HomeMy WebLinkAboutContract 60105-CO1CSC No. 60105-COI
FORT WORTH. City of Fort Worth
Change Order Request
Project Name Greenleaf Sump Storm Drain City Sec # I 60105
Client Project #(s)l 103260
Project Description This Project will relocate and install a SD line along Greenleaf Street in preparation for the South Bypass Channel Proposed for the Trinity River Vision
Project. II
Contractorl S J Louis Construction of Texas LTD Change Order#I 1 Datel 9/18/2024
Max Aransen, P.E. City Inspector James Ruiz
City Project Mgc1
Dept.
TPW
Contract Time
Totals
(CDl
Original Contract Amount
$6,050,404.00
$6,050,404.00
365
Extras to Dale
Credits to Date
$59,288.82
$59,288.82
Pending Change Orders (in M&C Process)
Contract Cost to Date
$5,991,115.18
$5,991,115.18
365
Yo to ADD & DEL Tabs to Enter CO Backup
_ $0.00
45
evised Contract Amount
$5,991,115.18
$5,991,115.18
410
Original Funds Available for Change Orders
$0.00
Remaining Funds Available for this CO
$59,288.82
$59,288.82
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
-0.98%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
$7,563,005.00
JUSTIFICATION (REASONS) FOR CHANGE ORDER
This Change Order will be to add 45 construction days for the installation of 17 Hydratite Seals on the 6' x 4' box culvertjoints between STA 7+15 to STA 8+55 as per USACE
requirement all pipes within USACE jurisdiction must be watertight While the Hydratite cost addition was handled via the construction allowance, the days are added via this
Change Order. These days arejustified to account for additional work as directed by city staff.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting reouirements.
Contractor's Company Name t Contractor Name Contract Si nature
Date
Aafi�n!/afFatd
S J Louis Construction of Texas LTD l Adam Lunsford
Oct 4,2024
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
Oct 4, 2024
3Pro
Oct 4, 2024
Pro gram Manager
Date
Senior Ca ital ect Officer
Date
Md
Oct 4, 2024
slll
Oct 4, 2024
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
Oct 8, 2024
X..vSi. - ......
Oct 8, 2024
Assistant Ci Attorney
Date
I Assistant City Manager
Date
Oct 24, 2024
Oct 24, 2024
Council Action if required)
4� Foer°9n. M&C Number l M&C Date Approved l
ATTEST:
� 000� o�•ovAo
v
Jannette Goodall, City Secretary
gad QEo 45aq
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
� V-1 Change Order Additions
Project Name 1
Greenleaf Sump Storm Drain
Client Project # 1
103260
Contractorl
S J Louis Construction of Texas LTD
I I tM UESCHIP I ION
City Sec # 60105
1
PMI Max Aransen, P.E. I Inspectorl James Ruiz
Change Order Submittal # 1-7 Date 1 9/18/2024 1
ADDITIONS
DEPI Oty Unit Unit Cost total 1
I
1
I
1
I
1
I
1
I
1
1
1
I
1
I
1
I
1
I
1
I
1
I
1
1
1
I
1
I
1
I
1
I
1
I
1
I
1
1
1
I
1
I
1
I
1
I
1
I
1
I
1
1
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
TPW $0.001
Sub Total Additions $0.001
Change Order Additions Page 2 of 4
FORT�W�oRTH City of Fort Worth
Change Order Deletions
ITEM
Project Name I Greenleaf Sump Storm Drain City Sec # 1 60105 1
Client Project # 1 103260 1
Contractorl S J Louis Construction of Texas LTD I PM l Max Aransen, P.E. l Inspectorl James Ruiz
Change Order Submittal # 0 Date 1 9/18/2024 1
DELETIONS
DESCRIPTION DEPT Oty Unit Unit Cost Total 1
I
I
1
I
1
I
I
1
I
1
I
I
1
I
1
I
1
I
1
I
1
1
I
1
I
I
1
I
1
I
1
I
1
I
1
I
I
1
I
I
1
I
1
I
1
I
1
I
1
I
1
1
I
1
I
1
I
1
I
1
I
1
I
1
I
I
1
1
I
1
T15W $0.001
I I
I I
I I
Sub Total Deletions $0.001
Change Order Deletions Page 3 of 4
M/SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO # DATE I AMOUNT
Total $0.00
S J LOUIS CONSTRUCTION OF TEXAS LTD -
Construction Contract Change Order -
Final Audit Report 2024-10-25
Created: 2024-10-23
By: Sadie Ishmael (Sadie.Ishmael@fortworthtexas.gov)
Status: Canceled / Declined
Transaction ID: CBJCHBCAABAALQld1ef6fg7S0_PP9rge7gPyfeRqOnC
"S J LOUIS CONSTRUCTION OF TEXAS LTD - Construction C
ontract Change Order -" History
Document created by Sadie Ishmael (Sadie.Ishmael@fortworthtexas.gov)
2024-10-23 - 7:31:50 PM GMT- IP address: 204.10.90.100
Document approved by Sadie Ishmael(Sadie.lshmael@fortworthtexas.gov)
Approval Date: 2024-10-23 - 7:38:27 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to Douglas Black(Douglas.Black@fortworthtexas.gov) for signature
2024-10-23 - 7:38:28 PM GMT
iSo Document e-signed by Douglas Black (Douglas.Black@fortworthtexas.gov)
Signature Date: 2024-10-24 - 5:33:25 PM GMT - Time Source: server- IP address: 208.184.124.181
P+ Document emailed to Jesica McEachern aesica.mceachern@fortworthtexas.gov) for signature
2024-10-24 - 5:33:29 PM GMT
&0 Document e-signed by Jesica McEachern Oesica.mceachern@fortworthtexas.gov)
Signature Date: 2024-10-25 - 4:22:06 AM GMT - Time Source: server- IP address: 69.212.100.108
04 Document emailed to Jannette Goodall Oannette.goodall@fortworthtexas.gov) for signature
2024-10-25 - 4:22:08 AM GMT
Email viewed by Jannette Goodall Oannette.goodall@fortworthtexas.gov)
2024-10-25 - 12:43:57 PM GMT- IP address: 208.184.124.181
&0 Document e-signed by Jannette Goodall Qannette.goodall@fortworthtexas.gov)
Signature Date: 2024-10-25 - 12:44:06 PM GMT - Time Source: server- IP address: 208.184.124.181
FDRTWORTHs I P°`4'y
Adobe
Acrobat Sign
Form filling automatically delegated to Elisa Winterrowd (Elisa.Winterrowd@fortworthtexas.gov) by Allison
Tidwell (allison.tidwelI@fortworthtexas.gov)
2024-10-25 - 12:44:07 PM GMT
-' Document emailed to Allison Tidwell (allison.tidwell@fortworthtexas.gov) for filling
2024-10-25 - 12:44:07 PM GMT
Document emailed to Elisa Winterrowd (Elisa.Winterrowd@fortworthtexas.gov) for filling
2024-10-25 - 12:44:08 PM GMT
Document declined by Allison Tidwell (allison.tidwell@fortworthtexas.gov)
Decline reason: There is not a text box for me to include the contract number.
2024-10-25 - 5:58:39 PM GMT- IP address: 208.184.124.181
FoRTWORTHs I P—m`l8y
Adobe
Acrobat Sign
FORT WORTH,
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: -Greenleaf Sump Storm Drain Change Order I
M&C: CPN:
103260 CSO: 60105
DOC#:
Date:
To:
Name
Department
Initials
Date Out
1
Adam Lunsford
Contractor
—AIiL
Oct 4, 2024
AdamL@SJLouis.Com
2.
James Ruiz
TPW - Inspector
Oct 4, 2024
I 3.
Max Aransen
TPW - Project Manager
Oct 4, 2024
4.
Thanaa H. Maksimos
TPW — Program Manager
Oct 4, 2024
5.
Lissette Acevedo
TPW — Sr. CPO
LA
Oct 4, 2024
6.
Patricia Wadsack
TPW — Assistant Director
PLW
Oct 8, 2024
7.
Lauren Prieur
TPW - Director
LP
Oct 8 2024
8.
Doug Black
Legal - Assistant City Attorney De Da
Oct 24, 2024
9.
Jesica McEachern
CMO — Assistant City Manager ?�—
Oct 24, 2024
10.
Jannette Goodall
CSO — City Secretary
JG 36
Oct 25, 2024
11.
Allison Tidwell
CSO — City Secretary
�
Oct 28, 2024
12.
Tpw—SW—Contract
TPW Stormwater
CC: Program Manager — Thanaa Maksimos, Sr. CPO — Lissette Acevedo, TPW BSPAP Recon
Team — Cindy Sengathith
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES NNo
RUSH: ❑YES NNo SAME DAY: ❑YES NNo NEXT DAY: ❑YES NNo
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
N Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return to: tnw sw contracts(&fortworthtexas.eov Call 817-229-3283 with questions. Thank you!