NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Talon Hills Phase IV
City Project No.: 103653
Improvement Type(s): □ Paving □Drainage � Street Lights □Traffic Signals
Original Contract Price: $136,925.00
Amount of Approved Change Order(s): $0.00
Revised Contract Amount: $0.00
Total Cost of Work Complete: $136,925.00
�Oct 29, 2024
Contractor Date Operations Manager
Title
C & S Utility Contractor
Company Name
ddt[M dtMd(!, Oct 31, 2024 Adrian Aranda {Oct 31, 202414:54 CDT)
Project Inspector Date
Cu/,_u�� Oct 31, 2024
Project Manager Date m.�Bebecca O�e□ {Oct31 202417:09 CDT} Oct31,2024
CFA Manager Date
Oct 31, 2024
TPW Director Date
Oct31,2024
Asst. City Manager Date
Page 1 of 2
Notice of Project Completion
Project Name: Talon Hills Phase IV
City Project No.: 103653
City's Attachments
Final Pay Estimate 0
Change Order(s): ❑ Yes 0 N/A
Contractor's Attachments
Affidavit of Bills Paid �
Consent of Surety �
Statement of Contract Time
Contract Time 180 WD Days Charged: 320
Work Start Date: 4/10/2023 Work Complete Date: 9/25/2024
Completed number of Soil Lab Test: 297
Completed number of Water Test: 13
Page 2 of 2
FORTWORTH
CITY OF FORT WORTH
F1NAL PAYMENT REQUEST
Contract Name Talon Hill, Phase IV
Contract Limits
Project Type STREET LIGHTING IMPROVEMENTS
City Project Numbers 103653
DOE Number 3653
Estimate Number 1 Payment Number 1
City Secretary Contract Number 58808
Contract Date 12/16/2022
For Period Ending 9/25/2004
WD
Project Manager NA
Contractor C� S UTILITY CONTRACTORS, INC.
6705 HIGHWAY 287
ARLINGTON , TX 76001
Inspectors D. WATSON / P. JONES
Contract Time 3PdD
Days Charged to Date 320
Contract is 100.00 Complete
Wednesday, October 16, 2024 Page 1 of 4
City Project Numbers 103653
Contract Name Talon Hill, Phase IV
Contract Limits
Project Type STREET LIGHTING IMPROVEMENTS
Project F+unding
Unit V: Street LighHng Improvements
Item Description of Items
No.
1 2" CONDT PVC SCH 80 (T)
2 Rdvry Illum Foundation TY 1,2,and 4
3 Furnish/Install Rdwy Illum TY 11 Pole
4 Furnish/Install Type 33B Arm
5 NO 10 Insulated Elec Condr
6 Furnish/Install LED Lighting Fixture (70 watt
ATBO Cobra Head)
DOE Number 3653
Estimate Number 1
Payment Number 1
For Period Ending 9/25/2004
Estimated Unit Unit Cost Estimated Completed Completed
Quanity Total Quanity Total
2240 LF $17.50 $39,200.00 2240 $39,200.00
25 EA $1,100.00 $27,500.00 25 $27,500.00
25 EA $1,898.00 $47,450.00 25 $47,450.00
25 EA $300.00 $7,500.00 25 $7,500.00
6720 LF $125 $8,400.00 6720 $8,400.00
25 EA $275.00 $6,875.00 25 $6,875.00
Sub-Total of Previous Unit $136,925.00 $136,925.00
Wednesday, October 16, 2024 Page 2 of 4
City Project Numbers 103653
Contract Name Talon Hill, Phase IV
Contract Limits
Project Type STREET LIGHTING IMPROVEMENTS
Project F+unding
Contract Information Summary
Original Contract Amount
Change Orders
Total Contract Price
DOE Number 3653
Estimate Number 1
Payment Number 1
For Period Ending 9/25/2004
$136,925.00
$136,925.00
Total Cost of Work Completed $136,925.00
Less % Retained $0.00
Net Earned $136,925.00
Earned This Period $136,925.00
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$136,925.00
Wednesday, October 16, 2024 Page 3 of 4
City Project Numbers 103653
Contract Name Talon Hill, Phase IV
Contract Limits
Project Type STREET LIGHTING IMPROVEMENTS
Project F+unding
Project Manager NA
Inspectors D. WATSON / P. JONES
Contractor C& S UTILITY CONTRACTORS, INC.
6705 HIGHWAY 287
ARLINGTON , TX 76001
DOE Number 3653
Estimate Number 1
Payment Number 1
For Period Ending 9/25/2004
City Secretary Contract Number 58808
Contract Date 12/16/2022
Contract Time 30 WD
Days Charged to Date 320 WD
Contract is 000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center
Amount Gross Retainage Net
Funded
Total Cost of Work Completed
Less % Retained
Net Earned
Earned This Period $136,925.00
Retainage This Period $0.00
Less Liquidated Damages
� Days @ $0.00 / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$136,925.00
$0.00
$136,925.00
$0.00
$0.00
$0.00
$0.00
$0.00
$136,925.00
Wednesday, October 16, 2024 Page 4 of 4
��������x�
TRANSPORTATION AND PUBLIC WORKS
September 30, 2024
C& S Utility Contractos Inc
6705 Highway 287
Arlinfton TX 76001
RE: Acceptance Letter
Project Name: Talon Hills Phase IV
Project Type: Streetlight
City Project No.: 103653
To Whom It May Concern:
On September 30, 2024 a final inspection was made on the subject project. There were no punch list
items identified at that time. The final inspection indicates that the work meets the City of Fort Worth
specifications and is therefore accepted by the City. The warranty period will start on September 30,
2024, which is the date of the final inspection and will extend of two (2) years in accordance with the
Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
392-6251.
Sincerely,
���o�,ct�' �ro�
Andrew Goodman P.E, Project Manager
Cc: Adrian Aranda , Inspector
Donald Watson , Inspection Supervisor
Aaron Ybarra , Senior Inspector
Victor V. Torneo P.E , Program Manager
A.N.A Consultant LLC, Consultant
C& S Utility Contractors Inc , Contractor
BYDTaIon Hill Development, LLC, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 08/20/19
AF� IDAVIT
STATE OF Texa�
COUNTY OF Tarrant
Before xr�e, tY�e undersign�d autho�-ity, a notazy public in the state
and co�a�:ty a��resaid, on this day personally appeared D�ana Saylors, Vice
Pres�dent Of C&S Utility Contractors, Inc, known to �e to be a credible
pexson, who being hy me duly swo�nn., upon his oath deposed and said;
That all �ersons, fizms, associations, corporations, or other
organizations fuz-r�ishing labor andlor materials hati�e been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has be�n paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Gontract described as;
Ta1on Hill. Phase N- CPN 143653
BY �t����� �-
Dyana Saylors, Vice President
Subscribed and sworn before me on this date 14 0� October, 2024.
a,
tary Pub ' c
Ta�•r , s
�s� ��e BLAKE MENA�ACE
i � Notary 1D k13fl941676
n, ; My Commission Expires
a�fi February 2, 2025
�� � �
.
� � i�/
:,� ��
�- ,
1,' J'� �, /%, ^`"';,,,,�,,,,�
� i ,�� , � � , ., .
� �
6705 Highway 287
Arlington, Texas 76001
(817)829-9623
10/17f 2024
City o� Fort �orth
CFA Administration �
1000 Throckmorton Si.
Fort Warth, TX 76102
RE: Ta1on HiIl, Phase IV
DOE #: City Froject # 103653
The putpose of this Ietter is to acknowledge that C&S Utili�y Contractors, Inc.
has been paid in fizll by BYD Talon FP, LLC. for the public improvemenis coz�structed to
serve Talon Hill, Phase IV in Fort Worth, Texas. As a result, we hereby waive, relea�e
and relinQuish all rights ta assert any cla.im or der�and for lien in connection with this
project.
Please feel free to contacti me with any questions you may have.
Sincerely,
Blake Menapace
Operations Manager
�
,��
���x
�
�� ,�� s .��;
r
���
SURETEC INSURANCE C4MPANY
2103 CityWest Boulevard, Suite 1300
Houston, TX 77042
OWNER ❑
ARCHITECT ❑
C�NSENT OF SURETY CONTRACTOR ❑
TO FINAL PAYMENT SURETY �
OTHER ❑
BOND NO.: 4459499
TO OBLIGEE:
(Name andAddress)
City of Fort Worth, TX
PROJECT:
(Name and Address)
Talon Hill - Phase IV
PRINCIPAL: C&S Utility Contractors, Inc.
CONTRACT FOR:
FW City Project No. 103653
Street Light Improvements
CONTRACT DATED:
At the request af the Obligee and the Principal indicatecl above, (Insertname and address ofSurety)
SureTec Insurance Company, 2103 CityWest Boulevard, Suite 1300, Houston, TX
77042, SUREtY,
Otl 1�11d Of (Insert name and address of Contractor)
C&S Utility Contractors, Inc., 6705 Highway 287, Arlington, TX 76001
, CONTRACTOR,
and conditioned on the representation by Obligee that all Contract provisions relating to the payment
of final payment under the Contract have been satisfied by Principal as of the date of final payment,
and that no claims by Obligee or any third party are known or believed by Obligee or its
representatives to exist as of the date of final payment, representations as to the truth and accuracy
of the foregoing conditions being deemed to have be�n made by Obligee in connection with this
request for Consent of Surety, hereby approves of the final payment to the Principal, and agrees that
final payment in accordance with the terms hereof shall not relieve the Surety of its obligations to
(Insert name and addre.�s of Ob/igee)
City of Fort Worth, TX
as set forlfi in said Surety's bond.
,OBLI�EE,
IN WITNESS WHEREOF, the Surety has hereunto set its hand on this date: October 28, 2024
(Insert in wrrting the month fo/lowed by the numeric date and year.)
Company(SuretyJ
ig ure ofa orizec
Kirk D. Drey , Attorn�y-in-Fact
SIC COS Final Payment rev 10_2Q21 Page 1 of 1
POA #: 4221060
SureTec Insurance Company
LIMITED PQWER OF ATTORNEY
Know All Merr by Tliese Presenis, That SURETEC INSURANCE CCIMPANY (the "Company"), a carporation duly organized and
existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents
make, constitute and appoint
Frank Swingie, Warren Gravely, Jr., Matthew B. Elmore, Kirk D. Dreyer, John M. Huff, Stacey Healy, DeAnna Hansford Crombie, Lynsie DeCet, l.awrence
Wesson, Jr., Katie Hunt, Crystai Carison, Coliin Brence, Sarah Swain
its true and lawtut Attorney-in-tact, with i'uti power and authority hereby conYerred in its name, place and stead, to execute, acknowledge
and deliver any and all bonds, recognizances, undertakings ar other instruments or cpntracts of suretyship to include waivers ta the
conditions of contracts and consents of surety for, providing the bond penalty does not exceed
Five Million and 00/100 Dollars {$5,000,000.00)
and to bind the Company thereby as fully and to the same extent as if such bond were signed by the President, sealed with the corporate
seal of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney-in-Fact may do in the
premises. Said appointment is made under and by authority of the following resalutions of the Board of Directors of the SureTec
Insurance Company:
Be it Resolved, that the President, any Vice-President, any Assistant Vice-President, any Secretary or any Assistant Secretary shail be and is
hereby vested with full power and authority to appoint any one or more suitable persans as Attorney(s)-in-Fact to represent and act for and on
behalf of the Company subject to the follawing provisions:
,4ttorney-in-Facr may be given fuil power and authority for and in the name of and of behalf of the Company, to execute, acknowledge and
deliver, any and ait bonds, recognizances, contracts, agreements or indemnity and other conditionat or obligatory undertakings and any and a11
notices and documents cance(ing or terminating the Company's liabitity thereunder, and any such instruments so executed by any such
Attorney-in-Fact shall be binding upon the Company as if signed by the President and sea(ed and effected by the Corporate Secretary.
Be it Resolved, that the signature of any au[horized officer and sea( of the Company heretofore or hereafter affixed to any power of attorney or
any certificake relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or facsimile seal shalt be vatid
and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 21I'� ofApril,
1999.)
In Witfaess Wl:ereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its President, and its corparate seal
to be hereto affixed this zom day of A�g�sc , A.D. zoza .
State of Texas ss:
County of FIarris
yUflRNCF.
�c,� �'a
` X q ti�,2
iTW 5 f��
?m `•.,, 1 p*��
SURETEC INSURANCE COMPANY
By:
Michaet C. K m'rg, President
On this zou, day of August , A.D. zoza before me personaliy came Michael C. Keimig, to me known, who, being by me duly sworn, did depose
and say, that he resides in Houston, Texas, that he is President of SUitETEC INSURANCE COMPANY, the company described in and which executed
the above instrument; that he knows the seal of said Company; that the seal affixed to said instrument is such corporate seat; that it was so affixed by
order of the Board of Directors of said Company; and that he sigr�e��j i+is��t�n�,trereto by like order.
•''�,�y �v pt,R��'9�:
. �i'G��e�
: U ; o� �'c,� .
:a -
: N �� Chelsea Turner, Notary Public
=i :, .��, QF A��,. ' t" My commission expires July 6, 2028
� '
1, M. Brent Beaty, Assistant Secrekary of SURETEC INSU�t'.j.IC��E�G�l�'A �.'�iereby certify that the above and foregoing is a true and correct coPY
of a Power af Attorney, executed by said Company, which is'St' fn Q��i�i0�'@� � effect; and furthermore, the resolutions of the Board of Directors, set
out in the Power of Attomey are in fu(1 force and effect. ���+� �����''� �
� f -~�,,-
Given under my hand and the seal of said Company aC Houston, Texas this __ a day oi�....��'� .�g ,��� > A.D.
Any instrument issued in excess of the penaity stated above is totally void and without any va�idity. azz;oso
For verification ot the authority of this power you may call (713) 812-0800 any business day tretween 8:3ti am and 5:00 pm GST.
SureTec Insurance Company
IMPORTANT NOTICE
Statutary Complaint Notice/Filing of Claims
To obtain information or make a complaint: You may calf the Surety's toll free telephone number for information or
to make a mmplaint or file a claim at: 1-866-732-0099. You may also write to the Surety at:
SureTec Insurance Company
9500 Arboretum Bivd., Suite
40Q
Austin, TX 78759
You may contact the Texas Department of Insurance to obtain informafiion on companies, coverage, rights or
mmplaints at 1-800-252- 3439. You may write the Texas Department of Insurance at:
PO Box 149104
Austin, TX 78714-
9104
Fax#: 512-490-1OQ7
Web: http://www.tdi.state.tx.us
Email: ConsumerProtectian@tdi.texas.gov
PREMIUM OR ClAIMS DISPUTES: Should you have a dispute conceming your premium or about a ciaim, you
shouid contact the Surety firsC. If the dispute is not resalved, yau may contact the Texas Department of
Insurance.
SIC TX Rider TC►I Required Notices rev Q7_2022 Page 1 of 1
�ureTec Insurance Company
THIS BtJND RIDER CONTAINS IMP4RTANT COVERAGE INFORMATION
Limita#ion on Bond Penalty Increase
Notwithstanding any provision in the bonds or subcontrac# to the contrary, the penal sum of this Bond
shail automatically be adjusted to reflect the additive or deductive amounts af all change orders
issued to the Subcontract; provided, however, that Obligee shall notify Surety if an individual change
order increases the Subcontract Price by mare than 10%, and, if at any point the aggregate amaunt
of all change orders increases the Subcontract Price by more than 35°to of the Subcontract Price, the
Surety's consent shal! be required to increase the penal sum of this Bond in excess of 35% of the
Subcontract Price, such consent not ta be unreasanably withheld. The failure to provide #he required
natice shall not release Surety from its obligations to the extent of the bond penalty in force priar the
change that required such notice.
Texas Rider 010106