Loading...
HomeMy WebLinkAboutContract 61327-CO1PROJECT NAME: (CONTRACT: ICFA # ICITY PROJECT # ICITY SECRETARY CONTRACT # IFID # IX# FILE # INSPECTOR: PROJECT MANAGER: DEVELOPER -AWARDED -PROJECT CHANGE ORDER CATTLEMANS CROSSING PHASE 1 WATER, SEWER, PAVING, DRAINAGE, AND STREET LIGHT CFA23-0171 I CITY PARTICIPATION:( 104562 61327 30114-0200431-104562-EO7685 X-27837 W-2939 Cody Horton Phone No: Izeldeen Ahmed Phone No: WATER SEWER Developer Cost City Cost Developer Cost City Cost IORIGINAL CONTRACT $956,802.08 $1,570,416.92 $589,193.40 $7,810.60 I EXTRAS TO DATE $0.00 $0.00 $0.00 $0.00 ICREDITS TO DATE $0.00 $0.00 $0.00 $0.00 ICONTRACT TO DATE $956,802.08 $1,570,416.92 $589,193.40 $7,810.60 (AMOUNT OF PROP. CHANGE ORDER $0.00 $0.00 $5,430.00 $0.00 I REVISED CONTRACT AMOUNT $956,802.08 $1,570,416.92 $594,623.40 $7,810.60 TOTAL REVISED CONTRACT AMOUNT PER UNIT $2,527,219.00 $602,434.00 REVISED COST SHARE Dev. Cost: $3,876,522.48 TOTAL REVISED CONTRACT You are directed to make the following changes in the contract documents PAY ITEM # CITY BID ITEM # �11.0000 QUANTITY UNIT 3331.4115 8.0000 (89.00) L 3331.4208 119.00 L PAY ITEM # CITY BID ITEM # �7.0000 QUANTITY UNIT 3291.0100 0.167 C Revised: 12-17-2018 CSC No,, 61327-COl YES I I I I 682-215-8720 817-392-7380 CHANGE ORDER No: CONTRACT UNIT DRAINAGE PAVING Developer Cost City Cost Developer Cost City Cost $830,335.00 $0.00 $1,218,763.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $830,335.00 $0.00 $1,218,763.00 $0.00 $0.00 $0.00 $0.00 $0.00 $830,335.00 $0.00 $1,218,763.00 $0.00 $830,335.00 $1,218,763.00 CONTRACT STREET LIGHTS I DAYS Developer Cost City Cost $275,999.00 $0.00 240 I $0.00 $0.00 I $0.00 $0.00 I $275,999.00 $0.00 240 I $0.00 $0.00 0 I $275,999.00 $0.00 240 I $275,999.00 City Cost: $1,578,227.52 $5,454,750.00 UNIT I: SANITARY SEWER IMPROVEMENTS F F Y ITEM DESCRIPTION CFW Unit Price UNIT PRICE Developer Cost City Cost TOTAL 3331.4115 8" SEWER PIPE $49.38 $62.00 ($5,518.00) $0.00 (55,518.00) 3331.4208 12" SEWER PIPE $53.46 $92.00 $10,462.48 $485.52 $10,948.00 TOTAL UNIT I: SANITARY SEWER IMPROVEMENTS $4.944.48 $485.52 $5,430.00 UNIT II: PAVING IMPROVEMENTS ITEM DESCRIPTION CFW Unit Price UNIT PRICE Developer Cost City Cost TOTAL 3291.0100 TOPSOIL 1 $48.00 $8.00 $8.00 TOTAL UNIT II: PAVING IMPROVEMENTS $8.00 $0.00 $8.00 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 1 Asterisk (•) Indicates New Pay Item REASONS FOR CHANGE ORDER This change order is required for our site, as wetl as the future 42 Real Estate Property's sewer usage. Per Matt Kusnir (after plan approval) required us to increase the propsoed 8" sewer connection to a 12" to ensure capacity for all future connections to the hunter crossings regional lift station. These revisions are shown on sheet number 25 & 26. The paving change order was due to the initial quantity submitted rounding off causing an $8 discrepancy that has been resolved by adding the difference in material. RECOMMENDED: Shield Engineering Group Name: Landon G. Geary Title: Project Manager APPROVAL RECOMMENDED: CFW- Water Department By. S 6� ✓� P� OH Name: _yj,bv Varuahese RE Title: Enaineerina Manager RECOMMENDED: CFW - *Contract Compliance Manager lgga&2H Ahmgd,A By, aeIdee Ah—d,P E 01115.202414 Name: Izeldeen Ahmed rtle:_5gpior Professional Enaineer M&C Number. 24-0223 M&C Date Approved: 03/19/2024 APPROVED: Ashton D 8 By: / Residential L.L.C. ���jjj��^r/ Name: Cody Bailey Title: Development Director APPROVED: CFW -Assistant City Manager By. Dn B,,ghdoff Odrvzaza1a DT) Name: Dana Burandoff Title: Assistant Citv Manaaer PO4 FONT�QOd ATTEST V �AQo nE4p96p e Jannette S. Goodall City Secretary APPROVED: Conatser C ruc'on , .P. r By: Name: Brock Huggin Title: President APPROVED AS TO FORM AND LEGALITY: CFW - Assistant City Attorney By. �' "IT `',m' Name: Richard McCracken Title: Senior Assitant Attorney • Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, include ensuring all performance and reporting requirements. ❑ There are NO City Funds associated with this Contract ❑' There are City Funds associated with this Contract OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Revised: 12-17-2018 Page 2