HomeMy WebLinkAboutContract 61071-CO2CSC No. 61071-CO2
FORT WORTH,. City of Fort Worth
Change Order Request
Project Name 2024 Asphalt Resurfacing Contract 5 City Sec # l 61071
Client Project #(s)l 104937
Project Description Milling 2 inches of existing pavement and applying a 2-inch HMA overlay in addition to replacing damaged curb and gutter, driveways, and non -compliant
ADA ramps. II
Contractorl Peachtree Construction, Ltd. I Change Order #1 2 Date 1111312024
City Project Mgr.l Manvan Hafez l City Inspectorl Carlos Garcia l
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
TPW PARD
$2,741,253.55 $0.00
$0.00
Contract Time
Totals (CD�
$2,741,253.55 10
20
$2,741,253.55 230
$258,323.58 40
$2,999,577.13 270
$137,063.00
$137,063.00
$202,900.58
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 9.42%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) 1 $3,426,566.94
$2,741,253.55
$0.00
$55,423.00
$202,900.58
$2,796,676.55
$202,900.58
$137,063.00
$137,063.00
$0.00
$202,900.58
This Change Order No. 2 will remove the scope of work on Colonial Parkway from South University Drive to the pavement change on the east and replace it with Park Place
Avenue from Forest Park Boulevard at the north end to the park boundary south. This change will increase the quantities for concrete replacement on curb and gutters as well
as driveways to be paid by TPW but no additional asphalt bid items.
This change order will also add Park Place Avenue from the park boundary to Forest Park Boulevard at the south end to be funded by the Park & Recreation Department
(PARD). It will add all the associated items, including asphalt paving and concrete curb and gutter, under a new unit funded by PARD.
The staff supports the contractor's request for an additional 40 days to complete the expanded scope of work and ensures all necessary approvals are in place for this change
order.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Monlrntractoes Company Name lContractor Na ntract Signature Date
Peachtree Construction, Ltd. J. Barry Clark oa„Q Nov 14, 2024
Inspector/Inspection Supervisor
Date
Project and Con ompliance Manager
Date
—
Nov 14, 2024
M 6
Nov 14, 2024
Program Manager
Date
Nov 14, 2024
Senior Capital Project Officer
� �a
Date
Nov 14, 2024
e � a o-1 A- aP
Assistant Director (Dept)
Date
Director, Contracting Department Dept
Date
Nov 15,2024
Nov 17,2024
Date
Assistant Cit Mana er
Date
LAssistant,,Citorne
Nov 18, 2024
C
Nov 20, 2024
Council Action if required
ATTEST:
po�voOQ�
F
aA
........
Odd
p~o a
Jannette Goodall, City Secretary
0�.10
0,0= o=d
Oaa� 4�6544a
M&C Number I 24-0986 1 M&C Date Approved I 11/12/20241
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FOR_7 W/'�R_ TH
City of Fort Worth
. `'
Change Order Additions
Project Name 1 2024 Asphalt Resurfacing Contract 5
City Sec # 61071
Client Project # 1 104937
1
Contractorl Peachtree Construction, Ltd.
I PMI Marwan
Hafez I
Inspectorl Carlos Garcia
I
Change Order Submittal # 0
Date 1 11/13/2024
ADDITIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total 1
1-New
0241.1300 Remove Conc Curb & Gutter
PARD
100.00000000
LF
2.35
$235.001
2-New
3216.0102 7" Conc Curb and Gutter
PARD
100.00000000
LF
b.35
7,035.001
3-New
0241.1506 2" Surface Milling
PARD
7,802.00000000
SY
$3.95
4-New
3212.0302 2" Asphalt Pvmt Type D
PARD
7,802.00000000
SY
$17.84
$�0,817.901
9,187.681
5-New
3305.0112 Manhole Adjustment (With Concrete Collar)
PARD
2.00000000
EA
$1,150.00
12,300.001
6-New
3305.0108 Miscellaneous Structure Adjustment (10' Storm
Drain Inlet Top) PARD
1.00000000
EA
$8,325.00
$8,325.001
7-New
PARD Construction Allowance
PARD
1.00000000
LS
$15,000.00
$15,000.001
2
0241.1300 Remove Conc Curb & Gutter
TPW
600.00OOOOOU
LF
$2.35
$1,410.001
3
3216.0102 7" Conc Curb and Gutter
TPW
600.000OOOOU
LF
$70.35
$42,210.001
4
0241.0401 Remove Concrete Driveway
TPW
580.000OOOOU
SF
$2.25
$1,305.001
5
3213.0401 6" Conc Driveway
TPW
580.000OOOOU
SF
$18.10
$10,498.001
1
I
I
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
TPW
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
I
I
$55,423.001
I
1
PARD
$202,900.581
1
I
I
Sub
Total Additions
1
$258,323.581
Change Order Additions Page 2 of 4
HEM
FORT H City of Fort Worth
Change Order Deletions
Project Name 1 2024 Asphalt Resurfacing Contract 5 City Sec # 1 61071
Client Project # 1 104937 1
Contractorl Peachtree Construction, Ltd. I PMI Marwan Hafez I Inspectorl Carlos Garcia I
Change Order Submittal # Date 1 11/13/2024 1
DELETIONS
UESUKINIIUN UEPI Uty Unit unit Uost lotal
I
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
TPW 0.001
PARD �0.00 1
Sub Total Deletions $0.00 1
Change Order Deletions Page 3 of 4
MISBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Westhill Construction Concrete repairs, curb & gutter, and driveways $26,310.00
Total 1 $26,310.00
Previous Change Orders
CO # DATE I AMOUNT
6/28/2024 $0.00
Total I $0.00 1
M&C Review
Page 1 of 3
A CITY COUNCIL AGEND
Create New From This M&C
DATE: 11/12/2024 REFERENCE
NO.:
**M&C 24- LOG NAME:
0986
CODE: C TYPE: CONSENT PUBLIC
HEARING:
Official site of the City of Fort Worth, Texas
FORT WORTH
'*41v
2024 ASPHALT
RESURFACING
CONTRACT 5-0O2
NO
SUBJECT: (CD 3 and CD 9) Authorize Execution of Change Order Number 2 in the Amount of
$258,323.58 and the Addition of 40 Calendar Days to the Contract with Peachtree
Construction Ltd., for the 2024 Asphalt Resurfacing Contract 5 Project for a Revised
Contract Amount of $2,999,577.13, Adopt the Appropriation Ordinance and Amend
the Fiscal Years 2025-2029 Capital Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
Authorize execution of Change Order Number 2 in the amount of $258,323.58, and the
addition of 40 Calendar Days to City Secretary Contract Number 61071 with Peachtree
Construction Ltd., for the 2024 Asphalt Resurfacing Contract 5 project (City Project No.
104937) and Forest Park Road & Parking project (City Project No. 100335) for a revised
contract amount of $2,999,577.13;
Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations
in the PARD Gas Lease Capital Project Fund by increasing estimated receipts and
appropriations in the Forest Park Road & Parking project (City Project No. 100335) in the
amount of $17,500.00 and decreasing estimated receipts and appropriations in the Park
Improvements programmable project (City Project No. P00059) by the same amount; and
Amend the Fiscal Years 2025-2029 Capital Improvement Program.
DISCUSSION:
On January 23, 2024, Mayor & Council Communication (M&C) 24-0032, awarded City Secretary
Contract No. 61071 in the amount of $2,741,253.55 to Peachtree Construction Ltd. for 2024 Asphalt
Resurfacing Contract 5 (City Project No. 104937) at various locations.
The Contract was subsequently revised by Change Order No.1, which was administratively authorized
on June 28, 2024, at no additional cost, providing for an additional 20 calendar days for the brick work
on Stadium Drive and N Bellaire Drive.
Change Order No. 2 will remove the scope of work on Colonial Parkway, from South University Drive
to the pavement change on the east, since it was found to be located outside the City's right-of-way
and part of Forest Park Property, per the updated Forest Park plat. This change order will add Park
Place Avenue from Forest Park Boulevard at the north end of the park boundary south, to be funded
by the Transportation and Public Works, and the Park Place Avenue from the park boundary to the
Forest Park Boulevard at the south end to be funded by the Park & Recreation Department.
The staff has reviewed and verified the quantities for the additional work under this Change Order No.
2. Additionally, to complete this work, staff recommends extending the contract by 40 calendar days.
The Transportation & Public Works Department's share of this Change Order No. 2 is $55,423.00,
which is available in the Transportation and Public Works (TPW) Department's General Capital
Projects Fund of the project (City Project No. 104937). The Park & Recreation Department's share of
this change order is $202,900.58 and will be available in the PARD Gas Lease Capital Project Fund
for the project (City Project No. 100335).
http://apps.cfwnet.org/council_packet/mc review.asp?ID=32693&councildate=l1/12/2024 11/8/2024
M&C Review
Page 2 of 3
Recommendation 2 will transfer the residual budget in the Park Improvements Programmable project
(City Project No. P00059) to the Forest Park Road & Parking static project (City Project No. 100335).
This administrative action is needed as the Park Improvements project is no longer receiving new
appropriations and the FWLab will be closing this project.
Funding for the Forest Park Road & Parking project (City Project No. 100335) was not included in the
FY2025 Capital Improvement Program. The action in this M&C will amend the FY2025-2029 Capital
Improvement Program as approved and is summarized in the table below:
(Capital Fund IlProject Name Existing IlFunding
Additional IlProject
Name Funding Total
33002 - PARD Forest Park
Gas Lease Road & $185,501.45 $17,500.00 $203,001.45
Capital Project Parkiing
Business Equity: The Business Equity Division placed a 7.27\% business equity goal on this
solicitation/contract. Peachtree Construction, Ltd., will be exceeding the goal at 10.18\%, meeting the
City's Business Equity Ordinance. Any changes in subcontractors will be reviewed by the Business
Equity Division.
This project is located in COUNCIL DISTRICTS 3 and 9.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are currently available in the Park Improvements and
Forest Park Road & Parking projects within the PARD Gas Lease Capital Project Fund and in the
2024 Asphalt Resurface Contr 5 project within the General Capital Projects Fund upon approval of
the above recommendations and adoption of the attached appropriation ordinance, funds will be
available in the PARD Gas Lease Capital Project Fund for the Forest Park Road & Parking project to
support the above recommendations and execution of the change order to the contract. Prior to an
expenditure being incurred, the Transportation & Public Works Department has the responsibility of
verifying the availability of funds.
TO
Fund Department Account Project Program Activity Budget Reference # Amount
ID ID Year (Chartfield 2)
FROM
Fund Department Account Project
ID ID
Submitted for Citv Manager's Office bv:
Oriainating Department Head:
Additional Information Contact:
I_%if_Tll:I�i14k'kK
100335 PBS.pdf (CFW Internal)
104937 PBS.r)df (CFW Internal)
Program Activity Budget Reference #
Year (Chartfield 2)
Jesica McEachern (5804)
Lauren Prieur (6035)
Monty Hall (8662)
104937 FID Table Peachtree Construction CO2 (1).xlsx (CFW Internal)
Amount
http://apps.cfwnet.org/council_packet/mc review.asp?ID=32693&councildate=l1/12/2024 11/8/2024
M&C Review
Page 3 of 3
2024 ASPHALT RESURFACING CONTRACT 5 - CO2.docx (CFW Internal)
24-104937 CO 5 for ITB 2024 Asphalt Resurfacinq Approved-NS.lDdf (CFW Internal)
Form 1295 Certificate 101240269.iDdf (CFW Internal)
M&C Map AsphaltResurfacinq Contract5 CPN104937.iDdf (Public)
ORD.APP 2024 ASPHALT RESURFACING CONTRACT 5 - CO2 33002 AO25(R2) (3).docx
(Public)
SAM Report Peachtree Construction 104937-CO2.gdf (CFW Internal)
Sharinq Funds TPW & PARD CO2.iDdf (CFW Internal)
http://apps.cfwnet.org/council_packet/mc review. asp?ID=32693 &councildate= I 1/ 12/2024 11/8/2024
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: 2024 Asphalt Resurfacing Contract 5 — CO2
M&C: 24-0986 CPN: 104937
CSO:
61071
DOC#: I
Date: 11/13/2024
To:
Name
Department
Initials
Date Out
1
Sophia Flores (BSP)
TPW
Nov 14, 2024
2
J Barry Clark/Peachtree Construc.
Vendor
,B
Nov 14, 2024
3
Carlos Garcia (Inspector)
TPW
Nov 14, 2024
4
Marwan Hafez (PM)
TPW
Mff
Nov 14, 2024
5
Zelalem Arega (PGM)
TPW
1�4
Nov 14, 2024
6
Mary Hanna (SCPO)
TPW
Nfi'
Nov 14, 2024
7
Patricia Wadsack (AD)
TPW
PLW
Nov 15, 2024
8
Lauren Prieur (Director)
TPW
LLP
Nov 17, 2024
9
Doug Black (ACA)
Legal
DS
Nov 18, 2024
10
Jesica McEachern (ACM)
CMO
CO-
Nov 20, 2024
11
Jannette Goodall (CS)
CSO
,G 7C
Nov 21, 2024
12
TPW Contracts
TPW
CC:
Program Manager, Sr. CPO, TPW BSPAP
Recon Team, TPW Records
Room, TPW Contracts
ALSO
List: - Bus Sppt: Sovhia Flores: Prg Mgr:
Zelalem Areea: Sr CPO: Mary Hanna
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and
take the next steps.
NEEDS TO BE NOTARIZED: DYES ®No
RUSH: DYES ®No SAME DAY: DYES ❑No NEXT DAY: DYES ®No
ROUTING TO CSO: ®YES ❑No
Action Required: ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
Return To: Please notify TPWContracts(ir fortworthtexas.uov for pickup when complete. Call ext. 7233 or ext.
8363 with questions. Thank you!