Contract 59041-AR1
FORT WORTH,. City of Fort Worth -" CMAR Construction Allowance Request Project Name (Cromwell Marine Creek Road Widening Improvements Project #(s) 101012 Cromwell Marine Creek Road widening from 2 lanes to 4 lanes divided roadway between Boat Club Road to Description Marine Creek Parkway and modifications to the roundabout at Marine Creek Parkway Contractor (Sundt Construction, Inc. City PM Alejandra Ayala City Inspector Dennis Rodgers NO. ITEM DESCRIPTION UNIT QTy UNIT PRICE Original GNP Cost Previous GNP Delayed Start Invoiced Total Impact Preconstruction Phase LF 1 $120.000.00 $120.000.00 $120,000.00 CSC No. 59041-AR1 City SeC #I59041 Date10/15/2024 AR # 1 Revised GNP Invoiced Total EWP1.1 SWPP-Silt Fence LF 8280 $4.34 $35,935.20 $35,935.20 $35,935.20 EWP1.2 Site Clearing AC 8 $9,076.44 $72,611.52 $72,611.52 $72,611.52 EWP1.3 ROW Temp Fencing Crane/Hayoo LF 4600 $11.75 $54,050.00 $54,050.00 $54,050.00 EWP1.4 ROW Temp Fencing East End LF 3680 $11.75 $43,240.00 $43,240.00 $43,240.00 EWP1.5 Established Control LS 1 $55,595.37 $55,595.37 $55,595.37 $55,595.37 EWP1.6 OfOoelyard Setup LS 1 $193,955.30 $193,955.30 $193,955.30 $193,955.30 $0.00 Reduced General Conditions MO 2 $ 71,475.37 $142,950.74 $142,950.74 $142,950.74 Insurance (Liability & BR) LS 1 $ 3,838.77 $3,838.77 $3,838.77 $3,838.77 Bonds LS 1 $ 3,230.97 $3,230.97 $3,230.97 $3,230.97 Fee % 0.0575 $ 605,407.87 $34,810.95 $34,810.95 $34,810.95 $0.00 EWP2.1 WP1- CMAR & General Work Items Mo 1 $1,107,600.56 $1,107,600.56 $1,107,600.56 $1,107,600.56 $0.00 EWP2.2 WP2- Removals, Earthwork, Subgrade(BV) Ls 1 $3,653,395.67 $3,653,395.67 $3,653,395.67 $3,653,395.67 $0.00 EWP2.3 WP3- Underground Water &WW(Venus)(LB) Ls 1 $1,662,804.47 $1,662,804.47 $1,662,804.47 $1,662,804.47 $0.00 EWP2.4 WP4- Underground Storm (Sundt) Ls 1 $7,044,662.90 $7,044,662.90 $7,044,662.90 $7,044,662.90 $0.00 GMPIA WP5-Flatwork(Urban)(BV) Ls 1 $2,678,330.17 $2,678,330.17 $2,678,330.17 $2,678,330.17 $0.00 EWP2.5 WP6- Traffic Control (LB) Ls 1 $1,746,982.20 $1,746,982.20 $1,746,982.20 $1,746,982.20 $0.00 GMP1.2 WP7- Concrete Paving (Sundq(BV) Ls 1 $8,791,126.25 $8,791,126.25 $8,791,126.25 $8,791,126.25 $0.00 GMP1.3 WP8- Illumination & Signals (Durable)(BV) Ls 1 $3,564,831.24 $3,564,831.24 $3,564,831.24 $3,564,831.24 $0.00 EWP2.6 WP9- Erosion Control/Sodding (LB) Ls 1 $863,286.07 $863,286.07 $863,286.07 $863,286.07 $0.00 GMPIA WP10- Striping (Traffic Highway Mainq(LB) Ls 1 $422,095.66 $422,095.66 $422,095.66 $422,095.66 $0.00 EWP2.7 WP11- Structures (BV) Ls 1 $2,723,084.47 $2,723,084.47 $2,723,084.47 $2,723,084.47 $0.00 General Conditions Mo 1.0 $4,782,448.17 $4,782,448.17 $4,782,448.17 $4,782,448.17 CMAR Contingency Ls 1 $1,512,258.00 $1,512,258.00 $1,512,258.00 $1,512,258.00 Insurance Ls 1 $261,272.19 $261,272.19 $261,272.19 $261,272.19 Sundt Performance & Payment Bond Ls 1 $219,904.08 $219,904.08 $219,904.08 $219,904.08 5.75% Fee Ls 1 $2,359,459.72 $2,359,459.72 $2,359,459.72 $2,359,459.72 $0.00 Adjustments Ls 1 $0.00 $0.00 $0.00 $0.00 Utility Delay Ls 1 $259,984.14 $0.00 $0.00 $ 259,984.14 $259,984.14 Owners Allowance Ls 1 $852,379.67 $852,379.67 $852,379.67 $ (259,984.14) $592,395.53 Grant Total I $45,006,140.31 $45,006,140.31 $ I $ Is 1 $45,006,140.31 Contract Time 858 Additional Days Requested 0 Revised Contract Time 858 USTIFICATION (REASONS) FOR CONSTRUCTION ALLOWANCE IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST, THE CONTRACT SHALL: Furnish all labor and material as per attached proposed Construction Allowance Request (with attachments): AR #1 is to compensate Sundt Construction, Inc. for the impact of delaying the start of construction at the intersection of Cromwell Marine Creek and Bowman Roberts Road between May 15, 2024 and September 9, 2024. During the pre -construction phase, franchise utility relocation delays were identified as a risk to the project and funding was allocated in the Owners Allowance. This Allowance Request is to move the amount of $259,984.14 out of the Owners Allowance to compensate Sundt for the impact of the delayed start. See attached documents for further explanation. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Construction Allowance Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Contractor's Company Name Contractor's Name Contractor Si nature Sundt Construction, Inc. Tammam H. Nashad mamNa.tad,Nw,. ems. i zn Nov 7, 2024 Project Inspector - Dennis Rodgers Date Project Manager - Alejandra A ala to Assistant Ci Mana Imo ..,zazo„zs«, Nov 14, 2024 AA A Nov 7, 2024 Nov 26, 2024 ATTEST: poFP?Rr°aa A >3>x 6 �9oio OFFICIAL RECORD pig 8:, Nov 26, 2024 Jannette Goodall, City Secretary 0000**° e' Date CITY SECRETARY c°4aogaga FT. WORTH, TX CMAR Construction AlbwanCe Request Page 1 of 1 SUNDT October 18, 2024 SNDT-CFW-0005 Alejandra Ayala, P.E., Project Manager Transportation and Public Works Department 200 Texas Street Fort Worth, TX 76102 Reference Cromwell Marine Creek CMAR 101012 Subject: Utility Relocation Impact — Schedule Acceleration Dear Ms. Ayala, We are writing in response to the City of Fort Worth's request to accelerate the project schedule to mitigate delays incurred by the City due to delays in third -parry utility relocations. Sundt has made every effort to accommodate this request while managing the challenges of a delayed start due to the utility relocation in Area One. Per the CMAR Amendment No. 1, the Notice to Proceed (NTP) was originally expected after utility relocations were completed by May 15th, 2024. However, the actual completion date was delayed until September 9th, 2024, resulting in a potential I I8-day delay. Based on the agreed time related expenses cost of $40,395 per week, or $5,770.71 per calendar day, this would have resulted in a total delay cost of $680,943.78. In response to the City's request and to minimize disruption, Sundt took proactive steps by working out of sequence, significantly reducing the overall delay to just 34 days. Despite this, working out of sequence has led to additional costs and inefficiencies, including multiple unplanned mobilizations for equipment and subcontractors. Additionally, the acceleration required changing the originally scheduled paving dates which introduced further challenges. These additional mobilizations and schedule adjustments, which were not included in the original GMP, total $63,780.00. Sundt Construction — 8445 Freeport Pkwy Ste 240, Irving, TX 75063 Instead of requesting compensation for the full delay cost of $680,943.78, Sundt is only seeking reimbursement for the 34-day delay and the associated out -of -sequence work. The breakdown is as follows: • Overhead for the 34-day delayed start: $196,204.14 • Additional costs due to out -of -sequence work: $63,780.00 The total amount Sundt is requesting is $259,984.14. By accelerating the project and reducing the delay, Sundt has saved the City of Fort Worth $420,959.64 in potential delay costs. We believe this represents a significant benefit to the project and demonstrates Sundt's commitment to meeting the City's objectives efficiently. This cost will be transferred from the City of Fort Worth's Allowance, resulting in no change to Sundt's Guaranteed Maximum Price. Please feel free to reach out for further clarification, and we would be happy to provide any additional information or documentation. We look forward to continuing our partnership with the City of Fort Worth and delivering the project successfully. Respectfully, -- a Tamman H. Nashad Project Manager Sundt Construction — 8445 Freeport Pkwy Ste 240, Irving, TX 75063 Description Quantity Rate Unit Total One -day shutdown for AT&T line installation (equipment) 2 $5,640.00 Day $11,280.00 One -day shutdown for AT&T line (labor) Driller mobilization Equipment mobilization in and out (Sundt) Flatwork subcontractor extra mobilizations Total 60 $ 50.00 HR $3,000.00 1 $ 7,500.00 EA $7,500.00 12 $ 2,000.00 EA $24,000.00 2 $ 9,000.00 EA $18,000.00 $63,780.00 1* EquipmentWatch.. www.equipmentwatch.com All prices shown in US dollars ($) Rental Rate Blue Book°, O&O Rates Report for 2000 Gallon water truck in Cromwell Marine Cost update October 24, 2024 Miscellaneous DSL 4X2 2500 On -Highway Water Tankers Size Class: To 199 hp Weight: 10500lbs Configuration for DSL 4X2 2500 Horsepower 150.0 Power Mode Diesel Tank Capacity 2500.0 gal Blue Book Rates ** FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating cost. Ownership Costs Estimated Operating FHWA Rate** Costs Monthly Weekly Daily Hourly Hourly Hourly Published Rates USD $2,015.00 USD $565.00 USD $140.00 USD $21.00 USD $21.53 USD $32.98 Adjustments Region ( 100%) - - - - Model Year (2024: 100%) - - - - Adjusted Hourly Ownership USD $302.25 USD $84.75 USD $21.00 USD $3.15 Cost (114.99999999999999%) Hourly Operating Cost (114.99999999999999%) USD $3.23 Total: USD $2,317.25 USD $649.75 USD $161.00 USD $24.15 USD $24.76 USD $37.93 Non -Active Use Rates Hourly Standby Rate USD $9.68 Idling Rate USD $28.91 Rate Element Allocation Element Percentage Value Depreciation (ownership) 48.93% USD $985.85/mo Overhaul (ownership) 26.46% USD $533.20/mo CFC (ownership) 12.33% USD $248.48/mo Indirect (ownership) 12.28% USD $247.47/mo Fuel (operating) @ USD 3.65 63.59% USD $13.69/hr Revised Date: 4th quarter 2024 All material herein © 2003-2024 Randall -Reilly All rights reserved. Page 1 of 5 10, EquipmentWatch . www.equipmentwatch.com Rental Rate Blue Book®, O&O Rates Report for Caterpillar 289D3 Track skid steer in Cromwell Marine Cost update October 24, 2024 Caterpillar 2891013 Compact Track Loaders Size Class: 2501- 2850 Ibs Weight: NIA Zx Configuration for 289D3 Horsepower 72.9 hp Operator Protection ROPSIFOPS Power Mode Diesel Blue Book Rates ** FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating cost. Ownership Costs Estimated Operating FHWA Rate** Costs Monthly Weekly Daily Hourly Hourly Hourly Published Rates USD $8,860.00 USD $2,480.00 USD $620.00 USD $93.00 USD $29.72 USD $80.06 Adjustments Region (100%) Model Year (2024: 100%) - - Adjusted Hourly Ownership USD $1,329.00 USD $372.00 USD $93.00 Cost (114.99999999999999%) Hourly Operating Cost (114.999999999999990/o) Total: USD $10,189.00 USD $2,852.00 USD $713.00 Non -Active Use Rates Standby Rate Idling Rate Rate Element Allocation Element Percentage Depreciation (ownership) 21.22% Overhaul (ownership) 54.87% CFC (ownership) 10.74% Indirect (ownership) 13.17% Fuel (operating) @ USD 3.65 33.14% Revised Date: 4th quarter 2024 USD $13.95 USD $4.46 USD $106.95 USD $34.18 Value USD $1,880.19/mo USD $4,861.53/mo USD $951.26/mo USD $1,167.03/mo USD $9.85/hr USD $92.07 Hourly USD $26.13 USD $69.22 All material herein 0 2003-2024 Randall -Reilly All rights reserved. Page 2 of 5 EquipmentWatch.. www. equipmentwatch.com Rental Rate Blue Book*, O&O Rates Report for Caterpillar 335 Excavator in Cromwell Marine Cost update October 24, 2024 Caterpillar 335 Crawler Mounted Hydraulic Excavators Size Class: 33.5 - 40.4 mt Weight: NIA Configuration for 335 Bucket Capacity 2.01 cu yd Horsepower 273 hp Operating Weight 77000 Ibs Power Mode Diesel Blue Book Rates ** FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating cost. Ownership Costs Estimated Operating FHWA Rate** Costs Monthly Weekly Daily Hourly Hourly Hourly Published Rates USD $14,865.00 USD $4,165.00 USD $1,040.00 USD $155.00 USD $48.17 USD $132.63 Adjustments Region ( 100%) - Model Year (2024: 100%) - Adjusted Hourly Ownership USD $2,229.75 Cost (114.99999999999999%) Hourly Operating Cost (114.99999999999999%) Total: USD $17,094.75 Non -Active Use Rates Standby Rate Idling Rate Rate Element Allocation Element Depreciation (ownership) Overhaul (ownership) CFC (ownership) Indirect (ownership) Fuel (operating) @ USD 3.65 Revised Date: 4th quarter 2024 USD $624.75 USD $156.00 USD $23.25 I USD $4,789.75 USD $1,196.00 Percentage 31.51% 41.31% 16.96% 10.23% 39.32% USD $7.23 USD $178.25 USD $55.40 Value USD $4,683.60/mo USD $6,140.10/mo USD $2,520.94/mo USD $1,520.36/mo USD $18.94/hr USD $152.52 Hourly USD $57.01 USD $118.91 All material herein * 2003-2024 Randall -Reilly All rights reserved. Page 3 of 5 10, EquipmentWatch . www. eq u i pmentwatch. co m Rental Rate Blue Book®, O&O Rates Report for Caterpillar 374 Excavator in Cromwell Marine Cost update October 24, 2024 Caterpillar 374 Crawler Mounted Hydraulic Excavators' %N Size Class: 66.5-90.4mt Weight: NIA Configuration for 374 Bucket Capacity 4.32 cu yd Horsepower 484 hp Operating Weight 158200 Ibs Power Mode Diesel Blue Book Rates ** FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating cost. Ownership Costs Estimated Operating FHWA Rate** Costs Monthly Weekly Daily Hourly Hourly Hourly Published Rates USD $25,275.00 USD $7,080.00 USD $1,770.00 USD $265.00 USD $82.38 USD $225.99 Adjustments Region (100%) Model Year (2024: 100%) Adjusted Hourly Ownership USD $3,791.25 Cost (114.99999999999999%) Hourly Operating Cost (114.999999999999990/o) Total: USD $29,066.25 Non -Active Use Rates Standby Rate Idling Rate Rate Element Allocation Element Depreciation (ownership) Overhaul (ownership) CFC (ownership) Indirect (ownership) Fuel (operating) @ USD 3.65 Revised Date: 4th quarter 2024 USD $1,062.00 USD $265.50 USD $39.75 USD $8,142.00 USD $2,035.50 Percentage 31.51% 41.31% 16.96% 10.23% 40.75% USD $12.36 USD $304.75 USD $94.74 Value USD $7,963.54/mo USD $10,440.02/mo USD $4,286.36/mo USD $2,585.08/mo USD $33.57/hr USD $259.89 Hourly USD $96.93 USD $203.75 All material herein 0 2003-2024 Randall -Reilly All rights reserved. Page 4 of 5 EquipmentWatch.. www.equipmentwatch.com Rental Rate Blue Book', O&O Rates Report for Caterpillar CS44 smooth compactor in Cromwell Marine Cost update October 24, 2024 Caterpillar CS44B Single Drum Vibratory Compactors Size Class: 4.5 - 7.4 mt Weight: NIA Configuration for CS44B Drum Type Smooth Drum Width 66 in Horsepower 100.6 hp Power Mode Diesel Blue Book Rates ** FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating cost. Ownership Costs Estimated Operating I FHWA Rate** Costs Monthly Weekly Daily Hourly Hourly Hourly Published Rates USD $4,915.00 USD $1,375.00 USD $345.00 USD $52.00 USD $24.43 USD $52.36 Adjustments Region ( 100%) - - - - Model Year (2024: 100%) - - - - Adjusted Hourly Ownership USD $737.25 USD $206.25 USD $51.75 USD $7.80 Cost (114.99999999999999%) Hourly Operating Cost (114.99999999999999%) USD $3.66 Total: USD $5,652.25 USD $1,581.25 USD $396.75 USD $59.80 USD $28.09 USD $60.21 Non -Active Use Rates Hourly Standby Rate USD $24.44 Idling Rate USD $43.10 Rate Element Allocation Element Percentage Value Depreciation (ownership) 45.99% USD $2,260.19/mo Overhaul (ownership) 23.89% USD $1,174.37/mo CFC (ownership) 16.94% USD $832.50/mo Indirect (ownership) 13.18% USD $647.94/mo Fuel (operating) @ USD 3.65 39.09% USD $9.55/hr Revised Date: 4th quarter 2024 These are the most accurate rates for the selected Revision Date(s). However, due to more frequent online updates, these rates may not match Rental Rate Blue Book@ Print. Visit the Cost Recovery Product Guide on our Help page for more information. The equipment represented in this report has been exclusively prepared for (tjvosdogan@sundt.com) All material herein © 2003-2024 Randall -Reilly All rights reserved. Page 5 of 5 CoFW - Cromwell Marine Creek RD - September 2024 UPD 07 23-Sep-24 14:07 Activity ID Activity Name Original Start Finish Total I{1922 / Duration FloalFl AI SI UI NI' -I FI MI- - -I "JAI SI UI NIl1 JI FI _IA ' "I (111"JI4I5I6I �I8I9IA711 'I � A7 (1 I'117111 � 2121 "LI" IL 21 "LIL 11 LI:f I3 3 3 3131 •�if■.nu.�aullr..u�:,ad■. •...7a.nau,aa✓�1JUa ,a�11����� :. : :. :. :. : :... :. :. :. : :. :. :. :. :. :. : :., :. : :. PRE -CONSTRUCTION PHASE PRECO-1000 SUNDT Proposal Submited- Cromwell Marine Parkway 0 11-Aug-22A ♦ SUNDT Proposal Submited- Cromwell Mai ine Parkway PRECO-1010 City of Fort Worth selection of SUNDT as CMAR 0 07Sep-22A PRECO-1020 Project Details Kick Off Project Details Mtg - BMcD -Roadway Drainage 0 28Sep-Sep PRECO-1030 0 12Oct-22A PRECO-1040 Project Details Mtg - BMcD - Utility /ROW 0 26-Oct-22A PRECO-1050 Pmject Details Mtg - BMcD - MOT / Structures 0 09-Nov-22A PRECO-1060 City of Fort Worth City Council Contract Approval 0 13-Dec22A PRECO-1070 Constructability Workshop -Storm Drainage 0 10Jan-23A PRECO-1080 Constructability Workshop - Storm Drainage 0 17.jan-23A PRECO-1090 Constructability Workshop - Illumination / Traffic Signals 0 24Jan-23A PRECO-1100 Constructability Workshop - Phasing / MOT / Earthwork 0 03-Feb-23A PRECO-1110 Constmctability Workshop -Feedback Meeting -City of Fort Worth 0 07-Mar-23A PRECO-1120 SUNDT presentation of 60%ROM Pricing 08-Mar-23A - 0 PRECO-1130 Contract Execution Date 0 14-Mar-23A PRECO-1142 Prepare -CMI/ Site Design PRE 95% Plans- Bums& McDonnell Pre -Construction Phase Ni Issued 0 0 14-Mar-23A 17-Mar-23A 02Jun-23A PRECO-1140 PRECO-1160 SUNDT LED VE Brainstorming Session 05-Apr-23A 0 PRECO-1170 SUNDT LED VE Workshop 0r28 Apr-23A PRECO-1175 90% PS&E Planning Workshop 0-Apr-23A PRECO-1178 Submittal of Pre -Con Phase Schedule (SUNDT) 0-Apr-23A PRECO-2250 ROW Acquisition- Original Parcels Acquired Date(Baseline) 0May-23A PRECO-2220 Review Civil/Site PRE 95%Plans -SUNDT 7 02Jun-23A 09Jun-23A PRECO-2160 Finalize - Civil/Site 95%Plans - Bums &McDonnell 29Jun-23A 8 05Jun-23A PRECO-1187 Franchise Utility Relocation - Original Start Up (Baseline) 19Jun-23A 0 PRECO-1320 Submit 95%Plans - By Bums & McDonnell CFW/ SUNDT Review of 95%Drawings RFC Drawings (Release for Construction)- Bums & McDonnell 0 16 29Jun-23A 29Jun-23A 18Ju1-23A 17Jul-23A 09-NOv-23A PRECO-1330 PRECO-1200 21 PRECO-1190 Franchise Utility Relocation - Begin 0 16-Aug-23A PRECO-1224 Begin scheduling community meeting Sub/Supplier Packages Advertise DATE 8 07-Nov-23A 09-Nov-23A 14-Nov-23 A PRECO-1210 0 PRECO-1180 ROW 100%Acquisition Complete 14-Nov-23 A 0 PRECO-1220 Sub / Supplier Pre -Bid Conference Date 0 16-Nov-23A PRECO-1230 SUNDT Self -Perform Quotes Due 0 04-0eo-23A PRECO-1240 Sub / Supplier Packages Quotes Due 0 75-0eciA — — PRECO-1185 Submittal of Construction Phase Schedule to - City of Fort Worth 121)eo-23A 0 PRECO-1265 Pre -Construction community meeting 0 26-Feb-24A PRECO-2300 Revised GMP M&C Routing 27 21-Mar-24A 26-Apr-24A PRECO-1300 Construction Phase Limited NTP due to Utility Delay 0 07Jun-24A PRECO-1310 Start Construction 0 07Jun-24A PRECO-1280 Franchise Utility Relocation - Complete 0I 21-Nov-24 131 PREPARE - CIVIL / SITE PRE ■ ■ ■■ ' PRECO-1143 ,Illumination -Design 58 14-Mar-23A 02Jun-23A ♦ Milestone Actual Level of Effort Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work ♦ City of Fort Worth selection of. SUNDT a., CMAR: Project Details Kick Off ♦ Project Details Mtg - BMcD - Roadwa r Drainage Project Details Mtg - BMcD - Utility /I20W Project Details Mtg BMcD - MOT) Structures I♦ City of Fort Worth City Council Contract Approval ♦ Constructability Workshop - S or m Drainage ♦ Constmctabitity Workshop - *oro Drainage ♦ Constructability Workshop - Iluminat on / Traffic,SigMs ♦ Constructability Workshop - Phasing / MOT/ Earth, ork ♦ Constmctabilily Worksho - Feedback Meeting - :ity of Fort Worth SUNDTpresentation of 30% ROM Pricing (Contract Execution Datr — Prepare-Civil/!;Re Design PRE 95%F ins - Bums&McDonnell ♦ Pre -Construction Phase NTP Issued ♦ SUNDT LED VE Brainstorming Session ♦ SUNDT LED VE Workshop'. ♦90%PS&E Planninc Workshop ♦ Submittal of Pre -Co i Phase Schedule (SUi DT) ROW Acquisition Original Parcels Acquit d Date (Baseline) ■ Review �Civil /Sia PRE 95%Plans -SL JDT Finalize -Civil Site 95%Plans -Bum & McDonnell ♦.. Franchise. Utilfi, Relocation -.Original S in Up (Baseline) Submit 95% Rans - By Bums & McD—nell GFW/ SUNDT Review of 95%Drav ngs r_ RI'C Drawings (Release f. r Construction) - Bums & McDonnell ♦ Franchise Utility Relocation - Begi Begin scheduling commu ity meeting ♦ Sr.b/Supplier Packages/ lvertise DATE ♦ ROW 100%Acquisition C �mplete ♦ S ib'/ Supplier Pre, Bld Cr■ference Date ♦ SUNDT Self -Perform Q otes Due ♦ 3ub / Supplier Package Quotes Due : ♦ Submittal of Constructs n Phase Schedule to -City of Fort Worth- ♦ Pre-Constnictio, community meeting L. Revised G 1P M&C Routing ♦ Constrtion Phase Limited NTP due to Utility Delay ♦ Start C nstmction * Franchise Utility Relocation -Com Nate r— Illumination-De.;ign Crom II Marine Creek Rd. - City of Fort Worth P6 Schedule - Progress Update SEPT 2024 DID 09/22/2024 Page 1 of 17 SUNDT Ska Grit»e ..• CoFW - Cromwell Marine Creek RD - September 2024 UPD 07 Activity ID PRECO-1144 Activity Name Utilities - Design Original Duration 58 Start 14-Mar-23A Finish 02-Jun-23A Total Float PRECO-1145 SUNDTs MOT Phasing - Design 9 14-Mar-23A 11-May-23A PRECO-1146 Maintenance of Traffic - Design 49 14-Mar-23A 28Jun-23A PRECO-1147 Roadway (Plan & Profile) -Design 49 14-Mar-23A 02Jun-23A PRECO-1148 Drainage (Bowman Roberts Culvert Plan & Profile) - Design 49 14-Mar-23A 02Jun-23A PRECO-2230 Bridge -Design 49 14-Mar-23A 28Jun-23A PRECO-2240 Retaining Wall- Design 49 14-Mar-23A 28Jun-23A PRECO-2000 Title Sheet 8 05Jun-23A 29Jun-23A PRECO-2010 Index of Sheets 8 05Jun-23A 29Jun-23A PRECO-2020 General Notes 8 05Jun-23A 29Jun-23A PRECO-2030 Project Control Plan 8 05Jun-23A 29Jun-23A PRECO-2040 Right of way Plan 8 05Jun-23A 29Jun-23A PRECO-2050 Typical Sections 8 05Jun-23A 29Jun-23A PRECO-2060 Maintenance of Traffic 3 05Jun-23A 29Jun-23A PRECO-2070 Removals 8 05Jun-23A 29Jun-23A PRECO-2080 Roadway 8 05Jun-23A 29Jun-23A PRECO-2090 Retaining Walls 3 05Jun-23A 29Jun-23A PRECO-2100 Drainage 8 05Jun-23A 29Jun-23A PRECO-2110 Bridge 3 05Jun-23A 29Jun-23A PRECO-2120 Signing and Striping 8 05Jun-23A 29Jun-23A PRECO-2130 Traffic Signals 8 05Jun-23A 29Jun-23A PRECO-2140 Illumination 8 05Jun-23A 29Jun-23A PRECO-2150 Utilities 8 05Jun-23A 29Jun-23A PRECO-2170 Roadway Mod 8 05Jun-23A 29Jun-23A PRECO-2180 Cmss Sections 8 05Jun-23A 29Jun-23A ity of FW Standards 8 05Jun-23A 29Jun-23A 11W uantities 8 05Jun-23A 29Jun-23A MS3030 Specs Submit RFP 16 01-Nov-23A • 0 11-Aug-22 A 09-Nov-23A MS-1000 Notice of CMAR Selection 0 07Sep-22A MS3050 NTP- Prawnstruclion Phase 0 27-Mar-23A MS3070 Pre -Construction Phase Duration 123 27-Mar-23A 14-May-24A MS-3120 Design Complete (RFC Drawings) 0 11Sep-23 A MS3100 City of Fort Worth ROW Acquisition (Parcels Acquired) Complete 0 24-Nov-23A MS3350 Early Work Package 001 -Begin Construction 0 02Jan-24 A MS3060 Pre -Construction Phase Complete 0 14-May-24A MS3360 Resequenoe due to Utility Delay 101 15-May-24A 24Sep-24 -46 MS3080 City of R. Worth Utility Relocation Complete / at Proposal 0 22Sep-24' 343 MS3300 Utility Relocation Complete -Area 1 0 22Sep-24 49 MS-2000 NTP- Construction Phase 0 25Sep-24 47 MS3010 Project Duration (26.5 Months) -Substantial Completion 717 25Sep-24 11Sep-26 39 MS3020 Work Days - 5 Day W & H 439 26Sep-24 13-Nov-26 -24 ♦ Milestone r_ Actual Level of Effort r— Remaining Level of Effort Actual Work Remaining Work r_ Critical Remaining Work 23-Sep--24 14:07 I�AI SI UI NI- JI FI MIAI-rJI JAISIOI N�u JI FI MI P' - -I /l1LI 4I5I6 JJJ19IA711 'II � A7l 1 1711f ,` 2121 "LI"ILI21'LIL�11 LI :S IFI sl3 3I 1 r_ lfti6ties -.Design SUNDTs MOT Ph icing - Design �'. Maintenanceof Traffic -Design r— Roadway (Plan �z Profile)- Design Drainage (Bowman Roberts Culvert.. Plai & Profile) - Design Bridge - Desig i '.. Retaining Wei - Design — Title Sheet '.. Index of Shea s -. General Note: Project Comm I Plan Right bf way F Ian '.. '.. - Typical Sections - Maintenance .fi Tmffc Removals Roadway �'. Retaining We is �. Drainage � Bridge Signing and Snping _. _. -. Traffic Signals -', Illumination Utilities �:. Roadway Moc Cross Section. City of FW Stndards Quantities ■ Sp--cs ♦ Submit;RFP ♦ Notice of CMAR Selection ♦ NTP-Precenstruction'hase Pre -Cone ruction Phase Duration ♦.. Design Complete (RFC ..Drawin s).. City of Fort Worth ROW .cquishion (Parcels Acquired) Complete • Early Work. Package 01.- Begin Construction _ ♦, PreConruction Phase Complete Resequence due to Utility Delay • • City of R. Worth Utility Relocation Com )late / at Proposal • Utility Relocation Complete Area.1 . NTP - Construction Phase Project Duration (26.5 Mo V\ork Days -5 Day L Cromwell Marine Creek Rd. - City of Fort Worth P6 Schedule - Progress Update SEPT 2024 DD 09/22/2024 Page 2 of 17 SUNDT Sb'Q Grit RV.. CoFW - Cromwell Marine Creek RD - September 2024 UPD 07 1 ---- IIIGI21233--S1ep-24 14:07 Activity ID Activity Name Original Start Finish Total 2 Duration Roat IJ SIOINIi JIFIM AMISON JIFM JMv VILASOI-IIII--IIII-I---IIA MI1O -- - - -- - - --1` IN`1133333 J MS3310 MS3230 Utility Relocation Complete -Area 2 Phase 1 Stage 1 Completion 0 0 11Oct-24 11-Nov-24 19 -47 MS3320 Utility Relocation Complete -Area 3 0 20-Nov-24 13 MS3170 Phase 1 Stage 2B Completion 0 14-Aug-25 95 MS3180 Phase 1 Stage 2A Completion 0 29Sep-25 234 MS3260 Phase 1 Stage 2C Completion 0 12Jan-26 -26 MS3200 Phase 2 Stage 1ACompletion 0 06-Apr-26 45 MS3240 Phase 2 Stage 1 B Completion 0 21-May-26 0 MS3140 Phase 2 Stage 2A Completion 0 17Jun-26 -17 MS-3340 Phase 3 Stage 1 B Completion 0 01Jul-26 -20 MS3160 Phase 2 Stage 2B Completion 0 10Jul-26 65 MS3110 Project Substantial Completion (August 2026) 0 11Sep-26 39 MS3270 Phase 3 Completion 0 11Sep-26 2 MS-3330 Phase 3 Stage 1A Completion 0 11Sep-26 -17 MS3220 FINAL Phase Completion 0 21-W-26 -24 MS3000 Project Final Completion (October 2026) 0 13-Nov-26 36 ROWACQUISITION 174 2,3- ay- WCFW-1020 ROW - Parcel 03 (K3J Group)- Parcel Acquisition Complete 1740%VMM 0 23-May-23A WCFW-1050 ROW -Parcel 05 (FOX) -Parcel Acquisition Complete 0 23-May-23A ROW-1060 FROW-CFW-1100 ROW - TCE07 (FOX) - Construction Easement Complete 0 23-May-23A ROW-1090 ROW -TCE08(IUOE)-Construction Easement Complete 0 234v1ay-May ROW - DE02 (IUOE) - Drainage Easement Complete 0 23-May-23A WCFW-1110 ROW -TCE01(IUOE)-Construction Easement Complete 0 234May-23A ROWCFW-1120 ROW - TCE06 (IUOE) - Construction Easement Complete 0 23-May-23A ROWCFW-1130 ROW - Parcel 07(IUOE)- Parcel Acquisition Complete 0 23-May-23A ROWCFW-1150 ROW -Parcel 08(IOUE)- Parcel Acquisition Complete 0 23-May-23A ROWCFW-1000 ROW -Parcel 01(Oncor Electric)- Parcel Acquisition Complete 0 29-Aug-23A ROWCFW-1030 ROW -TCE04(SOK)- Construction Easement Complete 0 29-Aug-23A ROWCFW-1040 ROW - Parcel 04(SOK)- Parcel Acquisition Complete 0 29-Aug-23A ROW-CFW-1070 ROW - Parcel 06(SOK)- Parcel Acquisition Complete 0 29-Aug-23A ROWCFW-1080 ROW - TCE05 (SOK) - Construction Easement Complete 0 29-Aug-23A ROWCFW-1180 ROW - Parcel 10(WRHA)- Parcel Acquisition Complete 0 29-Aug-23A ROWCFW-1010 ROW - Parcel 02 (Onoor Electric) - Parcel Acquisition Complete 0 29-Aug-23A ROWCFW-1190 ROW - DE03 (HAY) - Drainage Easement Complete 0 14-Nov-23A ROWCFW-1200 ROW - DE04 (HAY) - Drainage Easement Complete 0 14-Nov-23A ROWCFW-1210 ROW - DE05 (HAY) - Drainage Easement Complete 0 14-Nov-23A ROW-CFW-1220 ROW - DE06 (HAY) - Drainage Easement Complete 0 14-Nov-23A ROWCFW-1230 ROW - TCE02 (HAY) - Construction Easement Complete 0 14-Nov-23A ROWCFW-1240 ROW - Parcel ll(HAY) - Parcel Acquisition Complete 0 14-Nov-23A ROW-CFW-1250 ROW - TCE09 (HAY) - Construction Easement Complete 0 14-Nov-23A "1 ROWCFW-1260 I I 11 ROW -TCE10(EMS)-Construction Easement Complete 1 r . {• . 01 123-May-23 ROWCFW-1270 ROW -TCE11(EMS)- Construction Easement Complete 101 12May-23A ♦ Milestone r_ Actual Level of Effort r- Remaining Level of Effort Actual Work r_ Remaining Work r_ Critical Remaining Work tilily elocution Comp ate - me ♦Phase 1 Stage 1 Completion Utility Relocation Complete -Area 3 Phase 1 &age 2B Completion ♦ Phase 1 Stage 2A Completioq. ♦ Phase 1 Stage 2C Completin Phase 2 Stage 1A Cmnpletion Phase Stage 1H Completion ♦ Phase 2 Stage 2A Completion ♦ Phase 3 Stagy 1 B Completion Is Phase 2 Sta5ie 2B Completion ♦. Project substantial Comp Phase: l Completion Phase: l Stage 1 A Compl ! FINAL Phase Comple ♦ Pi oject Final Compla ♦ ROW - Parcel 03 (K3J Group) -parcel Acuisition Complete ♦ ROW -Parcel 05(FOX�-Parcel Aoquisitir iComplete ♦ ROW -TCE07 (F )X)-Construction Ease nent Complete ♦ ROW -TCE08(IL IOE)- Construction Ea::ment Complete ! ROW ; DE02 (IUOE) - Drainage Easeme t Complete l ROW-TCE01 (IL IOE)= Construction Eas ement Complete ♦ ROW -TCE06 (IUOE)- Construction Ea: anent Complete ROW - Parcel 07 (IUOE) - Parcel Acquisit m Complete ROW - Parcel 08 (IOUE) - ParcelAcquisit nComplete ♦ ROW -F3rcel 01 (Onoor Electric -Parcel Acquisition Complete ROW-T:E04 (SOK)-Construon Easement Complete ♦ ROW-Parce104(SOK)-Parcel .oquisition Complete ROW Fzaroe106'.(SOK)',Parcel .oquisition Complete ♦ ROW- T:E05(SOK)- Construe7n Easement Complete ♦ ROW - Rarce1 10 (WRHA) - Parr Acquisition Complete ROW- FZareel 02.(Oncor Electric Parcel Acquisition Complete ♦ R )W - DE03 (HAY)-Dra cage Easement Complete As ROW -DE04 (HAY) -Die cage Easement Complete ♦ ROW -DE06(HAY)-Dra cage Easement Complete ! R 3W -DE06 (HAY) Dra gage Easement Complete ♦ R' JW -TCE02 (HAY)- CG isttuction Easement Complete ♦ROW - Parcel 11(HAY)- jarcel Acquisition Complete ♦_ ROW -TCE09 (HAY)- C stmction Easement Complete ♦ ROW -TCE10(E NS)-Construction Ea ment Complete ♦ROW -TCE11(E VS) - Construction Ea ment Complete Cromwell Marine Creek Rd. - City of Fort Worth P6 Schedule - Progress Update SEPT 2024 DD 09/22/2024 Page 3 of 17 SUNDT Ska Grit»e ..• CoFW - Cromwell Marine Creek RD - September 2024 UPD 07 ctivity ID Activity Name Original Start Finish Duration ROWCFW-1280 ROW - TCE1 2 (HAWK) - Construction Easement Complete 0 234May-23A II ROWCFW-1290 ROW -TCE3(HAWK)- Construction Easement Complete 0 234May-23A ROWCFW-1300 ROW - UE01 (HAWK)- Utility Easement Compete 0 23-May-23A ROWCFW-1140 ROW DE01(MCP)- Drainage Easement Complete 0 23-May-23A ROWCFW-1160 ROW-DE07(MCP)- Drainage Easement Complete 0 23-May-23A ROWCFW-1170 ROW - Parcel 09(MCP)- Parcel Acquisition Complete 0 23-May-23A ROWCFW-1310 ROW -Acquisition at Area 03 STA 196+00 to STA 208+00 -Water Line Conflict, 60 19-Mar-24A 12Jun-24 A SPECTRUM Utility Contractors (SUB Selection Process) I30' 11Sep-23 A 03-May-24 A r •- UTILCFW-1660 ONCOR OH Electric Line Sta. 104+00 to Sta. 147+00 P1 S2 - - 42 20-W-23A 10 01-Mar-24 A UTILCFW-1200 ONCOR UG Electric Line Sta. 100+00 to Sta. 146+00 P1S2 (2 Lines) 20 12-Feb-24A 21-Feb-24A UTILCFW-1240 ONCOR UG Electric line Ste. 108+00 to Ste. 120+00 XINGs (2 Xings) P1S2 15 22-Feb-24A 01-Mar-24 A UTILCFW-1260 ONCOR OH Electric Line Sta. 13+50 to Sta. 17+50 P1 S2 (Bowman Roberts R 10 22-Feb-24A 01-Mar-24 A UTILCFW-1730 ONCOR OH Electric Line Sta. 100+00 to Sta. 128+00 XINGS (8 Xings) P1S2 20 22-Feb-24A 01-Mar-24A UTILCFW-1100 SPECTRUM UG Telecom line Sta. 125+50 to Sta. 126+00 PlIS2 UTILCFW-1490 SPECTRUM OH Telecom line Sta. 117+00 to Sta. 147+00 P1S2 UTILCFW-1750 SPECTRUM OH Telecom line Sta. 120+65 XING Pi S2 UTILCFW-1110 SPECTRUM UG Telecom line Sta. 117+00 to Sta. 120+00 XING P1S2 + UTILCFW-1150 ZAYO UG Telecom line Sta. 127+90 XING P1S2 UTILCFW-1230 I ZAYO UG Telecom line Sta. 116+00 to Sta. 117+50 P2S1 UTILCFW-1680 ZAYO OH Telecom Line Sta. 104+00 to Sta. 147+00 P1 S2 10 17-May-24A 23-Aug-24A 15 17-May-24A 23-Aug-24A 10 17-May-24A 23-Aug-24A 2 15-Aug-24A 23-Aug-24A 23-Sep-24 14:07 Totall�� Z I - I' Float 171 AI SI (?INI- J�F�M�"�M �GvA- G�-1J I M�A -J,'(I?�-IYIN 11y�w���ll 'JAI i���'����i ��1�1�1�1�11r1�1Y1rL�3�:�3 � s ��:�� IFI R 12(F!A - on ction amen Compee ROW j TCE3 (HP WK) - Construction,. Easonent Complete ♦ ROW - UE01 (HA.NK)- Utility Easement :omplete ROW - DE01 (M( P) - Drainage Easeme r Complete ROW DE07 (MCP) - Drainage Easeme, I Complete ♦ ROW - Parcel 09(MCP)-Parcel AcquisRi nComplete ROW Acquisition at Area 03 STA 196+00 to STA 208+00 - Water Lane Conflict w Ih ONCOR CH Pc SPECTR■■v1 Utility Contractors (SUB Selection Pmiiass) ONCOR OH Eb�Aric Line Sta. 104+00 to Sta. 147+00 P�S2 - ■ ONCOR UG Eta '.ric Line Sta. 100+00 to Sta. 146+00 P1 32 (2 Lines) ONCOR, U6 El-ztdc line Sta. 108+00 to Sta. 120+00 AN Gs (2 Xing$) P1 S2 - ONCOR OH Eyrie Line Sta. 13+50 to Sta. 17+50 P1 S:: (Bowman Roberts Rd) ■ ONCOR OH Eh xdc Line Sta. 100+00 to Sta. 128+00 At IGS (8 Xings) P1 S2 ■ ONCOR OH E' ctric Line Sta. 13+50 to Sta. 17+50 P2S I (Bowman Roberts Rd). r— PECTRUM UG Telecom line Ste. 125+5 l to Sta. 126+00 P1S2 PECTRUM OH Telecom line Sta. 117+01) to Sta. 147+00 P1 S2 �. PECTRUM OH Telecom line Sta. 12046 5 XING P1S2 •. PECTRUM UG Telecom line Ste. 117+0I to Ste. 120+00 XING P1S2 r Caused the delay ZAY, UG Telecom line Sta. 100+00 to Sta. 147+00 P1S2 (3 Lines) 7 15-Apr-24A 02Jul-249/ I , �■■�� ZAY, UG Telecom line Sta,, 127+90 XING PsS2 0ZAY, I UG Telecom .- - --- 3015-Apr-2462Jul-24A ZAY- OH Telecom( Line Sta.1104+00t Sta,117+00 P1 `5,15,A��QA�2.lyi L3 ZAYi OH Telecom Line Sta. 127+65 XING P S2 UTILCFW-1010 AT&T UG Telecom line Sta. 100+00 to Sta. 127+00 P1 S2 (3 Lines) 20 07-May-24A 30-Aug-24 A AT&T UG Telecom fine Sta. 100+00 to St•. 127+00 P1 S2 (3 Lines) UTILCFW-1590 AT&T UG FOC line Sta. 11+35 to Sta. 11+37 XINGS (2 Xings) P1S2 Bowman l 10 13-Nay-24A 03Sep-24 A AT&T UG FOC line Sta. 11+35 to Sta. 11 37 XINGS (2 Xings) P1S2 Boe+nan Roberts Rd UTILCFW-1700 AT&T OH Telecom Line Sta. 104+00 to Sta. 147+00 P1 S2 25 14-May-24A 30-Aug-24 A is iT&T OH Telecom Line Sta. 104+00 to S a 147+00 P1 S2 UTILCFW-1040 AT&T UG Telecom line Ste. 101+45 to Sta. 144+40 XINGS (4 Xings) P1 S2 51 154May-24A 30-Aug-24 A -00-0- aT&T UG Telecom Gne Sta. 101+45 to SA. 144+40 XINGS (4 Xings) P1� UTILCFW-1000 AT&T UG Telecom line Sta. 100+70 to Sta. 127+50 P2S1 (2 Lines) 19 22-May-24A 30-Aug-24 A - kT&T UG Telecom fine Sta. 100+70 to St% 127+50 P2S1 (2 Lines) UTILCFW-1060 AT&T UG FOC line Sta. 100+80 to Sta. 127+00 P281 (2 Lines) 5 22-May-24A 03Sep-24 A _ AT&T UG FOC line. Sta. 100+80 to Sta. 127+00 P2S1 (2 Lines) _ UTILCFW-1080 AT&T UG FOC line Sta. 100+80 to Sta. 147+00 XINGS (5 Xings) P1 S2 5 22-May-24A 03Sep-24 A AT&T UG FOC Ime. Sta. 100+80 to Sta. 147+00 XINGS (5 Xings) P1 S2 UTILCFW-1580 AT&T UG FOC line Sta. 124+00 to Ste. 126+00 P1 S2 - Not Complete 19 22-May-24A 03Sep-24 A r_ AT&T UG FOC line Sta. 124+00 to Sta 126+00 P1S2 - Not Complete UTILCFW-1050 AT&T UG Telecom line Sta. 144+40 H 147+00 P2S1 5 08Jul-24A 30-Aug-24 A AT&T UG Telecom fine Sta. 144+40 H 14:400 P2S1 UTILCFW-1740 AT&TOH Telecom Line Sta. 115+95 XING P1S2 5 08Jul-24A 30-Aug-24A AT&TOH Telecom Line Sta. 115+95 XIN-3 P1S2. UTILCFW-1820 AT&T OH Telecom Line Sta. 127+65 XING P1S2 5 08Jul-24A 30-Aug-24A ♦T&TOH Telecom Line Sta 127+65 XING P1S2' UTILCFW-1570 BKV Gas Line Sta. 103+00 to Sta. 114+00 P1S2 ♦ Milestone r— Actual Level of Effort Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work 25 04-Apr-24A 17-May-24A Cromwell Marine Creek Rd. - City of Fort Worth P6 Schedule - Progress Update SEPT 2024 DD 09/22/2024 — BKV Ga-! ine Sta. 103+00 to Sta. 114+00 P1 S2 Page 4 of 17 SUNDT Ska Grit RV.. CoFW - Cromwell Marine Creek RD - September 2024 UPD 07 Activity ID Activity Name •Ill Original I Start Duration WA• Finish Total Float UTIL-CFW-1180 ATMOS UG Gas Line Ste. 100+00 to Sta. 140+00 P1 82 25 21Sep-23A 28-Dec-23A UTIL-CFW-1190 ATMOS UG Gas Line Ste. 100+00 to 120+00 XINGS (5 Xings) P1S2 10 06-Nov-23A 28-Dec-23 A UTILCFW-1920 ATMOS UG Gas Line Sta. 103+00 P1S2 - Missed during Design Phase 70 16-Apr-24A 21Oct-24 -18 UTIL-C -1620 MTC UGTelecarn line Sta. 100+95 XING P1S2 fill UTILCFW-1880 ONCOR UG Electric BORE Across Marine Creek Bdge Ste. 178+00 to Ste. 18: 25 09Jul-24A 85 12Jun-24A 13-Aug-24A • 18Ju1-24A UTILCFW-1220 ONCOR UG Electric Line Ste. 148+00 to Ste. 171+00 XINGS (9 Xings) P1S2 35 26-Aug-24A 11-Oct-24 13 UTILCFN-1500 ONCOR OH Electric Line Sta. 174+00 to Sta. 180+00 P2S1 15 26-Aug-24A 11-0ct-24 37 UTILCFN-1670 ONCOR OH Electric Line Sta. 147+00 to Sta. 167+00 P1 S2 20 26-Aug-24A 11-0ct-24 10 r• UTILCFW-1120 SPECTRUM UG Telecom line Sta. 171+00 to Sta. 178+00 XINGS (2 Xhgs) P' 10 17-May-24A 04Oct-24 22 UTILCFW-1510 SPECTRUM OH Telecom Lhe Sta. 174+00 to Sta. 180+00 P2S1 5 17-May-24A 04-Oct-24 12 UTILCFW-1720 SPECTRUM OH Telecom line Sta. 147+00 to Sta. 166+00 P182 17 17-May-24A 23-Aug-24A UTILCFW-1770 SPECTRUM OH Telecom line Sta. 150+97 XING Pi S2 5 17-May-24A 23-Aug-24A UTILCFW-1790 SPECTRUM OH Telecom line Sta. 175+90 XING P1S2 5 17-May-24A 23-Aug-24A UTILCFW-1870 SPECTRUM OH Telecom Lha Sta. 177+00 to Sta. 186+00 XING P2S1 6 17-May-24A 04-Oct-24 28 • • • UTILCFW-1160 ZAYO UG Telecom line Sta. 162+00 II 175+95 XINGS (2 Xings) P1 S2 r 15 15-Apr-24A r 02Jul-24 A UTILCFW-1520 ZAYO OH Telecom Line Sta. 174+00 to Sta. 180+00 P2S1 15 15-Apr-24A 02Jul-24A UTILCFW-1690 ZAYO OH Telecom Line Sta. 147+00 to Sta. 166+00 P1S2 10 15-Apr-24A 02Jul-24A UTILCFW-1780 ZAYO OH Telecom line Sta. 150+97 XING P1S2 3 15-Apr-24A 02Jul-24A UTILCFW-1800 ZAYO OH Telecom line Sta. 175+90 XING P1S2 5 15-Apr-24A 02Jul-24A UTILCFW-1020 AT&T UG Telecom line Sta. 147+00 to Sta. 170+00 P2S1 8 22-May-24A 30-Aug-24A UTILCFW-1030 AT&T UG Telecom line Sta. 148+55 to Sta. 150+80 P1 S2 15 22-May-24A 30-Aug-24A UTILCFW-1070 AT&T UG Telecom line Sta. 165+20 XING P2S1 5 22-May-24A 30-Aug-24A UTILCFW-1090 AT&T UG FOC line Sta. 158+00 to Sta. 165+50 P2S1 (4 Lines) 20 22-May-24A 03Sep-24A UTILCFW-1530 AT&T OH Telecom Line Ste. 174+00 to Ste. 180+00 P2S1 10 22-May-24A 30-Aug-24A UTILCFW-1600 AT&T UG FOC line Sta. 146+00 to Sta. 151+00 P1 S2 15 22-May-24A 03Sep-24 A UTILCFW-1710 AT&T OH Telecom Line Sta. 147+00 to Sta. 166+00 P1 S2 19 22-May-24A 30-Aug-24A UTILCFW-1810 AT&T OH Telecom line Sta. 175+90 XING P182 5 22-May-24A 30-Aug-24A UTILCFW-1630 BKV Gas Line Sta. 179+00 XING P1 S2 r 18 30-May-24A r. 06Jun-24A r • •• rr r: r1 UTILCFW-1540 ONCOR OH Electric Line Sta. 188+00 to Sta. 208+00 P1S2 20 26-Aug-24A 11-Oct-24 7 UTILCFN-1280 ONCOR UG Electric Line Sta. 187+00 to Sta. 206+00 KINGS (5 Xings) P1S2 25 14-Oct-24 15-Nov-24 10 UTILCFW-1830 ONCOR OH Electric Line Sta. 197+55 XING P182 6 14-Oct-24 21-Oct-24 10 UTILCFW-1850 ONCOR OH Electric Line Ste. 186+00 to SG. 189+00 XING P281 5 22Oct-24 28Oct-24 26 UTILCFN-1550 SPECTRUM OH Telecom Line Sta. 188+00 to Sta. 208+00 P1S2 r • 18 14-Oct-24 r• 06-Nov-24 7 ♦ Milestone r_ Actual Level of Effort r- Remaining Level of Effort Actual Work r_ Remaining Work r_ Critical Remaining Work 23-Sep-24 14:07 122 IJIAISIOINI IJIFIMIAIMI IAISIDINIif 3IFIMIAlMI'I11ZISI40ISI6I7I8I9IA711nI1I11A111110171 t 1IGI21ZILI'LI21LILl i 3131 3It31313 ATMOS UG Gas'Line 3ta. 100+00 to Sta'. 140+00 P1 S2 ATMOS UG Gas Line Re. 100+00 to 120+00 KINGS (5 Xings) P1 S2 ATMOS UG Gas Line Sta. 103+00 F4S2 - Missed during Design Pha se P TC UG Telecom line Sta. 100+95 XING P1S2 Cromwell Marine Creek Rd. - City of Fort Worth P6 Schedule - Progress Update SEPT 2024 DD 09/22/2024 T ON :OR UG Electric BORE Across Marine C eek Bdge Sta. 178+q0 to Sta. 1 33+01) P132 r_ ONCOR UG Electric Line Sta. 148+00 to Ste. 171+00 XINGS (9 Xing;) P1S2 ONCOR OH Electric Line Sta.. 174+01) to Sta. 180+00 P2S1 r_ ONCOR OH Electric Line Sta. 147+01) to Sta. 167+00 P1S2 r- SPECTRUM UG Telecom line Sta. 171+00 to Sta. 178+00 XINGS (2.(hgs)P1S2 r_ SPECTRUM OH Telecom L"ne Sta. V'4+00 to Sta. 180+OD P2S1 PECTRUM OH Telecom line Sta. 147+0 ) to Sta, 166+00 P1S2 PECTRUM OH Telecom line Sta. 150+9 7 XING Pl S2 PECTRUM OH Telecom line Sta. 175+9) XING P1S2 SPECTRUM OH Telecom L'ne Sta. 1- 7+00 to Sta. 185+00 XING P2S1 ZAY- UG Telecom line Sta.. 162+00 ii 175+95 XINGS (2 Xings) P1S2 r_ ZAY- OH Telecom Line Sta. 174+00 to Sta. I ; IO+00 P2S1 ZAYi OH Telecom Line Sta. 147+00 to Sta. 1166+00 PlIS2 - ZAY- OH Telecom line Sta.: 150+97 XING P1 52 r_ ZAY- OH Telecom line Sta. 175+90 XING P1 52 iT&T UG Telecom line Sta. 147+00 to Stm. 170+00 P2S1- ■■ommom ♦T&T UG Telecom line Sta 148+55'toSt,. 150+80P1S2 r- kT&T UG Telecom line Sta. 165+20 XING P2S1 r_ AT&T UG FOC line. Sta. 158+00 to Sta. 165+50 P2S1 (4 Lines) _ .�, kT&TOH Telecom Line Sta. 174+00 to S a. 180+00 P2S1 AT&T UG FOC line Sta. 146+00 to Sta. 151+00 P1 S2 r_ kT&T OH Telecom Line Sta. 147+00 to S a. 166+00 P1 S2 ♦T&TOH Telecom tine Sta. 175+90.XIN6 P1S2 ■ BKV C�s Line Sta. 179+00 XING P1 S2 ONCOR OH.Electric Line Sta.. 188+01) to Sta. 208+00 P1S2 ' r. ONCOR UG Electric Line Sta. 187+00 to Sta. 206+00 XINGS (S )ngs) P1S2 ■ ONCOR OH Electric Line Sta. 197+M XING P1S2 - • ONCOR OH Electric Line Sta. 186 v10 to Ste. 189+00 XING, P2S1 SPECTRUM OH Telecom Line Sta. 188+00 to Sta. 208+00 P1 S2 Page 5 of 17 SUNDT .Ska Grit»e ..• CoFW - Cromwell Marine Creek RD - September 2024 UPD 07 .ctivity ID UTILCFW-1860 Activity Name SPECTRUM OH Telecom Line Sta. 186+00 to Sta. 189+00 XING P2S1 Original Duration I6 Start 21-W-24 Finish 28-Oct-24 Total Float 1 55 UTILCFW-1130 SPECTRUM UG Telecom line Sta. 195-00 to Sta. 206+00 XINGS (2 Xhgs) P' 10 28-0ct-24 08-Nov-24 7 UTILCFW-1560 ZAYO OH Telecom Line Sta. 188+00 to Ste. 208+00 P1S2 11 07 Nov-24 21-Nov-24 37 UTILCFW-1170 ZAYO UG Telecom line Sta. 205+00 to Sta. 208+00 P1S2 8 114Jov-24 20-Nov-24 7 COMMUNICATIONS 14 23-Sep-24 I r• UTILCFW-1610 I AT&T UG FOC line Sta. 189+00 XING P I 10-Oct-24 36 PROCESSGMP PRECO-2260 ICE Review GMP Package • 10 :• 28-Oc[-23A 05-Mar-24 DS-1070 Estimate Development -100%Design 16 15-Nov-23A 08-Deo-23A PRECO-1350 Permits (Draft) ready for GMP 0 28-Nov-23A DS-1100 GMP Cost Estimate Negotiations 8 12-Deo-23A 20-Mar-24A PRECO-1250 GMP Pricing Due Date 0 12-Dec23A PRECO-1260 Revised GMPAcceptance 16 12-Deo-23A 10-Apr-24A PRECO-1262 GMP WP# 02 Delivery Discussions 8 12-Deo-23A 19-Feb-24A PRECO-2270 GMP WP 002 Acceptance 16 02-Feb-24A 19-Feb-24A PRECO-2290 Revised GMP Submittal 7 21-Mar-24A 27-Mar-24A DS-1110 GMP Final Agreement 0 10-Apr-24A PRECO-1270 Final City of Fort Worth Routing Date for City Council Meeting / Revised GMP 0 26-Apr-24A PRECO-1290 City Council Approval of GMP 0 51 r — 14-May-24A c— ... EARLYWORK PACKAGE 1 EWPP-1010 Clearing and Grabbing 10 1 03Jan-24A 23-Feb-24 EWPP-1030 Office Trailerand Construction Yard Set Up 03Jan-Jan 02-Feb-24A EWPP-1040 Survey Control Points 103-Jan-24A 03Jan-Jan 16-Feb-24A EWPP-1050 Install Temp RON fence 26Jan-24A EWPP-1000 Install SWPPP and Erosion Control BMP's 5 20-Mar-24A 01-Apr-24A 2&Mar-24A I 09-Apr-24A SUBMITTALS 176 SUBMCFW-1000 Wate r and Wastewater Material Submittals Sanitary Sewer Manhole Shop Drawings Submittal 10 10 SUBMCFW-1020 01-Apr-24A I 09-Apr-24A SUBMCFW-1140 Design and Shop Drawings Temp Special Shoring Submittal 30 02-Apr-24A 2&Apr-24A SUBMCFW-1040 Asphalt/ Concrete Mix Design Submittal 15 23-Apr-24A 084ul-24A SUBMCFW-1050 Reinf. Cones Box(RCB) Shop Drawing Submittal 15 24-May-24A 10Jun-24A SUBMCFW-1080 Reinf. Steel Sub -Structure Shop Drawings Submittal 45 24Jun-24A 05Jul-24A SUBMCFW-1110 SEJ and mist. metals Shop Drawings Submittals 45 01Jul-24A 18-Oot-24 76 SUBMCFW-1100 Concrete Beams Shop Drawings Submittal 45 11Jul-24 A 18-Oct-24 38 SUBMCFW-1130 Deck Precast Concrete Panels Shop Drawings Submittal 45 11Jul-24 A 18-Oct-24 38 SUBMCFW-1010 Electric and Communications Material Submittals 45 j 15Jul-24A 06-Aug-24A SUBMCFW-1060 Traffic Signal Poles/ Mast Arms Shop Drawing Submittals 45 15Jul-24A 06-Aug-24A SUBMCFW-1070 Traffic Signal Special Components/ Equipment Materials Shop Drawing Submit 45 15Jul-24A 06-Aug-24A SUBMCFW-1120 Lighting Poles Shop Drawing Submittals 45 15Jul-24A 06-Aug-24A SUBMCFW-1090 MSE We II Pan els Sin p Drawings S Lb millal 45 16-Aug-24A 28-Aug-24A SUBMCFW-1150 24"Concrete AWWA C303 Water Pipe Shop Drawings Submittal 15 10.Sep-24A 11-W-24 73 SUBMCFW-1030 Inlet Structure Shop Drawings Submittal CITY OF FORT WORTH 45 229 23Sep-24 22-Nov-24 34 ♦ Milestone Actual Level of Effort Remaining Level of Effort Actual Work Remaining Work Critical Remaining Work 23-Sep-24 14:07 �I2JIAISIOINI JIFIMIAIMI IAISIOINI6 JIFIMIAlMI I1IZISID SP,(;TRUM��MHTeI�OA1lS 0 &a.18� 111�� 111�1. ■ SPECTRUM UG Telecom One Sta. 195+00 to Ste. 206+00 XINGS (2 Xngs) PI S2 ZAYO OH Telecom Line Sta. 18& 00 to Sta. 208+00 P1 S2 ■ ZAYO UG Telecom line Sta. 205+r IO to Sta. 208+00 P1 S2 ■ AT&T UG FCC; line Sta. 189+00 XINC � P1 S2 ICE Review Gk � Package. Estimate Development 100% Design F I-emrits(Draft) ready for 3MP GMP Cost Es hate Negotiations ♦ GMP Pricing Due Date '.. '.. — Revised Gllw Aoceptanoe GMP WP # 02 L\iveryDiscussions �I GMPWP:002A.eptance Revised GMF Submittal GMPFinal Fieement ♦ Anal City r Fort Worth Routing Dale for City Count Meeting /. Revised GMP ♦, City Cow cil Approval of GMP Clearing and Gr bbing Offce Trailer and ►onstmction Yard Set Up Elio Survey Control tents Install Temp ROW race ■ Install SWPPN and Erosion Control BMP s ■ Water and -astewater Material Submittals ■ Sanitary Se--er Manhole Shop Drawings Submittal r. Design an Shop Drawings Temp Spedal Shoring S rbmithal ...... Asp. aft / Concrete Mix Design Submittal Reinf. :onc. Box (RCB). Shop Drawing Submitta ■ Reir . Steel SubStmdure Shop Drawings Sul: m ttal SEJ and mist. metals Shop Drawing:; Submittals Concrete Beams Shop Drawings Suhmittal Deck Precast Concrete Panels Shop Drawings Submittal E :dric and Communications Material. Submittals T :ffic Signal Poles / Mast Arms Shop',Dra% ng Submittals T ;ffic Signal Special Components / Equipment Materials Shop Drawing Sut mittals L lhtmg Poles Shop Drawing Submittals ■ ASE Wall Panels Shop Dmwngs,Submltlal �'.24" Concrete AWWA C303 Water Pip, a Shop Drawings Submittal — Inlet Structure Shop Drawings Suhmittal Cromwell Marine Creek Rd. - City of Fort Worth Page 6 of 17 P6 Schedule - Progress Update SEPT 2024 DD 09/22/2024 SUNDT V'ma Ga »v ... CoFW - Cromwell Marine Creek RD - September 2024 UPD 07 ctivity ID CITY-CFW-1420 Activity Name Early Work Package 01 City of Fort Worth Approval Original Duration 0 Start 02Jan-24A Finish Total Float CITY-CFW-1130 Review and Approval Water and Wastewater Material Submittals 21 09.Apr-24A 26-Apr-24A CITY-CFW-1150 Review and Approval Sanitary Sewer Manhole Shop Drawings Submittal 15 09-Apr-24A 26-Apr-24 A CITY-CFW-1170 Review and Approval Asphalt/ Concrete Mix Design Submittal 15 23-Apr-24A 31Jul-24A CITY-CFW-1430 Review and Approval Temp Special Shoring Submittal 21 29-Apr-24A 03Jun-24A CITY-0FW-1180 Review and Approval Reinf. Conc. Box (RCB) Shop Drawing Submittal 15 10Jun-24A 06-Aug-24A CITY-CFW-1220 Review and Approval Reinf. Steel for SubStmcture Shop Drawings Submittal 21 05Ju1-24A 15Jul-24A CITY-CFW-1140 Review and Approval Electric and Communications Material Submittals 21 07-Aug-24A 08-0ct-24 89 CITY-CFW-1190 Review and Approval Traffic S lgril Poles/ Mast Arms Shop Drawing Submittals 21 07-Aug-24A 08-01-24 82 CITY-CFW-1200 Review and Approval Traffic S lgnal Special C omponents/ Equ ipment Materials 21 07-Aug-24A 08-01-24 82 CITY-CFW-1210 Review and Approval Lighting Poles Shop Drawing Submittals 21 07-Aug-24A 08-Od-24 376 CITY-CFW-1230 Review and Approval MSE Wall Panels Shop Drawings Submittal 21 29-Aug-24A 1540ct-24 14 CITY-CFW-1450 Review and Approval 24" Concrete AWWA C303 Water Pipe Shop Drawing Suit 21 14-Oct-24 11-Nov-24 73 CITY-CFW-1240 Review and Approval Concrete Beams Shop Drawings Submittal 21 21-W-24 18-Nov-24 74 CITY-CFW-1390 Review and Approval Deck Precast Concrete Panels Shop Drawings Submittal 21 21-0d-24 18-Nov-24 38 CITY-0FW-1250 Review and Approval SEJ and mist. metals Shop Drawings Submittals 21 23-Oct-24 20-Nov-24 74 CITY-CFW-1160 PROCUREMENT• CITY-CFW-1260 Review and Approval Inlet Structure Shop Drawings Submittal • Procurement Water and Wastewater Materials 21 254Jov-24 27-Dec-24 ■517 18Jul-24A 34 20 29-Apr-24A CITY-CFW-1280 Procurement Sanitary Sewer Manhole Structures 14 29-Apr-24A 14Jun-24A CITY-CFW-1440 Procurement Temporary Shoring Materials 15 04Jun-24A 20Jul-24A CITY-CFW-1310 Procuremen Reinf. Conc. Box (RCB) 21 15Ju1-24A 02-Aug-24A CITY-CFW-1340 Pmcurement Reinf. Steel Material 30 15Jull 02-Aug-24A CITY-CFW-1270 Procurement Electric and Communications Materials 90 09-W-24 06Jan-25 133 CITY-CFW-1320 Procurement Traffic Signal Poles/ Mast Anne Materials 150 09-W-24 07-Mar-25 439 CITY-CFW-1330 Procurement Traffic Signal Special Components / Equipment Materials 150 09-0ct-24 07-Mar-25 439 CIMFW-1400 Procurement Temp Traffic Signals Traffic Signal Poles Mast Arms Materials 100 09-Oct-24 16Jan-25 123 CITY-CFW-1350 Procurement MSE Wal Pa rids 30 16-0ct-24 14-Nov-24 20 CITY-CFW-1360 Procurement Concrete Beams 45 19-W-24 02-Deo-24 53 CITY-CFW-1370 Pmcurementl SEJ and mist. metals Materials 90 21-Oct-24 18Jan-25 53 CITY-CFW-1380 Pmcurement Lighting Poles 120 28-W-24 24-Feb-25 528 CITY-CFW-1460 Procurement 24"Concrete AWWA C303 Water Pipe Material 115"12-No�2406-Mar-25 109 CITY-CFW-1410 Procurement Deck Precast Concrete Panels 45 59 CITY-CFW-1290 Pmcurement Inlet Structures 30-52 21Jun-24A Al PlSl-1030 Set Up Treffc Contml-At PH 1STAGE 1 307Jun-24A Al Pl Sl-1070 Install 24" Sanitary Sewer Line -Al PH 1 STAGE 1 -ATT UG Line In Conflict Str 15 20Jun-24A 25Jun-24 A AlPl Sl-1370 A7TTemp. Mitigation to Allow24"Sewer Line to Resume Work 6 26Jun-24A 09Jul-24A Al Pl Sl-1380 Install 24" Sanitary Sewer Line -At PH 1 STAGE 15 10Ju1-24A 19Jul-24A Al PlSl-1090 Install Tempaary Shang along Cromwell Marine -At PHI STAGE 1331Ju1-24A 15-Aug-24A Al Pl Sl-1360 Install Temporary Shoring along Bowman Roberts RD -Al PH I STAGE I 12 31Jull 15-Aug-24A Al Pl Sl-1000 Misc. Removals - Exist. RCP / Misc. Sir. (200 ft) Al PH 1 STAGE 1 5 12-Aug-24A 19-Aug-24A Al Pl Sl-1010 I ELB Bowman Roberts Rd MB Culvert 4 EA 9'X5' -A1 PH 1 STAGE 1 19 19-Aug-24A I 26Sep-24 -24 ♦ Milestone r_ Actual Level of Effort r— Remaining Level of Effort Actual Work r_ Remaining Work r_ Critical Remaining Work 23'7I-Sep-24 14:07'7I IrI"I'IUINI IJIFIMIAI iJl IAISIVINI'' J�FIMI"� I/II1�4ISJ6l�ItIJJ'1iJ1I �IA�II'll 'IIG111"111111113'SIFI3 MIJIJ + all y ork. a Ci y o Fort o h proval - Review an Approval Water and Wastewater Materia Submittals Review an Approval Sanitary Sewer Manhole Shop Drawings Submittal — R, view and Approval Asphalt / Concrete Mill Design Submittal Review and Approval Temp, Special Shoring. Submittal R view and ApprovalReinf. Cones Box (RC B) Shop Drawing Submittal ■ Revew and Approval Reinf. Steel for SubStn icture Shop Drawings Submittal — Review and Approval Electric and Communications Material Submittals — Review and Approval TrafficSlgnaFPres/ Mast Arms Shop Drawing S jbmittals — Review and Approval Traffic Slgnal'S(`xtal Components/ Equipment l Aaterals Shop DrE Review and Approval Lighting: Poles tiop Drawing Submittals r� Review and Approval MSE Wall Panel Shop. Drawings Submittal o Review and Approval 24' Concrete AWWA C303 Water Pipe Shop Umwing'Submittak o Review and Approval Concrete Beams Shop Drawings Submittal v Review and Approval Deck Precast Concrete Panels Shop Drawing; Submittal — Review and Approval SEJ. and me. metals Shop Drawings Submil talc r_ Review and Approval Inlet Stru lure Shop Drawings Submittal Cromwell Marine Creek Rd. - City of Fort Worth P6 Schedule - Progress Update SEPT 2024 DD 09/22/2024 Pro uremenl Water and Wastewater Material: Procla ment Sanitary SewerlManhole StmctUree Prc4eirement TemporaryShoring Materials Pi curemen Reinf. Conc. Box (RCB) Pi curement Reinf.: Steel Material r_ Procurement Electric and Cormuncations Material's Procurement Traffic Slgr al Poles / Mast Ames Materials Procurement Traffic Slgr-al Special Components / Equipment Materials Procurement Temp Traffic Signals Tragic Signal Poles,/ Mast/ erns Materials Procurement MSE Wal Panels r_ Procurement Concrete Beams Procurementl SEJ and mist. metals Materials Pmcurement Lighting Pol =s Procurement 24" ConcreIe AW WA C303 Water Pipe Mate vial Procurement Deck Precast Cmcrete Panels Procurement Inlet Stmcturee ■ Set U Traffic Control -Al PH 1 STAGE 1 •, Instal 24" Sanitary Sewer Line'' -At PH.1 $TAC 1 -ATT UG Line In Conflict Sty Work ■ ATT emp. Mitigation to Allow 24" Sewer Line n Resume Work ■ Ins tll 24" Sanitary Sewer Line -At PH 1 STAGE 1. i I stall Temporary Shang along Cromwdl Marine -At PH 1 STAGE 1 g 1 stall Temporary Shang along Bowman Roberts RD -At PH 1'STAGE 1 ■ Ilse. Removals - Exist. RCP / Misc. Str. (2 )0 ft)At PH 1 STAGE 1 ELB Bowman Roberts Rd MB Culvert, EA 9'X5' -A1 PH 1 STAGE 1 Page 7 of 17 SUNDT SkilL Grit RV.. CoFW - Cromwell Marine Creek RD - September 2024 UPD 07 23-Sep-24 14:07 eUvity ID Activity Name Original Start Duration Finish Total 2 AISIUI NI- �I FIMIAIM--IAISIUI Float27 NJ JI FIMIA MIItl.I\I\�ap�l 11 �1 J� �I I( ;il;i :i :�':iI:S(3 A1P1S1-1040 Place Temp. Pavement -Al PH1STAGE1(151+00 //153+00 23Sep-24 07-0ct-24 Pavement FI G/j�1(15J0`//153I+\�JY�rLS P� T. 1 H 1 E 1: 1'. 0 00) Al Pl Sl-1310 Asphalt Milling pavement removal Bowman Roberts Rd. NORTH At PH 1 STA, 2 23-Sep-24 24Sep-24 -19I Asphalt Milling. pavement removal Bow nan Roberts Rd. NORTH Al P■ 1 STAGE 1 Al Pl Sl-1260 Temp Drainage / SET Bowman Roberts Rd. SOUTH -Al PH 1 STAGE 1 2 27Sep-24 30Sep-24 -24I Temp Drainage / SET Bowman Robe Rd SOUTH -At PH 1 STAGE 1 Al Pl Sl-1350 Place CSB between Culvert Barrels MB Culvert 4 EA 9'X5' -A1 PH 1 STAGE 1 2 27Sep-Sep 30Sep-Sep -22I Place CSB between Culvert Bartels M Culvert 4 EA 9'X5' -A1 PH 1 STAGE 1 Al Pl Sl-1330 Asphalt Milling pavement removal Bowman Roberts Rd. SOUTH Al PH 1 STA, 2 01-Oct-24 02-Oct-24 -24I : : :. : :. :. :. 1 Asphalt Milling pavement removal Bovrnan Roberts, Rd. SOUTH At PI 1 STAGE 1: :. Al Pl Sl-1170 Remove Existing Pavement Bowman Roberts Rd. / SOUTH -Al PH 1 STAG 3 03-W-24 07-Oct-24 -24I : ■ Remove Existing Pavement Bowman Roberts Rd. / SOUTH -At PH 1 STAG 1 Al Pl Sl-1020 Excev. / Embank. Bowman Roberts Rd. SOUTH -At PH 1 STAGE 1 6 08-Oct-24 17-Oct-24 -24I ■ Excay. / Embank. Bowman Roberts Rd. SOUTH -At PH 1 STAGE 1 Al Pl Sl-1150 Remove Existing Pavement Bowman Roberts Rd. / NORTH -Al PH 1 STAGE 3 08-W-24 11-01 -27I ■ Remove Existing Pavement Boman Roberts Rd. / NORTH -Al PH ' STAGE 1. Al Pl Sl-1190 Excev. / Embank. Bowman Roberts Rd. NORTH -At PH 1 STAGE 1 3 14-0ct-24 17-0ct-24 -27I r Excay. / Embank. Bowman Roberts F d. NORTH At PH 1 STAGE 1 '.. Al Pl Sl-1050 Place Temp Pavement Bowman Roberts Rd. NORTH -At PH 1 STAGE 1 5 18-0ct-24 25-0ct-24 -27I _ ■ Place Temp pavement Bowman Ro►eris Rd.. NORTH -At PH 1 STA 3E 1 AlPIS1-1180 Place Temp Pavement Bowman Roberts Rd. SOUTH -At PH 1 STAGE 1 5 18-W-24 25-Oct-24 -241 ■ Place Temp Pavement Bowman Ro►erts Rd. SOUTH -At PH 1 STAB 3E 1 Al PlSl-1080 Place Temp Striping/ Set Temp Traffic Control- Switch Traffic into Temp Detour 1 5 01-Nov-24 11-Nov-24 -27I: : : : : : : : ■ : Place Temp Striping t Set Temp Tire ffic Control -Switch Traffic i rto Tr pDetour @Bo% IL Al Pl Sl-1160 Place Temp Pavement Bob Hangers St -Al PH 1 STAGE 1 6 23Sep-24 01-0ct-24 -12 Place Temp Pavement Bob Hangers a. -Al PH 1 STAGE 1 CRYSTAL LAKE Al Pl Sl-1120 ■ Remove Existing Pavement Crystal Lake Dve -A2 PH 1 STAGE 1 3 26Jul-24A 06 31Jul-24 A I■ R move Existing Pavement Crystal Lake. D� -A2 PHI STAGE 1 Al Pl Sl-1320 Asphalt Milling Pavement removal Crystal Lake Dve -A2 PH 1 STAG 1 2 26Jul-24A 31Jul-24 A I • Arhak Milling Pavement removal Crystal Like Dve -A2 PH 1 STAG 1 Al Pl Sl-1130 Place 1st lift Lime Treated Sub-Gmde Crystal Lake Dve -A2 PH 1 STAGE 1 4 08-Aug-24 A 09-Aug-24 A I hce 1st lit Lime Treated Sub -Grade Crysrl Lake Dve -A2 PH 1 STAGE 1 Al Pl Sl-1280 Cure Lime Treated Sub -Grade 1st Lift Crystal Lake Dve -A2 PH 1 STAGE 1 2 09-Aug-24A 12-Aug-24 A I ■ t im Lime Treated Sub -Grade 1 st Lift Cry_ al Lake Dve -A2 PH 1 STAGE 1 Al Pl Sl-1290 Place 2nd lift / Fnsh Lime Treated Sub -Grade Crystal Lake Dve -A2 PH 1 STAC 2 13-Aug-24A 13-Aug-24 A I , ?,am 2nd lift:/ Fnsh Lime Treated Sub -Gm, Is Crystal Lake Dve -A2 PH 1 :CAGE 1 Al Pl Sl-1340 Cure Lime Treated Sub -Grade 2nd Lift Crystal Lake Dve -A2 PH 1 STAGE 1 2 14-Aug-24A 18-Aug-24 A I ■ ure Lime Treated Sub -Grade 2nd Lift Crystal Lake Dve - A2 PH 1 STAGE 1 Al Pl Sl-1210 RFI-014 Crystal Lake Dr. Transition 10 09Sep-24A 13Sep-24 A I ■ RFI-014 Crystal Lake Dr. Transition Al Pl Sl-1140 Place 10" Concrete Pavement Crystal Lake Dve -A2 PH 1 STAGE 1 3 11Sep-24 A 11Sep-24 A I Place 10" Concrete Pavement Crystal Like Dve.-A2 PH 1 STAGE l Al Pl Sl-1270 Cure 10" Concrete Pavement Crystal Lake Dve -A2 PH 1 STAGE 1 7 12Sep-24A 18Sep-24 A I ■ Cure 10" Concrete Pavement Crystal L; ike Dve'.-A2 PHI STAGE 1 '.. Al Pl Sl-1390 Place 10" Concrete Pavement Crystal Lake Dve -A2 PH 1 STAGE 1 RFI-014 3 23Sep-24 26Sep-24 -13I Place 10" Gonmte Pavement Crystal Lake Dve -A2 PHI STAGE 1 RFI-014 Al Pl Sl-1400 Cure 10" Concrete Pavement Crystal Lake Dve -A2 PH 1 STAGE 1 RR-014 7 27Sep-24 03-W-24 -23I Cum 10" Concrete Pavement Crystal lake Dve -A2 PHI STAGE 1 R °I-014 Al Pl Sl-1110 Place Temp. Pavement Crystal Lake Dve -A2 PH 1 STAGE 1 Inc. 550 BY Rem 3 28-0ct-24 31-0ct-24 -27I : : : Place:Temp. Pavement Crystal Lako Dve. -A2 PH 1 STAGE 1 Inc. 5F 0 BY: Rem Al P1 S1-1230 Place Striping / Set Traffic Control - Switch Traffic into Crystal Lake Dve 3 01-Nov-24 06-Nov-24 -25I r Place Striping / Set Traffic Control - Switch Traffic into Crystal Lake Dve AlEWP-1050 FPS Culvert Extensions @ 133+00 Area 1 12 01-W-24 18-Oct-24 19 Al EWP-1010 ELB 9' X 6' Box Culvert Extension @ Sta. 145+80 Area 1 5 21-W-24 28-01 191 Al Pl SZA-1000 Set Up Tmffic Control -At PH 1 STAGE 2A 5 12-Nov-24 20-Nov-24 -27I Al P1S2A-2330 Asphalt Milling Pavement removal Sta. 100+00 to 127+00 - Al PH 1 STAGE 2l 3 22-Nov-24 27-Nov-24 -26I Al P1S2A-1040 Misc. Removals Sta. 100+00 to 127+00 - Al PH 1 STAGE 2A 7 02-Dec-24 12-Dec-24 -26I A1P1S2A-2340 Asphalt Milling Pavement removal Sta. 127+00 to 147+00-All PH 1 STAGE 0 302-0ec-24 05-Dec-24 -22I Multiple crews Al P1S2A-1050 Misc. Removals Sta. 127+00 to 147+00 - Al PH 1 STAGE 2A 7 16-0ec-24 31-Dec-24 -26I A1P1S2A-1095 Tem Dreina a B n3�b O17}{�g1�F{�S�G�2 d Al P1SZA-1 5 EL Drainage a ta. 27+00 01 7+00- 1 P 1 STAGE2A 17 02Jan-25 31Jan-Jan Al P1S2A-2 0 FPS Inlet Bases Sta. 127+00 to 147+00 -Al PH 1 STAGE2A (4 EA) 10 27Jan-Jan 13-Feb-25 4I Al P1S2A-10 0 ELB Drainage Sta. 100+00 to 115+00 -At PH 1 STAGE 2A 12 05-Feb-25 26-Feb-25 -27I Al P1S2A-22 0 FPS Inlet Bases Sta. 100+00 to 115+00 -Al PH 1 STAGE 2A (4 EA) 12 05-Feb-25 26-Feb-25 -27I Al P1S2A-10 Excavation / Embankment Ste. 127+00 to 147+00 - Al PH 1 STAGE 2A 14 14-Feb-25 11-Mar-25 -24I A1PIKA-240, B rai g St 11 + to 27 0 Al H S G 2 u��_ �13J 27xFe 25� 2jMgQ72k -27I ♦ Milestone r_ Actual Level of Effort r— Remaining Level of Effort Actual Work r_ Remaining Work r_ Critical Remaining Work Cromwell Marine Creek Rd. - City of Fort Worth P6 Schedule - Progress Update SEPT 2024 DD 09/22/2024 FPS Culvert Extensions @ 133+00 P as 1 ELB 9 X 6'Box Culvert Extension @ Sta. 145+80 Area 1 ■ Set Up Tmffic Control - Al PH 1 ;CAGE 2A ■ Asphalt Milling Pavement remova I Sta.:100+00 to 127+00 - Al: P■ 1: STAGE 2A • Misc. Removals Sta. 100+00 to 127+00- Al PH 1 STAGE 2A r Asphalt Milling Pavement removed Sta. 127+00 to 147+00 - At PI 1 STAGE 2A ■ Misc Removals Sta. 127+00 t ) 147+00 - Al PH 1 STAGE 2A ■ Temp Drainage @ Bowman Rc berts Rd. SOUTH -At PH 1 STAGE 2A ELB Drainage Sta. 127+00 to 147+00.-At PH 1 STAGE 2A FPS Inlet Bases Sta. 127.00 to 147+00 -At PH 1 STAGE 2A (4 EA) o ELB Drainage. Sta. 100-0 to 115+00-Al PHI STAGESA - FPS Inlet Bases Sta. 100'00 to 115700 -At PH 1 STAGE 2A (4 EA) o Excavation / Embankment Sta. 127+00 to 147+00 - Al PH 1 STAGE 2A o ELB Drainage Sta. 115+00 to 127+00 -At PHI STAGE: 2A Page 8 of 17 SUNDT SkilL Grit RV.. CoFW - Cromwell Marine Creek RD - September 2024 UPD 07 Ac tivity ID Activity AlPlS2A-249bv Name I FPS Inlet Bases Sta. 115+00 to 127+00 -A] PH 1 STAGE 2A (11 EA) Orin final reL n 13 10 Start'Finish 27-Feb-25 1 -M -2 v 21-Mar-25 Total Most -27 A1P1S2A-1065 1 +0 0 7 0 A r- -24 Al P1 S2A-1030 Excavation / Embankment Sta. 100+00 to 127+00 - Al PH 1 STAGE 2A 24-Mar-25 09-Apr-25 -27 Al P1S2A-2170 Cure 1st Lift Lime Treated Sub -Grade Sta. 127+00 to 147+00 - Al PH 1 STAGI 3 25-Mar-25 27-Mar-25 -4 Al P1S2A-2180 Place 2nd Lift / Finish Lime Treated Sub -Grade Sta. 127+00 to 147+00 - Al PF 3 28-Mar-25 01-Apr-25 -25 Al P1 S2A-2350 Cure 2nd Lift Lime Treated Sub -Grade Sta. 127+00 to 147+00 - Al PH 1 STAC 3 02-Apr-25 04-Apr-25 d6 Al P1 S2A-1070 Place 10" CRCP (w Curb) Sta. 127+00 to 147+00 - Al PH 1 STAGE 2A 15 07-Apr-25 30-Apr-25 -24 Al P1S2A-1060 Install Electrical Conduit Area 1 STA 100 to STA 147 -PH 1 STAGE 2A 2 07-Apr-25 094r-25 -27 Al P1S2A-1035 Place 1st Lift Lime Treated Sub -Grade Sta. 100+00 to 127+00 -At PH 1 STAG 9 10-Apr-25 23-Apr-25 -27 Al P1S2A-2190 Cure 1st Lift Lime Treated Sub -Grade Sta. 100+00 to 127+00 -At PH 1 STAGE 3 24-Apr-25 26-Apr-25 -45 Al Pl S2A-1080 Removal / Excavation Driveways Sta. 100+00 to 127+00 -Al PH 1 STAGE 2A 4 25-Apr-25 30-Apr-25 -1 Al P1S2A-2200 Place 2nd Lift / Finish Lime Treated SubGmde Sta. 100+00 to 127+00 -All PH 6 28-Apr-25 05-May-25 -26 Al PI M-2110 Cure 10" CRCP (w Curb) Sta. 127+00 to 147+00 - Al PH 1 STAGE 2A 7 01-May-25 07-May-25 -42 Al P1S2A-2320 FPS Inlet Tops Sta. 127+00 to 147+00 -At PH 1 STAGE 2A (4 EA) 3 01-May-25 05-May-25 8 Al P1S2A-2360 Cure 2nd Lift Lime Treated Sub -Grade Sta. 100+00 to 127+00 -All PH 1 STAG 3 06-May-25 08-May-25 -43 Al PI M-1075 Place 10" CRCP (w Curb) Sta. 100+00 to 127+00 -At PH I STAGE 2A 20 09-May-25 13-Jun-25 -26 Al P1S2A-2120 Cure 10" CRCP (w Curb) Sta. 100+00 to 127+00 -At PH 1 STAGE 2A 7 14Jun-25 20-Jun-25 -12 Al P1S2A-1560 Place Driveways Sta. 100+00 to 127+00 -At PH 1 STAGE 2A (3 EA) 12 16Jun-25 02Jul-25 -26 Al P1S2A-2300 FPS Inlet Tops Sta. 100+00 to 127+00 -At PH 1 STAGE 2A (15 EA) 10 16Jun-25 30Jun-25 -24 A1P1S2A-1090 FPS Flatwork/Mist. Finishes -Al PH 1 STAGE 2A 10 03Jul-25 18Jul-25 -26 Al P1S2A-1140 j Dress Slopes / Rough Grade Culvert Ditch Area -At PH 1 STAGE 2A 5 21.Iul-25 28Jul-25 19 Al P2S1A-1210 Place Temp Striping / Set Temp Traffic Control - Switch Traffic into PH 2 STAGE 5 21Jul-25 2Wul-25 -26 Al P1S2A-1150 Place Large Stone Rip Rap Culvert Ditch Area -At PH 1 STAGE 2A 8 29Jul-25 08-Aug-25 19 BOWMAN ROBERTS RD INTERSECTION 69 22�1ov-24 TApr-25 W Al P1S2A-2380 Asphalt Millings Pavement removal Bowman Roberts Rd STH -At PH 1 STAGE 2 22-Nov-24 26-Nov-24 -27 Al P1S2A-2450 FPS Bowman Roberts Rd Ck MB Culvert (North) 4EA9' X 5'- At PH 1 STAGE 15 22-Nov-24 27-Deo-24 -7 A1P1S2A-1010 Remove Pavement Bowman Roberts Rd STH -Al PH 1 STAGE 2A 3 27-Nov-24 04-Deo-24 -27 Al P1S2A-2390 Asphalt Millings Pavement removal Bowman Roberts Rd NTH -At PH 1 STAG 2 27-Nov-24 02-Deo-24 0 A1P1S2A-1100 Relocate 16" DI Existing Water LineAl PH 1 STAGE 2A 15 05-Deo-24 06Jan-25 -27 Al PI KA-1130 Remove Pavement NTH - Bowman Roberts Rd At PH 1 STAGE 2A i2 054)eo-24 06-Deo-24 -1 A1P1S2A-1120 Excavation / Embankment Sub -Grade Bowman Roberts Rd NTH - Al PH 1 Sl 3 09-Dec24 A1P1S2AA145 Place 1st Lift Lime Treated Sub -Grade Bowman Roberts Rd NTH -Al PH 1ST 4 16-Deo-24 A1P1S2A-2210 Cure 1st Lift Lime Treated Sub -Grade Bowman Roberts Rd NTH -All PH 1 STA 3 25-Deo-24 Al P1 KX2220 Place 2nd Lift / Finish Lime Treated Sub -Grade Bowman Roberts Rd NTH -At 1 2 30-Deo-24 A1P1S2A-2370 Cure 2nd Lift Lime Treated Sub-Gmde Bowman Roberts Rd NTH -Al PH 1 ST, 3 01Jan-25 A1P1S2A-11 a 1 C w u n s Kc NiH �A1 wH n-zs t 12-Deo-24 -1 24-Deo-24 13 27-Deo-24 25 31-Deo-24 13 03Jan-25 24 wFSJen-26 12 Al P1S2A-117 FPS South MBC Headwall Footing -At PH 1 STAG 2A 20 08Jan-25 13-Feb-25 -11 Al P1S2A-117 ELB Bowman Roberts Rd Ck MB Culvert (South/Crossing) 4EA9' X 5' -Al PH 15 O8Jan-25 03-Feb-25 -27 Al P1 S2A-21 Al PlS 25 FPS South MBC Headwall & Closure -At PH 1 STAGE 2A 10 14-Feb-25 03-Mar-25 -11 Al P1S2A-1t - - -11 Al P1S2A-1200 Place tat Lift Lime Treated Sub -Grade Bowman Roberts Rd STH -Al PH 1 ST/ 6 05-Mar-25 14-M!r-25 -11 Al P1S2A-2230 Cure Lime Treated Sub -Grade Bowman Roberts Rd STH -At PH 1 STAGE 2A 3 15-Mar-25 17-Mar-25 -18 Al P1S2A-2240 Place 2nd Lift / Finish Lime Treated Sub -Grade Bowman Roberts Rd STH -At 1 2 18-Mar-25 19-Mar-25 -9 ♦ Milestone r_ Actual Level of Effort r— Remaining Level of Effort Actual Work r_ Remaining Work r_ Critical Remaining Work 23--S24-24 4 I I2- AI- - - - - FI MIAIM - -IAI SI �INU \14::07 J I \ 1 \`//I,1 /I 11\ 1 I` /I 1/I 1 JI♦\ - - -AMI -I1 IZIS 44 5I6I7IB-IA SI Inlelt.BA�seI GS '�'5+0p to 127+0�0 �A1 PH 1. STAi�E:2A-1 • Place 1st Lift Lime Treted Sub -Grade Ste. 127+00 to 147+00 . At PH 1 ■ Excavation / Embank nent Sta. 100+00 to 127+00 - N PH 1 STAGE 2A Cure 1 st Lift Lime Ties led Sub -Grade Sta. 127+00 to 1 17+00 - Al PH 1 Place 2nd Lift / Finish -ime Treated Sub -Grade Sta. 121+00 to 147+00 - r Cure 2nd Lift Lime Treated Sub -Grade Sta. 127+00 to 147+00 Al :PH Multiple Crews — Place 10 CRCP (w Curb) Sta. 127+00 to 147+00- 41 PH STAGE r Install Electrical Cond ilt Area 1 STA 100 to STA 147 -PH 1 STAGE 2A •, Place 1st Lift Lime mated Sub -Grade Sta. 100+00 t r 127+00 - Al PH r Cure 1st Lift Lime T eated Sub -Grade Sta. 100+00 to 127+00 - At PH Removal / Excavati m Driveways Sta. 100+00 to 121 +00 -At PH 1 ST : : : ■ Place 2nd Lift l Fini sh Lime Treated Sub -Grade Sta. 100+00 to: 127+01 Cure 10" CRCP'. (w Cum) Sta. 127+00 to 147+00 - 411 PH 1 STAGE 2 r FPS Inlet Tops Sta 127+OD to 147+00 -At PH 1 Sl AGE 2A (4 EA) r Cure 2nd Lift Lime Treated Sub -Grade Sta. 100+00 to 127+00 -All P :. :. :. : : : :. r• :. Place 10" CRCP (w Curb) Sta. 100+00 to 127+C-0 -..At PH 1 STAG . .. .. .. .. .. .. .. • Cure 10" CRCP (w Curb) Sta. 100+00 to 127+0 D -At PH 1 STAG ■ Place Drivewa vs Sta. 100+00 to 127+00 -At PH 1 STAGE 2A ■ FPS Inlet Topi Sta. 100+00 to 127+00 -At PF 1 STAGE 2A (15 FPS: Flatwod /Mist. Finishes -All PH 1 STAC �E 2A '.. ■ Dress Slopes / Rough Grade Culvert Ditch lea -At PH 1. STG Place Temp Striping /Set Temp Traffic Contml - Switch Traffic it - • Place Larg a Stone Rip Rap Culvert Ditch Pea -AL PH 1 STA Asphalt Millings Pavement remoul Bowman Roberts Rd STH -At PH 1 STAGE 2A o FPS Bowman Roberts. Rd Ck I AB Culvert (North) 4EA9' X 5'- r,11 PH 1 STAGE 2f o Remove Pavement Bowman Ro )erts Rd STH -At PH 1 STAGE 2A u Asphalt Millings Pavement removal Bowman Roberts Rd NTH -A I PH'1 STAG 2A — Relocate 16" DI Existing Way L'neA1 PH 1 STAGE 2A - r Remove Pavement NTH - Bowman Roberts Rd Al PH 1 STAGE. 2A r Excavation / Embankment',Sub� 3rede Bowman Roberts Rd NTF -,At PH 1 STAG ■ Place 1st Lift Lime Treated Sul -Grade Bowman Roberts Rd NT I -At PH 1 STAG r Cure 1 st Lift Lime Treated Sub Grade Bowman Roberts Rd NIT i - Al PH 1 STAG Place 2nd Lift? Finish Lime Treated Sub -Grade Bowman Roberts Rd. NTH: -At PI r Cure 2nd Lift Lime Treated'Sr bGrade Bowman Roberts Rd N fH'-A1'PH 1STA r Place 10" CRCP (w Curb) Brsrtoan Roberts Rd NTH -Al PH 1 STAGE 2A r_ FPS South MBC Headwal Footing -At PH 1 STAG 2A ELB Bowman Roberts Rd wk MB Culvert (South/Crossing) 1EA9' X 5' -A1 PI . . -" Multiple crews � � : � CRCP (W Curb) � NTH -A1 PH 1 STAGE 2A: • Cure 1p"CR Bcsman Roberts Rd ■ FPS South MBC Headw dl & Closure -At PH 1 STAGE 24 r Excavation ./ Embankment SubGrede.Bowman Roberts \d STH - All PH • Place list Lilt Lime Treal ad Sub -Grade Bowman Roberts Rd STH -Al PH r : Cure Lime Treated Sub Grade Bowman Roberts Rd SP I - At PH 1 STAG r Place 2nd Lit / Finish line Treated Sub -Grade Bomar Roberts Rd STH Cromwell Marine Creek Rd. - City of Fort Worth P6 Schedule - Progress Update SEPT 2024 DD 09/22/2024 Page 9 of 17 SUNDT Ska Grit RV.. CoFW - Cromwell Marine Creek RD - September 2024 UPD 07 Ac tivity ID Activity Al P1 S2A-2400 Name Cure 2nd Lift Lime Treated Sub -Grade Bowman Roberts Rd STH -At PH 1 STi Original Duration 2 Start 20-Mar-25 Finish 21-Mar-25 Total Float -15 Al P1S2A-1210 Place 10" CRCP (w Curb) Bowman Roberts Rd STH -Al PH 1 STAGE 2A 3 24-Mar-25 27-Mar-25 -9 Al P1S2A-1165 FPS Flatwork Bowman Roberts Rd -Al PH 1 STAG 2A 4 28-Mar-25 03-Apr-25 -0 Al P1S2A-2140 Cure 10" CRCP (w Curb) Bowman Roberts Rd STH -Al PH 1 STAGE 2A 7 28-oar-25 03-Apr-25 -16 Al P1S2A-1180 Temp Striping Bowman Roberts Rd -At PH 1 STAGE 2A IF BOB HANGER ST (INTERSECTION) 2 044r-25 07-Apr-25 -9 Mill UFFINES BLA 8Jun-25 Al P1S2A-2410 Asphalt Millings Pavement removal Huffines Blvd. STH -Al PH 1 STAGE 2A 2 054Mar-25 07-Mar-25 -4 Al P1S2A-2000 Remove Pavement Huffines Blvd. STH -Al PH 1 STAGE 2A 2 10-Mar-25 11-Mar-25 -4 Al P1S2A-2420 Asphalt Millings Pavement removal Bob Hangers St. NTH -At PH 1 STAGE 2A 2 10-Mar-25 11-Mar-25 12 Al P1S2A-2010 Remove Pavement Bob Hangers St. NTH -At PH 1 STAG 2A 2 13-Mar-25 14-Mar-25 12 A1P1S2A-2020 Excavation / Fine Grade Huffines Blvd. STH -At PH 1 STAGE 2A 2 25-Apr-25 28-Apr-25 -13 Al P1S2A-2030 Place 1st Lift Lime Treated Sub -Grade Huffines Blvd. STH Al PH 1 STAGE 2A 4 29-4r-25 02-May-25 -13 Al P1S2A-2050 Excavation / Fine Grade Bob Hangers St. NTH -At PH 1 STAGE 2A 2 29-Apr-25 30-Apr-25 5 Al P1S2A-2250 Cure 1st Lift Lime Treated Sub -Grade Huffines Blvd. STH Al PH 1 STAGE 2A 3 03-May-25 05-May-25 -4 Al P1S2A-2260 Place 2nd Lift / Finish Lime Treated Sub -Grade Huffines Blvd. STH Al PH 1 STi 2 07-May-25 08-May-25 -2 Al P1 S2A-2080 Place 1 at Lift Lime Treated Sub -Grade Bob Hangers ST NTH Al PH 1 STAGE, 2 09-May-25 12-May-25 0 Al P1S2A-2430 Cure 2nd Lift Lime Treated Sub -Grade Huffines Blvd. STH Al PH 1 STAGE 2A 2 09-May-25 10-May-25 -2 A1P1S2A-2070 Place 10"CRCP (w Curb)- Huffines Blvd STH Al PH 1 STAGE 2A 312-May-25 15-May-25 -1 Al P1S2A-2270 Cure 1st Lift Lime Treated Sub -Grade Bob Hangers ST NTH Al PH 1 STAGE 2 3 13-May-25 15-May-25 0 Al P1S2A-2060 FPS Ratmrk Huffines Blvd. STH -At PH 1 STAGE 2A 4 16-May-25 21-May-25 4 A1P1S2A-2150 Cure 10"CRCP (w Curb)- Huffines Blvd STH At PH I STAGE 2A 716-May-25 22-May-25 10 Al P1S2A-2280 Place 2nd Lift / Finish Lime Treated Sub -Grade Bob Hangers ST NTH Al PH 1 2 16-May-25 19-May-25 0 Al P1S2A-2470 Cure 2nd Lift Lime Treated Sub -Grade Bob Hangers ST NTH Al PH 1 STAGE: 3 20-May-25 22-May-25 0 A1P1S2A-2100 Place 10" CRCP (w Curb) - Bob Hangers St. NTH -Al PH 1 STAGE 2A 2 23-May-25 27-May-25 0 Al P1S2A-2090 Temp Striping Huffines Blvd. STH -Al PH 1 STAGE 2A 2 23-May-25 27-May-25 4 Al P1S2A-2160 Cure 10" CRCP (w Curb)- Bob Hangers St. NTH - Al PH 1 STAGE 2A 7 28-May-25 03Jun-25 0 Al P1S21A-211 FPS Ratwork Bob Hangers St NTH -At PH 1 STAGE 2A 4 29-May-25 03Jun-25 0 Al P1 S2A-2040 Temp Pavement Bob Hangers -At PH 1 STAGE 2A 3 29-May-25 02Jun-25 1 Al P1S21A-21: Temp Striping Bob Hangers St NTH -At PH 1 STAGE 2A 2 04Jun-25 06Jun-25 0 Al Pl Sl-1200 Place Temp. Pavement Ciomwell/ Huffnes Blvd. Al PH 1 STAGE 2A 146+001 3 16Jun-25 18Jun-25 -17 WFMINGM A2P1 S2A-15E Excavate / Fine Grade Footing CIP Wall RW-03 3 13-Mar-25 17-Mar-25 -4 A2P1SZA-15£ FPS Footing CIP Wall RW-03 8 18-Mar-25 31-Mar-25 d A2P1S2A-16C FPS CIP Wall RW-03 15 01-Apr-25 2&4r-25 -0 A2P1S2A-161 Install 6" Pipe Underdrain Ty 6 CIP Wall RW-03 2 28-Apr-25 29-Apr-25 -4 A2P1S2A-16E Select Ball CIP Wall RW-03 6 304r-25 08-May-25 4 A2P1S2A-162 FPS Retrofit Rail Ty C221 CIP Wall RW -03 10 09-May-25 27-May-25 -0 A2P1S2A-164 FPS Mow Strip CIP Wall RW-03 4 29-May-25 03Jun-25 -4 A2P1S2A-16: ApplyAnti-graffiti coating CIP Wall RW-03 6 04Jun-25 13Jun-25 -4 AREA 2 - (HILIF FINES A2P1S2A-1000 BLVD 11 MARINE CREEK BRIDGE) rr rr Set Up Timffic Contml-A2PH 1ST2A 5084Jov-24 15-Nov-24 -4 A2P1 S2A-1265 Place Striping / Set Traffic Control - Switch Traffic into Crystal Lake Dve PH 1 ST 3 184Jov-24 22-Nov-24 5 A2P1S22A-1210 Sanitary Sewer Line Adjustment -179a00-A2 PH 1 STAGE 2A 5 26-Nov-24 05-Deo-24 5 A2P1S22A-1170 Misc. Removals-A2 PH 1 STAGE 2A 7 06-Deo-24 20-Dec24 5 ♦ Milestone Actual Level of Effort r- Remaining Level of Effort Actual Work Remaining Work r_ Critical Remaining Work 23--Seep-24 14:017 �I22 23JIAI5IOINI-IJIFIMIAIMI--IAISI°INI- - - -I- --I1IljSI4OI5I6I7I6I91A711^I1I1JAl 1/I1OI7 t 1I\GJIJLIIri IZILI'LIL LILI �3131 I { r Cure2nd. Lift Lime reed Sufi -Grade Bowmanobert Rd S -A1 PH r Place '10" CRCP (W Cr rb) Bowman Roberts Rd STH-Al PH 1 STAGE 2 s FPS Flatwork Bowmar Roberts Rd -Al PH 1 STAGE :A ■ Cure 10" CRCP (w Cr rb) Bowman Roberts Rd STH -, \1 PH 1 STAGE 2 Temp Striping Bowmn Roberts Rd Al PH 1 STAGE 2A: r Asphalt Millings Paveme it removal Huffines Blvd. STH -r U PH 1 STAGE 2 - i Remove Pavement Hut ines Blvd. STH -At PH 1 STAGE: 2A i Asphalt. Millings Pavemht removal Bob Hangers St. NTI I -At PH 1 STAG i Remove Pavement Bot Hangers St. NTH -At PH I STAG 2A r Excavation / Fine G ade Huffines Blvd. STH -At PH 1 STAGE 2A Place tat Lift Lime'freated Sub -Grade Huffines Blvd. STH Al PH.1 ST i Excavation '/ Find G ade Bob Hangers St. NTH Al 13H 1 STAGE 2A i Cure 1 st Lift Lime Treated Sub -Grade Huffines Blvd STH At PH 1 SF r Place 2nd Lift / Fin sh Lime Treated Sub -Grade Huf ines Blvd. STH Al r Place 1st Liff,Lime TreatedSub-Grade Bob.. Hange►` ST NTH Al PH 'Cure 2nd Lift Lime Treated Sub -Grade Huffines BM I. STH At PH 1'S r Place ION CRCP (v Curb) - Huffines Blvd STH At PH I STAGE 2A r Cure 1 st Lift Lime Treated SubGmde Bob Hanger, ST NTH Al PH 1 - r l FPS Flatwork Hut ines Blvd. STH Al PH I STAGE: 2A -- r Cure 10"CRCP (v Curb) - Huffines Blvd STH Al PH 1 STAGE 2A r Place 2nd Lift / Fir ish Lime Treated Sub -Grade Bcb Hangers ST NIT r Cure 2nd Lift Limy r Treated Sub -Grade Bob Hangers ST NTH Al PH d Place 10"CRCP (w Curb) - Bob Hangers St'. NTH -At PH I STAGE - - Temp Striping Hu Fines Blvd. STH -AI PH 1 STAC= 2A - m Cure 10" CRCP (w Curb) - Bob Hangers St. NTH - Al PH 1 STAGE FPS Flatwork Bo 3 Hangers St NTH -At PH 1 STAGE 2A Temp. Pavement Bob Hangers -At PH 1'STAGE 2A r Temp Striping Bob Hangers St NTH -At PH 1 S AGE 2A - r Place Temp..Privement Cmmwell/Huffines Blv�A1 PH1.STAGE i Excavate / Fine Grade footing CIP Wall RW-03 ■ FPS Footing CIP Nall RW-03 FPS CIP Wall RW-03 1 Install 6' Pipe Unde ^drain Ty 6CIP Wall RW03 ■ Select Backfill CIP JJall RW-03 FPS Retrofit Rail Ty C221 CIP Wall RW - 03 i FPS Mow Strip C IP'Wali RW-03 ApplyAnti-graffi i coating CIP Well RN-03 Cromwell Marine Creek Rd. - City of Fort Worth P6 Schedule - Progress Update SEPT 2024 DD 09/22/2024 ■ Set Up. Traffic Contml - A2. PH 1 S f 2A r.. Place Striping / Set Traffic Control - Switch; Traffic into Crystal Lake )ve PH 1 STAGE rr Sanitary Sewer Line Adjustment 179+00 -A2 PH 1 STAGE 2A w Misc. Removals -A2 PH 1 STAGE 2A Page 10 of 17 SUNDT Ska Grit RV.. CoFW - Cromwell Marine Creek RD - September 2024 UPD 07 tivity, ID A2PIS21113-110801 Activity Name ELB Drainage w Inlets-A2 PH 1 STAGE2A (3 EA) Original Duretion 10 Start 03-Feb-25 Finish 21-Feb-25 Total Float -16 A2P1S22A-1000 Remove Existing Conc. Pavement-A2 PH 1 STAGE 2A 7 24-Feb-25 05-Mar-25 -15 A2P1S22A-1180 Excavation / Embankment-A2 PH 1 STAG 2A 10 07-Mar-25 24-Mar-25 -15 Al P1S2A-2440 Install Electrical ConduitArea 2 STA 147 to STA 186 -A2 PH 1 STAGE 2A 2 21-Mar-25 24-Mar-25 -15 A2P1S22A-1190 Place 1st Lift Lime Treated Sub -Grade -A2 PH 1 STAGE 2A 7 25-Mar-25 04-Apr-25 -15 A2P1S22A3050 Cum Lime Treated Sub-Grade-A2 PH 1 STAGE 2A 3 05-Apr-25 07-Apr-25 -25 A2P1S22A3030 Excavation / Embankment City Streets -A2 PH 1 STAGE 2A 5 07-Apr-25 14-Apr-25 -13 A2P1S22A3060 Place 2nd Lift / Finish Lime Treated SubCrede -A2 PH 1 STAGE 2A 5 09-4r-25 1&Apr-25 -14 A2P1S22A3070 Cure 2nd Lift Lime Treated Sub -Grade -A2 PH 1 STAGE 2A 2 16-Apr-25 17-Apr-25 -25 A2P1S22A-1200 Place 10"CRCP(w Curb)-A2 PH I STAGE 2A 20 18-Apr-25 21-May-25 3 A2P1S22A-1540 Place City Street-A2 PH 1 STAGE 2A (5 EA) WEST 15 18-Apr-25 13-May-25 -16 A2P1S22A3080 Place City Street-A2 PH 1 STAGE 2A (5 EA) EAST 15 15-May-25 10-Jun-25 -16 A2P1S22A3040 Cure 10" CRCP (w Curb)-A2 PH 1 STAGE 2A 7 22-May-25 28-May-25 11 Al Pl Sl-1220 Place Temp. Pavement Stone Water Bend Trail A2 PH 1 STAGE 2A 185+00 to 3 19Jun-25 23Jun-25 -17 A1P1S21C-1070 FPS FlatworkA2 PH 1 STAGE 2A 7 24Jun-25 03-Jul-25 -17 MARINE CREEK BRIDGE 149 22Jul-24A 05-May-25 UTIL-CFW-130 CFTW 20" Waterl-he Sta. 177+00 tD 183+00 P2S1 15 22Jul-24A 05-Aug-24A UTILCFW-193 RFI#07 20"-WalsrLinea4ustments 15 24Jul-24A 27Sep-24 -1 A2P1S2A-1120 Install Drill Shafts Marine Creek Bridge - Bents 2 & 3 10 EA 136" Diam. 6 29Jul-24A 08-Aug-24A Al Pl Sl-1250 Set Up Traffic Control / Temp. Bander at Bridge -A2 PH 1 STAGE 2A 4 12-Aug-24A 15-Aug-24A A2P1S2A-1110 Remove Existing Bridge Deck OH / Wingwall &Abut Cap -A2 PH 1 STGA 8 19-Aug-24A 27-Aug-24A A2P1S2A-1100 Remove Existing C223 Rail & Bridge Deck-A2 PH 1A 5 21-Aug-24A 22-Aug-24A A2P1S2A-1130 FPS Columns Marine Creek Bridge -8 EA 8 30-Aug-24A 09-Sep-24A UTILCFW-194 CFTW 20" Water LIna Sta. 17 5+0 0 tD 177+00 P2S1 5 30Sep-24 04Oct-24 -1 UTILCFW-195 CFTW 20" Water Lha Sta. 18 3+0 0 to 187+00 P2S1 5 07-W-24 11-W-24 -1 A2P1S2A-1670 Install Drill Shafts Marine Creek Bridge -Abuts 1 & 4 10 EA 136" Diam. 9 14-Oct-24 28Oct-24 -1 A2P1S2A-1140 FPS Column Extensions Marine Creek Bridge -12 EA 8 29-Oct-24 12-Nov-24 -1 A2P1S2A-1150 FPS Cap - Bent 02 Marine Creek Bridge 5 14-Nov-24 22-Nov-24 -1 UTILCFW-191 CFTW 20" Waterl-he Tie In P2S1 5 18Nov-24 22-Nov-24 3 A2P1S2A-1160 FPS Cap - Bent 03 Marine Creek Bridge 5 26-Nov-24 05-Deo-24 -1 A2P1S2A-1170 FPS Abutment - Bent 01 Marine Creek Bridge 8 13Jan-25 27Jan-25 3 A2P1S2A-1180 FPS Abutment- Bent 04 Marine Creek Bridge 8 28Jan-25 11-Feb-25 3 A2P1S2A-1480 FPS Bridge (6) Rip Rap - Marine Creek Bridge 7 19-Feb-25 28-Feb-25 3 A2P1S2A-1190 Install Concrete Girders TX 34's Marine Creek Bridge -21 EA 2 03-Mar-25 05-Mar-25 3 A2P1S2A-1200 Install OH Bridge Deck/ EoD -Marine Creek Bridge 5 07-Mar-25 14-Mar-25 3 A2P1S2A-1210 Install Precast Concrete Panels Bridge Deck- Marine Creek Bridge 5 10-Mar-25 17-Mar-25 3 A2P1S2A-1490 Install 4"SEJ Bridge Deck - Marine Creek Bridge 4 1B-Mar-25 24-Mar-25 3 A2P1S2A-1220 Install Reber Bridge Deck- Marine Creek Bridge 2 25-Mar-25 27-Mar-25 3 A2P1S2A-1230 FPS Bridge Deck - Marine Creek Bridge 3 28-Mar-25 01-Apr-25 3 A2P1S2A-1250 FPS Approach Slabs - Marine Creek Bridge 4 09-Apr-25 14-Apr-25 3 S2A-1260 FPS 6' Conc. Sidewalk- Marine Creek Bridge 3 1 &Apr-25 17-Apr-25 152P1S2A-1240FPS rA2P1 C223 Rail - Marine Creek Bridge 8 18-Apr-25 014Nay-25 152P1S2A-1270 FPS 4' Conc. Median - Marine Creek Bridge 2 02-May-25 05-May-25 18 RETAINING WALL WB-1 M 119 26-Nov-24 02-Jul-25 98 ♦ Milestone r_ Actual Level of Effort r- Remaining Level of Effort Actual Work r_ Remaining Work r_ Critical Remaining Work 4 J I J I 11 I -/11 f J 23--Sefp--2414:07 I I2iAISIl7l NI-I�IFIMIAIMI- -IAISI.INIU IFI MIA- - I1IZIS 4CISI6I7I- 9�LB` Imina ewInlOel PH1 STACi�2LI11LiL :�31313I 3I Il!iN o Remove Existing Conc. Pavement-A2 PH 1 STAGE 2A o Excavation / Embankment -A2 PHI STAG 2A u Install Electrical Condu t Area 2 STA 147 to STA 186 -A: PH 1 STAGE 2A o Place let Lift Lime Tre3ted Sub -Grade -A2 PH 1 STArE 2A - r Cure Lime Treated.. Sr b-Gmde -A2 PH 1 STAGE 2A • Excavation / Embankment City Streets -A2 PH 1 STYE 2A ■ Place 2nd LAt / Finist Line Treated Sub -Grade - A2 Fi 1 STAGE 2A r Cure 2nd Lift Line Teated Sub-Grade-A2 PH l STAGE 2A o Place 10" CRCP w Curb)-A2 PH 1 STAGE 2A - o Place City Street -42 PH 1 STAGE 2A (5 EA) WE BT o Place City Stme I A2. PH 1 STAGE 2A (5 EA) LAST o Cure 10" CRCP w Cuth)'.-A2 PH 1 STAGE 2A r Place Temp. Pavement Stone Water Bend Trail A2 PH 1 STAGE ■ FPS Flatxork, k2 PH 1 STAGE 2A • C TW 20"WaterL'ne5ta:117a00'to: :183+ P281 .RFI#07 20"-WabarLineadju:iments ■ Ir tall Drill Shafts Marine Creek Bridge - Be its 2 & 3 10 EA 1 36" Diam. �,t Up 1mffic Contrdl / Temp. Banierat Bn ige A2 PH 1 STAGE 2A - - ■ Remove Existing Bridge Deck OH / Wingr gall &Abut'Cap -A2 PH 1 STGP - a :emove Existing C223 Rail & Bridge Dedc-A2 PH 1A ■ FPS Columns Marine Creek Bridge-8 EA. - r CFTW 20' Water L'ne Sta.. 175+00 to 177+01) P281 r CFTW 29'Water L'ne Sta. 183+00 k 187+00 P2S1 Install Drill Shafts Marine Creek Bnd 1e -Abuts 1 & 4 10 EA 136" Dia n. FPS Column Extensions Marine Ci eek Bridge 12 EA ■. FPS Cap- Bent 02 Marine Creek Bridge ■ CFfW 20"Water L'neTieln P259 ■ FPS Cap- Bent 03 Marine Creel Bridge. �. FPS Abutment -Bent 01 Mfiine Creek Bridge FPS Abutment -Bent 04 l.arine Creek Bridge ■ FPS Bridge (5l Rip Rap Marine Creek Bridge a Install Concrete Girders 7C 34's Marine Creek Bridge -2EA. Install OH Bridge Deck EoD - Marine Creek,. Bridge ■ Install Precast Concrete Panels Bridge Deck - Marine C eek Bridge ■ Install 4"SEJ Bridge D,rck- Marine Creek Bridge r Install Reber Bridge, Drdk - Marine Creek Bridge ■ FPS Bridge Deck- Marine Creek' Bridge ■ FPS Approach Slabs - Marine Creek Bridge --- --_. -- - -. a FPS 6 Conc. Sidewlk-Marine Creek Bridge --- -_.. • FPS C223 Rail -:Mann Creek Bridge a FPS 4' Conc. Medi, m Marine Creek Bridge Cromwell Marine Creek Rd. - City of Fort Worth P6 Schedule - Progress Update SEPT 2024 DD 09/22/2024 Page 11 of 17 SUNDT Ska Grit»e ..• CoFW - Cromwell Marine Creek RD - September 2024 UPD 07 Ac tivity ID A2P1S2A-1400 AcCrvlty Name Excavate/ Fine Grade Level Pad MSE Ret Wall WB-1 Original Duration 3 Start 26-Nov-24 Finish 02-Deo-24 Total Float J A2P1S2A-1510 FPS Level Pad and Install Underdrain MSE Ret Wall WB-1 2 04-Dec24 05-Dec-24 -1 A2P1S2A-1410 Install Panels / Backfll MSE Rat Wall W3-1 5 06-Deo-24 16-Deo-24 -1 A2P1S2A-1440 Install Coping MSE Ret WaII WB-1 2 13-Feb-25 14-Feb-25 -2 A2P1S2A-1460 FPS Ty C223 Rail MSE Ret Wall WB -1 6 02-May-25 12-May-25 15 A2P1S2A-1520 FPS Moment Slab MSE Ret Wall WBA 10 13-May-25 3D-May-25 15 A2P1S2A-1530 FPS Mow Strip MSE Ret We WB-1 10 02Jun-25 17Jun-25 98 A2P1 S2A-1540 ApplyAnti-graffiti coating MSE Ret Wall WB-1 10 18Jun-25 02Jul-25 98 RETAINING WALL WB-2 126 04-Deo-24 8Jul-25 A2P1S2A-1420 Excavate / Fine Grade Level Pad MSE Ret Wall WB-2 5 04-Dec24 10-Deo-24 3 A2P1S2A-1500 FPS Level Pad and Install Underdrein MSE Ret Well WB-2 4 12-Deo-24 20-Deo-24 3 A2P1S2A-1430 Install Panels / Backfll MSE Ret Wall W3-2 10 24-Dec24 10Jan-25 3 A2P1S2A-1450 Install Coping MSE Rat WaII WB-2 3 13-Feb-25 18-Feb-25 3 A2P1S2A-1470 FPS Ty C223 Rail MSE Ret Wall WB -2 10 13-May-25 30-May-25 15 A2P1S2A-1550 FPS Moment Slab MSE Rat We 11 WB-2 10 02Jun-25 17Jun-25 15 A2P1S2A-1560 FPS Mow Strip MSE Rat We WB-2 10 18Jun-25 02Jul-25 98 A2P1 S2A-1570 AppyAnti-graffiti coating MSE Ret Wall WB-2 10 03Jul-25 18Jul-25 98 A3P1S2A-1540 Set Up Traffic Control - A3 PH 1 STAGE 2A 3 22-N0v-24 27-9ov-24 4 A3EWP-1020 FPS 10' X 7' (2) M Box Culvert Extension @ Sta. 188+00 Area 3 20 02-Dec24 10Jan-25 4 A3EWP-1030 FPS RCP 60" Extension @ Ste. 201+50 Area 3 3 13Jan-25 16Jan-25 4 A3P1S2A-1180 FPS MBC Headwall Stmcture-A3 PH 1 STAGE 2A 10 17Jan-25 05-Feb-25 4 Al EWP-1040 ELB Culvert Extensions Tie Ins with Existing 12 07-Feb-25 27-Feb-25 4 A3P1S2A-1000 ELB Drainage-A3 PH 1 STAG 2A-WEST 12 24-Feb-25 14-Mar-25 -16 A3P1S2A-1620 ELB Drainage-A3 PH 1 STAG 2A-EAST 12 17-Mar-25 04-Apr-25 -16 A3P1S2A-1010 Excavation / Embankment-A3 PH 1 STAGE 2A 11 07-Apr-25 23-Apr-25 -7 A3P1S2A-1590 FPS Inlet Bases-A3 PH 1 STAG 2A It EA) 20 07-Apr-25 08-May-25 -16 A3P1S2A-1020 Place 1st Lift Lime Treated Sub -Grade - A3 PH 1 STAGE 2A 6 09-May-25 19-May-25 -16 A3P1S2A-1560 Cure Lime Treated Sub -Grade- A3 PH 1 STAGE 2A 3 20-May-25 22-May-25 -28 A3P1S2A-1580 Misc. Removals @ Roundabout - A3 PH 1 STAGE 2A 4 20-May-25 27-May-25 -4 A3P1S2A-1570 Place 2nd Lift/ Finish Lime Treated Sub -Grade - A3 PH 1 STAGE 2A 3 23-May-25 29-May-25 -17 A3P1S2A-1110 Build Temp. Pavement @ Roundabout -A3 PHI STAGE 2A 5 29-May-25 04Jun-25 -4 A3P1S2A-1610 Cure 2nd Lift Treated Sub -Grade - A3 PH 1 STAGE 2A 2,301 31-May-25 30 A3P1S2A-1030 Place 10"CRCP (w Curb)- A3 PH 1 STAGE 2A 15 02Jun-25 24Jun-25 -16 A3P1S2A-1550 Cure 10" CRCP (w Curb)- A3 PH 1 STAGE 2A 7 25Jun-25 01Jul-25 -23 A3P1S2A-1600 FPS Inlet Tops-A3 PH 1 STAGE 2A It 1 EA) 5 26Jun-25 02Jul-25 -16 A3P1S2A-1160 Dress Slopes / Rough Grade Culvert Ditch Area -A3 PH 1 STAGE 2A 4 11-Aug-25 15-Aug-25 33 A3P1S2A-1170 Place Large Stone Rip Rap Culvert Ditch Area -A3 PH 1 STAGE 2A 5 18-Aug-25 22-Aug-25 33 Al P1 S2B-1550 Set Up Traffic Control / Switch Traffic to Al PH 1 STAGE 213 I5 09-Apr-25 I 15-Apr-25 -9 Al P1S2B-1640 Asphalt Millings Pavement removal Bowman Roberts Rd STH -A1 PH 1 STAGE 2 16-Apr-25 17-Apr-25 -9 A1P1S2B-1180 Remove Pavement/ Detour Bowman Roberts Rd STH -At PH 1 STAGE213 4 18-Apr-25 254r-25 -9 A1P1S213-1100 Remove Pavement/Temp. DetourBowman Roberts Rd NTH-A1 PH1STAGE 428-Apr-25 01-May-25 -9 ♦ Milestone r_ Actual Level of Effort r— Remaining Level of Effort Actual Work r_ Remaining Work r_ Critical Remaining Work 23--Seep--2414:017 �I2JIAISIOINI-IJIFIMIAIMI-I J IAISIOINID JIFIMIAIMI-I1IZIS1111tN6l7I8I91A7finI1I1lA1l1I1O`7I1t r I JJJ J I J J /I /I /I 1fGJJ21AIMJL1LILI2ILILI1313 cavate e Grade Level Pad SSE Ret Wall NB-1 FPS Level Pad and Install Unceiimin MSE Rat Wall WB4 ■ Install Panels/ Backfill MSE Re] Well W3-1 r Install Coping MSE Ret VuIIWB-1 • FPS Ty C223 Rail NSE Rat Wall WB - 1 FPS Moment Sb MSE Rat Wall W137 '.. .. '.. '.. -_. FPS Mow Strip MSE Ret WaIW&1 - ■ ApplyAnti-gmi flti coating MSE Ret Wall WB-1 ■ Excavate / Fine Grade Level Pad MSE Ret WaII WB-2 ■ FPS Level Pad and Install Und, adrein MSE Ret Wail WB 2 Install Panels / Badffill MSE Fet Wall WB-2 '.. '.. '.. • Install Coping MSE Ret Vall WB 2 '.. '.. '.. FPS Ty C223 Rail MSE RetWall WB-2 FPS Moment Cab MSE Rat Wall WB-2 P FPS Mow Strip MSE Ret Wa I W B-2 _ Appl And-gr 0di coating MSE Rat Wall WB, - Cromwell Marine Creek Rd. - City of Fort Worth P6 Schedule - Progress Update SEPT 2024 DD 09/22/2024 . Set. Up Traffic Contml - A3 PH 1 31AGE 2A ',FPS 10' X:7' (2) M Box Culvei t Extension @ Sta. 188+00 Areu 3': r FPS. RCP 60" Extension @ Me. 201+50 Area 3 FPS MBC Headwall Struck re -A3 PH 1 STAGE 2A o ELB Culvert Extensions lie Ins with Existing o ELB:Drainai STAGE2A-WEST ELB Drainage-A3 PF 1 STAG 2A-EAST Excavation / Emban anent -A3 PH 1 STAG 2A FPS Inlet Bases A.3 PH 1 STAGE 2A (11 EA) • Place 1 st Lift Lime Treated Sub -Grade A3 PH 1 : STAGE 2A r Cure Lime Treate I Sub -Grade - A3 PH 1 STAGE:?A •. Misc. Removals @ Roundabout - A3 PH 1 STAG E 2A. Place 2nd Lilt Ri fish Lime Treated Sub -Grade - Al3 PH 1 STAGE 2) • Build Temp. Pavement @ Roundabout - A3 PH I STAGE 2A r Cure 2nd Lift Tre ited Sub -Grade - A3 PH 1 STAGE 2A - Place 10" CRCP (w Curb) - A3 PH 1 STAGE 2L Cure 10 CRCP (w'Curb) - A3 PH 1STAGE 2L r FPS Inlet Topi -A3 PH 1 STAGE ZA (11 EA) r- Dress Slol xis / Rough Grade Culvert Ditch Area -A3 PH 1 S- r Place Large Stone Rip Rap Culvert Ditch, \rea ; A3 PH 1 ST ■ Set Up Traffic Control / Switch Traffic to Al PH 1. STAGE 2B r Asphalt Millings Pai removal Bowman Roberts Rd STH -At PM • Remove Pavement ' Detour Bowman Roberts Rd S-H-At PH 1 STA- r Remove. Pavement / Temp. Detour Bauman RD bens Rd NTH -Al PF Page 12 of 17 SUNDT SkilL Grit RV.. CoFW - Cromwell Marine Creek RD - September 2024 UPD 07 23--Se�p--24 14:017 Activity ID Activity Name Original Start Finish Total 4I22Al _ -I -I-I-I_ _ -I -I _I- - I -II IZ1: 4I5I6I7I8 9I 711`1I, 111 1�I7I1 1�GI 21��ZIL 'LI 21 L, L1 :i 3 313)3 3�33 Duretion Float I J S O N J F M A M A S O N LJ J F M A M J A S O N J F M A MB A S O N CJ J F M A M A S O N J F A M J J Al P1S2B-1600 Build Te In Cromwell Marine 1 Bowman Roberts Rd STH- Al PH 1 STAGE 2B 5 28-Apr-25 02-May-25 5 Al P1 S2B-1570 Place 1st Lift Lime Treated Sub -Grade Bowman Roberts Rd NTH -At PH 1 STi 6 02-May-25 12-May-25 -9 Al P1S2B-1620 Cure Lime Treated Sub -Grade Bowman Roberts Rd NTH -Al PH 1 STAGE 2B 3 13-May-25 15-May-25 -14 Al P1S2B-1630 Place 2nd Lift / Finish Lime Treated Sub -Grade Bowman Roberts Rd NTH -At 1 2 16-May-25 19-May-25 -8 Al P1S2B-1650 Cure 2nd Lift Lime Treated Sub -Grade Bowman Roberts Rd NTH -At PH 1 ST, 2 20-May-25 21-May-25 -14 Al P1S2B-1580 Place 10" CRCP (w Curb) Bowman Roberts Rd NTH -Al PH 1 STAGE 2B 13 23-May-25 16-Jun-25 -9 A2P1S2B-1560 Build Rockhaven St. -Te Ins WB Lanes- A2 PH 1 STAGE 2B 8 12Jun-25 23Jun-25 -16 Al P1S2B-1610 Cure 10" CRCP (w Curb) Bowman Roberts Rd NTH -Al PH 1 STAGE 2B 7 17Jun-25 23Jun-25 -15 A2P1S2B-1590 Build Neptune St. - Te Ins WB Lanes - A2 PH 1 STAGE 2B 8 24Jun-25 07Jul-25 -16 A2P1S2B-1600 Build Province St. -Tie Ins WB Lanes - A2 PH 1 STAGE 2B 9 08Ju1-25 21Jul-25 -16 A2P1S213-1580 Build Crystal Lake Dve STH - A2 PH 1 STAGE 2B 10 22Ju1-25 06-Aug-25 -16 A3P1S213-1570 Build Roundabout Median / Cut De Sac- A3 PH 1 STAGE 2B 5 07-Aug-25 14-Aug-25 39 Al P1S2C-1500 Set Up Trefc Control / Switch Traffic to Al PH 1 STAGE 2C 3 29Ju1-25 31Jul-25 -26 A1P1S2C-1060 Relocate Exist. 24"Water Lim -At PHI STAGE 2C 2001-Aug-25 02Sep-25 -26 A1P1S2C-1640 Hydrostatic Test, Clean, Disinfect &Batt. Test 24"Water Line -At PHI STAGE 703Sep-25 15Sep-25 -26 Al P1S2C-1650 Asphalt Millings Pavement removal Cromwell Marine Rd (STA 125-129)-At PI 3 16Sep-25 19Sep-25 -26 Al P1S2C-1110 Remove Existing Pavement Cromwell Marine Rd (STA 125 -127) -At PH 1 STA 3 22Sep-25 25Sep-25 -26 Al P1S2C-1130 FPS North MBC Headwall Footing -At PH 1 STAGE 2C 10 26Sep-25 13-Oct-25 -26 A3P1S2C-1100 ELB MB 9' X 5' Culvert Te In to previous phase -At PH 1 STAGE 2C 7 26Sep-25 06-Oct-25 -26 Al P1S2C-1120 Remove Existing Pavement Cromwell Marine Rd (STA 127 -129) -Al PH 1 STA 3 26Sep-25 30Sep-25 -9 A2P1S2C-1090 ELB Box Culvert 5' X3' -A1 PH 1 STAGE 2C 10 01-Oct-25 16-Oct-25 -9 A2P1S2C-1130 ELB MB 9' X 5' Culvert -At PH 1 STAGE 2C 20 08-W-25 11-Nov-25 -4 Al P1S2C-1660 FPS North MBC Headwall Structure -Al PH 1 STAGE 2C 20 14-Oct-25 19-Nov-25 -26 A3P1S2C-1610 Build Te In Cromwell Marine 1 Bowman Roberts Rd STH- A2 PH 1 STAGE 2C 10 17-Oct-25 03-Nov-25 -9 A1P1S2C-1610 Build New RoundaboutArea-A3 PH 1 STAGE 2C 10 05-Nov-25 25-Nov-25 -9 A2P1S2C-1140 Place CSB between Culvert Barrels -At PH 1 STAGE 2C 3 13-Nov-25 19-Nov-25 -4 A1P1S2C-1670 FPS North MBC Closure Pour -Al PH 1 STAGE 2C 10 21-Nov-25 11-Deo-25 -26 A2P1S2C-1120 Build Temp. Pavement -A2 PH 1 STAGE 2C (153+00 to 156+OOAREA 2) 5 26-Nov-25 08-Dec25 -9 Al P1S2C-1630 Demo Existing & FPS South MBC Headwall Structure -At PH 1 STAGE 2C 15 15-Dec25 12Jan-26 -26 >■ Al P2S1A-1710 r •■ :■• ■ rr rr rr Install Temp. Traffic Signals at Boat Club Rd -At PH 2 STAGE 1A ■ 20 16-Apr-25 19-May-25 20 UTRL-1040 Relocate City of Fort Worth 24" Water Line -Area 111 Bowman Roberts Int. 19 20-May-25 20Jun-25 20 UTRL-1050 Hydrostatic Test, Clean, Disinfect & Bact. Test 24" Water Line -Area 111 Bowmat 10 23Jun-25 08Jul-25 20 A1P2S1A-2460 Misc. Removals -At PH 2STAGE 1A (100+00 to 127+00) 10 01-Aug-25 18-Aug-25 3 Al P2S1A-2470 ELB Drainage Line -At PH 2 STAGE 1A (100+00 to 127+00) 20 06-Aug-25 04Sep-25 3 Al P2S1A-2480 FPS Inlet Bases -At PH 2 STAG 1A ( EA) (100+00 to 127+00) 20 06-Aug-25 04Sep-25 3 Al P2S1A-2490 Excavation / Embankment -At PH 2 STAGE 1A (100+00 to 127+00) 15 05Sep-25 01-Oct-25 3 Al P2S1A-2500 Install Electrical Conduit -At PH 2 STAGE 1A (100+00 to 127+00) 2 02-W-25 03-W-25 3 Al P2S1A-1000 Temp Striping -Al PH 2 STAGE 1A 3 21-Nov-25 25-Nov-25 -4 Al P2S1A-1010 Set Up Traffic Control and Switch Traffic - Al PH 2 STAGE 1A 4 13-Jan-26 19Jan-26 -26 A1P2S1A-1020 Misc.Removals-At PH 2 STAGE 1A (127+00 to 147+00) 220Jan-26 21Jan-26 -26 ♦ Milestone r_ Actual Level of Effort r— Remaining Level of Effort Actual Work r_ Remaining Work r_ Critical Remaining Work Cromwell Marine Creek Rd. - City of Fort Worth P6 Schedule - Progress Update SEPT 2024 DD 09/22/2024 r u d : ie In. romwrl anne Bowman Roberts c13Tti-. 1 P S� • Place 1st Lift Lime Treated Sub -Grade Bowman Roeis:Rd NTH -A- Cure Lime Treatec Sub -Grade Bowman Roberts R I NTH - At PH 1 r Place 2nd Lift / Finish Lime Treated Sub -Grade Bo, man Roberts Rd r Cure 2nd Lift Lim, r Treated Sub -Grade Bowman R )berts Rd NTH -A Place 10" CRC ° (w Curb).. Bowman Roberts Rd NTH -At PH 1 S ■ Build Rockhawn St. -Te Ins WB Lanes - A2 Fi 1 STAGE 2B ■ Cure 1O" CRC o (w Curb) Bowman Roberts Rd NTH -At PH 1 S • Build Neptum St Te Ins WB Lanes A2 PF 1 STAGE 2B • Build Provine St. - Te Ins WB Lanes - A2 P i 1 STAGE 2B ■ Build Cryst+l Lake Dve STH - A2 PH 1 STYE 2B ■ Build Roundabout Median / Cul:. De Sac- :2 PH 1 STAGE 2 r Set Up Tmf 1c Contml / Swtch Treffic to Al PH 1 STAGE 2C Relocate Exist. 24"WaterUce-At PH 1 STAGE 2C ■ Hydros alit Test, Clean Dsirfect $ Bac Test 24" Water L r Asphal Millings Pavement removal Croi nwell Marine Rd I. ■. Remo Existing. Pavement. Cromwell l Aarine Rd( STA 12 ■ 'FPS North IBC Headwall':Footing -Al PH'1 STAGE 2C + ELB I AB. 9' X 5' Culvert Tie Into previo us'phase -At PH r Remr�e Existing Pavement Cromwell Marine Rd (STA 1: o ELB Box Culvert 5' X3' -Al PH 1 STLGE 2C o Ee MB 9' X!5' Cull -TAGE 2C o PS North MBC Headwall Stmctu e -At PH 1 STAC Bull Tie In Cromwell Marine I Boman Roberts Rd S- o E uilo New Roundabout Area -A3 PH 1 STAGE 2C n Face CSB between CulvertBare s -A1 PH 1 STAG FPS North MBC Closure Pour -Al PH 1 STAGE 2- Build Temp. Pavement-A2 PH STAGE 2C (153- - Demo Existing & FPS South I ABC Headwall Str o Install Temp.: Traff— Signals at Boat Club Rd -At Fi 2 STAGE 1A o Relocate City el Fort Worth 24" Water Line -Area 111 Bowman Ro o Hydrostatic T-st, Clean, Disinfect&Batt. Test 24"Water Line -A Misc. Removals -At PH 2 STAGE 1A(10C+00 to 127+00) r. ELB Dr mage Line Al PH 2 STAGE 1A (1'.00+00 to 127+ FPS Inl�- Bases' -At PH 2 STAGE 1A( I A) (100+00 to 12 r. Exca�tion / Embankment -At PH 2 STAGE 1A (100+0 r Install Electrical Conduit -Al PH2ST)AGE 1A.(100+00t ■ imp Striping -At PH 2 STAGE 1 A ■ Set Up Tiaffc Control and S Atch Traffic -Al Pl r Misc. Removals -Ai PH 2 STAGE 1A(127+00 Page 13 of 17 SUNDT SkilL Grit RV.. CoFW - Cromwell Marine Creek RD - September 2024 UPD 07 Ac tivity ID Activity Al P2S1A-1580 Name ELB Drainage Line -At PH 2 STAGE 1A (127+00 to 147+00) Original Duration 2 Start 23Jan-26 Finish 26-Jan-26 Total Float -26 Al P2S1A-1680 FPS Inlet Bases -At PH 2 STAGE 1A ( EA) (127+00 to 147+00) 2 23Jan-26 26-Jan-26 -26 Al P2S1A-1030 Excavation / Embankment -Al PH 2 STAGE 1A (127+00 to 147+00) 3 28Jan-26 02-Feb-26 -26 Al P2S1A-2450 Install Electrical Conduit -Al PH 2 STAGE 1A (127+00 to 147+00) 1 02-Feb-26 02-Feb-26 -14 Al P2S1A-1040 Place 1st Lift Lime Treated Sub -Grade -Al PH 2 STAGE 1A 6 03-Feb-26 12-Feb-26 -14 A1P2S1A-1620 Cure Lime Treated SubGrade-Al PH 2 STAGE 1A 3 13-Feb-26 15-Feb-26 -27 Al P2S1A-1630 Place 2nd Lift / Finish Lime Treated Sub -Grade -At PH 2 STAGE 1A 3 17-Feb-26 19-Feb-26 -14 Al P2S1A-1720 Cure 2nd Lift Lime Treated Sub -Grade -Al PH 2 STAGE 1A 2 20-Feb-26 21-Feb-26 -27 A1P2S1A-1050 Place 10" CRCP (w Curb) -Al PH 2 STAGE 1A 12 23-Feb-26 12-Mar-26 -14 Al P2S1A-1550 Place City Street / Driveways # 01 -At PH 2 STAGE 1A 8 23-Feb-26 06-Mar-26 1 Al P2S1A-2510 Place City Street / Driveways # 02 -At PH 2 STAGE 1A 8 09-Mar-26 20-Mar-26 1 A1P2S1A-2550 Place 10" CRCP (w Curb) -Al PH 2 STAGE 1A 12 16-Mar-26 03-Apr-26 -14 Al P2S1A-2520 Place CityStreet / Driveways # 03 -At PH 2 STAG 1A 9 23-Mar-26 06-Apr-26 1 A1P2S1A-1590 Cure 10"CRCP (w Curb) -Al PH 2STAGE IA 7 044r-26 10-Apr-26 3 A1P2S1A-1690 FPS Inlet Tops- Al PH 2 STAGE 1A (EA) 806-Apr-26 17-Apr-26 -6 BOB Al P2S1A-1700 • Install Temp. Traffic Signals at Huffines BMd. -Al PH 2 STAGE 1A 20 •.• 06 Dct-25 10-Nov-25 3 Al P2S1A-1080 Remove Pavement Huffines Blvd. STH -At PH 2 STAGE 1A 2 03-Feb-26 04-Feb-26 -24 Al P2S1A-1750 Asphalt Millings Pavement removal Huffines Blvd. STH -Al PH 2 STAGE 1A 2 03-Feb-26 04-Feb-26 -26 Al P2S1A-1760 Asphalt Millings Pavement removals Bob Hangers NTH -Al PH 2 STAG 1A 2 06-Feb-26 09-Feb-26 -26 Al P2S1A-1090 Remove Pavement Bob Hangers NTH -At PH 2 STAGE 1A 2 11-Feb-26 12-Feb-26 -26 Al P2S1A-1560 Place 1st Lift Lime Treated Sub -Grade Bob Hangers NTH -At PH 2 STAGE 1A 6 13-Feb-26 24-Feb-26 -26 Al P2S1A-1140 Place Lime Treated Sub -Grade Huffines Blvd STH -Al PH 2 STAGE 1A 6 26-Feb-26 06-Mar-26 -20 Al P2S1A-1640 Cure Lime Treated Sub -Grade Bob Hangers NTH -At PH 2 STAGE 1A 3 26-Feb-26 03-Mar-26 -26 Al P2S1A-1650 Place 2nd Lift / Finish Lime Treated Sub -Grade Bob Hangers NTH -At PH 2 S1 2 04-Mar-26 05-Mar-26 -26 Al P2S1A-1730 Cure 2nd Lift Lime Treated Sub -Grade Bob Hangers NTH -Al PH 2 STAGE 1A 2 06-Mar-26 09-Mar-26 34 Al P2S1A-1660 Cure Lime Treated Sub -Grade Huffines Blvd STH -At PH 2 STAGE 1A 3 07-Mar-26 09-Mar-26 36 Al P2S1A-1570 Place 10" CRCP (w Curb) Bob Hangers NTH -At PH 2 STAGE 1A 8 10-Mar-26 23-Mar-26 -25 Al P2S1A-1670 Place 2nd Lift / Finish Lime Treated Sub -Grade Huffines Blvd STH - Al PH 2 S1 2 10-Mar-26 11-Mar-26 -20 Al P2S1A-1740 Cure 2nd Lift Lime Treated SubGmde Huffines Blvd STH -At PH 2 STAGE 1A 2 12-Mar-26 13-Mar-26 36 Al P2S1A-1150 Place 10" CRCP (w Curb) Huffines Blvd STH -Al PH 2 STAGE 1A 8 24-Mar-26 06-Apr-26 -25 Al P2S1A-1600 Cure 10" CRCP (w Curb) Bob Hangers NTH -At PH 2 STAGE 1A I 7 24-Mar-26 30-Mar-26 8 Al P2S1A-1610 Cure 10" CRCP (w Curb) Huffnes Blvd STH -Al PH 2 STAGE 1A 7 07-Apr-26 13-Apr-26 6 A2P2S1A-1070 BRIDGE)rr rr Set Up Traffic Control -A2 PH 2 STAGE 1A 82 2 • 07-Aug-25 r 08-Aug-25 -16 A2P2S1A-1550 Misc. Removals-A2 PH 2 STAGE 1A 10 11-Aug-25 25-Aug-25 -16 A2P2S1A-1060 ELB Drainage -A2 PH 2 STAGE 1A 20 26-Aug-25 29Sep-25 -16 A2P2S1A-1590 Install Inlet Bases -A2 PH 2 STAGE 1 A ( EA) 20 26-Aug-25 29Sep-25 -16 A2P2S1A-1480 Excavation / Embankment -A2 PH 2 STAG 1A 5 30Sep-25 06-Oct-25 -16 A2P2S1A-2460 Install Electrical Conduit Area 2 STA 147 to STA 186 -A2 PH 2 STAGE 1A 2 03-Oct-25 06-Oct-25 -16 A2P2S1A-1020 Place 1st Lift Lime Treated Sub -Grade -A2 PH 2 STAGE 1A 10 08-Oct-25 24-0ct-25 -16 A2P2S1A-1570 Cure Lime Treated Sub-Grade-A2 PH 2 STAGE 1A 3 25-Oct-25 27-Oct-25 -27 A2P2S1A-1580 Place 2nd Lift / Finish Lime Treated Sub -Grade -A2 PH 2 STAGE 1A 3 28-Oct-25 30-Oct-25 -15 A2P2S1A-2470 Cure 2nd Lift Lime Treated Sub -Grade -A2 PH 2 STAGE 1A I2 31-W-25 I 01-Nov-25 -27 ♦ Milestone r_ Actual Level of Effort r— Remaining Level of Effort Actual Work r_ Remaining Work r_ Critical Remaining Work 23-Sep-24 14:07 i I2JAISIl7INl-I�IFIMIAIMI-I-IAISI0INJU ..I FI MIA MI.I1 IZIS 4GISI6I7I8I9IT'.11I1 A1I1I1Gl 7l 1t 'G1l"LI�ZILI'�21L�P 1 raln2S .GE 7A (12r ',. ■ FPS Inlet Bases -At PH 2 FTAGr 1A( EA) ( - r Excavation / Embankment Al PH 2 STAGE Install Electrical Conduk -A I PH 2 STAGE 1A ■ Place 1st Lift Lime Treated Sub -Grade -At F . '.... '.. '.. ■ . Cure Lime Treated SubGr ade -At PH 2 ST, r Place 2nd Lift / Finish Lim a Treated Sub-Gra - r Cure 2nd Lift Lime Treate i SubGmde -At o Place 10"CRCP (w Cur/i)-A1 PH 2 STAG o Place City Street / Driveways # 01 -At. PH o Place City Street / Driv■ nays # 02 -At PF o Place.10" CRCP (w C jrb) -Ai. PH 2 STF o Place City Street / DO revays # 03 -Al F -- n Cure 10"CRCP(wCarb)-Ai PH 2STF o FPS Inlet Tops -At PH 2 STAGE 1A(E In,;tall Temp. Traffic Signals at Huff nes Blvd. -At PH t Remove Pavement Huffing Blvd. STH -At F + Asphalt Millings Pavement emoval. Huffines E '.. '.. ■ ,Asphalt Millmgs'Pavement removals Bob Hai r Remove Pavement Bob Hangers NTH -.At F ■ Place 1st Lift Lime Treate 1 Sub -Grade Bob ■ Place Lime Treated Sub -Grade Huffines Bt - Cure Lime Treated Su"rdda Bob Hangs. r Place 2nd Lift / Finish Line Treated SubGi ■ Cure 2nd Lift Lime Treat ad Sub -Grade Bot + Cure Lime Treated SubGmde Huffines Bk- '' . Place 10" CRCP (w Curb) Bob Hangers Place 2nd Lift / Finish Lii ne Treated SubG r Cure 2nd Lift Lime Treai ad Sub -Grade Hu '.. w Place10"CRCP(wCurb) Huffnes BNc • Cure 10" CRCP (w Curb) Bob Hangers ■ CurelO"CRCP(wCurb) Huffnes Blvc '.. r Set Up Traffic Control-A2 PH 2..STAGE -1A '.. ■ Misc. Removals-A2 PH 2 STAGE 1A — ELB L coinage -A2 PH 2 STAG 1A '.. — Install Inlet Bases A2 PH 2 STAGE 1 r (,. EA) ■ Excaration / Embankment -A2 PH 2 9 TAGS 1A r Instal Electrical Conduft Area 2 STA 1, A to STA 186 -A2 ■. Plae 1st Lift Lime Treated Sub-Grace-A2 PH 2 STA ■ Cur.- Lime treated Sub -Grade - A2 PH2 STAGE 1A - i Pla cee 2nd Lift / Finish Lime Treated ">ubGrade - A2 P r Cue 2nd Lift Lime Treated Sub —Grade -A2 PH 2 STA Cromwell Marine Creek Rd. - City of Fort Worth P6 Schedule - Progress Update SEPT 2024 DD 09/22/2024 Page 14 of 17 SUNDT SkilL Grit RV.. CoFW - Cromwell Marine Creek RD - September 2024 UPD 07 Activity ID Activity Name Original Start Finish Duration A2P2S1A-1030 Place 10"CRCP (w Curb)-A2 PH 2 STAGE 1A 15 03-Nov-25 05-Deo-25 A2P2S1A-1560 Cure 10" CRCP (w Curb)-A2 PH 2 STAGE 1A 7 06-Dec25 12-Dec-25 A2P2S1A-1040 Place City Street / Driveways -A2 PH 2 STAGE 1A (5 EA) 15 08-Dec25 07Jan-26 A2P2S1A-1600 FPS Inlet Tops-A2 PH 2 STAGE 1A ( EA) 7 08-Deo-25 22-Deo-25 Misc. Removals - Roundabout / Marine Creek 5 08Jan-26 15Jan-26 A3P2S1A-10 P1S2C-1620 r Build Pavement Tie -Ins ML with Roundabout Area& Te Ins Intersection with Me 10 16Jan-26 03-Feb-26 A3P2S1A-10 FPS Flatwork/Sidewalks- Roundabout/Marine Creek 8 04-Feb-26 18-Feb-26 Al P2S1 B-1110 Excavation / Embankment -Bowman Roberts Rd -Al PH 2 STAGE 1B 2 06-Apr-26 07-Apr-26 Al P2S1 B-1660 Removal of Existing Box Culvert @ Bowman Roberts Rd -At PH 2 STAGE 1 B 2 08-Apr-26 09-Apr-26 Al P2S1 B-1120 Place Lime Treated Sub -Grade Bowman Roberts Rd -At PH 2 STAGE 1 B 1 22-Apr-26 22-Apr-26 Al P2S1 B-1700 Cure Lime Treated Sub -Grade Bowman Roberts Rd -At PH 2 STAGE 1 B 3 23-Apr-26 25-Apr-26 Al P2S1 B-1730 Mix / Finish Lime Treated Sub -Grade Bowman Roberts Rd -At PH 2 STAGE 1E 2 27-Apr-26 30-Apr-26 Al P2S1 B-1130 Place HES 10" CRCP - Bowman Roberts Rd -At PH 2 STAGE 1 B 3 01-May-26 06-May-26 Al P2S1 B-1670 Cure HES 10" CRCP - Bowman Roberts Rd -At PH 2 STAGE 1 B 7 25FTRRPMM 07-May-26 13-May-26 :•: i,iArt:ekY)1LTl1`%*rREET Al P2S1 B-1590 Excavation / Embankment - Bob Hangers St -Al PH 2 STAGE 1B 24-Mar-26 1 . 29 ar-26 2 A1P2S1B-1600 Place Lime Treated Sub -Grade Bob Hangers Rd -A1 PH 2 STAGE 1B 6 27-Mar-26 06-Apr-26 A1P2S1B-1710 Cure Lime Treated Sub -Grade Bob Hangers Rd -A1 PH 2 STAGE 1B 3 07-Apr-26 09-Apr-26 Al P2S1 B-1740 Mix / Finish Lime Treated Sub -Grade Bob Hangers Rd -At PH 2 STAGE 1B 2 13-Apr-26 14-Apr-26 Al P2S1 B-1610 Place 10" CRCP (w Curb) Bob Hangers Rd -At PH 2 STAGE 1B 8 16-Apr-26 30-Apr-26 Al P2S1 B-1680 •25 Cure 10" CRCP (w Curb) Bob Hangers Rd -At PH 2 STAGE 1 B 7 01-May-26 1 . 07-May-26 Al P2S1 B-1620 Excavation / Embankment - Huffines Blvd -At PH 2 STAGE 1B 2 07-Apr-26 08-Apr-26 Al P2S1 B-1630 Place Lime Treated Sub -Grade Huffines Blvd -At PH 2 STAGE 1 B 6 09-Apr-26 20-Apr-26 Al P2S1 B-1720 Cure Lime Treated Sub -Grade Huffines Blvd -At PH 2 STAGE 1 B 3 21-Apr-26 23-Apr-26 Al P2S1 B-1750 Mix / Finish Lime Treated Sub -Grade Huffines Blvd -Al PH 2 STAGE 1 B 2 24-Apr-26 27-Apr-26 A1P2S1B-1640 Place 10"CRCP (w Curb) Huffines Blvd -At PH 2STAGE IB 8 30-Apr-26 14-May-26 Al P2S1 B-1690 ;RYSTAL LAKE Cure 10" CRCP (w Curb) Huffines Blvd -At PH 2 STAGE 1B DVE 7 7 15-May-26 20-Janr 21-May-26 Al P2S1 B-1650 Build Tie In Mainline at Crystal Lake Dve -A2 PH 2 STAGE 1B 1 71 20Jan-26 6TFeb-26 A3P2S2A-1650 Temp Striping -A3 PH 2 STAGE 2A 3 19-Feb-26 24-Feb-26 A3P2S2A-1080 Set Up Tmffc Control /Switch Phase to A3 PH 2 STAGE 2A 3 26-Feb-26 03-Mar-26 A3P2S2A-1060 ELB SB Culvert 5 X T -A3 PH 2 STAG 2A 12 04-Mar-26 23-Mar-26 RAA3P2S2A-10 Misc. Removals - Roundabout / Marine Creek 5 04-Mar-26 10-Mar-26 RAA3P2S2A-10 Excavation / Embankment - Roundabout / Marine Creek A3 PH 2 STAGE 2A 10 11-Mar-26 27-Mar-26 A3P2S2A-1070 ELB Drainage -A3 PH 2 STAG 2A 12 24-Mar-26 13-Apr-26 RAA3P2S2A-10 Place Lime Treated Sub -Grade - Roundabout / Marine Creek A3 PH 2 STAGE : 10 31-Mar-26 14-Apr-26 A3P2S2A-1690 FPS Inlet Bases -A3 PH 2 STAGE 2A ( EA) 12 31-Mar-26 17-Apr-26 RAA3P2S2A-10 Build Roundabout Lanes / Marine Creek A3 PH 2 STAG E 2A 10 16-Apr-26 05-May-26 ♦ Milestone r_ Actual Level of Effort r- Remaining Level of Effort Actual Work Remaining Work r_ Critical Remaining Work 23-Sep-24 14:07 Total[[I[kkl��'n�7722 Float lIIJ AISIUI NI_JIHIMIAIM--IAISIVIN (y' '7I '/I Y ,/7 /I I , J L/JIFIMIA MI ILI yl4l6161/IiS(Y j?I I�IJ 1Jll�fb �-A2 -I/( wl�Ili 11 IIG(J�Al �L 1A� 16 r• glace 1 " C P w Cu YI SIA(i 38I ', ,• Cure 10" CRCP (wCurb)-A2 PH 2STAGE 1A -16I Place City Street / Driveways A2 PH 2 STAGE 131 ■ FPS Inlet Tops--A2 PH 2 STAG 1A ( EA) -16 '.. • Misc. Removals - Roundabout /.. Marne Creek -16I ■ Build Pavement Tie -Ins MIL nith Roundabout. -16I ■ FPS Flatwork / Sidewalks - Roundabout/ ME 14 Excavation / Embanki nent -Bowman R- -14I i ..Removal of Existing E ox Culvert @ Bov 19I .. '.. '.. '.. '.. '.. i. Place Lime Treated iub-Grade BowmE 34I r Cure Lime Treated 9;ub-Grade Boma -20I r Ma / Finish Lime Tn gated Sub -Grade E -20I ■ Place HES 10"CR7P-:Bowman Ro 36I .. • ' Cure HES 10' CR�,P - 'Bowman Ro 0119 Excavation / Embanknent - Bob Hanger 17I .. '.. .. 0 ;Place Lime Treated S rb-Grade Bob Her -29I r 'Cure Lime Treated St b-Grade Bob. Han -171 1 Mix/ Finish Lime Tre. ted Sub -Grade Bc -17I ■ Place 10"CRCP-(wCurb) Bob Hange 30I .. .. .. .. .. • Cure 10" CRCP (w Curb) Bob Hangs 25 r / Embankment -Huffines BI, -25I .Excavation s, Place Lime Treated:>ub-GradeHuffine .43I '.. 1 Cure Lime Treated :vb-Grade Huffine -24I • Mix / Finish Lime Tr►`ated Sub -Grade F -24I ■ Place 10" CRCP(v Curb). Huffines 44I, '... '.. '... '.. '.. • Cure 10"CRCP (v Curb) Huffines; -0 ■ Build Tie In Mainline at Crysal Lake Dve -A2 -16 • Temp Striping -A3 PH 2 E TAGE 2A -161 • Set Up Traffic Contml /S Mch Phase to A3 -13I '.. '.. r ELB SB Culvert 5 X T -A3 PH 2 STAGE 16I • Misc.Removals - Roundabout/Marine Cr 16I - Excavation / Embanknent - Roundabout -13I ELB Drainage -A3 PH 2 STAG 2A 23I Place Lime Treated Lub-Grade - Rounc 16I FPS Inlet Bases -A3 PH 2 STAGE 2A 231 Build Roundabout I.anes / Marine Cn Cromwell Marine Creek Rd. - City of Fort Worth P6 Schedule - Progress Update SEPT 2024 DD 09/22/2024 Page 15 of 17 SUNDT SkilL Grit F""e• CoFW - Cromwell Marine Creek RD - September 2024 UPD 07 Ac tivity ID Activity A3P2S2A-1120 Name Excavation / Embankment -A3 PH 2 STAGE 2A Original Duration 10 Start 20-Apr-26 Finish 07-May-26 Total Float -16 A2P2S1A-2480 Install Electrical ConduitArea 3 STA 186 to STA208 -A3 PH 2 STAGE 2A 2 06 May-26 07-May-26 -16 A3P2S2A-1090 Place 1st Lift Lime Treated Sub-Gmde - A3 PH 2 STAGE 2A 7 11-May-26 20-May-26 -16 A3P2S2A-1670 Cure Lime Treated Sub -Grade - A3 PH 2 STAGE 2A 3 214May-26 23-May-26 JO A3P2S2A-1680 Place 2nd Lift / Finish Lime Treated Sub -Grade - A3 PH 2 STAGE 2A 2 26-May-26 27-May-26 -16 A3P2S2A-1710 Cum 2nd Lift Lime Treated Sub -Grade - A3 PH 2 STAGE 2A 2 28-May-26 29-May-26 30 A3P2S2A-1130 Place 10" CRCP (w Curb)- A3 PH 2 STAGE 2A 8 01Jun-26 11Jun-26 -18 A3P2S2A-1150 FPS Ratwork-A3 PH 2A Marine Creek Parkway Rd -A3 PH 2 STAGE 2A 4 12Jun-26 17Jun-26 -17 A3P2S2A-1660 Cure 10" CRCP (w Curb)- A3 PH 2 STAGE 2A 7 12Jun-26 18Jun-26 -28 A3P2S2A-1700 FPS Inlet Tops -A3 PH 2 STAGE 2A ( EA) 4 18Jun-26 23Jun-26 3 STONEWATER BEND A3P2S2B-1000 ELB Drainage w Inlets-A3 PH 2 STAGE 2 B Stonewater Bend Trail r ■ 3 19Jun-26 23Jun-26 -18 A3P2S2B-1010 Place City Streets -A3 PH 2 STAGE 213 (2 EA) 10 1 24Jun-26 10Jul-26 -18 PHASE 3 STAGE FN-2510 1A Install Rock Rip - Rap @ Culvert Areas (6 Locations) • 129 12 r 31-Mar-26 . rs 17-Apr-26 21 AREA 1 it 1 69 22 Al P3-1000 Set Up Traffic Contml / In MOT -Al PH 3 3 22-May-26 27-May-26 -24 Al P3-1040 Place Fill / Top Soil Median Areas -At PH 3 15 28-May-26 18Jun-26 -9 A1P3S1A-1030 Place 10" CRCP FIIAreas - Al PH 3STAGE IA 1528-May-26 18Jun-26 8 Al P3-1020 Install Electrical Conduit / Lightpole Foundation Area 1 100 to 147 - PH 3 (40 E 15 28-May-26 18Jun-26 -24 Al P2A-1360 FPS Flatmrk (Sidewalk) / RnishesAl STH - PH 3 (1540 FT) NBL 15 19Jun-26 14Jul-26 -24 A1P3S1A-1040 Cure 10" CRCP Fill Areas -At PH 3STAGE IA 7 19Jun-26 01Jul-26 18 Al P1 B-1350 FPS Ratwork (Sidewalk) / FnishesAl NTH - PH 3 (1700 FT) NBL 19 29Jun-26 28Jul-26 -23 Al P2A-1370 FPS Ratwork (Sidewalk) / Finishes At STH - PH 3 (1535 FT) MID 17 15Jul-26 07-Aug-26 -24 Al P1 B-1420 FPS Flatwork (Sidewalk) / FnishesAl NTH - PH 3 (1700 FT) SBL 19 29Jul-26 27-Aug-26 -18 Al P2A-1380 FPS Ratw rk (Sidewalk) / RnishesAl STH - PH 3 (1540 FT) SBL 17 10-4ug-26 08Sep-26 -24 Al P3-1060 Place Seeding/ Mulch Median Areas -At PH3 2 09Sep-26 11Sep-26 -24 AREA21E A2P3-1000 Set Up Traffic Control / In MOT-A2 PH 3 70 03-Feb-26 05,1un-26 6 3 03-Feb-26 06-Feb-26 -9 A2P3S1A-1040 Place 10" CRCP FIIAreas - AZ PH 3STAGE 1A 15 09-Feb-26 064v1ar-Mar 3 A2P3-1040 Install Electrical Conduit / Lightpole Foundation Area 2 147 to 186 - PH 3 (44 E/ 18 09-Feb-26 11-Mar-26 -0 A2P3S1A-1050 Cure 10" CRCP Fill Areas-A2 PH 3STAGE 1A 7 09-Mar-26 19-Mar-26 28 A2P2A-1580 FPS Flatwork (Sidewalk) / RnishesA2 NTH - PH 3 (1525 FT) NBL 15 12-Mar-26 07-Apr-26 -9 A2P2A-1590 FPS Ratwork (Sidewalk)/ FnishesA2 NTH - PH 3 (1525 SBL 15 08-Apr-26 064v1ay-May A2P3-1060 Place Fill /Top Soil Median Areas -A2 PH 3 10"FM-Sep-26 May22-v1ay-26 2 A2P3B-1650 FPS Ratwork (Sidewalk)/ FnishesA2 STH - PH 3 (1680 F) 1703Jun-Jun -9 A2P3-1070 Place Seeding / Mulch Median Areas -A2 PH 3 205Jun-Jun 6 A3P3-1000 Set Up Traffic Control -A3 PH 3 33 3 13Jul-Jul 15Jul-Jul -18 Al P3-1080 Place Fill / Top Soil Median Areas -A3 PH 3 4 16Jul-Jul 21,Iul-26 6 A3P3-1010 Install Electrical Conduit / Lightpole Foundation Area 3 186 to 208 - PH 3 (14 E 8 16Jul-26 28Jul-26 1 -18 A3P1A-1750 FPS Ratwork (Sidewalk)/ FnishesA3 NTH - PH 3 (1990 FT) 20 29Jul-26 28-Aug-26 1 -18 ♦ Milestone r_ Actual Level of Effort r— Remaining Level of Effort Actual Work r_ Remaining Work r_ Critical Remaining Work 23-Sep-24 14:07 I2JJAISIOINI IJIFI MIAI MI IAISIOI NIU JIFI MI AI""I-I1 IZISI40ISI6I7I8I9IA711nI 1I 1lA1I 1I10I 71U 1I GI 21��LZI LI�21L mbar 1 kment Jnstal1Electrical Co iduflAma 3 STA 1 ■ Place 1st Lift Lim( Treated Sub -Gm —Cum Lime Treats i Sub -Grade - A3 i Place 2nd Lift / F nish Lime Treated r Cum 2nd Lift Lire. Treated Sub-Gr ■ Place 10" CRCF' (w Curb)- A3 PH r FPS Flatwork-s13 PH 2A Marine r Cure 10" CRCP (w Curb)- A3 PF ■ FPS Inlet TopE -A3 PH 2 STAGE r ELB Drainage N Ihlets'-A3 PH:2 Place City Sti eets -A3 PH 2 ST Install Rode Rip - Ra ) @ CulvertAreas . Set Up Treffic Control/In MOT-A1 o PlaceFill / Top iol Median Alas o Place 10"CRC3FIIAreas-A1 PI- - Install Electrical Conduit / Lightpo o FPS Flatwork (Sidewalk) / Fnist- • Cure 10"CRCF FIIAreas-A1'.F m FPS Flatwoi k (Sidewalk) / Finis r. FPS Flatwrk (Sidewalk) / Fin o FPS Flatrork (Sidewalk) / F o FPSFlahnork'(Sldewalk)/ Place Seeding / Mulch Me Set Up Traffic Control / In ROT-A2 PH 3 Place 10" CRCP RII Ares - A2 PH 3 STAG r• Install Electrical Conduit I Lightpole Found ■ Cure 10" CRCP FIIAm as A2 PH. 3 STAL 'FPS Flatwork (Sklewa k) /Finishes A2 N- FPS Flatwork (Side Nalk) / Finishes A2 ■ Place Fill / Top SA Median Areas -A r FPS Flatwork (Si lewalk) / Finishes. r Place Seeding / Mulch Median Are r Set Up Traf ;Conlml-A3. PH r Place Fill / Top Soil Median Are ■ Install Elect ical Conduk / Ligh — FPS Flat vork (Sidewalk) / F Cromwell Marine Creek Rd. - City of Fort Worth P6 Schedule - Progress Update SEPT 2024 DD 09/22/2024 Page 16 of 17 SUNDT SkilL Grit RV.. CoFW - Cromwell Marine Creek RD - September 2024 UPD 07 Activity ID I Activity Name Original Start Finish Duration A3P3-1090 I Place Seeding / Mulch Median Areas -A3 PH 3 2 31-Aug-26 01 Sep-26 BOAT CLUB RD 10 28-May-26 11Jun-26 Al P3S1A-1000 Install LPTB @ Boat Club Rd -Al PH 3 STAGE 1A 2 28-May-26 29-May-26 Al P3S1A-1010 Install Temp Pavement Me rkings @ Boat Club Rd -At PH 3 STAGE 1A 3 01Jun-26 03Jun-26 Al P3S1A-1020 Install Curb & Gutter// Curb Ramp @ Boat Club Rd -Al PH 3 STAGE 1A 5 04Jun-26 11Jun-26 MARINE CREEK PARKWAY 17 16Jul-26 10-Aug-26 A3P3S1A-1040 I Place 10"CRCP Widening Areas -A3 PH 3STAGE 1A 10 16Jul-26 30Jul-26 A3P3S1A-1050 Cure 10"CRCP Widening Areas-A3 PH 3 STAGE 1A 7 31Jul-26 10-Aug-26 BOAT CLUB RD 12 12Jun-26 01Jul-26 Al P3S1 B-1030 Install LPTB @ Boat Club Rd -Al PH 3 STAGE 1 B 2 12Jun-26 15Jun-26 Al P3S1 B-1040 FPS Median / Now modifications @ Boat Club Rd -At PH 3 STAGE 1 B 10I 16Jun-26 01Jul-26 A21FN-1050 I Electrical Tenmnations/ LigNpole I mtallatan Area 2 147 to 186 - PH 3 10 04Jun-26 18Jun-26 Al P3-1010 Install Traffic Signal - Bowman Roberts Rd - PH 3 20 29Jul-26 28-Aug-26 FNA 020 Install Traffic Signal - Huffines Blvd - PH 3 20 31-Aug-26 01-Oct-26 FN7520 Preliminary City Punch List 66 12Sep-26 16-Nov-26 Al P1B-1390 Electrical Terminations/ LigNpole I rstallatim Area 1100 to 147-PH3 10 14Sep-26 28Sep-26 Al P1B-1410 Electrical Terminations/ LigNpole I retallatim Area 3 186 to 208 - PH 3 4 29Sep-26 05-Oct-26 FNA 000 Install Pavement Markers -PH3 6 06-W-26 13-Oct-26 FN-1010 Install Signs 7 09-Oct-26 21-Oct-26 FN-2500 Pmject Punch List 17 22-Oct-26 13-Nov-26 ♦ Milestone r_ Actual Level of Effort r_ Remaining Level of Effort Actual Work Remaining Work r_ Critical Remaining Work 23-Sep-24 14:07 Totall42� Floatf(J --UIN-1-J I1-IMIAI-I-I-I-I-1-1 J -I -I - IA- - I-- - --- :� -li� 1-1r,11A 11,1s�h MI 11,11,YI 156Q191A, lViV1�U 18 dinMu e -121 -12I r Install LPTB @ E7at Club Rd -Al F -12I r Install Temp Pavement MaddngsC -12I ■ Install Curb & G fitter// Curb Ramp -51 SI ■ Place l O CRCP Widening Ar -51 ■ .Cure 10" ff2CP Widening Ar -121 -12I r Install LPTB @ Boat Club Rd -Al 12I FPS Median / Now modification '.... '.. 741 '.... '.. Install Traffic Signal - Crystal Lap ■ Electrical Te nnn a ions I Lighpole -23I L. m Install Tr ffic Signal - Bowm 23 ' .. .. Install Traffic Signal- Hv 39 r_ Preliminary City Pur -24I ■ ElectrimlTerminations/ 24I rr Electcal Terminations/ -24I ■ InstA Pavement Marke 24I. ■ Instiill Signs -241 Pi oject Punch List. Cromwell Marine Creek Rd. - City of Fort Worth P6 Schedule - Progress Update SEPT 2024 DD 09/22/2024 Page 17 of 17 SUNDT SkilL Grit RV.. FORTWORTH. Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: Cromwell Marine Creek Road Widening AR #1 M&C: CPN: 101012 CSO: 59041 DOC#: Date: 11 /7/2024 To: Name Department Initials 1 Tammam Nashad — Sundt Contractor - Signature thnashad(cr)sundt.com 7 2. Wendi Hedlund — Bus. Sup. TPW — Initial � N,H 3. Alejandra Ayala TPW - Signature a 4. Dennis Rodgers TPW — Signature 5. Raul Lopez TPW — Initial1 6. Lissette Acevedo TPW — Initial o(�% 7. Patricia Wadsack TPW — Initial 8. Lauren Prieur TPW — Initial z9a 9. Doug Black Legal - Initial D$ 10. Jesica McEachern CMO - Signature C'` 11. Jannette Goodall CSO - Signature 'G 12. TPW Contracts TPW DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps NEEDS TO BE NOTARIZED: ❑ Yes X No RUSH: ❑ Yes X No SAME DAY: ❑ Yes ❑ No NEXT DAY: ❑ Yes ❑ No ROUTING TO CSO: X Yes Action Required: ❑ As Requested ❑ For Your Information X Signature/Routing and or Recording ❑ Comment ❑ File ❑ No ❑ Attach Signature, Initial and Notary Tabs