HomeMy WebLinkAboutContract 61679-CO1CSC No. 61679-COI FO -r Wt3 tZ'r 1A City of Fort Worth Change Order Request Project Name: Water and Sanitary Sewer Replacement Contract 2019 WSM-G City Sec No.: 61679 Project No.(s)] 393001 0600430 4623001 102303 I DOE No. I N/A City Proj. No.: 102303 Project Description:1 Extend Water and Sewer Lines along Jacksboro Highway Contractord William J. Schultz, Inc. dba Circle C Construction Co Change Order # 1 I Date: I 11/1/2024 City Project Mgr.l Walter Norwood City Inspector: ! Andre Taylor Phone Number: 817-392-5026 I Phone Number.l (817)223-2275 Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date f Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (f necessary) CHANGE ORDERS to DATE (II MAX ALLOWABLE CON Water Sewer $1,488,315.00 $1,827,411.00 $0.00 $0.00 Totals Contract Time Calender days) 1 300 3,315,726.06 $0.00 $1,488,315.00 $1,827,411.00 $3,315,726.00 300 2,000.00 $0.00 $62,000.00 7,550,315.00 $1,827,411.00 $3,377,726.00 300 $74,416.00 $91,371.00 $165,787.00 $74,416.00 $91,371.00 $165,787.00 XLUDING THIS ONE) AS % OF ORIGINAL CONTRACT rRACTAMOUNT (ORIGINAL CONTRACT COST+ 2591o) 1.87% $4,144,657.50 JUSTIFICATION (REASONS) FOR CHANGE ORDER This Change Order No. 1 provides for the following: • Installation of water and sewer mains by directional drilling in lieu of open cut due to limited space to excavate as a result of the north frontage road being constructed prior to installing the water and sewer mains as originally designed. • The deletion of pay item quantities that are no longer necessary on the project. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Contractor Name —Contractor Signature Date William J. Schuh, Inc. dba Circle C Construction Co I Teri Skelly % ; f�e- 9 . P y —Inspector Dale Pro' ct Mana er Date 11/10/2024 11-08-24 Date Director (Water Dept) Date Construction Supervisor TPW Dept) C;lf. IVIA 11 /18/2024 /'_ A'tt-_ 11 /11 /2024 hh oP,e, HaIdel - en[or Assstant I Attome DateN"l ilyManager Date Nov 19, 2024 0,11,JCS7, Nov 19, 2024 Courral Acton If R wired) M&C Number NIA M&C Date Approved N/A FcUR"r City of Fort Worth Change Order Additions Project Name I Water and Sanitary Sewer Replacement Contract 2019 WSM-G ! City Sec No.: 1 61679 Project No.(s): J 393001 0600430 4623001 102303 DOE No,I N/A City Proj. No.: 1 102303 I Project Extend Water and Sewer Lines along Jacksboro Highway Description Contractor William J. Schultz, Inc. dba Circle C Construction Co Change Order: l 1 I Date: 1 11/1/2024 City Project Mgr. I Walter Norwood City Inspector I Andre Taylor ADDITIONS 11 LM ULsLKIF i wn DEFT Qty Unit Unit Cost I Total 34 12 Inch Dia. PVC Water Line by Horizontal Directional Drill Water 2,700.00 LF $225.00 $607,500.00 37 8 Inch Dia. HDPE Sewer Line by Horizontal Directional Drill Sewer 1,466.00 LF $130.00 $190,580.00 38 Vertical Shafts to Install Manholes on HDPE Sewer Line Sewer 40.00 VF $1,450.00 $58,000.00 I I f I I 1 I I I I I I I I I I I I I I 1 I I I 1 I I I I I I I I I I I I I I I I I I I I I Water $607,500.00 Sewer $248,580.00 Page 1 of 1 Additions Sub Total $856,080.00 F0R-r W_ OR-ri-t City of Fort worth W Change Order Deletions Project Name I Water and Sanitary Sewer Replacement Contract 2019 WSM-G City Sec No.: I 61679 I Project No.(s): 393001 0600430 4623001 102303 1 DOE No. I N/A City Proj. No.: 102303 Project Description I Extend Water and Sewer Lines along Jacksboro Highway Contractor I William J. Schultz, Inc. dba Circle C Construction Co 1 Change Order: = Date I 11/1/2024 City Project Mgr. I Walter Norwood I City Inspector: I Andre Taylor I ITEM DESCRIPTION 1 12" Water Pipe 2 12" DIP Water 17 Remove Existing Concrete Driveway 18 6" Concrete Driveway 19 IRemove Asphalt Drive 20 16" HMAC Driveway 32 IWater Construction Allowance 1 18" Sewer Pipe by Open Cut 21 IRemove Existing Concrete Driveway 22 15" Concrete Driveway 23 IRemove Asphalt Drive 24 I6" HMAC Driveway III I I I I 1 I I I I I I 1 1 1 DELETIONS DEPT Water I Water l Water I Water I Water I Water I Water ISewer ISewer ISewer ISewer ISewer I Page 1 of 1 (sty Unit 2,580.00 LF 120.00 LF 3,000.00ISF 3,000.00ISF 14,000.00ISF 4,000.00 SF 1.00 LS 1,450.00 LF 500.00 ISF 500.00 ISF 3,910.00 SF 4,118.67 ISF I I I I Water Sewer Unit Cost Total $125.00 $322,500.00 $150.00 $18,000.00 $5.00 $15,000.00 $20.00 $60,000.00 $5.00 $20,000.00 $15.00 $60,000.00 $50,000.001$50,000.00 $105.001$152,250.00 $10.001$5,000.00 $20.00 $10,000.00 $5.00 $19,550.00 $15.00 $61,780.00 Deletions Sub Total I r I J$545,500.00 J$248,580.00 I I$794,080.00 MWBE Sub CO # MIWBE Breakdown for this Change Order Type of Service I Amount for this CO Total I $0.00 1 Previous Change Orders DATE AMOUNT I Total $0.00 Page 1 of 1 11/13/2024 Water & Sanitary Sewer Replacement Contract 2019, WSM-G CSC: 61679 CPN:102303 Change Order 1 Notes Staff has reviewed the requested prices and considers them to be fair and reasonable. Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Walter Norwood Name of Employee Project Manager Title 4,d4vnn�� �a o� FORr� a 1.s o a o°-o ° % 0 ATTEST: �vo o Pa*6°° °.�cd as °° a n� exp!? � Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX