Loading...
HomeMy WebLinkAboutContract 60884-CO1FO R T WO tR -F m Change Order Request Project Name IWater and Sanitary Sewer Replacements Contract 2020, WSM-B Project No.(s)15600210600430/0700430/0200431/5740010 I M&C 1 23-1008 Project Water and Sanitary Sewer Replacements Contract 2020, WSM-B Description CSC No. 60884-COI City Sec No. 160884 City Pro. No. 1103359 Contractorl Gra-Tex Utilities, Inc. Change Order # 1 1 Date: 1 11/7/2024 City Project Mgr. l Clayton Torrance City Inspector l Eric Tinner Phone Number:) 817-392-8528 l Phone Number:) 817-647-2566 Dept. Water Unit 1 Sewer Unit 2 Paving Unit 3 I Totals I Contract Time (Calandar Days) Original Contract Amount $2,466,001.00 $2,134,129.00 $1,316,558.00 $5,916,688.00 400 Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $2,466,001.00 $2,134,129.00 $1,316,558.00 $5,916,688.00 400 Amount of Proposed Change Order $0.00 $0.00 $0.00 $0.00 03 Revised Contract Amount $2,466,001.00 $2,134,129.00 $1,316,558.00 $5,916,688.00 403 Orig. Funds Available for Change Orders $98,640.00 $85,365.00 $65,828.00 $249,833.00 Remaining Funds Available for this CO $98,640.00 $85,365.00 $65,828.00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.00% $7,395,860.00 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No. 1 provides for the coring/modification of new manhole to match the grade of the existing sewer line. The existing sewer connection grade was unknown prior to beginning construction of the project. Staff agrees with the contactor requested 3 additional days. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Contractor Name 4 a 49ont5ptor Signature Date Gra-Tex Utilities, Inc. John Crowley 11171?02.f Inspector Project Manager Date 2-G W. %e,L� 11 /7/202 Director Water Dept Constr tion Supervisor TPW Dept Date CHristonher ffarder i. �. %D Ga��f�re� 11 / 13/24 ttorney Assistant City Manager Date Dou l,, Black(NO 19,20241552 CST) i) ,-J--�, Nov 19, 2024 - — - --_ - —A--q Council Action (if required) M&C Number I N/A I M&C Date Approved N/A l F" W" City of Fort Worth Change Order Additions Project Name Water and Sanitary Sewer Replacements Contract 2020, WSM-B I City Sec No. 60884 Project No.(s) 56002/0600430/0700430/0200431/5740010 DOE No. 23-101 City Pro. No. 103359 Project Water and Sanitary Sewer Replacements Contract 2020, WSM-B Description Contractor Gra-Tex Utilities, Inc. Change Order # 0 Date: 1 11/7/2024 City Project Mgr. Clayton Torrance City Inspector I Eric Tinner ADDITIUN5 DESCRIPTION I DEPT I Qty JUnit I Unit Cost I Total 57 Modification of new manhole to add drop Sewer Unit 2 2.0 EA $2,500.00 $5,000.00 58 Modification of new manhole to add hydraulic slide Sewer Unit 2 1.0 EA $2,500.00 $2,500.00 (Water Unit 1 (Sewer Unit 2 $7,500.00 (Paving Unit 3 Additions Sub Total 1 $7,500.00 Page 1 of 1 FORT WORTH City of Fort Worth Change Order Deletions Project Name I Water and Sanitary Sewer Replacements Contract 2020, WSM-B City Sec No. I 60884 Project No.(s) I 56002/0600430/0700430/0200431/5740010 DOE No. 1 23-1008 City Pro. No. 103359 Project Description I Water and Sanitary Sewer Replacements Contract 2020, WSM-B Contractor Gra-Tex Utilities, Inc. Change Order #I 1 Date 11/7/2024 City Project Mgr. Clayton Torrance City Inspector I Eric Tinner DELETIONS ITEM IDESCRIPTION I DEPT I Qty JUnit I Unit Cost JTotal 55 Construction Allowance Sewer Unit 2 0.0750 LS $100,000.00 $7,500.00 (Water Unit 1 (Sewer Unit 2 $7,500.00 (Paving Unit 3 (Deletions Sub Total $7,500.00 Page 1 of 1 M/WBE Breakdown for this Change Order MWBE Sub I Type of Service I Amount for this CO Total $0.00 Previous Change Orders co # DATE I AMOUNT Total 1 $0.00 I 11/7/2024 Water & Sanitary Sewer Replacements Contract 2020, WSM-B CSC: 60884 CPN:103359 Change Order 1 Notes Staff has reviewed the requested prices and addition to calendar days and considers them to be fair and reasonable. Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Clayton M. Torrance, P.E. Name of Employee Professional Engineer Title ATTEST: ')�� �' - &- z '-'� Jannette Goodall City Secretary d4vvpn 4 nIl �A F �oRT�addd ° O Pig °'�Id Ovo p�P'F ° o o *,a Q44nEap564b OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX