HomeMy WebLinkAboutContract 60091-FP2FORT WORTHa
-FP2
City Secretary
Contract No. 60091
Date Received 11/6/2024
AT
NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Chapel Creek Ph.7
City Project No.: 104312
Improvement Type(s): Water M Sewer 0
Original Contract Price:
$1,970,271.80
Amount of Approved Change Order(s): $2,260.00
Revised Contract Amount: $1,972,531.80
Total Cost of Work Complete: $1,972,531.80
�Nov 5, 2024
Mike Jones ( 5, 202415:25 CST)
Contractor Date
Project Manager
Title
Circle H Contractors, LP
Company Name
K'. 9.'4"�
Nov 5, 2024
Project Inspector
Date
Nov 6, 2024
Project Manager
Date
Nov 6, 2024
Rebecca Owen(Nov 6. 202409:40 CST)
CFA Manager
Date
Nov 6, 2024
TPW Director
Date
cp�' I
Nov 6, 2024
Asst. City Manager
Date
OFFICIAL RECORD
CITY SECRETARY Page 1 of 2
FT. WORTH, TX
Notice of Project Completion
Project Name: Chapel Creek Ph.7
City Project No.: 104312
City's Attachments
Final Pay Estimate x❑
Change Order(s): ❑x Yes ❑ N/A
Pipe Report: x❑ Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time: 160 WD
Work Start Date: 10/18/2023
Completed number of Soil Lab Test: 829
Completed number of Water Test: 24
Days Charged: 210 WD
Work Complete Date: 10/10/2024
Page 2of2
FoRTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name CHAPEL CREEK PHASE 7
Contract Limits
Project Type WATER & SEWER
City Project Numbers 104312
DOE Number 4312
Estimate Number 1 Payment Number 1 For Period Ending 10/10/2024
City Secretary Contract Number Contract Time
Contract Date Days Charged to Date 210
Project Manager NA Contract is 100.00 Complete
Contractor CIRCLE H CONTRACTORS, LP
P O BOX 939
MIDLOTHIAN , TX 76065
Inspectors G. DEYON / K. JACKSON
Tuesday, November 5, 2024 Page 1 of 5
City Project Numbers 104312 DOE Number 4312
Contract Name CHAPEL CREEK PHASE 7 Estimate Number I
Contract Limits Payment Number 1
Project Type WATER & SEWER For Period Ending 10/10/2024
Project Funding
UNIT IA: WATER IMPROVEMENTS
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1
REMOVE 8" WATER LINE
13 LF
$20.00
$260.00
13
$260.00
2
8" WATERLINE LOWERING
11 EA
$4,850.00
$53,350.00
11
$53,350.00
3
UTILITY SERVICE SURFACE RESTORATION
9 SY
$28.00
$252.00
9
$252.00
SODDING
4
TRENCH SAFETY
7451 LF
$0.50
$3,725.50
7451
$3,725.50
5
DUCTILE IRON WATER FITTINGS W/
2 TN
$18,820.00
$37,640.00
2
$37,640.00
RESTRAINT
6
8" PVC WATER PIPE
7451 LF
$55.70
$415,020.70
7451
$415,020.70
7
FIRE HYDRANT
10 EA
$4,930.00
$49,300.00
10
$49,300.00
8
CONNCECTION TO EXISTING 4"-12" WATER
3 EA
$1,590.00
$4,770.00
3
$4,770.00
MAIN
9
1" WATER SERVICE (DOMECTIC)
196 EA
$1,210.00
$237,160.00
196
$237,160.00
10
1" WATER SERVICE (IRRIGATION)
9 EA
$1,210.00
$10,890.00
9
$10,890.00
11
6" GATE VALVE & BOX
10 EA
$1,740.00
$17,400.00
10
$17,400.00
12
8" GATE VALVE & BOX (CO #1)
22 EA
$2,260.00
$49,720.00
22
$49,720.00
13
8" GATE VALVE & BOX (PRESSURE PLANE
6 EA
$2,260.00
$13,560.00
6
$13,560.00
VALVE)
14
TRAFFIC CONTROL
1 MO
$1,800.00
$1,800.00
1
$1,800.00
Sub -Total of Previous Unit
$894,848.20
$894,848.20
UNIT 2A SANITARY IMPROVEMENTS
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1
CONC PVMT REPAIR, RESIDENTIAL
65 SY
$264.00
$17,160.00
65
$17,160.00
2
POST - CCTV INSPEECTION
7288 LF
$2.50
$18,220.00
7288
$18,220.00
3
MANHOLE VACUUM TESTING
37 EA
$200.00
$7,400.00
37
$7,400.00
4
TRENCH SAFETY
7288 LF
$2.00
$14,576.00
7288
$14,576.00
5
IMPORTED EMBEDMENT/ BACKFILL, CSS
480 LF
$60.00
$28,800.00
480
$28,800.00
6
4" SEWER SERVICE
196 EA
$790.00
$154,840.00
196
$154,840.00
7
8" SEWER MAIN
7288 LF
$72.70
$529,837.60
7288
$529,837.60
8
EPDXY MANHOLE LINER
279 VF
$225.00
$62,775.00
279
$62,775.00
9
4'MANHOLE
33 EA
$4,275.00
$141,075.00
33
$141,075.00
10
4' DROP MANHOLE
4 EA
$6,275.00
$25,100.00
4
$25,100.00
Tuesday, November 5, 2024
Page 2 of 5
City Project Numbers 104312
Contract Name CHAPEL CREEK PHASE 7
Contract Limits
Project Type SANITARY
Project Funding
DOE Number 4312
Estimate Number 1
Payment Number 1
For Period Ending 10/10/2024
11 EXTRA DEPTH MANHOLE (> 6.0) 190 VF $410.00 $77,900.00 190 $77,900.00
Sub -Total of Previous Unit $1,077,683.60 $1,077,683.60
Tuesday, November 5, 2024 Page 3 of 5
City Project Numbers 104312
Contract Name CHAPEL CREEK PHASE 7
Contract Limits
Project Type SANITARY
Project Funding
Contract Information Summary
Original Contract Amount
Change Orders
Change Order Number 1
DOE Number 4312
Estimate Number 1
Payment Number 1
For Period Ending 10/10/2024
$1,970,271.80
$2,260.00
Total Contract Price $1,972,531.80
Total Cost of Work Completed $1,972,531.80
Less % Retained $0.00
Net Earned $1,972,531.80
Earned This Period $1,972,531.80
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$1,972,531.80
Tuesday, November 5, 2024 Page 4 of 5
City Project Numbers 104312
Contract Name CHAPEL CREEK PHASE 7
Contract Limits
Project Type SANITARY
Project Funding
Project Manager NA
Inspectors G. DEYON / K. JACKSON
Contractor CIRCLE H CONTRACTORS, LP
P O BOX 939
MIDLOTHIAN , TX 76065
DOE Number 4312
Estimate Number 1
Payment Number 1
For Period Ending 10/10/2024
City Secretary Contract Number
Contract Date
Contract Time
Days Charged to Date 210
Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $1,972,531.80
Less % Retained $0.00
Net Earned $1,972,531.80
Earned This Period $1,972,531.80
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$1,972,531.80
Tuesday, November 5, 2024 Page 5 of 5
DocuSign Envelope ID: CCFFDCB2-OEBA-4882-BD08-CABO724495A6
PROJECT NAME:
CONTRACT:
CFA A
CITY PROJECT #
FID #
FILE #
INSPECTOR:
PROJECT MANAGER:
ORIGINAL CONTRACT
EXTRAS TO DATE
CREDITS TO DATE
CONTRACT TO DATE
AMOUNT
OFF PROP. TC%Hj�A`�iNGE ORDER
OUNT
0��� R�VI OONTRACT AMOUNT
PER UNIT
REVISED COST SHARE
TOTAL REVISED CONTRACT
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
CHAPEL CREEK PHASE 7
CHANGE
WATER, SEWER, PAVING, DRAINAGE, AND STREET LIGHT
ORDER No:
CFA23-0001 CITY PARTICIPATION: NO
104312
1
$0114-0200431-104312-EO7685
W-2881 & X-27532
REVIEWED
Kevin Jackson Phone No: 682-328-7823
Debbie J Willhelm Phone No: 817-392-2481
By Debbie J. Willhelm at 2:56 pm, Feb 29, 2024
CONTRACT UNIT
WATER I SEWER PAVING IDRAINAGE STREET LIGHTS
CONTRACT
Developer
beveloper
DAYS
Cost City Cost developer Cosl City Cost peveloper Cost City Cost Developer Cost
City Cost /Cost City Cost
$892.588.20 $1.077.683.60 $1,555,157.98 $1,004,573.60
$184,738.14
160
$892,588.20 $0.00 $1,077,683.60 $0.00 $1,555,157.98 $0.00 j $1,004,573.60
$0.00 $184,738.14 $0.00
160
$ 2,260.00
0
$894,848.20 Z0.00 $1,077,683.60 $0,00 $1,555,157.98 *0.00 $1,004,573.60
$0.00 $184,738.14 $0,00
160
$894.848.20 $1.077.683.60 $1.555.157.98 $1,004,573.60 $184,738.14
Dev. Cost: $4,717,001.52 City Cost:
$0.00
$4,717,001.52
Revised: 10-12-2011 Page 1
DocuSign Envelope ID: CCFFDCB2-OEBA-4882-BD08-CABO724495A6
You are directed to make the following GG1lhanges in the contract documents UNIT 1A: WATER IMPROVEMENTS
3312. 003 CITY B12 ITEM PAY ITEM # QUANTITY UNIT ITE3312.3003 8G GATE VAL E & BOX $ UNIT
2 260, 0 i TOTAL
2.260.00
} Igr
TOTAL i 2,260.00
REASONS FOR CHANGE ORDER 1.) Lot layout, private retaining walls, and fire hydrant/irrigation meter locations changed. Changes correspond to Revision No.1 as shown on sheets 7, 9, 10, 11, 15, 24, 32,
33, 34, 36, 48, & 64 of the construction plans. There were no changes to the quantities for public improvements
2.) Changes made to private pond grading, emergency spillway, and spillway details. Added gate valve for isolation. Changes correspond to Revision No.2 as shown on
sheets 1, 10, 18, 33, 35, 37, 60, 68, 69, 75, 76, & 77 of the construction plans.
3.) There were no additional days requested for this change order.
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
EC,QQ MENDED: APPROVED: APPROVED:
Shield nglneering Group Forester (USA) Real Estate Group Inc. Circle 7Ct ctors, LP.
oo„s�9„ea 6y:
By: l/ I By: I By:
Q �%���]2D96E591C]5448.. �r
Name: Landon G. Geary Name: Stephen Brim Name: Brad Owens
Title: Proiect Manager Title: Development Director Title: President
Revised: 10-12-2011 Page 2
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Chapel Creek Ph.7
CITY PROJECT NUMBER: 104312
WATER
PIPE LAID SIZE TYPE OF PIPE
C-900 8" PVC
LF
7451
FIRE HYDRANTS: 10 VALVES (16" OR LARGER) N/A
PIPE ABANDONED SIZE TYPE OF PIPE LF
N/A
DENSITIES: Uploaded to Accela
NEW SERVICES: 1 " copper 205 EA
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
SDR-26 8" PVC 7288
PIPE ABANDONED SIZE TYPE OF PIPE LF
N/A
DENSITIES: Uploaded to Accela
NEW SERVICES: 4" PVC 196 EA
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311
(817) 392 - 7941 • Fax: (817) 392 - 7845
FORTWORTH.
M,
TRANSPORTATION AND PUBLIC WORKS
October 30, 2024
Circle H Contractors
1550 FM 875
Midlothian, TX 76065
RE: Acceptance Letter
Project Name: Chapel Creekph.7
Project Type: water/sewer/storm
City Project No.: 104312
To Whom It May Concern:
On October 15, 2024 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on October 30, 2024. The final inspection
and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and
is therefore accepted by the City. The warranty period will start on October 30, 2024, which is the date
of the punch list completion and will extend of two (2) years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at
Debbie J. Willhelm, PE Senior Professional Engineer Infrastructure Plan Review Center (IPRC)
(817) 392-2481 Debbie.Willhelm@fortworthtexas.gov.
Sincerely,
Debbie Willhelm, Project Manager
Cc: Kevin Jackson, Inspector
Gary Deyon, Inspection Supervisor
Lorrie Pitts, Senior Inspector
Andrew Goodman, Program Manager
Sheild Engineering Group, Consultant
Circle H Contractors, Contractor
Forestar Group INC., Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
CIRCLE
CONTRACTORS LP. 0
BORING S UTILITIES
AFFIDAVIT OF BILLS PAID
Circle H Contractors, LP
P.O. Box 220 / 1550 W FM 875
Midlothian. TX 76065
972-723-0802
www.cirdelicontract ors. coin
BEFORE ME, the undersigned authority, on the day personally appeared Kim Owens, who after
being by me duly sworn, deposes, and says that he is the Manager for Circle H Contractors, LP.
KNOW ALL MEN THESE PRESENTS,
1. The undersigned hereby certifies the improvements on the aforementioned project have been
fully and satisfactorily completed in conformity with the contract.
2. The undersigned further certifies that there are no claims of laborers or mechanics for unpaid
wages arising out of the performance of said contract and that the wage rates paid by
Contractor were in conformity with the contract provisions relating to said wage rates.
3. The undersigned further certifies that there are no claims of subcontractors or materials
suppliers for unpaid bills for labor or materials and supplies furnished in the course of the
contract.
PROJECT: Chatrel Creek Ph 7
CERTIFIED TRUE AND COR �CT
Contractor
STATE OF TEXAS
COUNTY OF ELLIS
BEFORE ME, the undersigned, a Notary Public in and for said County and State, on this day
personally appeared Kim Owens, known to me to be the person whose name is subscribed to the
foregoing instrument and acknowledged to me that he executed the same for the purposes and
consideration therein expressed.
Given under my hand and seal of office this SO` day of
2024.
NIGGLE NORWOOO
NOTARY PUBLIC
STATE OF TEXAS
Notary Public �; J,�< RAY COMM. EXR 05105l21
NOTARY 1013021446-3 OL
CONSENT OF OWNER
SURETY COMPANY ARCHITECT ❑
CONTRACTOR ❑
TO FINAL PAYMENT SURETY ❑
AIA DOCUMENT G707 OTHER ❑
PROJECT: Chapel Creek Phase 7-Drainage, Sewer and Water
(name, address)
TO (Owner)
Circle H Contractors, LP ARCHITECT'S PROJECT NO:
PO Box 220
Midlothian, TX 76065 CONTRACT FOR: S-340301
CONTRACT DATE: August 14, 2023
FINAL CONTRACT PRICE: $2,977,105.40
CONTRACTOR: Forestar (USA) Real Estate Group, Inc
and the City of Fort Worth
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
(here insert name and address of Surety Company)
NGM Insurance Company (formerly known as National Grange Mutual Insurance Company)
55 West Street
Keene, NH 03431 SURETY COMPANY,
on bond of (here insert name and address of Contractor)
Circle H Contractors, LP
PO Box 220
Midlothian, TX 76065
,CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (here insert name and address of Owner)
Forestar (USA) Real Estate Group, Inc and
the City of Fort Worth
, OWNER,
as set forth in the said Surety Company's bond.
IN WITNESS WHEREOF,
the Surety Company has hereunto set its hand this 5th day of November, 2024.
NGM surance Company (formerly known as National
Gra e M Cual Insurance Company)
Suret C ganyr L e
Attest: s'n o �uth�oorriizedd _Representative
(Seal): c�
Attorney-inFact
Title
NOTE: This form is to be used as a companion document to AIA DOCUMENT, G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT
OF DEBTS AND CLAIMS, Current Edition
Printed in cooperation with the American Institute of Architects (AIA) by the NGM Insurance Company. The language in this document
conforms exactly to the language used in AIA document G707, April 1970 Edition.
68-5089 (06/2006)
® NGM INSURANCE COMPANY POWER OF ATTORNEY
A member of The Main Street Amerka QxM
06-03111776
KNOW ALL MEN BY THESE PRESENTS: That NGM Insurance Company, a Florida corporation having its principal
office in the City of Jacksonville, State of Florida, pursuant to Article 1V, Section 2 of the By -Laws of said Company, to
wit:
"Article IV, Section 2. The board of directors, the president, any vice president, secretary, or the
treasurer shall have the power and authority to appoint attorneys -in -fact and to authorize them to execute
on behalf of the company and affix the seal of the company thereto, bonds, recognizances, contracts of
indemnity or writings obligatory in the nature of a bond, recognizance or conditional undertaking and to
remove any such attorneys -in -fact at any time and revoke the power and authority given to them. "
does hereby make, constitute and appoint Bret Tomlinson, Sheri R Allen, David Oxford, Steven Lott, Sherrel
Breazeale, Peggy Hogan -----------
its true and lawful Attorneys -in -fact, to make, execute, seal and deliver for and on its behalf, and as its act and deed,
bonds, undertakings, recognizances, contracts of indemnity, or other writings obligatory in nature of a bond subject to the
following limitation:
1. No one bond to egad Five Million Dollars ($5,000,000)
and to bind NGM Insurance Company thereby as fully and to the same extent as if such instruments were signed by the
duly authorized officers of NGM Insurance Company; the acts of said Attorney are hereby ratified and confirmed.
This power of attorney is signed and sealed by facsimile under and by the authority of the following resolution adopted
by the Directors of NGM Insurance Company at a meeting duly called and held on the 2nd day of December 1977.
Voted: That the signature of any officer authorized by the By -Laws and the company seal may be affixed by
facsimile to any power of attorney or special power of attorney or certification of either given for the execution of
any bond, undertaking, recognizance or other written obligation in the nature thereof; such signature and seal, when
so used being hereby adopted by the company as the original signature of such office and the original seal of the
company, to be valid and binding upon the company with the same force and effect as though manually affixed.
IN WITNESS W14EREOE, NGM Insurance Company has caused these presents to be signed by its Vice President,
General Counsel and Secretary and its corporate seal to be hereto aged this 7th day of January, 2020.
NGM INSURANCE COMPANY By:
nt4=
Kimberly K. Law
Vice President, General
Counsel and Secretary
State of Florida,
County of Duval.
On this 7th day of January, 2020, before the subscriber a Notary Public of State of Florida in and for the County of Duval duly
commissioned and qualified, came Kimberly K. Law of NGM Insurance Company, to me personally known to be the officer described
herein, and who executed the preceding instrument, and she acknowledged the execution of same, and being by me fully sworn,
deposed and said that she is an officer of said Company, aforesaid: that the seal affixed to the preceding instrument is the corporate
seal of said Company, and the said corporate seal and her signature as officer were duly affixed and subscribed to the said instrument
by the authority and direction of the said Company; that Article IV, Section 2 of the By -Laws of said Company is now in force.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal at Jacksonville, Florida this 7th day of January,
2020
.(� 'ur`cM `rl ..w
2.eoarar
I. Nancy Giordano -Ramos, Vice President of NGM Insurance Company, do hereby certify that the above and foregoing is a true and
correct copy of a Power of Attorney executed by said Company which is still in full force and effect.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of said Company at Jacksonvil e, Florida this
LA i day of
n 'I ��
v WARNiN Any unsutha reproduction or alteration of this document is prohibited.
TO CONFIRM VALIDITY of the attached bond please call 1-800-225-5646. 1 1
TO SUBMIT A CLAIM: Send all correspondence to 55 West Street Keene, NH 03431 Attn: Bond Claims.