Loading...
HomeMy WebLinkAboutContract 59492-A1City of Fort Worth, Texas W&SS Repl. Contract 2022, WSM-J Prof Services Agreement Amendment Template CPN 104482 Revision Date: 12/08/2023 Page 1 of 2 AMENDMENT No.1 TO CITY SECRETARY CONTRACT No. 59492 WHEREAS, the City of Fort Worth (CITY) and Shield Engineering Group, PLLC, (ENGINEER) made and entered into City Secretary Contract No. 59492, (the CONTRACT) which was authorized by M&C 23-0343 on the 25th day of April, 2023 in the amount of $671,995.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2022, WSM-J; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $16,194.00 (Water: $8,471.00; Sewer: $7,723.00 ). 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $688,189.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth, Texas W&SS Repl. Contract 2022, WSM-J Prof Services Agreement Amendment Template CPN 104482 Revision Date: 12/08/2023 Page 2 of 2 EXECUTED and EFFECTIVE as of the date subscribed by the City’s designated Assistant City Manager. APPROVED: City of Fort Worth ENGINEER Shield Engineering Group, PLLC William Johnson Jean-Marie Alexander, P.E. Assistant City Manager Chief Operating Officer DATE: _______________DATE: _________________ ATTEST: Jannette Goodall City Secretary APPROVAL RECOMMENDED: Christopher Harder, P. E. Director,Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. _______________________________ Preeti KC, P.E. Project Manager M&C No.#: ______ N/A______ APPROVED AS TO FORM AND LEGALITY: M&C Date: ______ N/A______ Douglas W. Black Form 1295: ______ N/A_____ Sr. Assistant City Attorney October 10, 2024 Preeti KC Senior ProfessionalEngineer City of Fort Worth Water Department RE: Amendment 1 to Provide Limited Professional Services Dear Preeti, Shield Engineering Group, PLLC (The Firm) is pleased to submit the following as amended services to the original contract below: Original Contract: Water and Sanitary Sewer Replacements Contract 2022, WSM-J City Contract No: 104482 Shield Project No: 2022128.01 Amendment 1 Additional SS Rehabilitation: $6,545 Rehabilitation of 392 LF of exis Existing water meters transfer from COFW line to City of Samson Park and water line abandonment along Glade St. (survey included for water meter section): $13,235 Amendment No. 1= $19,780 Less remaining Additional Services ($3,586) Amendment No. 1 Total= $16,194 The following table summarizes the fee for this amendment by project phase: Water Sewer TPW Total Original Contract $401,325.00 $246,910.00 $23,760.00 $671,995.00 Total Amendment No. 1 $8,471.00 $7,723.00 $0.00 $16,194.00 Total $409,796.00 $254,633.00 $23,760.00 $688,189.00 Please feel free to contact me with any questions or comments. Sincerely, Jean Marie Alexander, PE COO Shield Engineering Group, PLLC � C N � II C d O G N H W Z V N "3'> E �odd m Y N `u° c m Q m � aw'N M � w � � m O d O p.' C 3 � � w d w = E T ° � � `m � w a = J F O m � N dII i0 C 3� d m � � � N � E ry w m ��- 3m- i` E O ��� r�¢a