Loading...
HomeMy WebLinkAboutContract 62296CSCO NO. 62296 TRANSPORTATION IMPACT FEE CREDIT AGREEMENT THIS TRANSPORTATION IMPACT FEE CREDIT AGREEMENT (the "Agreement") is made and entered into effective as of the Effective Date (as defined below), by and among THE CITY OF FORT WORTH, TEXAS (the "City"), a Texas home rule municipal corporation, and Jefferson Primrose Land Holdings, LLC, a Texas Limited Liability company authorized to do business in Texas (the "Applicant Owner"), and Jefferson Primrose North, LLC, a Texas Limited Liability company authorized to do business in Texas (an "Additional Owner"), and Denton Texas Venture, LTD, a Texas Limited Partnership authorized to do business in Texas (an "Additional Owner"), and FW Primrose Public Facility Corporation, a Texas Public Facility Corporation (an "Additional Owner"), (Applicant Owner and the Additional Owners are collectively referred to herein as the "Owners" and individually as an "Owner"; the City and the Owners are each referred to herein as a "Party", and collectively, the "Parties"). RECITALS WHEREAS, the Owners are the owners of approximately 122.7158. acres in Tarrant County, Texas, as described by metes and bounds in Exhibit "A" (the "Property") located within the corporate boundaries of the City. A map of the Property showing its location is attached hereto as Exhibit "B"; and WHEREAS, the Owners are desires to proceed with development of the Property as described or illustrated on the Development Plan, attached hereto as Exhibit "C ", which identifies the on -site and/or off -site transportation facilities necessary for serving full development of the Property; and WHEREAS, the City has adopted a Transportation Impact Fee program pursuant to Texas Local Government Code Chapter 395, codified in City Code Chapter 30, Article VIII, as amended, under which transportation impact fees are imposed on new development for impacts to the City's transportation facilities as a result of said development; and WHEREAS, transportation impact fees are collected and must be spent by the City on impact fee eligible transportation facilities identified within the City's adopted Transportation Improvements Plan ("TIP"), as amended, within the service area(s) in which the new development is located; and WHEREAS, the Transportation Impact Fee Program provides for credits against impact fees for dedication of right-of-way and/or construction of transportation improvements identified as impact fee eligible on the adopted TIP; and WHEREAS, the Property is located within service area Y; and WHEREAS, certain transportation facilities depicted on Exhibit "D" are identified as impact fee eligible within the City's adopted TIP and therefore eligible for impact fee credit; and OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Transportation Impact Fee Credit Agreement- CA-23-011 Page 1 of 18 Primrose Station 10/28/2024 WHEREAS, Applicant Owner has agreed to dedicate the right-of-way and/or construct the transportation improvements shown on Exhibit "D" for which credits against transportation impact fees shall be granted; and WHEREAS, the Applicant Owner has received preliminary plat approval for Primrose Station, PP-22-030, on 6/8/2022; and WHEREAS, the Applicant Owner has received final plat approval for Primrose Station, FP-23-010, on 12/8/2023; and WHEREAS, the Applicant Owner has dedicated 161,238 square feet of right-of-way for Brewer Boulevard with FP-23-010, recorded as Instrument D223217451, on 12/8/2023; and WHEREAS, the Applicant Owner has received approval for Brewer Boulevard construction plans IPRC22-0133 on 12/11/2023, and executed a Community Facilities Agreement (CFA22-0189, CSCO#60072), on September 9, 2023 with a development bond financial guarantee (CPN#104256). NOW, THEREFORE, for and in consideration of the mutual agreements, covenants, and conditions contained herein, and other good and valuable consideration, the City and the Owners hereby covenant and agree as follows: 1. Recitals. The recitals contained in this Agreement are true and correct as of the Effective Date and form the basis upon which the Parties negotiated and entered into this Agreement. 2. Transportation Improvements. Applicant Owner agrees to dedicate the rights -of - way for and/or construct the system facilities identified in Exhibit "D". For any transportation improvement which has been previously dedicated or constructed by Applicant Owner on the Property and accepted by the City prior to execution of this Agreement, the improvement shall be identified as completed on Exhibit "D". 3. Credits. The Parties agree that the estimated value of the credits for each transportation improvement, expressed in current dollars, shall be as set forth in Exhibit "E". The value of credits associated with the improvements first shall be reduced by the Schedule 2 impact fee associated with any lot for which a building permit has previously been issued, and the net value of credits shall be as shown on Exhibit "E". 4. Phasing. The Parties acknowledge that, where it is anticipated that the project will be developed in phases, the anticipated construction of improvements by phase shall be as depicted in Exhibit "D", which is attached hereto and incorporated herein by reference. 5. Allocation of Credits by Phase. The general allocation of credits to each phase of the development shall be as shown on Exhibit "F", which is attached hereto and incorporated herein by reference. The Parties agree that the credits identified in this Agreement shall not be deemed to have been created until the system facility for which credit is to be granted has been Transportation Impact Fee Credit Agreement- CA-23-011 Page 2 of 18 Primrose Station 10/28/2024 dedicated and accepted (in the case of right-of-way) or constructed through an executed Community Facilities Agreement and final acceptance by the City has been obtained. The Parties further agree that, prior to the application of a credit against transportation impact fees otherwise due for any phase of development; the following events shall take place: (a) The number of credits resulting from such improvement shall be valued. 6. Term and Effective Date. The term of this Agreement shall be ten (10) years from its Effective Date. 7. Assignment. Each Owner shall have the right to assign this Agreement to any person or entity ("Owner's Assignee") with the written consent of the City, provided: (a) the assignment is in writing executed by the Owner and its assignee; and (b) the assignment incorporates this Agreement by reference and binds the Owner's Assignee to perform (to the extent of the obligations assigned) in accordance with this Agreement. Each Owner's Assignee shall become a Party to this Agreement upon the execution of such assignment. In no event may this Agreement be construed to authorize assignment of any credits attributable to a system facility to be dedicated or constructed hereunder for use outside the boundaries of the Property. 8. Amendment. This Agreement shall not be modified or amended except as follows: (a) Any amendment or modification to this Agreement or any Exhibit or schedule hereto shall be in writing and signed by the Parties. (b) Any revision, amendment, or modification to this Agreement, the Development Plan, or any Exhibit or schedule thereto, shall become effective on the date executed by the Parties or, as applicable, upon the date of approval by the City Council or designated city official. 9. Exhibits. The exhibits attached to this Agreement are incorporated as part of this Agreement for all purposes as if set forth in full in the body of this Agreement. (Remainder of Page Intentionally Left Blank) Transportation Impact Fee Credit Agreement- CA-23-011 Page 3 of 18 Primrose Station 10/28/2024 IN WITNESS WHEREOF, the undersigned parties have executed this Agreement to be effective as of the date subscribed by the City's Assistant City Manager. CITY OF FORT WORTH, TEXAS Daum Ba�Hdoff Dana Burghdoff (Nov 1 , 202418:49 CST) Dana Burghdoff Assistant City Manager Date: Nov 12, 2024 Recommended By: DJ Harrell Director, Development Services Approved as to Form and Legality: fj� Douglas Black (Nov 12, 202413:01 CST) Douglas Black Assistant City Attorney M&C: None required Form 1295: None required 4.p44UQQ�� °°° ATTEST: ���°° d!`o o Ov° o o °°o*Ad a p % �S�scs aB�� EXA5o4a nua000 Jannette Goodall City Secretary APPLICANT OWNER Jefferson Primrose Land Holdings a Texas Limited Liability Company Blake Taylor (Oct W,202413:29 CDT) Blake Taylor Senior Vice President (Additional owner signatures on following page) City Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. a nifer Ro erts (Oct 28, 12:09 CDT) Jennifer H. Roberts Assistant Director, Development Services Department OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Transportation Impact Fee Credit Agreement- CA-23-011 Page 4 of 18 Primrose Station 10/28/2024 ADDITIONAL OWNERS ADDITIONAL OWNER Jefferson Primrose North a Texas Limited Liability Company 3 TZ2 Blake Taylor (Oct 202413:29 CDT) Blake Taylor Senior Vice President ADDITIONAL OWNER Denton Texas Venture, LTD. a Texas Limited Partnership By: D-F Fund I GP, LLC, a Texas limited liability company its general partner kobeit Y" Bv: Robert Yu (Nov 1, 202417:15 PDT) Robert Yu Manager ADDITIONAL OWNER FW Primrose Public Facility Corporation a Texas Corporation ILAS Mary- a ret Lemons (Nov 4, 2024 08:22 CST) Mary -Margaret Lemons Secretary/Treasurer Transportation Impact Fee Credit Agreement- CA-23-011 Page 5 of 18 Primrose Station 10/28/2024 EXHIBIT LIST "A" Description of the Property "B" Map of Property "C" Development Plan "D" Eligible Transportation Improvements "B" Credits Against Transportation Impact Fees "F" Allocation of Credits Transportation Impact Fee Credit Agreement- CA-23-011 Page 6 of 18 Primrose Station 10/28/2024 EXHIBIT A Description of Property: Primrose Station Preliminary Plat, PP-22-030 WHEREAS, DENTON TEXAS VENTURE, LTD., JEFFERSON PRIMROSE LAND HOLDINGS, LLC, JEFFERSON PRIMROSE NORTH, LLC and CITY OF FORT WORTH, are the owners of a tract of land situated in the J. Asbury Survey, Abstract No. 52 and A. Hodge Survey, Abstract No. 1789, Tarrant County, Texas and being all of a tract of land described in Special Warranty Deed to JEFFERSON PRIMROSE LAND HOLDINGS, LLC, recorded in Instrument No. D222287027, Official Public Records, Tarrant County, Texas and being a part of a called 144.643 acre tract of land described in Special Warranty Deed to DENTON TEXAS VENTURE, LTD. recorded in Instrument No. D205197517, of said Official Public Records and being all of a tract of land described in Special Warranty Deed to Jefferson Primrose North, LLC, recorded in Instrument No. D222287683, of said Official Public Records and being all of a tract of land described in Dedication of Right -of -Way Agreement to the City of Fort Worth in Instrument No. D218213695, of said Official Public records, and being more particularly described as follows: BEGINNING at a 5/8" iron rod with cap stamped "JACOBS" found for the north corner of Primrose Crossing an addition to the City of Fort Worth according to the plat recorded in Instrument No. D218172937, of said Official Public Records and being the south corner of Tract II, a called 3.960 acre tract of land described in Special Warranty Deed to TEXAS ELECTRIC SERVICE COMPANY recorded in Volume 8728, Page 1700, Deed Records, Tarrant County, Texas; THENCE with the southeast line of said Tract II and Tract I, a called 1.368 acre tract of land described in Special Warranty Deed to TEXAS ELECTRIC SERVICE COMPANY recorded in Volume 8728, Page 1700, of said Deed Records, and southeast line of a called 0.344 acre tract of land described in Deed to the City of Forth Worth recorded in Volume 8503, Page 2011, of said Deed Records, North 270 East, a distance of 2,491.07 feet to a 1/2" iron rod found for the northeast corner of said Tract I and being the northwest corner of said 144.643 acre tract and being in the south right-of-way line of Sycamore School Road (a variable width right-of-way); THENCE with said south right-of-way line of Sycamore School Road, North 89°58'08" East, a distance of 1295.00 feet to a 5/8" iron rod with cap stamped "GORRONDONA ASSOC INC FORT WORTH TX" found for the northwest corner of a called 15.286 acre tract of land described in Judgment of court in Absence of Objection to the State of Texas recorded in Instrument No. D209260349, of said Official Public Records; THENCE with the west line of said 15.268 acre tract of land, the following courses and distances: South 22°43'12" East, a distance of 58.23 feet to a 5/8" iron rod with cap stamped "GORRONDONA ASSOC INC FORT WORTH TX" found for corner; South 12°40'35" East, a distance of 1,001.59 feet to a 5/8" iron rod found for corner; South 00°23'56" East, a distance of 1,649.38 feet to a 5/8" iron rod found for the southwest corner of said 15.286 acre tract and being in the north line of Primrose Transportation Impact Fee Credit Agreement- CA-23-011 Page 7 of 18 Primrose Station 10/28/2024 Crossing an addition to the City of Fort Worth according to the plat recorded in Instrument No. D207282015, of said Official Public Records; THENCE with the north lines of said Primrose Crossing additions and with the north line of Primrose Crossing an addition to the City of Forth Worth according to the plat recorded in Instrument No. D206404801, of said Official Public Records and with the north line of the terminus of Brewer Boulevard recorded in Cabinet A, Slide 11614, the following courses and distances: South 89°41'56" West, a distance of 2,197.32 feet to a 5/8" iron rod with cap stamped "CARTER & BURGESS" found for corner; North 22°39'00" East, a distance of 77.95 feet to a 5/8" iron rod with cap stamped "CARTER & BURGESS" for corner; North 30°53'08" West, a distance of 287.38 feet to a 1/2" iron rod found for corner; North 67°14'50" West, a distance of 396.76 feet to the POINT OF BEGINNING and containing 5,632,500 square feet or 129.3044 acres of land. SAVE AND EXCEPT THE FOLLOWING TRACT: BEING a tract of land situated in the A. Hodge Survey, Abstract No. 1789, Tarrant County, Texas and being all of a called 6.586 acre tract of land described in Agreed Final Judgment to Tarrant Regional Water District recorded in Instrument No. D218283339, of said Official Public Records; COMMENCING at a 1/2" iron rod found for the northwest corner of a tract of land described in Special Warranty Deed to JEFFERSON PRIMROSE LAND HOLDINGS, LLC, recorded in Instrument No. D222287027, of said Official Public Records and being in the south right-of-way line of Sycamore School Road (a variable width right-of-way); THENCE with said south right-of-way line of Sycamore School Road, North 89°58'08" East, a distance of 683.96 feet to a 5/8" iron rod with cap stamped "TRANSYSTEMS" found at the intersection of said south right-of-way line of Sycamore School Road and the west right-of-way line of Brewer Boulevard (a 110-foot right-of-way) recorded in Instrument No. D218213695, of said Official Public Records; THENCE departing said right-of-way line of Sycamore School Road and with said right-of-way line of Brewer Boulevard, the following courses and distances: South 00°00'00" East, a distance of 319.76 feet to a 5/8" iron rod with cap stamped "KHA" set at the beginning of a tangent curve to the left with a radius of 1,055.00 feet, a central angle of 10°33'21 ", and a chord bearing and distance of South 05° 16'40" East, 194.09 feet; In a southerly direction, with said tangent curve to the left, an arc distance of 194.36 feet to a 5/8" iron rod with cap stamped "KHA" set at the beginning of a reverse curve to the right with a radius of 945.00 feet, a central angle of 10'32'38", and a chord bearing and distance of South 0597 01" East, 173.66 feet; Transportation Impact Fee Credit Agreement- CA-23-011 Page 8 of 18 Primrose Station 10/28/2024 In a southerly direction, with said reverse curve to the right, an arc distance of 173.90 feet to a 5/8" iron rod with cap stamped "TRANSYSTEMS" found for the northeast corner of said 6.586 acre tract of land and being the POINT OF BEGINNING and being at the beginning of a non -tangent curve to the right with a radius of 945.00 feet, a central angle of 00°00'42", and a chord bearing and distance of South 00°00'21" East, 0.19 feet; THENCE with the north, west, south and east lines of said called 6.586 acre tract, the following courses and distances: In a southerly direction, with said non -tangent curve to the right, an arc distance of 0.19 feet to a point for corner South 00°00'00" East, a distance of 567.47 feet to a 5/8" iron rod with cap stamped "TRANSYSTEMS" found for corner; North 89'58'11" West, a distance of 561.94 feet to a 5/8" iron rod found for corner; North 00°00'00" East, a distance of 382.93 feet to a 5/8" iron rod found for corner; North 69° 18'50" East, a distance of 240.41 feet to a 5/8" iron rod with cap stamped "KHA" set for corner; North 00°00'00" East, a distance of 99.64 feet to a 5/8" iron rod found for corner; South 89°58'43" East, a distance of 337.03 feet to the POINT OF BEGINNING and containing 286,998 square feet or 6.5886 acres of land leaving a 5,345,502 square feet or 122.7158 acres. Bearings based on the State Plane Coordinate System, Texas North Central Zone 4202, North American Datum of 1983. Transportation Impact Fee Credit Agreement- CA-23-011 Page 9 of 18 Primrose Station 10/28/2024 EXHIBIT B Map of Property: Primrose Station Preliminary Plat, PP-22-030 VICINITY MAP Transportation Impact Fee Credit Agreement- CA-23-011 Primrose Station N6RTH N.T.S. Page 10 of 18 10/28/2024 EXHIBIT C Development Plan: Primrose Station Preliminary Plat, PP-22-030 I MATCH IMM . IMMIMMIMMIMM " Transportation Impact Fee Credit Agreement- CA-23-011 Page 11 of 18 Primrose Station 10/28/2024 EXHIBIT D Eligible Transportation Improvements ,¢o�A EXHIBIT D Primrose Station `Eligible for Credit Against Transportation Impact Fees Right -of -Way Dedication & Construction ,+• t SYCA&iORESCH40t COLIIYOIIS - • L qr a W AU :fit .�. .tiR,•."i� `•- 4 � 0— s 4.4 qW ca Z ex t�• 4 �y LU r I ;IHOPNINOOD 1 w BURGUNDY ld4SE Ehiible Improvements Reference # Limits Brewer Blvd FP-23-010 Right-of-way dedication from south of Brewer Blvd Brewer Blvd CPN 104256 Construction of south two lanes, street lights and drainage Transportation Impact Fee Credit Agreement- CA-23-011 Page 12 of 18 Primrose Station 10/28/2024 EXHIBIT E Credits Against Transportation Impact Fees Primrose Station Transportation Impact Fee Credit Overview Value of ROW Dedication Instrument # Final Plat # Eligible Arterial Value D223217451 FP-23-010 Brewer Blvd $902,932.80 Total ROW Transportation Impact Fee Credit $902,932.80 TrIF Eligible Community Facilities Agreement Construction City Secretary # CFA # Eligible Arterial Value 60072 CFA#22-0189 Brewer Blvd $7,114,587.95 CPN#104256 75% Community Facilities Agreement Credit Prior to Final Acceptance of the Facility $5,335,940.96 Engineering, Surveying, and Material Testing = 20% of eligible construction costs $1,422,917.59 Total Transportation Impact Fee Credit $7,661,791.35 1 Transportation Impact Fee Credit Agreement- CA-23-011 Page 13 of 18 Primrose Station 10/28/2024 Right -of -Way Valuation for McPherson Blvd Valuation Method 1 - Percentage of TIP Project Cost Eligible Arterial Brewer Blvd 2022 Transportation Improvements Plan Project Number Y-31 Estimated Construction Costs from 2022 Transportation $8,426,000 Improvements Plan Value of Total Project Right -of -Way (20% of Construction Cost) $1,685,200 Total Project Length (LF) 2740 Arterial Cross -Section Width (LF) 110 Additional ROW needed for Roundabout (SF) 0 Total Project Right -of -Way (SF) 301,400 Right -of -Way Value Per Square Foot $5.60 Valuation Method 2 - Percentage of Construction Project Cost Eligible Arterial Brewer Blvd City Project Number 104256 Estimated Construction Costs from CFA $7,114,587.95 Value of Total Project Right -of -Way (20% of Construction Cost) $1,422,918 Total Project Length (LF) 2722 Arterial Cross -Section Width (LF) 110 Additional ROW needed for Roundabout (SF) 0 Total Project Right -of -Way (SF) 299,420 Right -of -Way Value Per Square Foot $4.76 Valuation Method 3 - TAD appraised value TAD Value as of 08/9/2023 Brewer Blvd TAD Account 42855118 Total Area (SF) 267,545 Appraised Value $276,390 Value per Square Foot $1.04 Right -of -Way Dedication Brewer Blvd Recording Instrument Number D223217451 Final Plat Number FP-23-010 Recording Date 12/8/2023 Total area of ROW dedicated (SF) 161,238 Value per SF $5.60 ROW Credit Available $902,932.80 Transportation Impact Fee Credit Agreement- CA-23-011 Page 14 of 18 Primrose Station 10/28/2024 Paving Item No. Description Unit Estimated Quantity Unit Price Estimated Credit Available 1 8" CONC PVMT SY 10,043 $98.00 $ 984,214.00 2 4" CONC SIDEWALK SF 15,747 $10.00 $ 157,470.00 3 6" CONC CURB AND GUTTER LF 5,485 $3.00 $ 16,455.00 4 BARRIER FREE RAMP, TYPE P-1 EA 10 $1,900.00 $ 19,000.00 5 BARRIER FREE RAMP, TYPE P-2 EA 0 $0.00 $ - 6 ABUTMENTS CY 139 $1,580.00 $ 219,778.00 7 18" DRILL SHAFTS LF 741 $390.00 $ 288,990.00 8 36" DRILL SHAFTS LF 160 $220.00 $ 35,200.00 9 BENT CAPS CY 128 $1,500.00 $ 191,700.00 10 CONCRETE COLUMNS CY 23 $2,100.00 $ 47,250.00 11 C221 RAIL LF 785 $236.00 $ 185,283.60 12 T221 RAIL LF 1,637 $162.00 $ 265,258.80 13 TX40 BEAMS LF 1,315 $308.00 $ 405,020.00 14 TX46 BEAMS LF 1,398 $280.00 $ 391,440.00 15 TX54 BEAMS LF 1,007 $286.00 $ 288,087.80 16 SIDEWALK COVER PLATE LBS 558 $15.20 $ 8,481.60 17 CONCRETE RIP RAP CY 208 $670.00 $ 139,360.00 18 CLASS S BRIDGE SF 28,852 $33.00 $ 952,116.00 19 CEMENT STABILIZED BACKFILL CY 437 $290.00 $ 126,730.00 20 APPROACH SLABS CY 202 $1,100.00 $ 222,200.00 21 SEJ - EXPANSION JOINTS LF 218 $234.78 $ 51,182.04 22 LIGHT FOUNDATION ON BRIDGE EA 4 $1,350.00 $ 5,400.00 23 TL-3 LOW SPEED TRANSITION (WOOD) EA 4 $2,500.00 $ 10,000.00 24 GUARDRAIL END TREATMENT (MSKT) EA 4 $4,250.00 $ 17,000.00 25 8" SLD PVMT MARKING HAS (W) LF 299 $2.75 $ 822.25 26 6" SLD PVMT MARKING HAS (Y) LF 7,565 $1.65 $ 12,482.25 27 18" SLD PVMT MARKING HAE (Y) LF 388 $11.00 $ 4,268.00 28 PREFORMED THERMOPLASTIC CONTRAST LF 106 $11.00 $ 1,166.00 MARKINGS - 24" STOP BARS 29 PREFORMED THERMOPLASTIC CONTRAST LF 575 $27.50 $ 15,812.50 MARKINGS - 24" CROSSWALK 30 4" SOLID WHITE PAVEMENT MARKINGS LF 3,850 $1.10 $ 4,235.00 31 4" BROKEN WHITE PAVEMENT MARKINGS LF 90 $2.20 $ 198.00 32 4" SOLID YELLOW PAVEMENT MARKINGS LF 956 $2.20 $ 2,103.20 33 SIGNAGE EA 19 $757.89 $ 14,399.91 34 SITE CLEARING LS 1 $632,948.00 $ 632,948.00 35 SITE CLEARING - HAUL OFF SURFACE DEBRIS LS 1 $2,000.00 $ 2,000.00 36 SITE CLEARING - MACHINE GRADE LS 1 $20,181.00 $ 20,181.00 SIDEWALKS 37 SITE CLEARING - BACKFILL CURBS LS 1 $13,734.00 $ 13,734.00 38 SITE CLEARING - REMOVE CONSTRUCTION LS 1 $1,500.00 $ 1,500.00 ENTRANCE 39 SITE CLEARING - REMOVE SILT FENCE LS 1 $8,748.00 $ 8,748.00 40 SITE CLEARING - RESPREAD STOCKPILED LS 1 $28,236.00 $ 28,236.00 TOPSOIL 41 BLOCK SOD PLACEMENT SF 113,973 $0.45 $ 51,287.85 Transportation Impact Fee Credit Agreement- CA-23-011 Page 15 of 18 Primrose Station 10/28/2024 42 BLOCK SOD PLACEMENT- FINE GRADING SF 113,973 $0.10 $ 11,397.30 Paving Subtotal $ 5,853,136.10 Storm Drain Item Description Unit Eligible Unit Price Credit Available No. Quantity 1 21" RCP, CLASS III LF 536 $92.00 $ 49,312.00 2 24" RCP, CLASS III LF 1,154 $97.00 $ 111,938.00 3 36" RCP, CLASS III LF 265 $165.00 $ 43,725.00 4 42" RCP, CLASS III LF 403 $228.00 $ 91,884.00 5 54" RCP, CLASS III LF 318 $398.00 $ 126,564.00 6 24" STRAIGHT HEADWALL, 1 PIPE EA 2 $8,581.00 $ 17,162.00 7 24" FLARED HEADWALL, 1 PIPE EA 1 $5,906.00 $ 5,906.00 8 54" FLARED HEADWALL, 1 PIPE EA 1 $16,147.00 $ 16,147.00 9 4' STORM JUNCTION BOX EA 6 $8,577.00 $ 51,462.00 10 5' STORM JUNCTION BOX EA 3 $9,242.00 $ 27,726.00 11 7' STORM JUNCTION BOX EA 1 $23,535.00 $ 23,535.00 12 10' RECESSED INLET EA 8 $7,972.00 $ 63,776.00 13 15' RECESSED INLET EA 1 $9,568.00 $ 9,568.00 14 4' DROP INLET EA 2 $10,233.00 $ 20,466.00 15 TRENCH SAFETY LF 2,676 $2.00 $ 5,352.00 16 RIP RAP SY 845 $484.49 $ 409,394.05 Storm Drain Subtotal $ 1,073,917.05 Transportation Impact Fee Credit Agreement- CA-23-011 Page 16 of 18 Primrose Station 10/28/2024 Street Light Improvements Item No. Description Unit Quantity Unit Price Credit Available 1 2" CONDT PVC SCH 80 (T) LF 2,830 $16.59 $ 46,949.70 2 EXPLORATORY EXCAVATION OF EXISTING EA 1 $2,090.00 $ 2,090.00 UTILITIES 3 NO 2 INSULATED ELEC CONDR LF 8,490 $3.65 $ 30,988.50 4 FURNISH/INSTALL GROUND BOX TYPE B, EA 10 $1,100.00 $ 11,000.00 W/APRON 5 INSTALL TYPE 33A ARM EA 15 $495.00 $ 7,425.00 6 FURNISH/INSTALL 240-480 VOLT SINGLE EA 1 $10,780.00 $ 10,780.00 PHASE TRANSOCKET METERED PEDESTAL 7 LED LIGHTING FIXTURE EA 15 $1,009.80 $ 15,147.00 8 TYPE 18 POLES EA 15 $2,519.00 $ 37,785.00 9 TYPE 3 FOUNDATION EA 11 $1,375.00 $ 15,125.00 10 NO. 2 INSULATED CONDUCTOR FOR LF 2,830 $3.62 $ 10,244.60 GROUND Street Lights Subtotal $ 187,534.80 Paving Subtotal $ 5,853,136.10 Storm Drain Subtotal $ 1,073,917.05 Street Lights Subtotal $ 187,534.80 Construction Subtotal $7,114,587.95 Transportation Impact Fee Credit Agreement- CA-23-011 Page 17 of 18 Primrose Station 10/28/2024 EXHIBIT F Allocation of Credits Credits shall be allocated on a first -come, first -served basis within the preliminary plat of Primrose Station PP-22-030 based on the date of building permit acceptance for review. L= FA 0="' mom Transportation Impact Fee Credit Agreement- CA-23-011 Primrose Station 09 Page 18 of 18 10/28/2024