HomeMy WebLinkAboutContract 57868-A1CSC No. 57868-A1
AMENDMENT No . 1
TO CITY SECRETARY CONTRACT No. 57868
WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates,
Inc., (ENGINEER) made and entered into City Secretary Contract No. 57868,
(the CONTRACT) which was authorized by M&C 22-0539 on the twenty-eighth
day of June, 2022 in the amount of $149,976.00; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Traffic Signal Improvements at Western Center Blvd. and Sandshell
Blvd., CPN 103999; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $20,300.00. (See Attached Funding Breakdown Sheet, Page
-4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $170,276.00.
OFFICIAL RECORD
3. CITY SECRETARY
FT. WORTH, TX
All other provisions of the Contract, which are not expressly amended
City of Fort Worth, Texas Traffic Signal Improvements at Western Center Blvd. and Sandshell Blvd.
Prof Services Agreement Amendment Template CPN 103999
Revision Date: 03/08/2024
Page 1 of 3
herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date subscribed by the City"s
designated Assistant City Manager.
APPROVED:
City of Fort Worth
op*�
Jesica McEachern
Assistant City Manager
DATE: Nov 20, 2024
4d.044p�n�
ATTEST: d �fORt*'! Po
d� d
Fo
Pv8 a=d
Jannette Goodall
City Secretary
APPROVED AS TO FORM AND LEGALITY:
Douglas Black (Nov 15, 202411:33 CST)
Douglas W. Black
Sr. Assistant City Attorney
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: 03/08/2024
Page 2 of 3
ENGINEER
Kimley-Horn and Associates, Inc.
41--ka
Scott R. Arnold, P.E.
Vice President
DATE: October 1, 2024
M&C No.#: N/A
M&C Date: N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
T affic Signal Improvements at Western Center Blvd. and Sandshell Blvd.
CPN 103999
FUNDING BREAKDOWN SHEET
City Secretary No. 57868
Amendment No. 1
Project CF1- ID Activity CF2 -
Fund Dept ID Account Bond Amount
Reference
30100 0200431 5330500 103999 007130 9999 $20,300.00
Total: $20,300.00
City of Fort Worth, Texas Traffic Signal Improvements at Western Center Blvd. and Sandshell Blvd.
Prof Services Agreement Amendment Template CPN 103999
Revision Date: 03/08/2024
Page 3 of 3
FORT WORTH.
Ir-
ATTACHMENT "A"
Scope for Enaineerina Desian Related Services for
Traffic Sianal Improvements at Western Center Boulevard and Sandshell Boulevard
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project.
OBJECTIVE
The objective of this project to provide design and construction phase services to construct
a new traffic signal and turn lane improvement to help improve traffic operations and safety
for Western Center Blvd and Sandshell Blvd intersection. The project will include turn lane
improvements which extends approximately 150 feet on eastbound approach and 100 feet
on westbound approach to provide zero offset for eastbound and westbound left turn lanes.
WORK TO BE PERFORMED
Task 1. Dv ign Managemen+
Task `'. on optual Design )
Tac-l(2 Preliminary design (60%-)
Task 1. Final De 0 and 0
T-a-sk G. gird Phase Seniinnc
Task 6. Construction Phase Services
Tack 7 ROW/Easement S., v 11 ec
Task 8. ✓irv—e - d ✓ibourfage Utility Engineering Services
Tsok 0. Permitting
Task 10. Quality Control/ Q ,1vNJ -ranee
City of Fort Worth, Texas Traffic Signal Improvements at Western Center Blvd. and Sandshell Blvd.
Attachment A CPN 103999
Release Date: 07.22.2021
Page 1 of 4
FORT WORTH,,
TASK 1. DESIGN MANAGEMENT. [NOT USED]
TASK 2. CONCEPTUAL DESIGN (30 PERCENT). [NOT USED]
TASK 3. PRELIMINARY DESIGN (60 PERCENT). [NOT USED]
TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS
(100 PERCENT). [NOT USED]
TASK 5. BID PHASE SERVICES. [NOT USED]
TASK 6. CONSTRUCTION PHASE SERVICES.
ENGINEER will support the construction phase of the project as follows.
6.1. Construction Support
The ENGINEER will provide the following additional Construction Support:
• The ENGINEER shall attend additional monthly construction progress meetings
during the duration of construction. The ENGINEER will prepare meeting notes with
action items and distribute these to the project team.
• The ENGINEER shall provide additional responses to Request for Information (RFI)
from the contractor.
• The ENGINEER shall provide updated plans in response to RFIs.
• The ENGINEER shall prepare additional Task Order documents.
ASSUMPTIONS
• Eight (8) additional site visits are assumed.
• Seven (7) additional RFI's are assumed.
• One (1) additional Task Order is assumed.
DELIVERABLES
• Response to Contractor's Request for Information
• Documents pertaining to Task Order
6.2. Record Drawings
• The ENGINEER will prepare record drawings from information provided by the CITY
depicting any changes made to the Final Drawings during construction. Information
provided by the CITY may include, but is not limited to the following:
o As -Built Survey
o Red -Line Markups from the Contractor
City of Fort Worth, Texas Traffic Signal Improvements at Western Center Blvd. and Sandshell Blvd.
Attachment A CPN 103999
Release Date: 07.22.2021
Page 2 of 4
FORT WORTH
o Red -Line Markups from the City Inspector
o Copies of Approved Change Orders
o Approved Substitutions
The ENGINEER shall modify the Final Drawings electronically and shall place a
stamp on the plans indicating that they represent Record Drawings of the project as
constructed. The stamp shall be signed and dated by the ENGINEER and shall be
placed on each plan sheet, whether there were any revisions on the sheet or not.
Each sheet shall clearly indicate all changes which apply to that sheet by clouding
and numbering, or other suitable means.
• The following disclaimer shall be included with the Record Drawing stamp:
These Record Drawings were prepared using information provided by others
and represent the as constructed conditions to the extent that documented
changes were provided for recording. The ENGINEER assumes no liability
for undocumented changes and certifies only that the documented changes
are accurately depicted on these drawings.
• The ENGINEER shall submit a set of sealed Final Drawings, modified and stamped
as Record Drawings, in Adobe Acrobat PDF format (version 6.0 or higher). The
ENGINEER may keep copies of the information provided by the CITY for their files,
but all original red -lined drawings shall be returned to the CITY with the digital files.
• There shall be one (1) PDF file for the TPW plan set and a separate PDF file for the
Water plan set, if required. Each PDF file shall contain all associated sheets of the
particular plan set. Sinqular PDF files for each sheet of a plan set will not be
accepted. PDF files shall conform to naming conventions as follows:
I. TPW file name example — "W-1956_org47.pdf" where "W-1956" is the
assigned file number obtained from the CITY, "_org" designating the file is of
an original plan set, "47" shall be the total number of sheets in this file.
Example: W-0053_org3.pdf and K-0320_org5.pdf
II. Water and Sewer file name example — "X-35667_org36.pdf" where "X-
35667" is the assigned file number obtained from the CITY, "_org"
designating the file is of an original plan set, "36" shall be the total number of
sheets in this file.
Example: X-12755_orgl8.pdf
PDF files shall be uploaded to the project's Record Drawing folder in eBuilder.
For information on the proper manner to submit files and to obtain a file number for
the project, the ENGINEER should coordinate with the City project manager. File
numbers will not be issued to a project unless the appropriate project numbers and
fund codes have been assigned and are in the Department of Transportation and
Public Works database.
City of Fort Worth, Texas Traffic Signal Improvements at Western Center Blvd. and Sandshell Blvd.
Attachment A CPN 103999
Release Date: 07.22.2021
Page 3 of 4
FORT WORTH,,
TASK 7. ROW/EASEMENT SERVICES. [NOT USED]
TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES. [NOT
USED]
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
Additional Services not included in the existing Scope of Services — CITY and
ENGINEER agree that the following services are beyond the Scope of Services described in
the tasks above. However, ENGINEER can provide these services, if needed, upon the
CITY's written request. Any additional amounts paid to the ENGINEER as a result of any
material change to the Scope of the Project shall be agreed upon in writing by both parties
before the services are performed. These additional services include the following:
• Services related to development of the CITY's project financing and/or budget.
• Services related to disputes over pre -qualification, bid protests, bid rejection and re-
bidding of the contract for construction.
• Services necessary due to the default of the Contractor.
• Services related to damages caused by fire, flood, earthquake or other acts of God.
• Services related to warranty claims, enforcement and inspection after final completion.
• Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY.
• Performance of miscellaneous and supplemental services related to the project as
requested by the CITY.
City of Fort Worth, Texas Traffic Signal Improvements at Western Center Blvd. and Sandshell Blvd.
Attachment A CPN 103999
Release Date: 07.22.2021
Page 4 of 4
ATTACHMENT B
COMPENSATION
Design Services for
Design of Traffic Signal Improvements at Western Center Blvd. and Sandshell Blvd.
City Project No. 103999
Time and Materials with Rate Schedule Project
Compensation
A. The ENGINEER shall be compensated in an hourly amount not -to -exceed
$20,300.00 for personnel time, non -labor expenses, and subcontract expenses in
performing services enumerated in Attachment A as follows:
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Cateaory Rate for the ENGINEER's team member performing the work.
Labor Cateaory Rate as presented in the rate schedule table below is the rate for
each labor category performing the work and includes all direct salaries,
overhead, and profit.
Labor Category
Rate
($/hour)
Senior Project Manager
$280
Senior Professional
$260
Project Manager
$220
Professional
$185
Analyst III
$165
Analyst II
$155
Analyst 1
$150
Business Support
$120
Administrative
$105
Intern
$90
ii. Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Direct Expenses (non -labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
iii. Subcontract Expenses. Subcontract expenses and outside services shall
be reimbursed at cost to ENGINEER plus a markup of ten percent (10%).
iv. Budgets. ENGINEER will make reasonable efforts to complete the work
within the budget and will keep the City informed of progress toward that end so
that the budget or work effort can be adjusted if found necessary.
City of Fort Worth, Texas Traffic Signal Improvements at Western Center Blvd. and Sandshell Blvd.
Attachment B CPN 103999
PMO Official Release Date: 8.09.2012
Page 1 of 4
:is
ATTACHMENT B
COMPENSATION
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may
be adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services, that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether
by change in scope of the project, increased costs or other conditions, the
ENGINEER shall immediately report such fact to the City and, if so instructed by
the City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER's excess costs expended prior
to such increase will be allowable to the same extent as if such costs had been
incurred after the approved increase.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER
in performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 2 of 4
Traffic Signal Improvements at Western Center Blvd. and Sandshell Blvd.
CPN 103999
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm Primary Responsibility
Prime Consultant
Kimley-Horn and Project Management, Design
Associates, Inc.
Proposed MBE/SBE Sub -Consultants
Non-MBE/SBE Consultants
Project Number & Name
Design of Traffic Signal Improvements at
Western Center Blvd. and Sandshell
Blvd. (City Project No. 103999)
City MBE/SBE Goal = 7%
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 3 of 4
TOTAL
Fee Amount I %
$20,300.00 1 100.0%
$20,300.00 100.0%
Total Fee MBE/SBE Fee MBE/SBE
$20,300.00 $0.00 0.0%
Consultant Committed Goal = 7%
Traffic Signal Improvements at Western Center Blvd. and Sandshell Blvd.
CPN 103999
i
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
City Project No. 103999 - Design of Traffic Signal Improvements at Western Center Blv. and Sandshell Blvd - Amendment No. 1
Task No. Task Description
Senior PM
Senior
Professional
Project
Manager
Professional
Labor (hours)
Analyst III
Analyst II
Analyst I
Business
Support
Administrative
Total Labor
Cost
Expense
Subconsultant
SBE I Non-SBE
Travel
Fees
I otal Expense
Cost
Task Sub Total
Rate
1.0 Design Management (6 Months)
2.0 Conce3tual Design r130%
3.0 Preliminar�V DeslillLn (60%�
4.0 Final Design (90%) and Final Construction Documents
(100%)
5.0 Bid Phase Services
6.0 Construction Phase Services
6.1 Attend Additional Monthl On -Site Status Meetings (8 ea)
6.2 Prepare Additional RFIs�7 each)
6.3 Construction Plan Revasions
6.4 Prepare Additional Task Order Document
6.9 Prepare Record Drawings
$280
$260
$220
$185
$165
$155
$150
$120
$105
0
0
0
0
0
0
0
0
4
$420
$0
$0
$0
$0
$0
$420
0
0
0
0
0
0
0
0
0
$0
$0
$0
$0
$0
$0
$0
0
0
0
0
0
0
0
0
0
$0
$0
$0
$0
$0
$0
$0
0
0
0
0
0
0
0
0
0
$0
$0
$0
$0
$0
$0
$0
0
0
0
0
0
0
0
0
0
$0
$0
$0
$0
$0
$0
$0
0
10
0
25
0
81
0
0
0
$19,780
$0
$0
$100
$0
$100
$19,880
1
2
4
1
1
4
6
10
2
3
8
12
50
9
6
$2,240
$3,490
$100
$100
$2,340
$0
$3,490
$10,900
$1,405
$1,745
$0
$10,900
$0
$1,405
$0
$1,745
7.0
8.0
ROW/Ease o f Services
Surve anSu�surface Utility Engineering
0
0
0
0
0
0
0
0
0
$0
$0
$0
$0
$0
$0
$0
0
0
0
0
0
0
0
0
0
$0
$0
$0
$0
$0
$0
$0
9.0
Permitting
0
0
0
0
0
0
01
0
0
$0
$0
$0
$0
$0
$0
$0
10.0 Quality Control / Quality Assurance
Totals
0
0
0
0
0
0
01
0
0
$0
$0L$O
$0
$0
$0
$0
$0
0
10
0
25
0
81
0
0
4
$20,200
$0
$100
$0
$100
$20,300
a.L_
Lissette Acevedo (Nov 13, 2DM 10 31 CST)
Lissette Acevedo, PE, PTOE, PIMP
Sr. Capital Projects Officer
Transportation and Public Works
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date: 8.09.2012
Project Summary
Total Hours
120
Total Labor
$20,200
Total Expense
$100
�($�E $lonsultant
Non- �jj� E $$u[[�tconsultant
$0
$0
10% Sub Markup
$0
MBE/SBE Participation
0.0%
Total Project Cost
$20,300
Traffic Signal Improvements at Western Center Blvd. and Sandshell Blvd.
CPN 103999
1 Of
CFW - Integrated Program Management
-1, ID ACMyN ne OD I RD I " I Sbl
Kabar Fanta eos z1e �os/ovzzA-
Planning o 0 oaWMA
A1199 Projeri Start 0 0 loop/. 05/02/22A
Project Schedule — Data Date: 09/01/24
Finch Va'iance-11 pr 3, H124 Otr 1,-1 Or 2, 2025 Otr32M5
Raa,Da1a Pig Sep Oct Nis, I Os Jan I Feb I Mer I Ap I May I Jun Jul I Ar0 I Sep
07/15/25 0
I® r
05102122A 0
0
)esryt
25 LOE Spending Plan 2024
Design Agreerllerit
1120 MBC Process-Desgn
1130 Award DesignPgreement
1140 Agreemem Exewson
1150 Issue Design Notice To Pmceed(Task Order Pmjeds)
Conceptual Destgrd30%Design
1200 Design KsiFOB Meesrg
410
0
0&02/22A
05/2024A
-94
10
0
100%
05/02/22A
05/20/24A
-94
38 0
OY2&22A
07/7222A
-7
26
0
100%
05/23MA
OU2&22A
0
0
0
10MA
O&2822A
0
10
0
1001A
06129/22A
07/22/22A
-7 --
0
0
100%
07/22122A
o7/1s/22A
-6
75
0
07/1922A
7
1
0
100%
07/19/22A
1210
Prepare Conceptual Drawings
30
0
loop/.
07/22/22A
102122A
-35
1220
Co pWal Plans Submittal to Wises, ROW, Traffic, Pals, 9orm Mar,1
0
0
100%
102122A
0
1230
Review Caloeptual Plan(CFW)
10
0
100%
1024t22A
11/0322A
1
1270
ConoepWN Design Compete
0
0
10MA
11/0322A
0
Fred Design
152
10
01l03/23A
0&0723A
1 0
1400
Prepare Final Plans and SpecYiceSons(In—paste 90% City Cammards)
30
0
100%
01/0323A
04r12/23A
-41
1410
Final Flan and Spelii®tion Submitted (Wises, ROW, Traffic, Parks, Storm
0
0
100%
04/17/23A
0
1420
Review Final Plansand Speakations(CFW)
2
0
10D%
I 04/1323A
04/1423A
0
1424
Held Public meeting
1
0
loop/.
I 04/05/23A
04/0523A
11
1425
ConstrudabiM Review Walk through
1
0
100%
I 04111/23A
04/1123A
0
1426
Peer-6w meeting
1
0
100%
03/2323A
032323A
25
1440
Inmrporate 90%Fined Commems
25
0
10D%
I 04/17/23A
0&2323A
-24
1445
Submit 100p/. Foal Plan and Spedrasons
7
0
loop/.
I 07/1023A
07/18MA
0
1450
Review 100% Final Plan (CFW)
5
0
100%
I 06/26/23A
06/3023A
16
1455
Approve Fred Plans and Spedfiartbrisand Rafe for Signatures
3
0
100%
OMMA
Oa(07/23A
0
1460
Design Complete
0
0
iW%
I
06/30/23A
25
1470
Request and Receive MWBE Goal(Con9rumm)
0
0
iW%
I 0411323A
04/1323A
0
1480
Prepare Bid PaUmge(Construcbm)/raskOrder
0
0
100%
, D4113MA
04/1323A
0
ROW
4010
reACgnnation Uti 0 1W A W/O62RA 0
Identity ROW Needs 10 0 100% 1024122A 11/0322A 1
4020
PM request Properly Mgmt Dept far Land AtqudimEesernent(Provide 15 0 100% 02/1523A 03108/23A 0
ROW Negotiations
_ 234
0
03/0823A
02/OMA
0
4000 Rghtof Way3zrt 0
0
100%
03/08/23A
0
4030 OrderAppraisel 31
0
100%
03/0&21A
0610523A
-3:
4040 Order TNe Canmilmem 31
0
100%
03/0623A
0610523A
-3:
4050 Order E—nmental Report (if netted) 31
0
100%
03/08/23A
06r05WA
-3:
4050 Send Irnroduraon Letter with Land Usurer Bill of Rights 1
4080 Appraisal Received date 1
0
100%
0&W/23A
0606/23A
0
0
100%
06W23A
Oar0MA
0
4090 Review Appraises and Prepare Fist Offer 10
0
100%
06AW23A
062123A
0
4130 Presets lnihal Offer 1
0
100%
OFJ27/23A
0622123A
0
4140 NegosatioNA[ceptance Period 15
0
100%
06/2323A
02/0624A
-14
4900 Real PropertyAtquisNoNEssemem Complete 0
0
100%
02/08/24A
0
tltiity Ral00atim
7010
$ubmi Cover Leker antl 30°/.Drvgsto WSyCo-ormnafor (CFW/Desgn 5
0
0
100%
MAMA
iN2422A
O&1623A
Ol/0323A
0
-4:
70:
Submi CFW Design Dnvgs to Frandres Utilities (CFW Utility Coordinator 5
0
100%
01/03MA
01/09/23A
0
UtI ty Relocation
Coordiretbn
Ia29A
0&1ii29A
7000
1 Udilies Stan
0
0
100%
01/1023A
0
7030 Review 30°/. CFW Design Dnvgs and Respond to CFW (Utility) 20 0 100% 01/1023A
7040 Review 60p/.CFW Design DrwgsaM RCKpoMroCFW (tuts) 20 0 10D% W/2&73A
7055 1Review 90% CFW Design Dnvgs and Respond to CFW (Way) 10 0 100% 03108MA
Actual Work ♦ ♦ Milestone - Remaining Level of Effort
Remaining Work ♦ ♦ Oitiml Milestone - Actual Level of Effort
Gitical Remaining Work ♦ ♦ Completed Milestone Project Baseline Bar
♦ Baseline Milestone
103999 - Western Center at Sandshell Blvd Traffic Signal
CFW - Integrated Program Management
mylu
Aamyr4ane
7100
Utility Rebadw
7120
I umNes CleareNComplete
Construction
Bitlantl Awartl
7340
I &tl &Award- Task Order (EARrC)
Cw&;ectExecu11w
7350
Award Contract-Conarumon
7410
E—rle Caltrat 0=,(s(Cdy)
7420
Execute Calh'act Documents (Contractor)
Pre wstruct=Activities
8000
Site WAThrcugh
8100
Datribute Executed Contract Documents to Calaruchon
8110
Hold Pre -Construction Meeting with Contractor
8120
Hold Pudic Meeting #4-Pre-Construchon
8200
Material pr—rement & Site Mobilization
Construction Contract
8210
Construction Start
8220
ComUuchoNLandscaping
8540
Construchon Phase Complete
8545
Construchan Substantially complete
Impact!an
8500
Inspections
8510
Final lnsperaon
8520
Complete Pundl Lst tasks
853_W91kThrough
Completed Punch List
Closeout
Coast Contract Close -art
9100
Contract Reconciliation9105
ASBuX Survey (Submitted! by Contractor)
9110
$ubmittals(Projet Closeout Doa/menlation)
9130
Notice of Completion/que Sheet
9140
Final Invoice Paid
9410 Consultant Letter of Map Revaon(FEMA)Submittal
9420 City Submit LOMR
9440 Submit Final Invoice for Design Contract
Close Design Contract
9500 Close Design Contract
Flrrsrrcial Capitakatim
9710 Financial Reconciliation
9715 Prolet Compete
9720 Capitauetion
w
t4)
n Pcalrs^
a
sm1
10
0
100%
0610523A
0
0
100-A
313
71
0911423A
0911a23A
11
0
0
0
100°A
10
0
09/1923A
0
0
101%
5
0
,OD%
09/2623A
5
0
100°A
09119MA
161
0
0911423A
5 0 100% 04/04/24A
3 0 100% 04/22/24A
1 0 100% OS'07/24A
1 0 100% 02)0524A
100 0 1001/. 09/1423A
143
71
051=4A
0
0
100%
OS/.4A
180
76
5%
06/2O24A
0
0
0°A
0
0
0%
143 71
05✓20/24A
180
76
s%
0520.24A
11/1_
1
1
0%
10
10
0%
11/1924
1 1
147 147
0%
12/12/24
12113/24
41
15
5
1s
0
1
41
15
5
15
0
1
0%
0%
0%
0%
0%
1211324
12/1324
12/13/24
01/0725
02/1225
220/24
10
10
10
10
10
10
10
10
0%
0%
0%
0%
1-
01/0725
01/2725
02/OS/25
10
10
1021I925
10 10
0%
02JI925
92 92
03/0 m
30
0
0
30
0
0
0°/b
0A
0%
oaID5/25
Project Schedule
Data Date: 09/01/24
anal
U I &: 1—
ur4QW
ut" NLJ OF a—
la —
-4—
Fiaa,Oae
Sap of
r�a I
oe:
deg Fed Me' Apr
du, del Au I Sep
06/1623A
0
12/1224
0
iQWMA
0
-
10/0223A
0
09119/23A
0
1O/0223A
...... ..
0
....:... .......
..................
......
... ..... .... ... ...... .. ........ ... ... .. .....
... .... . ..... ..... ... ..
09125/23A
0
..
05/17/24A
-8
04/11/24A
18
',.
04/24/24A
0
OY02/24A
0.
05/17/24A
-69
12/1224
0
s..........
...........
0
.....:... . .... .....
........
...............
.. ........ ................. ........ ...:.......... ...........
......... ......... ............... .
11/16/24
0
.
12/12/24
0'
11/1524
0
12/1224
0
11/15/24
0
11/18/24
0
'.
12IW24
0
12/12/24
0
'r
02/1225
0
01/06/25
0
12/1924
0
... ...... .. .:. ..........
,.
0128/25
0
02IM/25
0
02/1825
0
01/O(1f25
0
02/M/25
0
02/18/25
0
-
03/0425
0
03/OM25
0
07/1525
0
04/15/25
0 -....
. II II _.
_ ...'.. ........
0411525
0
07/15/25
0
Ll
Actual Work ♦ ♦ Milestone - Remaining Level of Effort ♦ ♦ Baseline Milestone
Remaining Work ♦ ♦ Oitital Milestone - Actual Level of Effort 103999 - Western Center at Sandshell Blvd Traffic Signal
Critical Remaining Work ♦ ♦ Completed Milestone Project Baseline Bar
• � : • • : • `�, �„\ did PI
OT
0 0 4;,F. 1*7
c
3oomerJack's�G�rll 41•�0`:, F
9
A a
rn
g9 �' k ''� 4 , ��w to t w • � r. �`�' � 3
Wester." =tatio�„ + "'• �F2e a e e
F
Express Emp—y ,ent rofessionaIs-
.
n
�Fs Patio' Grillk- m
E Office Pri t & Ship
�J mmy John's r '
ster Ba Inc- r
I
Family 1st of Texas FCU
O illiam D. AI g D
Wes _
ern �� .. • . - ' , . ,> , _ ,
Center Blvd —® �
' -.. Western Center. Bled Wes ern Center Blud
Western Center B ;d n
' + Carmel CreeMinistry
C~reek`ILn.
FA
s. yi �. � •+; �
C 6
FOUR SEASONS ROOFING
�Bcaum`s Ice Cream & Dairy Store41
�lGolden Star Media Agency" p
'-
0�4arth
IFI V9.Shad�v. Ogk.Rarhenue & Grill I 1000 ft
103999-EPAM-Western Center Blvd &
Sandshell Blvd Traffic Signal Engineering
Amendment #1
Final Audit Report 2024-11-04
Created: 2024-11-02
By: Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
Status: Approved
Transaction ID: CBJCHBCAABAA17D5ZoBy4LLF75-wLVg35kcXDSKL6HU7
"103999-EPAM-Western Center Blvd & Sandshell Blvd Traffic Si
gnal Engineering Amendment #1" History
Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2024-11-02 - 0:16:40 AM GMT- IP address: 204.10.90.100
Document emailed to Fanta Kaba (fanta.kaba@fortworthtexas.gov) for filling
2024-11-02 - 0:22:14 AM GMT
F Document emailed to Scott Arnold (scott.arnold@kimley-horn.com) for filling
2024-11-02 - 0:22:14 AM GMT
Document emailed to Leonel Rios (Leone1.Rios@fortworthtexas.gov) for filling
2024-11-02 - 0:22:15 AM GMT
Document emailed to Donnette Murphy(donnette.murphy@fortworthtexas.gov) for approval
2024-11-02 - 0:22:15 AM GMT
"5 Email viewed by Scott Arnold (scott.arnold@kimley-horn.com)
2024-11-02 - 0:32:03 AM GMT- IP address: 107.115.171.22
Form filled by Scott Arnold (scott.arnold@kimley-horn.com)
Form filling Date: 2024-11-03 - 8:41:51 PM GMT - Time Source: server- IP address: 130.41.174.195
>', Form filled by Leonel Rios(Leonel.Rios@fortworthtexas.gov)
Form filling Date: 2024-11-04 - 2:01:28 PM GMT - Time Source: server- IP address: 204.10.90.100
`s Email viewed by Fanta Kaba (fanta.kaba@fortworthtexas.gov)
2024-11-04 - 2:20:09 PM GMT- IP address: 204.10.90.100
FORT 1`1'dl?iTH•.. I Pa 'd by
Adobe
Acrobat Sign
Form filled by Fanta Kaba (fanta.kaba@fortworthtexas.gov)
Form filling Date: 2024-11-04 - 2:50:14 PM GMT - Time Source: server- IP address: 204.10.90.100
Email viewed by Donnette Murphy (don nette.murphy@fortworthtexas.gov)
2024-11-04 - 6:58:04 PM GMT- IP address: 99.150.145.211
Document approved by Donnette Murphy (donnette.murphy@fortworthtexas.gov)
Approval Date: 2024-11-04 - 6:58:12 PM GMT - Time Source: server- IP address: 99.150.145.211
Agreement completed.
2024-11-04 - 6:58:12 PM GMT
FoRTWORTH, I P—e'b'
Adobe
Acrobat Sign
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE:
Western Center Blvd & Sandshell Blvd Traffic Signal
Engineering Contract
M&C:
22-0539
CPN: 103999 CSO:
DOC#:
Date:
To:
Name
Department Initials
Date Out
1.
Fanta Kaba, Project Manager TPW FNK
Nov 4, 2024
2.
Scott Arnold, Consultant Consultant S k1%
Nov 3, 2024
3.
Leonel Rios
TPW /-
Nov 4, 2024
4.
Donnette Murphy
Risk Mgmt DM
Nov 4, 2024
5.
Patricia Wadsack
TPW ApDvdviaAgiloft Tn: 1553
6.
Lauren Prieur
TPW
7
Doug Black
Legal pg �a
Nov 15, 2024
8
Jesica McEachern
CMO im
Nov 20, 2024
9
Jannette Goodall
CSO 7
Nov 20, 2024
10.
TPW Contracts
TPW
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW
Contracts
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: []YES ®No SAME DAY: []YES []No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: Please notify TPWContracts(&,fortworthtexas.gov for pickup when complete. Call ext.
7233 or ext. 8363 with questions. Thank you!
Amendment Purpose Statement:
The purpose of this engineering amendment is to provide additional design services for the Western
Center Blvd & Sandshell Blvd traffic signal project.
Construction for this new traffic signal began in May 2024 and is anticipated to be complete in
November 2024. Throughout the course of construction, we have held weekly site visits with the
consultant preparing agendas and status summary reports, and there have been thirteen RFls. These
efforts have exhausted the remaining capacity for the design effort.
The funding appropriated with this amendment will be used by the consultant towards the remaining
design efforts in the contract.