NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Palladium East Berry
City Project No.: 104031
Improvement Type(s): ❑ Paving ❑ Drainage x❑ Street Lights ❑ Traffic Signals
Original Contract Price: $415,852.75
Amount of Approved Change Order(s):-$164,711.80
Revised Contract Amount: $251,140.95
Total Cost of Work Complete: $251,140.95
�
Ja HNovess (11WNov 11, 202410:23 CST) , 2024
Contractor Date
Bean Electrical, LLC
Title
Bean Electrical, Inc.
Company Name
61)aall
Nov 11, 2024
Project Inspector
Date
Mosadage Rohawnxdem,T. U.
Nov 11, 2024
Project Manager
Date
Rebecca Owen (Nov 11, 2024 14:39 CST)
Nov 11, 2024
CFA Manager
Date
Lauren 11, 2024 14:39 CST)
Nov 11, 2024
TPW Director
Date
op�
Nov 12, 2024
Asst. City Manager
Date
OFFICIAL RECORD
CITY SECRETARY Page 1 of 2
FT. WORTH, TX
Notice of Project Completion
Project Name: Palladium East Berry
City Project No.: 104031
City's Attachments
Final Pay Estimate x❑
Change Order(s): ❑x Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid'
Consent of Surety
Statement of Contract Time
Contract Time 120 WD Days Charged: 299 WD
Work Start Date: 11/7/2022 Work Complete Date: 11/4/2024
Completed number of Soil Lab Test: 15
Completed number of Water Test: 10
Page 2of2
FoRTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name PALLADIUM EAST BERRY
Contract Limits
Project Type STREETLIGHT IMPROVEMENTS
City Project Numbers 104031
DOE Number 0403
Estimate Number 1 Payment Number 1 For Period Ending 11/4/2024
WD
City Secretary Contract Number Contract Time 12WD
Contract Date 11/7/2022 Days Charged to Date 299
Project Manager NA Contract is 100.00 Complete
Contractor BEAN ELECTRICAL, INC
821 E ENON
FORT WORTH, TX 76140
Inspectors M. GLOVER / E. WALKER
Friday, November 8, 2024 Page 1 of 4
City Project Numbers 104031 DOE Number 0403
Contract Name PALLADIUM EAST BERRY Estimate Number 1
Contract Limits Payment Number 1
Project Type STREETLIGHT IMPROVEMENTS For Period Ending 11/4/2024
Project Funding
UNIT V: STREETLIGHT IMPROVEMENT
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1
FURNISH/INSTALL ELEC SERV PEDESTAL
1 EA
$8,500.00
$8,500.00
1
$8,500.00
2
2" CONDT PVC SCH 80(T)
2346 LF
$29.50
$69,207.00
2346
$69,207.00
3
NO. 6 INSULATED ELC CONDR (CO#1)
0 LF
$3.60
$0.00
0
$0.00
4
NO.8 INSULATED ELC CONDR
7038 LF
$6.90
$48,562.20
7038
$48,562.20
5
GROUND BOX TYPE B, W/APRON
4 EA
$1,425.00
$5,700.00
4
$5,700.00
6
RDWY ILIUM FOUNDTION TY 1
13 EA
$1,750.00
$22,750.00
13
$22,750.00
7
FURNISWINSTALL LED LIGHTING FICTURE
13 EA
$750.00
$9,750.00
13
$9,750.00
(ATBO)
8
FURNISH/INSTALL10' WASHINGTON POLE &
0 EA
$4,075.00
$0.00
0
$0.00
FIXTURE (CO#1)
9
REMOVE EXISTING LIGHTS
9 EA
$1,500.00
$13,500.00
9
$13,500.00
10
FURNISH/INSTALL RDWY HIUM FOUNDATION
13 EA
$3,385.00
$44,005.00
13
$44,005.00
TY 18
11
FURNISH/INSTALL TYPE 33A ARM
13 EA
$565.00
$7,345.00
13
$7,345.00
12
FRUNSIH.INSTALL RDWY RIUM FOUNDATION
0 EA
$1,500.00
$0.00
0
$0.00
TY 7 (CO#1)
13
EXPLORATORY EXCAVATION OF EXISITING
38 EA
$250.00
$9,500.00
38
$9,500.00
UTILITIES
14
REMOVE EX. VERHEAD STREETLIGHT
2495 EA
$1.65
$4,116.75
2495
$4,116.75
CONDUCTOR
15
RECONNECT CONDUCTOR
43 EA
$185.00
$7,955.00
43
$7,955.00
16
--------------------------------------
ELECTRICAL PERMIT
1 EA
$250.00
$250.00
1
$250.00
--------------------------------------
Sub-Total of Previous Unit
$251,140.95
$251,140.95
Friday, November 8, 2024 Page 2 of 4
City Project Numbers 104031
Contract Name PALLADIUM EAST BERRY
Contract Limits
Project Type STREETLIGHT IMPROVEMENTS
Project Funding
Contract Information Summary
Original Contract Amount
Change Orders
Change Order Number 1
Total Contract Price
DOE Number 0403
Estimate Number 1
Payment Number 1
For Period Ending 11/4/2024
$415,852.75
($164,711.80)
$251,140.95
Total Cost of Work Completed $251,140.95
Less % Retained $0.00
Net Earned $251,140.95
Earned This Period $251,140.95
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$251,140.95
Friday, November 8, 2024 Page 3 of 4
City Project Numbers 104031
Contract Name PALLADIUM EAST BERRY
Contract Limits
Project Type STREETLIGHT IMPROVEMENTS
Project Funding
Project Manager NA
Inspectors M. GLOVER / E. WALKER
Contractor BEAN ELECTRICAL, INC
821 E ENON
FORT WORTH, TX 76140
DOE Number 0403
Estimate Number 1
Payment Number 1
For Period Ending 11/4/2024
City Secretary Contract Number
Contract Date
11/7/2022
Contract Time
120 WD
Days Charged to Date
299 WD
Contract is .000000
Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $251,140.95
Less % Retained $0.00
Net Earned $251,140.95
Earned This Period $251,140.95
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$251,140.95
Friday, November 8, 2024 Page 4 of 4
REVIEWED
DEVELOPER -AWARDED -PROJECT CHANGE ORDER By Mosadage Mohammdeen at 9:36 am, Sep 05, 2024
PPROJECT NAME:
PALLADIUM EAST BERRY
ICONTRACT:
Water. Sewer. Pavinc, Draina0e and Street LiOhtS
CHANGE
ORDER No:
ICFA#
CFA22.0086 I CITY PARTICIPATION(
NIA
ICITYPROJECT#
104031
I IPRC #
IPRC22.0060
IFID #
30114-0200431-104031-EO7685
1
I
IX -Number
X-27303
(FILE #
K-2962
`
INSPECTOR:
Erc Yarger Phone No:
PROJECT MANAGER:
VICTOR TORNERO, JR. P.E. Phone No:
817-392-7830
'
CONTRACT UNIT
WATER SEWER
PAVING
DRAINAGE
STREETLIGHTS
CONTRACT DAYS
Ow�lopar Dwslopor
D-lopor
D�valop�r
Cast CIIv Cort Cost CIN Cast
Coet CIN Cos'
Cost
CItVCoSt
Devaloptr Coat
City COO
ORIGINAL CONTRACT
$261.42206 $0,00 $31.193.00 50.00
$250,276.66 $0.00
$349.631.60
30.00
$415,152.75
$0100
120 I
(EXTRAS TO DATE
$0.00 $0.00 $0.00 30.00
$0.00 $0.00
S0.00
30.00
$ -
$0.00
45 I
CREDITS TO DATE
S0.00 $0.00 $0,00 30.00
$0.00 30.00
$0.00
$0.00
$0.00
10.00
I
(CONTRACT TO DATE
$264,422.01 50.00 $31,193.00 $0.00
$250,276.66 $0.00
$369,531.60
$0.00
$415,952.75
$0.00
165
AMOUNT OF PROP. ORDER
Kee S0.00
$0.00
$0.00
S 1164.711.001
jCHANGE
I F CT AMOUNT PER
5294.42206 3100 $31,193.00 $0.00
S250,276.66 $0.00
$369.531.60
40.00
$251.140.95
$0.00
165
EO CO�
UNIT
$294.422.05 531.193.00
$250,276.66
113119.531.0
$251.140.95
REVISED COST SHARE
Dev, Cost: $1,186,564.29
City Coal:
$0.00
TOTAL REVISED CONTRACT
$1,106,564.29
I
Revised:10-12-2011 Page 1
REVIEWED
I By Mosadage Mohammdeen at 9:36 am, Sep 05, 2024 I
` J
You are directed to make the following changes In the contract documents:
CITY BID ITEM
PAY ITEM
0 QUANTITY UNIT REM DESCRIPTION
UNIT PRICE
TOTAL
:UNIT IV: Zi gi Prov.m.nts
I I I
I I
(UNIT IV; Paving Im ,rovamonte Total
UNIT III; Dralpage �morovamsnfp
UNIT III: Dra na/1a mpprovemen Talal
I
UNIT V; Street L)g4Ing40mJrrovemenL+
993441.11303887
3 -7038 LF No, 6 Insulated Elec Condr
$ 3.60 5
)25,336.80
8 .25 FA FuMsh/lnslall 10' Washlrrpp��an Pole 8 FlMuie
S 4,075.00 $
(101,875.00
.3 0312
-25 EA FumishllnslalllRdwy lllumFlundaUon TY7I
$ 11500.00 5
J3377.500.001
IUNIT V:Sheet LlMing lmorovements
I I
i 11.80
I
I
TOTAL
5
(164,711.00)
REASONS FOR CHANGE ORDER
Removedpedesi ien lights along E BdmlStreef and E Berry Street South
NO CITY FUNDS INVOLVED IN THIS CO CT. DEVELOPER IS RESPONSIBLE FOR 100%OF
THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL E SOUGHT BY THE DEVELOPER.
RTMEND APPROVED:
APPROVED:
(r);? /�(Dexebper)
�"�l By' .C[.. `/�L6L9ili
Nam s E "rim Name: Scott JohnEbn- Palladium East Berry, Ltd.
(CcnOaclBy:
By:
Name: Roy Bean- Bean Electrical, Inc.
e: ATitle: Senior Vice President
Title: Senior Prolect Manager
Revised; 10-12-2011 - Page 2
FORTWORTH.
TRANSPORTATION AND PUBLIC WORKS
November 4, 2024
BEAN ELECTRICAL,INC.
821 E.ENON AVENUE
FORT WORTH,TEXAS 76140
RE: Acceptance Letter
Project Name: PALLADIUM EAST BERRY
Project Type: WATER,SEWERPAVING,DRAINAGE & STREET LIGHT IMPROVEMENTS
City Project No.: 104031
To Whom It May Concern:
On August 30, 2024 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on November 4, 2024. The final inspection
and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and
is therefore accepted by the City. The warranty period will start on November 4, 2024, which is the date
of the punch list completion and will extend of two (2) years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
392-2443.
Sincerely,
MOSMage MahawmdeeN,T.U.
Mosadage Mohammdeen, Project Manager
Cc: Eddie Walker, Inspector
Mike Glover, Inspection Supervisor
Daniel Roy, Senior Inspector
Andrew Goodman, Program Manager
CROSS ENGINEERING CONSULTANTS, Consultant
BEAN ELECTRICAL, INC., Contractor
PALLADIUM EAST BERRY,LTD., Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
BEA�N-'EL ALA\J J JL Ll C
ELECTRICAL
213 Still Forest Dr A SUBSIDIARY OF
Cedar Creek, TX 78612
P: 512-201-6911
821 E. Enon
Fort Worth, TX 76140
P: 817-561-7400
11 / 11 /2024
City of Fort Worth
CFA Administration
100 Fort Worth Trail
Fort Worth, TX 76102
RE: Palladium East Berry
CFA# 22-0086 City Project # 104031
COMPONENTS: Street Lights
1 u =J
TRA NSP 09 TAT 10N Tc C H iF101.0 fi 1=S
The purpose of this letter is to acknowledge that Bean Electrical, LLC., have been paid in full by Palladium East
Berry, Ltd., for the public improvements constructed to serve Palladium East Berry in Fort Worth, Texas. As a
result, we hereby waive, release and relinquish all rights to assert any claim or demand for lien in connection
with this project.
Please feel free to contact me with any questions you may have.
Roy E. Bean II
VP, SW Region
Bean Electrical, LLC.
TECL17979
Regulated by The Texas Department of Licensing and Regulations, P.O. Box 12157, Austin, Texas 78711, 1800 803 9202, 512 463 6599, website
www.license.state.tx.us/complaints
BEA N_'EL_L_2ECLT1R1CAL. LL\C-i::�2==�
ELECTRICAL
213 Still Forest Dr A SUBSIDIARY OF
Cedar Creek, TX 78612
P: 512-201-6911 1 MUMf ��
TRANSPORTATION TECHNOLOGIES
821 E. Enon
Fort Worth, TX 76140
P: 817-561-7400
11 /11 /2024
Bean Dec rical, LLC., only provided a maintenance bond for the Palladium East Berry CPN
1 04project.
Koy E. Bean 11
VP, SW Region
Bean Electrical, LLC.
TECL17979
Regulated by The Texas Department of Licensing and Regulations, P.O. Box 12157, Austin, Texas 78711, 1800 803 9202, 512 463 6599, website
www.license.state.tx.us/complaints