HomeMy WebLinkAboutContract 58684-CO3CSC No. 58684-CO3 FORT WORTHt City of Fort Worth Change Order Request Project Name: Northside IV 24-Inch Water Transmission Main Phase 1 B 1 City Sec No.: I 58684 Project No.(s):l 56020 0700430 5740010102687 001780 DOE No. I N/A City Proj. No.: 102687 Project Description: 24-Inch water transmission main extends from Heritage Trace Parkway to Bonds Ranch Road along Business Highway 287. Contractor: Jackson Construction, Ltd. I Change Order /I 3 I Date: 1 10/28/2024 City Project Mgr.1 Suzanne Abbe 1 City Inspector: Shane Behn 1 Phone Numberl 817-392-8209 1 Phone Number: 682-328-1264 1 Dept. Water Totals Contract Time Calender days) Original Contract Amount $10,499,744.25 $10,499,744.25 60 Extras to Dale 0165 Credits to Dale Pending Change Orders (in M&C Process) Contract Cost to Date $10,499,744.25 $10,499,744.25 JAmounl of Proposed Change Order $0.00 $0,00 030 Revised Contract Amount $10,499,744.25 $10,499,744.25 655 Original Funds Available for Change Orders $262,494.00 $262,494.00 Remaining Funds Available for this CO $262,494.00 I $262,494.00 Additional Funding (if necessary) I CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%) 1$13,124,680,31 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No. 3 provides compensation for rock riprap protection of the culvert near the flow transfer station. Staff recommends an additional 30 calendar days for the additional work and final clean up on the project. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or Incidental to, the above Change Order. Contractor's Company Name Contractor Name Contractor Signature Date Jackson Construction, Ltd. Troy Jackson Inspector Director (W c Dept) n alat Rlark !•V 14 11 4211TI fin M&C Number ' N/A Date ZfMI— Date/,a-'A Construction Supervisor (Water Dept) 11 /18/2024 ` /' /,—'-�_. Date Assistantt Ci Manager 11/19/2024�/.:..ti, Council Action (If lam ohm— I by 19,202416:00 CST) Required) M&C Date Approved I NIA Date 11 /12/2024 Date ll' -/?- Date 111 /1 A/9n94� OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORT WORTH City of Fort Worth Change Order Additions Project Name I Northside IV 24-Inch Water Transmission Main Phase 1 B j City Sec No.: 1 58684 Project No.(s): 1 56020 0700430 5740010102687 001780 DOE No,1 N/A City Proj, No,: 1 102687 Project 24•inch water transmission main extends from Heritage Trace Parkway to Bonds Ranch Road along Business Highway Description 287. Contractor 1 Jackson Construction, Ltd. j Change Order: 02 2 Date:1 10/28/2024 9/6/2024 City Project Mgr, I Suzanne Abbe City Inspector I Shane Behn ADDITIONS I I tM UtSCRIPI IUN DEPT I Qty Unit Unit Cost Total 57 Culvert Riprap Protection Water 1,00 LS $6,927.78 $6,927.78 I � I I I I I I I Water $6,927.78 Page 1 of 1 Additions Sub Total $6,927.78 FOR-r WORTH City of Fort Worth Change Order Deletions Project Name Northside IV 24-Inch Water Transmission Main Phase 1 B City Sec No.: 58684 Project No.(s): 66020 0700430 6740010102687 001780 1 DOE No. N/A City Proj. No.: 102687 Project Description 24-inch water transmission main extends from Heritage Trace Parkway to Bonds Ranch Road along Business i Highway 287. 1 Contractor Jackson Construction, Ltd. Change order:F73 Date 10/2812024 City Project Mgr. ' Suzanne Abbe City Inspector: 1 Shane Behn ITEM DESCRIPTION 50 Construction Allowance DELETIONS DEPT Qty (Unit Unit Coat Total Water 0.0432N6251LS $160,000.00 $6,927.78 Page 1 of 1 Water Deletions Sub Total 1$6,927.78 1$6,927.78 M[ BE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total 1 $0.00 Previous Change Orders CO# DATE AMOUNT Total 1 $0.00 Page 1 of 1 10/28/2024 CPN 102687 Northside IV 24-Inch Water Transmission Main Phase 113 Change Reauest 3 Notes Change Order No. 1 provides for rock riprap protection of the culvert near the flow transfer station. During the final inspection of the vault, plant operations noted that re -grassing the area would not provide enough protection and that erosion would undermine the road into the station and a corner of the fence over time. They requested the culvert be protected with riprap. The contractor installed approximately 56 square yards of riprap, approximately 18 inches deep and charged by time and materials (see attached for cost). The resulting unit cost is approximately $82.47/CY. Recent bid prices for similar work ranged from $180/CY to $300/CY. Staff recommends an addition of 30 calendar days to final acceptance for the additional work and final clean up on the project for a final acceptance date of December 6, 2024. + Jackson Construction, Ltd. Change Order Request Harvest Riprap from another projet and place around drainage system at Transfer vault to stop erosion, one additional load of Flexbase used to regrdade and clean up driveway area. City Project No. 102687 Northside IV 241nch Water Transmission Main, Phase 1B Date 28.Oct•24 Item Description Quantity UM Bid Price T&M Riprap at Transfer Station and Repaid Regrade Driveway Total 1.000 LS $ 6,927.00 $ W Amount 6,927.00 6,927.00 Page 1 of 3 10/2812024 10:10 AM County Project JACKSON CONSTRUCTION LTD. Force Account Daily Time and Material City Highway N/A Description of Work: (Harvest Rlprap from anotherproject and Utilize around Inlet al Transfer Station. Additional load of Base and grade work to clean up around Date: 9127 & 1011 transfer s taflon EQUIPMENT `• ^ T-Hrs� agate � _Labor Hours Rate �•-� Description Amount Amount Reg. O.T. Reg. -_ O.T. (i) Caterpillar 320 Trackhoe $ 127.53 $ _ _.__.._._ ....._ $ (2) Caterpillar 420 Backhoe 23.00 $ 57.00 $ 1,311.00 Juan 11.00 $ 47.60 $ $ 522.50 (i)Pickup --- 11.00 $ 18.99 $ 208.89 Labor/ Skilled - _11.00 2.00 $ 22.00 $ _ _ 33.00 $ 308.00 (1) Trash Pumps $ 7.60 $ Labor/ Skilled 11.00 2.00 $ 22.00 $ 33.00 $ 308.00 $ Labor/ Skilled 8.00 2.00 $ 22.00 $ 33.00 $ 242.00 Labor/ Skilled y 8.00 - 2.00 $ 22.00 $ _ 33.00 $ 242.00 S Labor/ Skilled 7.00 $ 22.00 $ $ 154.00 $ Labor/ Skilled ---7.00 $ 22.00 $ $ 154.00 Labor/ Skilled 7.00 $ 22.00 $ $ 154.00 - - ---- S ---- -- $ $ _ Sub -Total $ 1,519.89 Sub-Tolal $ 2,084.50 15% $ 227.98 55% $ 1,146.48 Total Equipment: $ 1,747,87 25% $ 521.13 Total Labor: $ 3,752.11 Material Subcontract Description Quantity UOM Rate Amount Quantity UOM Rate Amount 1.5' Recycled Base ^ - 2400 ~ TN S 27.00 $ - 648.00 Tandem Trucks haul Riprap sourced from a different-- 00.00 HR S 65.000 $� 650.00 _ s $ Sub -Total $ .... 648.00 ���••��� � _.._..._.. Sub -Total $ J 650.00 10% $ 64.80 10% $ 65.00 Total Material: $ 712.80 Total Subcontract: $ 715.00 Approved: JACKSON CONSTRUCTION LTD. Dale Dale JACKSON CONSTRUCTION JOB # 3354 � T�_ Labor $ Equipment_ - $ 1,747.87 Water ta1_ $ �- 712.80 Subcontract $ 715.00 Bond $ Total This Sheet a _.� ; �.._ 8,927 70- 10/28/2024 10:10 AM Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Suzanne Abbe Name of Employee Senior Engineer, Capital Project Delivery Title 444��nn�� a�.04 FORt�aad ATTEST: a� nEXA`�oapp Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX