HomeMy WebLinkAboutContract 53640-CO3Contract Time
(CD)
548
15
563
128
691
Date
Date
Date
Date
Date
ATTEST:
____________________________________________
Jannette Goodall, City Secretary
Original Contract Amount
M&C Date Approved
Contractor's Company Name Contractor (Name)Contract Signature
Senior Capital Project Officer
Director, Contracting Department (Dept)
DateProgram Manager
DateAssistant Director (Dept)
Assistant City Manager
$4,621,767.97
$632,495.57
15.85%
$4,986,590.50
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
Additional Funding (if necessary)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
DateAssistant City Attorney
This change order request will increase the repair/replace steel bridge members' bid item due to the poor condition found during the inspection that necessitated replacing these members. Add a new bid item to install
flex base in lieu of lime stabilization for the roadway pavement due to the over-excavation beyond subgrade limits and the small area the lime stabilization machine would not be able to access. Add a new bid item to
remove and replace the existing metal beam guard fence with appropriate TXDOT standards, as the existing one does not meet the standards. Add a new bid item to install expansion joint steel cover plates that meet
ADA standards. This change order will also reduce the paving limits outside of the bridge to cover this additional cost and to stay within the contract amount. Based on a comparison with similar projects, the City
agrees that the price for the new bid items is fair and reasonable.
Additionally, the staff concurs with the contractor’s request for 128 additional days as follows:
• 38 days for additional bridge steel member inspections and to develop the condition reports for repair or replacements (12/12/2022 – 12/16/2022, 09/11/2023 – 9/29/2023, 01/09/2024 – 01/23/2024).
• 41 days for work delays from Union Pacific Railroad throughout the project. (This is based on 90 total days working in RR ROW with 12 trains passing daily. This stops construction work on average 15 minutes each
pass, bringing 3-hour delay each day, divided by an 8-hour work day)
• 38 days for the additional work to replace or repair the bridge steel members (utilized with existing bid item). (03/03/2023– 03/16/2023, 10/10/2023 – 10/19/2023, 02/06/2024 – 02/19/2024).
• 5 days to over-excavate on all approach slabs (05/30/2023 – 05/31/2023, 04/08/2024 – 04/10/2024).
• 6 days to remove and install metal beam guard fence (06/12/2024 – 06/14/2024), (07/10/2024 – 07/12/2024).
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges
that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Council Action (if required)
M&C Number
Inspector/Inspection Supervisor Date Project and Contract Compliance Manager
$3,989,272.40
Original Funds Available for Change Orders
$4,621,767.97
Extras to Date $632,495.57
$3,989,272.40
Credits to Date
City Sec #W Felix Street Deck and Pavement Rehabilitation
TPWDept.Totals
Project Description Replacement of brige deck including bridge sidewalk, railing and steel member.
Change Order #Rebcon, Inc
Christian Cardona Eddie WalkerCity Inspector
Remaining Funds Available for this CO
Pending Change Orders (in M&C Process)
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%)
$0.00
Contract Cost to Date
$0.00
Amount of Proposed Change Order
$4,621,767.97
Revised Contract Amount $4,621,767.97
$0.00
City of Fort Worth
Contractor
53640
Client Project #(s)101385
Date 10/11/2024
City Project Mgr.
Change Order Request
3
Project Name
$335,718.40
$335,718.40
Sub Total Additions
Date
TPW
ADDITIONS
TXDOT 784-6601A REPAIR/REPLACE STL BRIDGE MEMBERS54
Client Project # 101385
3 10/11/2024
Christian Cardona InspectorContractor
Change Order Submittal #
Rebcon, Inc PM Eddie Walker
City of Fort Worth
Change Order Additions
Project Name W Felix Street Deck and Pavement Rehabilitation City Sec # 53640
59
60
57
58
$225,133.20
TotalUnit Cost
$460.00
Unit
TPW
TPW
$2,926.00
$11,088.00
TPW
TPW
LF
532.00000000
TXDOT 0247 - 6081 Flexible Base (Type A, GR 2)
TXDOT 540 - 6001 MTL W-Beam Gd Fen (Tim Post)
TXDOT 422 - 7011 Remove and install EJCP
TXDOT 542 - 6001 Remove Metal Beam Guard Fence
320.00000000
Qty
489.42000000
DEPTITEMDESCRIPTION
TPW
1,669.00000000
532.00000000
TN
LF
LF
LB
$75,105.00
$21,466.20
$45.00
$40.35
$5.50
$34.65
Change Order Additions Page 2 of 4
Rebcon, Inc PM Christian Cardona Inspector Eddie Walker
$13,812.50
$276,250.00
$38,155.34
$6.50
$130.00
$100,000.00
2,125.00000000
0.38155340
SY
SY
LS
12
14
38
TPW
TPW
TPW
$7,500.56
Total
TN
Qty
35.38000000
DEPTITEMDESCRIPTION
TPWHydrated Lime11
Unit Cost
$212.00
Unit
8" Lime Treatment
9" Concrete Pvmt
Construction Allowance
City of Fort Worth
Change Order Deletions
Project Name W Felix Street Deck and Pavement Rehabilitation City Sec # 53640
DELETIONS
Client Project # 101385
3 10/11/2024Change Order Submittal #
Contractor
Sub Total Deletions
Date
TPW
$335,718.40
$335,718.40
2,125.00000000
Change Order Deletions Page 3 of 4
1 6/28/2022
CO #DATE AMOUNT
$632,495.57
2 1/26/2023 $0.00
M/SBE for this Change Order
Previous Change Orders
$0.00Total
Type of Service Amount for this COM/SBE Sub
Not Applicable Not Applicable Not Applicable
$632,495.57Total
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE:Change Order #3 Felix Street Bridge Deck and Pavement
Rehabilitation
M&C:20-0020 CPN: 101385 CSO: 53640 DOC#:
Date:
To: Name Department Initials Date Out
1. Sophia Flores TPW - Initials
2. Danny Krieg
Rebcon, Inc -
signature
3.Eddie Walker TPW -signature
4. Mike Glover TPW - signature
5. Christian Cardona TPW - signature
6. Gregory Robbins TPW - signature
7. Mary Hanna TPW - signature
8. Patricia Wadsack TPW - signature
9. Lauren Prieur TPW - signature
10. Doug Black Legal - signature
11. Jesica McEachern CMO - signature
12. Jannette Goodall CSO - signature
13. TPW Contracts
ATURE: All documents received from any
TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip,
David will review and take the next steps.
NEEDS TO BE NOTARIZED: YES No
RUSH:YES No SAME DAY:YES No NEXT DAY:YES No
ROUTING TO CSO: YES No
Action Required: Attach Signature, Initial and Notary Tabs
As Requested
For Your Information
Signature/Routing and or Recording
Comment
File
Return To:TPWContracts @FortWorthTexas.gov at ext. 7233 for pick up when completed.
Thank you!