WHEREAS, the City of Fort Worth (CITY) and Jacobs Engineering Group
Inc,, y Secretary Contract No. 38733 ,
the CONTRACT) which was authorized by M&C 2 3 51 1 on the 12t" day of May,,
2009 in the amount of $251, 818 . 00; and
WHEREAS, the CONTRACT was subsequently revised by Amendment Number
1 in the amount of $48 , 553 . 00 authorized by the City Council by M&C C,-
24033, on January 26, 2 1 �, Amendment Number 2 ,'i the amount of $�19, 6 9 . 'O
administratively authorized by the City on May 26 , 2010 , Amendment Number
3 in the amount of $37, 616 . 00 administratively author z ed by the City on
September 3 , 2 1 , and Amendment Number 4 in the amount of $ .
administratively authorized by the City on June 27 , 2 1.1 and Amendment
Number 5 in the am �unt of $�24,. 475 . 00 authorized by the City Council by
M&C C-25794 on August 21, 2012, and Amendment Number 6' 'n the amount of
$48 , 864 . 00, administratively authorized, by the City on January 29, 2013 ;
and
WHEREAS, the CONTRACT 'involves engineering services for the
following pr ► ct
North Busch Street from Vista Meadows Drive to south of Shiver Road,
WHEREAS, it has become : ecessary to, execute Amendment No. 7 to the
CONTRACT to include an increased scope of work and revised fee .
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter 'into the following agreement,
which amends the CONTRACT:
Article I of the CONTRACT is amended to includ the additional
engineering services, specifin a proposal dated August 27, 2013 , a
copy of which is attached hereto and incorporated herein. The cost to
city for the additional design services to be performed by Engineer
totals $7 , 854 - 00 .
2 .
Article I3 of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract,, as amended, so that the total, fee paid by l y �r a
work and services shall be an amount of $439, 149 . 00 - OFFICIAL RECORD'
` CITY SECRETARY
2a I Page -I - WORTH,TX
i:Ts
tlmNIIOIIIIIII.... IwlrvlltltltltltltlllllllllllltllllllllMlAmMnIBVIfM1hAAlltlmtlmlwAAIItlMMwIYI%nPowl%MMIAYWkIMMIV uuuww.. mwianm+«�•^_--•• ,,,
3 .
All other provisions of the Contract, whi-ch are not express- ly
4
amended herein, shall remain in full force and effect .
EXECUTED and EFFECTIVE as of the date last wr-itten by a signatory,
below,.
APPROVED:
City of Fort Worth. ENGINEER
Jacobs Engineering Group Inc .
Fernando Costa Scott Russell
Assistant City Manager Vice President
DATE: DATE : 67
APP VAL RECOMMENDED:
Douglas, Wiersig, P.E.
Directo Transportation atyPublic Works Department
APPROVED AS TO FORM AND LEGALITY: M&C -#
Date
z, -e Ile
Assistant City Attorney
ATTEST: tow:
do
M ' r J. Ka
City Secre, a y
OFFICIAL RECORD
CITY SECRETARY
Page -2- FT,Woff"s
YX
JACOMS
August 27, 2013
Mr. Mike Weiss, P.E.
Project Manager
City of Fort Worth
Transportation / Public 'works, Department
1000 Throckmoirton Street
Fort Worth, Texas 76102
Reference: North, Beach Street,(Vista Meadows to 0.2 mIL South of Shiver) —
Supplement#7
Dear Mr. 'Weiss:
Attached please find our scope and fee proposal for Supplement #7 to design services for North
Beach Street. This scope includes surveyed potholed locations of the exiisting 3611 waterline and
the design for approximately 110001f of 36" waterline relocatioln.
Please feel free to contact me if you have any questions oir need anything 'further. We ire
happy to be of service.
Sincerely,
Scott Yates,, P.E.
ziUPPLEIVIENT #7 TO DESIGN S ERVICES
for
North Beach Street (Vista adIoI s to Shiver)
City Project No. TP, - 292
SCOPE, F SERVICES
This supplement to the design services contract, provides for relocation of existing 361" Waterline.
I. Design, of 36" Waterline relocation from approximate North Beach Street Station, 109+00
to Station 119+00
1. Cover Sure map showilng isolation valves for system
a. Cover/Summary map showing isolation valves for system
bi. General Notes
c. Standard Details
21. Plan/Profile sheets,for Waterline relocation
a. Locate the new 36" DIP waterline in the center of the southboluind left lane with 45
degree bends to connect to the existing 36 111 concrete waterline.
b. Use 36" Butterfly valves. City of Fort Worth will determine how many and will provide
vault,details.
c. Provide for 5' minimum cover on new waterline under the pavement. The cover over
the air release valve and butterfly valves are the critical items.
3. Project Management/Coor 'Ira t,l'on/ lee ti*ngis
a. Project management, coordination as necessary and miscel,laneo,us meetings
11. ATTACHMENTS
Al.Fee Proposal, Calculation 'worksheet
ASSUMPTIONS
1. Any additional work not specifically included in the above scope of services will be accomplished as
Additional Services, after approval by the Client.
2. If additional meetings or additional meeting duration are required, they will be performed as additional
services.
3. City will pothole and locate top of existing 36" Waterline, Some survey locates for waterline have
been conducted by the contractor and have been provided to Engineer.
a. For the waterline relocation, additional locates are required, at approximate Stations
109+0011117+00, 118+0011,19+001.
North Beach supplemen:tal 7 scope 2013-09-04,,doc
Page 1 of 1
..........
0 0
W
co 4-
0 u9l� Oil> 69.11,
4w 1 M L)1 0
M 69,
CO N CN
M M 'r-
LO l (3) 010
B
0 64
M 0 69
iE
x
LU
N co w w w
M
400 0
0 COI
,ow z
M 0
CD 0
N
Ol
UJ
4)
Uj LO
(N) CL
El 10
CY)
NINON, V-
1,11,41 C ol
M$*No"
�O
.0
UJ CL
0 01)
m 4)
0 co CIO
im
man E
0 (D
ol omm
0 C114
"to
c: Q
LL 0
OI 1
4) 0
0, cz
NO
C4
Co
C: (.5 M 0
C)
TOWN
> (OD
19 M v*w C)l 2
WAOMW %;� M�
0
01
+
0)
Q 0) 0, cu wow
r-
111
tv 110
z
0
M 0 ARM
10 lu
0 01 IPL
0
M
4) 10
0
ca
N=
0 low
>