Loading...
HomeMy WebLinkAboutContract 61703-PM1FORTWORTH. CSC No. 61703-PM1 PROJECT MANUAL FOR THE CONSTRUCTION OF SEWER IMPROVEMENT TO SERVE Tidal Wave Auto Spa IPRC No.: IPRC23-0095 City Project No.: 104995 FID No.: 30114-0200431-104995-EO7685 X-27871 Mattie Parker David Cooke Mayor City Manager Christopher P. Harder, P.E. Director, Water Department Lauren Prieur Director, Transportation and Public Works Department Aw � ........ TF�lI� * *. EDUARDO SOTO 1...... 48851 r��ll`SS�ONAL ENG+09/19/2024 Prepared for The City of Fort Worth 2023 Prepared by: Foresite Group, LLC TBPELS Firm No. F-12878 100 NE Loop 410, Suite 100 San Antonio, Texas 78216 Tel: 770-368-1399 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 8 SECTION 00 00 10 TABLE OF CONTENTS DEVELOPER AWARDED PROJECTS Division 00 - General Conditions t, io t Bidders Last Revised 001113 nno�3 iny irztruoK.,a s t Bidder 03 20,12 20 03i 40 004100 00 42 43 nno Bid Fefm Proposal Form Unit Price Bid Ben 04,102,Q014 05/22/2019 04/02,12014 nn nc 11 0045 12 Bidders Pr-equalifie ion's Prequalification Statement n,-e,,, n rri nn 02,120i n 09/01/2015 0045 13 00 45 26 0045 40 wader alai., io ie ie Contractor Compliance with Workers' Compensation Law r ine Business En4e,... Goal 031/09 O20 04/02/2014 nQi g 00 52 43 fit-y fife Agreement 06/16/2016 00 61 25 nno�3 Certificate of Insurance Per-f t:m ree Bond 07/01/2011 0 i�12 nno�4 00 62 19 00 7200 Payment Bon Maintenance Bond rene fa Conditions 0 i�z 01/31/2012 t t /t�017 007300 0073 10 c,,pple,..ent., y Conditions Standard City Conditions of the Construction Contract for Developer n7/0i Q0ii 01/10/2013 Awarded Projects Division 01 - General Requirements Last Revised 01 1100 Summary of Work 12/20/2012 01 2500 Substitution Procedures 08/30/2013 01 31 19 Preconstruction Meeting 08/30/2013 01 3233 Preconstruction Video 08/30/2013 01 3300 Submittals 08/30/2013 01 35 13 Special Project Procedures 08/30/2013 01 45 23 Testing and Inspection Services 03/20/2020 01 5000 Temporary Facilities and Controls 07/01/2011 01 5526 Street Use Permit and Modifications to Traffic Control 07/01/2011 01 57 13 Storm Water Pollution Prevention Plan 07/01/2011 01 60 00 Product Requirements 03/20/2020 01 66 00 Product Storage and Handling Requirements 04/07/2014 01 70 00 Mobilization and Remobilization 04/07/2014 01 71 23 Construction Staking and Survey (DAP MOD) 02/14/2018 01 74 23 Cleaning 04/07/2014 01 77 19 Closeout Requirements 04/07/2014 01 78 23 Operation and Maintenance Data 04/07/2014 01 78 39 Project Record Documents 04/07/2014 CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 8 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents Date Division 02 - Existing Conditions Modified 0241 13 Selective Site Demolition None 0241 14 Utility Removal/Abandonment None 0241 15 Paving Removal None Division 03 - Concrete 03 30 00 Cast -In -Place Concrete None 03 34 13 Controlled Low Strength Material (CLSM) None 03 34 16 Concrete Base Material for Trench Repair None 03 80 00 Modifications to Existing Concrete Structures None Division 26 - Electrical 26 05 00 Common Work Results for Electrical None 2605 10 Demolition for Electrical Systems None 26 05 33 Raceways and Boxes for Electrical Systems None 26 05 43 Underground Ducts and Raceways for Electrical Systems None Division 31- Earthwork 31 1000 Site Clearing None 3123 16 Unclassified Excavation None 31 23 23 Borrow None 31 24 00 Embankments None 31 25 00 Erosion and Sediment Control None 31 36 00 Gabions None 31 37 00 Riprap None Division 32 - Exterior Improvements 3201 17 Permanent Asphalt Paving Repair None 3201 18 Temporary Asphalt Paving Repair None 32 01 29 Concrete Paving Repair None 32 1123 Flexible Base Courses None 32 1129 Lime Treated Base Courses None 32 1133 Cement Treated Base Courses None 32 1137 Liquid Treated Soil Stabilizer None 32 12 16 Asphalt Paving None 32 1273 Asphalt Paving Crack Sealants None 32 13 13 Concrete Paving None 32 1320 Concrete Sidewalks, Driveways and Barrier Free Ramps None 32 1373 Concrete Paving Joint Sealants None 32 1416 Brick Unit Paving None 32 1613 Concrete Curb and Gutters and Valley Gutters None 32 1723 Pavement Markings None 32 1725 Curb Address Painting None 3231 13 Chain Fences and Gates None CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 8 32 31 26 Wire Fences and Gates None 32 31 29 Wood Fences and Gates None 3232 13 Cast -in -Place Concrete Retaining Walls None 3291 19 Topsoil Placement and Finishing of Parkways None 3292 13 Hydro -Mulching, Seeding, and Sodding None 32 93 43 Trees and Shrubs None Division 33 - Utilities 33 01 30 Sewer and Manhole Testing None 33 01 31 Closed Circuit Television (CCTV) Inspection None 3303 10 Bypass Pumping of Existing Sewer Systems None 33 04 10 Joint Bonding and Electrical Isolation None 3304 11 Corrosion Control Test Stations None 33 04 12 Magnesium Anode Cathodic Protection System None 33 04 30 Temporary Water Services None 33 04 40 Cleaning and Acceptance Testing of Water Mains None 33 04 50 Cleaning of Sewer Mains None 3305 10 Utility Trench Excavation, Embedment, and Backfill None 3305 12 Water Line Lowering None 3305 13 Frame, Cover and Grade Rings - Cast Iron None 3305 13.10 Frame, Cover and Grade Rings - Composite None 3305 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to None Grade 3305 16 Concrete Water Vaults None 3305 17 Concrete Collars None 33 05 20 Auger Boring None 33 05 21 Tunnel Liner Plate None 33 05 22 Steel Casing Pipe None 33 05 23 Hand Tunneling None 33 05 24 Installation of Carrier Pipe in Casing or Tunnel Liner Plate None 33 05 26 Utility Markers/Locators None 33 05 30 Location of Existing Utilities None 33 1105 Bolts, Nuts, and Gaskets None 33 11 10 Ductile Iron Pipe None 33 11 11 Ductile Iron Fittings None 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe None 33 11 13 Concrete Pressure Pipe, Bar -Wrapped, Steel Cylinder Type None 33 11 14 Buried Steel Pipe and Fittings None 33 11 15 Pre -Stressed Concrete Cylinder Pipe None 33 12 10 Water Services 1-inch to 2-inch None 33 1211 Large Water Meters None 33 1220 Resilient Seated Gate Valve None 33 1221 AWWA Rubber -Seated Butterfly Valves None 33 1225 Connection to Existing Water Mains None 33 1230 Combination Air Valve Assemblies for Potable Water Systems None 33 1240 Fire Hydrants None 33 1250 Water Sample Stations None 33 1260 Standard Blow -off Valve Assembly None 33 31 12 Cured in Place Pipe (CIPP) None CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 8 33 31 13 Fiberglass Reinforced Pipe for Gravity Sanitary Sewers None 33 31 15 High Density Polyethylene (HDPE) Pipe for Sanitary Sewer None 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe None 33 31 21 Polyvinyl Chloride (PVC) Closed Profile Gravity Sanitary Sewer None Pipe 33 31 22 Sanitary Sewer Slip Lining None 33 31 23 Sanitary Sewer Pipe Enlargement None 33 31 50 Sanitary Sewer Service Connections and Service Line None 33 31 70 Combination Air Valve for Sanitary Sewer Force Mains None 3339 10 Cast -in -Place Concrete Manholes None 33 39 20 Precast Concrete Manholes None 33 39 30 Fiberglass Manholes None 33 39 40 Wastewater Access Chamber (WAC) None 33 39 60 Epoxy Liners for Sanitary Sewer Structures None 3341 10 Reinforced Concrete Storm Sewer Pipe/Culverts None 3341 11 High Density Polyethylene (HDPE) Pipe for Storm Drain None 3341 12 Reinforced Polyethlene (SRPE) Pipe None 33 46 00 Subdrainage None 33 46 01 Slotted Storm Drains None 33 46 02 Trench Drains None 3349 10 Cast -in -Place Manholes and Junction Boxes None 33 49 20 Curb and Drop Inlets None 33 49 40 Storm Drainage Headwalls and Wingwalls None Division 34 - Transportation 3441 10 Traffic Signals None 3441 10.01 Attachment A — Controller Cabinet None 3441 10.02 Attachment B — Controller Specification None 3441 10.03 Attachment C — Software Specification None 3441 11 Temporary Traffic Signals None 3441 13 Removing Traffic Signals None 3441 15 Rectangular Rapid Flashing Beacon None 3441 16 Pedestrian Hybrid Signal None 34 41 20 Roadway Illumination Assemblies None 34 41 20.01 Arterial LED Roadway Luminaires None 34 41 20.02 Freeway LED Roadway Luminaires None 34 41 20.03 Residential LED Roadway Luminaires None 34 41 30 Aluminum Signs None 3471 13 Traffic Control None CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 5 of 8 Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: httiD:Hfortworthtexas.uov/tnw/contractors/ or htti)s:Hapgs.fortworthtexas.gov/Proi ectResources/ Division 02 - Existing Conditions Last Revised Division 03 - Concrete 03 30 00 Cast -In -Place Concrete 12/20/2012 03�3 Ceirtr�lljd L/,3.V St..engtl. >,,l.,te,.;,,1 (C crR4 12/2�12 03 34 16 Concrete Base Material for Trench Repair 12/20/2012 03 80 00 Modi e.,t;efls to Existing Co erete StFuettir-es 12/ 0,9 Division 26 - Electrical 260500 re,, fRO 3a'e,a, DeSHhS 7f Qe,.tfiea 11/22QOB 2605 10 F,-y4eMS 12/rtr20/zoiz ')�3 R ee,. ays and Boxes f Eleet,-;e.,l Systems Q/2zzr20112 i2 2605 43 Trn e.-,.,-e,,..,1 Duets and Raee,. ays f , > 100trical Firys*ms 07/n�n zv-v�v Communisations �,- Division 31- Earthwork 31 1000 Site Clearing 12/20/2012 31 23 16 T, fi a Er iea,y ti n1 /2o/2n13 �-rzTry .���1.'�LY�1e v�-avravi� 3 1�3 BE)FFO n 11 /23 3124 nn Embacskm--ntsn1 /2�14 31 25 00 Erosion and Sediment Control 12/20/2012 2 lino Ripr-ap 1 2 /zzr20/2012 Division 32 - Exterior Improvements 32-01 17 efmanef�'10rka t llzAn.7,- P. i2/20,12 32 01 29 Concrete Paving Repair 12/20/2012 37�3 Flexible Base (`oufses 12/20,9010 32 11 29 Lime e Treated Base Cour-ses 12/'fez 2'7� Cement Treated Base Ce12/20QO12 32 1137 Liquid T- fe4e.l C �oil F,,eAilizcr 08/21 /201 5 37�o Asphalt It D.,.,i*g 12/20/2012 27�3 i��101 W1 ag C-.,ev Se.,laws 12/20,90z 32 �0 Conefete Sid&. alko, Dri:,e, ays andB.,fr e. F.eo Ramtfj3 061$5�2918 37�0 B -;ek Unit t Pa-y ng 12/20,L2012 CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS City Project # 104995 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 6 of 8 3231 22 rl..,i >~e..ees and Gates 12/2zzr20,120 2 27�9 Weed Fences and Gates 12/2zzr20/201" 3232 12 r Gonerete De+.,:..ing \xl.,06/0a4 3291 19 Topsoil Placement and Finishing of Parkways 12/20/2012 3292 13 Hydro -Mulching, Seeding, and Sodding 12/20/2012 2 7�3 T-fOOC/,Ind FA2'4 0 1 2 /2 W20 �Q Division 33 - Utilities 33 01 30 Sewer and Manhole Testing 12/20/2012 3301 31 Closed Circuit Television (CCTV) Inspection 03/03/2016 22�0 22�0 22�11 22� RyfG\-,) 1`,dm1iim`• of L '.frog Sewer- Syste,....n joint Beading and Eleetr:e.,l Tsel. tie. rerresio Ca trel Test Sta4io s r„tl,edie Dreteet:en Syste.v. 12/2zzr20/2012 12/2rL7z0,9viz 12/20,9012 12/2zzr20,120 22�0 22�no 33 04 50 Magnesium Anode Tempor..ryWa4e,- Sefy e Cleaning and Aeeepta ee Testing ofW ter>\ Gins Cleaning of Sewer Mains 2 07/llmTvV201i 02/03, 12/20/2012 3305 10 22� Utility Trench Excavation, Embedment, and Backfill AI Towering 12/12/2016 12/2zzr2W2012 3305 13 a4er- Line Frame, Cover and Grade Rings — Cast Iron 01/22/2016 3305 13.10 Frame, Cover and Grade Rings — Composite 01/22/2016 3305 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to 12/20/2012 330 22�T Grade renerete Water- Vaults renerete rellafs 1 21 /2�0% 12/20/2012 121 /'1 33 05 20 22�T 22� 330523 22�4 T,,....el Liner- er Dla4e Steel Casi g Npe I -.,and Timna-ling Dla4e Tthn z 12/2zzr20112W2 12/2zzrzv/iviz 121 /220% 33 05 26 lastelWie.., of Caff:er Pipe i Casing er el Liner- er Utility Markers/Locators 06/1 3 12/20/2012 33 05 30 22� Location of Existing Utilities .,,,..a 12/20/2012 12/2�0204-2 2 20 Belts Nttom Gaskets DUOtl� IY^� 1 2 /20 /2 22 11 11 � D °tile Tr �Ci. �i�1::gS 12/20/2012 �� 2,2 11 12 Polyvinyl Chloride ,le (PVC) Pressure Pipe Type 1 11 1 /i a9 33 11 33 11 11 Conefete Pr -es ",re Pipe Bar- Wrapped, Steel Cylinder- n„r:e,1 Steel Pipe and Fitting—., i2/'fez 12/2�02012 22�0 22�T 22�0 Wa4er- S voo 1 itwk to-24*e 3 T afge \I 4er Meters Desil efA Sea4e.l 02/1�T 12/2z 12/2�02012 2 2�} -p- 12 2E 22�0 Gate Valve AAVWA R—Libber S ea4e.7 Butter -fly V..l..e., renneetio to Existing Water- Mains Combination Air- Valve Assemblies for- Potable Wa4er Systems 1 'l /'fez 02/W2013 12/20/2012 22�0 Fire 14ydr-af4s 01 /03,904-4 CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 7 of 8 3�-12 50 Watur Ean-,,r).a Stations 12/�r20r2012 33 12 60 Standard Blow e ff Valve Assembly 06/1w�vi3 2Z�z Q"d in Plaoa Pipe (CIPP) 12/�12 3,33 3,11 '' 13 Fiber -glass Rein eree.l Pipe for-f Gfa-,;ty c.,,,itar-y Sewer Q/zr20112W2 3- ✓ 15 High Density Polyethylene (HDPE) PiN for F/anitar, er 112/�Q 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 06/19/2013 33 2- 2 TVyvil,l Chl—We (PVC) Closed DreF;le Gravity San taffy Sewer 12/�12 Pipe 33 3,11 22 S.,n; der Flip L/ning 12/�12 33 31 50 Sanitary Sewer Service Connections and Service Line 04/26/2013 ZZ�O n;r v.,lye for- San tai-7y Se.,,o,->~,, 6e Mains 12/�12 3339 �o Cam in Mace 12/2W2012 33 39 20 Precast Concrete Manholes 12/20/2012 333930 Fiber -glass Manholes 12/20/2012 33 39 400 Wastewater- n eeess Jxxx,, Or ) 12/'1�r20,9012 33 39 60 Epoxy Liners for Sanitary Sewer Structures 12/20/2012 33-44 10 veinf reel Genefete Ste...,., Sewer Pipe/!'idiyei4s 07/0T 33 11 .. High Density Polyethylene (LD2E) Pire- for- -Storn. Dioin 12/2W20Q 33 11 1 7 Rein f reel Del.,et1.1 (f' TE) Dina 1 1 /1 5 33 4600 S„tie 171 /7 z 33 4601 worm. D211im. 07/0T n�/n1 /2n11 3-3-4F-A2 c�'� Dnlins �>T 3�-49 10 Cast in 121.00e Manholes and junetion B 12/�12 33 4920 Curb a -ad Drop inlets 12/20/2012- 33 49 400 Stef Drainage ue.,1..W.1V4*gi*a4s n�/nm robgoii Division 34 - Transportation 34 41 10 T- faf ;e Sig 1s 7 10/1 5 34 41 10.01 rnrttaehmel_it A C—eatrelle�Zabinet 17/1 90i_s 34 41 1nrr1 n llerS�e���; �vz rrttaCirT�€�it� ��irtrericrvpcGriicutien 34 41 10.03 1 n.03 1t%adh1x,\it G�Sepdirc-vre CfCiti6n W2012 ?/1 ,1 1 1 Temporary T- fa ffie Signals 1 1 /7nr22�2013 34 41 13 Removing Tr-affie Signals 12/20/2012 2A�o Pedestrian 14ybr-id Signal. 1 11 1 /'l am 3n�0 Assemblies l.l;es 12 20/�n1 � �� IlluminatieM �rz 34 4120.01 -Aftcriy�! LED Rey Li.mir�okrrs 06/1�1�5 34 4120.02 Freeway LED ne.,,l.. ay r1 e � �an�06/1 e/20r �irss �7 2n n�o3 Residontial .r T� Aoadw r}� .2ar.�ir.aires 06/15 ,901c� 34 4130 Aluminum F/.gns 11 "�3 34 4150 Single Me.le Filer Optie Cable 02/7vz�-26/2016 3471 13 Traffic Control 11/22/2013 CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Appendix Page 8 of 8 GR-01 60 00 Product Requirements END OF SECTION CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised March 20, 2020 00 42 43 DAP - BID PROPOSAL Page 1 of2 UNIT PRICE BID SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification I Unit of Bid Unit Price Bid Value No. Section No. I Measure Quantity UNIT II: SANITARY SEWER IMPROVEMENTS 1 3331.4115 8" Sewer Pipe 3331 20 LF 9 $40.00 $360.001 2 3339.1001 4' Manhole 33 39 20 EA 1 $3,000.00 $3,000.001 3 3339.1003 4' Extra Depth Manhole 33 39 20 VF 5 $150.00 $750.001 4 3339.0001 Epoxy Manhole Liner 33 39 60 VF 11 $400.00 $4,400.001 5 3305.0109 Trench Safetv 33 05 10 LF 15 $1.00 $15.001 6 3301.0101 Manhole Vacuum Testing 3301 30 EA 1 $200.00 $200.001 7 3301.0002 Post -CCTV Inspection 3301 31 LF 9 $10.00 $90.001 8 3201.0614 Concrete Pavement repair, Residential 3201 29 SY 23 $350.00 $8,050.001 9 3292.0101 Utility Service Surface Restoration Seedinq 32 92 13 SY 60 $10.00 $600.001 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS $17,465.001 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 00 42 43 Bid Proposal_DAP.xIs SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID 00 42 43 DAP - BID PROPOSAL Page 2 or 2 Bidder's Application Project item information IBidlisl Item) f Specification I Unit or Bid No Description Section No. Measure Quantity Bid 5u m mary UNIT II: SANITARY SEWER IMPROVEMENTS This Bid is submitted by the entity named below: BIDDER: 11a}:,ri ConIraaun,. 1 I t N) Boy 11140 Roauohe iC-h'-m-' Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. Total Construction Bid By, Andy 9N<Yd TITLE: Owner 'f'aM DATE: 4 / 10 / 2 4 Bidder's Proposal Unit Price I Bid Value $17,465.00 $17,465.00 20 working days after the date when the END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 00 42 43_Bid Propasal_DAP.xIs 0045 12 DAP PREQUALIFICATION STATEMENT Page 1 of 1 SECTION 00 45 12 DAP — PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Maior Work Tvve" box provide the complete major work type and actual description as provided by the Water Department for water and sewer and TPW for paving. Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date Sewer Collection System, Dagger Contracting, LLC Development, 8-inches and 4/ 3 0/ 2 5 smaller The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: Dagger Contracting, LLC PO Box 1040 Roanoke, TX 76262 Andrew Nord (Signature) TITLE: Owner / DATE: 12/26/23 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT— DEVELOPER AWARDED PROJECTS 00 45 12—Prequalification Statement 2015_DAP.docx Form Version September 1, 2015 004526-1 1 N 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 M 39 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No. 104767. Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: Dagger Contracting, LLC Company PO Box 1040 Address Roanoke, TX 76262 City/State/Zip THE STATE OF TEXAS § COUNTY OF TARRANT § By: Andy Nord (Ple a in Signature: Title: Owner / GM (Please Print) BEFORE ME, the undersigned authority, on this day personally appeared Andy Nord , known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as the act and deed of Dagger Contracting, LLC for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this 2 6th day of December 2023 ��•``'H1H�'' '•,� %oSr r r... `� 0's x s c� 9y'rFQF �E�� ;=NetZry Public in and for the State of Texas % .71 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised April 2, 2014 Tidal Wave Auto Spa City Project # 104995 1 SECTION 00 52 43 Page 1 of 6 2 AGREEMENT 3 4 THIS AGREEMENT, authorized on 12/29/23 is made by and between the Developer, 5 Creed Commercial Development, LLC, authorized to do business in Texas ("Developer") , and 61�t authorized to do 7 busirill in Texas, acting by and through its duly authorized representative, ("Contractor"). 8 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree 9 as follows: 10 Article 1. WORK 11 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 12 Project identified herein. 13 Article 2. PROJECT 14 The project for which the Work under the Contract Documents may be the whole or only a part 15 is generally described as follows: 16 Tidal Wave Auto Spa 17 City Project # 104995 18 Article 3. CONTRACT TIME 19 3.1 Time is of the essence. 20 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 21 Documents are of the essence to this Contract. 22 3.2 Final Acceptance. 23 The Work will be complete for Final Acceptance within 20 working days after the date 24 when the Contract Time commences to run as provided in Paragraph 12.04 of the 25 Standard City Conditions of the Construction Contract for Developer Awarded Projects. 26 3.3 Liquidated damages 27 Contractor recognizes that time is of the essence of this Agreement and that Developer 28 will suffer financial loss if the Work is not completed within the times specified in 29 Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of 30 the Standard City Conditions of the Construction Contract for Developer Awarded CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS City Project # 104995 Revised June 16, 2016 005243-2 31 32 33 34 35 36 Developer Awarded Project Agreement Page 2 of 6 Projects. The Contractor also recognizes the delays, expense and difficulties involved in proving in a legal proceeding the actual loss suffered by the Developer if the Work is not completed on time. Accordingly, instead of requiring any such proof , Contractor agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay Developer zero Dollars ($0.00) for each day that expires after the time specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of Acceptance. 37 Article 4. CONTRACT PRICE 38 Developer agrees to pay Contractor for performance of the Work in accordance with the 39 Contract Documents an amount in current funds of 40 5cft ACM n NA^J/%A Dollars ($ I 4AP5. O0 ) SiA'iV ,Ic'Qol1lars x. Of %o conlrt 41 Article S. CONTRACT DOCUMENTS 42 5.1 CONTENTS: 43 A. The Contract Documents which comprise the entire agreement between Developer 44 and Contractor concerning the Work consist of the following: 45 1. This Agreement. 46 2. Attachments to this Agreement: 47 a. Bid Form (As provided by Developer) 48 1) Proposal Form (DAP Version) 49 2) Prequalification Statement 50 3) State and Federal documents (project specific) 51 b. Insurance ACORD Form(s) 52 c. Payment Bond (DAP Version) 53 Cl. Performance Bond (DAP Version) 54 e. Maintenance Bond (DAP Version) 55 f. Power of Attorney for the Bonds 56 g. Worker's Compensation Affidavit 57 h. MBE and/or SBE Commitment Form (If required) 58 3. Standard City General Conditions of the Construction Contract for Developer 59 Awarded Projects. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS City Project # 104995 Revised June 16, 2016 005243-3 Developer Awarded Project Agreement Page 3 of 6 60 4. Supplementary Conditions. 61 5. Specifications specifically made a part of the Contract Documents by attachment 62 or, if not attached, as incorporated by reference and described in the Table of 63 Contents of the Project's Contract Documents. 64 6. Drawings. 6S 7. Addenda. 67 68 69 70 71 72 73 74 75 8. Documentation submitted by Contractor prior to Notice of Award. 9. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS Revised June 16, 2016 Tidal Wave Auto Spa City Project # 104995 005243-4 Developer Awarded Project Agreement Page 4 of 6 76 Article 6. INDEMNIFICATION 77 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 78 expense, the city, its officers, servants and employees, from and against any and all 79 claims arising out of, or alleged to arise out of, the work and services to be performed by 80 the contractor, its officers, agents, employees, subcontractors, licenses or invitees under 81 this contract. This indemnification provision is specifically intended to operate and be 82 effective even if it is alleged or proven that all or some of the damages being sought 83 were caused, in whole or in part, by anv act, omission or negligence of the citif. This 84 indemnity provision is intended to include, without limitation, indemnity for costs, 85 expenses and legal fees incurred by the city in defending against such claims and causes 86 of actions. 87 88 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 89 the city, its officers, servants and employees, from and against any and all loss, damage 90 or destruction of property of the city, arising out of, or alleged to arise out of, the work 91 and services to be performed by the contractor, its officers, agents, employees, 92 subcontractors, licensees or invitees under this contract. This indemnification provision 93 is specifically intended to operate and be effective even if it is alleged or proven that all 94 or some of the damages being sought were caused, in whole or in part, by any act, 95 omission or negligence of the city. 96 97 Article 7. MISCELLANEOUS 98 7.1 Terms. 99 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of 100 the Construction Contract for Developer Awarded Projects. 101 7.2 Assignment of Contract. 102 This Agreement, including all of the Contract Documents may not be assigned by the 103 Contractor without the advanced express written consent of the Developer. 104 7.3 Successors and Assigns. 105 Developer and Contractor each binds itself, its partners, successors, assigns and legal 106 representatives to the other parry hereto, in respect to all covenants, agreements and 107 obligations contained in the Contract Documents. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised June 16, 2016 005243-5 Developer Awarded Project Agreement Page 5 of 6 108 7.4 Severability. 109 Any provision or part of the Contract Documents held to be unconstitutional, void or 110 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 111 remaining provisions shall continue to be valid and binding upon DEVELOPER and 112 CONTRACTOR. 113 7.5 Governing Law and Venue. 114 This Agreement, including all of the Contract Documents is performable in the State of 115 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 116 Northern District of Texas, Fort Worth Division. 117 118 7.6 Authority to Sign. 119 Contractor shall attach evidence of authority to sign Agreement, if other than duly 120 authorized signatory of the Contractor. 121 122 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple 123 counterparts. 124 125 This Agreement is effective as of the last date signed by the Parties ("Effective Date") 126 Contractor: Dagger Contracting, LLC By. � (Signature) Developer: Creed Commercial ent, LLC CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised June 16, 2016 005243-6 Andy Nord (Printed Name) Title: Owner / GM Company Name: Address: Dagger Contracting, LLC PO Box 1040 Roanoke, TX 76262 City/State/Zip: 12/26/23 Date 127 Developer Awarded Project Agreement Page 6 of 6 AD i It < (Printed Name) Title: vicelside4 Company name: Address: UetJ U-C �-� kv- �-F� q 57 f City/State/Zip: Date CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS City Project # 104995 Revised June 16, 2016 COMMERCIAL AUTO CA 04 49 11 16 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY - OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. A. The following is added to the Other Insurance Condition in the Business Auto Coverage Form and the Other Insurance — Primary And Excess Insurance Provisions in the Motor Carrier Coverage Form and supersedes any provision to the contrary: This Coverage Form's Covered Autos Liability Coverage is primary to and will not seek contribution from any other insurance available to an "insured" under your policy provided that: 1. Such "insured" is a Named Insured under such other insurance; and 2. You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to such "insured". B. The following is added to the Other Insurance Condition in the Auto Dealers Coverage Form and supersedes any provision to the contrary: This Coverage Form's Covered Autos Liability Coverage and General Liability Coverages are primary to and will not seek contribution from any other insurance available to an "insured" under your policy provided that: 1. Such "insured" is a Named Insured under such other insurance; and 2. You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to such "insured". CA 04 49 11 16 © Insurance Services Office, Inc., 2016 Page 1 of 1 CA 70 77 09 00 BLANKET ADDITIONAL INSURED This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM GARAGE COVERAGE FORM The provisions and exclusions that apply to LIABILITY COVERAGE also apply to this endorsement. The following is added to: SECTION II — LIABILITY COVERAGE A. COVERAGE 1. WHO IS AN INSURED Any person, organization or governmental entity with respect to the operation, maintenance or use of a covered auto if you are required to add such person, organization or governmental entity to this policy as an additional insurer in order to comply with the terms of a written insured contract or written agreement. However, such person, organization or government entity is an insured only with respect to legal responsibility for acts or omissions of a person for whom Liability Coverage is afforded under this policy which may be imputed to that person or organization directly arising out of your on going operations under the written contract or written agreement. The additional insured is not required to pay for any premiums stated in the policy or earned from the policy. Any return premium and any dividend, if applicable, declared by us shall be paid to you. You are authorized to act for the additional insured in all matters pertaining to this insurance. The additional insured will retain any right of recovery as a claimant under this policy. CA 70 77 09 00 COMMERCIAL AUTO CA 71 09 01 17 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BUSINESS AUTO ULTRA ENDORSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM COMMON POLICY CONDITIONS COVERAGEINDEX DESCRIPTION PAGE Temporary Substitute Auto Physical Damage 2 Broad Form Insured 2 Employee as Insureds 2 Additional Insured Status by Contract, Agreement or Permit 2 Bail Bond Coverage 3 Loss of Earnings Coverage 3 Amended Fellow Employee Coverage 3 Towing and Labor 3 Physical Damage Additional Transportation Expense Coverage 3 Extra Expense - Theft 3 Rental Reimbursement and Additional Transportation Expense 4 Personal Effects Coverage 4 Personal Property of Others 4 Locksmith Coverage 4 Vehicle Wrap Coverage 5 Airbag Accidental Discharge 5 Audio, Visual and Data Electronic Equipment Coverage 5 Auto Loan/Lease Total Loss Protection 5 Glass Repair — Deductible Amendment 5 Amended Duties in the Event of Accident, Claim, Suit or Loss 6 Waiver of Subrogation Required by Contract 6 Unintentional Failure to Disclose 6 Hired, Leased, Rented or Borrowed Auto Physical Damage 6 Mental Anguish 7 Extended Cancellation Condition 7 The COVERAGE INDEX set forth above is informational only and grants no coverage. Terms set forth in (Bold Italics) are likewise for information only and by themselves shall be deemed to grant no coverage. CA 71 09 01 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 1 of 7 (Temporary Substitute Auto Physical Damage) A. TEMPORARY SUBSTITUTE AUTO PHYSICAL DAMAGE SECTION I — COVERED AUTOS, paragraph C. Certain Trailers, Mobile Equipment and Temporary Substitute Autos is amended by adding the following at the end of the existing language: If Physical Damage Coverage is provided under this Coverage form for an "auto" you own, the Physical Damage coverages provided for that owned "auto" are extended to any "auto" you do not own while used with the permission of its owner as a temporary substitute for the covered "auto" you own that is out of service because of its breakdown, repair, servicing, 'loss", or destruction B. BROADENED LIABILITY COVERAGES SECTION II — LIABILITY COVERAGE in Paragraph A. Coverage at 1. Who Is An Insured is amended to include the following: (Broad Form Insured) d. Any legally incorporated subsidiary in which you own more than 50% of the voting stock on the effective date of the Coverage Form. However, the Named Insured does not include any subsidiary that is an "insured" under any other automobile policy or would be an "insured" under such a policy but for its termination or the exhaustion of its Limit of Insurance. e. Any organization that is acquired or formed by you, during the term of this policy and over which you maintain majority ownership. However, the Named Insured does not include any newly formed or acquired organization: (1) That is a joint venture or partnership, (2) That is an "insured" under any other policy, (3) That has exhausted its Limits of Insurance under any other policy, or (4) 180 days or more after its acquisition or formation by you, unless you have given us notice of the acquisition or formation Coverage does not apply to "bodily injury" or "property damage" that results from an accident that occurred before you formed or acquired the organization. (Employee as Insureds) f. Any employee of yours while acting in the course of your business or your personal affairs while using a covered "auto" you do not own, hire or borrow. (Additional Insured Status by Contract, Agreement or Permit) g. Any person or organization whom you are required to add as an additional insured on this policy under a written contract or agreement; but the written contract or agreement must be: (1) Currently in effect or becoming effective during the term of this policy; and (2) Executed prior to the "bodily injury" or "property damage." The additional insured status will apply only with respect to your liability for "bodily injury" or "property damage" which may be imputed to that person(s) or organization(s) directly arising out of the ownership, maintenance or use of the covered "autos" at the location(s) designated, if any. Coverage provided by this endorsement will not exceed the limits of liability required by the written contract or written agreement even if the limits of liability stated in the policy exceed those limits. This endorsement shall not increase the limits stated in Section II. C. Limits of Insurance. For any covered "auto" you own this Coverage Form provides primary coverage. Page 2 of 7 Includes copyrighted material of Insurance Services Office, Inc., with its permission. CA 71 09 01 17 (Amended Duties in the Event of Accident, Claim, Suit or Loss) I. AMENDED DUTIES IN THE EVENT OF ACCIDENT, CLAIM, SUIT OR LOSS Under SECTION IV — BUSINESS AUTO CONDITIONS, A. Loss Conditions , the following is added to paragraph 2. Duties In The Event of Accident, Suit or Loss: d. Knowledge of any "accident", "claim", "suit" or "loss" will be deemed knowledge by you when notice of such "accident", "claim", "suit" or "loss" has been received by: (1) You, if you are an individual; (2) Any partner or insurance manager if you are a partnership; (3) An executive officer or insurance manager, if you are a corporation; (4) Your members, managers or insurance manager, if you are a limited liability company; or (5) Your officials, trustees, board members or insurance manager, if you are a not -for -profit organization. (Waiver of Subrogation by Contract) J. WAIVER OF SUBROGATION REQUIRED BY CONTRACT Under SECTION IV, BUSINESS AUTO CONDITIONS, A. Loss Conditions 5. Transfer of Rights of Recovery Against Others to Us the following language is added: However, we waive any rights of recovery we may have against the person or organization with whom you have agreed in writing in a contract, agreement or permit, to provide insurance such as is afforded under the policy to which this endorsement is attached. This provision does not apply unless the written contract or written agreement has been executed, or permit has been issued, prior to the "bodily injury" or "property damage." (Unintentional Failure to Disclose) K. UNINTENTIONAL FAILURE TO DISCLOSE Under SECTION IV — BUSINESS AUTO CONDITIONS, B. General Conditions , the following is added to 2. Concealment, Misrepresentation Or Fraud: Your unintentional error in disclosing, or failing to disclose, any material fact existing at the effective date of this Coverage Form, or during the policy period in connection with any additional hazards, will not prejudice your rights under this Coverage Form. (Hired, Leased, Rented or Borrowed Auto Physical Damage) L. HIRED, LEASED, RENTED OR BORROWED AUTO PHYSICAL DAMAGE Under SECTION IV — BUSINESS AUTO CONDITIONS B. General Conditions 5. Other Insurance Paragraph 5.b. is replaced by the following: b. (1) For "Comprehensive" and "Collision" Auto Physical Damage coverage provided by this endorsement, the following are deemed to be covered "autos" you own: (a) Any Covered "auto" you lease, hire, rent or borrow; and (b) Any Covered "auto" hired or rented by your "employee" under a contract in that individual "employee's" name, with your permission, while performing duties related to the conduct of your business. However, any "auto" that is leased, hired, rented or borrowed with a driver is not a covered "auto" (2) Limit of Insurance For This Section The most we will pay for any one "loss" is the lesser of the following: (a) $75,000 per accident, or (b) actual cash value at the time of loss, or (c) cost of repair. Page 6 of 7 Includes copyrighted material of Insurance Services Office, Inc., with its permission. CA 71 09 01 17 COMMERCIAL GENERAL LIABILITY POLICY NUMBER: 85328129 CG 02 05 12 04 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. TEXAS CHANGES - AMENDMENT OF CANCELLATION PROVISIONS OR COVERAGE CHANGE This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART OWNERS AND CONTRACTORS PROTECTIVE LIABILITY COVERAGE PART POLLUTION LIABILITY COVERAGE PART PRODUCT WITHDRAWAL COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART In the event of cancellation or material change that reduces or restricts the insurance afforded by this Coverage Part, we agree to mail prior written notice of cancellation or material change to: SCHEDULE 1. Name: PER SCHEDULE ON FILE 2. Address: CANCELLATION FOR NONPAYMENT 10 DAYS 3. Number of days advance notice: 30 DAYS Information required to complete this Schedule, if not shown above, will be shown in the Declarations. CG 02 05 12 04 © ISO Properties, Inc., 2003 Page 1 of 1 POLICY NUMBER: 85328129 COMMERCIAL GENERAL LIABILITY CG20100413 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s) Location(s) Of Covered Operations ANY PERSON OR ORGANIZATION TO WHOM LOCATIONS DESIGNATED AND YOU HAVE AGREED TO NAME AS ADDIT- DESCRIBED IN THE ABOVE IONAL INSURED BY WRITTEN CONTRACT MENTIONED WRITTEN CONTRACT OR AGREEMENT IF THE CONTRACT OR AGREEMENT IS EXECUTED PRIOR TO LOSS Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf; in the performance of your ongoing operations for the additional insured(s) at the location(s) designated above. However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. PREMIUM 250 B. With respect to the insurance afforded to these additional insureds, the following additional exclusions apply: This insurance does not apply to "bodily injury" or "property damage" occurring after: 1. All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or 2. That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. CG 20 10 04 13 © Insurance Services Office, Inc., 2012 Page 1 of 2 C. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. Page 2 of 2 © Insurance Services Office, Inc., 2012 CG 20 10 04 13 POLICY NUMBER: 85328129 COMMERCIAL GENERAL LIABILITY CG 20 37 04 13 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s) Location And Description Of Completed Operations ANY PERSON OR ORGANIZATION TO WHOM LOCATIONS DESIGNATED AND YOU HAVE AGREED TO NAME AS ADDIT- DESCRIBED IN THE ABOVE IONAL INSURED BY WRITTEN CONTRACT MENTIONED WRITTEN CONTRACT OR AGREEMENT IF THE CONTRACT OR AGREEMENT IS EXECUTED PRIOR TO LOSS Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury" or "property damage" caused, in whole or in part, by "your work" at the location designated and described in the Schedule of this endorsement performed for that additional insured and included in the "products -completed operations hazard". However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. PREMIUM 1,000 B. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on be half of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. CG 20 37 04 13 © Insurance Services Office, Inc., 2012 Page 1 of 1 CG 72 08 07 17 TEXAS - EXTENDED ULTRA LIABILITY PLUS ENDORSEMENT COMMERCIAL GENERAL LIABILITY EXTENSION ENDORSEMENT SUMMARY OF COVERAGES This is a summary of the various additional coverages and coverage modifications provided by this endorsement. No coverage is provided by this summary. * Extended Property Damage * Expanded Fire Legal Liability to include Explosion, Lightning and Sprinkler Leakage * Coverage for non -owned watercraft is extended to 51 feet in length * Property Damage — Borrowed Equipment * Property Damage Liability — Elevators * Coverage D — Voluntary Property Damage Coverage $5,000 Occurrence with a $10,000 Aggregate * Coverage E — Care, Custody and Control Property Damage Coverage $25,000 Occurrence with a $100,000 Aggregate — $500 Deductible * Coverage F — Electronic Data Liability Coverage — $50,000 * Coverage G — Product Recall Expense $25,000 Each Recall Limit with a $50,000 Aggregate — $1,000 Deductible * Coverage H — Water Damage Legal Liability — $25,000 * Coverage I — Designated Operations Covered by a Consolidated (Wrap -Up) Insurance Program — Limited Coverage * Increase in Supplementary Payments: Bail Bonds to $1,000 * Increase in Supplementary Payments: Loss of Earnings to $500 * For newly formed or acquired organizations — extend the reporting requirement to 180 days * Broadened Named Insured * Automatic Additional Insured — Owners, Lessees or Contractors — Automatic Status When Required in Construction Agreement With You — Including Upstream Parties * Contractors BlanketAdditional Insured — Products — Completed Operations Coverage — Including Upstream Parties * Automatic Additional Insured — Vendors * Automatic Additional Insured — Lessor of Leased Equipment Automatic Status When Required in Lease Agreement With You * Automatic Additional Insured — Managers or Lessor of Premises * Additional Insured — Engineers, Architects or Surveyors Not Engaged by the Named Insured * Additional Insured — State or Governmental Agency or Subdivision or Political Subdivision — Permits or Authorizations * Additional Insured — Consolidated Insurance Program (Wrap -Up) Off -Premises Operations Only — Owners, Lessees or Contractors Automatic Status When Required in Construction Agreement With You * Additional Insured — Employee Injury to Another Employee * Automatically included — Aggregate Limits of Insurance (per location) * Automatically included — Aggregate Limits of Insurance (per project) * Knowledge of occurrence — Knowledge of an "occurrence", "claim or suit" by your agent, servant or employee shall not in itself constitute knowledge of the named insured unless an officer of the named insured has received such notice from the agent, servant or employee * Blanket Waiver of Subrogation * Liberalization Condition * Unintentional failure to disclose all hazards. If you unintentionally fail to disclose any hazards existing at the inception date of your policy, we will not deny coverage under this Coverage Form because of such failure. However, this provision does not affect our right to collect additional premium or exercise our right of cancellation or non -renewal. * "Insured Contract" redefined for Limited Railroad Contractual Liability * Mobile equipment to include snow removal, road maintenance and street cleaning equipment less than 1,000 Ibs GVW * Bodily Injury Redefined REFER TO THE ACTUAL ENDORSEMENT FOLLOWING ON PAGES 2 THROUGH 14 FOR CHANGES AFFECTING YOUR INSURANCE PROTECTION CG 72 08 07 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 1 of 14 CG 72 08 07 17 C. SUPPLEMENTARY PAYMENTS — COVERAGES A AND B is amended: 1. To read SUPPLEMENTARY PAYMENTS 2. Bail Bonds Item 1.b. is amended as follows: b. Up to $1,000 for cost of bail bonds required because of accidents or traffic law violations arising out of the use of any vehicle to which the Bodily Injury Liability Coverage applies. We do not have to furnish these bonds. 3. Loss of Earnings Item 1.d. is amended as follows: d. All reasonable expenses incurred by the insured at our request to assist us in the investigation or defense of the claim or "suit', including actual loss of earnings up to $500 a day because of time off from work. 4. The following language is added to Item 1 However, we shall have none of the duties set forth above when this insurance applies only for Voluntary Property Damage Coverage and/or Care, Custody or Control Property Damage Coverage and we have paid the Limit of Liability or the Aggregate Limit for these coverages. SECTION II - WHO IS AN INSURED A. The following change is made: Extended Reporting Requirements Item 3.a. is deleted and replaced by the following : a. Coverage under this provision is afforded only until the 180th day after you acquire or form the organization or the end of the policy period, whichever is earlier. B. The following provisions are added: 4. BROAD FORM NAMED INSURED Item 1.f. is added as follows: f. Any legally incorporated entity of which you own more than 50 percent of the voting stock during the policy period only if there is no other similar insurance available to that entity. However: (1) Coverage A does not apply to "bodily injury" or "property damage" that occurred before you acquired more than 50 percent of the voting stock; and (2) Coverage B does not apply to "personal and advertising injury" arising out of an offense committed before you acquired more than 50 percent of the voting stock. 5. Additional Insured — Owners, Lessees or Contractors -Automatic Status When Required in Construction or Service Agreement With You — Including Upstream Parties a. Any person or organization for whom you are performing operations when you and such person or organization have agreed in writing in a contract or agreement that such person or organization be added as an additional insured on your policy; b. Any other person or organization you are required to add as an additional insured under the contract or agreement described in Paragraph a. above. Such person(s) or organization(s) is an additional insured only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" which may be imputed to that person or organization directly arising out of: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf; in the performance of your ongoing operations for the additional insured. However, the insurance afforded to such additional insured: 1. Only applies to the extent permitted by law; and CG 72 08 07 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 5 of 14 CG 72 08 07 17 2. Will not be broader than that which you are required by the contract or agreement to provide for such additional insured. c. With respect to the insurance afforded to these additional insureds, the following additional exclusions apply: This insurance does not apply to: 1. "Bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering of, or the failure to render, any professional architectural, engineering or surveying services, including: a. The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or b. Supervisory, inspection, architectural or engineering activities. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the 'occurrence" which caused the "bodily injury" or "property damage", or the offense which caused the "personal and advertising injury", involved the rendering of or the failure to render any professional architectural, engineering or surveying services. 2. "Bodily injury" or "property damage" occurring after: a. All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or b. That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. 6. Additional Insured — Products Completed Operations Coverage — Including Upstream Parties a. Any person or organization for whom you are performing operations when you and such person or organization have agreed in writing in a contract or agreement that such person or organization be added as an additional insured on your policy; and b. Any other person or organization you are required to add as an additional insured under the contract or agreement described in Paragraph a. above. Such person(s) or organization(s) is an additional insured only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" which may be imputed to that person or organization directly arising out of "your work" specified in the "written contract" and included in the "products -completed operations hazard". However: (1) The insurance afforded to such additional insureds only applies to the extent permitted by law; (2) If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. (3) Such coverage will not apply subsequent to the first to occur of the following: i. The expiration of the period of time required by the "written contract"; or ii. The expiration of any applicable statute of limitations or statute of repose with respect to claims arising out of "your work". c. With respect to the insurance afforded to any additional insured under this endorsement, the following additional exclusionary language shall apply: This insurance does not apply to "bodily injury" or "property damage" arising out of the rendering of, or the failure to render, any professional architecture, engineering or surveying services, including: (1) The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or (2) Supervisory, inspection, architectural or engineering activities. CG 72 08 07 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 6 of 14 CG 72 08 07 17 7. Additional Insured —Vendors a. Any person(s) or organization(s) (referred to throughout this additional coverage as vendor), but only with respect to "bodily injury" or "property damage", which may be imputed to that person(s) or organization(s) arising out of "your products" shown with the Schedule which are distributed or sold in the regular course of the vendor's business is an insured. However: (1) The insurance afforded to such vendor only applies to the extent permitted by law; and (2) If coverage provided to the vendor is required by a contract or agreement, the insurance afforded to such vendor will not be broader than that which you are required by the contract or agreement to provide for such vendor. b. With respect to the insurance afforded to these vendors, the following additional exclusions apply: (1) This insurance afforded the vendor does not apply to: (a) "Bodily injury" or "property damage" for which the vendor is obligated to pay damages by reason of the assumption of liability in a contract or agreement. This exclusion does not apply to liability for damages that the vendor would have in the absence of the contract or agreement; (b) Any express warranty unauthorized by you; (c) Any physical or chemical change in the product made intentionally by the vendor; (d) Repackaging, except when unpacked solely for the purpose of inspection, demonstration, testing, or the substitution of parts under instructions from the manufacturer, and then repackaged in the original container. (e) Any failure to make such inspections, adjustments, tests or servicing as the vendor has agreed to make or normally undertakes to make in the usual course of business, in connection with the distribution or sale of products. (f) Demonstration, installation, servicing or repair operations, except such operations performed at the vendor's premises in connection with the sale of the product. (g) Products which, after distribution or sale by you, have been labeled or relabeled or used as a container, part or ingredient of any other thing or substance by or for the vendor. (h) "Bodily injury" or "property damage" arising out of the sole negligence of the vendor for its own acts or omissions or those of its employees or anyone else acting on its behalf. However, this exclusion does not apply to: i. The exceptions contained in Sub -paragraphs d. or f.; or ii. Such inspections, adjustments, tests or servicing as the vendor has agreed to make or normally undertakes to make in the usual course of business, in connection with the distribution or sale of the products. (2) This insurance does not apply to any insured person or organization, from whom you have acquired such products, or any ingredient, part or container, entering into, accompanying or containing such products. 8. Additional Insured — Lessor of Leased Equipment — Automatic Status When Required in Lease Agreement With You a. Any person(s) or organization(s) from whom you lease equipment when you and such person(s) or organization(s) have agreed in writing in a contract or agreement that such person(s) or organization(s) be added as an additional insured on your policy. Such person(s) or organization(s) is an insured only with respect to your liability for "bodily injury", "property damage" or "personal and advertising injury" directly arising out of the maintenance, operation or use of equipment leased to you, which may be imputed to such person or organization as the lessor of equipment. However, the insurance afforded to such additional insured: (1) Only applies to the extent permitted by law; and (2) Will not be broader than that which you are required by the contract or agreement to provide for such additional insured. CG 72 08 07 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 7 of 14 CG 72 08 07 17 A person's or organization's status as an additional insured under this endorsement ends when their contract or agreement with you for such leased equipment ends. b. With respect to the insurance afforded to these additional insureds, this insurance does not apply to any "occurrence" which takes place after the equipment lease expires. 9. Additional Insured — Managers or Lessors of Premises a. Any person(s) or organization(s), but only with respect to liability arising out of the ownership, maintenance or use of that part of the premises leased to you and subject to the following additional exclusions: This insurance does not apply to: (1) Any "occurrence" which takes place after you cease to be a tenant in that premises. (2) Structural alterations, new construction or demolition operations performed by or on behalf of the person(s) or organization(s) shown in the Schedule. However: (1) The insurance afforded to such additional insured only applies to the extent permitted by law; and (2) If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. 10. Additional Insured — Engineers, Architects or Surveyors Not Engaged by the Named Insured a. Any architects, engineers or surveyors who are not engaged by you are insureds, but only with respect to liability for "bodily injury" or "property damage" or "personal and advertising injury" which may be imputed to that architect, engineer or surveyor arising out of: (1) Your acts or omissions; or (2) Your acts or omissions of those acting on your behalf; in the performance of your ongoing operations performed by you or on your behalf. But only if such architects, engineers or surveyors, while not engaged by you, are contractually required to be added as an additional insured to your policy. However, the insurance afforded to such additional insured: (1) Only applies to the extent permitted by law; and (2) Will not be broader than that which you are required by the contract or agreement to provide for such additional insured. b. With respect to the insurance afforded to these additional insureds, the following additional exclusion applies: This insurance does not apply to "bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering of or failure to render any professional services, including: (1) The preparing, approving, or failing to prepare or approve, maps, drawings, opinions, reports, surveys, change orders, designs or specifications; or (2) Supervisory, inspection or engineering services. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment, training or monitoring of others by that insured, if the "occurrence" which caused the "bodily injury" or "property damage", or the offense which caused the "personal and advertising injury", involved the rendering of or the failure to render any professional services. 11. Additional Insured — State or Governmental Agency or Subdivision or Political Subdivision — Permits or Authorizations Any state or governmental agency or subdivision or political subdivision is an insured, subject to the following provisions: CG 72 08 07 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 8 of 14 CG 72 08 07 17 a. This insurance applies only with respect to operations performed by you or on your behalf for which the state or governmental agency or subdivision or political subdivision has issued a permit or authorization. However: (1) The insurance afforded to such additional insured only applies to the extent permitted by law; and (2) If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. b. This insurance does not apply to: (1) "Bodily injury", "property damage" or "personal and advertising injury" arising out of operations performed for the federal government, state or municipality; or (2) "Bodily injury" or "property damage" included within the "products -completed operations hazard". 12. Additional Insured Consolidated Insurance Program (Wrap -Up) Off -Premises Operations Only — Owners, Lessees or Contractors a. Any persons or organizations for whom you are performing operations, for which you have elected to seek coverage under a Consolidated Insurance Program, when you and such person or organization have agreed in writing in a contract or agreement that such person or organization be added as an additional insured on your policy as an insured. Such person or organization is an additional insured only with respect to your liability which may be imputed to that person or organization directly arising out of your ongoing operations performed for that person or organization at a premises other than any project or location that is designated as covered under a Consolidated Insurance Program. A person's or organization's status as an insured under this endorsement ends when your operations for that insured are completed. b. With respect to the insurance afforded to these additional insureds, the following additional exclusion applies. This insurance does not apply to: "Bodily injury", "property damage", or "personal and advertising injury" arising out of the rendering of, or failure to render, any professional architectural, engineering or surveying services, including: (1) The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; and (2) Supervisory, inspection, architectural or engineering activities. 13. Additional Insured — Employee Injury to Another Employee With respect to your "employees" who occupy positions which are supervisory in nature: Paragraph 2.a.(1) of SECTION II — WHO IS AN INSURED is amended to read: a. "Bodily injury" or "personal and advertising injury": (1) To you, to your partners or members (if you are a partnership or joint venture), or to your members (if you are a limited liability company); (2) For which there is any obligation to share damages with or repay someone else who must pay damages because of the injury described in paragraph (1)(a) above; or (3) Arising out of his or her providing or failing to provide professional healthcare services. Paragraph 3.a. is deleted. For the purpose of this Item 12 only, a position is deemed to be supervisory in nature if that person performs principle work which is substantially different from that of his or her subordinates and has authority to hire, direct, discipline or discharge. CG 72 08 07 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 9 of 14 CG 72 08 07 17 12. With respects to the insurance afforded to additional insureds afforded coverage by items 5 through 13 of SECTION II — WHO IS AN INSURED above, the following is added: The most we will pay on behalf of the additional insured is the amount of insurance: a. Required by the contract or agreement; b. Available under the applicable Limits of Insurance shown in the Declarations; Whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. 13. Subject to 5. of SECTION III — LIMITS OF INSURANCE, a $5,000 'occurrence" limit and a $10,000 "aggregate" limit is the most we will pay under Coverage A for damages because of "property damage" covered under Coverage D — Voluntary Property Damage Coverage. For the purposes of this Voluntary Property Damage Coverage, our right and duty to defend ends when we have paid the Limit of Liability or the Aggregate Limit for each coverage, and we are granted sole discretion in making payments under this coverage. 14. Subject to 5. of SECTION III — LIMITS OF INSURANCE, a $25,000 'occurrence" limit and a $100,000 "aggregate" limit is the most we will pay under Coverage E — Care, Custody and Control Coverage regardless of the number of: a. Insureds; b. Claims made or "suits" brought; or c. Persons or organizations making claims or bringing "suits". Deductible - Our obligation to pay damages on your behalf applies only to the amount of damages in excess of $500. This deductible applies to all damages because of "property damage" as the result of any one 'occurrence" regardless of the number of persons or organizations who sustain damages because of that 'occurrence". We may pay any part or all of the deductible amount to effect settlement of any claim or "suit" and upon notification of the action taken, you shall promptly reimburse us for such part of the deductible amount as has been paid by us. As respects this coverage "Aggregate" is the maximum amount we will pay for all covered 'occurrences" during one policy period. For the purposes of this Care, Custody and Control Property Damage Coverage, our right and duty to defend ends when we have paid the Limit of Liability or the Aggregate Limit for each coverage, and we are granted sole discretion in making payments under this coverage. 15. Subject to 5. of SECTION III — LIMITS OF INSURANCE, the most we will pay for "property damage" under Coverage F — Electronic Data Liability Coverage for loss of "electronic data" is $50,000 without regard to the number of "occurrences". SECTION IV - COMMERCIAL GENERAL LIABILITY CONDITIONS A. The following conditions are amended: 1. Knowledge of Occurrence a. Condition 2., Items a. and b. are deleted and replaced by the following: (1) Duties In The Event Of Occurrence, Offense, Claim Or Suit (a) You must see to it that we are notified as soon as practicable of an 'occurrence" or an offense which may result in a claim. Knowledge of an 'occurrence" by your agent, servant or employee shall not in itself constitute knowledge of the named insured unless an officer of the named insured has received such notice from the agent, servant or employee. To the extent possible, notice should include: i. How, when and where the 'occurrence" took place; ii. The names and addresses of any injured persons and witnesses, and iii. The nature and location of any injury or damage arising out of the 'occurrence" or offense. CG 72 08 07 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 11 of 14 CG 72 08 07 17 (b) If a claim is made or "suit" is brought against any insured, you must: i. Immediately record the specifics of the claim or "suit' and the date received; and ii. Notify us as soon as practicable. You must see to it that we receive written notice of the claim or "suit' as soon as practicable. Knowledge of a claim or "suit' by your agent, servant or employee shall not in itself constitute knowledge of the named insured unless an officer of the named insured has received such notice from the agent, servant or employee. 2. Where Broad Form Named Insured is added in SECTION II — WHO IS AN INSURED of this endorsement, Condition 4. Other Insurance b. Excess Insurance (1).(a) is replaced by the following: (a) Any of the other insurance, whether primary, excess, contingent or on any other basis, that is available to an insured solely by reason of ownership by you of more than 50 percent of the voting stock, and not withstanding any other language in any other policy. This provision does not apply to a policy written to apply specifically in excess of this policy. B. The following are added: 1. Condition (5) of 2. "Duties in the event Occurrence, Offense, Claim or Suit" c. You or any other involved insured must: (5) Upon our request, replace or repair the property covered under Voluntary Property Damage Coverage at your actual cost, excluding profit or overhead. 10. Blanket Waiver Of Subrogation We waive any right of recovery we may have against any person or organization because of payments we make for injury or damage arising out of: premises owned or occupied by or rented or loaned to you, ongoing operations performed by you or on your behalf, done under a contract with that person or organization, "your work", or "your products". We waive this right where you have agreed to do so as part of a written contract, executed by you before the "bodily injury" or "property damage" occurs or the "personal injury" or "advertising injury" offense is committed. 11. Liberalization If a revision to this Coverage Part, which would provide more coverage with no additional premium becomes effective during the policy period in the state designated for the first Named Insured shown in the Declarations, your policy will automatically provide this additional coverage on the effective date of the revision. 12. Unintentional Failure to Disclose All Hazards Based on our reliance on your representations as to existing hazards, if you unintentionally should fail to disclose all such hazards at the inception date of your policy, we will not deny coverage under this Coverage Part because of such failure. However, this provision does not affect our right to collect additional premium or exercise our right of cancellation or non -renewal. 13. The following conditions are added in regard to Coverage G — Product Recall Expense In event of a "product recall", you must a. See to it that we are notified as soon as practicable of a "product recall". To the extent possible, notice should include how, when and where the "product recall" took place and estimated "product recall expense". b. Take all reasonable steps to minimize "product recall expense". This will not increase the limits of insurance. c. If requested, permit us to question you under oath at such times as may be reasonably required about any matter relating to this insurance or your claim, including your books and records. Your answers must be signed. d. Permit us to inspect and obtain other information proving the loss. You must send us a signed, sworn statement of loss containing the information we request to investigate the claim. You must do this within 60 days after our request. e. Cooperate with us in the investigation or settlement of any claim. f. Assist us upon our request, in the enforcement of any rights against any person or organization which may be liable to you because of loss to which this insurance applies. CG 72 08 07 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 12 of 14 CG 72 08 07 17 g. Claims Handling (1) Within 15 days after we receive written notice of claim, we will: (a) Acknowledge receipt of the claim. If we do not acknowledge receipt of the claim in writing, we will keep a record of the date, method and content of the acknowledgment; (b) Begin any investigation of the claim; and (c) Request a signed, sworn proof of loss, specify the information you must provide and supply you with the necessary forms. We may request more information at a later date, if during the investigation of the claim such additional information is necessary. (2) We will notify you in writing as to whether: (a) The claim or part of the claim will be paid; (b) The claim or part of the claim has been denied, and inform you of the reasons for denial; (c) More information is necessary; or (d) We need additional time to reach a decision. If we need additional time, we will inform you of the reasons for such need. (3) We will provide notification, as described in (2)(a) through (2)(d) above, within: (a) 15 business days after we receive the signed, sworn proof of loss and all information we requested; or (b) 30 days after we receive the signed, sworn proof of loss and all information we requested, if we have reason to believe the loss resulted from arson. If we have notified you that we need additional time to reach a decision, we must then either approve or deny the claim within 45 days of such notice. h. We will pay for covered loss or damage within 5 business days after: (1) We have notified you that payment of the claim or part of the claim will be made and have reached agreement with you on the amount of loss; or (2) An appraisal award has been made. However, if payment of the claim or part of the claim is conditioned on your compliance with any of the terms of this policy, we will make payment within 5 business days after the date you have complied with such terms. i. Catastrophe Claims If a claim results from a weather related catastrophe or a major natural disaster, the claim handling and claim payment deadlines described in a. and b. above are extended for an additional 15 days. Catastrophe or Major Natural Disaster means a weather related event which is: (1) Declared a disaster under the Texas Disaster Act of 1975; or (2) Determined to be a catastrophe by the State Board of Insurance. j. The term "business day", as used in this endorsement, means a day other than Saturday, Sunday or a holiday recognized by the state of Texas. k. We will issue loss payment to the first Named Insured shown in the Declarations and any mortgagee or loss payee as designated. 14. Limited Railroad Contractual Liability The following conditions are applicable only to coverage afforded by reason of the redefining of an "insured contract" in the DEFINITIONS section of this endorsement: a. Railroad Protective Liability coverage provided by Railroad Protective Liability Coverage Form (CG 00 35) with minimum limits of $2,000,000 per occurrence and a $6,000,000 general aggregate limit must be in place for the entire duration of any project. b. Any amendment to the Other Insurance condition of Railroad Protective Liability Coverage Form (CG 00 35) alters the primacy of the coverage or which impairs our right to contribution will rescind any coverage afforded by the redefined "insured contract" language. c. For the purposes of the Other Insurance condition of Railroad Protective Liability Coverage Form (CG 00 35) you, the named insured, will be deemed to be the designated contractor. CG 72 08 07 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 13 of 14 CG 72 08 07 17 SECTION V - DEFINITIONS A. At item 12. Mobile Equipment the wording at f.(1) is deleted and replaced by the following: If. (1) Equipment designed primarily for: (a) Snow removal; (b) Road maintenance, but not construction or resurfacing; or (c) Street cleaning; except for such vehicles that have a gross vehicle weight less than 1,000 Ibs which are not designed for highway use. B. Item 3. "bodily injury" is deleted and replaced with the following: 3. "bodily injury" means physical injury, sickness or disease sustained by a person. This includes mental anguish, mental injury, shock, fright or death that results from such physical injury, sickness or disease. C. Item 9. "Insured Contract" c. is deleted and replaced with the following: c. Any easement or license agreement; D. Item 9. "Insured Contract" f.(1) is deleted. E. The following definitions are added for this endorsement only: 23. "Electronic data" means information, facts or programs stored as or on, created or used on, or transmitted to or from computer software, including systems and applications software, hard or floppy disks, CD-ROMS, tape drives, cells, data processing devices or any other media which are used with electronically controlled equipment. 24. "Product recall" means a withdrawal or removal from the market of "your product' based on the determination by you or any regulatory or governmental agency that: a. The use or consumption of "your product' has caused or will cause actual or alleged "bodily injury" or "property damage"; and b. Such determination requires you to recover possession or control of "your product' from any distributor, purchaser or user, to repair or replace "your product', but only if "your product' is unfit for use or consumption, or is hazardous as a result of: (1) An error or omission by an insured in the design, manufacturing, processing, labeling, storage, or transportation of "your product'; or (2) Actual or alleged intentional, malicious or wrongful alteration or contamination of "your product' by someone other than you. 25. "Product recall expense" means reasonable and necessary expenses for: a. Telephone, radio and television communication and printed advertisements, including stationery, envelopes and postage. b. Transporting recalled products from any purchaser, distributor or user, to locations designated by you. c. Remuneration paid to your employees for overtime, as well as remuneration paid to additional employees or independent contractors you hire. d. Transportation and accommodation expense incurred by your employees. e. Rental expense incurred for temporary locations used to store recalled products. If. Expense incurred to properly dispose of recalled products, including packaging that cannot be reused. g. Transportation expenses incurred to replace recalled products. h. Repairing, redistributing or replacing covered recalled products with like products or substitutes, not to exceed your original cost of manufacturing, processing, acquisition and/or distribution. These expenses must be incurred as a result of a "product recall". CG 72 08 07 17 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Page 14 of 14 0106 08-31-2024 POLICY NUMBER: 85328129 FORMS SUPPLEMENTAL DECLARATIONS The following coverage form(s) govern coverage that is not limited to any specific state even though they are specifically listed in only one state in the declarations. Premium Applicable to the state of Texas *CG2010(12-19) ADDL INSURED -OWNERS LESSEES/CONTRACTORS-SCHEDULED *CG2010(12-19) ADDL INSURED -OWNERS LESSEES/CONTRACTORS-SCHEDULED *CG2010HB(04-13) ADDL INSURED -OWNERS LESSEES/CONTRACTORS-SCHEDULED *CG2037(12-19) ADDL INSURED-OWNER/LESSEE/CONTRACTOR-COMPLETED OPR *CG2037(12-19) ADDL INSURED-OWNER/LESSEE/CONTRACTOR-COMPLETED OPR *CG2037HB(04-13) ADDL INSURED-OWNERS/LESSEES/CONTRACTOR-COMPLETED Other Forms Applicable to the state of Texas *CG0001(04-13) COMM GENERAL LIAB COVG FORM *CG0103 (06-06) TX-CHGS *CG0205(12-04) TX-CHGS AMENDMENT OF CANCEL PROVISIONS/COVG CHG *CG2001(12-19) PRIMARY & NONCONTRIBUTORY -OTHER INSURANCE *CG2106(05-14) EXCL-ACCESS/DISCLOSURE OF CONFIDENTIAL/PERSONAL *CG2132-(05-09) COMMUNICABLE DISEASE EXCL *CG2167(12-04) FUNGI/BACTERIA EXCL *CG2170(01-15) CAP ON LOSSES FROM CERTIFIED ACTS OF TERRORISM *CG2187(01-15) CONDITIONAL EXCL OF TERRORISM *CG2196(03-05) SILICA/SILICA-RELATED DUST EXCL *CG2234(04-13) EXCL-CONST MANAGEMENT E&O *CG2279(04-13) EXCL-CONTRACTORS-PROFESSIONAL LIAB *CG2639(12-07) TX-CHGS EMPLOYMENT RELATED PRACTICES EXCL *CG4010(12-19) EXCLUSION -CROSS SUITS LIAB *CG4015(12-20) CANNABIS EXCL WITH HEMP EXCEPTION *CG7001(03-23) COMMERCIAL GENERAL LIABILITY COVERAGE PART *CG7004(02-05) COMM GENERAL LIABILITY SUPPLEMENTAL DECLARATIONS *CG7015(02-15) EXCL-PROFESSIONAL SERVICES & ERRORS/OMISSIONS *CG7115(09-01) EXCL-EXTERIOR INSULATION & FINISH SYSTEMS *CG7125(02-12) PROPERTY DAMAGE DEDUCTIBLE LIABILITY INSURANCE *CG7208(07-17) TX -EXTENDED ULTRA LIAB PLUS END *IL0017(11-98) COMMON POLICY CONDITIONS *IL0021(09-08) NUCLEAR ENERGY LIAB EXCL END *IL0168(03-12) TX-CHGS DUTIES *IL0275(11-13) TX-CHGS-CANCEL & NONRENEW PROVISIONS FOR CASUALTY *IL7068(01-10) EXCL-LEAD-HAZARDOUS PROPERTIES *IL7069(01-10) EXCL-UNDERGROUND STORAGE TANKS *IL7070(09-12) ABSOLUTE ASBESTOS EXCL *IL7095(01-20) INTERNET SECURITY & PRIVACY INSURANCE END *IL7147(01-20) ONLINE BANKING THEFT INSURANCE END *IL7177(08-22) ABSOLUTE PFAS EXCLUSION *ST-1403(09-01) EXTERIOR INSULATION & FINISH SYSTEMS EXCLUSION *ST1120CG(10-92) COMM GENERAL LIAB POLICY -QUICK REFERENCE *ST1435-(08-04) TX -NOTICE GL EXCL ASBESTOS UW 70 02 04 96 100 100 250 200 200 1,000 0106 08-31-2024 POLICY NUMBER: 85328129 Other Forms *ST1436- (08-04) *ST1544 (01-10) *ST1644- (01-12) *ST1681 (06-22) *ST1813 (01-20) *ST1882 (06-16) *ST1947 (11-19) *ST1965 (01-21) *ST2003 (11-21) UW 70 02 04 96 FORMS SUPPLEMENTAL DECLARATIONS TX -NOTICE GL EXCL LEAD TX-EXCL UNDERGROUND STORAGE TANKS POLICY WEBSITE STUFFER TX -NOTICE -RISK CONTROL INFORMATION IMPORTANT NOTICE-INTERNET SECURITY & PRIVACY NOTICE -LOCATION & PREMISES CLARIFICATION TX -NOTICE -HAVE A COMPLAINT OR NEED HELP? NOTICE TO POLICYHOLDERS -COMMUNICABLE DISEASE EXCL NOTICE OF PREM AUDIT NONCOMPLIANCE CHARGE COMMERCIAL GENERAL LIABILITY CG 20 01 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY - OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART The following is added to the Other Insurance (2) You have agreed in writing in a contract or Condition and supersedes any provision to the agreement that this insurance would be contrary: primary and would not seek contribution Primary And Noncontributory Insurance from any other insurance available to the additional insured. This insurance is primary to and will not seek contribution from any other insurance available to an additional insured under your policy provided that: (1) The additional insured is a Named Insured under such other insurance; and CG 20 01 12 19 © Insurance Services Office, Inc., 2018 Page 1 of 1 POLICY NUMBER: COMMERCIAL GENERAL LIABILITY CG 02 05 12 04 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. TEXAS CHANGES - AMENDMENT OF CANCELLATION PROVISIONS OR COVERAGE CHANGE This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART OWNERS AND CONTRACTORS PROTECTIVE LIABILITY COVERAGE PART POLLUTION LIABILITY COVERAGE PART PRODUCT WITHDRAWAL COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART In the event of cancellation or material change that reduces or restricts the insurance afforded by this Coverage Part, we agree to mail prior written notice of cancellation or material change to: SCHEDULE 1. Name: Blanket 2. Address: 3. Number of days advance notice: 30 Information required to complete this Schedule, if not shown above, will be shown in the Declarations. CG 02 05 12 04 © ISO Properties, Inc., 2003 Page 1 of 1 WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 42 03 04 B 85328129 (Ed. 6-14) TEXAS WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in Item 3.A. of the Information Page. We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule, but this waiver applies only with respect to bodily injury arising out of the operations described in the Schedule where you are required by a written contract to obtain this waiver from us. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. The premium for this endorsement is shown in the Schedule. Schedule 1. ( ) Specific Waiver Name of person or organization (g) Blanket Waiver Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver. 2. Operations: 3. Premium: The premium charge for this endorsement shall be percent of the premium developed on payroll in connection with work performed for the above person(s) or organization(s) arising out of the operations described. 4. Advance Premium: This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective Insured Insurance Company WC420304B (Ed. 6-14) Policy No. Countersigned by © Copyright 2014 National Council on Compensation Insurance, Inc. All Rights Reserved. Endorsement No. Premium WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 42 06 01 85328129 (Ed. 1-94) TEXAS NOTICE OF MATERIAL CHANGE ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in Item 3.A. of the Information Page. In the event of cancelation or other material change of the policy, we will mail advance notice to the person or organization named in the Schedule. The number of days advance notice is shown in the Schedule. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. Schedule 1. Number of days advance notice: 3 0 2. Notice will be mailed to: PER SCHEDULE ON FILE CANCELLATION FOR NONPAYMENT 10 DAYS This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective Insured Insurance Company WC420601 (Ed.1-94) Policy No. Countersigned by Endorsement No. Premium: 85328129 POLICY NUMBER: COMMERCIAL AUTO CA71 33 12 10 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. TEXAS CANCELLATION PROVISION OR COVERAGE CHANGE ENDORSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM GARAGE COVERAGE FORM MOTOR CARRIER COVERAGE FORM TRUCKERS COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless mod- ified by the endorsement. This endorsement changes the policy effective on the inception date of the policy unless another date is indi- cated below. Endorsement Effective: Named Insured: Number of Days' Notice 30 Name Of Person Or Organization Countersigned By: SCHEDULE (Authorized Representative) PER SCHEDULE ON FILE, CANCELLATION FOR NONPAYMENT 10 DAYS Address If this policy is canceled or materially changed to reduce or restrict coverage, we will mail notice of cancellation or change to the person or organization named in the Schedule. We will give the number of day's notice indi- cated in the Schedule. CA 71 33 12 10 © ISO Properties, Inc., 2003 Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc., with its permission. Bond No. 100264450 006219-1 MAINTENANCE BOND Page 1 of 5 1 SECTION 00 62 19 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we Dagger Contracting, LLC known as 9 "Principal" herein and Merchants Bonding Company (Mutual) a corporate surety 10 (sureties, if more than one) duly authorized to do business in the State of Texas, known as 11 "Surety" herein (whether one or more), are held and firmly bound unto the Developer, 12 Creed Commercial Development, LLC, authorized to do business in Texas ("Developer") and the 13 City of Fort Worth, a Texas municipal corporation ("City"), in the sum 14 of Seventeen Thousand Four Hundred Sixty -Five and 00/100 Dollars ($ $17,465.00 ), 15 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment 16 of which sum well and truly be made jointly unto the Developer and the City as dual obligees 17 and their successors, we bind ourselves, our heirs, executors, administrators, successors and 18 assigns, jointly and severally, firmly by these presents. 19 20 WHEREAS, Developer and City have entered into an Agreement for the construction of 21 community facilities in the City of Fort Worth by and through a Community Facilities Agreement, 22 CFA Number 24-0009 ; and 23 WHEREAS, the Principal has entered into a certain written contract with the Developer 24 awarded the 5th day of September , 20 24 , which Contract is 25 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish 26 all materials, equipment labor and other accessories as defined by law, in the prosecution of the 27 Work, including any Work resulting from a duly authorized Change Order (collectively herein, the 28 "Work") as provided for in said Contract and designated as Tidal Wave Auto Spa; and 29 CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CITY CONDITIONS— DEVELOPER AWARDED PROJECTS City Project # 104995 Revised January 31, 2012 006219-2 MAINTENANCE BOND Page 2 of 4 1 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 2 accordance with the plans, specifications and Contract Documents that the Work is and will 3 remain free from defects in materials or workmanship for and during the period of two (2) years 4 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and 5 6 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon 7 receiving notice from the Developer and/or City of the need thereof at any time within the 8 Maintenance Period. 9 10 NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy 11 any defective Work, for which timely notice was provided by Developer or City, to a completion 12 satisfactory to the City, then this obligation shall become null and void; otherwise to remain in 13 full force and effect. 14 15 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely 16 noticed defective Work, it is agreed that the Developer or City may cause any and all such 17 defective Work to be repaired and/or reconstructed with all associated costs thereof being 18 borne by the Principal and the Surety under this Maintenance Bond; and 19 20 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 21 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 22 Worth Division; and 23 24 PROVIDED FURTHER, that this obligation shall be continuous in nature and successive 25 recoveries may be had hereon for successive breaches. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised January 31, 2012 006219-3 MAINTENANCE BOND Page 3 of 4 1 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the 5th day of September 3 , 20 24. 4 5 6 7 8 9 10 11 Al 12 13 14 15 (Principal) Secretary 16 17 18 19 20 21 Witnes s � ncipal 22 23_ 24 25 - 26 27 - 28 29 30 ATTEST: 31 32 33 (Surety) Secretary 34 , 35 36 Witness as to Surety 37 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 PRINCIPAL: Dagger Contracting, LLC BY:- Signatu _ Andy Nord - Owner / GM Name and Title Address: 660 North Carroll Avenue Suite 120 Southlake. TX 76092 SURETY: Merchants Bonding Company (Mutual) BY: A'�4� Signature Mikaela Peppers, Attornev-In-Fact Name and Title Address: 6700 Westown Parkway West Des Moines, IA 50266 Telephone Number: 800-678-8171 Tidal Wave Auto Spa City Project # 104995 006219-4 MAINTENANCE BOND Page 4 of 4 1 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 2 from the by-laws showing that this person has authority to sign such obligation. If 3 Surety's physical address is different from its mailing address, both must be provided. 4 0 The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CITY CONDITIONS— DEVELOPER AWARDED PROJECTS City Project # 104995 Revised January 31, 2012 MERCHANT '%\ BONDING COMPANY POWER OF ATTORNEY Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., both being corporations of the State of Iowa, d/b/a Merchants National Indemnity Company (in California only) (herein collectively called the "Companies•') do hereby make, constitute and appoint, individually, Don E Cornell; Josh Saunders; Kelly A Westbrook; Mikaela Peppers; Ricardo J Reyna; Robbi Morales; Sophinie Hunter; Tina McEwan; Tonie Petranek their true and lawful Attorney(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. This Power -of -Attorney is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and April 27, 2024 and adopted by the Board of Directors of Merchants National Bonding, Inc., on October 16, 2015 and amended on April 27, 2024. "The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attomeys-in-Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof." "The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed." In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the Attorney -in -Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Attorney -in -Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner - Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 29th day of July 2024 +....... ....... MERCHANTS BONDING COMPANY (MUTUAL) P b •. 11Qr `•o `. MERCHANTS NATIONAL BONDING, INC. •`+ pOR' gyp' fJ 4iP81�' 4 • d/b/a MERCHANTS NATIONAL INDEMNITY COMPANY CO �yy0 C 4,, 2003 ;?� y r 1933 ; C: By 1 �%• •X 4 • �l=• •_y• •.,.� ' •.......• ,��•.• •• �r• ..... • \1V.' President STATE OF IOWA •'�•..;.+• •```� �`•. , •`''• COUNTY OF DALLAS ss. On this 29th day of July 2024 before me appeared Larry Taylor, to me personally known, who being by me duly sworn did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. t tAr s Penni Miller , Commission Number 787952 - • • My Commission Expires iowA January 20, 2027 !Votary Public (Expiration of notary's commission does not invalidate this instrument) 1, Elisabeth Sandersfeid, Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. In Witness Whereof, I have hereunto set my hand and OPT �O Nf.q0. �''�. LP 0.9 t>> :zrz -o_ o:�c 2003 POA 0018 (6/24) `•••••••••••• affixed the seal of the Companies on this day of ' LNG Cp , . • a��1Yf ' a °• •'�''. 1933 secretary 1 s . J �Q • .M.ERCHANTS BONDING COMPANY"-. MERCHANTS BONDING COMPANY (MUTUAL) P.O. BOX 14498, DES MOINES, IOWA 50306-3498 PHONE: (800) 678-8171 FAX: (515) 243-3854 IMPORTANT NOTICE To obtain information or make a complaint: You may contact your insurance agent at the telephone number provided by your insurance agent. You may call Merchants Bonding Company (Mutual) toll -free telephone number for information or to make a complaint at: 1-800-678-8171 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-262-3439 You may write the Texas Department of Insurance at: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 490-1007 Web: www.tdi.texas.00v E-mail: Consumerprotection@tdi.texas.gov PREMIUM AND CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. ,UP 0032 TX (2t15) STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS TABLE OF CONTENTS Article 1 — Definitions and Terminology.......... 1.01 Defined Terms ............................... 1.02 Terminology .................................. Article 2 — Preliminary Matters ....................... 2.01 Before Starting Construction...... 2.02 Preconstruction Conference........ 2.03 Public Meeting ............................ Page .............................................1 .............................................1 ............................................. 5 ....................................................... 6 ....................................................... 6 ....................................................... 6 ....................................................... 6 Article 3 — Contract Documents and Amending............................................................................................... 6 3.01 Reference Standards..................................................................................................................... 6 3.02 Amending and Supplementing Contract Documents.................................................................. 6 Article 4 — Bonds and Insurance....................................................................................................................... 7 4.01 Licensed Sureties and Insurers..................................................................................................... 7 4.02 Performance, Payment, and Maintenance Bonds........................................................................ 7 4.03 Certificates of Insurance............................................................................................................... 7 4.04 Contractor's Insurance.................................................................................................................. 9 4.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................12 Article 5 — Contractor's Responsibilities........................................................................................................12 5.01 Supervision and Superintendent.................................................................................................12 5.02 Labor; Working Hours................................................................................................................13 5.03 Services, Materials, and Equipment...........................................................................................13 5.04 Project Schedule..........................................................................................................................14 5.05 Substitutes and "Or-Equals".......................................................................................................14 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors).....................................16 5.07 Concerning Subcontractors, Suppliers, and Others...................................................................16 5.08 Wage Rates..................................................................................................................................18 5.09 Patent Fees and Royalties...........................................................................................................19 5.10 Laws and Regulations.................................................................................................................19 5.11 Use of Site and Other Areas.......................................................................................................19 5.12 Record Documents......................................................................................................................20 5.13 Safety and Protection.................................................................................................................. 21 5.14 Safety Representative.................................................................................................................21 5.15 Hazard Communication Programs.............................................................................................22 5.16 Submittals....................................................................................................................................22 5.17 Contractor's General Warranty and Guarantee..........................................................................23 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 5.18 Indemnification ............................................ 5.19 Delegation of Professional Design Services 5.20 Right to Audit: ............................................. 5.21 Nondiscrimination ........................................ Article 6 - Other Work at the Site....... 6.01 Related Work at Site ....... Article 7 - City's Responsibilities ............................................ 7.01 Inspections, Tests, and Approvals ....................... 7.02 Limitations on City's Responsibilities ................ 7.03 Compliance with Safety Program ........................ Article 8 - City's Observation Status During Construction....... 8.01 City's Project Representative ................................. 8.02 Authorized Variations in Work .............................. 8.03 Rejecting Defective Work ...................................... 8.04 Determinations for Work Performed ...................... Article 9 - Changes in the Work ...................... 9.01 Authorized Changes in the Work 9.02 Notification to Surety ................... Article 10 - Change of Contract Price; Change of Contract Time 10.01 Change of Contract Price ........................................... 10.02 Change of Contract Time ........................................... 10.03 Delays......................................................................... Article 11 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work ............ 11.01 Notice of Defects.............................................................................................................. 11.02 Access to Work................................................................................................................. 11.03 Tests and Inspections........................................................................................................ 11.04 Uncovering Work............................................................................................................. 11.05 City May Stop the Work................................................................................................... 11.06 Correction or Removal of Defective Work...................................................................... 11.07 Correction Period.............................................................................................................. 11.08 City May Correct Defective Work................................................................................... Article 12 - Completion ........................................... 12.01 Contractor's Warranty of Title ............ 12.02 Partial Utilization ................................. 12.03 Final Inspection .................................... 12.04 Final Acceptance .................................. Article 13 - Suspension of Work ..................................... 13.01 City May Suspend Work ............................. Article 14 - Miscellaneous ......................................... 14.01 Giving Notice ......................................... CITY OF FORT WORTH STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 24 24 25 25 26 26 26 26 26 27 a a ... 29 ... 29 ... 29 ... 29 ... 30 ... 30 ... 30 ... 30 ... 31 ................................. 32 ................................. 32 ................................. 32 ................................. 32 ................................. 33 ............................................................. 33 ............................................................. 33 34 34 14.02 Computation of Times................................................................................................................ 34 14.03 Cumulative Remedies................................................................................................................. 34 14.04 Survival of Obligations...............................................................................................................35 14.05 Headings......................................................................................................................................35 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 1 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 1 of 35 ARTICLE 1— DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Agreement - The written instrument which is evidence of the agreement between Developer and Contractor covering the Work 2. Asbestos —Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 3. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 4. Buzzsaw — City's on-line, electronic document management and collaboration system. 5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. 6. City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by, its governing body through its City Manager, his designee, or agents authorized pursuant to its duly authorized charter on his behalf. 7. Community Facilities Agreement (CFA) A Contract between the Developer and the City for the Construction of one or more following public facilities within the City public right-of- way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs. A CFA may include private facilities within the right-of-way dedicated as private right-of- way or easement on a recorded plat. 8. Contract —The entire and integrated written document incorporating the Contract Documents between the Developer, Contractor, and/or City concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 9. Contract Documents —Those items that make up the contract and which must include the Agreement, and it's attachments such as standard construction specifications, standard City Conditions, other general conditions of the Developer, including: a. An Agreement CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-2 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 2 of 35 b. Attachments to the Agreement i. Bid Form ii. Vendor Compliance with State Law Non -Resident Bidder iii. Prequalification Statement C. Current Prevailing Wage Rates Table (if required by City) d. Insurance Accord Form e. Payment Bond f. Performance Bond g. Maintenance Bond h. Power of Attorney for Bonds i. Workers Compensation Affidavit j. MWBE Commitment Form( If required by City) k. General Conditions 1. Supplementary Conditions in. The Standard City Conditions n. Specifications specifically made part of the Contract Documents by attachment, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents o. Drawings P. Documentation submitted by contractor prior to Notice of Award. q. The following which may be delivered or issued after the effective date if the Agreement and, if issued become an incorporated part of the Contract Documents i. Notice to Proceed ii. Field Orders iii. Change Orders iv. Letters of Final Acceptance r. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 10. Contractor —The individual or entity with whom Developer has entered into the Agreement. 11. Day or day —A day, unless otherwise defined, shall mean a Calendar Day. 12. Developer — An individual or entity that desires to make certain improvements within the City of Fort Worth 13. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 14. Engineer —The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the Developer. 15. Final Acceptance — The written notice given by the City to the Developer and/or Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 3 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 3 of 35 16. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 17. General Requirements —A part of the Contract Documents between the Developer and a Contractor. 18. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 19. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 20. Milestone —A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 21. Non -Participating Change Order —A document, which is prepared for and reviewed by the City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 22. Participating Change Order —A document, which is prepared for and approved by the City, which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 23. Plans — See definition of Drawings. 24. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 25. Project —The Work to be performed under the Contract Documents. 26. Project Representative —The authorized representative of the City who will be assigned to the Site. 27. Public Meeting — An announced meeting conducted by the Developer to facilitate public participation and to assist the public in gaining an informed view of the Project. 28. Regular Working Hours — Hours beginning at 7: 00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 29. Samples Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 4 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 4 of 35 30. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 31. Site —Lands or areas indicated in the Contract Documents as being furnished by City or Developer upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City or Developer which are designated for the use of Contractor. 32. Specifications —That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 33. Standard City Conditions — That part of the Contract Documents setting forth requirements of the City. 34. Subcontractor —An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of apart of the Work at the Site. 35. Submittals All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 36. Superintendent — The representative of the Contractor who is available at all times and able to receive instructions from the City and/or Developer and to act for the Contractor. 37. Supplementary Conditions —That part of the Contract Documents which amends or supplements the General Conditions. 38. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 40. Weekend Working Hours — Hours beginning at 9: 00 a. in. and ending at 5: 00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 5 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 5 of 35 41. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Participating Change Order, Non -Participating Change Order, or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 42. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p. m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.13 through D are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. C. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 6 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 6 of 35 ARTICLE 2 — PRELIMINARY MATTERS 2.01 Before Starting Construction Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting the Work. New schedules will be submitted to City when Participating Change Orders or Non - Participating Change Orders occur. 2.02 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.03 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. ARTICLE 3 — CONTRACT DOCUMENTS AND AMENDING 3.01 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.02 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Participating Change Order or a Non -Participating Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 7 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 7 of 35 1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or 2. City's written interpretation or clarification. ARTICLE 4 — BONDS AND INSURANCE 4.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverage so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided Section 4.04. 4.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 4.01 and 4.02.C. 4.03 Certificates of Insurance Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee identified in these Standard City Conditions certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 8 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 8 of 35 1. The certificate of insurance shall document the City, an as "Additional Insured" on all liability policies. 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in these Standard City Conditions. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 9. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-9 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 9 of 35 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 11. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 12. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either parry or the underwriter on any such policies. 13. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 4.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. 3. The limits of liability for the insurance shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations a. Statutory limits b. Employer's liability CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 10 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 10 of 35 1) $100,000 each accident/occurrence 2) $100,000 Disease - each employee 3) $500,000 Disease - policy limit B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. 1. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project 2. Contractor's Liability Insurance under this Section which shall be on a per project basis covering the Contractor with minimum limits of: a. $1,000,000 each occurrence b. $2,000,000 aggregate limit 3. The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. 4. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. 1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in an amount not less than the following amounts: a. Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 11 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 1 I of 35 1) $1, 000, 000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: 2) $250,000 Bodily Injury per person 3) $500,000 Bodily Injury per accident / 4) $100,000 Property Damage D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the following requirements: 1. The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks owned and operated by: None 2. The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. 3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: a. General Aggregate: None b. Each Occurrence:: None 4. With respect to the above outlined insurance requirements, the following shall govern: a. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at -grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. b. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights -of - CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 12 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 12 of 35 way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. c. If, in addition to a grade separation or an at -grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at -grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. d. If no grade separation is involved but other work is proposed on a railroad company's right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. 5. No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. 6. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 4.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the Developer and City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the Developer or City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the Developer or City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 5 — CONTRACTOR'S RESPONSIBILITIES 5.01 Supervision and Superintendent A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 13 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 13 of 35 Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 5.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 5.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 14 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 14 of 35 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 5.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and the General Requirements) proposed adjustments in the Project Schedule. 2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 9. Adjustments in Contract Time for projects with City participation shall be made by participating change orders. 5.05 Substitutes and "Or -Equals " A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or -Equal" Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 15 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 15 of 35 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 5.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 0125 00 and: 1) shall certify that the proposed substitute item will: i. perform adequately the functions and achieve the results called for by the general design; ii. be similar in substance to that specified; iii. be suited to the same use as that specified; and 2) will state: i. the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; ii. whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; iii. whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: i. all variations of the proposed substitute item from that specified; ii. available engineering, sales, maintenance, repair, and replacement services; and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 16 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 16 of 35 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 5.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.13. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Participating Change Order. 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors) A. The Contractor and any subcontractors are required to be prequalified for the work types requiring pre -qualification 5.07 Concerning Subcontractors, Suppliers, and Others A. Minority and Women Owned Business Enterprise Compliance: CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 17 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 17 of 35 ❑ Required for this Contract. Not Required for this Contract. It is City policy to ensure the full and equitable participation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent of the City's MWBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MWBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. C. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 18 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 18 of 35 Documents, Contractor shall provide City contract numbers and reference numbers to the Subcontractors and/or Suppliers. 5.08 Wage Rates ❑ Required for this Contract. deb Not Required for this Contract. A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 1 Ith day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 19 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 19 of 35 occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 5.09 Patent Fees and Royalties A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 5.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.01. 5.11 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 20 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 20 of 35 other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and shall be entitled to recover its cost in doing so. The City may withhold Final Acceptance until clean-up is complete and cost are recovered. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 5.12 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 21 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 21 of 35 Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 5.13 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 5.14 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 22 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 22 of 35 5.15 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 5.16 Submittals A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal will be identified as required by City. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 5.16.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 5.16.C. B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 23 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 23 of 35 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 5.17 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City or Developer of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 24 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 24 of 35 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 4.02.13. The City will give notice of observed defects with reasonable promptness. 5.18 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 5.19 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 25 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 25 of 35 C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 5.16.C. 5.20 Right to Audit: A. The City reserves the right to audit all projects utilizing City funds B. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 5.21 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 26 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 26 of 35 ARTICLE 6 — OTHER WORK AT THE SITE 6.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. ARTICLE 7 — CITY'S RESPONSIBILITIES 7.01 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 11.03. 7.02 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 27 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 27 of 35 7.03 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 5.13. ARTICLE 8 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 8.01 City's Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City's representative during construction are set forth in the Contract Documents. A. City's Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Representative's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents. 8.02 Authorized Variations in Work City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City Developer, and also on Contractor, who shall perform the Work involved promptly. 8.03 Rejecting Defective Work City will have authority to reject Work which City's Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or completed. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 28 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 28 of 35 8.04 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). ARTICLE 9 — CHANGES IN THE WORK 9.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Participating Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a project with City participation, a Field Order may be issued by the City. 9.02 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. ARTICLE 10 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 10.01 Change of Contract Price A. The Contract Price may only be changed by a Participating Change Order for projects with City participation. 10.02 Change of Contract Time A. The Contract Time may only be changed by a Participating Change Order for projects with City participation. 10.03 Delays A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 29 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 29 of 35 ARTICLE 11— TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 11.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 11.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 11.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations approved by City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 30 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 30 of 35 3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the Testing Lab by Contractor. Developer/Contractor. City will forward all invoices for retests to 4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance until the Testing Lab is Paid E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. 11.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. 11.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 11.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 11.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 31 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 31 of 35 Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 11.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor and Developer should such additional warranty coverage be required. Contractor's obligations under this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 11.08 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 32 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 32 of 35 stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 11.09. ARTICLE 12 — COMPLETION 12.01 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment will pass to City no later than the time of Final Acceptance and shall be free and clear of all Liens. 12.02 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 12.03 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 33 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 33 of 35 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 12.04 Final Acceptance A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction of the following: 1. All documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; 2. consent of the surety, if any, to Final Acceptance; 3. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and 4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. 5. after all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. ARTICLE 13 — SUSPENSION OF WORK 13.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will stop contract time on City participation projects. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 34 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 34 of 35 available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. ARTICLE 14 — MISCELLANEOUS 14.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given i£ 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 14.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 14.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 35 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 35 of 35 14.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 14.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 011100-1 DAP SUMMARY OF WORK SECTION 01 11 00 SUMMARY OF WORK PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 3 1. Summary of Work to be performed in accordance with the Contract Documents B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 - General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Work Covered by Contract Documents 1. Work is to include furnishing all labor, materials, and equipment, and performing all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work Any and all Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included on the standard bid item list, then the item shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. C. Use of Premises 1. Coordinate uses of premises under direction of the City. 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. Use and occupy only portions of the public streets and alleys, or other public places or other rights -of -way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the City. a. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects City Project # 104995 Revised December 20, 2012 01 11 00 - 2 DAP SUMMARY OF WORK Page 2 of 3 b. Excavated and waste materials shall be stored in such a way as not to interfere with the use of spaces that may be designated to be left free and unobstructed and so as not to inconvenience occupants of adjacent property. c. If the street is occupied by railroad tracks, the Work shall be carried on in such manner as not to interfere with the operation of the railroad. 1) All Work shall be in accordance with railroad requirements set forth in Division 0 as well as the railroad permit. D. Work within Easements 1. Do not enter upon private property for any purpose without having previously obtained permission from the owner of such property. 2. Do not store equipment or material on private property unless and until the specified approval of the property owner has been secured in writing by the Contractor and a copy furnished to the City. 3. Unless specifically provided otherwise, clear all rights -of -way or easements of obstructions which must be removed to make possible proper prosecution of the Work as a part of the project construction operations. 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, lawns, fences, culverts, curbing, and all other types of structures or improvements, to all water, sewer, and gas lines, to all conduits, overhead pole lines, or appurtenances thereof, including the construction of temporary fences and to all other public or private property adjacent to the Work. 5. Notify the proper representatives of the owners or occupants of the public or private lands of interest in lands which might be affected by the Work. a. Such notice shall be made at least 48 hours in advance of the beginning of the Work. b. Notices shall be applicable to both public and private utility companies and any corporation, company, individual, or other, either as owners or occupants, whose land or interest in land might be affected by the Work. c. Be responsible for all damage or injury to property of any character resulting from any act, omission, neglect, or misconduct in the manner or method or execution of the Work, or at any time due to defective work, material, or equipment. 6. Fence a. Restore all fences encountered and removed during construction of the Project to the original or a better than original condition. b. Erect temporary fencing in place of the fencing removed whenever the Work is not in progress and when the site is vacated overnight, and/or at all times to provide site security. c. The cost for all fence work within easements, including removal, temporary closures and replacement, shall be subsidiary to the various items bid in the project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects City Project # 104995 Revised December 20, 2012 01 11 00 - 3 DAP SUMMARY OF WORK Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects City Project # 104995 Revised December 20, 2012 012500-1 DAP SUBSTITUTION PROCEDURES SECTION 0125 00 SUBSTITUTION PROCEDURES PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 4 The procedure for requesting the approval of substitution of a product that is not equivalent to a product which is specified by descriptive or performance criteria or defined by reference to 1 or more of the following: a. Name of manufacturer b. Name of vendor c. Trade name d. Catalog number 2. Substitutions are not "or -equals". B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Request for Substitution - General 1. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2. Certain types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or -equals," as determined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a. Or -equals are unavailable due to strike, discontinued production of products meeting specified requirements, or other factors beyond control of Contractor; or, CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised August 30, 2013 012500-2 DAP SUBSTITUTION PROCEDURES Page 2 of 4 b. Contractor proposes a cost and/or time reduction incentive to the City. 1.5 SUBMITTALS A. See Request for Substitution Form (attached) B. Procedure for Requesting Substitution 1. Substitution shall be considered only: a. After award of Contract b. Under the conditions stated herein 2. Submit 3 copies of each written request for substitution, including: a. Documentation 1) Complete data substantiating compliance of proposed substitution with Contract Documents 2) Data relating to changes in construction schedule, when a reduction is proposed 3) Data relating to changes in cost b. For products 1) Product identification a) Manufacturer's name b) Telephone number and representative contact name c) Specification Section or Drawing reference of originally specified product, including discrete name or tag number assigned to original product in the Contract Documents 2) Manufacturer's literature clearly marked to show compliance of proposed product with Contract Documents 3) Itemized comparison of original and proposed product addressing product characteristics including, but not necessarily limited to: a) Size b) Composition or materials of construction c) Weight d) Electrical or mechanical requirements 4) Product experience a) Location of past projects utilizing product b) Name and telephone number of persons associated with referenced projects knowledgeable concerning proposed product c) Available field data and reports associated with proposed product 5) Samples a) Provide at request of City. b) Samples become the property of the City. c. For construction methods: 1) Detailed description of proposed method 2) Illustration drawings C. Approval or Rejection 1. Written approval or rejection of substitution given by the City 2. City reserves the right to require proposed product to comply with color and pattern of specified product if necessary to secure design intent. 3. In the event the substitution is approved, if a reduction in cost or time results, it will be documented by Change Order. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised August 30, 2013 012500-3 DAP SUBSTITUTION PROCEDURES Page 3 of 4 4. Substitution will be rejected if. a. Submittal is not through the Contractor with his stamp of approval b. Request is not made in accordance with this Specification Section c. In the Developer's opinion, acceptance will require substantial revision of the original design d. In the City's or Developer's opinion, substitution will not perform adequately the function consistent with the design intent 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. In making request for substitution or in using an approved product, the Contractor represents that the Contractor: 1. Has investigated proposed product, and has determined that it is adequate or superior in all respects to that specified, and that it will perform function for which it is intended 2. Will provide same guarantee for substitute item as for product specified 3. Will coordinate installation of accepted substitution into Work, to include building modifications if necessary, making such changes as may be required for Work to be complete in all respects 4. Waives all claims for additional costs related to substitution which subsequently arise 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised August 30, 2013 012500-4 DAP SUBSTITUTION PROCEDURES Page 4 of 4 EXHIBIT A REQUEST FOR SUBSTITUTION FORM: PROJECT: DATE: We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature Recommended as noted Firm Not recommended Address By Date Date Remarks Telephone For Use by City: Approved Rejected City Date Recommended Received late CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised August 30, 2013 013119-1 DAP PRECONSTRUCTION MEETING SECTION 01 31 19 PRECONSTRUCTION MEETING PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 3 1. Provisions for the preconstruction meeting to be held prior to the start of Work to clarify construction contract administration procedures B. Deviations from this City of Fort Worth Standard Specification 1. No construction schedule required unless requested by the City. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the delivery of the distribution package to the City. a. The meeting will be scheduled and administered by the City. 2. The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3. Attendance shall include: a. Developer and Consultant b. Contractor's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised August 30, 2013 01 31 19 - 2 DAP PRECONSTRUCTION MEETING Page 2 of 3 e. Other City representatives f. Others as appropriate 4. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals m. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre -Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. MBE/SBE procedures hh. Final Acceptance ii. Final Payment J. Questions or Comments CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised August 30, 2013 013119-3 DAP PRECONSTRUCTION MEETING Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised August 30, 2013 013233-1 DAP PRECONSTRUCTION VIDEO Page 1 of 2 SECTION 0132 33 PRECONSTRUCTION VIDEO PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative and procedural requirements for: a. Preconstruction Videos B. Deviations from this City of Fort Worth Standard Specification 1. Though not mandatory, it is highly recommended on infill developer projects. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Preconstruction Video 1. Produce a preconstruction video of the site/alignment, including all areas in the vicinity of and to be affected by construction. a. Provide digital copy of video upon request by the City. 2. Retain a copy of the preconstruction video until the end of the maintenance surety period. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised August 30, 2013 01 32 33 - 2 DAP PRECONSTRUCTION VIDEO Page 2 of 2 PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised August 30, 2013 SECTION 0133 00 DAP SUBMITTALS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 013300-1 DAP SUBMITTALS Page 1 of 8 General methods and requirements of submissions applicable to the following Work -related submittals: a. Shop Drawings b. Product Data (including Standard Product List submittals) c. Samples d. Mock Ups B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication f) Delivery g) Similar sequenced activities c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised August 30, 2013 013300-2 DAP SUBMITTALS Page 2 of 8 d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 03 30 00-08-B 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents 2. Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) `By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8 '/2 inches x 11 inches to 8 '/2 inches x 11 inches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised August 30, 2013 013300-3 DAP SUBMITTALS Page 3 of 8 2. The Project title and number 3. Contractor identification 4. The names of: a. Contractor b. Supplier c. Manufacturer 5. Identification of the product, with the Specification Section number, page and paragraph(s) 6. Field dimensions, clearly identified as such 7. Relation to adjacent or critical features of the Work or materials 8. Applicable standards, such as ASTM or Federal Specification numbers 9. Identification by highlighting of deviations from Contract Documents 10. Identification by highlighting of revisions on resubmittals 11. An 8-inch x 3-inch blank space for Contractor and City stamps F. Shop Drawings 1. As specified in individual Work Sections includes, but is not necessarily limited to: a. Custom -prepared data such as fabrication and erection/installation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates f. Special wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable to the Work 2. Details a. Relation of the various parts to the main members and lines of the structure b. Where correct fabrication of the Work depends upon field measurements 1) Provide such measurements and note on the drawings prior to submitting for approval. G. Product Data 1. For submittals of product data for products included on the City's Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City's Standard Product List, submittal data may include, but is not necessarily limited to: a. Standard prepared data for manufactured products (sometimes referred to as catalog data) 1) Such as the manufacturer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of compliances and applicability 4) Roughing -in diagrams and templates 5) Catalog cuts 6) Product photographs CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised August 30, 2013 013300-4 DAP SUBMITTALS Page 4 of 8 7) Standard wiring diagrams 8) Printed performance curves and operational -range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare -parts listing and printed product warranties 12) As applicable to the Work H. Samples As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: 1) Sections of manufactured or fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work I. Do not start Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1. Fabrication performed, materials purchased or on -site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals d. Samples 1) Distributed to the Project Representative 2. Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised August 30, 2013 013300-5 DAP SUBMITTALS Page 5 of 8 a. Shop Drawings 1) Distributed to the City 2) Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review 1. The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1) "NO EXCEPTIONS TAKEN' is assigned when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. b. Code 2 CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised August 30, 2013 013300-6 DAP SUBMITTALS Page 6 of 8 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non -conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked b. Submittals for each item will be reviewed no more than twice at the City's expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the Developer at least 7 Calendar Days prior to release for manufacture. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised August 30, 2013 013300-7 DAP SUBMITTALS Page 7 of 8 9. When the shop drawings have been completed to the satisfaction of the City, the Contractor may carry out the construction in accordance therewith and no further changes therein except upon written instructions from the City. 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days following receipt of submittal by the City. L. Mock ups 1. Mock Up units as specified in individual Sections, include, but are not necessarily limited to, complete units of the standard of acceptance for that type of Work to be used on the Project. Remove at the completion of the Work or when directed. M. Qualifications 1. If specifically required in other Sections of these Specifications, submit a P.E. Certification for each item required. N. Request for Information (RFI) 1. Contractor Request for additional information a. Clarification or interpretation of the contract documents b. When the Contractor believes there is a conflict between Contract Documents c. When the Contractor believes there is a conflict between the Drawings and Specifications 1) Identify the conflict and request clarification 2. Sufficient information shall be attached to permit a written response without further information. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised August 30, 2013 1 2 3 4 PART1- GENERAL 5 1.1 SUMMARY 0135 13- 1 DAP SPECIAL PROJECT PROCEDURES Page 1 of 7 SECTION 0135 13 SPECIAL PROJECT PROCEDURES 6 A. Section Includes: 7 1. The procedures for special project circumstances that includes, but is not limited to: 8 a. Coordination with the Texas Department of Transportation 9 b. Work near High Voltage Lines 10 c. Confined Space Entry Program 11 d. Air Pollution Watch Days 12 e. Use of Explosives, Drop Weight, Etc. 13 £ Water Department Notification 14 g. Public Notification Prior to Beginning Construction 15 h. Coordination with United States Army Corps of Engineers 16 i. Coordination within Railroad permits areas 17 j. Dust Control 18 k. Employee Parking 19 20 21 B. Deviations from this City of Fort Worth Standard Specification 22 1. None. 23 C. Related Specification Sections include, but are not necessarily limited to: 24 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 25 2. Division I — General Requirements 26 3. Section 33 12 25 — Connection to Existing Water Mains 27 28 1.2 REFERENCES 29 A. Reference Standards 30 1. Reference standards cited in this Specification refer to the current reference 31 standard published at the time of the latest revision date logged at the end of this 32 Specification, unless a date is specifically cited. 33 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 34 High Voltage Overhead Lines. 35 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction 36 Specification 37 1.3 ADMINISTRATIVE REQUIREMENTS 38 A. Coordination with the Texas Department of Transportation 39 1. When work in the right-of-way which is under the jurisdiction of the Texas 40 Department of Transportation (TxDOT): CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August, 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 013513-2 DAP SPECIAL PROJECT PROCEDURES Page 2 of 7 a. Notify the Texas Department of Transportation prior to commencing any work therein in accordance with the provisions of the permit b. All work performed in the TxDOT right-of-way shall be performed in compliance with and subject to approval from the Texas Department of Transportation B. Work near High Voltage Lines 1. Regulatory Requirements a. All Work near High Voltage Lines (more than 600 volts measured between conductors or between a conductor and the ground) shall be in accordance with Health and Safety Code, Title 9, Subtitle A, Chapter 752. 2. Warning sign a. Provide sign of sufficient size meeting all OSHA requirements. 3. Equipment operating within 10 feet of high voltage lines will require the following safety features a. Insulating cage -type of guard about the boom or arm b. Insulator links on the lift hook connections for back hoes or dippers c. Equipment must meet the safety requirements as set forth by OSHA and the safety requirements of the owner of the high voltage lines 4. Work within 6 feet of high voltage electric lines a. Notification shall be given to: 1) The power company (example: ONCOR) a) Maintain an accurate log of all such calls to power company and record action taken in each case. b. Coordination with power company 1) After notification coordinate with the power company to: a) Erect temporary mechanical barriers, de -energize the lines, or raise or lower the lines c. No personnel may work within 6 feet of a high voltage line before the above requirements have been met. C. Confined Space Entry Program 1. Provide and follow approved Confined Space Entry Program in accordance with OSHA requirements. 2. Confined Spaces include: a. Manholes b. All other confined spaces in accordance with OSHA's Permit Required for Confined Spaces D. Use of Explosives, Drop Weight, Etc. 1. When Contract Documents permit on the project the following will apply: a. Public Notification 1) Submit notice to City and proof of adequate insurance coverage, 24 hours prior to commencing. 2) Minimum 24 hour public notification in accordance with Section 0131 13 E. Water Department Coordination CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August, 30, 2013 013513-3 DAP SPECIAL PROJECT PROCEDURES Page 3 of 7 1 1. During the construction of this project, it will be necessary to deactivate, for a 2 period of time, existing lines. The Contractor shall be required to coordinate with 3 the Water Department to determine the best times for deactivating and activating 4 those lines. 5 2. Coordinate any event that will require connecting to or the operation of an existing 6 City water line system with the City's representative. 7 a. Coordination shall be in accordance with Section 33 12 25. 8 b. If needed, obtain a hydrant water meter from the Water Department for use 9 during the life of named project. 10 c. In the event that a water valve on an existing live system be turned off and on 11 to accommodate the construction of the project is required, coordinate this 12 activity through the appropriate City representative. 13 1) Do not operate water line valves of existing water system. 14 a) Failure to comply will render the Contractor in violation of Texas Penal 15 Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor 16 will be prosecuted to the full extent of the law. 17 b) In addition, the Contractor will assume all liabilities and 18 responsibilities as a result of these actions. 19 F. Public Notification Prior to Beginning Construction 20 1. Prior to beginning construction on any block in the project, on a block by block 21 basis, prepare and deliver a notice or flyer of the pending construction to the front 22 door of each residence or business that will be impacted by construction. The notice 23 shall be prepared as follows: 24 a. Post notice or flyer 7 days prior to beginning any construction activity on each 25 block in the project area. 26 1) Prepare flyer on the Contractor's letterhead and include the following 27 information: 28 a) Name of Project 29 b) City Project No (CPN) 30 c) Scope of Project (i.e. type of construction activity) 31 d) Actual construction duration within the block 32 e) Name of the contractor's foreman and phone number 33 f) Name of the City's inspector and phone number 34 g) City's after-hours phone number 35 2) A sample of the `pre -construction notification' flyer is attached as Exhibit 36 A. 37 3) Submit schedule showing the construction start and finish time for each 38 block of the project to the inspector. 39 4) Deliver flyer to the City Inspector for review prior to distribution. 40 b. No construction will be allowed to begin on any block until the flyer is 41 delivered to all residents of the block. 42 G. Public Notification of Temporary Water Service Interruption during Construction 43 1. In the event it becomes necessary to temporarily shut down water service to 44 residents or businesses during construction, prepare and deliver a notice or flyer of 45 the pending interruption to the front door of each affected resident. 46 2. Prepared notice as follows: 47 a. The notification or flyer shall be posted 24 hours prior to the temporary 48 interruption. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August, 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 013513-4 DAP SPECIAL PROJECT PROCEDURES Page 4 of 7 b. Prepare flyer on the contractor's letterhead and include the following information: 1) Name of the project 2) City Project Number 3) Date of the interruption of service 4) Period the interruption will take place 5) Name of the contractor's foreman and phone number 6) Name of the City's inspector and phone number c. A sample of the temporary water service interruption notification is attached as Exhibit B. d. Deliver a copy of the temporary interruption notification to the City inspector for review prior to being distributed. e. No interruption of water service can occur until the flyer has been delivered to all affected residents and businesses. f. Electronic versions of the sample flyers can be obtained from the Project Construction Inspector. H. Coordination with United States Army Corps of Engineers (USACE) 1. At locations in the Project where construction activities occur in areas where USACE permits are required, meet all requirements set forth in each designated permit. I. Coordination within Railroad Permit Areas 1. At locations in the project where construction activities occur in areas where railroad permits are required, meet all requirements set forth in each designated railroad permit. This includes, but is not limited to, provisions for: a. Flagmen b. Inspectors c. Safety training d. Additional insurance e. Insurance certificates f. Other employees required to protect the right-of-way and property of the Railroad Company from damage arising out of and/or from the construction of the project. Proper utility clearance procedures shall be used in accordance with the permit guidelines. 2. Obtain any supplemental information needed to comply with the railroad's requirements. J. Dust Control 1. Use acceptable measures to control dust at the Site. a. If water is used to control dust, capture and properly dispose of waste water. b. If wet saw cutting is performed, capture and properly dispose of slurry. K. Employee Parking 1. Provide parking for employees at locations approved by the City. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August, 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 013513-5 DAP SPECIAL PROJECT PROCEDURES Page 5 of 7 1.4 SUBMITTALS [NOT USED] 1.5 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.6 CLOSEOUT SUBMITTALS [NOT USED] 1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.8 QUALITY ASSURANCE [NOT USED] 1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.10 FIELD [SITE] CONDITIONS [NOT USED] 1.11 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] DATE NAME 8/31/2012 D.Johnson END OF SECTION Revision Log SUMMARY OF CHANGE 1.3.13— Added requirement of compliance with Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August, 30, 2013 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 01 35 13-6 DAP SPECIAL PROJECT PROCEDURES Page 6 of 7 EXHIBIT A (To be printed on Contractor's Letterhead) Date: CPN No.: Project Name: Mapsco Location: Limits of Construction: THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> OR Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August, 30, 2013 1 2 3 4 Date: EXHIBIT B FORT WORTH DOB NO. XXXX Project Name: 013513-7 DAP SPECIAL PROJECT PROCEDURES Page 7 of 7 NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, ,CONTRACTOR CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August, 30, 2013 013300-8 DAP SUBMITTALS Page 8 of 8 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] D 31111=1x4w11130 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised August 30, 2013 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 1 of 2 SECTION 0145 23 TESTING AND INSPECTION SERVICES PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Testing and inspection services procedures and coordination B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a. Contractor is responsible for performing, coordinating, and payment of all Quality Control testing. b. City is responsible for performing and payment for first set of Quality Assurance testing. 1) If the first Quality Assurance test performed by the City fails, the Contractor is responsible for payment of subsequent Quality Assurance testing until a passing test occurs. a) Final acceptance will not be issued by City until all required payments for testing by Contractor have been paid in full. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Testing 1. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be performed by the City, notify City, sufficiently in advance, when testing is needed. b. When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3. Distribution of Testing Reports a. Electronic Distribution 1) Confirm development of Project directory for electronic submittals to be uploaded to the City's document management system, or another form of distribution approved by the City. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised March 20, 2020 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 2 of 2 2) Upload test reports to designated project directory and notify appropriate City representatives via email of submittal posting. 3) Hard Copies a) 1 copy for all submittals submitted to the Project Representative b. Hard Copy Distribution (if required in lieu of electronic distribution) 1) Tests performed by City a) Distribute 1 hard copy to the Contractor 2) Tests performed by the Contractor a) Distribute 3 hard copies to City's Project Representative 4. Provide City's Project Representative with trip tickets for each delivered load of Concrete or Lime material including the following information: a. Name of pit b. Date of delivery c. Material delivered B. Inspection 1. Inspection or lack of inspection does not relieve the Contractor from obligation to perform work in accordance with the Contract Documents. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 03/20/2020 D.V. Magaiia Removed reference to Buzzsaw and noted that electronic submittals be uploaded through the City's document management system. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised March 20, 2020 015000-1 DAP TEMPORARY FACILITIES AND CONTROLS Page 1 of 4 SECTION 0150 00 TEMPORARY FACILITIES AND CONTROLS PART1- GENERAL 1.1 SUMMARY A. Section Includes: Provide temporary facilities and controls needed for the Work including, but not necessarily limited to: a. Temporary utilities b. Sanitary facilities c. Storage Sheds and Buildings d. Dust control e. Temporary fencing of the construction site B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Temporary Utilities 1. Obtaining Temporary Service a. Make arrangements with utility service companies for temporary services. b. Abide by rules and regulations of utility service companies or authorities having jurisdiction. c. Be responsible for utility service costs until Work is approved for Final Acceptance. 1) Included are fuel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as required for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic consumption by Contractor personnel and City's Project Representatives. c. Coordination 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised JULY 1, 2011 01 50 00 - 2 DAP TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 d. Contractor Payment for Construction Water 1) Obtain construction water meter from City for payment as billed by City's established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as required for Work, including testing of Work. 1) Provide power for lighting, operation of equipment, or other use. b. Electric power service includes temporary power service or generator to maintain operations during scheduled shutdown. 4. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and others performing work or furnishing services at Site. 5. Temporary Heat and Ventilation a. Provide temporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe working conditions. B. Sanitary Facilities 1. Provide and maintain sanitary facilities for persons on Site. a. Comply with regulations of State and local departments of health. 2. Enforce use of sanitary facilities by construction personnel at job site. a. Enclose and anchor sanitary facilities. b. No discharge will be allowed from these facilities. c. Collect and store sewage and waste so as not to cause nuisance or health problem. d. Haul sewage and waste off -site at no less than weekly intervals and properly dispose in accordance with applicable regulation. 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 4. Remove facilities at completion of Project C. Storage Sheds and Buildings 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off ground. 3. Store materials in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventory. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Final Acceptance. D. Temporary Fencing Provide and maintain for the duration or construction when required in contract documents E. Dust Control CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised JULY 1, 2011 01 50 00 - 3 DAP TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1. Contractor is responsible for maintaining dust control through the duration of the project. a. Contractor remains on -call at all times b. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Temporary Facilities 1. Maintain all temporary facilities for duration of construction activities as needed. 3.5 [REPAIR] / [RESTORATION] 3.6 RE -INSTALLATION 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES A. Temporary Facilities CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised JULY 1, 2011 01 50 00 - 4 DAP TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1. Remove all temporary facilities and restore area after completion of the Work, to a condition equal to or better than prior to start of Work. 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised JULY 1, 2011 015526-1 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 1 of 3 SECTION 0155 26 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative procedures for: a. Street Use Permit b. Modification of approved traffic control c. Removal of Street Signs B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 34 71 13 — Traffic Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this specification refer to the current reference standard published at the time of the latest revision date logged at the end of this specification, unless a date is specifically cited. 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 1.4 ADMINISTRATIVE REQUIREMENTS A. Traffic Control 1. General a. When traffic control plans are included in the Drawings, provide Traffic Control in accordance with Drawings and Section 34 71 13. b. When traffic control plans are not included in the Drawings, prepare traffic control plans in accordance with Section 34 71 13 and submit to City for review. 1) Allow minimum 10 working days for review of proposed Traffic Control. B. Street Use Permit 1. Prior to installation of Traffic Control, a City Street Use Permit is required. a. To obtain Street Use Permit, submit Traffic Control Plans to City Transportation and Public Works Department. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised July 1, 2011 015526-2 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 1) Allow a minimum of 5 working days for permit review. 2) Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. C. Modification to Approved Traffic Control Prior to installation traffic control: a. Submit revised traffic control plans to City Department Transportation and Public Works Department. 1) Revise Traffic Control plans in accordance with Section 34 71 13. 2) Allow minimum 5 working days for review of revised Traffic Control. 3) It is the Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. D. Removal of Street Sign 1. If it is determined that a street sign must be removed for construction, then contact City Transportation and Public Works Department, Signs and Markings Division to remove the sign. E. Temporary Signage 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting requirements of the latest edition of the Texas Manual on Uniform Traffic Control Devices (MUTCD). 2. Install temporary sign before the removal of permanent sign. 3. When construction is complete, to the extent that the permanent sign can be reinstalled, contact the City Transportation and Public Works Department, Signs and Markings Division, to reinstall the permanent sign. F. Traffic Control Standards 1. Traffic Control Standards can be found on the City's Buzzsaw website. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised July 1, 2011 015526-3 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised July 1, 2011 015713-1 DAP STORM WATER POLLUTION PREVENTION Page 1 of 3 SECTION 0157 13 STORM WATER POLLUTION PREVENTION PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for Storm Water Pollution Prevention Plans B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 3125 00 — Erosion and Sediment Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Activities resulting in less than 1 acre of disturbance a. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 2. Construction Activities resulting in greater than 1 acre of disturbance a. Measurement and Payment shall be in accordance with Section 3125 00. 1.3 REFERENCES A. Abbreviations and Acronyms 1. Notice of Intent: NOI 2. Notice of Termination: NOT 3. Storm Water Pollution Prevention Plan: SWPPP 4. Texas Commission on Environmental Quality: TCEQ 5. Notice of Change: NOC A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Integrated Storm Management (iSWM) Technical Manual for Construction Controls 1.4 ADMINISTRATIVE REQUIREMENTS A. General 1. Contractor is responsible for resolution and payment of any fines issued associated with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised July 1, 2011 01 57 13 - 2 DAP STORM WATER POLLUTION PREVENTION Page 2 of 3 B. Construction Activities resulting in: 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 3125 00 and Drawings. 2. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 1.5 SUBMITTALS A. SWPPP Submit in accordance with Section 0133 00, except as stated herein. a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City as follows: 1) 1 copy to the City Project Manager a) City Project Manager will forward to the City Department of Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised July 1, 2011 0157 13 -3 DAP STORM WATER POLLUTION PREVENTION Page 3 of 3 B. Modified SWPPP 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City in accordance with Section 0133 00. 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised July 1, 2011 SECTION 0160 00 PRODUCT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 01 60 00 DAP PRODUCT REQUIREMENTS Page 1 of 2 1. References for Product Requirements and City Standard Products List B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A list of City approved products for use is available through the City's website at: httDs://apps.fortworthtexas.2ov/ProiectResources/ and following the directory path: 02 - Construction Documents\Standard Products List A. Only products specifically included on City's Standard Product List in these Contract Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the City. B. Any specific product requirements in the Contract Documents supersede similar products included on the City's Standard Product List. 1. The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City's Standard Product List. C. Although a specific product is included on City's Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that manufacturer's standard product. D. See Section 0133 00 for submittal requirements of Product Data included on City's Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised March 20, 2020 01 60 00 DAP PRODUCT REQUIREMENTS Page 2 of 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City's Standard Product List 4/7/2014 M.Domenech Revised for DAP application 03/20/2020 D.V. Magafia Removed reference to Buzzsaw and noted that the City approved products list is accessible through the City's website. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised March 20, 2020 016600-1 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 1 of 4 SECTION 0166 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A. Delivery Requirements 1. Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised April 7, 2014 01 66 00 - 2 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 4. Deliver products or equipment in manufacturer's original unbroken cartons or other containers designed and constructed to protect the contents from physical or environmental damage. 5. Clearly and fully mark and identify as to manufacturer, item and installation location. 6. Provide manufacturer's instructions for storage and handling. B. Handling Requirements 1. Handle products or equipment in accordance with these Contract Documents and manufacturer's recommendations and instructions. C. Storage Requirements 1. Store materials in accordance with manufacturer's recommendations and requirements of these Specifications. 2. Make necessary provisions for safe storage of materials and equipment. a. Place loose soil materials and materials to be incorporated into Work to prevent damage to any part of Work or existing facilities and to maintain free access at all times to all parts of Work and to utility service company installations in vicinity of Work. 3. Keep materials and equipment neatly and compactly stored in locations that will cause minimum inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. a. Arrange storage to provide easy access for inspection. 4. Restrict storage to areas available on construction site for storage of material and equipment as shown on Drawings, or approved by City's Project Representative. 5. Provide off -site storage and protection when on -site storage is not adequate. a. Provide addresses of and access to off -site storage locations for inspection by City's Project Representative. 6. Do not use lawns, grass plots or other private property for storage purposes without written permission of owner or other person in possession or control of premises. 7. Store in manufacturers' unopened containers. 8. Neatly, safely and compactly stack materials delivered and stored along line of Work to avoid inconvenience and damage to property owners and general public and maintain at least 3 feet from fire hydrant. 9. Keep public and private driveways and street crossings open. 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to satisfaction of City's Project Representative. a. Total length which materials may be distributed along route of construction at one time is 1,000 linear feet, unless otherwise approved in writing by City's Project Representative. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised April 7, 2014 016600-3 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non -Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised April 7, 2014 01 66 00 - 4 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised April 7, 2014 1 2 3 4 PART1- GENERAL SECTION 0170 00 MOBILIZATION AND REMOBILIZATION 017000-1 MOBILIZATION AND REMOBILIZATION Page 1 of 6 5 1.1 SUMMARY 6 A. Section Includes: 7 1. Mobilization and Demobilization 8 a. Mobilization 9 1) Transportation of Contractor's personnel, equipment, and operating 10 supplies to the Site 11 2) Establishment of necessary general facilities for the Contractor's operation 12 at the Site 13 3) Premiums paid for performance and payment bonds 14 4) Transportation of Contractor's personnel, equipment, and operating 15 supplies to another location within the designated Site 16 5) Relocation of necessary general facilities for the Contractor's operation 17 from 1 location to another location on the Site. 18 b. Demobilization 19 1) Transportation of Contractor's personnel, equipment, and operating 20 supplies away from the Site including disassembly 21 2) Site Clean-up 22 3) Removal of all buildings and/or other facilities assembled at the Site for this 23 Contract 24 c. Mobilization and Demobilization do not include activities for specific items of 25 work that are for which payment is provided elsewhere in the contract. 26 2. Remobilization 27 a. Remobilization for Suspension of Work specifically required in the Contract 28 Documents or as required by City includes: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Tidal Wave Auto Spa Revised November 22, 2016 City Project # 104995 017000-2 MOBILIZATION AND REMOBILIZATION Page 2 of 6 1 1) Demobilization 2 a) Transportation of Contractor's personnel, equipment, and operating 3 supplies from the Site including disassembly or temporarily securing 4 equipment, supplies, and other facilities as designated by the Contract 5 Documents necessary to suspend the Work. 6 b) Site Clean-up as designated in the Contract Documents 7 2) Remobilization 8 a) Transportation of Contractor's personnel, equipment, and operating 9 supplies to the Site necessary to resume the Work. 10 b) Establishment of necessary general facilities for the Contractor's 11 operation at the Site necessary to resume the Work. 12 3) No Payments will be made for: 13 a) Mobilization and Demobilization from one location to another on the 14 Site in the normal progress of performing the Work. 15 b) Stand-by or idle time 16 c) Lost profits 17 3. Mobilizations and Demobilization for Miscellaneous Projects 18 a. Mobilization and Demobilization 19 1) Mobilization shall consist of the activities and cost on a Work Order basis 20 necessary for: 21 a) Transportation of Contractor's personnel, equipment, and operating 22 supplies to the Site for the issued Work Order. 23 b) Establishment of necessary general facilities for the Contractor's 24 operation at the Site for the issued Work Order 25 2) Demobilization shall consist of the activities and cost necessary for: 26 a) Transportation of Contractor's personnel, equipment, and operating 27 supplies from the Site including disassembly for each issued Work 28 Order 29 b) Site Clean-up for each issued Work Order CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Tidal Wave Auto Spa Revised November 22, 2016 City Project # 104995 017000-3 MOBILIZATION AND REMOBILIZATION Page 3 of 6 1 c) Removal of all buildings or other facilities assembled at the Site for 2 each Work Oder 3 b. Mobilization and Demobilization do not include activities for specific items of 4 work for which payment is provided elsewhere in the contract. 5 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects 6 a. A Mobilization for Miscellaneous Projects when directed by the City and the 7 mobilization occurs within 24 hours of the issuance of the Work Order. 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1— General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment [Consult City Department/Division for direction on if 15 Mobilization pay item to be included or the item should be subsidiary. Include the 16 appropriate Section 1.2 A. 1.] 17 1. Mobilization and Demobilization 18 a. Measure 19 1) This Item is considered subsidiary to the various Items bid. 20 b. Payment 21 1) The work performed and materials furnished in accordance with this Item 22 are subsidiary to the various Items bid and no other compensation will be 23 allowed. 24 25 2. Remobilization for suspension of Work as specifically required in the Contract 26 Documents 27 a. Measurement CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Tidal Wave Auto Spa Revised November 22, 2016 City Project # 104995 017000-4 MOBILIZATION AND REMOBILIZATION Page 4 of 6 1 1) Measurement for this Item shall be per each remobilization performed. 2 b. Payment 3 1) The work performed and materials furnished in accordance with this Item 4 and measured as provided under "Measurement" will be paid for at the 5 unit price per each "Specified Remobilization" in accordance with Contract 6 Documents. 7 c. The price shall include: 8 1) Demobilization as described in Section 1.1.A.2.a.1) 9 2) Remobilization as described in Section 1.1.A.2.a.2) 10 d. No payments will be made for standby, idle time, or lost profits associated this 11 Item. 12 3. Remobilization for suspension of Work as required by City 13 a. Measurement and Payment 14 1) This shall be submitted as a Contract Claim in accordance with Article 10 15 of Section 00 72 00. 16 2) No payments will be made for standby, idle time, or lost profits associated 17 with this Item. 18 4. Mobilizations and Demobilizations for Miscellaneous Projects 19 a. Measurement 20 1) Measurement for this Item shall be for each Mobilization and 21 Demobilization required by the Contract Documents 22 b. Payment 23 1) The Work performed and materials furnished in accordance with this Item 24 and measured as provided under "Measurement" will be paid for at the 25 unit price per each "Work Order Mobilization" in accordance with 26 Contract Documents. Demobilization shall be considered subsidiary to 27 mobilization and shall not be paid for separately. 28 c. The price shall include: 29 1) Mobilization as described in Section 1.1.A.3.a.1) 30 2) Demobilization as described in Section 1.1.A.3.a.2) CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Tidal Wave Auto Spa Revised November 22, 2016 City Project # 104995 017000-5 MOBILIZATION AND REMOBILIZATION Page 5 of 6 1 d. No payments will be made for standby, idle time, or lost profits associated this 2 Item. 3 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects 4 a. Measurement 5 1) Measurement for this Item shall be for each Mobilization and 6 Demobilization required by the Contract Documents 7 b. Payment 8 1) The Work performed and materials furnished in accordance with this Item 9 and measured as provided under "Measurement" will be paid for at the 10 unit price per each "Work Order Emergency Mobilization" in accordance 11 with Contract Documents. Demobilization shall be considered subsidiary 12 to mobilization and shall not be paid for separately. 13 c. The price shall include 14 1) Mobilization as described in Section 1.1.A.4.a) 15 2) Demobilization as described in Section 1.1.A.3.a.2) 16 d. No payments will be made for standby, idle time, or lost profits associated this 17 Item. 18 1.3 REFERENCES [NOT USED] 19 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 20 1.5 SUBMITTALS [NOT USED] 21 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 22 1.7 CLOSEOUT SUBMITTALS [NOT USED] 23 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 24 1.9 QUALITY ASSURANCE [NOT USED] 25 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 26 1.11 FIELD [SITE] CONDITIONS [NOT USED] 27 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Tidal Wave Auto Spa Revised November 22, 2016 City Project # 104995 1 PART 2 - PRODUCTS [NOT USED] 2 PART 3 - EXECUTION [NOT USED] 3 4 5 017000-6 MOBILIZATION AND REMOBILIZATION Page 6 of 6 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 11/22/16 Michael Owen 1.2 Price and Payment Procedures - Revised specification, including blue text, to make specification flexible for either subsidiary or paid bid item for Mobilization. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Tidal Wave Auto Spa Revised November 22, 2016 City Project # 104995 1 2 3 PART1- GENERAL 4 1.1 SUMMARY 5 6 7 8 9 10 11 12 1.2 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 017123-1 CONSTRUCTION STAKING AND SURVEY Page 1 of 8 SECTION 01 71 23 CONSTRUCTION STAKING AND SURVEY A. Section Includes: 1. Requirements for construction staking and construction survey B. Deviations from this City of Fort Worth Standard Specification 1. See Changes (Highlighted in Yellow). C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Staking a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 2. Construction Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 3. As -Built Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised February 14, 2018 017123-2 CONSTRUCTION STAKING AND SURVEY Page 2 of 8 l 1.3 REFERENCES 2 A. Definitions 3 1. Construction Survev - The survey measurements made prior to or while 4 construction is in progress to control elevation, horizontal position, dimensions and 5 configuration of structures/improvements included in the Project Drawings. 6 2. As -built Survev —The measurements made after the construction of the 7 improvement features are complete to provide position coordinates for the features 8 of a project. 9 3. Construction Staking — The placement of stakes and markings to provide offsets 10 and elevations to cut and fill in order to locate on the ground the designed 11 structures/improvements included in the Project Drawings. Construction staking 12 shall include staking easements and/or right of way if indicated on the plans. 13 4. Survev "Field Checks" — Measurements made after construction staking is 14 completed and before construction work begins to ensure that structures marked on 15 the ground are accurately located per Project Drawings. 16 B. Technical References 17 1. City of Fort Worth — Construction Staking Standards (available on City's Buzzsaw 18 website) — 01 71 23.16.01— Attachment A —Survey Staking Standards 19 2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files (available 20 on City's Buzzsaw website). 21 3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision 22 4. Texas Society of Professional Land Surveyors (TSPS), Manual of Practice for Land 23 Surveying in the State of Texas, Category 5 24 25 1.4 ADMINISTRATIVE REQUIREMENTS 26 A. The Contractor's selection of a surveyor must comply with Texas Government 27 Code 2254 (qualifications based selection) for this project. 28 1.5 SUBMITTALS 29 A. Submittals, if required, shall be in accordance with Section 0133 00. 30 B. All submittals shall be received and reviewed by the City prior to delivery of work. 31 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 32 A. Field Quality Control Submittals 33 1. Documentation verifying accuracy of field engineering work, including coordinate 34 conversions if plans do not indicate grid or ground coordinates. 35 2. Submit "Cut -Sheets" conforming to the standard template provided by the City 36 (refer to 01 71 23.16.01 — Attachment A — Survey Staking Standards). 37 38 1.7 CLOSEOUT SUBMITTALS 39 B. As -built Redline Drawing Submittal CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised February 14, 2018 017123-3 CONSTRUCTION STAKING AND SURVEY Page 3 of 8 l 1. Submit As -Built Survey Redline Drawings documenting the locations/elevations of 2 constructed improvements signed and sealed by Registered Professional Land 3 Surveyor (RPLS) responsible for the work (refer to 01 71 23.16.01 — Attachment A 4 — Survey Staking Standards) . 5 2. Contractor shall submit the proposed as -built and completed redline drawing 6 submittal one (1) week prior to scheduling the project final inspection for City 7 review and comment. Revisions, if necessary, shall be made to the as -built redline 8 drawings and resubmitted to the City prior to scheduling the construction final 9 inspection. 10 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 11 1.9 QUALITY ASSURANCE 12 A. Construction Staking 13 1. Construction staking will be performed by the Contractor. 14 2. Coordination 15 a. Contact City and Developer's Project Representative at least one week in 16 advance notifying the City of when Construction Staking is scheduled. 17 b. It is the Contractor's responsibility to coordinate staking such that 18 construction activities are not delayed or negatively impacted. 19 3. General 20 a. Contractor is responsible for preserving and maintaining stakes. If City 21 surveyors or Developer's Project Representative are required to re -stake for 22 any reason, the Contractor will be responsible for costs to perform staking. If 23 in the opinion of the City, a sufficient number of stakes or markings have been 24 lost, destroyed disturbed or omitted that the contracted Work cannot take place 25 then the Contractor will be required to stake or re -stake the deficient areas. 26 B. Construction Survey 27 1. Construction Survey will be performed by the Contractor. 28 2. Coordination 29 a. Contractor to verify that horizontal and vertical control data established in the 30 design survey and required for construction survey is available and in place. 31 3. General 32 a. Construction survey will be performed in order to construct the work shown 33 on the Construction Drawings and specified in the Contract Documents. 34 b. For construction methods other than open cut, the Contractor shall perform 35 construction survey and verify control data including, but not limited to, the 36 following: 37 1) Verification that established benchmarks and control are accurate. 38 2) Use of Benchmarks to furnish and maintain all reference lines and grades 39 for tunneling. 40 3) Use of line and grades to establish the location of the pipe. 41 4) Submit to the City copies of field notes used to establish all lines and 42 grades, if requested, and allow the City to check guidance system setup prior 43 to beginning each tunneling drive. 44 5) Provide access for the City, if requested, to verify the guidance system and 45 the line and grade of the carrier pipe. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised February 14, 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 01 71 23 - 4 CONSTRUCTION STAKING AND SURVEY Page 4 of 8 6) The Contractor remains fully responsible for the accuracy of the work and correction of it, as required. 7) Monitor line and grade continuously during construction. 8) Record deviation with respect to design line and grade once at each pipe joint and submit daily records to the City. 9) If the installation does not meet the specified tolerances (as outlined in Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct the installation in accordance with the Contract Documents. C. As -Built Survey 1. Required As -Built Survey will be performed by the Contractor. 2. Coordination a. Contractor is to coordinate with City to confirm which features require as - built surveying. b. It is the Contractor's responsibility to coordinate the as -built survey and required measurements for items that are to be buried such that construction activities are not delayed or negatively impacted. c. For sewer mains and water mains 12" and under in diameter, it is acceptable to physically measure depth and mark the location during the progress of construction and take as -built survey after the facility has been buried. The Contractor is responsible for the quality control needed to ensure accuracy. 3. General a. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features during the progress of the construction including the following: 1) Water Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Minimum every 250 linear feet, including (2) Horizontal and vertical points of inflection, curvature, etc. (3) Fire line tee (4) Plugs, stub -outs, dead-end lines (5) Casing pipe (each end) and all buried fittings 2) Sanitary Sewer a) Top of pipe elevations and coordinates for force mains and siphon sanitary sewer lines (non -gravity facilities) at the following locations: (1) Minimum every 250 linear feet and any buried fittings (2) Horizontal and vertical points of inflection, curvature, etc. 3) Stormwater — Not Applicable b. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features after the construction is completed including the following: 1) Manholes a) Rim and flowline elevations and coordinates for each manhole 2) Water Lines a) Cathodic protection test stations b) Sampling stations c) Meter boxes/vaults (All sizes) CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised February 14, 2018 017123-5 CONSTRUCTION STAKING AND SURVEY Page 5 of 8 1 d) Fire hydrants 2 e) Valves (gate, butterfly, etc.) 3 f) Air Release valves (Manhole rim and vent pipe) 4 g) Blow off valves (Manhole rim and valve lid) 5 h) Pressure plane valves 6 i) Underground Vaults 7 (1) Rim and flowline elevations and coordinates for each 8 Underground Vault. 9 3) Sanitary Sewer 10 a) Cleanouts 11 (1) Rim and flowline elevations and coordinates for each 12 b) Manholes and Junction Structures 13 (1) Rim and flowline elevations and coordinates for each 14 manhole and junction structure. 15 4) Stormwater — Not Applicable 16 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 17 1.11 FIELD [SITE] CONDITIONS [NOT USED] 18 1.12 WARRANTY 19 PART 2 - PRODUCTS 20 A. A construction survey will produce, but will not be limited to: 21 1. Recovery of relevant control points, points of curvature and points of intersection. 22 2. Establish temporary horizontal and vertical control elevations (benchmarks) 23 sufficiently permanent and located in a manner to be used throughout construction. 24 3. The location of planned facilities, easements and improvements. 25 a. Establishing final line and grade stakes for piers, floors, grade beams, parking 26 areas, utilities, streets, highways, tunnels, and other construction. 27 b. A record of revisions or corrections noted in an orderly manner for reference. 28 c. A drawing, when required by the client, indicating the horizontal and vertical 29 location of facilities, easements and improvements, as built. 30 4. Cut sheets shall be provided to the City inspector and Survey Superintendent for all 31 construction staking projects. These cut sheets shall be on the standard city template 32 which can be obtained from the Survey Superintendent (817-392-7925). 33 5. Digital survey files in the following formats shall be acceptable: 34 a. AutoCAD (.dwg) 35 b. ESRI Shapefile (.shp) 36 c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use 37 standard templates, if available) 38 6. Survey files shall include vertical and horizontal data tied to original project 39 control and benchmarks, and shall include feature descriptions 40 PART 3 - EXECUTION 41 3.1 INSTALLERS CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised February 14, 2018 017123-6 CONSTRUCTION STAKING AND SURVEY Page 6 of 8 1 A. Tolerances: 2 1. The staked location of any improvement or facility should be as accurate as 3 practical and necessary. The degree of precision required is dependent on many 4 factors all of which must remain judgmental. The tolerances listed hereafter are 5 based on generalities and, under certain circumstances, shall yield to specific 6 requirements. The surveyor shall assess any situation by review of the overall plans 7 and through consultation with responsible parties as to the need for specific 8 tolerances. 9 a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical 10 tolerance. Horizontal alignment for earthwork and rough cut should not exceed 11 1.0 ft. tolerance. 12 b. Horizontal alignment on a structure shall be within .0.1 ft tolerance. 13 c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and 14 walkways shall be located within the confines of the site boundaries and, 15 occasionally, along a boundary or any other restrictive line. Away from any 16 restrictive line, these facilities should be staked with an accuracy producing no 17 more than 0.05ft. tolerance from their specified locations. 18 d. Underground and overhead utilities, such as sewers, gas, water, telephone and 19 electric lines, shall be located horizontally within their prescribed areas or 20 easements. Within assigned areas, these utilities should be staked with an 21 accuracy producing no more than 0.1 ft tolerance from a specified location. 22 e. The accuracy required for the vertical location of utilities varies widely. Many 23 underground utilities require only a minimum cover and a tolerance of 0.1 ft. 24 should be maintained. Underground and overhead utilities on planned profile, 25 but not depending on gravity flow for performance, should not exceed 0.1 ft. 26 tolerance. 27 B. Surveying instruments shall be kept in close adjustment according to manufacturer's 28 specifications or in compliance to standards. The City reserves the right to request a 29 calibration report at any time and recommends regular maintenance schedule be 30 performed by a certified technician every 6 months. 31 1. Field measurements of angles and distances shall be done in such fashion as to 32 satisfy the closures and tolerances expressed in Part 3. LA. 33 2. Vertical locations shall be established from a pre -established benchmark and 34 checked by closing to a different bench mark on the same datum. 35 3. Construction survey field work shall correspond to the client's plans. Irregularities 36 or conflicts found shall be reported promptly to the City. 37 4. Revisions, corrections and other pertinent data shall be logged for future reference. 38 39 3.2 EXAMINATION [NOT USED] 40 3.3 PREPARATION [NOT USED] 41 3.4 APPLICATION 42 3.5 REPAIR / RESTORATION 43 A. If the Contractor's work damages or destroys one or more of the control 44 monuments/points set by the City or Developer's Project Representative, the monuments 45 shall be adequately referenced for expedient restoration. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised February 14, 2018 017123-7 CONSTRUCTION STAKING AND SURVEY Page 7 of 8 1 1. Notify City or Developer's Project Representative if any control data needs to be 2 restored or replaced due to damage caused during construction operations. 3 a. Contractor shall perform replacements and/or restorations. 4 b. The City or Developer's Project Representative may require at any time a 5 survey "Field Check" of any monument or benchmarks that are set be verified 6 by the City surveyors or Developer's Project Representative before further 7 associated work can move forward. 8 3.6 RE -INSTALLATION [NOT USED] 9 3.7 FIELD [OR] SITE QUALITY CONTROL 10 A. It is the Contractor's responsibility to maintain all stakes and control data placed by the 11 City or Developer's Project Representative in accordance with this Specification. This 12 includes easements and right of way, if noted on the plans. 13 B. Do not change or relocate stakes or control data without approval from the City. 14 3.8 SYSTEM STARTUP 15 A. Survey Checks 16 1. The City reserves the right to perform a Survey Check at any time deemed 17 necessary. 18 2. Checks by City personnel or 3rd party contracted surveyor are not intended to 19 relieve the contractor of his/her responsibility for accuracy. 20 21 3.9 ADJUSTING [NOT USED] 22 3.10 CLEANING [NOT USED] 23 3.11 CLOSEOUT ACTIVITIES [NOT USED] 24 3.12 PROTECTION [NOT USED] 25 3.13 MAINTENANCE [NOT USED] 26 3.14 ATTACHMENTS [NOT USED] 27 END OF SECTION 28 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D.Johnson Added instruction and modified measurement & payment under 1.2; added 8/31/2017 M. Owen definitions and references under 1.3; modified 1.6; added 1.7 closeout submittal requirements; modified 1.9 Quality Assurance; added PART 2 — PRODUCTS ; Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup. Removed "blue text"; revised measurement and payment sections for Construction 2/14/2018 M Owen Staking and As -Built Survey; added reference to selection compliance with TGC 2254; revised action and Closeout submittal requirements; added acceptable depth CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised February 14, 2018 017123-8 CONSTRUCTION STAKING AND SURVEY Page 8 of 8 measurement criteria; revised list of items requiring as -built survey "during" and "after" construction; and revised acceptable digital survey file format CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised February 14, 2018 SECTION 0174 23 CLEANING PART1- GENERAL 1.1 SUMMARY 017423-1 DAP CLEANING Page 1 of 4 A. Section Includes: 1. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fall on newly painted surfaces. 2. Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised April 7, 2014 01 74 23 - 2 DAP CLEANING Page 2 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2- PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site. 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised April 7, 2014 01 74 23 - 3 DAP CLEANING Page 3 of 4 6. Handle materials in a controlled manner with as few handlings as possible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. 8. Remove all signs of temporary construction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do not burn on -site. B. Intermediate Cleaning during Construction 1. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 3. Confine construction debris daily in strategically located container(s): a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haul from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transported by flowing water during the storm. C. Exterior (Site or Right of Way) Final Cleaning 1. Remove trash and debris containers from site. a. Re -seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised April 7, 2014 DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP application 01 74 23 - 4 DAP CLEANING Page 4 of 4 CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised April 7, 2014 SECTION 0177 19 CLOSEOUT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY 017719-1 DAP CLOSEOUT REQUIREMENTS Page 1 of 3 A. Section Includes: 1. The procedure for closing out a contract B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Guarantees, Bonds and Affidavits 1. No application for final payment will be accepted until all guarantees, bonds, certificates, licenses and affidavits required for Work or equipment as specified are satisfactorily filed with the City. B. Release of Liens or Claims 1. No application for final payment will be accepted until satisfactory evidence of release of liens has been submitted to the City. 1.5 SUBMITTALS A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised April 7, 2014 017719-2 DAP CLOSEOUT REQUIREMENTS Page 2 of 3 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 CLOSEOUT PROCEDURE A. Prior to requesting Final Inspection, submit: 1. Project Record Documents in accordance with Section 0178 39 2. Operation and Maintenance Data, if required, in accordance with Section 0178 23 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 01 74 23. C. Final Inspection 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b. Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective or incomplete. 2. Upon receiving written notice from the City, immediately undertake the Work required to remedy deficiencies and complete the Work to the satisfaction of the City. 3. Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. 4. Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified spare parts b. Adequate oil and grease as required for the first lubrication of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses f. Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of all equipment D. Notice of Project Completion CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised April 7, 2014 017719-3 DAP CLOSEOUT REQUIREMENTS Page 3 of 3 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) £ Contractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP application CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised April 7, 2014 017823-1 DAP OPERATION AND MAINTENANCE DATA Page 1 of 5 SECTION 0178 23 OPERATION AND MAINTENANCE DATA PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Product data and related information appropriate for City's maintenance and operation of products furnished under Contract 2. Such products may include, but are not limited to: a. Traffic Controllers b. Irrigation Controllers (to be operated by the City) c. Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Schedule 1. Submit manuals in final form to the City within 30 calendar days of product shipment to the project site. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 0133 00. All submittals shall be approved by the City prior to delivery. 1.6 INFORMATIONAL SUBMITTALS A. Submittal Form 1. Prepare data in form of an instructional manual for use by City personnel. 2. Format a. Size: 8 1/2 inches x 11 inches b. Paper 1) 40 pound minimum, white, for typed pages 2) Holes reinforced with plastic, cloth or metal c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised April 7, 2014 01 78 23 - 2 DAP OPERATION AND MAINTENANCE DATA Page 2 of 5 d. Drawings 1) Provide reinforced punched binder tab, bind in with text 2) Reduce larger drawings and fold to size of text pages. e. Provide fly -leaf for each separate product, or each piece of operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. f. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subject matter covered in the manual 3. Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupings. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify each product by product name and other identifying symbols as set forth in Contract Documents. 2. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable information 3. Drawings a. Supplement product data with drawings as necessary to clearly illustrate: 1) Relations of component parts of equipment and systems 2) Control and flow diagrams b. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. c. Do not use Project Record Drawings as maintenance drawings. 4. Written text, as required to supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures. b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised April 7, 2014 01 78 23 - 3 DAP OPERATION AND MAINTENANCE DATA Page 3 of 5 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel giving: 1) Proper procedures in event of failure 2) Instances which might affect validity of warranties or bonds C. Manual for Materials and Finishes 1. Submit 5 copies of complete manual in final form. 2. Content, for architectural products, applied materials and finishes: a. Manufacturer's data, giving full information on products 1) Catalog number, size, composition 2) Color and texture designations 3) Information required for reordering special manufactured products b. Instructions for care and maintenance 1) Manufacturer's recommendation for types of cleaning agents and methods 2) Cautions against cleaning agents and methods which are detrimental to product 3) Recommended schedule for cleaning and maintenance 3. Content, for moisture protection and weather exposure products: a. Manufacturer's data, giving full information on products 1) Applicable standards 2) Chemical composition 3) Details of installation b. Instructions for inspection, maintenance and repair D. Manual for Equipment and Systems 1. Submit 5 copies of complete manual in final form. 2. Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts 1) Function, normal operating characteristics and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Operating procedures 1) Start-up, break-in, routine and normal operating instructions 2) Regulation, control, stopping, shut -down and emergency instructions 3) Summer and winter operating instructions 4) Special operating instructions c. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Alignment, adjusting and checking d. Servicing and lubrication schedule 1) List of lubricants required e. Manufacturer's printed operating and maintenance instructions f. Description of sequence of operation by control manufacturer 1) Predicted life of parts subject to wear 2) Items recommended to be stocked as spare parts g. As installed control diagrams by controls manufacturer h. Each contractor's coordination drawings 1) As installed color coded piping diagrams CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised April 7, 2014 01 78 23 - 4 DAP OPERATION AND MAINTENANCE DATA Page 4 of 5 i. Charts of valve tag numbers, with location and function of each valve j. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage k. Other data as required under pertinent Sections of Specifications 3. Content, for each electric and electronic system, as appropriate: a. Description of system and component parts 1) Function, normal operating characteristics, and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards 1) Electrical service 2) Controls 3) Communications c. As installed color coded wiring diagrams d. Operating procedures 1) Routine and normal operating instructions 2) Sequences required 3) Special operating instructions e. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking f. Manufacturer's printed operating and maintenance instructions g. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage h. Other data as required under pertinent Sections of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Provide operation and maintenance data by personnel with the following criteria: 1. Trained and experienced in maintenance and operation of described products 2. Skilled as technical writer to the extent required to communicate essential data 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised April 7, 2014 01 78 23 - 5 DAP OPERATION AND MAINTENANCE DATA Page 5 of 5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] DATE NAME 8/31/2012 D. Johnson 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE 1.5.A.1 — title of section removed Revised for DAP Application CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised April 7, 2014 017839-1 DAP PROJECT RECORD DOCUMENTS Page 1 of 4 SECTION 0178 39 PROJECT RECORD DOCUMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Work associated with the documenting the project and recording changes to project documents, including: a. Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to City's Project Representative. 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Accuracy of Records 1. Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. 2. Accuracy of records shall be such that future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised April 7, 2014 01 78 39 - 2 DAP PROJECT RECORD DOCUMENTS Page 2 of 4 3. To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 4. Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modification of the Work to proceed without lengthy and expensive site measurement, investigation and examination. 1.10 STORAGE AND HANDLING A. Storage and Handling Requirements 1. Maintain the job set of Record Documents completely protected from deterioration and from loss and damage until completion of the Work and transfer of all recorded data to the final Project Record Documents. 2. In the event of loss of recorded data, use means necessary to again secure the data to the City's approval. a. In such case, provide replacements to the standards originally required by the Contract Documents. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2- PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED] 2.2 RECORD DOCUMENTS A. Job set 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no charge to the Contractor, 1 complete set of all Documents comprising the Contract. B. Final Record Documents 1. At a time nearing the completion of the Work and prior to Final Inspection, provide the City 1 complete set of all Final Record Drawings in the Contract. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set 1. Immediately upon receipt of the job set, identify each of the Documents with the title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised April 7, 2014 017839-3 DAP PROJECT RECORD DOCUMENTS Page 3 of 4 2. Preservation a. Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. b. Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. c. Maintain the job set at the site of work. 3. Coordination with Construction Survey a. At a minimum clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4. Making entries on Drawings a. Record any deviations from Contract Documents. b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c. Date all entries. d. Call attention to the entry by a "cloud" drawn around the area or areas affected. e. In the event of overlapping changes, use different colors for the overlapping changes. Conversion of schematic layouts a. In some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b. Show on the job set of Record Drawings, by dimension accurate to within 1 inch, the centerline of each run of items. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in ceiling plenum", "exposed", and the like). 3) Make all identification sufficiently descriptive that it may be related reliably to the Specifications. c. The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. B. Final Project Record Documents Transfer of data to Drawings a. Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. b. Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. c. Call attention to each entry by drawing a "cloud" around the area or areas affected. CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised April 7, 2014 01 78 39 - 4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP Application CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project # 104995 Revised April 7, 2014 APPENDIX GR-01 60 00 Product Requirements CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project # 104995 Revised July 1, 2011 GR-01 60 00 Product Requirements THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH Tidal Wave Auto Spa STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project# 104995 Revised July 1, 2011 CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 IApprovall Spec No. IClasssification Manufacturer Model No. National Spec Size Water & Sewer - Manholes & Bases/Components 33-39-10 (Rev 2/3/16) I 07/23/97 33 05 13 Urethane Hydrophilic Waterstop Asahi Kogyo K.K. Adeka Ultra -Seal P-201 ASTM 132240/13412/13792 I 04/26/00 33 05 13 Offset Joint for 4' Diam. MH Hanson Concrete Products Drawing No. 35-0048-001 I 04/26/00 33 05 13 Profile Gasket for 4' Diam. MH. Press -Seal Gasket Corp. 250-4G Gasket ASTM C-443/C-361 SS MH I 1126199 33 05 13 HOPE Manhole Adjustment Rings Ladtech, Inc HDPE Adjustment Ring Traffic and Non -traffic area I 5/13105 33 05 13 Manhole External Wrap Canusa - CPS WrapidSeal Manhole Encapsulation System I Water & Sewer - Manholes & Bases/Fiberglass 33-39-13 (1/8/13) I I 1/26/99 33 39 13 Fiberglass Manhole Fluid Containment, Inc. Flowthe ASTM 3753 Non -traffic area I 08/30/06 I 33 39 13 Fiberglass Manhole L.F. Manufacturing Non -traffic area I Water & Sewer - Manholes & Bases/Frames & Covers/Rectangular 33-05-13 (Rev 2/3/16) I33 05 13 IManhole Frames and Covers I Westem Iron Works, Bass & Hays Foundry 1001 24"x40" WD Water & Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13 (Rev 2/3/16) " 3305 13 Manhole Frames and Covers Westem Iron Works, Bass & Hays Foundry 30024 24" Dia. * 3305 13 Manhole Frames and Covers McKinley It. Works Inc. A 24 AM 24" Dia. I 08/24/18 33 05 13 Manhole Frames and Covers Neenah Foundry R-1272 ASTM A48 & AASHTO M306 24" Dia. I 08/24/18 33 05 13 Manhole Frames and Covers Neenah Foundry NF 1274 ASTM A48 & AASHTO M306 30" Dia. I33 05 13 Manhole Frames and Covers Sigma Corporation MH-144N I33 05 13 Manhole Frames and Covers Sigma Corporation MH-143N I33 05 13 Manhole Frames and Covers Pont-A-Moreson GTS-STD 24" the. I33 05 13 Manhole Frames and Covers Neenah Casting 24" the. I 10/31/06 33 05 13 Manhole Frames and Covers (Hinged) Powerseal Hinged Ductile Iron Manhole ASTM A536 24" Dia. I 7/25/03 3305 13 Manhole Frames and Covers Saint-Gobain Pipelines (Pamrex/rexus) RE32-R8FS 30" Dia. I 01/31/06 3305 13 30" Dia. MH Ring and Cover East Jordan Iron Works V1432-2 and V1483 Designs AASFITO M306-04 30" Dia. I 11/02/10 3305 13 30" Dia. MH Ring and Cover Sigma Corporation MH165IFWN & MH16502 30" Dia I 07/19/1 t 3305 13 30" Dia. MH Ring and Cover Star Pipe Products NIH32FTWSS-DC 30" Dia I 08/10/11 3305 13 30" Dia. MH Ring and Cover Accucast 220700 Heavy Duty with Gasket Ring 30" Dia 30" ERGO XL Assembly 10/14/13 3305 13 30" Dia. MH Ring and Cover (Hinged & Lockable) East Jordan Iron Works with Cam Lock/MPIC/T-Gasket ASSFITO MI 05 & ASTM A536 30" Dia I 06/01/17 3405 13 30" Dia. MH Rine and Cover (Lockable) CI SIP Industries 2280 (32") ASTM A 48 30" Dia. CAP-ONE-30-FTW, Composite, w/ Lock 09/16/19 33 05 13 30" Dia. MH Ring and Cover Composite Access Products, L.P. w/o Hing 30" Dia. 10/07/21 34 O 13 30" Dia. MH Ring and Cover Trumbull Manufacturing 32"(30") Frame and Cover 30" Dia. Water & Sewer - Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight 33-05-13 (Rev 2/3/16) * 33 05 13 Manhole Frames and Covers Pont-A-Mousson Pamtight 24" Dia. * 33 05 13 Manhole Frames and Covers Neenah Casting 24" Dia. * 3305 13 Manhole Frames and Covers Western Iron Works,Bass & Hays Foundry 300-24P 24" Dia. * 3305 13 Manhole Frames and Covers McKinley Iron Works Inc. WPA24AM 24" Dia. 03/08/00 3305 13 Manhole Frames and Covers Accucast RC-2100 ASTM A 48 24" Dia. 04/20/01 3305 13 Manhole Frames and Covers (SIP)Serampore Industries Private Ltd. 300-24-23.75 Ring and Cover ASTM A 48 24" Dia. Water & Sewer - Manholes & Bases/Precast Concrete Tev 1/8/13) * 33 39 10 Manhole, Precast Concrete Hydro Condurt Corp SPL Item -1 ASTM C 478 48" * 33 39 10 Manhole, Precast Concrete Wall Concrete Pipe Co. Inc. ASTM C-443 48" 12/0S/23 33 39 10 IManhole, Precast Concrete The Tumer Company 72" I.D. Manhole w/ 32" Cone ASTM C 478 72" OS/08/18 33 39 10 Manhole, Precast Concrete The Turner Company 48", 60" I.D. Manhole w/ 32" Cone ASTM C 478 48", 60" I 10/27/06 33 39 10 Manhole, Precast Concrete Oldeastle Precast Inc. 48" I.D. Manhole w/ 24" Cone ASTM C 478 48" Diam w 24" Ring I I 06/09/10 33 39 10 Manhole, Precast (Reinforced Polymer)Concrete US Composite Pipe Reinforced Polymer Concrete ASTM C-76 48" to 72" I I 09/06/19 33 3920 Manhole, Precast Concrete Forterra Pipe and Precast 60" & 72" I.D. Manhole w/32" Cone ASTM C-76 60" & 72" I I 10/07/21 32 39 20 Manhole, Precast Concrete Forterra Pipe and Precast 48" I.D. Manhole w/32" Cone ASTM C-77 48" I I 10/07/21 33 3920 Manhole, Precast (Reinforced Polymer) Concrete Armon-k 48" & 60" I.D. Manhole w/32" Cone 48" & 60" I I 10/07/21 33 3920 Manhole, Precast (Hybrid) Polymer & PVC Predl Systems 48" & 60" I.D. Manhole w/32" Cone 48" & 60" Non Traffic Areas I ASTM C-478; ASTM C-923; -1/07/23 33 3920 Manhole, Precast Concrete AmeriTex Pipe and Products, LLC 48" & 60" I.D. Manhole w/32" Cone ASTM C-443 I 03/07/23 33 3920 Manhole, Precast (Reinforced Polymer) Concrete P3 Polymers, RockHardscp 48" & 60" I.D. Manhole w/32" Cone I I 04/28/07 Manhole, Precast (Reinforced Polymer) Concrete Amiteeh USA Meyer Polycrete Pipe I I I I Sewer -(WAC) Wastewater Access Chamber 33 39 40 I I Water & Sewer - Manholes & Bases/Rehab Svstems/Cementitious IE1-14 Manhole Rehab Systems Ouadex I 04/23/01 E1-14 Manhole Rehab Systems Standard Cement Materials, Inc. Relmer MSP E1-14 Manhole Rehab Systems AP/M Permaform I 4/20/01 E1-14 Manhole Rehab System Strong Company Strong Seal MS2A Rehab System I 5/12/03 E1-14 Manhole Rehab System (Liner) Triplex Lining System MH repair product to stop infiltration ASTM D5813 I08/30/06 I General Concrete Repair FlexKrete Technologies Vinyl Polyester Reparr Product Misc. Use I * From Original Standard Products List 1 FORT WORTH® CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST (Approval Spec No. IClasssification I Manufacturer Water & Sewer - Manholes & Bases/Rehab Svstems/NonCementitious 05/20/96 E1-14 Manhole Rehab Systems Spravrog, 12/14/01 Coating for Corrosion protection(Exterior) ERTECH 01/31/06 Coatings for Corrosion Protection Chesterton 8/28/2006 Coatings for Corrosion Protection Warren Environmental 33 01 16, 33 39 10, 03/19/18 33 39 20 Coating for Corrosion protection(Exterior) Sherwin Williams Water & Sewer - Manhole Inserts - Field Onerations Use Only (Rev 2/3/16) * 33 05 13 Manhole Insert Knutson Enterprises * 3305 13 Manhole Insert South Western Packaging * 33 05 13 Manhole Insert Nofiow-Inflow 09/23/96 3305 13 Manhole Insert Southwestem Packing & Seals, Inc. 09/23/96 3305 13 Manhole Insert Southwestern Packing & Seals, Inc. Water & Sewer - Pine Casine Spacers 33-05-24 (07/01/13) 11/04/02 Steel Band Casing Spacers Advanced Products and Systems, Inc. 02/02/93 Stainless Steel Casing Spacer Advanced Products and Systems, Inc. 04/22/87 Casing Spacers Cascade Waterworks Manufacturing 09/14/10 Stainless Steel Casing Spacer Pipeline Seal and Insulator 09/14/10 Coated Steel Casin Spacers Pipeline Seal and Insulator 05/10/11 Stainless Steel Casing Spacer Powerseal 03/19/18 Casing Spacers BWM 03/19/18 Casing Spacers BWM 03/29/22 3305 13 Casing Spacers CCI Pipeline Systems Water & Sewer - PiDes/Ductile Iron 33-11-10(1/8/13) Model No. National Spec Spray Wall Polyurethane Coating ASTM D639/D790 Series 20230 and 2100 (Asphatic Emulsion) Arc 791, S1BB, Sl, S2 Acid Resistance Test S-301 and M-301 RR&C Dampproofing Non-Fibered Spray Grade (Asphatic Emulsion) Made to Order - Plastic ASTM D 1248 Made to Order - Plastic ASTM D 1248 Made to Order - Plastic ASTM D 1248 Lifesaver - Stainless Steel TetherLok- Stainless Steel Carbon Steel Spacers, Model SI Stainless Steel Spacer, Model SSI Casing Spacers Stainless Steel Casing Spacer Coated Steel Casin Spacers 4810 Powerchock SS-12 Casing Spacer(Stainless Steel) FB-12 Casing Spacer (Coated Carbon Steel) for Non_rressme Pipe and Grouted Casing CSC12, CSS12 * 33 11 10 Ductile Iron Pipe Griffin Pipe Products, Co. Super Bell-Tite Ductile Iron Pressure Pipe, AW WA C150, C151 08/24/18 33 11 10 Ductile It. Pipe American Ductile Iron Pipe Co. American Futile Pipe (Bell Spigot) AW WA C150, C151 08/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co. American Flex Ring (Restrained Joint) AW WA C150, C151 * 33 11 10 Ductile Iron Pipe U.S. Pipe and Foundry Co. AW WA C150, C151 * 33 11 10 Ductile Iron Pipe McWane Cast Iron Pipe Co. AW WA C150, C151 Water & Sewer - Utility Line Marker (08/24/2018) Sewer - Coatin¢s/Enoxv 33-39-60 (01/08/13) 02/25/02 Epoxy Lining System Sauereisen, Inc SewerGard 21ORS LA County #210-1.33 12/14/01 Epoxy Lining System Enech Technical Coatings Ertech 2030 and 2100 Series 04/14/05 Interior Ductile Iron Pipe Coating Induron Protean 401 ASTM B-117 01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1BB, Sl, S2 Acid Resistance Test 8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer - Coatin¢s/Polvurethane Updated:12/29/2023 Size Structures Only Sewer Applications Sealer Applications For Exterior Coating of Concrete Structures Only For 24" dia. For 24" dia. For 24" dia. For 24" dia. For 24" dia Up to 48" Up to 48" Up to 48" 3" fl m 24" 4" thm 30" 4" thm 30" Ductile Iron Pipe Only Sewer Applications Sealer Applications Sewer - Combination Air Valves 05/25/18 33-31-70 Air Release Valve A.R.I. USA, Inc. D025LTP02(Composite Body) 2" Sewer - Pines/Concrete * E:- Conc. Pipe, Reinforced Wall Concrete Pipe Co. Inc. ASTM C 76 * E I-04 Conc. Pipe, Reinforced Hydro Conduit Corporation Class III T&G, SPL Item #77 ASTM C 76 * E I-04 Conc. Pipe, Reinforced Hanson Concrete Products - - - -, - ASTM C 76 * E I-04 Conc. Pipe, Reinforced Concrete Pipe & Products Co. Inc. ASTM C 76 Sewer - Pine Enlarement Svstem (Method)33-31-23 (01/18/13) PIM System PIM Corporation Polyethylene PIM CorP.. Piscata WaY, N.J. Approved Previously McConnell Systems McLat Construction Polyethylene Houston, Texas Approved Previously TRS Systems Trenchless Replacement System Polyethylene Calgary, Canada Approved Previously * From Original Standard Products List 2 FORT WORTH® CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 (Approval Spec No. )Classsification Manufacturer Model No. National Spec Size Sewer- PiDe/Fiber0ass Reinforced/33-31-13(1/8/13) 7/21/97 33 31 13 Cent. Cast Fiberglass (FRP) Hobas Pipe USA, Inc. Helios Pipe (Non -Pressure) ASTM D3262/D3754 03/22/10 33 31 13 Fiberglass Pipe (FRP) Ameron Bondstrand RPMP Pipe ASTM D3262/D3754 04/09/21 3331 13 Glass -Fiber Reinforced Polymer Pipe (FRP) Thompson Pipe Group Thompson Pipe (Flowtite) ASTM D3262/D3754 03/07/23 3331 13 Fiberglass Pipe (FRP) Future Pipe Industries Fiberstrong FRP ASTM D3262, ASTM D3681, ASTM D4161, AW WA M45 Sewer - PiDe/Polvmer PIDe 4/14/05 Polymer Modified Concrete Pioe Anech USA MPolwrete Pipe ASTM C33, A276, -17 8" to 102", Class V 06/09/10 EI-9 Reinforced Polvmer Concrete Pipe UmS Composite Pipe Reinforcedeyer Polymer Concrete Pioe ASTM C-76 Sewer - PiDes/HDPE 33-31-23(1/8/13) * High -density polyethylene pipe Phillips Driswpipe, Inc. Ovticore Ductile Polyethylene Pipe ASTM D 1248 8" * High -density polyethylene pipe Plexco Inc. ASTM D 1248 8" * High -density polyethylene pipe Polly Pipe, Inc. ASTMD 1248 8" High -density Polyethylene pipe CSR Hydro Conduit/Pioeline Systems McConnell Pipe Enlargement ASTM D 1248 Sewer - PiDes/PVC (Pressure Sewer) 33-11-12 (4/1/13) 12/02/11 33-11-13 DR -Id PVC Pressure Pipe Pipelife Jetstream PVC Pressure Pipe AW WA C900 4" thru 12" 10/22/14 33-11-12 DR-14 PVC Pressure Pipe Royal Building Products Royal Seal PVC Pressure Pipe AW WA C900 4" thru 12" Sewer - PiDes/PVC* 33-31-20 (7/1/13), * 33-31-20 PVC Sewer Pioe 1-M Manufacturing Co., Inc. (JM Eagle) SDR-26 (PS115) ASTM D 3034 4" - 15" 12/23/97* 33-31-20 PVC Sewer Pioe Diamond Plastics Corporation SDR-26 (PS115) ASTM D 3034 4" thin 15" * 33-31-20 PVC Sewer Pioe Lamson Vylm Pipe SDR-26 (PSI 15) ASTM D 3034 4" thm 15" 12/05/23 33-31-20 PVC Sewer Pie Vin (tech PVC Pie SDR-26 PS115 ASTM D3034 4" thm 15" 12/05/23 33-31-20 PVC Sewer Pie Vin ltech PVC Pie Grovi Sewer PS 115 ASTM F 679 18" * 33-31-20 PVC Sewer PiJje J-M Manufacmrinv�Co, Inc (JM Eagle) PS 115 ASTM F 679 18" - 28" 05/06/05 33-31-20 PVC Solid Wall Pipe Diamond Plashes Corporation PS 115 ASTM F-679 18" to 48" 04/27/06 33-31-20 PVC Sewer Fittings Harco SDR-26 (PS 115) Gasket Finings ASTM D-3034, D-1784, etc 4" - 15" * 33-31-20 PVC Sewer Fittings Plastic Trends, Ine.(Westlak) Gasketed PVC Sewer Main Fittings ASTM D 3034 1 3/19/2018 33 3120 PVC Sewer Pipe Pipelife Jet Stream SDR 26 (PS 115) ASTM F679 18"- 24" 1 3/19/2018 33 3120 PVC Sewer PTe Pipelife Jet Stream SDR 26 ASTM D3034 4"- 11" 1 3/29/2019 33 3120 Gasketed Fittings (PVC) GPK Products, Inc. SDR 26 ASTM D3034 4"- 15" 1 10/21/2020 33 3120 PVC Sewer Pipe NAPCO(Westlake) SDR 26 ASTM D3034 4" - 15" 1 10/22/2020 33 3120 PVC Sewer Pipe Sanderson Pipe Corp. SDR 26 ASTM D3034 4"- 15" 1 10/21/2020 333120 PVC Sewer Pipe NAPCO(Westlake) SDR 26 PS 115 ASTM F-679 18"-36" Sewer - PiDes/Rehab/CIPP 33-31-12 (01/18/131 * Cured in Place Pioe In in— Texark, Inc ASTM F 1216 05/03/99 Cured in Place Pioe National Envirotech Group National Liner, (SPL) Item #27 ASF-1216/D-5813 05/29/96 Cured in Place Pipe Remolds Inc/Inliner Technol" (Inliner USA) Inlmer Technology ASTM F 1216 Sewer - Piues/Rehab/Fold & Form * Fold and Form Pipe Cullum Pipe Systems, hic. 11/03/98 Fold and Form Pipe Insimform Technologies, Inc. Insituform "NuPine" ASTM F-1504 Fold and Form Pipe American Pipe & Plastics, Inc. Demo. Purpose Only 12/04/00 Fold and Form Pipe Ultralner Ultraliner PVC Alloy Pipelmer ASTM F-1504, 1871, 1867 06/09/03 Fold and Form Pipe Miller Pipeline Com. EX Method ASTM F-1504, F-1947 UP to 18" diameter Sewer - PiDeS/ODen PCoelle Laree Diameter 09/26/91 E100-2 PVC Sewer Pipe, Ribbed Lamson Vylon Pipe Carlon Vylon H.C. Closed Profile Pipe, ASTM F 679 18" to 48" 09/26/91 E100-2 PVC Sewer Pipe, Ribbed Extrusion Technologies, Inc. Ultra -Rib Open Profile Sewer Pipe ASTM F 679 18" to 48" E100-2 PVC Sewer Pipe, Ribbed Up -or ETI Company 11/10/10 (E100-2) Polypropylene (PP) Sewer Pipe, Double Wall Advanced Drainage Systems (ADS) SaniTite UP Double Wall (Corrugated) ASTM F 2736 24"-30" 11/10/10 (E100-2) Polypropylene (PP) Sewer Pipe, Triple Wall Advanced Drainage Systems (ADS) SaniTite HP Triple Wall Pipe ASTM F 2764 30" to 60" * From Original Standard Products List 3 CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 (Approval Spec No. IClasssification Manufacturer Model No. National Spec Size Water - Aoour-enances 33-12-10 (07/01/13) 01/18/18 33-12-10 Double Strap Saddle Romac 202NS Nylon Coated AWWA C800 1"-2" SVC, up to 24" Pipe 08/28/02 Double Strap Saddle Smith Blau 4317 Nylon Coated Double Strap Saddle 07/23/12 33-12-10 Double Strap Service Saddle Mueller Company DR2S Double (SS) Strap DI Saddle AWWA C800 1"-2" SVC, up to 24" Pipe 03/07/23 33-12-10 Double Strap Service Saddle Powerseal 3450AS, Incl. Corp. Stop, ON Strap, Stainless NSF ANSI 372 1"-2" SVC, up to 24" Pipe 10/27/87 Curb Stops -Ball Meter Valves McDonald 6100M,6100MT & 61 OMT 3/4" and 1" 10/27/87 Curb Stops -Ball Meter Valves McDonald 4603B, 4604B, 6100M, 6100TM and 6101M 1'/:" and 2" FB600-7NL, FB1600-7-NL, FV23-777-W-NL, 1/25/2018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. -2-7-L AWWA C800 2" FB600-6-NL, FB1600-6-NL, FV23-666-W- 1111018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. NL, L22-66NL AWWA C800 - ^' FB600-4-NL, FB1600-4-NL, B11-444-WR- 1111.1. 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. NL, B22444-WR-NL, L28-44NL AWWA C800 I " 13-25000N, B-24277N-3, B-20200N-3, H- AWWA C800, ANSF 61, 1/25/2018 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15000N, , H-1552N, H142276N ANSI/NSF 372 _ B-25000N, B-20200N-3, B-24277N-3,H- AWWA C800, ANSF 61, 1111.1. 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15000N, H-14276N, H-15525N ANSI/NSF 372 1-1/3" B-25000N, B-20200N-3,H-15000N, H- AWWA C800, ANSF 61, 1111.1. 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15530N ANSI/NSF 372 V 01/26/00 Coated Tapping Saddle with Double SS Straps 1CM Industries, Inc. #406 Double Band SS Saddle 1"-2" Taps on up to 12" 0/5/21/12 33-12-25 Tapping Sleeve (Coated Steel) 1CM Industries, Inc. 412 Tapping Sleeve ESS AWWA C-223 Up to 30" w/12" Out 03/29/22 33-12-25 Tapping Sleeve (Coated or Stainless Steel) 1CM Industries, Inc. 415 Tapping Sleeve AWWA C-223 Concrete Pipe Only 05/10/11 Tapping Sleeve (Stainless Steel) Powerseal 3490AS (Flange) & 3490MJ 4"-8" and 16" 02/29/12 33-12-25 Tapping Sleeve (Coated Steel) Romac FTS 420 AWWA C-223 up to 42" w/24" Out 02/29/12 33-12-25 Tapping Sleeve (Stainless Steel) Romac SST Stainless Steel AWWA C-223 Up to 24" w/12" Out 02/29/12 33-12-25 Tapping Sleeve (Stainless Steel) Romac SST III Stainless Steel AWWA C-223 Up to 30" w/12" Out 05/10/11 Joint Repair Clamp Powerseal 3232 Bell Joint Repair Clamp 4" to 30" Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW37C-12-1EPAF FTW Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW39C-12-1EPAF FTW 08/30/06 Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW65C-14-1EPAF FTW Class "A" Concrete Meter Box Bass & Hays CMB37-B12 1118 LID-9 Concrete Meter Box Bass & Hays CMB-18-Dual 1416 LID-9 Concrete Meter Box Bass & Hays CMB65-B65 1527 LID-9 Water - Bolts. Nuts. and Gaskets 33-11-05 (01/08/13). Water - Combination Air Release 33-31-70 (01/08/13) * E1-11 Air Release Valve GA Industries, Inc. Empire Air and Vacuum Valve, Model 935 ASTM A 126 Class B, ASTM A 1" & 2" * E1-11 [rarbombination inationAir Release Valve Multiplex Manufacturing Co. Crispin Air and Vacuum Valves, Model No. 11" 1" & 2" E1-11 ombination Air Release Valve Valve and Primer Corp. APCO 4143C, #145C and #147C 1", 2" & 3" Water - Dry Barrel Fire Hvdrants 33-1240 (01/15/14) 10/01/87 E-1-12 Dry Barrel Fire Hydrant American -Darling Valve Drawing Nos. 90-18608, 94-18560 AWWA C-502 03/31/88 E-1-12 Dry Barrel Fire Hydrant American Darling Valve Shop Drawing No. 94-18791 AWWA C-502 09/30/87 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Shop Drawing No. D-19895 AWWA C-502 01/12/93 E-1-12 Dry Barrel Fire Hydrant American AVK Company Model 2700 AWWA C-502 08/24/88 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Drawings D20435, D20436, B20506 AWWA C-502 E-1-12 Dry Barrel Fire Hydrant ITT Kennedy Valve Shop Drawing No. D-80783FW AWWA C-502 0.1.7 E-1-12 Dry Barrel Fire Hydrant M&H Valve Company Shop Drawing No. 13476 AWWA C-502 Shop Drawings No. 6461 l0/14/87 E-1-12 Dry Barrel Fire Hydrant Mueller Company A-423 Centurion AWWA C-502 Shop Drawing FH-12 01/15/88 E1-12 Dry Barrel Fire Hydrant Mueller Company A-423 Super Centurion 200 AWWA C-502 10/09/87 E-1-12 Dry Barrel Fire Hydrant U.S. Pipe & Foundry Shop Drawing No. 960250 AWWA C-502 09/16/87 E-1-12 Dry Barrel Fire Hydrant American Flow Control (AFC) Waterous Pacer WB67 AWWA C-502 08/12/16 33-12-40 Dry Barrel Fire Hydrant EJ (East Jordan Iron Works) WaterMaster 5CD250 Water - Meters 02/05/93 E101-5 Detector Check Meter Ames Company Model 1000 Detector Check Valve AW WA C550 4" - 10" 08/05/04 Magnetic Drive Vertical Turbine Hersey Magnetic Drive Vertical AWWA C701, Class 1 3/4" - 6" * From Original Standard Products List 4 CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 IApprovall Spec No. IClasssification Manufacturer Model No. National Spec Size Water - Pines/PVC (Pressure Water) 33-31-70 (01/08/13) AWWA C900, AW WA C605, 12/05/23 33-I1-12 PVC Pressure Pie Vin loch PVC Pipe DR14 ASTM D1784 V-16" AWWA C900, AWWA C605, 12/OS/23 33-11-12 PVC Pressure Pipe Vinyltech PVC Pipe DR18 ASTM D1784 16"-18" 3/19/2018 33 11 12 PVC Pressure Pipe Pipelife Jet Stream DR14 AWWA C900 4"-12" 1 3/19/2018 3311 12 PVC Pressure Pipe Pipelife Jet Stream DR18 AWWA C900 16"-24" 1 5/25/2018 33 11 12 PVC Pressure Pipe Diamond Plastics Comoration DR 14 AWWA C900 4"-12" 5/25/2018 33 11 12 PVC Pressure Pipe Diamond Plastics Corporation DR 18 AWWA C900 16"-24" AWWA C900-16 UL 1285 12/6/2018 3311 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/b/a JM Eagle DR 14 ANSI/NSF 61 4"-28" FM 1612 12/6/2018 33 11 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/b/a JM Eagle DR 18 " ° 16"-24" 9/6/2019 33 11 12 PVC Pressure Pipe Underground Solutions Inc. DR14 Fusible PVC AWWA C900 4" - 8" 9/6/2019 33 11 12 PVC Pressure Pipe NAPCO(Westlake) DR18 AWWA C900 16"-24" 9/6/2019 33 11 12 PVC Pressure Pipe NAPCO(Westlake) DR14 AWWA C900 4%12" 9/6/2019 33 11 12 PVC Pressure Pipe Sanderson Pipe Corp. DR14 AWWA C900 4%12" Water - PlDes/Valves & Fittings/Ductile Iron Fittings 33-11-11 (01/08/13) 07/23/92 EI-07 Ductile Iron Fittings Star Pipe Products, Inc. Mechanical Joint Fittings AW WA C153 & C110 * E1-07 Ductile Iron Fittings Griffin Pipe Products, Co. Mechanical Joint Fittin, @ AWWA C 110 * E1-07 Ductile Iron Fittings McWane/Tyler Pipe/ Union Utilities Division Mechanical Joint Finings, SSB lass 350 AWWA C 153, C 110, C III 08/11/98 E1-07 Ductile Iron Fittings Sigma, Co. Mechanical Joint Finings, SSB Class 351 AWWA C 153, C 110, C 112 02/26/14 E1-07 MJ Fittings Accucast Class 350 C-153 MJ Finings AWWA C153 4"-12" 05/14/98 E1-07 Ductile Iron Joint Restraints Ford Meter Box Co./Uni-Flange Uni-Flange Series 1400 AW WA C111/C153 4" to 36" 05/14/98 E1-24 PVC Joint Restraints Ford Meter Box Co./Um-Flange Uni-Flange Series 1500 Circle -Lock AW WA C111/C153 4" to 24" 11/09/04 E1-07 Ductile Iron Joint Restraints One Bolt, Inc. One Bolt Restrained Joint Fitting AWWA C111/C116/C153 4" to 12" 02/29/12 33-11-11 Ductile Iron Pipe Mechanical Joint Restraint EBAA Iron, Inc. Megalug Series 1100 (for DI Pipe) AWWA C111/C116/C153 4" to 42" 02/29/12 33-11-11 PVC Pipe Mechanical Joint Restraint EBAA Iron, Inc. Megalug Series 2000 (for PVC Pipe) AWWA C111/C116/C153 4" to 24" 08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLC4 - SLC10 AW WA C111/C153 4" to 10" 03/06/19 33-11-11 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLCS4 - SLCS12 AW WA C111/C153 4" to 12" 08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLCE AW WA C111/C153 12" to 24" 08/10/98 E1-07 MJ Fittings(DIP) Sigma, Co. Sigma One-Lok SLDE AWWA C153 4" - 24" 10/12/10 E1-24 Interim Restrained Joint Svstem S & B Techncial Products Bulldog System ( Diamond Lok 21 & JM ASTM F-1624 4" to 12" 08/16/06 E1-07 Mechanical Joint Fittings SIP Industries(Serampore) Mechanical Joint Fittings AWWA C153 4" to 24" 11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. PVC Stargnp Series 4000 ASTM A536 AW WA CI I I 11/07/16 33-11-I1 Mechanical Joint Retainer Glands Star Pipe Products, Inc. DIP Stargrip Series 3000 ASTM A536 AW WA CI I I EZ Grip Joint Restraint (EZD) Black For DIP 03/19/18 33-11-I1 Mechanical Joint Retaner Glands SIP Industries(Serampore) ASTM A536 AW WA CI I I 3"-48" EZ Grip Joint Restraint (EZD) Red for C900 03/19/18 33-11-I1 Mechanical Joint Retainer Glands SIP Industries(Serampore) DR14 PVC Pipe ASTM A536 AW WA CI I I 4"-12" EZ Grip Joint Restraint (EZD) Red for C900 03/19/18 33-11-I1 Mechanical Joint Retainer Glands SIP Industries(Serampore) DR18 PVC Pipe ASTM A536 AW WA CI I I 16"-24" Water - Pines/Valves & Fittings/Resilient Seated Gate Valve* 33-12-20 (05/13/15) Resilient Wedged Gate Valve w/no Gears American Flow Control Series 2500 Drawing # 94-20247 16" 12/13/02 Resilient Wedge Gate Valve American Flow Control Series 2530 and Series 2536 AWWA C515 30" and 36" 08/31/99 Resilient Wedge Gate Valve American Flow Control Series 2520 & 2524 (SD 94-20255) AWWA C515 20" and 24" 05/18/99 Resilient Wedge Gate Valve American Flow Control Series 2516 (SD 94-20247) AWWA C515 16" 10/24/00 E1-26 Resilient Wedge Gate Valve American Plow Control Series 2500 (Ductile Iron) AWWA C515 4" to 12" 08/05/04 Resilient Wedge Gate Valve American Flow Control 42" and 48" AFC 2500 AWWA C515 42" and 48" 05/23/91 E1-26 Resilient Wedge Gate Valve American AVK Company American AVK Resilient Seaded GV AWWA C509 4" to 12" 01/24/02 E1-26 Resilient Wedge Gate Valve American AVK Company 20" and smaller * E1-26 Resilient Seated Gate Valve Kennedy 4" - 12" * E1-26 Resilient Seated Gate Valve M&H 4" - 12" * E1-26 Resilient Seated Gate Valve Mueller Co. 4" - 12" 11/08/99 Resilient Wedge Gate Valve Mueller Co. Series A2361 (SD 6647) AWWA C515 16" 01/23/03 Resilient Wedge Gate Valve Mueller Co. Series A2360 for 18"-24" (SD 6709) AWWA C515 24" and smaller 05/13/05 Resilient Wedge Gate Valve Mueller Co. Mueller 30" & 36", C-515 AWWA C515 30" and 36" 01/31/06 Resilient Wedge Gate Valve Mueller Co. Mueller 42" & 48", C-515 AWWA C515 42" and 48" 01/28/88 E1-26 Resilient Wedge Gate Valve Clow Valve Co. AWWA C509 4" - 12" 10/04/94 Resilient Wedge Gate Valve Clow Valve Co. 16" RS GV (SD D-20995) AWWA C515 16" 11/08/99 EI-26 Resilient Wedge Gate Valve Clow Valve Co. Clow RW Valve (SD D-21652) AWWA C515 24" and smaller 11/29/04 Resilient Wedge Gate Valve Clow Valve Co. Clow 30" & 36" C-515 AWWA C515 30" and 36" (Note 3) 11/30/12 ReaihentW Gate Valve eGate Clow Valve Co. Clow Valve Model 2638 AWWA C515 24" to 48" ote 3) 05/08/91 E1-26 Resilient Seat Valve Stockham Valves & Finings AWWA C 509, ANSI 420 - stem, 4" - * E1-26 Resilient Seated Gate Valve U.S. Pipe and Foundry Co. Met,,, a1250, requirements SPL #74 3" to 16" 10/26/16 33-12-20 Resilient Seated Gate Valve EJ (East Jordan Iron Works) IIIFlowMester Gate Valve & Boxes 08/24/18 Mateo Gate Valve Matco-Norca 225 MR AWWA/ANSI C115/An21.15 4" to 16" * From Original Standard Products List 5 FORT WORTH® CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 12/29/2023 (Approval Spec No. [Classsification Manufacturer Water - PiDes alves & Fittings/Rubber Seated Batter Valve 33-12-21 (07/10/14) Model No. National Spec Size * y E1-30 Rubber Seated Butterfly Valve Hei ry Pratt Co. AW WA C-504 24" * E1-30 Rubber Seated Butterfly Valve Mueller Co. AW WA C-504 24"and smaller 1/11/99 E1-30 Rubber Seated Butterfly Valve Dezurik Valves Co. AW WA C-504 24" and larger 06/12/03 E1-30 Valmatic American Butterfly Valve Valmanc Valve and Manufacturing Com. Valmatic American Butterfly Valve. AW WA C-504 Up to 84" diameter 04/06/07 E1-30 Rubber Seated Butterfly Valve M&H Valve M&H Style 4500 & 1450 AW WA C-504 24" to 48" 03/19/18 33 1221 Rubber Seated Butterfly Valve G. A. Industries (Golden Anderson) AW WA C504 Butterfly Valve AW WA C-504 30"-54" Water - Polvethvlene Encasement 33-11-10 (01/08/13) 05/12/05 E1-13 Polyethylene Encasment Fl—ol Packaging Fulton Entemrises AW WA C105 8 mil LLD 05/12/05 E1-13 Polyethylene Encasment Mountain States Plastics (MSP) and AEP Ind. Standard Hardware AW WA C105 8 mil LLD 05/12/05 E1-13 Polyethylene Encasment AEP Industries Bullstrong by Cowtown Bolt & Gasket AW WA C105 8 mil LLD 09/06/19 33-11-11 Polyethylene Encasment Northtown Products Inc. PE Encasement for DIP AW WA C105 8 mil LLD Water - SamDlinE Station 03/07/23 33 12 50 l Water Sampling Station Eclipse Number 88 , 12-inch Depth of Bury As shown in spec. 33 12 50 Water - Automatic Flusher HG6-A-IN-2-BRN-LPRR(Portable) 1.110 Automated Flushing System Mueller Hydroguard HG2-A-IN--2-PVC-018-LPLG(Perinanent) 04/09/21 Automated Flushing System Kupferle Foundry Company Eclipse #9800we 04/09/21 Automated Flushing System Kupferle Foundry Company Eclipse #9700 (Portable) The Fort Worth Water Department's Standard Products List has been developed to minimize the submittal review of products which meet the Fort Worth Water Department's Standard Specifications during utility construction projects. When Technical Specifications for specific products, are included as part of the Construction Contract Documents, the regmrements of the Technical Specification w 11 override the Fort Worth Water Department's Standard Specifications and the Fort Worth Water Department's Standard Products List and approval of the specific products will be based on the requirements of the Technical Specification whether or not the specific product meets the Fort Worth Water Department's Standard Specifications or is on the Fort Worth Water Yellow Highlight indicates recent changes * From Original Standard Products List FORT ORTH__ CITY OF PORT" WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT —" STANDARD PRODUCTS UST AS OF 05/1612024 417/2013 0330 Od mix Daiyy L —C—m &AkW,x .k%e I IDLCJS50W 3,bUO* C' ctc fur Driscd ShaftLightuV and Txuffic Shawau Fdxuuus 919,2022 03 N 00 Mix Dau(,m Ifi4,s C do & A,; eF4tea f 61PS5EM 4500 p i Cenxete Mix hx Hmld Placed PasnnC 9/912022 033000 Mix Ply 11 114c,m-SOR.Inc. 51771000(.a Cunc,ne Mix fu Sidc—U 91Y,20?2 033000 Mix De gn If Wom-SOR, Inc 126130UU psi Con—Miz Our Sid-1ks 9/9;3022 43000 Mi. D.iAu 119[w -SDR, be. 211545UO N Cpmrtc li RES Paviuys 914,2022 0331100 Mix Di.,H,geim-SOR. Ine. 1701400(It4 Qmarle Nf fix 4Uxnl Drain itructura. tiwliury Sewer Mmlhola, 7unctiml B.0 99,21122 0330 UU Mix Deign Doleim-SUR, Inc 54094000 psi Cnaae Mix fix Sidessalke, Inleu Y,9,2022 03 30 UO Mix Daip Held. -SUR Inc- 53U7 4500 Psi C-.—,Mix fur HandPixccd Paving 11_!15.0>?. 330W —D-vu Bnlclm-SO$lin. 37411O0;eacaa rc Ji f1maNcfdl,T.SLM 19;v,2022 11430 W Mix Daiym K'feirn-SOR buc SO I? NO 1. Cmsxele Our Base M—ill fix Ir 111 Itel-T 19:9,2022 U33UW Mix r)-v ilaid. -SUR. Inc. 90W 3000 piConcrac fur Drill 6b t6ilielr[ing and Truffic Signal Foundations 1Y:9;20L' 033000 Mir Dcsign Hulam-SOR Inc 18514500 psi C.—cf. Stur.Di. Staid—, Hand Placid Paving 112/5/2022 43000 Mix 1I ign Hutch. -SOR, htc. 18113RIO I..iC..nrne fmDilled StuftLighduga,d Traffic Siy,al Fwnd:tians 14,2/2024 3 30 W Mix Deaign Kkirn-S(Nt, 1­ 544031i01fwr C.— fix Machine Placement 119'1U22 033000 Mix D"i". ILddm-SOR, Inc. 19594W0 psi Concrac fur l7„II y1 Sh4f47.igh[ing and M u ie S,xnuf Fuund.W., 14,2,2024 033000 Mu Dargu Hula.-SOR, Inc 5MO-140Wpsi C'.oauvtcf ILmd PI—licuf 19A20?2 III Ili W Mix Derign 114ci.-SOR, L,e. 1551 IWO Ti C.ic,.c Mix fix Bhxwlg 14;7.0?S 0131100 Mix Zign Liquid Shore C101D 3oe .91101wi Cerelu fix Sidewalks, 4Mxwchee,.md Dri, a ways. 14,1712023 033UW Mix Dip l!quid 9twC C361 DNFK 3,600 psi Cuncrtofix' Rccuningvndl, dr'rcu:y,junction bulnp, ,aiii—h 1,4,711023 033UW Mix Dceien Ljquid St-, C361DHR MOO Pei Cwctm Aw DrAcd Sueft/ighriug and Tcadic Siguul FwudaLi 1124;2023 033000 Mix Deeign Liquid Stine C451DHR-A45U(4,.A Cnmrue 4x HES Paving 4192U221 (1.13090 Mix Dexifin Malin Mwixlu R2132214 3,000 rAi Clmcrete fir Sid-1kk & Ram,. 9/9/2U23 03 30 00 Mix Dcsign Mahn Mu'ia' D949OSC 3,000 mi Co.aae Sir Sid—dic & ILuttpx 9/9.0.x.1 033000 Mix Dce*rs Martin Mnrinta R2131143,000 ui L'w,ccct: I Sid Z'&Ranux 9N.032 U33UW Mix Dexrti Martin Marieua R2I313143,WOtmi C7."c fix Sidewalkx&Rannx 9/92U22 03 3U W Mix Dexign K/wtin Ma, iel' R2136Ut4 3,WU psi Cstaue C. Sidewalks & R.-, 9/9/2U22 03 30 U0 Mix Mile. MaltinMwSetta R2136214 3.0011 .1 Cmuac fie'Si,i calks & Rama 979/2022 0330 OU Mix D.iW, M;uuu Mu9ctra Rl14i1144.000 tni C,au—fa Sid-11.&Ral- 9/9/2022 013f1 UO Mi: D r Mann Marielu It2141024 4.UW psi C.maetc f &d—atU & H.- YMRII22 0339 OU Mix Design IMwtin Mwisitn R21302243,60(J mi Cu.ercUO, Curb b,leu 919,2021 03 30 OU Mix Dcsigu Madut Ma'istn 92141233 3,600pi Ccmernte fte Strom S--., Ild., Blacking & Euuu.uuw 919,2012 033000 Mix 11ailp, M.Un M:uincta IFL(nY35A 501u Conereef.FI-aWe FiILCLSM 9,9: 21122 07 3f10U Mix Dai!tn Mani. Maims R21421i3 3.61 nni frmerele fir Klmh.ln, MIeLs &Headwall,. 9:9,2022 03 3000 Mix Dnign Mwtin man9 a IR2 L46333 UUO mi C—de fb, Manhole, Inlm & Ilcedw 11 , Cun h. f cerement 9N:2022 033000 Mir D,aiw Mutiumanenta RI-141230/,W0psi L'wceacf Ma.uulcs, fact rs &t3eadwull4, V.,c Pads 9:9r2121 033W Mix Dniw Martin Mar'ic u R2t 46033 4.000 -.a C ,crete fixMenhrdns, Jill- & Hcai[—Ils, Valve Pade 9,9,2(122 0.13000 Mix Dnign Martin Mminla 12214Cs3354.50(1 psi Csmuele Ii r Hand Placed P—g, Wel,, S-1(rain Shmelures 112/20_'2 321313 Mix(kaign M..Ii. Mariatn Q2141N274,UWpei Cu fi.fu'Kfa fiinc Plxccd pushy 1112/2022 321311 Mn Dn,gu Nit. Q214LK304,000po I.— fie Muchul. PLccd Pniug 11/2/2022 321311 Mix Design Main' it 46N364.i1NpeiClaetef,r Hand PMaced Paving If/IS2Mk022 331313 Mflaign IManin RM,lin Marie' R21461C304,500 psi Cunaetr fro lfund Placed Paving f 11152022 341313 Mix Dcwgu IMtutin M:uiar4 R2146P364's00 psi C—Acfu' tLxnd Placed Paving 11/122022 321313 Mix Desitm Ma .Marino R2146K364,500po Cmcrete fix Hand Placed Paving 11ltJ2022 3213 13 Mix Design Martin Mari n' 112,46N35, 5.11 —kni 4,500 is,i —.11e fix Hand Place Paling, WIL:, Mwdtnles, Headwall„ 11122022 32 1313 Mix Design Mwtin M.= R2146K344,000 psi Curcrctc fro Inlccu Manhvin, I Indwells 1112:20_22 321313 Mix Dcsign Mwtiamericlfa �R2141N244,1100 psi Cmrnctc far Sid —A utd R.A. I I112,20^_2 321313 Mix Design Matti. Mwiena IR214IK244,000 psi C.—c fix lui fiat B-la, Sideaefk end Ranps jq/q/2O22 03 30 W Mix Design Marlin MaiaLr R2 WO38 4,5U0 f i Cxlcrcte fix Iftlux, harm Drain Shuctorea 19/9121/122 U3 3000 Mix Deign Martin Mwicna R7146IJ30 4,50 pi Cuncntc fp II.d Piucxd Poring, WA 19/tl/1022 U33000 ix MDcsign Marna Marietta R2I46M24,5U0 pi Cmcnfc fa Hand Puccd Pei.g 19/9.4-2 033000 Mix DeeiOn Marlin Mariettr R21462424SCOM!C',m=tef,x HC,d Pl vd Tieing 19/9/2g22 113000 Miz ISesien Mani. Mali— R21462364,500 rs,i C­ f Hwrd Placed Pain_- 19N/2U22 III 30 W Miz Dcaien Muni. Mxrinta DY493SC4,500 psi Cercra,f ilu,N Planul Paving 19N12022 033000 Mixee Dm. nrun MM.'ictu R21471414,500 cei C.— to, Hord l4accd Paviuft 12 13 20 mi. Darp, Mann Maielta R2136N 1415.00 sacks 13010 micro—f.r S,dmA6 j4/1/2023 411/2023 (1.3 31100 Mix D* Martin M.,im IR2146P33 f 6.01 --k., 4.000 psi cwuan (br Rridge Dal: 4/1,2013 033000 Min Dcup M.utiu Mnicttn R21469334,000Pei C—ete furR pnfl 1417:2023 311320 Mix Dwxu Mahn Maaet' 1 3M 4 3.00 .umxte fir nwa and rnmus 14i7;2013 321313 MixDaiw, Marlin Marietta ILtmK71)6,OvOtwi(3.000nsi"24hrx.)f.HFSft,m 14,1.2U23 0331300 Mix Du n Martin Mwiata IP-1 3101AP 3.09ci C—ete fu Rnainine Wall, 15.212023 32 13 13 Mix Dcs,gn Mwfin Mm'icv. R21461(3',,o.laeck /4,5OU psi C­.Ox H-d?heed P.1iug 11,1,2023 1133000 Mix Deign M.&,lMariatu R21410304.00miConcrcictbrRiP,ap FORT WORTH. C11 V OF FORT WORTH TTLANSPORTATIOIVPUBLIC WORKS DEP.ARINIENT —"'�.,✓ STANDARD PRODUCTS LIST AS OF 0511612024 1 C..dvte(C..linpndl 1919/202.2 03 30 00 M. Daigu C pLeri rac L,mpwy 30FIA25➢ 3000 pu C'eumnc Yur RoRyp I 19/9/2022 033000 Mix Deign C�Cnncrde Gmqury 30HA2OD 3000 MiGmera(e Mix fix$hrckintIy Sidewalk,, Flalwr,k Pads 19N12022 033000 Mix n-A,, Gly Gme, de C<rmrwrly 45NG251I1(AO pci Camerde Mix lbr Daillehulu. LJAhlinA anS"I'ra(lic Signul t.,unda,iunx d$ �YN,2U22 033000 Mi.D-v Cip Cancrru Cvmpry 5UOG25113WUpabluny Displwcd DriRal Shun IYN,2022 0330ad Mix Daw U(y-t Ziete L:ummmy 45NA-0114500 Mi C—M<fr}G,ad I'l- lhvinyy I0N,2022 033000 Mi, D.jpi Lily Cnnane C,m,,xm, 36TA2U1131,00 psi C.—Mi. r1Machine l'lacedl` mi, _ 199:2022 O33000 Mix n.Fi CA, Cu.—I Cum wnv 36JAOOIJ 3wu, cncrcic nlix fur Muchine Pl—I Paing 19,9,2022 033000 Mix DIW Gp'Cmacm Cumpmy 401-AIU114000WC,maac Mix fa Stmm Dann Suucw-cz I H'l6/1022 033000 Mix D-u' City C--C—f-'r CJ_VG'5➢3600 piC —te fm'Drilled ShAlligliliuand d Tnffic Signal Fumtdariwr 15,5:2023 013000 Mix Dxibr (Sty Cvaaete c'e— CCt.'A250AG 3600 M, C aete fir Drilled ShaOsLightingwrd 1,effic Siymal hamdsam. 15.5.2J23 U33U DU Mix Deign Ci'Concrete'--" CSSQA25UAG7.bOU pi Cunaxic fin Slurry Displueemcnr Slm6s, Undawmw Shoff, 19:9,2021 03 30 W NIA Deign Cam T-14di Mix 2503000 p6 C'uaaxv: Mix far Sirlewall , Driwways, ADA R-4- 19N,202^_ 113 so W Miv Dy ige Cow' Town Redi Mix 350 3000P. Cnrcrem Mix fvr Sidewalks, Orivew m, ADA Rmnp 19,9,2U22 (13.3413 Mix Dexign Crr Town Redi Mix 970 Mi t lvwahle Fill-(:L4M 19;9,1U22 131411 MixDra,gn Cow Tuwn Redi Mix 95d7UpiFluwgbleFill-CISM I 19,9, 01.1 03 74 17 Mix D:- I— Tvw. RMi Mix 220.E 50 Mi C'cuadcMiz fbr Flvwahlc Fill - CLSM 19,9r26J2 03 34 13 Mix D-W C- Tcwn Redi Mix 32f14150pi Grande Mixiix F11—ble Fill-LLSM 19,92(122 (13 3' W �,Jix D-v Gnv'1'nwn Itedi Mix 21f14f 750 Mi C.merete Rase Material liv french Rel— Iy,9/2U22 033000 Mix Dcvign C—Tuwn Redi M,x 133 .69750 psi Cmc, xt Ru, Mwc,,al fur Trench Repair 19;9/_'023 033000 Mix Dexigu '—T—ri Redi Moe 1353 3ON pei C-1. Mix fr Sidcwatla, ADA R-pe, Driveway,, C'.urb t Gutter, S:ttay Ed T,e ,—., Nuo-TxDOT Retaining a`nits I 1919/2022 U33UW Mix Deign Cr,--Town Redi Mix 1253YV 30 priCone—Mix Sid—W,.1DA Rmigm, Dritewa):; Cmh 6dter,S,ifely End Treatmml.. N,xi-T.DOT Ita:uning WxlLv 19A/2U22 (11lUW Mix Dexig. Cam�'1',mn Redi Mix 120141100poiC.—d.Mix Six Hrdge SIA-, Hvx Culvenx, Ile,dw:J6 1 19N11UL' U3 3U W Mix Deign Cow Tmrn Redi Min 260.1 36N psi Gmerac Mix 1'a heed-U, I 19N/IU22 03 3000 0 W Mix3hei Lvw Town R:di Mix 2tiUd 36W pi Curers, ALx fa Bta Lldvu'ts. HwdwWly 1 YM12022 033UW Mix Dezicn Cow Tomm Redi Mix 36M 40(Nl pci �'nleTete Mix fix Bridge Slalom. Box Culveu, Headw:dla I 9/972U22 07 30 W Mix Dcsian Cow Tux. Rrnli Mix 36tl-1 3600 pi C..cr do M,x 1'w Rex Culvdts, Ilcudwidl,, Winxwalis 9)9/2U2Z 033000 Mix Dczixn CmvT--,&Mix 264-N 45UO Pei C-1. Mix fr Hand Pl..d Puving I 99/1022 033000 Mix D.V Cow Tmnl Red, Mix 366450 psi Concrete Mix forHand Placed Paving I 910/2022 11110 UO Mix Dor Cow Twn Redi Mix 2(, 45011 Mi Cmaan ele Mix lix Hand 11—d Paving I Y/Y12022 03 70 OU Mix D.w Cow Tuwn Redi Mix 365 4590 pi C—ac Mix fur I lard PI—d Paring 1 9/9:2022 03 30 00 Mix DaaiRp Cow Towu Redi Mix 370-NC 4500 Mi Cwerac tie' HCS Paving 9N2022 03 30 00 Mix Drai.I Cow Term Redl Mix 370-INC 5000 pi C.", fur HES Paving 9;9,2022 03 30 00 Mix Dx�i Cow Town Redi Mix 175-NC 50Wy� i C...Ii r HES Paving 9,9,2022 U3 30 UU Mix 0es,gn Cow T.-Redi Mix 2674200 psi Qunerete Mix tin' M:mhvicv xnd Dr;dn'�gc Strueew,s YN2022 03 3000 Mix Duigai C-7uwu Rcdi Mix 270 i000 P,I Cwaev Ma fvr Uu, lace B,a LSilvvts 9,9,2022 i133(1W Mix Dni.4, Caw Town Redi Mix 37U SOW po Corcrete Mix fx Ca.4in-Place Bra L\llvert. 9e412622 III 10 OU Mix Dx.n C.-Town It di Mix 255-2 IWO psi C--I, Mix for lnl.k 11,nei Flnckieg C—et, Fore ., 9;Y,2021 03 JU OU Mix r-, Cur Tuwn Redi Mix 1573600 Mi Conroemh fur V.11ey Gatiery ti/7420222 321313 Mix D-s C-Towu Redi Mix 337-M 3600 pi(.oucroe V.- fa M.Lhinc pe PLd P.1a.g 9 9;1f)22 3313 13 Mix Design C.To—Redi Mix 257-M 360U i®i Cmlaete Miz I,x Machine Plced Paving 9,92022 14 11 It Mix Deai�n Cuw Tuwn Itedi M,x 260-M 4floo p, Cvnadc M,x for Machine Placed Paving 9,9:2022 35 13 17 Mix Dewgn Gov Tema Redi Mix 360-M 4000 p:i C--.Mix f, Mldline Ph — Paving %9.^_02^_ 03 30 W Mix D" ig i C..m' Town Redi Mix 255IS 3OW Mi C uocrwe Mix fa GI1t & Gurra• 9,921,12 0330W mix D-v Ccrw'1'1— Redi Mix 355-IJ' 30OUMi C,made .Mix fur CuAo& C tta Y:9/2U22 03 3000 Mix Dx'ign Cox Tuwn Redi M,x 255 3500 pi C—et, Mix fix Flatµurk, W i,• Th— Blu,king C—de F. -c , Y,9/SU22 033000 Mix Deziga Cow Tuivn Redi Mix 3553000 poi C.",Mixfurlulaa, ThnW ➢Ivckinw„mrtat g, C--e Ent 9N/202^_ 033000 Mix Design C— T... Redi MI. 365 SIX 4W0 Mi C—tn for Bridge elate,top sla0sof di— tic,vlvetif, aN.oad, xfit.-TXD0T CL, S.N. Fly Aeh 9N/21122 03 30 OU Mix DexiV C,nx'1'awn Redi Mix 157 3600 psi C iade Mix rw Valley C — 311/2U24 U33UW Mix Deign C.I. ROi M,x 360.217836Wpvi Cunade Mix f TXDUT' CIaa, C Milled Shad, 6/11,2023 U3 30 W M. MDcz,g. Cam 17—Rtdi Ma 360ZS 3600 psi C-1W f Drglal Sha#A-otA wanvm d Taaf4c Signal Fdetim I /1 R20.13 U3 30 OU Nix Dewg, C—Tmrn Redi Mix 38ONC 4500 pi G—a , fi. RES Paring 1/29,2024 34 11 11 Mix Dexign E—v Ready Mix 4575AESC, 7.50 SacW `4500 Mi 13,000 psi ,f},7.6yi Cmade Six HES 91,ing i/29, 2ON U33000 Mix Dcvign rg.di Ready Mix R305UVCWR SWSncks`},UW piCwcrctw t'w Sid,wnik§Ramp,lnlav, ;met Mnnhulca 1/29:2024 033000 Mix Aetgn F rrad.Rmdy Mix R3655AEW'R'5.50Sapb,3,WOpi C'uuatxef IWdwalls, Wing cells, and CtllvuL 1/293@4 033009 Mix D...igil Emnda Ready Mix R4U60AEWRI6.W Sack.: 4,Wi1 pi C,max,e fx Bridge SlWr Tip SIWs„md.Apm—I, Slats 2/61207 121.111 mix Deign Fslada Ready Mix TD1h5.iAliWR 15.50Suk,/3.604 pi C-,.,,e fu Meehine Placed Paving 1129`U14 321313 MlxDaign Emndn Rewly Min R4s60AHWRJb.00Sxxis/4,5WpiCmudcf.ILmd Placed P:twng 2/21 Z024 031000 Mix Drsi;" Estra& R adyMix R36575AEWR / 5.76 Sackd / 3,690 ri Gmurlc fm-Drdled Shag .s,I P aig mciTra4ic Sigudl Fwadxd,- 9N,2022 113 3000 Mix Dxio, GCH r mrrde Serviea CICH40,A/4000 psi Cn[crele fx for Sidewalk.. Uwn He —11, h, eL mW Si— IA-ain SW.—. 99:2922 U3 30 Oil Mix II.Ir GO ca—le 6avica GCI IV54UW pi C-- lin Machin, Plu,_cd Paving 992022 03 30 UU Mix De�p GCH Cmaac Saviecs JUCH45OU 4x0J L--1m HlmdPheedPuv 9,9,102? 0330W Mir Design htglmn Concrete&Agynepi,, IC47PV5E53UU4 Psi C—ettiw' SidnxalW,AhAR.w 9,92022 U33000 Mix Ox Mjmim C,made&Aggregatex 12MWR-70J235043U(10 psi C Le lx Sidex-aiW,l tangy 9,9:2U22 O3 JIJW Mix Dxtn 1--Cunwac&.jgRrckwtcx 12MWR-147UW5D53000 imi Conn ote M i x Yur S, d,.',taika, hD l Romp 1'920L' U33UW 111U, wgu fyr iCuucren &,[ggregitez 12MWR-056PS5D54UW psi Cexiente Maelline Places Pavirul 9:9,2023 i1330110 A1ix Deign InRrant Carcrett&Alv3eg-e I_ WR-I fi IUV5DM 45W pi Con,:,te fur R dl'lazed i'mang 9, e'2022 01 .10 W Mix DexiAn In>rzam C-ade & Afetrega,ex 12M W R-1 UMQ550N 4500 Mi Cmicrele fm Hand Placed Paving 9:9,2U22 23UW Mix Daurn 1n��SS,:kn, C"—, &A".eg:nux 161 PJ5 rM 4500 psi C--c I find Pl:teczl P1,4ng f IC47PV51'5300Psi 9;92022 03 10 00 mi, Deign, Cc—tie &Aggregates Cmaete M ix r,x Side-A,ADA OueN FoRTWORTH CITY OF FORT%NORYH TRkNSPORT.4TIONIPUBLIC WORKS DEC4111 MENT STANDARD PRODUCTS LISP AS OF O5/162024 15/3/2023 033004 Mix Osw M.•,.,,, M.—M78423444,000 ou C'anute fia Bndgc Dctk 1n/If2023 321320 Mi.Duulsp MannM.i3O A2136R203.000 siC—p-fxSidewalkaandlt-n dill/2021 121320 Mix De,Fn M,.nin Marietta R211GN20 i,(It10 r,a, C--&. Sidewalluand hump. 1G27'2023 033UW Mix D.r Martin Mai— U2M6N41IGA4d1&i, 3,WOMi C'unactcfw Drilled Shafts Iightingi-ITdr., Sig-1 ruund.iars 16/27'2023 03 30 UO Mix Dagu M,n Mwinr4 U2146K45 / 6.65 sacra / 3,600 Pai Cuu— far Drilled Sh f, / L%Uriug and Testis Sieusl Fawdatiuuc ISi4,2023 W30 OU Mix De..�p. Mann Mantua U'_I46R41/6.44m,ka, 4,5UONi L'.a..a, fiv UrillN Pie IbLht Pole tress.. 182023 U3 30 U0 Mix D.i r Marlin M-1. R2136R 1415.00 vu:kc, 3,5U0 p4 C.— lur Sidewalk. and 11— IS:4,2023 32132U Diiz Drt.gµ Maeda Mariam R2141R24/5.5J/4.WUp.iCmaate for Juacum But, Duz CWvn, Sidewall and Rwnw 11,1 ,2O23 1311W Mix D, iigu M:usWl m-.0 R2146R35 / 6.1 t (4,500 psi L'aec[ea f Iwa:, MassLWes, :wd tiradsrzlle 184,202J 331313 MixDesip, MartinMacidw R2M(R36,6.17,4,5WP,draa.nlef H.rdl'laanllaving 18,3012023 U3 30 00 Mia Design Matin md.iara R21411130,5.85 SK 14,r790 Par C--fur Re. CWverts&Ilwda-all. 18: 4,2U23 321313 Mel Deign Marti. Muxiala Q2141R27,5.69-1.r4,000 psi L'uncmcFur Mactiuc Placed Paving 111/20'2023 03 11 UO Mks 11,igu Martin M;mepa R2146R33 , 6.01 Sacks 14,000 psi Caacmte Mx fa LIP.ewer M.Ihola, �11'212111 fIJ 3000 hit, Design Marlin Marimw R2146K33'6.01 eaek.:4,0utl p.i rancrcet Mix l;n ClP Sewa Manholes. 32QU Mix Deign Matm Ma,idra IR2146R44. 6.69840,. 4,500 mi Concrete M,x faHand Placed Paring 412222023 2f22'2023321313 MaDcwgn MdiuMuraa R2146K44 1 6.60 Sam 14,500 P. CP.uvtc Mix f Hand Pl-W P.—g 9,9.2022 3, 1320 Mix Uraign NCa Redi Mi. NCS5020A 3U00 psi L'.aaa ae Mix fin Coen&Gaper, ➢riveway.,SWearalkn 13,420I2 (13 30 00 Mix ❑exign NHR Ready Mix TXr-YY3000psiConaettMi. tarCud.1.1- 11,92023 03 30 W Mix Desrgn NRR Ready Mix TX CNY 30M Psi CPnwtc Mix fu, CwL Wn 9;12,2023 033UW Mix lkeim NBR Rudy Mix CLS PI YYlG.W SaJn /4,0W psi C.wadcf CWlars, MaMules,Bus Cvlx.sts 1014,2028 U3 30 00 Mi. Denign NBit Reedy Miz CLS A-YY 15.UU Sacks, l,WU Ti C.m— A. Sidewalks Ranqu,.urd Cufi & Gulkr 10,4,2021 0131100 Mix Design NHR heady Mix CIS A -NY' 5.110 S=k, 110011 pu C.mnae Gn Sidew:dk,:$ Ramlu, and Cu.U& Gutl 10,4 2023 3213 13 Mix DeIig. NDR Ready Mix TX C &F-YY , S.SU Sadu / 3,6UOpai C-11 fw Machine Placal Paving 1042023 321313 Msx D- NBR Ready Mix 7XL SF-NY5.50 Sala/3.600 psi C'--fix MaWi.c Phial P—E 10,42f123 32 13 13 ]fix Design Wit Ready Mix CLS P2.YV / 6.50 sacks, 4,50f1 Ni (7—te for Rod Placed Paving 10/4l2U23 32 13 13 Nix r"i". NHR Rat Nix CLS P2-NY / 6.SU Sands r 4,51pJ Psi Cunut. l'u I Wnd Naccd Pa„ng I 10,42023 W3413 4/15'2024 033000 Mix Design MixD.p NDR Rwdy\fix NBR R�Mix FTW I2UW CILL Iso p� a 7c tin Fl—bic TXS-NY' 5.50 Seck:, 4U0x Ca..... Mi. fa� Class S Slab Paying N. Fly Ah 4/15'2024 433000 Mix De,/�j. NBIt ll a Mix TXS-Y Y'4.Sfl Saeke.4W si Cnaae Nix 1'. class S Mesh Paving. i U?42023 321310 Mix Dtaran NRR Readjy'Mi. T'XF-NY'47USacks/3UWpc,C—dc fur Sid..walka.. Th,ust. Cwdw, CIP 4/15'2024 03 300 U Mix D¢igu NBRRe.IYMix IF001W22; 2.5 Sscl / I Soo t;uucrde far n—Fill 7AW1023 0330 U0 Mix Decing (.Luna I30ASOMR I5SKf3.U00 pw Ca icroeetar'Sidwalis 71101iO23 321313 Mix llaign D.hum 45A6OMI2/53Kf4,5Wpsir.M—.fu Hand Placed Panne I.242023 U3 30 tl0 Mix Design Rapid Rd; Mix 'RRM5320kUP 4SUU psi Cunaztc ta' lland Placed Psv,n, 1.242023 033009 MaDsign Rapid RWi Mix RRM5525A 3G00pµ L'uuutc f VWI,7Guttcrs,&d- 6, A.Ixhudlm, ADA Ramps 118/2U23 033000 Mh Drciru Rgdd Redi Mix RRMW20ASS40UU!C.--fnr SO,xn DrainSwcmv1 I,IIZ2i 43 30 W MIND. Rapid Redi Mix RRM512041000 psi Lmrttxte la. Hlodir� . �ung, I.1 tl/20J3 U33UW Mix Dn�n Rapid Rd i Mix RRM5020A 3000 mi C'unercrc fur Cwt,, MivuPaw, Sidcnulk, Ram_oc 919,2022 U330 U0 Mii, Redi-.des DCA-E5343000—L'—IL far ResppR 9;9,ttl22 f13 30 W Mix D,s Redi-Max VO31 I524 30W Mi Cprerea M.x C.x Curl, & ua 9;92022 W3413 Mia=e Red, -Mix HICIO(D12t5 iH—Wc Fill -CLSM Y;Y,2ULs D3 JUW 9,9:022 033000 Mix Drargn Mix Draagu Faith-Miz Re6-4ix IW115143000 psi C—W Mix f. D.iwwnyyss. Sia-Wk-s, .ADA Rwana loll 15043UW Pei L'w—Mix fi Sidewa& -- _-- 9;5t2022 (13 30 W M1x Design IW,•Mix IULI 15U{ `6A(1 Sa.:k. 14.0007wi Cmerae Nix fm S.denalks. Cud. & C dtr. Sex'ee Manhole. Wd.. & lsspaim, B.- 992U22 U33UW Mix Dta,gn RWi-Mix Ill 11524/O.UO Sxcki 74,UW pii Cuncrac Nix Manhul o. Inlw.lundian Ruaxa, IlcWwallc ------_--- 9,92U22 U3 30 00 Mix Dcsig. Ruth-dix 1 ,, 5143500 psi Cw Kc Mix far lLruit Blacks, Wade: Puds 929,2022 033000 Mis Design Redi-Miz LUL215^_440UO lei C-.a1<rda Mix iir Maslhula 9M2012 U3 30 00 Mix Dod;;m Redi-Mix 15611534 4Os)u p i Cmmat Mix fax (:.win -Place Shorn Oran auvewra 9/9/2U22 U330 UO Mix Design Rali-Aix 101.1 ISFA 3600 Pei Cuncrctu Mix fix R,idge aubnm=cs U33000 His DCaipL Ruf-dix l56ll5D440UOpii Bndp:SIsW 19N2022 9MP022 0334 13 Nix Design Redi-Aix F35238NIN IUU pii D—W, Fill -CLSM 19N2032 033413 Nix Deaipn Redi-Mix FODt38VM 100 psi Flmvahle Fill -CLSM '9N721Y22 033413 Mix Design Redi-Aix IUJI15543000 psi Cunadchlixfw RiprRiw 19N/2022 033200 Nix De.g. Redi-Nis POG138K9 IUOU psi C—M.fir TrcaW Rpair Bus Mmcri.l 19I9R022 033000 Mix D,wipl Redi-Mix IOK! 15243(9)0 pi Cvlaae Mix lax Ene, ...I 1919/2O22 033000 Mix Deign Redi-Miz ION150745UO p.i(2GW ps, V924 hre.)CPne, ae Nix fw IlFS Pacing 1"9,21121 113 3'W Mi.Dusigu Redi-Mix ION11504 1000 psi 136W psi @, 2 daw) C-- Mix f.IICB Paving 19NR0^_2 033000 Mix ➢rigu Red'W. 50K715243600Psi C,asurae Nix fa2sfacldrse Ptwed Paving 0110 OU Mix Design. Redi-Sax t OM 115134 4500 p,i Copap,te Mix fax Hand PL,td Paving. aroma Drain Stucuu.a 117i9,2922 9;Y12U22 13330 OU Mix Da n Rcdi-H,x IUM 1152445OU wi C—.Ia Mix fa' I land Placed P-r,. 199.2922 033000 Mi.D r Wilma 1UML504450U}�+L'—z Min fir 1U.' P(acnl Pae g 19,9,2022 033060 I I I'2/2022 W 30 W Mix Dmupa Mix Dn Redi-Ma Itdi-Max 145CD5P44504 rni L-.muea Mizfar Haud Played Ni—St— Drvu SPvcwes 1431'25P{ 450(! i C.xaaele for Stnm.- fur R7ud., Valw Pads 112/52022 U33UW .lies D. RWi-N,x ILK 115C435UO w,Cwerete l7.ntn 156115C4 4WUya C•Pn CIP Stain ➢stir Stmdw.s 112/5t2022 U3 JUW 112/5/20^_2 (13.IV Mix Dr.yjP Mix Drat_gn Rcdi4dix RWi-dax 7ef 10LI ISC43GO0�yi Cal.xetx fw Maileole, Inlet, lurasiun Box, Headwall (1310W Mix Des.Im Redi-Aix g011I5D53h0 C.smcrne lhr D.illed Shalu'Lighain$and'Iral7ic Signal houndainnx :5.152023 15: 1512023 0330W Miy Design R'd,-Aix 10Nr 15M"l-1�l3icpinccmxrrz Shaf/s-, Und—. D,rllcd'haft, 19,9,102_' 03 34 13 Ma Dwgu SRN( C.wudc 30000 3,000 psil'=P1+ f. Sid —firs and Rena., lwt, &tildes 1919,2022 033413 Mix Dr SRN Cm—tn 4U05u 4,000 pW C`.xrate for Heufxnll> ReW... Wall, Coil.. 19,92022 03 3(1 W Mix Des�n SRN C.n,uett 15(27 1,6U0 Ni C.ur.:rete f.0 Machine PIueN Panne 1 %9R022 03 30 W Mix DrAsgn SRN Ca. w 40068 3,6UO Psi C.wlade f-llfachine Plaid P—,g FORT WORTH- C17 V OF FORT WORTH T14.ANSPORT.ATION/PUBLIC WORKS DEP.ARIMEN] '—"�'" STANDARD PRODUCT'S LI.SI AS OF 05/16/2014 9N12022 0330011 M'x15.pu SRM Cw1ww 451111.500 Ili Cuuscm mr Hind Placed PavuU; 9M2022 033U 00 Mix D-F, SRM Cmlcrae 450004.5WQQ" Cmlttaafa'HmdPlayed Paviy 9l9/2l122 tl]?O UII Mix Des[� SRM Came, ete 4(112fi 4500(i,(gl Nd ni Pvnw.maele Lv t l(-.S Pasi�� Y/9.2022 U33U 11U Mix Deign SRM C-e— JJ0_'13,6UUyyvi CUne- 'u )u iw Bux, RWining`V h 9/9,2022 033000 Mu Zu SRM Cmscw 30050 3,U06p,i C'mutc iR Srd—lu, Rnmv, kdcu, J—,tiuu Baas. Vitas+Blocks. Curb a¢d Cud., Dd ,xis, Barris R=lp 2/1(1'T_U23 03 3(1 U41 Mix 9RM Cpn'rae 50310 5.11f10 Ili Caapete I. HIS P.'in 1:13^02] 321313 Mix Dev�, SRM Cunaae 1450234,500pvi Cunpele l'w lt:md Pluce3 Paving 4,. 4 033000 Mix Dew SRM1f Csacrctu 19Ub4 Llvuct'vke ter FluwuNufiLL 1 04 L5t i L'amta'ete fnr LlSM T—It Re[- 4, 1:2024 4,12924 03 30 W 03311 UU Met Deuga Mix Desi6m SRM C'mu it i1tM C—"w 41(I lSUfz. fmtcrcte bx('1-SM 4,1,2V24 0330W hfix Design SRM C.-0. 450504500pvi C-em 5.5.2023 03 3U 00 IMa Deeig¢ SRM C-mcrdc DIDOOOSS53CB 4,U00 psi Cuucl—fu' Bdeidgc Apla,xlcb SLs6, Deek Slab 9191202^_ (15 30 DU Mix Devip Tarant C.—I, F W6DAHP 45110 psi Cen.r a Ma nv HaW Placed Paving 4:9,21122 1133(100 Mix Dexip Tmrutt fnpsem 1,W6020AHP 450U p,i C.—, Mix fx Hand laced Paving 9,9:2U22 1033U 00 KIN Design Tarrant Cmcrete T'CFW6920AIIP 45UU pvi Cvncntc Mix fw lland Pkxeed Paving 199,1022 U330 OU MLx Dr uwa Tmt Cmctc FW752UAMK 4500(3WOpsi,d3sL 1 metc Hs P.-wit 19A 2U22 033000Mix D TmuCmte FW6520AMR4500(30Utlpnigda3t,)fiHES1'ain 19++12U22 1133000 Mfs Design Iyranl Cnnvrcte FW352UAMP 36W P+i C.— Ox Maehine Pl.n-ed Pa,ing 10"12U22 U33000 Mix Tkvign T:vrutt Ce"-rt FW5320A 3WO pvi Conan.: M,x for Blocking 19,9/107_ 03 34 13 Mix Del'- Touart C.-- F'WFF150CTSM 50-130 psi Fi—blcFi0-LISNI 19N/2U32 031413 Mix Design Tnrant C-- FWFF27550-15tipafl—Ne174".C1,W JWV2022 II.T 31, 09 Mix Devip Ta,rant Cnncmr FW6020 A24f1!gt ps.i C+made Mix fz Slmm IAwn Suvcturrx I1U;10'2011 U33UW Mi.Dxip I--Cert— TCfW6015A24990psiCell— f MwhA. 11U-1011U21 03300U Mix De,ip T.—C—N TCFW502OA 30% pa( Cuu—iv Sid—A"19/9/2022 0330W Miz tp T—f,maete IFW5025A 3000 Ili C--Mix fix furl+&C.U.. Drivewey., Sidewalkw,AD A Rmgw 19/9/2022 033DW I3fix Devign Ti— Rxmty Mix 3029AF 30(U pvi Csluae lee Sidewalks 19/9/1022 035000 I.Nix Dcreign Tarwn[L--= CPSU20A 3000 fi C.-le Mix fur Cwb and Gutter 19/9/20_n2 033000 IMix Da' Tarwu Cum ae FW5525A23.00 ixci Cmuxete MLi fur Sidewalk., D,—Am—efe4,. ADA R:gm 19/9/2022 03 ]fl U(1 IMix DIV titan Bead) Mix '11W4520450U M (7—. 1. Hand Placed Paw)$ Ru+mx I YFJ2U22 U3 7U OU Mix Des/�1, Tiuc Git Rini Mix 0250,230 3WU P4 Cuncnic Mix Tw Flatwu,k, Cur(r & GuGn, Drivewuyv, Sidcwulkx, ADi 1YM,2012 U33U OU IMixDargu True Gut Redr Mix 170.23050W phi C.wluwe fw Haud Plued Paviug 19N,2012 03 30 00 IMix Deciyjt Tme Grit Redi Mix 0_50.'_301 3U � pvi CalaH Mix 4a' CutU eY Gwte ,, Driu: yes Sidmxiks, ADA Ratnpe 19,Z022 (1,33000 Desip Itue C t Redi Mix 0260. 230240(1(1 psi f.maae Mix f Muwtine Placed Paying 1Y,9,2022 033000 IMi. Mix Design Tuc Grit R etli Mix 0255.230136UU psi Concrete Mix fin Mubina laced Paying I9i9,2022 03 30 00 )MLI DL* True Grit Rcxlr Mix 0260.23014509 pvi C-ute Ma fw Haud Piaccd nlii 19,9,2022 11330(W Destp True G't Redi Mix 1165,211145W Ili Ctmuele Mit fix V.1.1 uU— Hand PWeed Paving 111130`2U2.3 321313 LM,,,� s Des n Wiidwtter liediwix 362041/6.W Sard,a 1.7,Ii110 mi C.MereleMix f Va4'; ePlacid Paving 1/2012023 321317 x F-91 W0ldelltcrRcdi.Mix 437AA1/6S0 Swkv74.$Wpp,ilatb'ctu Mixf lfandPlue'dpp''�� 99yyl/2U/1023 D33UW Duipu Wiide—Rcdi4l. 3010A1/S.00 Sadn/3,000�r C'atpelcMixfw Sidetvallaw lu(ca 1;2024 0330tio Afia1)a WilJ.—Redi-Mix 'S17S.6/3G0(putf:uncr-Mixf Rumd:Ui.m.5¢urxvrts 111/3012U23 f137000 D" W0ldwteer RNi-Mix 4020A116,W Sack,/4,ODfl pvi Concrete Mire F. Sidewaikvmd Was I9,9;2021 U3JOUO IMix Mix beep WtxRediMix 36733fi130yWCmera,Mi. C LightingandTrafficii"MF,—daU.vty I Aa «raxtn 19;4,2(122 3212a1fi Mis llev,gn Auxlin Asphalt FF5D137965 PG64-22 TyyuoeD Fine Swfacc 19/Y/2U11 321216 Mix Design Aux,,,,AVM1 DA5D135%1 PU64.1?'fypg➢fnu:Swfne.; 19/9/2022 311216 MixDuigu Austin.Aplwr FT5B1179C•S 1'G64:273WBFiue Bare 19K2/21,21 121211 Mix Ua,iip, Amain A,.pitait F'I IB1399651'C,li4-2213Pe B Nine Hass IYn,2V12 321216 Mix Design AWin Asp6ilt FTIR117.2 PG64-22 Tvpe B Fine B;ec 1511,1014 321216 Mix➢sign Ryynuldv Asphalt 340.DG43 PG64-12 Type B Bavc C'uwxa 19N,2022 32 12 l6 Mix Desist Reyvalda Asphalt 1901D PG64-11 T31n D Fine Swf- 19 9,2022 32 12 I6 Miz Design I24ynoldv'1WZ'tt I I1213 VG64-22'I3Tw B Fine Bave 1Y;Y;2V22 32 12 16 _ Mis Deign Rcynaldv Asphalt 16I213 PG64.22 T3W B Fine Rave 111'20/2023 31121G Mrs Duigu Reyucddv AspitaLt 1101DPGG4-2_'TN3rDPwc Swthtt 19,92U22 321216 Mix Desipt Surmwwn Paving 341DVM22 i'664-22 Type D Fine SUAare I1 ti6,'2022 3112 16 Mix [1-6m .SumMwnl Paving 140DV6422 PG(A-22 type D Nine nurU ce -022 33 12 16 Mix Design 1Sun,twunt Pitying 30763V6422 PG62-22 T)pu B fine Base Y.1 - �19 321216 Mh Dutgu .Suwit+mut Pavlug 347-BAAF6412ERG PGW-22 Type B Fiuc Bxsc 19.922022 32 1216 Mix D+sp 'TXBIT 37.211305-20 Prr,4-22 T)pr H FineB -x 3212tfi Mix ]x,p 7XHil 41-21131-17PG6422'1'yPeHFineRoe 19,9,20Z2 9:`J,1022 J21216 Mix lk4ip TX01T '-11303(1757)PCW-22 Type B F,nc Bav'e 19:Y,1022 321216 MetDulgu 'MIT 122475(1857)I'G64-12T)WgDI..Stlrtvrc 19,9/L022 32721fi M1fis t)en�rn `lyBfT 29-222475-19 PG64-22 Type D Fna Surface 32121fi hfix Dev�n iTXRIT 1-2224Tt201'G64-22 Type D Fine Swlace I9,9/2022 Y,911013 311216 Mfx Dca�ct �I..XBIT 64224125-1S PG71F12 Type fide Surttcc 91912U22 31117G Mix De„µ+ '37BIT 1^_,Z22475-19 PG64-22 TypeDFute Surtice 411/_'924 32 12 16 ?,Gx Deoi. tmfT 344 MAC-SP-D 7C,22XR S.AC.A-R Tvte D Rne Surrace DtrKtgUle "'o ,auttace I 012 32 i3_U Pine Holt Mick(Winston Sulcem NO Pavan 022 3213'_0 IDAJ-P',— DWS-Pavetr W«tan.6-C..(Huuslm, TXl IT-ile Detectable Wanvwg l9vers Ij YN/1012 311320 DWS- Cumpliitc Eagmeaed Pla:tiev,lue.(WAii—vide, AruturTilc 32131U DWS- Gumppsitc ADA Suluums(Wilmingtm, KA) :Haag Milk CIP Cvnyxwiw Paver I9/Y/2012 4/N2U23 3213213 IDW'S -Puvcrc ADA Suluuvns lWilminmui, M 4) IDetetable Wantiue Paver FORT ORTH CITY OF FORT WORTH TR{NSPORI ATION/PUBLIC WORKS DEPARTMENT '-" S-I'ANDARDPRODUCrS LIST AS OF 05/16/2024 I SWeme MetSal., 1'M12022 1321373 J:vnt Se:dane Unw 49USL-Cold A/v�+lie4 SinPJe Cartmnnent; Silicwre Jnin[tiaLuu 43'tM nSyys 19N2022 2137-1 Jmnl Sealant Ieemtn 9005L-Cnld.{pp ied, S'qle Conmmeni, SiliemeJninl Seaton/ ASTM D5N97 i'/v/2V22 I31:311 IJvint Scvl:mt Pe wn 3V0.81.-co,Apulied,Sin)1,C--Pwcnt, Silicvirc Juirrt Sutllnt ASTM IMSO 19i9121122 1213?] J,nnl jenlavt Gul'cv R,xulSuver Silicrne-Culr({tmlird, Single Gxrgnnrnt,&iliac JuinlSalnnl AR1MD5493 1 lJUlity T-eh EenhedrneN Send 1YJY72022 33 US lU fmLc knurt Send 1Sihcr G eek M-Ws Utilby Endndmrnt jnml ASTM C73 19Nl2012 330510 Emi-`.d-Said 34:neride Utiihy E^,I+:dutmt Saud ASTM C33 10MI2022 330510 Endn�dnte:d Sand Fund L Din M"". Utility Embelnent Send ASTM C33 1919/202213.103 i fl IFrnbedmenl Sund IT:.-,T"r f wd L Did NA,- Utility FMadmcnt Sand AS IM C13 19792022 33 0510 En;brdntenl Sand Manirr llfanzwi Utility Endxdrrtem Sand ia`3T1 C33 1 Strrv,Sown-McMidtl&BaaplFrma &Cwcra/B nrMard lRuuvd133415-J3 19/2N'2U1N 13(1513 MxdwlcFr;racs;ialC,ns A-C-1Z,1di lSneiCumPao3,LTDJ NMC#221X,0.5iSiac-•"24+Dial IAITMA4aAASLIT'OM306 330513 M;vdwl, Cma' Nc"md, Ewndry VP-1274-T91(Sirc-32^Din) ASTM A48 AAS1 ITO M306 IY/25`'2018 Y/1a 201tl 330513 MaWtolc Fiamcs and Colua NtauO Fonndry NF-1743-LM (ITiugcd)(Sizc-3P Dia) AS A4tl AASHEO M306 33/1113 Manhole Frune Necuh F""dry MF-193U-30Ilim-3225"Dia) .{STM Ma AASHTO M3061112112111 928201813t1513Manhvlc F-and C-e Neenah Foundry R-1743-I IV(S7ie-32"Diu.) ASTM A49 AA➢I ITO M396 413:201Y 3305 J3 MxnOule Erww-a c- s SIP Ind-ite-+ 1Sue-24"ML) ASTM A4tl.M.S11M M306 413,2019 330513 MnWtok Ft -and C'- SIP ludneriea- �70YST NUST 1Six-31"DiaJ ASTMA4a AASHTOM306 _ I0M%202U 33013 IMailide Frxaysa'.d Ctnmx IFJ IPu:wr➢y Fvrt lurdan lruu Wuka) PJ1U37 Z'L.1 tSiac-32.2s^Dish -I ASTM M36.MS11TO M306 •"Nxic-Ia rux4er�mexf xnipev inabGtinx rnanFok tld IwA Me Mlnivnw 3Srx<h s'IT rvpnn eta/ v+[.1p d'pur9Sulia 0.fr3. nxyanaYer eKxixp sirs wiY ont}•de aL'ar.<J/+rai;rin;; ircunliate>rr:�,l er�uirr rryJueen��nllrert+e�xndexe� Storm Sewer - Inlet & Svuen- 33-05-13 104'2020 33491U Curb luku I,atuma HUI'-IUO-4115-PREC{8'I'"" litm -VVXS) iS IM ('913 108 ^_020 33 CarL lnl u Feel FRT-1 0x3406-PRECM 1- ISix- [IV X 3y .ASTM C 913 10.8^_020 .134920 Curb inlets F'murtra FIi'1'-I Ox4.5-407-PIiRCASI**l5,<e-IU'X4.S) {51'M C913 IU`'8'2020 334929 Cuib HIm Funcrcin FRT-1 Ux4.5-42LLPRRCAST-(Sixc-19 X4.51 ASTM 1913 10'82U20 333910 Madtule F:uterrru PRT4X4.409-PREI;AST-TOP(8--4'X4) ASTML913 10;8'2021) 333920 Manh le F- FRT4X4-t09-PRECAST-BASE(Size-4'7C4) ASTM C-913 333920 Manhole Frnrrrm FRI'-5X541U-PRECASI'=t OP IRve-5'X iI IA51'MC413 :111'202(1 IUM^-U2U 3J J92U Munb.. Furtcrcrn FRT-5X5-4M-PRECAST-RASF(Six-5'X 2ki ASTM CYI3 10.8'1020 3339_10 Mah a Frut- tit7bX6411-PRECAST-TOP(Six-6'X6'1 J)k-TM C913 lw82U20 133920 Manhole F-- FRTWKC411-PRECAST-BASE(Sin:-RX 6) ASTM C913 ],02021 33442U Curb lnlrtx "I'hnmpx,a Pine C-0 'IP"(IX340.i-PRFC{STINIJ:'1-(Siie-19 X.11 .AS IM 61.5 3:19/2021 334921 Curb Inlets TI-Tne nP�i Gvup TPG-ISXJ-4Ui-PRECAST INIIT"!Silt-IS'X3) ASThi b)5 3:19/103i 334910 CuN )u(b Th-4.-Z. Gette TIY-2UX3405-PREC:4S71NLET*'(Sizc-20'X 7) ASTM 615 3,192021 333920 Manhole Thnem-V. C tun TTG4X4-409-PRBCAiT TOP (.i.-4'X 4') AiTMAII 3,191202; 333920 hImhvie ThvrmtxunP G-I, TPG-4X4-4UY-PRECAST R{SF ISixc-4'X4) AS11615 7: IY11021 333 13 79 20 kh h le Thumpapu Pun 11-G4X4412-PRDC'AST 4-PT RISER (Size - 4' X 41 AjTM 615 13rt9120_21 33391U Manhole C.-P II-4-P�pe Gr-P TI'GSX541rl.PRECAST TOP (Sise-9X 5'1 ASTM 615 13,191221 333920 Manhole I hn"- IYpe(iroup 'li'f5X5-410.PRECAS I HASE(Si&-5'X 5) ASIM 615 13:1V1221 333920 hlanhuie Thum P' G,uuu TPG-SX5412-PRF.CASTS-PTRISFR(Sim-SX5) ASTM015 131V2011 331120 Ms , Th,,e,,-Ptpa (irvup oGGXti-41l-PR➢(:AST TOP (Size-VX 6) AS IM 615 13/19:2011 33392U hludtde Tlrongtxrnt P�pe f-v TI'G-6X1411-PRECAST BASE (Size-6'X 61 ASTM 615 I3i19,2(21 ]33920 Mnh�le 7h my un Ppe(iruup IYG�X 41 LpRE( ASI Ft RISER(SFm-ON h') Aj1Mri15 17/IY:2U2I 77JY2U hl:mhvlaThvmPxpn Pip. Gruup TPG7\T-tII-PRRCASTTOP tSixc-TXT, AjTM615 I3/19,1021 33391U Mauhvlc Thn.P-Pipe Orwp TTG-7X7411-PRCC_ASTBASE•(Sin -TX T) ASTM bIS �311'92U21 333920 M:mhole hra Tm"im Pipe GnwP IT -7X7412-PREC.h1T4-FTRISErk(,Si.e-7'X7I ASTM fi15 13r19'2021 33392(1 Manhole 'IhomPson Piix Cx,tup '17'GA%R-411.1'REC {S'I"EC1P ISi2-R'X 8') {STM b15 13/"2. 3339_'0 Munhvle Thompson Pipe Group TPG41X841 I-PRrc AST R ASf. teiixu -S'XS) AS 615 13/I Y'1{Ll 3339_29 M:ntw Thaupsml Pipe Group TTrx- G-8XS41?-PRECAST 5-FT RISER IS8'XIV) AS 615 11912021. 113492f1 Dntp Inlet Th,mtryml Pill. Crtup TPCT4X44U8-PRECASTINLET(St<e-VX4) .44TM M5 13:19'2021 3.349211 D,vp(Wo Th-,-Pipe Guwa TPG-5XS40A-PRFCASTINLET (Sue-5'X.ij !.ASTM h1.5 13:192021 33491U Drop Inhe Tharnpatm pipe G V TPGSX640d-PRE AST INLET (Size-6'X 6) ASTM 615 1A:2N'2023 334910 Lfu 1 Oldcustle PCemst 4' a 4'SUrdred MaWtule(Size-4'X 4) ASTM C478 1N2N/21123 ]340 IU Manhole Oldea.de 1'rcra.t 5'x N'Sbmn luncdmn Bstt M, 5'X A) ASIMC478 1d:282023 3349IU Manhole Ul Icwlc Precast 4'x4`8turm Junaivn Hue (Sipe-4'X4) ASTM C478 la:2tl/2013 134911 Ma9holt U1 -Ile PnautSxS'Srotm Juac[ivn➢ue(Sizc-5'X 5) ASTM C478 1 a,2N M23 3349 Ol Malhde 0d-tte Prcust9 x 6 Seen'm Jmeeimt B.(Size-6'X 6') ASTM C478 18,D12023 3149111 Manhole 01dceslle the-, M. x 8' Skmn Jun- Hoe Baxa(Si«-X'X A) ASIM C47a IS.2811U23 334910 Munh9lu On'", P�-rut 5'x 8'St-Junction H9x It-(Sit,-5'X91 ASTM C478 1&1111021 334911 LLW de Rwker Mntanu Rciufnle.d 49-Dr-,SphdF-6,1, Mauhdc(Size-TX4y ASTM C433 Ia 282023 33392JJ Ntb inlet lOf 3'Ruer Thmte-T''P Ck"m Inlet Ruexl5i2e-3m ASTM L:J13-Ib 1&M2021 111920 Cudt lnlel 15'x 3'Rua Ihnm{u.a Pit, (-p Inln Rixer (Si<e -.i Pi) ASIM C913-Io 1d:2tl2U23 33392U Cub1-1-d iTr3'Iiiaa' Then"- Pipe G.-p h,.Riau'ISin:-3CT) ASTIMC913-16 I1r1212014 33492U Ik oIWu AmuiTtx F�y &Prodvus DropLl KX4'1 ASTM L9l3 ASTM L'913 I 1 /12:2024 33 49 20 Ilit9,202' ]14920 D,,R hde, Munh,4e A n-T. P�e ffiProdur:u A. rilexP,�1u&Pn,d- D w Inlm (5' X 5y P,-,4'x4'SunnnJunnilmB^rx AS] MC91.1 11119,2074 3349M Manhdc AmuiTcx Piuc&Prvdeeu Precast 5YS81+xmluvc1i-B- -ASTM C913 Ii/19_024 334920 Mauhae A-iT.Pioo&PNdue6 5'I1- Tausitiuu MH t4' MH ent roc[W of�JB I ASTM CY73 11It91024 334Y10 Ma10n1e Anteri,"Mpe&Z"dodo 14eca"tfi'x".S-Iuncu,mdux ASrMC)13 II/19'2024 33492U Menhwe AmcrZT Ape&Producb 6'Pre,Tmsit-M11(4'MlI- the 1,,n fb,JB) 1 45TMC913 11J1Y'2U24 334910 MevLutc Amu'IT. Pipc&P pelves Preataka'Stwm 7mcbvv Dux ASTM C973 11/19/2024 334920 Maahule Amr,iTee Pipe &I'mdvtts 8'I•xout T.nrsiuuu MHib'AII-I au ate [up n[8'JBI ASTM C913 11.19'2024 33492U hl>tiide hmcrilex Pge3Pntduru '1'tne CSlam Grain Maihrdtoe, Hnx(4' MH.nt We boyrlt(B I�3 "'Nwel'Yr-mxJnlm an Avin vdfertkc ugeJprdex xJr{eamrnn(6nkrJ xn/y.6lgyeJ/psedwr rfMesnruaxrexre rquhrYb lK rmi 3w�--. Ya escgob,uhgdrrrynnmwr ie albeK FORTWORTH CITYOPFORT WORTHTRANSPOIiT.ATIONIPUBLICWOIiKS DEPARTMENT S`I"ANDARD PRODUCTS 1191" AS OF 05116/24114 RM Cwuxly 919/2022 033000 MixDn�a, Aaelicw Cw.ete Csx>g,ap' 30CAF02930WPei Comwfu Sidaw-aU.&ADARaapr 9192022 0.130 W Mix 0-0 Alneriun Crmcrcle Crnmran5 OIJAF382 IWO fwi C,.o- Base MatenW R. 1-h It -V 9/912022 0330OU MixD n Anwrican Cv t Cvap:n) 4UCNF0654W0 mi Crncrch:fu MunhWa&Utihtl Sb-111 9Nt2022 0 UMO1n htD AmC__C-wity 45C&0764 dr-HmHPlued Paytl y500lpn[aidlang 033UO0 iNiaD.W, AM DIOfII73 fnd Pkud *s 99;2022 2022 0331,00 mi. Argw D I WOOOOI 7914500 mi C,'n- f Hard Placed Pa+ink (9,yriU22 U3 JU UU Mix Doixn Arxco DIWUWU179345Wpsi CunaMcfw Ihwd Placed N,inx Y,Y,2022 033U OU MixDnigu Argos DI WUWOY lU345V0 pri C'uuµ[dut�Hand Placari P:rvsvx 19,9,2022 433000 Mkx Dnig, Arp. DI WOWO'_10745W pei Crwantn RxHand Puta,d rating 19r62022 (t33{IOU Mix Design Argw a1n0110001273450n Pxi C.,nveu W Hand Placed Paving 119,2022 U33UW Ill. Dnign Argw DIWUWOW73610pci Gmu'dc farMmfiinc Placed Poring 19,9,202+_ 0330W Mix D, gu Argo. DI WOW08]814300ps, C:, do Cur LIES P-g 9:92022 033 W Mix Design Arbhw DI WO0009K57 50 Pc; n - Fill -CUM 1 919,2"" (13 30 W Mix Dnign Argw DIWOIIOUI0551000 Ni Cunerde for Mim. Junction Hvxag, Mwil+Wn. Channel Linea, Sid-Akc [Ni-Y., Curb $ G9Re1 ,V,000001043S U33UW MLxDnrgn Argw D WOO psi Cvua'dc in Sid-B., C.I.9,9,2022 �912021 U33UW Mix D-w Argue DIOW001565S 3000 psi Les= Cue C'mb:, L'ur0&Guars, Sid-lik., Drivvm•al's..ADA R-p& 9f9,1(122 031000 eng Mix Dn Argw D10000161536GU pi Cwade Rx lvlx, 3- Enaxanen6 Bhxking 9,9/2U22 U33UW Mix Design Argw DIWUUU019613690 Psi Cunerde fur tales, H.... Hnau i. Hluck,ng 9,2022 (a 3U 0U Mix D-st. flrgw DlOO00087S4UU0 psi Cwaa, f VWv,Pads, Inlas,Stm-ts, Headwalls, Than ➢Iwkiux W 9i9CU_ U3 30 00 Mix Design fL'gua D10W00010834.00 ps1 C-O, f4Valar P."ll1,t� lit- Hada:Ws, Thad Ell -king YN/2022 033U Ou Mix Design Argav DI(µ)UIIOU 168540611 pd Gmcrele for Valve fade 9192122 0330W hiix Design Argw Dl UN 00SI51750 Ni Ca,vIII, Rose lbr T-ch R,mi, 9/9/2U22 U33UW Mx Design As2tw Dl000WU16S 14000 psi Cwuvxc f Jicadvwlls,Rwa-,; Waffs, Box C OI111fs, VWlcy Gums 919l2U22 03 30 W hfia Design Btu D CauYde 7SKGRT 3000 Ni C.-I, far (-Ii l 01 ]G GU Mix Dais„ H D C.maele 145GOAE4500 'Colt fix High kart 3•,Svenr��5I',� Pavmg 5/L2023 J21313 Mix Dnign R;DCvnattc CM 145204r. 45W phi C-1- f. I I11nd Mated Paving 111112121 9N/2022 1133000 Mix D-W Bll✓�T=, C'awaare 452065-14500.i baud plxwdI 9"P022 1130Uf, Mix Dm� BigTnwn Calade 45U065-145WJ� hand pIaccdpa y� Mixnli. llanS Structurcx 919/2022 033000 Mix Des/�.,n Humcu'I'exw 45U.i0ORG45(Iljf'�`iGmercle Placed Paving, St,am 40US33RG 4WUnu"Cunouc Mi. f. Muehmc Plxcwl PavinG L9NJ2U72 U32U UU Mix Dcsl�r, Rumcv Tuxm Y%9r2022 1-,1022 033000 0310 UO Mu D,x,g, Mix DIF BUmcu T,�m Bwnen Tex:sx 53UI20AG4W0 mi luaudc Mix Yes HiypE:xl9 StrwPda Psviuk 3(RJI(19AG7DW1Ixu Gwade Mix fort nllax. hlldx.Th-Bhx:ks. Sid-lks, ADA Roam, 1Y,9,2U22 03 J000 Mix DniRn Bantu T.- 3OUIUl AG 3000 Psi cu .. Mixii hx,vrv,I, 30USOORG 3000 psi Cull -Mix fbr Rlvding, CnaucmcnL Cub lnitts, Jul fv Roxn, 1i4 llydrant Parts, rivcweya, Cu,b&Games, I9r9,2U22 11130 GU Mix D«ib H-l'1'exaa Sidewafk" ADA Raaw 19/Yt2U22 U3 ]U 00 Mix Oc{�r Rococo taw 4UU5UU➢G 4000 Psi Came Ye Mix f Sturm Drain Suv turn, Drivcvayz Screw W:d1s, Collins 19Nt2022 U33U UO MizDwW Bumcv Tsai 3dU50OBG 360U `Mi C'vucmte Mae Yn l.igh' :wd7 atBe Signal Fuuuda0cuu 19/9/2032 033000 Mix De,4(,m Bwmea'1'exax U8Y450RA 800 ps, Canasta Mix Rx Rave li trench ltrn , 19/Yi2122 9320 0tl Mix Dn/ [4lmcu Toxin UIY690RF IUUjlsi Cunuttc Mix tlx Flvwdafc Fill 1118.2024 033090 Mix D-V Baines Taxaa 36U5013615.74 Sad./3,600psi Cu,adc MixfLighciug &Trvfic S,plall'uuuSrtivus 1411,2024 033010 ,ix Dnig, Bumw Texan 35U5(IOBG35Grlp:i Cunvre[e fix fa Cnxsxvatk, 14, 1 i21124 (13 IC, OU Mix Dniym Bumcn'1'uxax 30U5(10BG 3WUryi Cnnane Nix l:x 3id-is 14, 1,2024 U3 30OU Mix Dnign Rumor Tuxes OYWSOR1 Gaut 14, h2024 U3 3U W mix Dcugn Bumcu Ttxae OIY699BF IOU psi Coal -re Mix f Fl-W, FUt 14,h2U24 U330Ou Mix Dnigl Bumen Texan 55U120AG 450UpiCa,-Mix fa High Emly Stra,gth 30011pxi�, 3 day, 14,1701-1 033411, hlix Design RumwTs- IOYH50HF 1000pei Con-, Hare M-W f.17ench Repair 1Y,9: 2022 U3 ]U OU Mix Dnign Csdcr Cvn is FWCC6U2U2145OOpa, Wncrdcfixihald Phtvml Poring (9N201-1 ,;2,022 033000 Mix Duigt C:.d..Cuu kc FWCC'55209136Wpa,Ra Machias Pla dPaving 1 (133UW Mix Design Corder Ca,aele FWCC602U71360t1nsi Rx Machine PtiPaving f67000 Mix Design Cardtt Cuneme FWCCS591GI Plowable Fill-CLSM �9:9,2n22 9,9,1022 0330 OU W, 17 esyn U-d Cvn4 to FWFP2375uinT de CiR-CLSM 9,9:2U22 !13 30 W Mix (7n�gn Cad. Concrete F WCC6U2W 1 4(100 psi C.-fiolit- Drtin Slruchu n, NI-W­lleulx+rlls, Retaining W:dls, VWkY C hers, Drive hw-hes 9,92n22 U3 3U W Mx Deng, Cads Gwade FWC'L'S02U21 350U psi tirade tar Sidevvalkx.Iki+evreys,gang,:, CuH, &. Gater 9,9/2022 ill 3000 Mix I)ex,8n Carder Cu, FWCC502WI 3WOlni lbr Sidewalks, IAive ,,Ramlgy Cwh$ Cnwe,. FW-sk 9,92022 U3 30 W Mix Design c7+arl Ns Canals 4142 3600 Pi C'wcvru fvr Cu,b lnlas, J-6- Rv 9/9/2022 113 30 W Mix D-W ,'Ir.,.lclfs L'wcrd.: 4513 4000,N L'xwl_ fa' Hmt%-As, Wi4�u'aW 9/4/2022 033000 Mix Deaigm isl.hyx C.lrrae 516736W Ma C.,-'Mixf Machine PL,u Paviacc 9N2022 033000 Mix Desiµn Ch.1e9L Cwuae 1460945W w� Cunclne Mix for l land Placed Paving, Manhvla 9PI/2(122 03 3U W Mix Deeian (hvl Ys Cmavttc 6103 43W tu, L'unerac Mix f Lixnd Plxecd Paviux, MxuUula 9PJC0" 033000 Nix Design C11 h,Ys Cwuem 45023UOOmi Cpud'e.Mixf SiS 1U- YPJ/2U22 033000 Nix Design Charle``jj'x(* net, 3"593000Zi C,l-Mix Rx Sidewalko 9N12022 033U1:19 Nix Dcxign assl, eCunerde ISU21iU (��Cvnurde for Fluty Wale Fill-CI3\1 9/Y12022 03 30 UU Mix ❑ash Churl Rs C mains 1518 150 Pei C'ours w f F _hha PiB-CLSM 9/9/2022 tl33U GO Mix Duw,g, Charleta L'.unae[e 56424W11 N L-unaete f Slvml Dmin SOuxures 9N/2022 03 3000 Mix Dnigt Chalq w Cnnade 6545 3W0 p.! Cvnvele Mix IM Him tat, Su'en1, Paving 9/Y, 2022 U33U UU Mix Dnign Ch;vlcyY Cuncrdc 6589450U/ Cvncntc M1lix for llish Fadv St- P;tvin Y/Y,2022 033000 Mix Dnig, Chidrabn Trad Rath Mix C1312011C i000 psi L'merde f Drisi''��yys�, C1W &Guau 919,2022 U330 UU Mix Dnign Cn)Cunerde COW, II1-35OZF 5G-I+u ps, Canadall I1vw;,01c Fi71-ClsM FORTWORTH CITY OF FORT WORTHTR-0SPORTAT'IONIPUBLIC WORKS DEI-ARTMEN1 ST'ANDARD PRODUCTS LIST AS OF 05/1612014 St—Sewer-►ipes k 0utn 33-05-t3 1I 4/9/2011 334113 Y�wm fhw'r Pgict 4�tvuneeA lhuirvk=iyMoiti, Inc.( i(1,5) 4Dg HP suxm PlA iene(PPI PPV9�7�(5ize-12"-lA") WIN tUXJ&4ASHl'D\1134 18/29.2023 3349 t11 Stan) Drain Pipes, RinkerM-46. Reinfxcud CnnvtePi 4aly emkd Gnxnz Jmnc Pipe tNize-21"�x lmgtt) ASTM C7h, C655 JA28�1023 .1144 I(1 C.1— P— Rinku ktwuin4 Reinfiezcd C..ntte H.x CW+m(Sie-VI 1-1 4S"fM C7k9. C850 110/122023334I 1 U Storm Drnin Pips. Amc M, P';W CProdu25 R.infu�'e.d Cun—Pip. Tungus and Gcanc Jwnt P'ipc•k5izc-15"ur lnrgm) 4STM C76, C506 �10'1^-2023 34411U L111-It Bur A—Tm Pipc SPmdlnla Ruufrcna Ccuvttc Dux CW—t(size-V-1) AS TM L 1433,C157' 110,M2 023 3541 in Stan- Dtain Pips, The T.—Co. Reinfncad C,mcrae Pipe T-911 and G-1 a T�ni,k lipe'(Sile t5"nr larger) .45TM C'7fi, C506 �10r132023 164110 CUroct Hoy the l'u—Cu. Rcinliviced Cunaet, Hea Cul ven(dm-V—) iS IM CI413 C 1577