.160.001 $160.00 $97,760.001 $195.00 $29,250.00 $285.00 $21,375.00 $285.00 $31,350.00 $4,000.00 $28.000.00 $5,000.00 $15.000.00 $6,000.00 $6,000.00 $5,500.00 $11000.00 $6,500.00 $13:000.00 $7,500.00 $7,500.001 $205.00 $8,610.001 $1,000.00 $5,000.001 $6,000.00 $15,000.001 $7,500.00 $7,500.001 $6,500.00 $13,000.001 $9,500.00 $9.500.001 $6,500.00 $6,500.001 $200.00 $2.200.001 $504.087.001 1 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form V.-. May 22, 2019 00 42 43_Bid hop-L_Tena Velma Phase I UNIT PRICE BID IBidlist Item No. f 1 2 3 4 5 6 7 8 j s 10 11 12 13 14 15 1 16 1 17 18 19 1 20 1 21 1 22 1 23 1 24 1 25 26 27 28 29 30 31 32 33 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Terra Vella, Phase 1, Equinine Trail Master Infrastructure Project Item Information Description I Specification Section No. UNIT IV: PAVING IMPROVEMENTS 3211.0502 8" Lime Treatment 3311 29 3211.0400 Hydrated Lime (36 Ibs/sy) 3211 29 3213.0301 4' Conc Sidewalk 3213.0302 5' Conc Sidewalk 3213.0303 6' Conc Sidewalk 3213.0501 Barrier Free Ramp, Type R-1 3213.0503 Barrier Free Ramp, Type M-1 3213.0506 Barrier Free Ramp, Type P-1 3291.0100 Topsoil 3292.0100 Block Sod Placement 9999.0009 7.5" Conc Pvmt 9999.0010 Sawcut and Connect by Longitudinal Joint 9999.0011 Construct Type III Barricade 9999.0012 Construct Std. Pvmt. Header 9999.0013 Type II-CR RPM 9999.0014 REFL PAV MRK TY I(11V)(6")(SNG)(BRK) 9999.0015 REFL PAV MRK TY I(1N)(8")(SNG)(SLD) 9999.0016 REFL PAV MRK TY I(Y)(6")(DBL)(SLD) 9999.0017 REFL PAV MRK TY I(W)(24"(SNG)(SLD) Stop Bar 9999.0018 REFL PAV MRK TY I(Y)(6")(SNG)(SLD) 9999.0019 REFL PAV MRK TY I(` )(18")(SNG)(SLD) �9999.0020 REFL PAV MRK TY I(Y)(6")(SNG)(BRK) 9999.0021 Lane Legend Arrows 16999.0022 STOP SIGN (R1-1) 19999,0023 ROAD SIGN (R2-1) 19999.0024 ROAD SIGN (R3-8b) 19999.0025 ROAD SIGN (R3-7R) ]9999.0026 ROAD SIGN (W11-2) 19999.0027 Street Name Blade Pair (D3-1) 19999.0028 Street Sign Pole 19999.0029 Remove Existing Sidewalk 19999.0030 Remove Existing Pavement Markings 19999.0031 All Weather Access Road 32 13 20 32 13 20 32 13 20 32 13 20 32 13 20 321320 3291 19 32 92 13 00 00 00 00 00 00 00 00 00 00 00 00 00 OD 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 000000 00 00 00 00 00 00 00 00 00 00 00 00 TOTAL UNIT IV: PAV Bid Summary UNIT I: WATER IMPROVEMENTS UNIT III: DRAINAGE IMPROVEMENTS UNIT IV: PAVING IMPROVEMENTS This Bid is submitted by the entity named below: BIDDER: Conatser Construction TX, L.P. 5327 Wichita Street Fort Worth, TX 76119 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. END OF SECTION Phase I Master DAP -HID PROPOSAL Page 5 or6 Bidder's Application Bidder's Proposal Unit of Bid Quantity Unit Price Bid Value Measure SY TN SF SF SF EA EA EA CY SY SY LF EA LF EA LF LF LF LF LF LF LF EA EA EA EA EA EA EA EA 8566 155 5121 181 17631 9 1 7 251 1508 8181 115 3 95 250 3236 606 2303 44 2148 223 2148 6 3 1 1 4 61 91 SY 1 671 LS 11 SY 1671 INGIMPROVEMENTSI Total Construction Bid BY: BROC UGGINS TITLE: p SIDENT DATE: 9-26-2024" I $5.00 $42,830.00 $275.00 $42,625.00 $4.25 $21,764.25 $4.25 $769.25 $4.25 $74.931.75 $2,200.00 $19,800.00 $2,600.00 $2,600.00 $2,400.00 $16,800.00 $28.00 $7,028.001 $8.00 $12,064.001 $68.00 $556.308.001 $30.00 $3.450.001 $80D.00 $2,400.001 $25.00 $2.375.001 $6.50 $1,625.001 $4.00 $12,944.001 $6.00 $3,636.001 $6.00 $13,818.001 $20.00 $880.00 $4.00 $8,592.00 $15.00 $3,345.00 $4.00 $8.592.00 $750.00 $4,500.00 $850.00 $5,950.00 $850.00 $2,550.00 $860.00 $850.00 $850.00 $850.001 $850.001 $3,400.001 $250.001 $1,500.001 $300.001 $2,700.001 $20.001 $1,340.001 $1,000.001 $1,000.001 $15.001 $2,505.001 $886,322.251 $454,794.00 $504,087.00 $886.322.25 $1,845,203.25 180 working days after the date when the CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS- DEVELOPER AWARDED PROJECTS Form Verswn May 22, 2019 (Kt4243 Bid Propa,al_T-Velma PhaseI UNIT PRICE BID SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Terra Vella, Phase 1, Equinine Trail Master Infrastructure - Street Lights Project Item Information Pl-1 Mot. - Steel Lighn DAP- BID PROPOSAL Page 6 of6 Bidder's Application Bidder's Proposal Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price UNIT V: STREET LfJMNG IMPROVEMENTS 1 2605.3015 2" CONDT PVC SCH 80 (T) 260633 LF 1250 $15.00 2 3441.3201 LED Lighting Fixture (50W) 34 41 20 EA 11 $750.00 3 3441.1633 Install Type 33B Arm 34 41 20 EA 11 $600.00 4 3441.3002 Rdwy Ilium Assembly TY 8.11,D-25, and D-30 34 41 20 EA 11 $2,500.00 5 3441.3301 Rdwy Ilium Foundation TY 1,2, and 4 34 41 20 EA 11 $1,200.00 6 9999.0032 Remove Existing Street Light 00 00 00 EA 1 $1,500.00 7 9999.0033 3 - #2 Copper Wire 00 00 00 LF 1250 $6.00 j TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS f Bid Summary UNIT V: STREET LIGHT IMPROVEMENTS Total Construction Bid This Bid is submitted by the entity named below: BIDDER: Conatser Construction TX, L.P. 5327 Wichita Street Fort Worth, TX 76119 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. END OF SECTION BY: BR GGINS�` /f TITLE- P S ENT 4 V(/ DATE: 9-26-2024 180 working days after the date when the Bid Value $18,750.00 $8,250.00 $6,600.00 $27,500.00 $13,200.001 $1,500.001 $7.500.001 $83.300.001 I I $83,300.001 $83,300.001 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 004243_Bid ProposalTenr Velle_Ph— 1