Loading...
HomeMy WebLinkAboutContract 38733-A7 CITY SECRETS AMENDMENT No,7 CONMCT TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Jacobs Engineering Group Inc,, y Secretary Contract No. 38733 , the CONTRACT) which was authorized by M&C 2 3 51 1 on the 12t" day of May,, 2009 in the amount of $251, 818 . 00; and WHEREAS, the CONTRACT was subsequently revised by Amendment Number 1 in the amount of $48 , 553 . 00 authorized by the City Council by M&C C,- 24033, on January 26, 2 1 �, Amendment Number 2 ,'i the amount of $�19, 6 9 . 'O administratively authorized by the City on May 26 , 2010 , Amendment Number 3 in the amount of $37, 616 . 00 administratively author z ed by the City on September 3 , 2 1 , and Amendment Number 4 in the amount of $ . administratively authorized by the City on June 27 , 2 1.1 and Amendment Number 5 in the am �unt of $�24,. 475 . 00 authorized by the City Council by M&C C-25794 on August 21, 2012, and Amendment Number 6' 'n the amount of $48 , 864 . 00, administratively authorized, by the City on January 29, 2013 ; and WHEREAS, the CONTRACT 'involves engineering services for the following pr ► ct North Busch Street from Vista Meadows Drive to south of Shiver Road, WHEREAS, it has become : ecessary to, execute Amendment No. 7 to the CONTRACT to include an increased scope of work and revised fee . NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter 'into the following agreement, which amends the CONTRACT: Article I of the CONTRACT is amended to includ the additional engineering services, specifin a proposal dated August 27, 2013 , a copy of which is attached hereto and incorporated herein. The cost to city for the additional design services to be performed by Engineer totals $7 , 854 - 00 . 2 . Article I3 of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract,, as amended, so that the total, fee paid by l y �r a work and services shall be an amount of $439, 149 . 00 - OFFICIAL RECORD' ` CITY SECRETARY 2a I Page -I - WORTH,TX i:Ts tlmNIIOIIIIIII.... IwlrvlltltltltltltlllllllllllltllllllllMlAmMnIBVIfM1hAAlltlmtlmlwAAIItlMMwIYI%nPowl%MMIAYWkIMMIV uuuww.. mwianm+«�•^_--•• ,,, 3 . All other provisions of the Contract, whi-ch are not express- ly 4 amended herein, shall remain in full force and effect . EXECUTED and EFFECTIVE as of the date last wr-itten by a signatory, below,. APPROVED: City of Fort Worth. ENGINEER Jacobs Engineering Group Inc . Fernando Costa Scott Russell Assistant City Manager Vice President DATE: DATE : 67 APP VAL RECOMMENDED: Douglas, Wiersig, P.E. Directo Transportation atyPublic Works Department APPROVED AS TO FORM AND LEGALITY: M&C -# Date z, -e Ile Assistant City Attorney ATTEST: tow: do M ' r J. Ka City Secre, a y OFFICIAL RECORD CITY SECRETARY Page -2- FT,Woff"s YX JACOMS August 27, 2013 Mr. Mike Weiss, P.E. Project Manager City of Fort Worth Transportation / Public 'works, Department 1000 Throckmoirton Street Fort Worth, Texas 76102 Reference: North, Beach Street,(Vista Meadows to 0.2 mIL South of Shiver) — Supplement#7 Dear Mr. 'Weiss: Attached please find our scope and fee proposal for Supplement #7 to design services for North Beach Street. This scope includes surveyed potholed locations of the exiisting 3611 waterline and the design for approximately 110001f of 36" waterline relocatioln. Please feel free to contact me if you have any questions oir need anything 'further. We ire happy to be of service. Sincerely, Scott Yates,, P.E. ziUPPLEIVIENT #7 TO DESIGN S ERVICES for North Beach Street (Vista adIoI s to Shiver) City Project No. TP, - 292 SCOPE, F SERVICES This supplement to the design services contract, provides for relocation of existing 361" Waterline. I. Design, of 36" Waterline relocation from approximate North Beach Street Station, 109+00 to Station 119+00 1. Cover Sure map showilng isolation valves for system a. Cover/Summary map showing isolation valves for system bi. General Notes c. Standard Details 21. Plan/Profile sheets,for Waterline relocation a. Locate the new 36" DIP waterline in the center of the southboluind left lane with 45 degree bends to connect to the existing 36 111 concrete waterline. b. Use 36" Butterfly valves. City of Fort Worth will determine how many and will provide vault,details. c. Provide for 5' minimum cover on new waterline under the pavement. The cover over the air release valve and butterfly valves are the critical items. 3. Project Management/Coor 'Ira t,l'on/ lee ti*ngis a. Project management, coordination as necessary and miscel,laneo,us meetings 11. ATTACHMENTS Al.Fee Proposal, Calculation 'worksheet ASSUMPTIONS 1. Any additional work not specifically included in the above scope of services will be accomplished as Additional Services, after approval by the Client. 2. If additional meetings or additional meeting duration are required, they will be performed as additional services. 3. City will pothole and locate top of existing 36" Waterline, Some survey locates for waterline have been conducted by the contractor and have been provided to Engineer. a. For the waterline relocation, additional locates are required, at approximate Stations 109+0011117+00, 118+0011,19+001. North Beach supplemen:tal 7 scope 2013-09-04,,doc Page 1 of 1 .......... 0 0 W co 4- 0 u9l� Oil> 69.11, 4w 1 M L)1 0 M 69, CO N CN M M 'r- LO l (3) 010 B 0 64 M 0 69 iE x LU N co w w w M 400 0 0 COI ,ow z M 0 CD 0 N Ol UJ 4) Uj LO (N) CL El 10 CY) NINON, V- 1,11,41 C ol M$*No" �O .0 UJ CL 0 01) m 4) 0 co CIO im man E 0 (D ol omm 0 C114 "to c: Q LL 0 OI 1 4) 0 0, cz NO C4 Co C: (.5 M 0 C) TOWN > (OD 19 M v*w C)l 2 WAOMW %;� M� 0 01 + 0) Q 0) 0, cu wow r- 111 tv 110 z 0 M 0 ARM 10 lu 0 01 IPL 0 M 4) 10 0 ca N= 0 low >