Loading...
HomeMy WebLinkAboutContract 59771-A1CSC No. 59771-A1 AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 59771 WHEREAS, the City of Fort Worth (CITY) and NEEL-SCHAFFER, INC., (ENGINEER) made and entered into City Secretary Contract No. 59771, (the CONTRACT) which was authorized by M&C 23-0517 on the 27th day of June, 2023 in the amount of $ 177,963.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Highland Hills Park, Roadway and Parking Lot Improvements, CPN 104477; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work, a revised fee and updated hourly rate schedule. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated September 12, 2024, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $14,755.00. (See Attached Funding Breakdown Sheet, Page -3-) 2. Article II, Paragraph A of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $192,718.00. Article II and Attachment B of the CONTRACT are amended to include the current hourly rate schedule specified in the proposal attached hereto (Exhibit 1) and incorporated herein. OFFICIAL RECORD CITY SECRETARY 3 • FT. WORTH, TX All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth, Texas Roadway and Parking Lot Improvements Prof Services Agreement Amendment Template CPN 104477 Revision Date: February 2, 2024 Page 1 of 3 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth C�P� Jesica McEachern Assistant City Manager DATE: OCt 17, 2024 Q,00vvnnn� FFORr�oa$ ATTEST: �a $9.►°0 v°P�� Pvo o=d ( } aaan�645bap KC Jannette Goodall City Secretary APPROVAL RECOMMENDED: � SP J Richard Zavala Director, Park & Recreation Department ENGINEER NEEL SCHAFFER, INC. P"1.9 Cit¢w� Derek Cheatham, P.E. Senior Vice President DATE: Oct 2, 2O24 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. 4-A Geoffrey Smith, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: Douglas Black (Oct 9, 2024 08:37 CDT) Douglas W. Black Sr. Assistant City Attorney M&C No.#: N/A M&C Date: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Roadway and Parking Lot Improvements Prof Services Agreement Amendment Template CPN 104477 Revision Date: February 2, 2024 Page 2 of 3 FUNDING BREAKDOWN SHEET City Secretary No. 59771 Amendment No. 1 Fund Dept ID Account Project ID CF1- Activity CF2 - Bond Reference Amount 31001 0800450 5330500 104477 003730 $14,755 Total: $14,755 City of Fort Worth, Texas Roadway and Parking Lot Improvements Prof Services Agreement Amendment Template CPN 104477 Revision Date: February 2, 2024 Page 3 of 3 September 12, 2024 Mr. Geoffrey Smith, P.E., CFM Project Manager City of Fort Worth — TPW Capital Delivery 1000 Throckmorton Street Fort Worth, Texas 76102 Reference: ARPA Cobb Park Road/Parking Improvements and ARPA Highland Hills Park Road/Parking Improvements Contract Amendment 1— CPN 104477 Dear Geoffrey: Neel -Schaffer, Inc. offers additional Professional Engineering Services for this project. These additional i ru services were requested by the City of Fort Worth and generally include additional work related to re- bidding ARPA Highland Hills Park Road/Parking Improvements on its own. N On August 21, 2024, The City of Fort Worth decided to reject all bids for the above referenced project to allow the Cobb Park Road Improvements and the Highland Hills Park improvements to be separated. Cobb _ Park Road Improvements will no longer be the responsibility of the Park & Recreation Department, N therefore Highland Hills Park Road/Parking Improvements needs to be bid out as a stand-alone project. NSI is proposing an increase in fee to handle the cost to split the plan set, redo the bidding documents N and specifications to remove any mention of Cobb Park, and cover additional time for meetings and addendums during the bidding process. ;_ The proposed increase to the contract is $14,755 for these additional services. All additional services will _ o be performed in accordance with the original contract dated June 27, 2023 (City Secretary Contract No. v 59771). V) 0 a, Summary of Contract Fee Original Contract Amount $177,963.00 Proposed Amendment No. 1 $14,755.00 Revised Contract Amount $192,718.00 _ Q If you have any questions or we may be of further service, please call me at 817/870-2422. v Sincerely,tLo _ .ram _ Derek B. Cheatham, P.E. Project Manager TBPE Firm Reg. No. F-2697 TBPLS Firm Reg. No. 10027200 P:817.870.2422 1 F:817.870.2489 1 515 Houston Street, Suite 651 O Fort Worth, TX 76102 www.nee[-schaffer.com Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Road and Parking Improvements in Cobb Park and Highland Hills Park - Splitting out Highland, Resign & seal, Re -bidding City Project No.104477 Task No. Task Description Project Director Project Man a er Labor Project Engin, hours) Err CADD Administrative Total Labor Cost EX Subconsultant E Non_ MWBE ense Travel Reproduction Total Expense Cost Task Sub Total Rate $285 1.0 roject Management 0 1.1 Managing the Team 1.1.1 Internal Team Meetings 1.1.2 QA/QC 1.2 Communications and Reporting 1.2.1 Pre-Desjyf Coordination Meeting 1.2.2 [monthly] Protect Update Meetings 1.2.3 Design Submittal Review Meetings 1.2.4 Prepare Baseline Schedule 1.2.5 Prepare Monthly �{y�r�$s� pot with Schedule 1.2.6 Prepare Monthly Mgt/� #eports 1.2.7 Invoicin_q 1.2.8 Prepare MH estimate & Supplemental Agreement $185 $155 $135 $140 $90 740 $0 $0 $0 $0 $0 $740 21 21 $370 $0 $370 $370 $0 $370 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 4.0 mal Desk'$^ - Break out Hi hland Plans and Re-sign & Seal) 4.1inal Drati (90 %) Constructionans and Specifications 4.2 Final (100%) Plans and Specifications - Split Plans and re-sign and seal 4.3 Project Decision Lois (90% and 100 % 4.4 Construction Estimates (90% and 10(11) 0 6 0 3,350 $0 $0 $0 $0 $0 $3,350 61 16 $0 $3,350 $0 $0 $0 $3,350 $0 $0 $0 $0 $0 $0 5.0 Bid Phase 5.1 Bid Support 5.1.1 Sell Contract Documents and Maintain Plan Holders List 5.1.2 Prepare & Issue Addenda 5.1.3 Attend Pre -bid Conference 5.1.4 Attend Bid Opening 5.1.5 Tabulate Bids and Recommend Award 5.1.6 Issue Conformed Contract Documents 1 281 0 2 8 $10,665 $0 $0 $0 $0 $0 $10,665 1 101 10 6 6 81 8 4 41 8 4 $0 $0 $0 1 $3,535 $1,950 $0 $3,535 $0 $1,950 $0 $2,960 $0 $0 $0 $2,960 $2,220 $0 $2,220 Totals 1 3811 1 ii 8 $14,755 $0 $0 i $0 $0 $0 $14,755 City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8.09.2012 Project Summary Total Hours 95 Total Labor $14,755 Total Expense $0 MBE/SBE Subconsultant $0 Non-MBE/SBE Subconsultant $0 5% Sub Markup $0 MBE/SBE Participation 0.0% Total Project Cost $14,755 1 Off