NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Cedarbrook Beltmill Phase 5
City Project No.: 104497
Improvement Type(s): ❑ Paving ❑ Drainage x❑ Street Lights ❑ Traffic Signals
Original Contract Price: $253,296.10
Amount of Approved Change Order(s):
Revised Contract Amount:
Total Cost of Work Complete: $253,296.10
Nov 20, 2024
Contractor Date
President
Title
Independent Utility Construction Inc
Company Name
(AU)Nov 20, 2024
Project Inspector
Date
ze�- %
Nov 20 2024
Pam Tmw-i (Nov)0 20)n 16 on CsTI
7
Project Manager
Date
Nov 20, 2024
IN.,I.,IN411:04CST)
CFA Manager
Date
de.Z.. -
Nov 20, 2024
I auren Prieur(Nov ?0, 2024 16:07 CST)
TPW Director
Date
c
Nov 20, 2024
Asst. City Manager
Date
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page 1 of 2
Notice of Project Completion
Project Name: Cedarbrook Beltmill Phase 5
City Project No.: 104497
City's Attachments
Final Pay Estimate ❑x
Change Order(s): ❑ Yes ❑x N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time 207 WD Days Charged: 207 WD
Work Start Date: 7/10/2023 Work Complete Date: 9/11/2024
Completed number of Soil Lab Test: 809
Completed number of Water Test: 18
Page 2of2
FORT WO lT H
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name CEDARBROOK-BELTMILL PHASE 5
Contract Limits
Project Type STREETLIGHTS
City Project Numbers 104497
DOE Number 4497
Estimate Number 1 Payment Number I
City Secretary Contract Number
Contract Date
For Period Ending 9/11/2024
WD
Project Manager NA
Contractor INDEPENDENT UTILITY CONSTRUCTION
5109 SUN VALLEY DRIVE
FORT WORTH, TX 76119
Inspectors M.GLOVER / E.WALKER
Contract Time 45VD
Days Charged to Date 207
Contract is 100.00 Complete
Thursday, September 26, 2024 Page 1 of 4
City Project Numbers 104497
Contract Name CEDARBROOK-BELTMILL PHASE 5
Contract Limits
Project Type STREETLIGHTS
Project Funding
UNIT V: STREET LIGHTS IMPROVEMENTS
Item Description of Items
No.
1 2" CONDT PVC SCH 80 (T)
2 FURNISH/INSTALL LED LIGHTING FIXTURE
(70 WATT ATBO COBRA HEAD)
3 RDWAY ILLUM FOUNDATION TY 1,2, AND 4
4 FURNISH/INSTALL RDWAY ILLUM TY 11 POLE
5 FURNISH/INSTALL TYPE 33B ARM
6 NO 10 INSULATED ELEC CONDR
7 NO 6 TRIPLEX OH INSULATED ELEC CONDR
8 FURNISH/INSTALL LED LIGHTING FIXTURE
(137 WATT AT132 COBRA HEAD)
9 FURNISH/INSTALL 8' WOOD LIGHT POLE ARM
10 2" CONDT PVC SCH 80 (T) - CONCRETE
ENCASED
DOE Number 4497
Estimate Number 1
Payment Number 1
For Period Ending 9/11/2024
Estimated Unit
Unit Cost
Estimated
Completed
Completed
Quanity
Total
Quanity
Total
4135 LF
$16.22
$67,069.70
4135
$67,069.70
42 EA
$311.00
$13,062.00
42
$13,062.00
42 EA
$1,204.00
$50,568.00
42
$50,568.00
42 EA
$1,908.00
$80,136.00
42
$80,136.00
42 EA
$234.00
$9,828.00
42
$9,828.00
12465 LF
$1.36
$16,952.40
12465
$16,952.40
920 LF
$7.00
$6,440.00
920
$6,440.00
8 EA
$550.00
$4,400.00
8
$4,400.00
8 EA
$500.00
$4,000.00
8
$4,000.00
20 LF
$42.00
$840.00
20
$840.00
Sub -Total of Previous Unit
$253,296.10 $253,296.10
Thursday, September 26, 2024 Page 2 of 4
City Project Numbers 104497
Contract Name CEDARBROOK-BELTMILL PHASE 5
Contract Limits
Project Type STREETLIGHTS
Project Funding
Contract Information Summary
Original Contract Amount
Change Orders
Total Contract Price
DOE Number 4497
Estimate Number 1
Payment Number 1
For Period Ending 9/11/2024
$253,296.10
$253,296.10
Total Cost of Work Completed $253,296.10
Less % Retained $0.00
Net Earned $253,296.10
Earned This Period $253,296.10
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$253,296.10
Thursday, September 26, 2024 Page 3 of 4
City Project Numbers 104497
Contract Name CEDARBROOK-BELTMILL PHASE 5
Contract Limits
Project Type STREETLIGHTS
Project Funding
Project Manager NA
Inspectors M.GLOVER / E.WALKER
Contractor INDEPENDENT UTILITY CONSTRUCTION
5109 SUN VALLEY DRIVE
FORT WORTH, TX 76119
DOE Number 4497
Estimate Number 1
Payment Number 1
For Period Ending 9/11/2024
City Secretary Contract Number
Contract Date
Contract Time 45 WD
Days Charged to Date 207 AID
Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed
$253,296.10
Less % Retained
$0.00
Net Earned
$253,296.10
Earned This Period $253,296.10
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$253,296.10
Thursday, September 26, 2024 Page 4 of 4
FORTWORTH.
TRANSPORTATION AND PUBLIC WORKS
September 11, 2024
INDEPENDENT UTILITY CONSTRUCTION, INC.
5109 SUN VALLEY DRIVE.
BENBROOK,TEXAS 76119
RE: Acceptance Letter
Project Name: CEDARBROOK-BELTMILL PHASE 5
Project Type: STREET LIGHTING
City Project No.: 104497
To Whom It May Concern:
On June 17, 2024 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on September 11, 2024. The final
inspection and the corrected punch list items indicate that the work meets the City of Fort Worth
specifications and is therefore accepted by the City. The warranty period will start on September 11,
2024, which is the date of the punch list completion and will extend of two (2) years in accordance with
the Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
392-2237.
Sincerely,
Ram Tiwari (Nov 20, 202416:00 CST)
RAM TIWARI P.E., Project Manager
Cc: EDDIE WALKER, Inspector
MIKE GLOVER, Inspection Supervisor
DAIEL ROY, Senior Inspector
ANDREW GOODMAN, Program Manager
PELETON LAND SOUTIONS, Consultant
INDEPENDENT UTILITYCONSTRUCTION ,INC., Contractor
D R HORTON TX,LTD, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared RICHARD
WOLFE, PRESIDENT Of INDEPENDENT UTILITY
CONSTRUCTION, INC., known to me to be a credible person, who being
by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Beltmill (Cedarbrook) Phase 5 - CirP
BYchard Wolfe, President
Subscribed and sworn before m o is date 20th of May, 2024.
aPublic
Tarrant County' State of ,,v�'r'p"�,,, CHRISTINA G
a Notary Public, State of Texas
Texas
:,-Z Comm. Expires 12-20-2024
oF�`` Notary ID 130940785
Of
CONSENT OF
OWNER
❑
SURETY COMPANY
ARCHITECT
❑
CONTRACTOR
❑
TO FINAL PAYMENT
SURETY
El
OTHER
(SIMILAR TO AIA DOCUMENT G707)
PROJECT: Street Lighting Improvements to serve Cedarbrook - Beltmill Phase 5
(name, address) Fort Worth, TX
TO (Owner)
F- City of Fort Worth
200 Texas Street
Fort Worth, TX 76102
1
CONTRACTOR: Independent Utility Construction, Inc.
Bond No. 260825K
ARCHITECT'S PROJECT NO:
CONTRACT FOR:
CONTRACT DATE:
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the (here insert name and
address of Surety Company)
Westfield Insurance Company
955 Garden Park Drive, Suite 230 , SURETY COMPANY,
Allen, TX 75013
on bond of (here insert name and address of Contractor)
Independent Utility Construction, Inc.
5109 Sun Valley Drive
Fort Worth, TX 76119
,CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that the final payment to the Contractor shall not relieve the
Surety Company of any of its obligations to (here insert name and address of Owner)
City of Fort Worth
200 Texas Street
Fort Worth, TX 76102 , OWNER,
as set forth in the said Surety Company's bond.
IN WITNESS WHEREOF,
The Surety Company has hereunto set its hand this
Attest:
(Seal):
21 st day of May
WESTFIELD INSURANCE COMPANY
Surety Company,,/
By
Signature of'Wuthonzed Representative
, 2024
Kyle W. Sweeney Attorney —in —Fact
Title
Note: This form is intended to be used as a companion document to the Contractor's Affidavit of Payment of Debts and Claims, Current Edition
THIS POWER OF ATTORNEY SUPERCEDES ANY PREVIOUS POWER BEARING THIS SAME
POWER # AND ISSUED PRIOR TO 09128123, FOR ANY PERSON OR PERSONS NAMED BELOW.
POWER NO. 4220052 06
General
Power
of Attorney
CERTIFIED COPY
Westfield Insurance Co.
Westfield National Insurance Co.
Ohio Farmers Insurance Co.
Westfield Center, Ohio
Know All Men by These Presents, That WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO
FARMERS INSURANCE COMPANY, corporations, hereinafter referred to individually as a "Company" and collectively as "Companies," duly
organized and existing under the laws of the State of Ohio, and having its principal office in Westfield Center, Medina County, Ohio, do by these
presents make, constitute and appoint
CHARLES D. SWEENEY, MICHAEL A. SWEENEY, KYLE W. SWEENEY, ELIZABETH GRAY, DAVID W. SWEENEY, JOINTLY OR
SEVERALLY
of FORT WORTH and State of TX its true and lawful Attorney(s)-in-Fact, with full power and authority hereby conferred in its name,
place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings, or other instruments or contracts of
suretyship in any penal limit. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - • - - - - • • - - - - -
LIMITATION: THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE
GUARANTEE, OR BANK DEPOSITORY BONDS.
and to bind any of the Companies thereby as fully and to the same extent as if such bonds were signed by the President, sealed with the corporate
seal of the applicable Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney(s)-i n- Fact may do in
the premises. Said appointment is made under and by authority of the following resoiution adopted by the Board of Directors of each of the
WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY:
"Be It Resolved, that the President, any Senior Executive, any Secretary or any Fidelity & Surety Operations Executive or other Executive shall
be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attorney(s)-in-Fact to represent and act for
and on behalf of the Company subject to the following provisions:
The Attorney -in -Fact. may be given full power and authority for and in the name of and on behalf of the Company, to execute, acknowledge and
deliver, any and all bonds, recognizances, contracts, agreements of indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attorney -in -Fact shall be as binding upon the Company as if signed by the President and sealed and attested by the Corporate Secretary."
"Be It Further Resolved, that the signature of any such designated person and the seal of the Company heretofore or hereafter affixed to any
power of attorney or any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signatures or facsimile
seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached." (Each adopted at a meeting
held on February 8, 2000).
In Witness Whereof, WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE
COMPANY have caused these presents to be signed by their National Surety Leader and Senior Executive and their corporate seals to be hereto
affixed this 28th day of SEPTEMBER A.D., 2023 .
Corporate �+•'' SiIA/i� �lnNFlt. i •��$(/ ' ,,WESTFIELD INSURANCE COMPANY
Seals /Q%...... •.!eF''� :'��� • '' sG.; ./' - WESTFIELD NATIONAL INSURANCE COMPANY
Affixed d)!i '�' ' [> 1 = () •.�' �'� ' 4 c�`�''' OHIO FARMERS INSURANCE COMPANY
.a
i��. r�or rf ;s''• .`0 , s:c184�fD
State of Ohio BY'
Gary W. tumper, Nationa Surety Leader and
County of Medina ss.: Senior Executive
On this 28th day of SEPTEMBER A.D., 2023 , before me personally came Gary W. Stumper to me known, who, being by me duly sworn,
did depose and say, that he resides in Medina, OH; that he is National Surety Leader and Senior Executive of WESTFIELD INSURANCE
COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, the companies described in and which
executed the above instrument; that he knows the seals of said Companies; that the seals affixed to said instrument are such corporate seals; that
they were so affixed by order of the Boards of Directors of said Companies; and that he signed his name thereto by like order.
Notarial `"' '•rr,,,
Seal ..........
Affixed CP'��`I)/�� F
State of Ohio r� o David A. Kotnik, Attorney at Law, Notary Public
County of Medina ss.: q Al It -My Commission Does Not Expire (Sec. 147.03 Ohio Revised Code)
rfoF0 `
I, Frank A. Carrino, Secretary of WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS
INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said
Companies, which is still in full force and effect: and furthermore, the resolutions of the Boards of Directors, set out in the Power of Attorney are
in full force and effect.
In Witness Whereof, I have hereunto set my hand and affixed the seals of said Companies at Westfield Center, Ohio, this 21st day of
May A.D.,2024
•,,,,r1111N!»,// • ,, 111IIr,.l r,,l • MrrYII/III
iNsc�1f1SUR,j;
N= rSJCcAL Iv� SEAL :m: 2cv: ;,v- / 1 Secretary
Frank A. Carrino, Secretary
BPOAC2 (combined) (03.22)