AMENDMENT No.1
TO CITY SECRETARY CONTRACT No. 59492
WHEREAS, the City of Fort Worth (CITY) and Shield Engineering Group,
PLLC, (ENGINEER) made and entered into City Secretary Contract No. 59492,
(the CONTRACT) which was authorized by M&C 23-0343 on the 25th day of April,
2023 in the amount of $671,995.00; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Water and Sanitary Sewer Replacement Contract 2022, WSM-J; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $16,194.00 (Water: $8,471.00; Sewer: $7,723.00
).
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $688,189.00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
City of Fort Worth, Texas W&SS Repl. Contract 2022, WSM-J
Prof Services Agreement Amendment Template CPN 104482
Revision Date: 12/08/2023
Page 2 of 2
EXECUTED and EFFECTIVE as of the date subscribed by the City’s
designated Assistant City Manager.
APPROVED:
City of Fort Worth ENGINEER
Shield Engineering Group, PLLC
William Johnson Jean-Marie Alexander, P.E.
Assistant City Manager Chief Operating Officer
DATE: _______________DATE: _________________
ATTEST:
Jannette Goodall
City Secretary
APPROVAL RECOMMENDED:
Christopher Harder, P. E.
Director,Water Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
_______________________________
Preeti KC, P.E.
Project Manager
M&C No.#: ______ N/A______
APPROVED AS TO FORM AND LEGALITY:
M&C Date: ______ N/A______
Douglas W. Black Form 1295: ______ N/A_____
Sr. Assistant City Attorney
October 10, 2024
Preeti KC
Senior ProfessionalEngineer
City of Fort Worth
Water Department
RE: Amendment 1 to Provide Limited Professional Services
Dear Preeti,
Shield Engineering Group, PLLC (The Firm) is pleased to submit the following as amended
services to the original contract below:
Original Contract: Water and Sanitary Sewer Replacements Contract 2022, WSM-J
City Contract No: 104482
Shield Project No: 2022128.01
Amendment 1
Additional SS Rehabilitation: $6,545
Rehabilitation of 392 LF of exis
Existing water meters transfer from COFW line to City of Samson Park and water line
abandonment along Glade St. (survey included for water meter section): $13,235
Amendment No. 1= $19,780
Less remaining Additional Services ($3,586)
Amendment No. 1 Total= $16,194
The following table summarizes the fee for this amendment by project phase:
Water Sewer TPW Total
Original Contract $401,325.00 $246,910.00 $23,760.00 $671,995.00
Total Amendment No. 1 $8,471.00 $7,723.00 $0.00 $16,194.00
Total $409,796.00 $254,633.00 $23,760.00 $688,189.00
Please feel free to contact me with any questions or comments.
Sincerely,
Jean Marie Alexander, PE
COO
Shield Engineering Group, PLLC
�
C
N
�
II
C
d
O G
N H
W Z V N
"3'> E
�odd
m Y N `u°
c
m Q m �
aw'N
M � w �
� m O d
O p.' C 3
� � w d
w = E T
° � � `m
�
w a =
J F O m
� N
dII
i0 C
3�
d
m
�
�
�
N
�
E ry
w m
��-
3m-
i` E O
���
r�¢a