HomeMy WebLinkAboutContract 60753-CO3FoRTWORTH. Project Namel Meadowbrook Golf Course Renovation Client Project #(s)l 104201 Project Description) Contractorl Heritage Links, a Division of Lexicon, Inc. City Project Mgr.l Scott Penn Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) PARD $11,358,398.00 $418,615.50 $197,925.00 $11,679,088.50 $320,270.58 $11,899,359.08 CSC No. 60753-0O3 City of Fort Worth Change Order Request City Sec # l 60753 Renovation of Meadowbrook Golf Course —18 holes Change Order #1 3 I Datel 9f7/2024 l City Inspectorl Kevin Jackson Contract Time Totals (CD) $11,358,398.00 $418,615.50 $197,925.00 $11,579,088.50 $320,270.58 120 $11,899,359.08 $0.00 $0.00 $320,270.58 $320,270.58 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 4.76% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) 1 $14,197,997.50 JUSTIFICATION (REASONS) FOR CHANGE ORDER Changes include modification to the existing fence installation on holes 3 and 4 to improve site security, installation of new additional fe n celba rrier and vehicular gates along the clubhouse packing lot and Wilson Road (left side of hole 1) for enhanced security and protection of site, installation of new 2' potable water line for restroom on hole 6 to restore water service to location, various modifications to the concrete cart path construction to better aocomodate site conditions and actual layout of golf course features, various adjustments to the grassing including the reduction of sprigging on fairways and roughs and the increase of sodding on fairways and roughs to reduce erosion and potential washouts over winter, deletion of turf reinforcement mat that is no longer needed based on site conditions, the construction of a new pump station building to enclose the pump station which was moved to a new location, the purchase of perenial ryegrass seed to overseed needy sprigged areas, and the purchase of tree'gator' watering bags for newly planted trees. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Contractor's Company Name Contractor (Name) Contract Signature Date I �.yw I Lexicon, Inc. dba Heritage Links Douglas Wright Oct 24, 20241 Ilnspector/Inspectlon Supervisor Date Project and Contract Compliance Manager Date Kw.:��-�-•�. Via Oct 29, 2024 s cP Oct 30, 2024 I Program Manager Date Senior Capital Project Officer Date Oct 30, 2024 Assistant Director (Dept) Date Director, Contracting Department (Dept) Date Oct 30, 2024 Oct 31, 2024 1 Assistant City Attorney oovvnnu Date Nov 1, 2024 Assistant City Manager Date Nov 5.20241 ~_ Q�D Council Action (if required)8T. �P ►°°o oo° ° o M&C Number 24-0884-7 M&C Date Approved 10/15/2024 ATTEST: Oaa� nEX45aa At-KC Jannette Goodall, City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FoRTWORTH ' City of Fort Worth " r" Change Order Additions Project Name 1 Meadowbrook Golf Course Renovation City Sec # 1 60753 Client Project # 1 104201 1 ConUactorl Heritage Links, a Division of Lexicon, Inc. I PMI Scott Penn I Inspeclorl Kevin Jackson l Change Order Submittal # Date 1 9l1I2024 ADDITIONS IIEM UESCRIPIIUN UEPI uty Unit UnitUost local Install 'Fortress 3-Had' hence in lieu of I dan' hence PARD 1.000UUUUU EA $4,Z15.bli $41215M 2' Potable Water Line Installation PARD 1,820.00000000 LF $5.75 $1U,465.U1U Remove Existing Post and Cable Fence PARD 250.00000000 LF $7.5U $1,875.00 Install New Post and Cable Fence wl Vehicular Barrier Gates PARD 1,176.0W00000 LF $37.20 $43,141.20 6" Safety Curb PARD 213.000000OU LF $15.45 $3,290.851 Concrete Cart Path PARD 720.000OOOOU SF $6.45 $4,644.W1 Truegnd Pro Lite Gravel Infill PARD 1,000.00000000 SF $12.55 $12,550.001 Truegrid Pro Lite Grass Infill PARD 960.00000000 SF $11.45 $10,992.001 Install ReinforoemenUDowels at Bridge Can Path Tie -Ins PARD 12.00W0000 EA $691.20 $8,294.401 TifTuf Bermudagrass Sod PARD 9,58000000 AG $29,b2U.8U $263,7b1.zbI Pump House Construction PARD 1.000000o0 LS $105,562.63 $105,562.631 Perenial Ryegrass Seed PARD 6,000.0000000U LBS $1.50 4000.UU Tree'Gator" Watering Bags PARD 212.00000000 LS $15.W $3,180.001 I I 1 1 1 1 1 1 1 1 I 1 I 1 1 1 1 I I PARD $501.583.941 1 1 1 Sub I otal Additions $51)1,583.941 Change Order Additions Page 2 of 4 I I EM FORT WORTH City of Fort Worth �T Change Order Deletions Project Name I Meadowbrook Golf Course Renovation City Sec # 1 60753 1 Client Project # 104201 1 Contractor Heritage Links, a Division of Lexicon, Inc. I PMI Scott Penn I Inspectorl Kevin Jackson l Change Order Submittal # F3 Date 1 9/7/2024 1 UESUKIF I IUN Alternate Z2 - Install Bate Concrete Roll Curb Low Water Crossing on Hole 6 Trinity Zoysia Sod Sprigging - Tees (TitTuf Bermudagrass) Sprigging - Fairways and Roughs (TifTuf Bermudagrass) Pyramat 25 - Turf Reinforcement DELETIONS UtP I Uty unit unit cast F'AHU 1.000UUUUU EA $b,000.UU PARD 340.000OOOOU LF $9.75 PARD 1.0000000U EA $10,000.00 PARD 1.0000000U AC $40,075.2U PARD 81,457.000OOOOU SF $0.28 PARD 6.3600000U AC $3,320.00 PARD 19,500.00000000 SF $4.OU PARD Sub I olal Deletions I otal I $b,000.UUI $3,315.001 $10,000.001 $40,075.201 $22,807.961 $411b.Z01 $78,000.001 1 1 1 1 1 1 1 1 1 i 1 I $181,313.361 I I I $181,313.381 Change Order Deletions Page 3 of 4 WSBE for this Change Order M/SBE Sub I Type of Service Amount for this CO Fort Worth Electric co # 2 Elecrtical Service to Pump Station Building Previous Change Orders DATE 6/13/2024 Total Total AMOUNT $36,416.44 $36,416.44 $5,000.00 $5,000.00 1 M&C Review CITY COUNCIL AGENDA Create New From This M&C DATE: 10/15/2024 REFERENCE **M&C 24- LOG NAME: NO.: 0884 CODE: C TYPE: CONSENT PUBLIC HEARING: 80MEADOWBROOK GC CHANGE ORDER #3 NO SUBJECT: (CD 11) Authorize Execution of Change Order No. 3, in the Amount of $320,270.58, to the Construction Contract with Heritage Links, a Division of Lexicon, Inc., for the Meadowbrook Golf Course Renovation Project, Increasing the Contract Amount to $11,899,359.08 (2022 Bond Program) RECOMMENDATION: It is recommended that the City Council authorize execution of Change Order No. 3, in the amount of $320,270.58, to the Construction Contract with Heritage Links, a Division of Lexicon, Inc., (City Secretary Contract No. 60753) for the 2022 Bond Meadowbrook Golf Course Renovation project (City Project No. 104201), increasing the contract amount to $11,899,359.08. DISCUSSION: The purpose of this Mayor and Council Communication (M&C) is to authorize the execution of Change Order No. 3, in the amount of $320,270.58 to City Secretary Contract No. 60753, a Construction Contract with Heritage Links, a Division of Lexicon, Inc. (Heritage Links), increasing the contract amount to $11,899,359.08. On November 14, 2023 (M&C 23-0988), the City Council authorized the execution of a construction contract with Heritage Links, in the amount of $11,358,398.00 for the renovation of Meadowbrook Golf Course (GC). Upon commencement of construction activities, it was determined that additional tree removal was necessary in areas denoted for clearing on plan documents and bid proposal. The clearing areas were mainly around existing ponds and drainage structures, which are being cleaned out and enlarged in order to provide better water quality and retention (as an amenity); the additional 168 trees were in excess of 6" but less than 18" caliper and consisted of primarily Hackberry and Cottonwood. The removal of declining and lower value tree species (cottonwood, hackberry, etc.) to facilitate increasing the size and holding capacity of ponds on the site enhances both storm water storage and water quality. Subsequently, the additional tree removals will improve both playability and the overall aesthetics of the course while allowing designers to preserve trees in better condition, higher value species (post oak, bur oak, cedar elm, etc.) and greater longevity. The initial tree removal permit, issued October 25, 2023, by the City Forester, was revised to include this additional removal on February 14, 2024. The additional tree removal work was completed in Change Order No, 1, in the amount of $81,075.00, which was executed administratively on April 22, 2024 (CSC No. 60753-001). On June 11, 2024 (M&C 24-0525), City Council authorized the execution of Change Order #2 with Heritage Links, in the amount of $139,615.50 for the relocation of the course pump station to a pond off the natural flow/drainage way, and the installation of a new 30" storm drainage pipe and associated fitting on holes 1 and 9 which will replace two sections of existing storm drainage pipe that had deteriorated and no longer functioned. FORTWORTII Change Order No. 3 will provide for additional site security fencing along Wilson Street and http://apps.cfwnet.org/council_packet/mc_review.asp?ID=32590&councildate=10/15/2024[10/22/2024 12:40:28 PM] M&C Review the existing parking area, the re-establishment of water line service to site restroom facility, some cart path re-routing to better align with course features, installation of a new pump station structure and grassing adjustments to better accommodate turf establishment (sod in lieu of sprigging in fairways and tee boxes, along with increased sprig bushels in remaining fairway areas not receiving sod). The renovation of Meadowbrook Golf Course began in February 2024 and is scheduled to be completed in October 2024. The course re -opening is anticipated to be Summer 2025 to allow for turf grow -in. The additional scope of work will not increase the contract time, it remains 260 calendar days. Funding for the difference of $540,961.08 in change orders to date and the appropriation amount is available in the base project budget (contingencies). Total Project Costs: Description Fund M&C Amount Meadowbrook General Capital Master Plan Projects Fund M&C 21-0365 $110,823.64 (City Project (Transfer from No. 103213) Municipal Golf Fund) Meadowbrook GC Design 2022 Bond Program M&C 22-0655 $553,500.00 Document Preparation Project $664,323.64 Design Total: 2022 Bond Program; PARD Gas Capital Project Lease Fund; Construction Municipal Golf Gas M&C 23-0988 $11,358,398.00 Contract Lease Capital Project Fund; and General City Gas Lease Capital Project Fund Change Order I2022 Bond Program N/A I $81,075.00 No. 1 Change Order 2022 Bond Program M&C 24-0525I $139,615.50 No. 2 Change Order 2022 Bond Program I This M&C I $320,270.58 No. 3 Construction Administration 2022 Bond Program N/A $461,317.28 Contingencies Project Construction $12,360,676.36 Total: Total Project $13,025,000.00 Cost: This project is included in the 2022 Bond Program. The City's Extendable Commercial Paper http://apps.cfwnet.org/council_packet/mc_review.asp?ID=32590&councildate=10/15/2024[10/22/2024 12:40:28 PM] M&C Review (ECP) (M&C 22-0607; Ordinance 25675-08-2022) provides liquidity to support the appropriation. Available resources will be used to actually make any interim progress payments until debt is issued. Once debt associated with a project is sold, debt proceeds will reimburse the interim financing source in accordance with the statement expressing official Intent to Reimburse that was adopted as part of the ordinance canvassing the bond election (Ordinance 25515-05-2022). Funding is budgeted in the 2022 Bond Program Fund for the purpose of funding the Meadowbrook Golf Course Renovation project. Heritage Links, A Division of Lexicon, Inc., agrees to maintain its initial M/WBE commitment of 6\% that it made on the original contract and extend and maintain that same M/WBE commitment of 6\% to all prior change orders up to and inclusive of this Change Order No. 3. Therefore, Heritage Links, A Division of Lexicon, Inc., remains in compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its company. Meadowbrook Golf Course is located in Council District 11. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are currently available in the capital budget, as previously appropriated, in the 2022 Bond Program Fund for the 2022 Bond Meadowbrook GC project to support the above recommendation and execution of the Change Order. Prior to any expenditure being incurred, the Park & Recreation Department has the responsibility to validate the availability of funds. fc, Fund Department Account Project Program Activity Budget Reference # Amount ID ID Year (Chartfield 2) FROM Fund Department Account Project Program Activity Budget Reference # Amount ID ID i Year (Chartfield 2) Submitted for Citv Manaaer's Office bv: Oriainatina Department Head: Additional Information Contact: ATTACHMENTS Jesica L. McEachern (5804) Richard Zavala (5704) Scott Penn (5750) 104201 fundinaavailabilitv.PNG (CFW Internal) Acceptance of Previous MWBE Committment Form (APCF) 2021 (3) - CO #3 Sianed RL.Ddf (CFW Internal) Chanae Order #3 - arassina - fencina.xlsm (CFW Internal) FID Table GC CO3.xlsx (CFW Internal) Form 1295 Certificate 101262425 CO#3.odf (CFW Internal) Total Project Costs Table Data.xlsx (CFW Internal) http://apps.cfwnet.org/council_packet/mc_review.asp?ID=32590&councildate=10/15/2024[10/22/2024 12:40:28 PM]