Loading...
HomeMy WebLinkAboutContract 43994-CO1 Aft Aft Cvjo�j L FORT WORTH. City of Fort Worth CITY SEQV:7MY I V Change Order Request CONTR=NOo V Project N'ame�l� 210!0'8 CIS"Contract#2A alt Sac# 43-9-94 Client,Project#(s)l DOE#62181 C�P#01320, Project Descriptioni 16th ST NW,22nd ST NW,Highland Ave,Belmont Ave,Odd ST,Gould Ave. Contractor Stabile&Winn, Inc. Change Order# Date L,8/16/2013 City Project Mgr., Golpal Sahu City Inspector =ados Vasquez Dept. TPW Water Sewer Contract Time 'Totals (CD) Original Contract Amount $10357,595.76 .$401,112.70 $75,329.00 $1,8314,097.46 270 Extras to Date Credits to Date Pending Change Orders din M'&C Process) Contract Cost to Date $1 o357m595.76 $ �1 72.7�O $75,329.00 $1,834,09 7.46 270 JAmount of Proposed Change 0 er $01-00 $71$5,50.00 $0.00 $710550.00 11111M 0 1 11 I'll I � 15 Revised Contract Amount $11357,595.76 $4721722.70----- $75,329.00 $1,905,647.46 285 Original Funds Available for Change Orders $67,879.791 $20,0518.64 $377661.45 $911704-88� Remaining Funds Available for this CO wowwk�$67x879.79 $20s058-64 $31766.45 $91,704.88 Additional Funding it necessary), L5114419136 $51,491.36 CHANGE'ORDERS to DATE(INCLUDING,THIS ONE),AS%OF ORIGINAL CONTRACT 3.90% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONS`RACTCOST+25%) $2,2921621 This change order is to increase the number of water semces specified in the contract which were not accurately quantified.This change order is also to incr+ ase!the number of service relocates specified which were also,miscalculated in the contract due to the fact that the ,,consultant referenced the old specification for service,relocates n the new water specification section 33-12-,10.15 calendar days, are requested for additional 45 services andl 96 relocate low 3: by: OFFICIAL C ORD Ia C S T Y ITY %SECRTARY r Cove. 00 WO TX ' WORTH,TX ar FFTTw city silkri It is understood and agreed that the acceptance of this Change,Order by the contractor constitutes an a=rd and satisfaction and represents i C payment in,full(both firrille and money)for ailll costs arising out off or ncident al to,the above hange Order. 1 1,10f I fi�1�I gp I WW�Y �� ! Sitaiblile&Winn,Inc. 11 U Xr_M -Mwm� am agamming 111 IS, INMAN IN P W 1 i W/ i NO I I al PfGJI 4 140 /V (,. l f� �//,, I r% ) , J'`; .f .��� �//. li lr f. l J. l Ir 1' f ' ' f l�! illig N% Pill % 1 li r l M&C Date oved M&C Number App r RECEIVED SEP 1 19 C ci UD 0 Cn r LiC) CIO M co cr CD 0) co CDL 0 ( �' 1," bm Um Cal mc 0 u cu 0) CD CIO L C 0 � M' ° of Cn col Lu cu 0 CL 0 0 CIO (L) CL z Q 0 --..., 0 CL CL c ,C> ICD ci ci ci 641), c1r) CY) C> T 0 (D CD (D .................. 0- cu CD (D CO CL W C. 7C) 155 0 t 0 z 4-0 0 F- uj 0 L- 0-1 4) LLJ a) Lo 0 0 w E *no ca 0 > 70 CO C) CN z m it cu C= o C6 CU (D 00 LLJ fa CK3 CL o 41 C.D Ll 4D :4 E co z 0 0 CL I I t III i I I I »o . coi \�\ \0\ Li Oi *! to m Oi 4< .� .0 0 �..: a4 .� MMBE Breakdown for this Change Order MWBE Sub Type of Service, Amount for thi's C0 'Total ;00.00 Previous Change Orders CO DATE AMOUNT $0,10 Total 8 PROJECT SHEET (Change Order Attachment) PROJECT NAME: 2008 CIP Contract PROJECT LIMITS: I t NW, 22nd� i e, BelmoinIt e f l Ave. CS. No.- CS439914 .E. N . 6 ' Attachment to CO 1 Today's Cate: 9/10/2013 Contract Time TOTAL Water Sewer T (Days) Original Contract Amount'. $ 1i , 4011172.70 751329.00 1135,715951.�76 270 Extras to ate: $ *0 Credits, to Date: $ Contract Amount to ate' "11834109 7,4 401, 172.70 75,329.00 113571595.76 5, 27 Flu Int of Proposed Change Order: 711)15150.010 711550.010 _ 1 Revised Contract Amount, 1 1905,64 .46 4721722.70 75329.00 11357,59576 285 Contingency Funds Avail�. for Ad in. Cha $ 911704.88 20,058.64 317661.45 671879.79 Remaining Funds Available for Change C $ 91,704.188 20,058.64 31766.45 $ 67,879.79 Additional Feu nd iing of necessary): $ 51A91.36 51,14911-36,