Loading...
HomeMy WebLinkAboutContract 62291Received Date: 11 /12/2024 Received Time: 3 :42 p.m. Developer and Project Information Cover Sheet: Developer Company Name: Address, State, Zip Code: Phone & Email: Authorized Signatory, Title: Project Name: Brief Description: Project Location: Plat Case Number: PP-22-052 Mapsco: 32A CFA Number: 24-0088 City of Fort Worth, Texas Standard Community Facilities Agreement Rev. 9/21 -ennar Homes of Texas Land and Construction, LTD 1231 Greenway Drive, Ste. 800, Irving, TX 5038 169-587-5293 1 Jennifer.eller@lennar.com lennifer Eller, Authorized Agent vorthpointe West, Phase lA Water, Sewer, Drainage, Paving, and Street Lights North of Boat Club Road Plat Name: Northpointe West Council District: City Project Number: Kll 104830 1 IPRC24-0027 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 1 of 16 City Contract Number: 62291 STANDARD COMMUNITY FACILITIES AGREEMENT This COMMUNITY FACILITIES AGREEMENT ("Agreement") is made and entered into by and between the City of Fort Worth ("City"), a home -rule municipal corporation of the State of Texas, acting by and through its duly authorized Assistant City Manager, and Lennar Homes of Texas Land and Construction, LTD ("Developer"), acting by and through its duly authorized representative. City and Developer are referred to herein individually as a "party" and collectively as the "parties." WHEREAS, Developer is constructing private improvements or subdividing land within the corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as Northpointe West, Phase IA ("Project"); and WHEREAS, the City desires to ensure that all developments are adequately served by public infrastructure and that the public infrastructure is constructed according to City standards; and WHEREAS, as a condition of approval of the Project, Developer is required to bear a portion of the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as described in this Agreement ("Community Facilities" or "Improvements"); and WHEREAS, as a condition of approval of the Project, Developer is required to meet the additional obligations contained in this Agreement, and Developer may be required to make dedications of land, pay fees or construction costs, or meet other obligations that are not a part of this Agreement; and WHEREAS, the City is not participating in the cost of the Improvements or Project; and WHEREAS, the Developer and the City desire to enter into this Agreement in connection with the collective Improvements for the Project; NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: 1. CFA Ordinance The Community Facilities Agreements Ordinance ("CFA Ordinance"), as amended, is incorporated into this Agreement by reference, as if it was fully set out herein. Developer agrees to comply with all provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in connection with the work performed by the contractors. If a conflict exists between the terms and conditions of this Agreement and the CFA Ordinance, the CFA Ordinance shall control. OFFICIAL RECORD City of Fort Worth, Texas Page 2 of 16 Standard Community Facilities Agreement CITY SECRETARY Rev. 9/21 FT. WORTH, TX 2. Incorporation of Engineering Plans The engineering plans for the Improvements that have been approved by the City ("Engineering Plans") are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the Improvements required by this Agreement. 3. Description of Improvements; Exhibits and Attachments The following exhibits describe the general location, nature and extent of the Improvements that are the subject of this Agreement and are attached hereto and incorporated herein by reference: ® Exhibit A: Water ❑X Exhibit A-1: Sewer ® Exhibit B: Paving ❑X Exhibit B-1: Storm Drain ® Exhibit C-1: Street Lights & Signs The Location Map and Cost Estimates are also attached hereto and incorporated herein by reference. To the extent that Exhibits A, A-1, B, B-1, C-1, the Location Map, or the Cost Estimates conflict with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1 — Changes to Standard Community Facilities Agreement, Attachment 2 — Phased CFA Provisions, and Attachment 3 — Concurrent CFA Provisions, are attached hereto and incorporated herein for all purposes. 4. Construction of Improvements Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the Improvements, and this Agreement. Developer acknowledges that City will not accept the Improvements until the City receives affidavits and lien releases signed by Developer's contractors verifying that the contractors, and all subcontractors and material suppliers, have been paid in full for constructing the Improvements, and consent of the surety on payment and performance bonds provided for the Improvements. 5. Financial Guarantee Developer has provided the City with a financial guarantee in the form and amounts set forth in this Agreement which guarantees the construction of the Improvements and payment by Developer of all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee"). Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the CFA Ordinance. City of Fort Worth, Texas Page 3 of 16 Standard Community Facilities Agreement Rev. 9/21 6. Completion Deadline; Extension Periods This Agreement shall be effective on the date this Agreement is executed by the City's Assistant City Manager ("Effective Date"). Developer shall complete construction of the Improvements and obtain the City's acceptance of the Improvements within two (2) years of the Effective Date ("Term"). If construction of the Improvements has started during the Term, the Developer may request that this Agreement be extended for an additional period of time ("Extension Period"). All Extension Periods shall be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement. In no event shall the Term of this Agreement plus any Extension Periods be for more than three years. 7. Failure to Construct the Improvements (a) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements if at the end of the Term, and any Extension Periods, the Improvements have not been completed and accepted by the City. (b) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of the Improvements before the expiration of the Term, and any Extension Period, if the Developer breaches this Agreement, becomes insolvent, or fails to pay costs of construction. (c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers are not paid for construction costs or materials supplied for the Improvements the contractors and suppliers may place a lien upon any property which the City does not have an ownership interest that is the subject of the Completion Agreement. (d) Nothing contained herein is intended to limit the Developer's obligations under the CFA Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's contractors, or other related agreements. 8. Termination If Developer desires to terminate this Agreement before Developer's contractors begin constructing the Improvements, Developer agrees to the following: (a) that Developer and City must execute a termination of this Agreement in writing; (b) that Developer will vacate any final plats that have been filed with the county where the Project is located; and (c) to pay to the City all costs incurred by the City in connection with this Agreement, including time spent by the City's inspectors at preconstruction meetings. 9. Award of Construction Contracts City of Fort Worth, Texas Page 4 of 16 Standard Community Facilities Agreement Rev. 9/21 (a) Developer will award all contracts for the construction of the Improvements and cause the Improvements to be constructed in accordance with the CFA Ordinance. (b) Developer will employ construction contractors who meet the requirements of the City to construct the Improvements including, but not limited, to being prequalified, insured, licensed and bonded to construct the Improvements in the City. (c) Developer will require Developer's contractors to provide the City with payment and performance bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent (100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and performance bonds shall guarantee construction of the Improvements and payment of all subcontractors and material suppliers. Developer agrees to require Developer's contractors to provide the City with a maintenance bond naming the City as an obligee, in the amount of one hundred percent (100%) of the cost of the Improvements, that guarantees correction of defects in materials and workmanship for the Improvements by the contractor and surety for a period of two (2) years after completion and final acceptance of the Improvements by the City. All bonds must be provided to the City before construction begins and must meet the requirements of the City's Standard Conditions, Chapter 2253 of the Texas Government Code, and the Texas Insurance Code. (d) Developer will require Developer's contractors to provide the City with insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City must be named as an additional insured on all insurance policies. The Developer must provide the City with a Certificate of Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's insurance provider, which shall be made a part of the Project Manual. (e) Developer will require the Developer's contractors to give forty-eight (48) hours' advance notice of their intent to commence construction of the Improvements to the City's Construction Services Division so that City inspection personnel will be available. Developer will require Developer's contractors to allow construction of the Improvements to be subject to inspection at any and all times by the City's inspectors. Developer will require Developer's contractors to not install or relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives consent to proceed, and to allow such laboratory tests as may be required by the City. M Developer will not allow Developer's contractors to begin construction of the Improvements until a notice to proceed to construction is issued by the City. (g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and service lines have been completed to the satisfaction of the City. 10. Utilities Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project; and (2) to construct the Improvements required herein. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the Improvements to be constructed pursuant to this Agreement. City of Fort Worth, Texas Page 5 of 16 Standard Community Facilities Agreement Rev. 9/21 11. Easements and Rights -of -Way Developer agrees to provide, at its expense, all necessary rights -of -way and easements required for the construction and dedication to the City of the Improvements provided for by this Agreement. 12. Liability and Indemnification (a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT. (b) THE DEVELOPER COVENANTS AND AGREES TO, AND BY THESE PRESENTS DOES HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM ALL SUITS, ACTIONS OR CLAIMS OF ANY CHARACTER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ONACCOUNT OFANYINJURIES OR DAMAGES SUSTAINED BYANYPERSONS, INCLUDING DEATH, OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE CONSTRUCTION, DESIGN, PERFORMANCE OR COMPLETION OF ANY WORK TO BE PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO PROPERLY SAFEGUARD THE WORK, OR ONACCOUNT OFANYACT, INTENTIONAL OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS CONTRACTORS, SUB -CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, WHETHER OR NOT SUCHINJURIES, DEATH OR DAMAGESARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. (c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY, INCLUDING DEATH, RESULTING FROM, OR INANY WAY CONNECTED WITH, THE CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY FOR ANY LOSSES, DAMAGES, COSTS OR EXPENSES SUFFERED BY THE CITY OR CAUSED AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE MANNER, FREE FROM DEFECTS, IN CONFORMANCE WITH THE CFA ORDINANCE, AND INACCORDANCE WITH ALL PLANS AND SPECIFICATIONS. 13. Right to Enforce Contracts City of Fort Worth, Texas Page 6 of 16 Standard Community Facilities Agreement Rev. 9/21 Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its contractors, along with an assignment of all warranties given by the contractors, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third -party beneficiary of such contracts. 14. Estimated Fees Paid by Developer; Reconciliation Prior to execution of this Agreement, Developer has paid to the City the estimated cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the construction of the Improvements, the City will reconcile the actual cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer, the Developer must pay the difference to the City before the Improvements will be accepted by the City. If the actual costs of the fees are less than the estimated payments made by the Developer, the City will refund the difference to the Developer. If the difference between the actual costs and the estimated payments made by the Developer is less than fifty dollars ($50.00), the City will not issue a refund and the Developer will not be responsible for paying the difference. The financial guarantee will not be released by the City or returned to the Developer until reconciliation has been completed by the City and any fees owed to the City have been paid by the Developer. 15. Material Testing The City maintains a list of pre -approved material testing laboratories. The Developer must contract with material testing laboratories on the City's list. Material testing laboratories will provide copies of all test results directly to the City and the Developer. If the Improvements being constructed fail a test, the Developer must correct or replace the Improvements until the Improvements pass all retests. The Developer must pay the material testing laboratories directly for all material testing and retesting. The City will obtain proof from the material testing laboratories that the material testing laboratories have been paid in full by the Developer before the City will accept the Improvements. 16. Notices All notices required or permitted under this Agreement may be given to a party by hand - delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be deemed to have been received when deposited in the United States mail so addressed with postage prepaid: CITY: Development Contract Management Office City of Fort Worth 100 Fort Worth Trail Fort Worth, Texas 76102 With conies to: City of Fort Worth, Texas Standard Community Facilities Agreement Rev. 9/21 DEVELOPER: Lennar Homes of Texas Land and Construction, LTD 1231 Greenway Drive,. Suite 800 Irving, Texas 75038 Page 7 of 16 City Attorney's Office City of Fort Worth 100 Fort Worth Trail Fort Worth, Texas 76102 and City Manager's Office City of Fort Worth 100 Fort Worth Trail Fort Worth, Texas 76102 Or to such other address one party may hereafter designate by notice in writing addressed and mailed or delivered to the other party hereto. 17. Right to Audit Developer agrees that, until the expiration of three (3) years after acceptance by the City of the Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to examine any directly pertinent books, documents, papers and records of the Developer involving transactions relating to this Agreement. Developer agrees that the City shall have access during normal working hours to all necessary Developer facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section. The City shall give Developer reasonable advance notice of intended audits. Developer further agrees to include in all contracts with Developer's contractors for the Improvements a provision to the effect that the contractor agrees that the City shall, until the expiration of three (3) years after final payment under the contract, have access to and the right to examine any directly pertinent books, documents, papers and records of such contractor, involving transactions to the contract, and further, that City shall have access during normal working hours to all of the contractor's facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. City shall give Developer's contractors reasonable advance notice of intended audits. 18. Independent Contractor It is expressly understood and agreed that Developer and its employees, representative, agents, servants, officers, contractors, subcontractors, and volunteers shall operate as independent contractors as to all rights and privileges and work performed under this Agreement, and not as agents, representatives or employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement, Developer shall have the exclusive right to control the details of its operations and activities and be solely responsible for the acts and omissions of its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat superior shall not apply as between the City and its officers, representatives, agents, servants and employees, and Developer and its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the City of Fort Worth, Texas Page 8 of 16 Standard Community Facilities Agreement Rev. 9/21 creation of a partnership or joint enterprise between City and Developer. It is further understood that the City shall in no way be considered a co -employer or a joint employer of Developer or any employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer. Neither Developer, nor any officers, agents, servants, employees or subcontractors of Developer shall be entitled to any employment benefits from the City. Developer shall be responsible and liable for any and all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. The City, through its authorized representatives and employees, shall have the sole and exclusive right to exercise jurisdiction and control over City employees. 19. Applicable Law; Venue This Agreement shall be construed under and in accordance with Texas law. Venue shall be in the state courts located in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. 20. Non -Waiver The failure of the City to insist upon the performance of any term or provision of this Agreement or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent of City's right to assert or rely on any such term or right on any future occasion. 21. Governmental Powers and Immunities. It is understood that by execution of this Agreement, the City does not waive or surrender any of its governmental powers or immunities. 22. Headings The paragraph headings contained herein are for the convenience in reference and are not intended to define or limit the scope of any provision of this Agreement. 23. Severability In the event that any clause or provision of this Agreement shall be held to be invalid by any court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the remaining provisions hereof. 24. Review of Counsel City and Developer, and if they so choose, their attorneys, have had the opportunity to review and comment on this document; therefore any rule of contract construction or interpretation that would City of Fort Worth, Texas Page 9 of 16 Standard Community Facilities Agreement Rev. 9/21 normally call for the document to be interpreted as against the drafting party shall not apply in interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be construed solely on the basis of the language contained therein, regardless of who authored such language. 25. Prohibition on Boycotting Israel Developer acknowledges that in accordance with Chapter 2271 of the Texas Government Code, the City is prohibited from entering into a contract with a company with 10 or more full-time employees that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" have the meanings ascribed to those terms by Chapter 2271 of the Texas Government Code. To the extent that Chapter 2271 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of this Agreement. 26. Prohibition on Boycotting Energy Companies Developer acknowledges that in accordance with Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City with a company with 10 or more full-time employees unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meanings ascribed to those terms by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. 27. Prohibition on Discrimination Against Firearm and Ammunition Industries Developer acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City with a company with 10 or more full-time employees unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. City of Fort Worth, Texas Page 10 of 16 Standard Community Facilities Agreement Rev. 9/21 28. Immigration and Nationality Act Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. 29. Amendment No amendment, modification, or alteration of the terms of this Agreement shall be binding unless the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer. 30. Assignment and Successors Developer shall not assign or subcontract all or any part of its rights, privileges, or duties under this Agreement without the prior written consent of City. Any attempted assignment or subcontract without the City's prior written approval shall be void and constitute a breach of this Agreement. 31. No Third -Party Beneficiaries The provisions and conditions of this Agreement are solely for the benefit of the City and Developer, and any lawful assign or successor of Developer, and are not intended to create any rights, contractual or otherwise, to any other person or entity. 32. Compliance with Laws, Ordinances, Rules and Regulations Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed and understood that, if City calls to the attention of Developer any such violation on the part of Developer or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately desist from and correct such violation. 33. Signature Authority City of Fort Worth, Texas Page 11 of 16 Standard Community Facilities Agreement Rev. 9/21 The person signing this Agreement on behalf of Developer warrants that he or she has the legal authority to execute this Agreement on behalf of the Developer, and that such binding authority has been granted by proper order, resolution, ordinance or other authorization of the entity. The City is fully entitled to rely on this warranty and representation in entering into this Agreement. 34. Counterparts This Agreement may be executed in multiple counterparts, each of which will be deemed an original, but which together will constitute one instrument. 35. Entire Agreement This written instrument, together with any attachments, exhibits, and appendices, constitutes the entire understanding between the City and Developer concerning the work to be performed hereunder, and any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall be void. [REMAINDER OF PAGE INTENTIONALLY BLANK] City of Fort Worth, Texas Page 12 of 16 Standard Community Facilities Agreement Rev. 9/21 36. Cost Summary Sheet Project Name: Northpointe West, Phase 1A CFA No.: 24-0088 Ite ms A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total City Project No.: 104830 B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer 4. Signals TPW Construction Cost Total Total Construction Cost (excluding the fees) Estimated Construction Fees: C. Construction Inspection Service Fee D. Administrative Material Testing Service Fee E. Water Testing Lab Fee Total Estimated Construction Fees: Financial Guarantee Options, choose one Bond = 100% (Completion Aqreement = 100%/ Holds Plat (Cash Escrow Water/Sanitary Sewer= 125% (Cash Escrow Pavinq/Storm Drain = 125% (Letter of Credit = 125% Escrow Pledqe Aqreement = 125% Developer's Cost $ 455,987.00 $ 257,156.50 $ 713,143.50 $ 1,794,544.80 $ 2,741,449.00 $ 278,623.00 $ 4,814,616.80 $ 5,527,760.30 $82,500.00 $12,985.00 $540.00 $ 96,025.00 IPRC No.: 24-0027 Choice Amount (Mark one $ 5,527,760.30 X $ 5,527,760.30 $ 891,429.38 $ 6,018,271.00 $ 6,909,700.38 City of Fort Worth, Texas Page 13 of 16 Standard Community Facilities Agreement Rev. 9/21 IN WITNESS WHEREOF, the City and Developer have each executed this Agreement by their duly authorized signatories to be effective on the date executed by the City's Assistant City Manager. CITY OF FORT WORTH IS4n4, &LY'6jAUaycle Dana Burghdoff (NdY12, 2024 f5:20 CST) Dana Burghdoff Assistant City Manager Date: 1 1 /1 2/2024 Recommended by: Dwayne Hollars / Bichson Nguyen Contract Compliance Specialist Development Services Approved as to Form & Legality: Richard McCracken (Nov 11, 202421:16 CST) Richard A. McCracken Sr. Assistant City Attorney M&C No. N/A Date: 11/11/2024 Form 1295: N/A oovvnp of -Goo. a 4 AA 00 Q Y ATTEST: pro Ovo o=d 000 o'*d IlIl"nEXkto Jannette S. Goodall City Secretary DEVELOPER Lennar Homes of Texas Land and Construction, LTD Jennifer Eller (Nov 11, 2024 09:34 CST) Jennifer Eller Authorized Agent Date: 11/11/2024 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Rebecca Owen (Nov 11, 2024 09:49 CST) Rebecca Diane Owen Development Manager OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Page 14 of 16 Standard Community Facilities Agreement Rev. 9/21 The following attachments are incorporated into this Agreement. To the extent a conflict exists between the main body of this Agreement and the following attachments, the language in the main body of this Agreement shall be controlling. Included Attachment ❑x Attachment 1 - Changes to Standard Community Facilities Agreement ❑ Attachment 2 — Phased CFA Provisions ❑ Attachment 3 — Concurrent CFA Provisions ® Location Map ® Exhibit A: Water Improvements ® Exhibit A-1: Sewer Improvements ® Exhibit B: Paving Improvements ® Exhibit B-1: Storm Drain Improvements ❑ Exhibit C: Wall Improvements ® Exhibit C-1: Street Lights and Signs Improvements ® Cost Estimates (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Page 15 of 16 Standard Community Facilities Agreement Rev. 9/21 ATTACHMENT "1" Changes to Standard Community Facilities Agreement City Project No. 104830 None City of Fort Worth, Texas Page 16 of 16 Standard Community Facilities Agreement Rev. 9/21 NORTHPOINTE WEST PHASE 2 CPN 104831 (TO BE CONSTRUCTED) — NORTHPOINTE WEST PHASE 1 B - r CPN 104829 (TO BE CONSTRUCTED) TIMBER OAKS �J sd MAPSCO NO. O32A COUNCIL DISTRICT 7 OWNED/DEVELOPED BY: LENNAR HOMES OF TEXAS LAND AND CONSTRUCTION, LTD. 1707 MARKET PLACE BLVD., SUITE 100 IRVING, Texas 75063 KYLE DICKERSON PHONE: (469) 587-5206 LOCATION PARK BAIL G�UNTY !jd 3 SOUTH VICINITY MAP : 2,000' NORTHPOINTE-WEST PHASE 1A CITY PROJECT NO. 104830 LJA Engineering, Inc. ZAA 6060 North Central Expressway Phone 469.621.0710 Suite 400 Dallas, Texas 75206 FRN - F-1386 �IIIIIIIIIIII NOT EXISTING INFRASTRUCTURE NORTHPOINTE WEST PHASE 2 8" WATER LINE CPN. 104831 q,o„E wAr (PROJECT UNDER CONSTRUCTION) NORTHPOINTE WEST PHASE 2 CPN 104831 POLO CLUB % BUILDERS INC - NOT EXISTING INFRASTRUCTURE 12" WATER LINE NORTHPOINTE WEST PHASE 1B CPN. 104829 (PROJECT UNDER CONSTRUCTION) EXISTING FENCE LINE OWNED/DEVELOPED BY: LENNAR HOMES OF TEXAS LAND AND CONSTRUCTION, LTD. 1707 MARKET PLACE BLVD., SUITE 100 IRVING, Texas 75063 KYLE DICKERSON PHONE: (469) 587-5206 N SCALE:1" = 500' NORTHPOINTE EAST PHASE 13 CPN XXXXXX ---��Tfl �-- KLLB AIV LLC NORTHPOINTE EAST PHASE 8 X CPN 103273 \ -- EXISTING INFRASTRUCTURE 16" WATER LINE NORTHPOINTE EAST PHASE 8 CPN. 103273 WATER EXHIBIT 'Al LEGEND PROPOSED WATER LINE EXISTING WATER LINE LIMITS OF PROJECT NORTHPOINTE-WEST PHASE 1A CITY PROJECT NO. 104830 LJA Engineering, Inc. `AA 6060 North Central Expressway Phone 469.621.0710 Suite 400 Dallas, Texas 75206 FRN - F-1386 NORTHPOINTE WEST PHASE 2 CPN 104831 FORCHIVI DRIVE I I I I NOT EXISTING INFRASTRUCTURE NORTHPOINTE WEST PHASE 113 CPN. 104829 (PROJECT UNDER CONSTRUCTION) I I I U U I I I J _FOGLINE BOULIVAf 1 I NORTHPOINTE WEST PHASE 1B CPN 104829 J J OWNED/DEVELOPED BY: LENNAR HOMES OF TEXAS LAND AND CONSTRUCTION, LTD 1707 MARKET PLACE BLVD., SUITE 100 IRVING, Texas 75063 KYLE DICKERSON PHONE: (469) 587-5206 1 i� t KLLB AIV LLC o Q 0 U Z Q C Z_ W EXISTING SANITARY SEWER PIONEER POINT PHASE 2 CPN. 102768 i I i r'itKl IHC�t I KHI,t %\gin RLI \F2y�4nv ' LJ ii I - NORTHPOINTE EAST PHASE 8 - CPN 103273 WASTEWATER EXHIBIT 'A-1' LEGEND PROPOSED SAN SEWER FLOW DIRECTION EXISTING SAN SEWER 2 LIMITS OF PROJECT S I I I NORTHPOINTE-WEST PHASE 1A CITY PROJECT NO. 104830 LJA Engineering, Inc. `J4 6060 North Central Expressway Phone 469.621.0710 Suite 400 Dallas, Texas 75206 FRN - F-1386 CHAPEL HILL WEST LLC NORTHPOINTE EAST PHASE 131 CPN XXXXXX 1 oNF war I Wes I NOT EXISTING INFRASTRUCTURE NORTHPOINTE WEST PHASE 2 CPN. 104831 I (PROJECT UNDER CONSTRUCTION) KLLB AIV LLC NORTHPOINTE / � � � 80' ROW WEST PHASE 2 23' B—B CPN104831 FOKHINI ORS : I -NE B]UIEVRN➢ NORTHPOINTE WEST PHASE 1B z I CPN 104829 1100, NOT EXISTING INFRASTRUCTURE �fM NORTHPOINTE WEST PHASE 1 B L/JI CPN. 104829 (PROJECT UNDER CONSTRUCTION) 112' ROW 23' B—B POLO CLUB BUILDERS INC EXISTING FENCE LINE OWNED/DEVELOPED BY: LENNAR HOMES OF TEXAS LAND AND CONSTRUCTION, LTD. 1707 MARKET PLACE BLVD., SUITE 100 IRVING, Texas 75063 KYLE DICKERSON PHONE: (469) 587-5206 I I / I 101' ROW - 23' B—B NOT EXISTING INFRASTRUCTURE NORTHPOINTE EAST PHASE 8 CPN. 103273 (PROJECT UNDER \CONSTRUCTION) V NORTHPOINTE EAST PHASE 8 CPN 103273 PAVING IMPROVEMENTS LEGEND EXHIBIT U I�I PROPOSED 23'B—B f~ 130' ROW ROADWAY I 2 x 25' B—B / PROPOSED 25'B—B ROADWAY PROPOSED SIDEWALK (BY HOMEBUILDER) 110' ROW PROPOSED SIDEWALK 23' B—B (BY DEVELOPER) PROPOSED ADA RAMPS (BY DEVELOPER) LIMITS OF PROJECT MENNOWN/A C NORTHPOINTE-WEST PHASE 1A CITY PROJECT NO. 104830 LJA Engineering, Inc. ZAA 6060 North Central Expressway Phone 469.621.0710 Suite 400 Dallas, Texas 75206 FRN - F-1386 CHAPEL HILL �T ` g` WEST LLC 1� J' SCALE:1" = 500' AY a'xB I1r:e � NORTHPOINTE EAST PHASE 13 CPN XXXXXX �'s, INILET21 RCP � 4.X1So 1aN BODC � _ r 21' RCP ,RioRE war fr 21• RCP _ 21' RCP S' SQ. / 2—f0• RILET JIX,C,ION BOX 21' RCP 21' RCP �\ 2T RCP g6. i Fw—O vmN=ALL 2—Y'7f!' IRXt 2—,a1a• moo _ NORTHPOINTE �+� � WEST PHASE 2� CPN 104831 1 1 1 1 121'- 21' RCP FORCHINI i ,B• mw 21' RCP ■ l 2�11 Ra -� F u E BWLEVPR� 1 mw NORTHPOINTE�'za, WEST PHASE 1 B 2-,Q' ILNPT- CPN 104829 LX6• DROP BLn= 2,' RCP_ 3 RCP— lop /NkT 21' RIP to INLET 24• RCP 1OF IINET 24RCP JINCCLi�00f 21• \ ,a NLT R� 21* RR CP o' INLET — 21' RCP 10, INLET - -� 21• RCP 4• SQ. / JLX,C,ION BOX J POLO CLUB 36 • RCP BUILDERS INC 27' MPJ 10' INLET \ 21, RCP 2-0' INLET 21' RCP \\ 2W INLET 21• RCP �' INLET 21• RCP -%'°. RCP KLLB AN LLC 21' RCP 4f,ft JRR•11CR BOOc 21• RCP 3E' RCP 4JLR, = Boot \� 21' RCP 3N' RCP 21' RCP �24• RCF �21• RCP OW-0 w.,B.wL — 30- RCP 15' INLET 21• RCP JUNa• M IV MET 21' RCP 21• RCP '' 10- INLET R� 21' RCP Sw—O WINGWA L 4• SO. JUNMN BOX 3a RCP 21• RCP 21' RCP Y sm JIINCIXIN BOX -21 . 2,• RCP 4' SO. JUNC,ION BOX EXISTING FENCE J LINE OWNED/DEVELOPED BY: LENNAR HOMES OF TEXAS LAND AND CONSTRUCTION, LTD. I 1707 MARKET PLACE BLVD., SUITE 100 IRVING, Texas 75063 KYLE DICKERSON PHONE: (469) 587-5206 NORTHPOINTE EAST PHASE 8 CPN 103273 �7\ \",� STORMWATER EXHIBIT'B-l' LEGEND PROPOSED STORM DRAIN LINE PROPOSED INLET EXISTING INLET \ LIMITS OF PROJECT NORTHPOINTE-WEST PHASE 1A CITY PROJECT NO. 104830 LJA Engineering, Inc. IA 6060 North Central Expressway Phone 469.621.0710 Suite 400 Dallas, Texas 75206 FRN - F-1386 CHAPEL HILL WEST LLC TINE NAr NORTHPOINTE WEST PHASE 2 CPN 104831 FORCHINI ORNE l as d LEI NORTHPOINTE WEST PHASE I CPN 104829 l POLO CLUB BUILDERS INC EXISTING FENCE LINE OWNED/DEVELOPED BY: LENNAR HOMES OF TEXAS LAND AND CONSTRUCTION, LTD. 1707 MARKET PLACE BLVD., SUITE 100 IRVING, Texas 75063 KYLE DICKERSON PHONE: (469) 587-5206 N SCALE:1" = 500' NORTHPOINTE EAST PHASE 13 CPN XXXXXX KLLB AN LLC Y<m�\ INORTHPOINTE EAST PHASE 8 CIPN 103273 WA' STREET LIGHTS & 'p "AR"Wpv STREET NAME SIGNS EXHIBIT 'C-1' I LEGEND PROPOSED STREET - NAME SIGN PROPOSED SINGLE STREET LIGHT PROPOSED DOUBLE STREET LIGHT EXISTING STREET NAME SIGN EXISTING SINGLE STREET LIGHT 4wir&0.»9za1x.1111 NORTHPOINTE-WEST PHASE 1A CITY PROJECT NO. 104830 LJA Engineering, Inc. 6060 North Central Expressway Suite 400 Dallas, Texas 75206 ZAA Phone 469.621.0710 FRN - F-1386 UNIT PRICE BID Bidlist Item No. I 1 I 2 3 i 4 5 6 I 7 I Northpoint. Phut IB DAP-BIDPROPOSAL No. 1 .f2 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Northpointe, Phase 1A, Residential Bidder's Application PFojmt Item Liformnlion Description Specification Section No. ofon Bid Quantity Measure UNIT V: STREET LIGHTING IMPROVEMENTS 2605.3015 2" CONDT PVC SCH 80 (T) 26 05 33 LF 4313 3441.1501 Fumishllnstall Ground Box Type B 3441 10 FA 16 3441.1632 Install TYce 33A Ann 34 41 20 EA 29 3441.1771 Furnish/Install 120-240 Vok Single Phase Metered Pedestal 344 20 EA 1 3441.3302 Rdwy Ilium Foundation TY 3,5,6, and 8 34 41 20 FA 29 3441.3003 R wy Ilium Assmbly TY 18,1BA, 19. and D40 34 41 20 FA 26 9999.OD35 4 hopper Wire OD DO OD LF 12939 TOTAL UNIT V: STRFW UCHTINW IMPROVEMENTS Biddcr's Proposal Unit Price I Bid Value $15.00 $64,695.00 $950.00 $15.200.00 $750.00 $21.750.00 S10.500.00 S10.500.001 S1.800.00 $52.200.00 S3.400.00 $88.400.00 S2.00 $25.B78.001 $278,623.001 CFFY OF FORT WORTH DOCUMENTS - DEVELOPER AWARDED PROJECTS F— Vaaian My 22, 2019 00 42 43 Bid Pp-1 N.nhlninte_Ph—IA UNIT PRICE BID SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Northpointe, Phase 1A, Residential Nonhpoimc Ph— IB DAP-DIDPROPOSAL Page 2 of 2 Bidder's Application Project item Infornmti= Bidder', Proposal Description Specification Section No. I Unit of Bid Quantity Unit Price Bid Vah:e I Measure Bid Summary UNIT I: WATER IMPROVEMENTS N/A UNIT II: SANITARY SEWER IMPROVEMENTS N/A UNIT III: DRAINAGE IMPROVEMENTS N/AI UNIT IV: PAVING IMPROVEMENTS N/AI UNIT V: STREET LIGHTING IMPROVEMENTS $276_623.001 Total Construction Bid . $278.623.001 This Bid is submitted by the entity named below BIDDER: Conatser Construction TX, L.P. 5327 Wichita Street Fort Worth, Texas 76119 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. END OF SECTION BY: BrockBrock H� l TITLE: President DATE: 40 working days after the date when the CRYOF FORT WORTH STANDARDCONSTRUC ION SPECIFICATION DOCUMENTS- DEVELOPER AWARDED PROJECTS Tam Vasim May 22, 2919 00 42 43 Bid Proposal NonhpoWm Phase IA UNIT PRICE BID SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Northpointe, Phase 1A, Residential Project Ile. Information Bidlist Iteml No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Description 3305.0003 8" Waterline Lowedno 3305.0109 Trench Safety 3311.0001 Ductile Iron Water Fittings wf Restraint 3311.0241 8" Water Pipe 3311.0251 W DIP Water 3311.0441 12" Water Pipe 3312.0001 Fire Hydrant 3312.0106 Connection to Existinq 16" Water Main 13312.1002 2" Combination Air Valve Assebly for Water 13312.3003 8" Gate Valve 13312.300512" Gate Valve 19999.0001 1" Imaation Service 19999.00021.5" Initiation Service 9999.0003 4" Initiation Sleeve 9999.0004 End 8 Plug 8" Water Line 19999.0005 End 8 Plug 12" Water Line Nonhpointe Phw is DAP - BID PROPOSAL P., 1ar5 Bidder's Application l Spocification Section No. l Unit of l Bid Quantity Measure UNIT I: WATER IMPROVEMENTS 33 05 12 EA 2 33 05 10 LF 3443 331111 TON 2.094 3311 10,33 11 12 LF 791 3311 10 LF 36 3311 10, 3311 12 LF 2652 331240 EA 1 331225 EA 1 I 331230 EA 1 I 331220 EA 3 331220 EA 3 1J 00 00 00 EA 2 1 000000 EA 3 I 00 00 00 LF I 80 1 00 00 00 EA l 3 1 00 00 00 TOTAL UNIT I: WATER EA IMPROVEMENTS 2 Bidder's Proposal Unit Pnee I Bid Value 35.500.00 $11.000.00I S2.00 s6.886.0o1 $9.500.00 $19.893.001 S72.00 $56,952.001 $92.00 $3,312.001 $112.00 2297.024.001 $6.500.00 $6,500.001 S4.500.00 $4.500.001 $12.500.00 $12.500.001 32.500.00 $7.500.001 S4.500.00 $13.500.001 $1.500.00 $3.000.001 $2.000.00 56.000.001 $24.001 $1.920.001 31.000.001 $3.000.001 $1.250,001 $2,500.001 $455.987.001 CrrV OF FORT WORTH DOCl1MENI'S - DEVELOPER AWARDED PROJECTS F— V—iw May22.2019 004243Aid Ncry",sd N-hp�i- Ph —IA Nwhpo w.ph— IB DAP - BID PROPOSAL Page 2 ofS SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Nodhpoinle, Phase 1A, Residential UNIT PRICE BID Bidder's Application Project Item Wormaum Biddcr's Propmal IBldlttt Item) Description No. I I Specification Section No. I U'a °f Mcasurc Bid Quantity Unit Price I Bid Value i I 1 3301.0002 Post -CCTV Inspection UNIT II: SANITARY SEWE 21MPROVEMENTS 3301 31 LF 125 S3.00 � $375.001 I 2 3301.0101 Manhole Vacuum Testini 3301 30 EA 7 S200.00 51,400.001 3 3305.0106 Manhole Adjustment, Major 32 05 14 EA 5 $7.500.00 S37.500.001 1 4 3305.0107 Manhole Adiustment. Minor 320514 EA 1 $2,500.00 $2.500.001 I 5 3305.0109 Trench Safek 33 05 10 LF 125 $2.00 $250.001 I 6 3305.0113 Trench Water Stops 33 05 15 EA 2 $500.00 S1.000.001 1 7 3331.4115 6" Sewer Pipe - SDR 26 3311 10, 33 31 12, 33 3120 LF 125 $108.00 $13.500.001 1 8 13331.4116 8" Sewer Pipe, CSS Badfill 3311 10, 33 31 12, 33 3120 LF 44 $138.00 S6.072.001 1 9 13339.0001 EKxy Manhole Liner 33 39 60 VF 44 $485.00 $21.340.001 10 13339.1002 4 Drop Manhole 33 3910. 33 39 20 EA 11 $5.500.00 $5 500.001 11 13339.1003 N Extra Depth Manhole 33 3910, 33 39 20 VF 38.201 $225.00 $8.595.00 12 19999.0006 CSS Backfill Over Existing Sewer Pipe 00 00 00 LF 18001 $60.00 $108,000.00 13 19999.0007 Adjust Existing Manhole Depth 00 00 00 1 EA 26.501 $1,533.00 $40.624.50 14 19999.0008 Connect to Existing 4' Manhole 00 00 00 1 EA 111 $10.500.00 1-- - - LQiALSLNIT__IL—SANITARY SEWER IMPROVEMENTS 1S10.500.00 $257156.50 CRY OF FORT WORTH PROJECTS F— V.A. McY22, 2019 004243 Bid Propwd Nanbpoin1ePhew IA Nm hpo-rh— IB DAP. BID PROPOSAL Page 3 of5 SECTION 00 42 43 Developer Awarded Projects -PROPOSAL FORM Northpointe, Phase 1A, Residential UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist [lent Descrlpfion I Specification Section No. I Unit or Measure I Bid Quantity Unit Prix I t Bid Value No. I UNIT III: DRAINAGE IJPRQ.YE 1 3137.0102 Large Stone Type "A" Dry Rip Rap (12" DeeM �7 00 Yf SY 4476 $145.00 $649 020.001 2 3305.0109 Trench Safety 3305 10 LF 4447 $2.00 $8.894.001 3 3305.0112 Concrete Collar 33 05 17 EA 3 S1,000.00 $3,OOD.001 4 3341.0201 21"RCP, Class III I 3341 10 LF 1674 $85.00 S142.29D.001 5 3341.0205 24" RCP, Class III 3441 10 LF 213 $95.00 S20235.001 6 3341.0302 30" RCP, Class III 3341 10 LF 545 $120.00 $65.400.001 7 3341.0309 36" RCP, Class III 3341 1 D LF 1407 $160.00 $225,120.001 8 3341.16W 9x9 Box Culvert 334110 1 LF 307 $870.00 $267.090.001 9 3349,0001 4' Storm Junction Box 334910 EA 10 S7.000.00 $70.000.001 10 3349.6DO1 10' Recessed Inlet 33 49 20 EA 16 S4,800.00 $76,800.001 11 3349.6002 15'Recessed Inlet 33 49 20 EA 7 $5.800.00 $40.600.001 12 3349,6003 20' Recessed Inlet I 33 49 20 EA 2 $6.800.00 $13.600.001 13 3349,7002 & Drop Inlet 33 49 20 EA 1 $7.500.00 ] 50D.00 14 9999,0009 Inlet Protection 00 00 00 EA 26 S200.00 5,200.00 15 9999.0010 2-7'x5' RCB Culvert 00 00 00 LF 195 $1,300.001 $253.50D.001 16 9999.0011 2-10'x10' RCB Culvert 00 00 00 LF 106 32200.001 S233 200.001 17 9999.0012 2-Tx5' RCB SW-0 with 5' Extended Curb 00 00 00 EA 2 545.ODO.001 590.000.001 18 9999.0013 2-9'x9' & 2-10 00' RCB PW-1 4:1 Wingwall with 5+' Extended Curb 00 00 00 EA 1 $215.000.001 $215.00D.001 19 9999.0014 2-9'x9' & 2-10'x10' RCB SW-0 & PW-1 4:1 Wingwall with 5+' Extended 00 00 00 EA 1 $165.000.001 $165.00D.001 20 9999.0015 Yx9' RCS SW-0 4:1 Wingwall with 5' Extended urb 00 00 00 EA 1 S65000.001 $65.000.00] 9999.0016 Yx9' RCB PW-1 45e Skew 4:1 Wingwall with 5+' Extended Curb 00 00 00 EA 1 21 5125;000.00I S125.000.00 T_4.TAL UNIT III: DRAINAGE IMPROVEMENT$ $2.741.449.001 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Fan W,4w Mey22, 2019 00 4243 Bid Proposd_Nonhpolnto Ph— 1A SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Northpointe, Phase 1A, Residential UNIT PRICE BID Narthpofele PI IB DAP -BID PROPOSAL. Pepe 4 ef5 Bidder's Application Project Item Information I Bidder's Proposal l lBidlat Iteml Description l Specification Section No. I Unit of Measure I Bid Q..dty I Unit Prix I Bid Value l No, 1 &1NIT IV: PAVING IMPROVEMENTS I 1 3211.0400 Hydrated Lime (361bslsy) 31 1129 TN 281 S245.00 $68.845.001 3211.0502 B" Lime Treatment 32 11 29 SY 15812 S5.00 $78,060.001 I2 3 3213.0105 10" Corlc Pvmt 32 13 13 SY 14493 $84.00 S1,217,412.001 1 4 3213.0506 Barrier Free Ramp, Type P-1 32 13 20 EA 13 $2.2DO.00 $28.600.001 1 5 3217.0502 Preformed Thermoplastic Contrast Markings - 24" Crosswalk 32 17 23 LF 211 $30.00 $6.330.001 I 6 3217.0504 Preformed Thermoplastic Contrast Markings - 24" Stop Bars 32 17 23 LF 60 $30.00 S1.800.001 I 7 Sing 3217.1010 Preformed Thermoplastic Contrast Markings - Legerle Head 32 17 23 EA 4 $750.00 $3.00D.001 I 8 YO 3217.1011 Preformed Thermolastic Contrast Markings - Legend O 32 17 23 EA 4 S750.00 $3.000.001 1 9 3217.1014 Preformed Thermoplastic Contrast Markings - Legend Double Head 32 17 23 EA 3 $750.00 $2.250.001 I 10 3217,1023 Preformed Thermoplastic Contrast Markings - Legend Straight 32 17 23 EA 3 $750.00 S2,250.001 I 11 3217.2103 REFL Raised Marker TY II -A -A 32 17 23 EA 170 $7.00 $1.190.001 1 12 3217.2104 REFL Raised Marker TY II-C-Ft 32 17 23 EA 24 $7.00 $168.ODI 1 13 3291.0100 Topsoil 3291 19 CY 1024 $28.00 S28,672.001 1 14 3292.0100 Block Sod Placement 32 92 13 SY 6144 $8.00 $49,152.01 I 15 9999.D017 10' Conc Sidewalk 00 00 00 SF 44700 $4.00 5178.800.001 16 9999.0018 Barrier Free Ramp, Type M-2 000000 EA 1 $2,400.00 $2.400.001 1 17 9999.DO19 Constr Barricade 00 00 00 EA 4 $850.00 $3 400.001 I 18 9999.0020 Construct Std. Pvmt. Header 00 00 00 LF 103 $30.00 $3 090.001 I 19 9999.0021 Pedestrian Rail 00 00 00 LF 440 $180.00 579.200.001 I 20 9999.0022 Reflective Pavement Marker TY I(W)(8")(SN )(BRK) 00 00 00 LF 100 $7.0D1 $700.001 1 21 9999.D023 Reflective Pavement Marker TY I(W)(8"1(SN LD) 00 00 00 LF 200 $7.00 $1,40D.ODI I 22 9999.0024 Reflective Pavement Marker TY I(Y)(6")(DBLj(SLD) 000000 LF 3333.16 $-.00 916.665.801 I 23 9999.0025 Reflective Pavement Marker TY I(W)(6")(SNG)(BRk) 000000 LF 652 $5.00 $3,260.001 I 24 9999.002¢ am Barricade &Connect to Existing Pavement Header 00 00 00 EA 2 $500.00 51,000.001 I 25 �ve 9999.002 top igns 00 00 00 EA 5 $450.00 52,250.001 26 9999.0028 Street Name Blade Pair 00 00 00 EA 2 $350.00 $700.001 I 27 9999.0029 Street Sir Pole 00 00 00 I EA 12 $650.00 $7,800.001 I 28 9999.0030 Traffic Sign R2-1 00 00 00 EA 3 $450.00 51,350.001 I 29 9999.0031 Traffic Sign R3-51- 00 00 00 EA 1 $450.001 $450.001 I 30 9999.0032 Traffic Sign R3-5R 00 00 00 EA 1 S450.001 S450.001 I 31 9999,0033 Traffic Sign R3-71- 00 00 00 EA 1 $450.001 S450.001 I 32 9999.0034 Traffic Sign R3-7R 00 00 00 EA 1 $450.001 $460.001 I TOTAL UNIT IV: PAVING IMPROVEMENTS $1.794.544.801 CITY OF FORT WORTH SFMIDARDCONSTR11CTM SPECIFICATION DOCUMEWS- DEVELOPER AWARDED PROJECTS F_ V_ Wy22, 2019 004243 Bid PrapoN_Nwhpoin,.t Ph -IA SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Northpointe, Phase 1A, Residential UNIT PRICE BID NNip,wal Pl— I DAP - BID PROPOS,U. Np5 of5 Bidder's Application Project Item Information Bidder's Proposal �Ndlist It— Description I Specification Section No- I Unit of I Bid Quantity Unit Price I Bid Value No. Measure Bid Summary 1 UNIT I: WATER IMPROVEMENTS $455.987.001 UNIT It: SANITARY SEWER IMPROVEMENTS $257.156.501 UNIT III: DRAINAGE IMPROVEMENTS $2 74lA49.001 UNIT IV: PAVING IMPROVEMENTS $1,794,544.801 UNIT V: STREET LIGHTING IMPROVEMENTS N/AI Total ConstrectionBid $5.249.137.301 This Bid is submitted by the entity named below: BIDDER: Conatser Construction T\, L.P. 5327 Wichita Street Fort Worth. Texas 76119 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the Central Conditions. END OF SECTION BY: BrockBrock H', TITLE: President DATE. - 180 working days after the date when the CRY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Farm VuA. Mry22, 20I9 00 42 43Bid Piap-I Nonhpoinu_Ph— IA