HomeMy WebLinkAboutContract 59493-A1CSC No. 59493-Al
AMENDMENT No . 1
TO CITY SECRETARY CONTRACT No. 59493
WHEREAS, the City of Fort Worth (CITY) and TranSystems Corporation
d/b/a TranSystems Corporation Consultants, (ENGINEER) made and entered into
City Secretary Contract No. 59493, (the CONTRACT) which was authorized by
M&C 23-0341 on the 251�h day of April, 2023 in the amount of $584,832.00;
and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Water and Sanitary Sewer Contract 2021, WSM-A; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $56,045.00(Water).
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $640,877.00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as
designated Assistant City Manager.
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: 12/08/2023
Page 1 of 2
of the date subscribed by the City's
OFFICIAL RECORD
CITY SECRETARY W&SS Contract 2021, WSM-K
FT. WORTH, TX CPN: 103498
APPROVED:
City of Fort Worth
William Johnson (N v 10, 202411:36 CST)
William Johnson
Assistant City Manager
11 /10/2024
DATE:
ATTEST: 6,,
?, ,, P
/
Jannette Goodall
City Secretary
APPROVAL RECOMMENDED:
YYG'v2�Qiz-
Christopher H rder (Nov 6, 2024 07:20 CST)
gdgq044
o eo o0��d0
to
OVI o=o
°a %
Chris Harder, P.E.
Director, Water Department
Contract Compliance Manager:
ENGINEER
TranSystems Corporation d/b/a
TranSys ems Corporation Consultants
Ch d a t r, P.E.
Senior Vice President
DATE: 11 /5/2024
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
z:1eAte^� ��
Dena John on, P.E.
Project Manager
APPROVED AS TO FORM AND LEGALITY:
Douglas Black (Nov 7, 2024 16:49 CST)
Douglas W. Black
Sr. Assistant City Attorney
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: 12/08/2023
Page 2 of 2
M&C No.#: N/A
M&C Date: N/A
Form 1295: N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
W&SS Contract 2021, WSM-{A
CPN: 103498
iGANNETT Gannett Fleming TranSystems
FLEMING TRANSYSTEMS
500 West 71h Street, Suite 1100
Fort Worth, TX 76102
Tel 817 339 8950
www.transystems.com
Date: October 15, 2024
Dena Johnson
Project Manager
Water Department
City of Fort Worth
200 Texas St.
Fort Worth, TX 76102
RE: Amendment 1 — Water & Sanitary Sewer Replacement Contract 2021, WSM-A
City Project No. 103498 CSC No. 59493
Dear Mrs. Johnson,
TranSystems appreciates the opportunity to provide this fee for additional services for the Water & Sanitary Sewer
Replacement Contract 2021, WSM-A Project. The additional scope includes the following:
• Adding a pressure reducing valve, meter, and vault with SCADA near the intersection of Long Ave. and Pearl
Ave.
• Abandoning water lines in the Marine Creek park area.
Additional scope included in this amendment is shown in the attached Exhibit A. The Exhibit B Level of Effort
Spreadsheet, attached to this letter, provides a breakdown of the added cost to complete the work. The fee to
complete the additional work will be deducted from the remaining total of additional services value of $5,650.00. The
remaining value will be required, in addition, to complete the work.
Fee
Additional Water Abandonment $3,645.00
PRV & Associated Components $58.050.00
Amendment 1 Total $61,695.00
Available Funds
Additional Citv Directed Services $5.650.00
Total Additional Required $56,045.00
Upon approval of the additional services fee of $56,045.00, TranSystems will proceed with incorporating the changes
into the design.
Contract Cost to Date
Original Contract Amount: $584,832.00
Amendment No. 1 Amount: $56,045.00
Revised Contract Amount: $640,877.00
Sincerely,
TranSystems Corporation Consultants
Michael Hobbs, PE
Project Manager
Ill
Task No.
1.0
1.1
2.0
3.0
4.0
4.1.1
4.2.1
4.2.2
15.0
16.0
17.0
I8.0
I 8.1
19.0
110.0
1
EXHIBIT B-2
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
Water and Sanitary Sewer Replacement Contract 2021, WSM-A - Additional Services 1 - PRV Station & Abandonment
City Project Number 103498
Labor(hours)
Erpense
Task Description
Principal Project
Project
EIT CADD RPLS Survey
Survey Administrative
Total Labor
Subconsuhant
Man;yer
Ennineer
Tech
Crew
Cost
Travel
Reproduction
Rate $380 $2'i0
$i55
$120 $140 $165 $110
$168 $110
MWBE Non-MWBE
Project Manaq�ment
'earn
0 0
0 0 0
0 0
$U
$0 $6
$0
$C
Managing the ii
Conceptual Design (30-Percent)
J 0
01
0 0 0
0 0
$0
$ I $0
$01
$C
Preliminary Design (60 Percent)
O 0
0
)
0 0 0 OI
0 0
$0
$01 $0
$01
$C
Final Des qn
0 5
111
18 31 0 QQQJJJ
0 0
$9,445
$0, $47,500
$01
$C
Final Dra 90(%) Marine Creek Park
AbandonmenneeCreek Park Abandonment 1 2 4 12 $2,690
Final (100%) Ma
(Water) I 1 2 4 S955
Final Draft (90%) & Final (100%) PRV Station
Plans. Details, & Specs (Water) 41 81 12 16 $5.800 $47.500
Bid Phase
01 01
01 0
0
0
0
0
$0
$0
$0
Construction Phase Services
01 01
0 01
01
01 0
0
0
$6
$6
$0
ROW/Easement Services
01 01
0
01
01
01 0
01
0
$0
$0
$0
Survey
0 0
I
0
01
0
01
01
0
$0
$0
$0
Desig f Survey
I
$0
Permitting
01
01 01
01
0
01
6
$0
$01
$0
Additional Services
I
j
1
1
1
$0
I
Totals 01
111 181
321
01 1
01
0
$9,445
$01
$47,500
1 Water Line Footage
#DIV/01
1 Sewer Line Footage
0 #DIV/01
0 #DIV/01
01
(A) Total Fee
$51,695
(B) Survey Fee
$0
(C) Total Fee (-) surve Fee
$61,695
1 Water Fee (100% o C)
Sewer Fee (0% of C) 1
1 561,695.00
$0.00 1
Description
WP Water
Sewer 1
Conceptual Design (30%)
$0.00
$0.00
PreliminaryY Design 60%)
910%)
$0.00
$0.00
Final besign
$61,695.D0
$0.00 I
Survey
$0.00
$0.00 I
Subtotal
1 $61.695.001
I
$0.00 I
Total
$61,695.00
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
Typical Water and Sewer Replacement
FWWTR Official Release Date: 8.09.2012
$0 $0
$0 $0
$0 $0
$0 $0
S01 $0
I
$ol $0
Total Expense
Cost Task Sub Total
$0
$0
$o
$47,500
$0
$0
S47,500
$0
$0
$0
$0
$0
$0
$0
$47,500
I Project Summa���YYY
ij Total Hours
Total Labor
I Total Expense
1 MBE/SBE Subconsultan
Non-MBE/SBE Subconsultant
I 10% Sub Markup
MBE/SBE Participation)
I Total Project Costl
Deduct Remaining Additional
Services $
I Total Additional Project Cost
$0
$o
$0
$56,945
$2.690
$955
$53,300
$0
$0
$0
$0
$0
$0
$0
$56,945.00
661
$9,4451
S47,5DD1
$01
$47,500
$4,750
0.0%
$61,695.00
5.650.00
$56,045.00
36TH
H
7
16
16'
yam'
35TH 35TH
A
C
O
01
34Tm
34TH
24"
924
2
14-
-
N
z
1pjx; `
_ _ 18!•
..LONG .
LONG LONG
P0O
Legend
'�-
w W
'-
® NS2 to ES2 Conversion
��
�o
R
W
—ES2
3
r
ST E
o
HO
a
—NS2
z
z
a
—NS3
=
24"
—NS4
—NS5
v N
—SS2
a z
�SS3
= 0
v N
-SS4
?st.,
2
N
-
- -WS2
-WS3
?
Y�
-
24' N
z
�WS4
>.
WS5
R
N
LYi
N�
Q!I5 Existing PPV
N
of
3N52023
CCP%RIG HT:C:3 SIT': i F
R1 V,ORI,
UH= UTHOR ICEC REPRODUCTION IS A VIOLATI0IJ
OF APPLIC�ELE LA-1
THIS DATA IS TO SE USED FORA GRAPHICAL
REPRESENTATIOIJ ONL%
THE ACCURAC , IS NOT TO BE TAKEN I USED
AS DATA PRODUCED FOR
ENGIHEERII IG PUP,POSE`_ OR BY A REGISTERED PROFESSIOAIAL LAUD
SURVEYOR. THE CITf OF FORT,%Ur TH ASSUMES NO RESPONSIBILITY
FOR THE ACCURAC`: OF SAID OATA.
O
Y
o
M pNT 2� -
16" 16'
r .
♦
j
INSTALL
DMA METER
-
♦♦
o
IN
16" ES2 LINE
e-
6�
ERMINAL
(ON
AMI SYSTEM)
-
-
REPLACE
EXISTING 12 NS2 LINE (1,000 LF)
N
w
ADD
PARALLEL 12" ES2 LINE (950 LF)
z -
INSTALL DMA METER
=
MqN
m
w Z
r
p�
IN 12" ES2 LINE
;
o ° o
r
(ON AMI SYSTEM)
o
JAS
ER,
-
P
O
-
_
H
.g ERS
w
c 24..
38T
- _
N
37
-
ABANDON SPECIFIC
_
_
rn
PIPES IN MARINE CREEK
7Ti
v
LINEAR PARK
_.
(SEE INSET)
>
—_
i6
o35TH
O
m
TERRA J
A
N
35
�QY
z
i7
INSTALL DMA METER
AY
o
N
IN 16" ES2 LINE
3
-
N
h
w ee
24"
3 T
(ON AMI SYSTEM)
--
o
NE 33RD
LO
=.
-ONG
E LONG
.. .. .. ..
..
--
16.1'
6-161,.
..
U
Cn
DIAMOND
IND
'A.,O\PMONO
ONO p DIAMOND
REPLACE -5,400 LF IN LONG AVE.
WITH 16"
m-
_
_ O
a
A
i
O
y
rn
-
32ND O 32ND J
m1A111
Scope of Work:
LONG AVE. PRV
31S
Install DMA meters (on AMI system):
o
WITH METER AND SCADA
Deen Rd. in 16" line
38th St. in 12" line
Long Ave. in 16" line
(
pTM
- 29th St. in 8" line
Install PRV with meter (on SCADA system):
} o
Long Ave. between Angle and Chestnut
w m
Install 12" lines in 38th St.:
4
Replace 1,000 LF of NS2 12" line
z 2 TH
o
-Add parallel 950 LF of ES2 12" line
r
r
o
Abandon existing lines in Marine Creek Linear Park:
- Lo E i
n
INSTALL DMA METER 3
-ColumbusAve. 1,100 LF
r
z
o
i
P
IN 8" ES2 LINE
- Chestnut Ave. 1,650 LF
1,100 LF
r
(ON AMI SYSTEM)
-PearlAve.
a 28TH
cC'4,
_ 36th St. 200 LF
Replace -5,400 LF 16" line in Long Ave. (CPM 103498)
$
a o It J
Replace other small diameter cast iron lines as directed by Capital Delivery Division
FORTIrWORTH
DIAMOND HILL AREA WATER SERVICE
ENHANCEMENTS
SCOPE OF WORK
WATER
Exhibit A
o sao oaa Z— N