HomeMy WebLinkAboutContract 62132-PM1CSC No. 62132-PM1 PROJECT MANUAL FOR THE CONSTRUCTION OF WATER, SEWER, PAVING ANDSTREET LIGHT IMPROVEMENTS SOMA Outpost Casitas IPRC Record No. IPRC24-0003 City Project No.105365 FID No. 30114-0200431-105365 EO7685 File No. K-3231 X File No. X28058 Mattie Parker Mayor David Cooke City Manager Chris Harder, P.E. Water Director Lauren Prieur, P.E. Director, Transportation and Public Works Department Prepared for The City of Fort Worth, Texas 200 Texas St, Fort Worth, TX 76102 Prepared by CI>'ll Englneering Planning lving- YiTO Rher Park Plaza, 9, 7W co Fart Worth. Tx 76116 81 r�242r66 ig evo TBPE No' F-12452 w .G"Mngreras.cam AUGUST 2024 zt IN— i SAMANTHA D. RENT OFFICIAL RECORD .... .. . ........ ... . 1 14504 CITY SECRETARY Elt'le . ' FT. WORTH, TX fj �_ nnrA ti 10/3/2024 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 8 SECTION 00 00 10 TABLE OF CONTENTS DEVELOPER AWARDED PROJECTS Division 00 - General Conditions Last Revised nn�13 kwit ie t bidders 03/20/2020 nn�13 Inst ,,etiers t Bidders 03/20/2020 00 41 00 Bid FefvA 04/02/2014 00 42 43 Proposal Form Unit Price 05/22/2019 00 43-13 Bid Ben 04/02/2014 0045 11 Bidde :s Pr-eq ,.,heat:, n's 04/02/2014 0045 12 Prequalification Statement 09/01/2015 99-45 13 'Mader Dreg alifiea4iEK kWioa 03/09/2020 00 45 26 Contractor Compliance with Workers' Compensation Law 04/02/2014 0045 40 Minerity Business Enterprise Goal 08/21/2018 00 52 43 Agreement 06/16/2016 00 61 25 Certificate of Insurance 07/01/2011 00 62 13 Performance Bond 01/31/2012 00 62 14 Payment Bond 01/31/2012 00 62 19 Maintenance Bond 01/31/2012 00 7200 General Genditions 11/15/2017 007300 Supplementary C=en ition 07/01/2011 0073 10 Standard City Conditions of the Construction Contract for Developer 01/10/2013 Awarded Projects Division 01- General Requirements Last Revised 01 1100 Summary of Work 12/20/2012 01 25 00 Substitution Procedures 08/30/2013 01 31 19 Preconstruction Meeting 08/30/2013 nib Pr-ejeet Meetings 07/01/2011 01 32 33 Preconstruction Video 08/30/2013 013300 Submittals 08/30/2013 01 35 13 Special Project Procedures 08/30/2013 01 45 23 Testing and Inspection Services 03/20/2020 01 50 00 Temporary Facilities and Controls 07/01/2011 01 5526 Street Use Permit and Modifications to Traffic Control 07/01/2011 0'�43 Storm Water Pollution Prevention Plan 07/01/2011 01 60 00 Product Requirements 03/20/2020 01 66 00 Product Storage and Handling Requirements 04/07/2014 01 70 00 Mobilization and Remobilization 04/07/2014 01 71 23 Construction Staking 04/07/2014 01 74 23 Cleaning 04/07/2014 01 77 19 Closeout Requirements 04/07/2014 01 78 23 Operation and Maintenance Data 04/07/2014 01 78 39 Project Record Documents 04/07/2014 CITY OF FORT WORTH SOMA Outpost Casitas STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105365 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 8 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents Date Division 02 - Existing Conditions Modified 02 41- 13 Selective Site no,, of do NONE 02 4 1 14 T Ut;1;t Refn ,,,,,1 i n an r,, e NONE 02 4T45 Paving Removal NONE DiVisioR 03—COHeFete 03 30 00 Cast I Place C ref:ete NONE 03 34 n C ftt. ellea Tow St engtt, M to -ia (rr crag NONE 03-34 16 GOneFetf UoNl M.,toFia for- Tr-en.i, Repai NONE 038000 Mod fie tions t Existing Concrete Stfuetur-es NONE 26 05 00 Carnn7zon NONE Demolition for- Eleetfieal Systems NONE 3 Raceways and Boxes for- Eleetfieal SystNONE 26 05 43 &2-a� Maew&ys--for Dzi rrroa) Fjystems NONE NONE 3 1� 1 23 16 T.>Z6c1rao-i fie Ev,,av t; NONE 312323 Beffe NONE 3 1� 1 24 00 Emk-,&:'km--iIts NONE 31�no E,.osio,, and Sedi ea4 C rt , NONE 313600 dens NONE 21�0 Ripr-ap NONE NONE 3�01-119 Tomr,ws -y n s,.ha ft n.,ying no,.,,;,. NONE 27�9 C ner-ete n.,ying Repa , NONE 27�3 Flexible Base Gets see NONE 2'1�0 Lime e Tr-Med Base C,.,,fs NONE 27�3 Cement Tr-ea4ed Base Ce NONE 32 1137 Liquid ted Eoil DeAili ff NONE Z 7�v AL;phalt Itv 4Ig NONE Z7�3 n.,,-.hak Paving Gr-ae r Sea] NONE Z7�3 C nee-ete n.,ying NONE 32 1320 i4✓»allka, T,.;,,o.,, ,, ra "a".`o r7,v�s NONE 27� .,,. re fete Paving joint Sealants 1 NONE 32 14 16 Bri-j1, UrLtPaving NONE Z7�3 C ner-ete Cufb and CydRe :s and Valley Gutters NONE Z7�3 Pavement TiT.,,.k4ngs NONE 32 5 C,, .i, Address PainAing NONE 2'�3 CSC ForzioDa-Ad tes NONE CITY OF FORT WORTH SOMA Outpost Casitas STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105365 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 8 '27�0 W .e > enees and Cates NONE 27�9 Wood >;en"es and rates NONE 1 32 31,2 13 CiaGt in Ila"e Goner-ete Retaining A7.,NONE 1329119 Topsoil PlaeemefA "~d Finiohing of Parkways NONE 17�13 Ryd .e M l 1 ing Seeding and S dding NONE 32 93 43 Trees and Shrubs NONE Division 33 - Utilities 22�0 Sower- "„d Manhole Testiffg NONE ZZ�T Closed Gi-eu t Television (CCTV) ifispeeti..,-, NONE 3303 TO Byram Pummr/ng-ef ter. is . Sewer- Systems NONE 33 04 10 tn�jal Ioolatim NONE 33 04 C,,,-.-osio,, Control Test Stations NONE 33 04 12 Mognivum Anode de C"t>,edie P f teetion System NONE 23 04 30 ToYr*omx, W"te.. Sen,;,.e" NONE 33 04 Cleaning and n""ept"r"e Testing ofWater- >\ dins NONE 33 04 Clearing fSewer- Mains NONE 22�0 J644 „ T,-enel, R.,.,.,y tim, Bmbadx,e,,,t and BaekF'll NONE 33 05 Q W-Mo Lim Lxrvfing NONE 23 05 13 n"..�werzGradeRings-,stir NONE 33 n�TO >~,-",.,,e, Cover- and Gr-a u Itirrgo Cumpoate n d;,,stifg Manholes, !filets, Val" B&Ees' Other- t,- ,, c-es t, NONE 33 �-0�-T4 and et Grade NONE 33 05 -�v Gen" .ete Water- Vaults NONE 22�T Cef".ete Cell",." NONE 33 05-20Auger-r-ing NONE 3321 Tunnel Liner Plate NONE 33 05 22 Stee-Croirr Piro NONE 22�3 NONE 22�4 T„st.,ll.,ti„ of C.,.-.-;e,- Pipe i Casing or 'T'unnol r.irierPlate NONE 22�o U444„ M",-ve,."ir ee tef:s NONE 22�0 r ee"tier of Existing U44i NONE 33 1105 Belts, Nut-, and Gaskets NONE 33 11 Ductile ir-en P pe NONE 33 , , , , T'•� 1 -m Fittings NONE 33 , , , 2 Polyvinyl C,,lof de (PVC) P-essufe Piro NONE 33 , , , 3 GoneretePr-es Baf: Wx SteelCylinder- Type NONE 3,31 11 11 ed, 13uwied Steol Piro anA FiAings NONE 3;-' 11 lc We Stfessed Goner-ete Gy4i de,. Pipe NONE 23 12 10 W is ' izzmli ta 2 inel} NONE ZZ�i Large W to f Naetef:s NONE 22�0 Resilient Seated Gate Va1w NONE 22�i nix A n P„bbef Seated B„tteffgy Valves NONE 22�5 Cemeetio to Existing Wa4e,. Mains NONE 33 1230 Cm mltiar Air- Va4ye n ""oamigo LL-x0i,1,e W teF S yste ,," NONE 33 1240 >;;.� NONE 33 1250 Aw-atcr gamero P"ati-ox-m NONE 33 1260 &andard Blow off Valve n sse..,.,b! NONE 33 2, , 7 Gufed i Place Pipe (QP-P\ NONE CITY OF FORT WORTH SOMA Outpost Casitas STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105365 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 8 Z Z�3 Fite, -glass D eif fe -ee Pipe for- G -a-yi „ Eanitar s ZZ�5 High Density Polyethylene (14PP ) Pipe 4oz,,Sanit&r, er 22�0 D 1,,yi „1 Chloride (PVC) C_,-. „ty Sanitary Sewer Pipe ., D1,,,,;,,,.1 Chloride (PVC) Closed Pr-ofile ('Gravity Samna,, cewe, NONE NONE NONE se ��T Ape NONE 33 11 canna,.,, Sewor Elie L1n17g NONE 33 3123 Sanitary Sewer Pipe 1~ 1arge„„e„+ NONE 0 Sanitary Sewer Service C,.n eetions and Service Line NONE 22�0 Combination Air V 1„e for Sanitary Sewer >~oree r,,r.,i NONE 2 2�0 Gast i Ulaee r, ner-ete Manholes NONE 2 2920 n.eeast C ner-ete Manholes NONE 33930 Fibit*r-rsc Manholes NONE 33 39-40 Wastewater A eeess Ct,.,mbe,. «x- A C= NONE 2 2960 >~,.o*y r e f� ZMiia��,, ce,,,e c+, .,, e� NONE 22�0 neinf -ee,l C ner-ete Stof.., Sewe.PipeiC„l„efts NONE 23 41 11 High Dmvd. ,, Polyethylene (14PP ) Pipe f^. Stons Dioin NONE 22�z Dei fn,-„e,7 Polyet lene (SRP ) Pipe NONE 3 2�0 Subdr-ainage NONE 33 46-01 Slotted E,�omt s NONE 33 4602 Tr-eadh Dminz NONE 22�0 Gast i Dlaee Manholes .,n r„f+etior NONE 22�0 C,,,-w and Drop inlets NONE 33 4940 Stomt. Dkrai%Gge Headwalls m,1 Wiagwa!6 NONE Division 34 - Transportation 2^� 'fa ffie Signals NONE 34 ^�-41 10.001 At4aehment A Gentreller O«ret NONE 34 ^� 41 10.02 AttaehmentB GofAfeller- Speeif eatien NONE 34 ^�03 AttaehmentG Se€twar-e Speei£eatien NONE 34 4 1111 1 Te,,,p,,,-afy T-Faffie Signals NONE 34 41 13 Removing -rm f-K- o Fi Will- NONE 3441 15 Reet gulax Rapr1 17,&-.*hir.,g Beaeon NONE 34� 4 16 godoctrizan flybf4Signal NONE 34 41 20 Readw lllumiwtz.�jn yes NONE 34� 4120.01 Axtccinl.1LD Raa 1as6ttai:es NONE 3n ^�02 F -eew ,, LED n,,.,,1,,, NONE 34 41 20.03 Residential LED Roadway Luminaires NONE 34� 4130 Aluminum Figns NONE NONE CITY OF FORT WORTH SOMA Outpost Casitas STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105365 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 5 of 8 Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: httiD:Hfortworthtexas.2ov/tpw/contractors/ or https:Happs.fortworthtexas.2ov/Proi ectResources/ Division 02 - Existing Conditions Last Revised 02 41- 3 releetiye Site Deffiel tie 12/20/2012 0241 14 Utility Removal/Abandonment 12/20/2012 0241 15 Paving Removal 02/02/2016 Division 03 - Concrete 03 30 00 Cast -In -Place Concrete 12/20/2012 03 34 13 Controlled Low Strength Material (CLSM) 12/20/2012 0334 16 Concrete Base Material for Trench Repair 12/20/2012 03 80 00 Modifications to Existing Concrete Structures 12/20/2012 Division 26 - Electrical 26 05 00 Common 11/22/2013 2605 10 Demolition for- leet,.ieal Systems 12/20/2012 260533 Raee,: ays and Boxes f > loyalt ,stems 12/20/2012 2605 43 Underground Duets and Raeeways for- Eleet.-iea Systems 07/01/2011 26 05 50 CorrmuniMions Multi Duet Cendi"t 02/26/2016 Division 31- Earthwork 31 1000 Site Clearing 12/20/2012 31�o U-nelassi e > xea-,.,tio 01/28/2013 21�3 Beffe 01/28/2013 31�14 00 Effi-h- —Aalmmef its 01/28/2013 1 31 25 00 Erosion and Sediment Control 12/20/2012 12/20/2012 12/20/2012 Division 32 - Exterior Improvements 3201 17 Pei:F a-ne A Asphalt It Dm,ifig D epa 12/20/2012 22�0 Temper-aff A✓y).Vt Da isg Rdpx: 12/20/2012 320129 Gene fete Pa-, ng Repai 12/20/2012 27�3 Flexible Base Cetffses 12/20/2012 32 1129 Lime Treated Base Courses 12/20/2012 32 1133 Cement Treated Base Courses 12/20/2012 32 1137 Liquid Treated Soil Stabilizer 08/21/2015 32 1216 Asphalt Paving 12/20/2012 32 1273 AGr4 It Ba- -ing-C-aok ✓oa wAs 12/20/2012 3�13 13 Goner-ete Paving 12/20/2012 32 1320 Concrete Sidewalks, Driveways and Barrier Free Ramps 06/05/2018 32 1373 Concrete Paving Joint Sealants 12/20/2012 32 114 116 Brijk Unit Paving 12/20/2012 32 16 13 Concrete Curb and Gutters and Valley Gutters 10/05/2016 CITY OF FORT WORTH SOMA Outpost Casitas STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105365 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 6 of 8 32 1723 Pavement Markings 11/22/2013 37�5 Curb Addi as Nvntisg 11/04/2013 32 P. 13 Chai,, Fences and Gates 12/20/2012 3.131.16 ` ir-e Fenees and Gates 12/20/2012 27�9 Wood Fo. ees an C_.,tos 12/20/2012 32 3213 mot in Dl oa C ner-ete Retaining Walls 06/05/2018 27�9 Topsoil nlaeeme~+ and Fin ohing ofD.,,-Lway 12/20/2012 32 92 13 Hydro -Mulching, Seeding, and Sodding 12/20/2012 32 93 43 Trees and Shrubs 12/20/2012 Division 33 - Utilities 330130 Sewer and Manhole Testing 12/20/2012 330131 Closed Circuit Television (CCTV) Inspection 03/03/2016 33�0 I?mNF/ng of Existing Sewer- Syste 12/20/2012 Z2�no T if4 Beading and Eleetfieal is 1, tie 12/20/2012 33 04 11 Gorroakoxt Gent o Test Stations 12/20/2012 22�2 raagfiesiu- , node Cathodic n,- teetio Syste.. 12/20/2012 22�o Temporary Water- SeFv e 07/01/2011 22�o Cleaning and n , eept, ree Testing of Water- Mains 02/06/2013 22�o Cleaning of Sewer- Mains 12/20/2012 3305 10 Utility Trench Excavation, Embedment, and Backfill 12/12/2016 3305 2 Wa4ef: T; e T o 12/20/2012 3305 13 Frame, Cover and Grade Rings — Cast Iron 01/22/2016 3305 13.10 Fftame, Cover- and tee Rings Composite 01/22/2016 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to 3305 14 Grade 12/20/2012 1105 16 Cover-ete Water- Vaults 12/20/2012 22�T C ner-ete Goll,, -s 12/20/2012 33 05 20 12/20/2012 330521 Tunl.,Q'. Tixr e 12/20/2012 22�z Stool C. sifi, p;pe 12/20/2012 22�3 Hand Tt wm eling 12/20/2012 33 0524 of C,,f fie,. n;ro i Gass g or- Tunnel Liner- e.. Plate 06/19/2013 33 05 26 Utility Markers/Locators 12/20/2012 22�0 Leeation of xi sting Utilit;zxj 12/20/2012 33 1105 Bolts, Nuts, and Gaskets 12/20/2012 33 11 Ductile ly-on n;po 12/20/2012 ?i3 11 11 Duet le ir-en Fittings 12/20/2012 11 12 Pelyvinvl Chloride (PVQ Press f-e Aige 11/16/2018 33 '' ' 3 Cener-ete Pr-essufe Pipe, Baf Ix ed, SteelCylinder- T5Te 12/20/2012 33 , , , 1 Bur-ied Steel Pipe an F-44i g 12/20/2012 33 1210 Water Services 1-inch to 2-inch 02/14/2017 33 1211 T afge Wale. Mete,-s 12/20/2012 3Z220 Resilient Seated Gate Vlye 12/20/2012 ZZ�i AWW-A Rubber- Sea4ed Butte-flyV 12/20/2012 33 1225 Connection to Existing Water Mains 02/06/2013 22�o C,.,..,bin io Aif 3,1Assemblies Mies for- Potable Water- Systems 12/20/2012 ye 33 1240 Fire Hydrants 01/03/2014 33 1250 Wakor EamrZ2 Sta4ions 12/20/2012 CITY OF FORT WORTH SOMA Outpost Casitas STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105365 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 7 of 8 ZZ�vv Standard Blow effValve Asseffbly 06/19/2013 2 2�i C,, .e,l i Ulaee Pipe (Crnn4 12/20/2012 23 3113 Fibr:Vl-ze R2inf f:ee a Pipe for- Gravity Sanitary Sew 12/20/2012 22� High Density Polyethylene (14PPE) Pipe for Sanitary Sewe,- 12/20/2012 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 06/19/2013 PolyvinylChloride (PIX) Clese,l Profile !`,-ayit-�ai-limey Sewef 3�-34�� Pipe 12/20/2012 12 22 SanitarySews.. Viff, ✓^ning 12/20/2012 33 3123 Sanitary Sewer Pipe E 1arge,M,e + 12/20/2012 ZZ�oo Saaitai-y Sewer- Se.. nee Gen eetions Se...,;ee Li e 04/26/2013 and 33 31 70 Coxm /mtka Air- v, lye for Eanitar; Sewe. L-& err � 12/20/2012 33 39-10 Cwt. in NGoe Go erete "' an eles 12/20/2012 33 39 20 Precast Concrete Manholes 12/20/2012 ZZ�o Fite, -glass Manholes 12/20/2012 22�o Wastewater- . n eeess Chamber- (WAG) C) 12/20/2012 33 39 60 Epoxy Liners for Sanitary Sewer Structures 12/20/2012 33 41 neinf ,-eea Cone-ete Stem Sewe,-Pipe G lyerts 07/01/2011 33 41 High Density Polyethylen, ('DDE) '-Npt �rn�min 12/20/2012 33 41 12 Uein f -ee'7 Polyet le"e (9P. E) Pic 11/13/2015 33 4600 Subdfainage 12/20/2012 33 4601 worm Ebrcir� 07/01/2011 33 4602 Tr-enosh Drc�--.qc 07/01/2011 22�o Cast i Dlaee Manholes and June Ior Ecxca 12/20/2012 22�o C,,,.l. and Tiro r pleas 12/20/2012 33 49 40 Stopm Emimge 14e d-w lls and xxr,n,.w.,lls 07/01/2011 Division 34 - Transportation 34 41 10 T~affie Signals 10/12/2015 34 n�01 Att-aelment AGe}treller Gabinet 12/18/2015 2n ^�02 Attaehmen4 B QmAfellerSpeei e-atien 02/2012 3n ^env3 AaaehmeatC Softwar-eSpeei emiee 01/2012 34 41 11 Tempe-^M. T-affie Signals 11/22/2013 ?/I i 1 13 Removing T,-affi . Signals 12/20/2012 ?/I 11 15 Reet gular Pv�.a Flashing Beaeo 11/22/2013 34 41 16 'Re -des riar: 11/22/2013 34 4120 Readw Tllu:�mat✓A1^ n ssemblies 12/20/2012 34 4120.01 Afto,iai.1LD Rai 06/15/2015 34 4120.02 � F fee. ay LED D.,.,.1.�,..r�, �(amim-irvs 06/15/2015 34 ^�03 Resion ial. lE'r' - l(drninci-fas 06/15/2015 34� 4130 Alu&gas 11/12/2013 2/I�o Single Mode Fite- Opt e Cable 02/26/2016 3471 13 Traffic Control 11/22/2013 CITY OF FORT WORTH SOMA Outpost Casitas STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105365 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Appendix Page 8 of 8 GG 4.01 �Walla:.fllty 4 GC-4.02 Subsurface and Physical Conditions FE-4.✓I LUndogro;Iaa Faeilities GG 4.0-E IIa--ard,s Efwironmental Condition at Site GG 6.07 W_ GG 6.09 Porto and Td rs 49C—E.21 N sc irsinattiaff GR-01 60 00 Product Requirements END OF SECTION CITY OF FORT WORTH SOMA Outpost Casitas STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105365 Revised March 20, 2020 00 42 43 DAP - BID PROPOSAL Page I of 5 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Unit of Bid Unit Price Bid Value No. Section No. Measure Quantity UNIT I: WATER IMPROVEMENTS 1 0241.1511 Salvage 3/4" Water Meter 0241 14 EA 2 $1,250.68 $2,501.36 2 3311.0163 6" PVC Water Pipe, Select Backfill 33 11 12 LF 24 $54.77 $1,314.48 3 3312.0001 Fire Hydrant 33 12 40 EA 1 $8,407.14 $8,407.14 4 3312.2203 2" Water Service 33 12 10 EA 1 $3,968.10 $3,968.10 5 3312.3002 6" Gate Valve 33 1220 EA 1 $1,996.16 $1,996.16 6 3312.4004 8" x 6" Tapping Sleeve & Valve 33 1225 EA 1 $5,921.29 $5,921.29 7 9999.0000 Abandon and remove 3/4" Water meter and service 00 00 00 EA 4 $1,250.68 $5,002.72 TOTAL UNIT I: WATER IMPROVEMENTS $29,111.25 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 Copy of2023042 6.26.24 CFA BID PROPOSAL UNIT PRICE BID SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information 00 42 43 DAP - BID PROPOSAL Page 2 of 5 Bidder's Application Bidder's Proposal Bidlist Item Specification Unit of Bid Description Unit Price No. Section No. Measure Quantity UNIT II: SANITARY SEWER IMPROVEMENTS 1 0241.2013 Remove 8" sewer Line 0241 14 LF 20 $23.02 2 3331.5301 8" PVC Sewer Pipe, 0' to 6' (Misc Only) 3331 20 LF 20 $81.26 33 39 1U 3 3339.1001 4' Manhole 33 39 20 EA 1 $7,320.74 TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 Bid Value $460.40 $1,625.20 $7,320.74 $9.406.34 Copy of 2023042 6.26.24 CFA BID PROPOSAL UNIT PRICE BID Bidlist Item No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM 00 42 43 DAP - BID PROPOSAL Page 3 of 5 Bidder's Application Project Item Information Bidder's Proposal Description Specification Unit of Bid Unit Price Bid Value Section No. Measure Quantity 0241.0100 Remove Sidewalk 0241.0401 Remove Concrete Drive 0241.1300 Remove Conc Curb&Gutter 0241.1100 Remove Asphalt Pvmt 0241.1700 11" Pavement Pulverization 3213.0505 Barrier Free Ramp, Type M- 3213.0506 Barrier Free Ramp, Type P-1 3213.0507 Barrier Free Ramp, Type P- 3216.0101 6" Conc Curb and Gutter 3212.0303 3" Asphalt Pvmt Type D 3211.0601 8" CEMLIME (32lb/SY) 3213.0301 4" Conc Sidewalk 3213.0401 6" Concrete Driveway 3213.0402 7" Concrete Driveway 3292.0100 Block Sod Placement 3125.0101 SWPPP >_ 1 acre 3471.0001 Traffic Control UNIT IV: PAVING IMPROVEMENTS 0241 13 2 SF 806 $14.40 $11,606.40 0241 13 SF 443 $14.40 $6,379.20 0241 15 LF 220 $20.33 $4,472.60 0241 15 SY 1113 $16.05 $17,863.65 0241 15 SY 1113 $10.76 $11,975.88 3 32 1320 EA 2 $1,800.00 $3,600.00 32 1320 EA 5 $2,000.00 $10,000.00 32 1320 EA 7 $2,828.57 $19,799.99 32 16 13 LF 480 $68.75 $33,000.00 321216 SY 1113 $42.49 $47,291.37 32 11 29 TN 18 $1,318.54 $23,733.72 32 1320 SF 3629 $9.95 $36,108.55 32 1320 SF 990 $13.01 $12,879.90 32 1320 SF 450 $28.10 $12,645.00 3292 13 SY 163 $98.37 $16,034.31 31 2500 LS 1 $11,386.60 $11,386.60 3471 13 MO 1 $12,896.47 $12,896.47 TOTAL UNIT IV: PAVING IMPROVEMENTS $291,673.64 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 Copy of 2023042 6.26.24 CFA BID PROPOSAL UNIT PRICE BID SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information 00 42 43 DAP - BID PROPOSAL Page 4 of 5 Bidder's Application Bidder's Proposal Bidlist Item Description Specification Unit of Bid Unit Price No. Section No. Measure Quantity UNIT V: STREET LIGHTING IMPROVEME VTS 1 3441.3037 Furnish/Install 10'- 14' Washington Standard Light Polom Fixture L =D EA 10 $7,710.08 2 2605.3015 2" CONDT PVC SCH 80 (T) 26 05 33 LF 559 $23.68 3 3441.3303 Rdwy Illum Foundation TY 7 3441 20 EA 10 $2,991.97 4 3441.3301 Rdwy Illum Foundation TY 1,2, and 4 3441 20 EA 2 $2,991.97 5 3441.1408 NO 6 Insulated Elec Condr 3441 10 LF 1677 $2.97 6 3441.1501 Furnish/Install Ground Box Type B 3441 10 EA 4 $1,035.68 7 3441.3323 Furnish/Install 8' Wood Light Pole Arm 3441 20 EA 1 $5,753.60 8 3441.3341 Rdwy Illum TY 11 Pole 3441 20 EA 2 $3,797.50 9 3441.1771 Furnish/Install 120-240 Volt Single Phase Metered 3441 20 EA 2 $8,630.69 Pedestal Bid Value $77,100.80 $13,237.12 $29,919.70 $5,983.94 $4,980.69 $4,142.72 $5,753.60 $ 7, 595.00 $17,261.38 TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS $165,974.95 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 Copy of2023042 6.26.24 CFA BID PROPOSAL UNIT PRICE BID Bidlist Item No. SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information Description 00 42 43 DAP - BID PROPOSAL Page 5 of 5 Bidder's Application Bidder's Proposal Specification Unit of Bid Section No. I Measure I Quantity Unit Price Bid Value Bid Summary UNIT I: WATER IMPROVEMENTS UNIT II: SANITARY SEWER IMPROVEMENTS UNIT IV: PAVING IMPROVEMENTS UNIT V: STREET LIGHTING IMPROVEMENTS This Bid is submitted by the entity named below: BIDDER: West Fork Construction 2421 W 7th Street, Suite 350 Fort Worth, TX 76107 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. $29,111.25 $9,406.34 $291,673.64 $165,974.95 Total Construction Bid $496,166.18 BY: Michael Graham TITLE: Mana ' g Me�ber DATE: Septe ber 26th, 2024 120 working days after the date when the END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 Copy of 2023042 6.26.24 CFA BID PROPOSAL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 004512-1 PREQUALIFICATION STATEMENT Page 1 of 1 SECTION 00 45 12 PREQUALIFICATION STATEMENT Each Bidder for a City procurement is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. Major Work Contractor/Subcontractor Company Name Prequalification Type Expiration Date Water Improvements Trophy Construction Services 04/30/2025 Sanitary Sewer Improvements Trophy Construction Services 04/30/2025 Paving Improvements Pavecon 05/31 /2025 Street Light Improvements STF Design and Build Co. Inc. 04/22/2025 The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: West Fork Construction By: Michael Graham Company (Please Print) 2421 W 7th St. Suite 350 Signature: Address / Fort Worth. Texas 76107 Title: Manaqinq Member City/State/Zip (Please Print) Date: 26-September-2024 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised September 30, 2021 SOMA Outpost Casitas 105365 005243-1 Developer Awarded Project Agreement Pagel of 4 1 SECTION 00 52 43 2 AGREEMENT 3 4 THIS AGREEMENT, authorized on 6/25/2024 is made by and between the 5 Developer, Outpost Fort Worth, LLC, authorized to do business in Texas ("Developer") , and 6 West Fork Construction. LLC I authorized to 7 do business in Texas, acting by and through its duly authorized representative, ("Contractor"). 8 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 9 follows: 10 Article 1. WORK 11 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 12 Project identified herein. 13 Article 2. PROJECT 14 The project for which the Work under the Contract Documents may be the whole or only a part is 15 generally described as follows: 16 SOMA Outpost Casitas 17 105365 18 Article 3. CONTRACT TUVIE 19 3.1 Time is of the essence. 20 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 21 Documents are of the essence to this Contract. 22 3.2 Final Acceptance. 23 The Work will be complete for Final Acceptance within 120 ealentiff days after the date 24 when the Contract Time commences to run as provided in Paragraph 12.04 of the 25 Standard City Conditions of the Construction Contract for Developer Awarded Projects. 26 27 3.3 Liquidated damages 28 Contractor recognizes that time is of the essence of this Agreement and that Developer 29 will suffer financial loss if the Work is not completed within the times specified in 30 Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of 31 the Standard City Conditions of the Construction Contract for Developer Awarded 32 Projects. The Contractor also recognizes the delays, expense and difficulties involved in 33 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not 34 completed on time. Accordingly, instead of requiring any such proof , Contractor agrees 35 that as liquidated damages for delay (but not as a penalty), Contractor shall 36 pay Developer one hundred Dollars ($100.00) for each day that expires after the time 37 specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of 38 Acceptance. CITY OF FORT WORTH SOMA Outpost Cacitm sTANDARD coNsTRucTIoN sPECIFICAuON DOCUMENTS — DEVELOPER AWARDED PROJECTS 105365 Revised June 16,2016 00 52 43 - 2 Developer Awarded Project Agreement Page 2 of 4 39 Article 4. CONTRACT PRICE 40 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract 41 Documents an amount in current funds of four hundred ninety sic thousand, one hundred slay sic doftars and Dollars 42 ($ 496.166.18 1. evmeen cam. 43 Article 5. CONTRACT DOCUMENTS 44 5.1 CONTENTS: 45 A. The Contract Documents which comprise the entire agreement between Developer and 46 Contractor concerning the Work consist of the following: 47 1. This Agreement. 48 2. Attachments to this Agreement: 49 a. Bid Form (As provided by Developer) 50 1) Proposal Form (DAP Version) 51 2) Prequalification Statement 52 3) State and Federal documents (project specific) 53 b. Insurance ACORD Form(s) 54 c. Payment Bond (DAP Version) 55 d. Performance Bond (DAP Version) 56 e. Maintenance Bond (DAP Version) 57 f. Power of Attorney for the Bonds 58 g. Worker's Compensation Affidavit 59 h. MBE and/or SBE Commitment Form (If required) 60 3. Standard City General Conditions of the Construction Contract for Developer 61 Awarded Projects. 62 4. Supplementary Conditions. 63 5. Specifications specifically made a part of the Contract Documents by attachment 64 or, if not attached, as incorporated by reference and described in the Table of 65 Contents of the Project's Contract Documents. 66 6. Drawings. 67 7. Addenda. 68 8. Documentation submitted by Contractor prior to Notice of Award. 69 9. The following which may be delivered or issued after the Effective Date of the 70 Agreement and, if issued, become an incorporated part of the Contract Documents: 71 a. Notice to Proceed. 72 b. Field Orders. 73 c. Change Orders. 74 d. Letter of Final Acceptance. 75 76 CITY OF FORT WORTH soars ourpoar Canons STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105365 Revised June 16, 2016 00 52 43 - 3 Developer Awarded Project Agreement Page 3 of 4 77 Article 6. INDEMNIFICATION 78 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 79 expense, the city, its officers, servants and employees, from and against any and all 80 claims arising out of, or alleged to arise out of, the work and services to be performed 81 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 82 under this contract. This indemnification provision is Mecifically intended to operate 83 and be effective even if it is alleged or proven that all or some of the damages being 84 sought were caused, in whole or in cart. by anv act. omission or negligence of the citv. 85 This indemnity provision is intended to include, without limitation, indemnity for 86 costs, expenses and legal fees incurred by the city in defending against such claims and 87 causes of actions. 88 89 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 90 the city, its officers, servants and employees, from and against any and all loss, damage 91 or destruction of property of the city, arising out of, or alleged to arise out of, the work 92 and services to be performed by the contractor, its officers, agents, employees, 93 subcontractors, licensees or invitees under this contract. This indemnification 94 provision is snecificallv intended to operate and be effective even if it is alle eg d or 95 proven that all or some of the damages being sought were caused. in whole or in part. 96 by anv act, omission or negligence of the citv. 97 98 Article 7. MISCELLANEOUS 99 7.1 Terms. 100 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of 101 the Construction Contract for Developer Awarded Projects. 102 7.2 Assignment of Contract. 103 This Agreement, including all of the Contract Documents may not be assigned by the 104 Contractor without the advanced express written consent of the Developer. 105 7.3 Successors and Assigns. 106 Developer and Contractor each binds itself, its partners, successors, assigns and legal 107 representatives to the other party hereto, in respect to all covenants, agreements and 108 obligations contained in the Contract Documents. 109 7.4 Severability. 110 Any provision or part of the Contract Documents held to be unconstitutional, void or ill unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 112 remaining provisions shall continue to be valid and binding upon DEVELOPER and 113 CONTRACTOR. 114 7.5 Governing Law and Venue. 115 This Agreement, including all of the Contract Documents is performable in the State of 116 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 117 Northern District of Texas, Fort Worth Division, CrrV OF FORT WORTH SOMA Outpost CO8ltas STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105365 Revised June 16, 2016 118 119 120 121 122 123 124 125 126 127 128 00 52 43 - 4 Developer Awarded Project Agreement Page 4 of 4 7.6 Authority to Sign. Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized signatory of the Contractor. IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple counterparts. This Agreement is effective as of the last date signed by the Parties ("Effective Date"). Contractor: West Fork Construction, LLC By: (Signature) Michael Graham (Printed Name) Developer: Outpost Fort Worth. LLC By: Xldlta n ..44AC41�f rD✓ (Signature) William Moncrief (Printed Name) Title: Managing Member Title: Manager Company Name: West Fork Construction LLC Company name:Outpost Fort Worth LLC Address: Address: 2421 W 7th St 4460 Harley Ave Suite 350 City/State/Zip: Fort Worth, Texas 76107 6/25/2024 Date City/State/Zip: Fort Worth, Texas 76107 6/25/2024 Date CITY OF FORT WORTH SOMA Outpost Casitas STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105365 Revised June16,2016 006125-1 CERTIFICATE OF INSURANCE Pagel of 2 SECTION 00 6125 CERTIFICATE OF INSURANCE CITY OF FORT WORTH SOMA-OUTPOSE CASITAS STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS CPN 105365 Revised January 31, 2012 POLICY NUMBER: COMMERCIAL GENERAL LIABILITY CG 20 10 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s) As required by written contract executed and signed by all parties prior to the date of loss but only to the extent permitted by law. The insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. Location(s) Of Covered Operations As designated in written contract with the Named Insured. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf; in the performance of your ongoing operations for the additional insured(s) at the location(s) designated above. However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following additional exclusions apply: This insurance does not apply to "bodily injury" or "property damage" occurring after: 1. All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or 2. That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. CG 20 10 12 19 © Insurance Services Office, Inc., 2018 Page 1 of 2 C. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable limits of insurance; whichever is less. This endorsement shall not applicable limits of insurance. increase the Page 2 of 2 © Insurance Services Office, Inc., 2018 CG 20 10 12 19 COMMERCIAL GENERAL LIABILITY CG20371219 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART Name Of Additional Insured Person(s) Or Organization(s) As required by written contract executed prior to the date of occurrence but only to the extent permitted by law and the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. SCHEDULE Location And Description Of Completed Operations As designated in written contract with the Named Insured. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury" or "property damage" caused, in whole or in part, by "your work" at the location designated and described in the Schedule of this endorsement performed for that additional insured and included in the "products -completed operations hazard". However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable limits of insurance; whichever is less. This endorsement shall not increase the applicable limits of insurance. CG 20 37 12 19 © Insurance Services Office, Inc., 2018 Page 1 of 1 COMMERCIAL GENERAL LIABILITY CG24041219 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART ELECTRONIC DATA LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART POLLUTION LIABILITY COVERAGE PART DESIGNATED SITES POLLUTION LIABILITY LIMITED COVERAGE PART DESIGNATED SITES PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART UNDERGROUND STORAGE TANK POLICY DESIGNATED TANKS SCHEDULE Name Of Person(s) Or Organization(s): Any person or organization to whom or to which you are obligated by virtue of a written contract to waive your right of recovery. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. The following is added to Paragraph 8. Transfer Of Rights Of Recovery Against Others To Us of Section IV — Conditions: We waive any right of recovery against the person(s) or organization(s) shown in the Schedule above because of payments we make under this Coverage Part. Such waiver by us applies only to the extent that the insured has waived its right of recovery against such person(s) or organization(s) prior to loss. This endorsement applies only to the person(s) or organization(s) shown in the Schedule above. CG 24 04 12 19 © Insurance Services Office, Inc., 2018 Page 1 of 1 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY WORDING This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE With respect to coverage provided to an additional insured via attachment of an Additional Insured endorsement to this policy, such coverage is primary insurance and we will not seek contribution from any other insurance available to that additional insured. ALL OTHER TERMS AND CONDITIONS OF THIS POLICY REMAIN UNCHANGED VCAS2035 11 10 Page 1 of 1 Policy Number: 10005572CA COMMERCIAL AUTO BA30001215 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BUSINESS AUTO POLICY PLUS ENDORSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below. Named Insured: Endorsement Effective Date: CONTENTS: A. ADDITIONAL INSURED — AUTOMATIC STATUS B. BROADENEDINSURED C. DUTIES IN THE EVENT OF AN ACCIDENT, CLAIM, SUIT OR LOSS CONDITION D.. UNINTENTIONAL FAILURE TO DISCLOSE ALL HAZARDS E. RESULTANT MENTAL ANGUISH F. AMENDMENT OF FELLOW EMPLOYEE LIABILITY EXCLUSION G. EMPLOYEES AS INSUREDS H. EMPLOYEE HIRED AUTOS I. INCREASED BAIL BONDS AND LOSS OF EARNINGS J. INCREASED TRANSPORTATION EXPENSE — TOTAL THEFT OF A COVERED AUTO K. INCREASED LOSS OF USE EXPENSE L. ACCIDENTAL DISCHARGE OF AIRBAG COVERAGE M. GLASS REPAIR DEDUCTIBLE WAIVER N. COLLISION DEDUCTIBLE WAIVER O. INCREASED LIMIT FOR ELECTRONIC EQUIPMENT P. TOWING Q. AUTO LOAN/LEASE GAP COVERAGE R. PERSONAL EFFECTS COVERAGE S. LOCKSMITH SERVICES T. TAPES, RECORDS AND DISCS COVERAGE U. HIRED AUTO PHYSICAL DAMAGE V. HIRED PRIVATE PASSENGER AUTOS AND LIGHT TRUCKS — WORLDWIDE COVERAGE W. TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US BA 30 00 12 15 Page 1 of 6 Policy Number: 10003372CA A. ADDITIONAL INSURED — this Coverage Part or would be AUTOMATIC STATUS an "insured" under such Item A.1.c. of SECTION II —COVERED policy but for its termination or AUTOS LIABILITY COVERAGE,WHO the exhaustion of its limits of IS AN INSURED is deleted and insurance. Each such replaced with the following: organization remains qualified c. Anyone liable for the conduct of as an "insured" only while you an "insured" described above own a financial interest of more but only to the extent of that than 50% in the organization liability. This includes, but is not during the policy period. limited to, any person or e. Any organization that is acquired organization for whom you are or formed by you, other than a performing operations when partnership or joint venture, of you and such person or which you own a financial organization have agreed in a interest of more than 50% will written contract or a written qualify as an "insured". agreement that such person or However, such organization will organization be added as an not qualify as an "insured" if it is additional insured on your also an "insured" under another policy. Such person or policy, other than a policy organization is an additional written to apply specifically in insured under this policy only excess of this Coverage Part or with respect to liability caused would be an "insured" under in whole or in part by your acts such policy but for its or omissions in the termination or the exhaustion of performance of your ongoing its limits of insurance. Each operations for the additional such organization remains insured. A person or qualified as an "insured" only organization's status as an while you own a financial additional insured for ongoing interest of more than 50% in the operations under this policy organization during the policy ends when your operations for period. the additional insured are This provision does not include: completed or when this policy (1) any organization is cancelled, whichever occurs 180 days or more after its first. acquisition or formation; or (2) "bodily injury", B. BROADENED INSURED "property damage" or The following paragraph is added "covered pollution cost or to SECTION II —A.1. WHO IS AN expense" caused by an INSURED: "accident" that occurred d. Any organization of yours, other before you acquired or than a partnership or joint formed the organization. venture, of which you own a financial interest of more than C. DUTIES IN THE EVENT OF AN 50% as of the effective date of ACCIDENT, CLAIM, SUIT OR LOSS this Coverage part, will qualify CONDITION as an "insured". However, such The following paragraph is added to organization will not qualify as "insured" the end of Paragraph A. 2., an if it is also an "insured" under another policy, SECTION IV — BUSINESS AUTO other than a policy written to CONDITIONS: apply specifically in excess of Your obligation to notify us promptly of an "accident", claim, "suit" or "loss" is BA 30 00 12 15 Page 2 of 6 Policy Number: 10003372CA satisfied if you send us written notice as excess over any other collectible soon as practicable after any of your insurance executive officers, directors, partners, insurance managers, legal representatives, or "employees" G. EMPLOYEES AS INSUREDS authorized by you to give or receive The following is added to the SECTION notices becomes aware of or should II —COVERED AUTOS LIABILITY have become aware of such "accident", COVERAGE, Paragraph A.1. Who Is An claim, "suit" or "loss". Insured provision: If you report an "accident" or "loss" to Any "employee" of yours is an "insured" your workers compensation insurer while using a covered "auto" you don't which later becomes a claim under this own, hire or borrow in your business or coverage part, failure to report such your personal affairs. "accident" or "loss" to us at the time of the "accident" or "loss" will not be H. EMPLOYEES HIRED AUTOS considered a violation of this Condition, if you notify us as soon as practicable The following is added to the SECTION when you become aware that the II —COVERED AUTOS LIABILITY "accident" or "loss" has become a COVERAGE, Paragraph A.1. Who Is An liability claim. Insured provision: Any "employee" of yours is an "insured" while operating an "auto" hired or rented D. UNINTENTIONAL FAILURE TO under a contract or agreement in that DISCLOSE ALL HAZARDS "employee's" name, with your The following paragraph is added to permission, while performing duties Paragraph B. of SECTION IV — related to the conduct of your business. BUSINESS AUTO CONDITIONS: SECTION IV — BUSINESS AUTO Based on our reliance on your CONDITIONS, B. General Conditions, representations of existing hazards, if 5.b. Other Insurance is replaced by the you unintentionally fail to disclose all following: such hazards prior to the beginning of For Hired Auto Physical Damage the policy period of this Coverage Part, Coverage, the following are deemed to we shall not deny coverage under this be covered "autos" you own: Coverage Part because of such failure. 1. Any covered "auto" you lease, hire, rent or borrow; and E. RESULTANT MENTAL ANGUISH 2. Any covered "auto" hired or rented by your "employee" The definition of "bodily injury" is under a contract in that SECTION V- DEFINITIONS is replaced individual "employee's" name, by the following" with your permission, while "Bodily injury" means bodily injury, performing duties related to sickness or disease sustained by any the conduct of your business. person, including mental anguish or However, any "auto" that is leased, death resulting from any of these. hired, rented or borrowed with a driver is not a covered "auto". F. AMENDMENT OF FELLOW EMPLOYEE LIABILITY EXCLUSION I. INCREASED BAIL BONDS AND LOSS The Fellow Employee Exclusion OF EARNINGS contained in Section II — Covered Autos SECTION II — COVERED AUTOS Liability Coverage does not apply if the LIABILITY COVERAGE, A.2. Coverage "bodily injury" results from the use of a Extensions, a. Supplementary covered "auto" you own or hire. The Payments is amended by: insurance granted under this provision is BA 30 00 12 15 Page 3 of 6 Policy Number: 10005572CA 1. Replace the $2,000 limit for cost of bail bonds with $5,000 in paragraph (2); and 2. Replace the $250 a day limit for reasonable expenses including actual loss of earnings with $500 a day in paragraph (4). J. INCREASED TRANSPORTATION EXPENSE — TOTAL THEFT OF A COVERED AUTO SECTION III — PHYSICAL DAMAGE COVERAGE, A.4. Coverage Extensions, a. Transportation Expenses, is amended by replacing $20 per day with $60 per day, and the $600 maximum with $1,800 maximum. This extension applies to all covered "autos" with a Gross Vehicle Weight of less than 10,001 pounds. K. INCREASED LOSS OF USE EXPENSES SECTION III — PHYSICAL DAMAGE COVERAGE, A.4. Coverage Extensions, b. Loss Of Use Expenses, is amended by replacing $20 per day with $60 per day, and the $600 maximum with $1,800 maximum. L. ACCIDENTAL DISCHARGE OF AIRBAG COVERAGE The following is added to Exclusion 13.3.a. of SECTION III — PHYSICAL DAMAGE COVERAGE: However, this exclusion does not apply to the accidental discharge of an airbag. M. GLASS REPAIR DEDUCTIBLE WAIVER The following is added to paragraph D. of SECTION III — PHYSICAL DAMAGE COVERAGE: No deductible applies to glass damage if the glass is repaired in a manner acceptable to us rather than replaced. N. COLLISION DEDUCTIBLE WAIVER The following is added to paragraph D. of SECTION III — PHYSICAL DAMAGE COVERAGE: When a covered "auto" insured for Collision coverage under this policy collides with another "auto" we insure, the Collision deductible applicable to the covered "auto" or "autos" insured under this policy shall not apply. O. INCREASED LIMIT FOR ELECTRONIC EQUIPMENT Section III PHYSICAL DAMAGE COVERAGE C.1. b. is amended by replacing the $1,000 with $2,500. P. TOWING SECTION III — PHYSICAL DAMAGE COVERAGE, A.2. Towing, is replaced by replacing the following: 2. Towing We will pay up to $75 for towing and labor costs incurred each time an "auto" with a Gross Vehicle Weight of less than 10,001 pounds is disabled if the declarations indicate that either Comprehensive Coverage or Specified Causes of Loss Coverage and Collision Coverage are provided for that "auto". Q. AUTO LOAN/LEASE GAP COVERAGE The following is added to SECTION III — PHYSICAL DAMAGE COVERAGE: In the event of a total "loss" to a covered "auto" shown in the Schedule or Declarations, we will pay any unpaid amount due on the lease or loan for a covered "auto", less: 1. Overdue payments and financial penalties associated with those payments as of the date of the "total loss"; 2. The carryover, transfer or rollover of a previous outstanding lease or loan BA 30 00 12 15 Page 4 of 6 Policy Number: 10005572CA balance from another vehicle to the original lease or loan for the scheduled "auto"; 3. The dollar amount of any unrepaired damage which occurred prior to the total "loss" of the scheduled "auto"; 4. All refunds paid or payable to you as a result of the early termination of the lease of loan agreement or, to the extent financed, as a result of the early termination of any warranty or extended service agreement on the scheduled "auto"; 5. Financial penalties imposed under a lease agreement for high mileage, excessive use or abnormal wear and tear; 6. Nonrefundable security deposits; and 7. Costs for extended warranties, Credit Life Insurance, Health, Accident or Disability Insurance purchased with the loan or lease. The following is added to paragraph A. Loss Conditions of SECTION IV — BUSINESS AUTO CONDITIONS: Lease/Loan Gap Coverage shall apply to the remaining term of the original lease or loan agreement written on the scheduled "auto" at the time of total "loss". R. PERSONAL EFFECTS COVERAGE The following is added to SECTION III — PHYSICAL DAMAGE COVERAGE, A.4. Coverage Extensions: c. Personal Effects We will pay up to $500 for "loss" to personal effects which are: (1) owned by an "insured"; and (2) in or on a covered "auto". This coverage applies only in the event of a total theft of a covered "auto". No deductible applies to this coverage. Tapes, records, discs or other similar devices used with audio, visual or data electronic equipment are not considered personal effects. S. LOCKSMITH SERVICES The following is added to SECTION III — PHYSICAL DAMAGE COVERAGE, A.4. Coverage Extensions: d. Locksmith Services We will pay up to $100 for necessary locksmith services incurred because keys to a covered "auto" have been lost, stolen or damaged. No deductible applies to this coverage. T. TAPES, RECORDS AND DISCS COVERAGE Exclusion BA.a. of SECTION III — PHYSICAL DAMAGE COVERAGE does not apply. The following is added to SECTION III — PHYSICAL DAMAGE COVERAGE, A.4. Coverage Extensions: e. Tapes, Records And Discs Coverage Under Comprehensive Coverage we will pay for "loss" to tapes, records, discs or other similar devices used with audio, visual or data electronic equipment. We will pay only if the tapes, records, discs or other similar audio, visual or data electronic devices: (1) Are your property or that of a family member or employee (2) Are in a covered "auto" at the time of "loss". The most we will pay for "loss" is $200. U. HIRED AUTO PHYSICAL DAMAGE If hired "autos" are covered "autos" for Covered Autos Liability Coverage, then BA 30 00 12 15 Page 5 of 6 Policy Number: 10003372CA Comprehensive and Collision coverages $1,000 deductible will apply are extended to an "auto" you lease, for the "loss". hire, rent, or borrow subject to the following: V. HIRED PRIVATE PASSENGER AUTOS 1. The most we will pay for AND LIGHT TRUCKS — WORLDWIDE "loss" to any leased, hired, COVERAGE rented, or borrowed "auto" Paragraph b. 7.5.(1) of Section IV — is is the Actual Cash Value or BUSINESS AUTO CONDITIONS — thecost to repair the "auto", echever Policy Period, Coverage Territory is is smallest. whireplaced by the following: 2. The deductible for Hired Anywhere in the world if a covered Auto Physical Damage will "auto" of the private passenger type or a be equal to the largest light truck with Gross Vehicle Weight deductible applicable to any "auto" less than 10,001 pounds is leased, owned scheduled on hired, rented or borrowed without a this policy for that coverage. driver for a period of 30 days or less. No deductible applies to loss by fire or lightning. 3. If the "loss" to the leased, W.TRANSFER OF RIGHTS OF hired, rented, or borrowed RECOVERY AGAINST OTHERS TO "auto" is covered by US Comprehensive Coverage, The following is added to Section IV — and if no owned "auto" BUSINESS AUTO CONDITIONS A.S. scheduled on this policy is Transfer Of Rights Of Recovery Against insured for Comprehensive Others To Us: Coverage, a $100 We waive any right of recovery we may deductible will apply to the have against any person or organization "loss". to the extent required of you under a 4. If the "loss" to the leased, written contract executed prior to any hired, rented, or borrowed "accident" or "loss", provided the "auto" is covered by "accident" or "loss" arises out of Collision Coverage, and if operations contemplated by such no owned "auto" scheduled contract. This waiver applies only to the on this policy is insured for person or organization designated in Collision Coverage, a such contract. BA 30 00 12 15 Page 6 of 6 Policy Number: 10003372CA COMMERCIAL AUTO CA044911 16 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY - OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. A. The following is added to the Other Insurance Condition in the Business Auto Coverage Form and the Other Insurance — Primary And Excess Insurance Provisions in the Motor Carrier Coverage Form and supersedes any provision to the contrary: This Coverage Form's Covered Autos Liability Coverage is primary to and will not seek contribution from any other insurance available to an "insured" under your policy provided that: 1. Such "insured" is a Named Insured under such other insurance; and 2. You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to such "insured". B. The following is added to the Other Insurance Condition in the Auto Dealers Coverage Form and supersedes any provision to the contrary: This Coverage Form's Covered Autos Liability Coverage and General Liability Coverages are primary to and will not seek contribution from any other insurance available to an "insured" under your policy provided that: 1. Such "insured" is a Named Insured under such other insurance; and 2. You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to such "insured". CA 04 49 11 16 © Insurance Services Office, Inc., 2016 Page 1 of 1 P ---eXaSMutuar WORKERS' COMPENSATION INSURANCE WORKERS' COMPENSATION AND WC 42 03 04 B EMPLOYERS LIABILITY POLICY Insured copy TEXAS WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in item 3.A. of the Information Page. We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule, but this waiver applies only with respect to bodily injury arising out of the operations described in the schedule where you are required by a written contract to obtain this waiver from us. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. The premium for this endorsement is shown in the Schedule. Schedule 1. ( ) Specific Waiver Name of person or organization (X)Blanket Waiver Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver. 2. Operations: All Texas operations 3. Premium: The premium charge for this endorsement shall be 2.00 percent of the premium developed on payroll in connection with work performed for the above person(s) or organization(s) arising out of the operations described. 4. Advance Premium: Included, see Information Page This endorsement changes the policy to which it is attached effective on the inception date of the policy unless a different date is indicated below. (The following "attaching clause" need be completed only when this endorsement is issued subsequent to preparation of the policy.) This endorsement, effective on 9/17/23 at 12:01 a.m. standard time, forms a part of: Policy no. 0002028704 of Texas Mutual Insurance Company effective on 9/17/23 Issued to: WEST FORK CONSTRUCTION LLC / 4 This is not a bill NCCI Carrier Code: 29939 Authorized representative 9/13/23 PO Box 12058, Austin, TX 78711-2058 1 of 1 texasmutual.com 1 (800) 859-5995 1 Fax (800) 359-0650 WC 42 03 04 B POLICY NUMBER: COMMERCIAL GENERAL LIABILITY CG 20 10 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s) As required by written contract executed and signed by all parties prior to the date of loss but only to the extent permitted by law. The insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. Location(s) Of Covered Operations As designated in written contract with the Named Insured. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf; in the performance of your ongoing operations for the additional insured(s) at the location(s) designated above. However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following additional exclusions apply: This insurance does not apply to "bodily injury" or "property damage" occurring after: 1. All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or 2. That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. CG 20 10 12 19 © Insurance Services Office, Inc., 2018 Page 1 of 2 C. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable limits of insurance; whichever is less. This endorsement shall not applicable limits of insurance. increase the Page 2 of 2 © Insurance Services Office, Inc., 2018 CG 20 10 12 19 COMMERCIAL GENERAL LIABILITY CG20371219 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART Name Of Additional Insured Person(s) Or Organization(s) As required by written contract executed prior to the date of occurrence but only to the extent permitted by law and the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. SCHEDULE Location And Description Of Completed Operations As designated in written contract with the Named Insured. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury" or "property damage" caused, in whole or in part, by "your work" at the location designated and described in the Schedule of this endorsement performed for that additional insured and included in the "products -completed operations hazard". However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable limits of insurance; whichever is less. This endorsement shall not increase the applicable limits of insurance. CG 20 37 12 19 © Insurance Services Office, Inc., 2018 Page 1 of 1 COMMERCIAL GENERAL LIABILITY CG24041219 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART ELECTRONIC DATA LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART POLLUTION LIABILITY COVERAGE PART DESIGNATED SITES POLLUTION LIABILITY LIMITED COVERAGE PART DESIGNATED SITES PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART UNDERGROUND STORAGE TANK POLICY DESIGNATED TANKS SCHEDULE Name Of Person(s) Or Organization(s): Any person or organization to whom or to which you are obligated by virtue of a written contract to waive your right of recovery. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. The following is added to Paragraph 8. Transfer Of Rights Of Recovery Against Others To Us of Section IV — Conditions: We waive any right of recovery against the person(s) or organization(s) shown in the Schedule above because of payments we make under this Coverage Part. Such waiver by us applies only to the extent that the insured has waived its right of recovery against such person(s) or organization(s) prior to loss. This endorsement applies only to the person(s) or organization(s) shown in the Schedule above. CG 24 04 12 19 © Insurance Services Office, Inc., 2018 Page 1 of 1 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY WORDING This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE With respect to coverage provided to an additional insured via attachment of an Additional Insured endorsement to this policy, such coverage is primary insurance and we will not seek contribution from any other insurance available to that additional insured. ALL OTHER TERMS AND CONDITIONS OF THIS POLICY REMAIN UNCHANGED VCAS2035 11 10 Page 1 of 1 Policy Number: 10005572CA COMMERCIAL AUTO BA30001215 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BUSINESS AUTO POLICY PLUS ENDORSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below. Named Insured: Endorsement Effective Date: CONTENTS: A. ADDITIONAL INSURED — AUTOMATIC STATUS B. BROADENEDINSURED C. DUTIES IN THE EVENT OF AN ACCIDENT, CLAIM, SUIT OR LOSS CONDITION D.. UNINTENTIONAL FAILURE TO DISCLOSE ALL HAZARDS E. RESULTANT MENTAL ANGUISH F. AMENDMENT OF FELLOW EMPLOYEE LIABILITY EXCLUSION G. EMPLOYEES AS INSUREDS H. EMPLOYEE HIRED AUTOS I. INCREASED BAIL BONDS AND LOSS OF EARNINGS J. INCREASED TRANSPORTATION EXPENSE — TOTAL THEFT OF A COVERED AUTO K. INCREASED LOSS OF USE EXPENSE L. ACCIDENTAL DISCHARGE OF AIRBAG COVERAGE M. GLASS REPAIR DEDUCTIBLE WAIVER N. COLLISION DEDUCTIBLE WAIVER O. INCREASED LIMIT FOR ELECTRONIC EQUIPMENT P. TOWING Q. AUTO LOAN/LEASE GAP COVERAGE R. PERSONAL EFFECTS COVERAGE S. LOCKSMITH SERVICES T. TAPES, RECORDS AND DISCS COVERAGE U. HIRED AUTO PHYSICAL DAMAGE V. HIRED PRIVATE PASSENGER AUTOS AND LIGHT TRUCKS — WORLDWIDE COVERAGE W. TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US BA 30 00 12 15 Page 1 of 6 Policy Number: 10003372CA A. ADDITIONAL INSURED — this Coverage Part or would be AUTOMATIC STATUS an "insured" under such Item A.1.c. of SECTION II —COVERED policy but for its termination or AUTOS LIABILITY COVERAGE,WHO the exhaustion of its limits of IS AN INSURED is deleted and insurance. Each such replaced with the following: organization remains qualified c. Anyone liable for the conduct of as an "insured" only while you an "insured" described above own a financial interest of more but only to the extent of that than 50% in the organization liability. This includes, but is not during the policy period. limited to, any person or e. Any organization that is acquired organization for whom you are or formed by you, other than a performing operations when partnership or joint venture, of you and such person or which you own a financial organization have agreed in a interest of more than 50% will written contract or a written qualify as an "insured". agreement that such person or However, such organization will organization be added as an not qualify as an "insured" if it is additional insured on your also an "insured" under another policy. Such person or policy, other than a policy organization is an additional written to apply specifically in insured under this policy only excess of this Coverage Part or with respect to liability caused would be an "insured" under in whole or in part by your acts such policy but for its or omissions in the termination or the exhaustion of performance of your ongoing its limits of insurance. Each operations for the additional such organization remains insured. A person or qualified as an "insured" only organization's status as an while you own a financial additional insured for ongoing interest of more than 50% in the operations under this policy organization during the policy ends when your operations for period. the additional insured are This provision does not include: completed or when this policy (1) any organization is cancelled, whichever occurs 180 days or more after its first. acquisition or formation; or (2) "bodily injury", B. BROADENED INSURED "property damage" or The following paragraph is added "covered pollution cost or to SECTION II —A.1. WHO IS AN expense" caused by an INSURED: "accident" that occurred d. Any organization of yours, other before you acquired or than a partnership or joint formed the organization. venture, of which you own a financial interest of more than C. DUTIES IN THE EVENT OF AN 50% as of the effective date of ACCIDENT, CLAIM, SUIT OR LOSS this Coverage part, will qualify CONDITION as an "insured". However, such The following paragraph is added to organization will not qualify as "insured" the end of Paragraph A. 2., an if it is also an "insured" under another policy, SECTION IV — BUSINESS AUTO other than a policy written to CONDITIONS: apply specifically in excess of Your obligation to notify us promptly of an "accident", claim, "suit" or "loss" is BA 30 00 12 15 Page 2 of 6 Policy Number: 10003372CA satisfied if you send us written notice as excess over any other collectible soon as practicable after any of your insurance executive officers, directors, partners, insurance managers, legal representatives, or "employees" G. EMPLOYEES AS INSUREDS authorized by you to give or receive The following is added to the SECTION notices becomes aware of or should II —COVERED AUTOS LIABILITY have become aware of such "accident", COVERAGE, Paragraph A.1. Who Is An claim, "suit" or "loss". Insured provision: If you report an "accident" or "loss" to Any "employee" of yours is an "insured" your workers compensation insurer while using a covered "auto" you don't which later becomes a claim under this own, hire or borrow in your business or coverage part, failure to report such your personal affairs. "accident" or "loss" to us at the time of the "accident" or "loss" will not be H. EMPLOYEES HIRED AUTOS considered a violation of this Condition, if you notify us as soon as practicable The following is added to the SECTION when you become aware that the II —COVERED AUTOS LIABILITY "accident" or "loss" has become a COVERAGE, Paragraph A.1. Who Is An liability claim. Insured provision: Any "employee" of yours is an "insured" while operating an "auto" hired or rented D. UNINTENTIONAL FAILURE TO under a contract or agreement in that DISCLOSE ALL HAZARDS "employee's" name, with your The following paragraph is added to permission, while performing duties Paragraph B. of SECTION IV — related to the conduct of your business. BUSINESS AUTO CONDITIONS: SECTION IV — BUSINESS AUTO Based on our reliance on your CONDITIONS, B. General Conditions, representations of existing hazards, if 5.b. Other Insurance is replaced by the you unintentionally fail to disclose all following: such hazards prior to the beginning of For Hired Auto Physical Damage the policy period of this Coverage Part, Coverage, the following are deemed to we shall not deny coverage under this be covered "autos" you own: Coverage Part because of such failure. 1. Any covered "auto" you lease, hire, rent or borrow; and E. RESULTANT MENTAL ANGUISH 2. Any covered "auto" hired or rented by your "employee" The definition of "bodily injury" is under a contract in that SECTION V- DEFINITIONS is replaced individual "employee's" name, by the following" with your permission, while "Bodily injury" means bodily injury, performing duties related to sickness or disease sustained by any the conduct of your business. person, including mental anguish or However, any "auto" that is leased, death resulting from any of these. hired, rented or borrowed with a driver is not a covered "auto". F. AMENDMENT OF FELLOW EMPLOYEE LIABILITY EXCLUSION I. INCREASED BAIL BONDS AND LOSS The Fellow Employee Exclusion OF EARNINGS contained in Section II — Covered Autos SECTION II — COVERED AUTOS Liability Coverage does not apply if the LIABILITY COVERAGE, A.2. Coverage "bodily injury" results from the use of a Extensions, a. Supplementary covered "auto" you own or hire. The Payments is amended by: insurance granted under this provision is BA 30 00 12 15 Page 3 of 6 Policy Number: 10005572CA 1. Replace the $2,000 limit for cost of bail bonds with $5,000 in paragraph (2); and 2. Replace the $250 a day limit for reasonable expenses including actual loss of earnings with $500 a day in paragraph (4). J. INCREASED TRANSPORTATION EXPENSE — TOTAL THEFT OF A COVERED AUTO SECTION III — PHYSICAL DAMAGE COVERAGE, A.4. Coverage Extensions, a. Transportation Expenses, is amended by replacing $20 per day with $60 per day, and the $600 maximum with $1,800 maximum. This extension applies to all covered "autos" with a Gross Vehicle Weight of less than 10,001 pounds. K. INCREASED LOSS OF USE EXPENSES SECTION III — PHYSICAL DAMAGE COVERAGE, A.4. Coverage Extensions, b. Loss Of Use Expenses, is amended by replacing $20 per day with $60 per day, and the $600 maximum with $1,800 maximum. L. ACCIDENTAL DISCHARGE OF AIRBAG COVERAGE The following is added to Exclusion 13.3.a. of SECTION III — PHYSICAL DAMAGE COVERAGE: However, this exclusion does not apply to the accidental discharge of an airbag. M. GLASS REPAIR DEDUCTIBLE WAIVER The following is added to paragraph D. of SECTION III — PHYSICAL DAMAGE COVERAGE: No deductible applies to glass damage if the glass is repaired in a manner acceptable to us rather than replaced. N. COLLISION DEDUCTIBLE WAIVER The following is added to paragraph D. of SECTION III — PHYSICAL DAMAGE COVERAGE: When a covered "auto" insured for Collision coverage under this policy collides with another "auto" we insure, the Collision deductible applicable to the covered "auto" or "autos" insured under this policy shall not apply. O. INCREASED LIMIT FOR ELECTRONIC EQUIPMENT Section III PHYSICAL DAMAGE COVERAGE C.1. b. is amended by replacing the $1,000 with $2,500. P. TOWING SECTION III — PHYSICAL DAMAGE COVERAGE, A.2. Towing, is replaced by replacing the following: 2. Towing We will pay up to $75 for towing and labor costs incurred each time an "auto" with a Gross Vehicle Weight of less than 10,001 pounds is disabled if the declarations indicate that either Comprehensive Coverage or Specified Causes of Loss Coverage and Collision Coverage are provided for that "auto". Q. AUTO LOAN/LEASE GAP COVERAGE The following is added to SECTION III — PHYSICAL DAMAGE COVERAGE: In the event of a total "loss" to a covered "auto" shown in the Schedule or Declarations, we will pay any unpaid amount due on the lease or loan for a covered "auto", less: 1. Overdue payments and financial penalties associated with those payments as of the date of the "total loss"; 2. The carryover, transfer or rollover of a previous outstanding lease or loan BA 30 00 12 15 Page 4 of 6 Policy Number: 10005572CA balance from another vehicle to the original lease or loan for the scheduled "auto"; 3. The dollar amount of any unrepaired damage which occurred prior to the total "loss" of the scheduled "auto"; 4. All refunds paid or payable to you as a result of the early termination of the lease of loan agreement or, to the extent financed, as a result of the early termination of any warranty or extended service agreement on the scheduled "auto"; 5. Financial penalties imposed under a lease agreement for high mileage, excessive use or abnormal wear and tear; 6. Nonrefundable security deposits; and 7. Costs for extended warranties, Credit Life Insurance, Health, Accident or Disability Insurance purchased with the loan or lease. The following is added to paragraph A. Loss Conditions of SECTION IV — BUSINESS AUTO CONDITIONS: Lease/Loan Gap Coverage shall apply to the remaining term of the original lease or loan agreement written on the scheduled "auto" at the time of total "loss". R. PERSONAL EFFECTS COVERAGE The following is added to SECTION III — PHYSICAL DAMAGE COVERAGE, A.4. Coverage Extensions: c. Personal Effects We will pay up to $500 for "loss" to personal effects which are: (1) owned by an "insured"; and (2) in or on a covered "auto". This coverage applies only in the event of a total theft of a covered "auto". No deductible applies to this coverage. Tapes, records, discs or other similar devices used with audio, visual or data electronic equipment are not considered personal effects. S. LOCKSMITH SERVICES The following is added to SECTION III — PHYSICAL DAMAGE COVERAGE, A.4. Coverage Extensions: d. Locksmith Services We will pay up to $100 for necessary locksmith services incurred because keys to a covered "auto" have been lost, stolen or damaged. No deductible applies to this coverage. T. TAPES, RECORDS AND DISCS COVERAGE Exclusion BA.a. of SECTION III — PHYSICAL DAMAGE COVERAGE does not apply. The following is added to SECTION III — PHYSICAL DAMAGE COVERAGE, A.4. Coverage Extensions: e. Tapes, Records And Discs Coverage Under Comprehensive Coverage we will pay for "loss" to tapes, records, discs or other similar devices used with audio, visual or data electronic equipment. We will pay only if the tapes, records, discs or other similar audio, visual or data electronic devices: (1) Are your property or that of a family member or employee (2) Are in a covered "auto" at the time of "loss". The most we will pay for "loss" is $200. U. HIRED AUTO PHYSICAL DAMAGE If hired "autos" are covered "autos" for Covered Autos Liability Coverage, then BA 30 00 12 15 Page 5 of 6 Policy Number: 10003372CA Comprehensive and Collision coverages $1,000 deductible will apply are extended to an "auto" you lease, for the "loss". hire, rent, or borrow subject to the following: V. HIRED PRIVATE PASSENGER AUTOS 1. The most we will pay for AND LIGHT TRUCKS — WORLDWIDE "loss" to any leased, hired, COVERAGE rented, or borrowed "auto" Paragraph b. 7.5.(1) of Section IV — is is the Actual Cash Value or BUSINESS AUTO CONDITIONS — thecost to repair the "auto", echever Policy Period, Coverage Territory is is smallest. whireplaced by the following: 2. The deductible for Hired Anywhere in the world if a covered Auto Physical Damage will "auto" of the private passenger type or a be equal to the largest light truck with Gross Vehicle Weight deductible applicable to any "auto" less than 10,001 pounds is leased, owned scheduled on hired, rented or borrowed without a this policy for that coverage. driver for a period of 30 days or less. No deductible applies to loss by fire or lightning. 3. If the "loss" to the leased, W.TRANSFER OF RIGHTS OF hired, rented, or borrowed RECOVERY AGAINST OTHERS TO "auto" is covered by US Comprehensive Coverage, The following is added to Section IV — and if no owned "auto" BUSINESS AUTO CONDITIONS A.S. scheduled on this policy is Transfer Of Rights Of Recovery Against insured for Comprehensive Others To Us: Coverage, a $100 We waive any right of recovery we may deductible will apply to the have against any person or organization "loss". to the extent required of you under a 4. If the "loss" to the leased, written contract executed prior to any hired, rented, or borrowed "accident" or "loss", provided the "auto" is covered by "accident" or "loss" arises out of Collision Coverage, and if operations contemplated by such no owned "auto" scheduled contract. This waiver applies only to the on this policy is insured for person or organization designated in Collision Coverage, a such contract. BA 30 00 12 15 Page 6 of 6 Policy Number: 10003372CA COMMERCIAL AUTO CA044911 16 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY - OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. A. The following is added to the Other Insurance Condition in the Business Auto Coverage Form and the Other Insurance — Primary And Excess Insurance Provisions in the Motor Carrier Coverage Form and supersedes any provision to the contrary: This Coverage Form's Covered Autos Liability Coverage is primary to and will not seek contribution from any other insurance available to an "insured" under your policy provided that: 1. Such "insured" is a Named Insured under such other insurance; and 2. You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to such "insured". B. The following is added to the Other Insurance Condition in the Auto Dealers Coverage Form and supersedes any provision to the contrary: This Coverage Form's Covered Autos Liability Coverage and General Liability Coverages are primary to and will not seek contribution from any other insurance available to an "insured" under your policy provided that: 1. Such "insured" is a Named Insured under such other insurance; and 2. You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to such "insured". CA 04 49 11 16 © Insurance Services Office, Inc., 2016 Page 1 of 1 P ---eXaSMutuar WORKERS' COMPENSATION INSURANCE WORKERS' COMPENSATION AND WC 42 03 04 B EMPLOYERS LIABILITY POLICY Insured copy TEXAS WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in item 3.A. of the Information Page. We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule, but this waiver applies only with respect to bodily injury arising out of the operations described in the schedule where you are required by a written contract to obtain this waiver from us. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. The premium for this endorsement is shown in the Schedule. Schedule 1. ( ) Specific Waiver Name of person or organization (X)Blanket Waiver Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver. 2. Operations: All Texas operations 3. Premium: The premium charge for this endorsement shall be 2.00 percent of the premium developed on payroll in connection with work performed for the above person(s) or organization(s) arising out of the operations described. 4. Advance Premium: Included, see Information Page This endorsement changes the policy to which it is attached effective on the inception date of the policy unless a different date is indicated below. (The following "attaching clause" need be completed only when this endorsement is issued subsequent to preparation of the policy.) This endorsement, effective on 9/17/23 at 12:01 a.m. standard time, forms a part of: Policy no. 0002028704 of Texas Mutual Insurance Company effective on 9/17/23 Issued to: WEST FORK CONSTRUCTION LLC / 4 This is not a bill NCCI Carrier Code: 29939 Authorized representative 9/13/23 PO Box 12058, Austin, TX 78711-2058 1 of 1 texasmutual.com 1 (800) 859-5995 1 Fax (800) 359-0650 WC 42 03 04 B THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY SCHEDULE OF UNDERLYING INSURANCE The limits shown below reflect your underlying limits. We attach over only those lines of coverage (A, B, C or D) where underlying limits are shown. Coverage afforded under this policy is subject to all forms, endorsements, exclusions, definitions, terms and conditions of the underlying policy. Type of Policy A. COMMERCIAL GENERAL LIABILITY: Company: Berkley Assurance Company Policy No: VUMA0326150 Effective Date: 09/17/2023 Expiration Date: 09/17/2024 Each Occurrence Limit General Aggregate Limit (Other than Products/Completed Operations) Products/Completed Operations Aggregate Limit Personal & Advertising Injury Limit B. AUTOMOBILE LIABILITY: Limits of Liability $ 1,000,000 $ 2,000,000 $ 2,000,000 $ 1,000,000 Company: State Auto Insurance Companies Policy No: 10005572CA Effective Date: 09/17/2023 Expiration Date: 09/17/2024 CSL $ 1,000,000 Each Accident Hired/Non-Owned Only $ 1,000,000 Each Accident C. EMPLOYER'S LIABILITY: Company: Texas Mutual Workers' Compensation Insurance Policy No: 0002028704 Effective Date: 09/17/2023 Expiration Date: 09/17/2024 Employers' Liability — Bodily Injury by Accident $ 1,000,000 Each Accident Employers' Liability— Bodily Injury by Disease $ 1,000,000 Aggregate Limit Employers' Liability — Bodily Injury by Disease $ 1,000,000 Each Employee CEXC 10 01 (10-17) Page 1 of 1 COMMERCIAL EXCESS LIABILITY POLICY Various provisions of this policy restrict coverage. Read the entire policy carefully to determine rights, duties, and what is and is not covered. In consideration of the payment of the premium, the Company, in reliance upon the covenants, warranties, representations and mutual agreements set forth herein and in the "Underlying Insurance", and subject to all the terms and conditions of this policy, hereby agrees with the Insured as follows: Section 1 - Insuring Agreements The Company hereby agrees to pay on behalf of the Insured that portion of "Ultimate Net Loss" in excess of the limits of "Underlying Insurance" as shown in the Schedule of "Underlying Insurance", but only up to an amount not exceeding the Company's Limit of Liability as show in the Declarations. Except for the Terms, Definitions, Conditions and Exclusions of this policy, the coverage provided by this policy will follow the "Underlying Insurance" policy as shown in the Schedule of "Underlying Insurance". In no event will this policy grant broader coverage than that provided by the most restrictive policy included in the "Underlying Insurance". 2. The inclusion or addition hereunder of more than one Insured will not increase the Company's Limit of Liability beyond that set forth in the Declarations. 3. If "Underlying Insurance" provides for any sublimit of liability, this policy will not apply in excess of such sublimit. 4. This insurance applies to "Ultimate Net Loss" that takes place in the "Coverage Territory" Section 2 - Definitions 1. "Each Annual Period" The term "Each Annual Period" will mean consecutive period of one year commencing from the inception date of this policy. 2. "Ultimate Net Loss" The term "Ultimate Net Loss" will mean all sums which the Insured will become legally obligated to pay as damages, including interest thereon, whether by reason of adjudication or settlement because of injury or damage, after making deductions of all recoveries and for other valid and collectible insurance, excepting however the policy(ies) of the underlying insurer(s). "Ultimate Net Loss" will exclude all interest accruing after entry of judgment, costs, and expenses, except with the consent of the Company. 3. "Underlying Insurance" The term "Underlying Insurance" will mean the policy or polices listed in the Schedule of "Underlying Insurance". 4. "Coverage Territory" The "Coverage Territory" will be deemed to be anywhere in the world, with the exception of any country or jurisdiction which is subject to trade or other economic sanction or embargo by the United States of America, provided a claim or suit for damages within the "Coverage Territory" must be brought within the United States of America. Payments under this policy will only be made in full compliance with all United States of America economic or trade sanction laws or regulations, including, but not limited to, sanctions, laws and regulations administered and enforced by the U.S. Treasury Department's Office of Foreign Assets Control ("OFAC"). CEXC1000 08 14 Page 1 of 7 Section 3 - Conditions Premium The Insured will pay premium to the Company as specified in the Declarations. Unless otherwise provided, the premium for this policy is a flat premium and is not subject to adjustment except as provided herein or amended by endorsement. If any additional premium charge is made to the "Underlying Insurance", during the policy period or if there is an increase in the risk assumed by us, our premium may be adjusted accordingly. 2. Duties in the Event of Accident, Occurrence, Claim or Suit Any Insured must see to it that we: a. are notified as soon as practicable of any accident or occurrence which may result in a claim or suit which may involve this policy or any "Underlying Insurance"; b. receive notice of the claim or suit as soon as practicable. Notice will include: 1) how, when and where the accident or occurrence took place; 2) the Insured's name and address; 3) the names and addresses of any injured persons and witnesses; and 4) the nature and location of any injury or damage arising out of the accident or occurrence. C. are assisted, upon our request, in the enforcement of any right against any person or organization which may be liable to any Insured because of injury or damage to which this insurance may apply; and d. receive the Insured's full cooperation in the investigation, adjustment, settlement or defense of any claim or suit. In addition, it is a requirement of this policy that: e. the Insured not make any admission of liability; no Insured will, except at their own cost, voluntarily make a payment, agree to settle any claim, assume any obligation, or incur any costs, charges or expenses for investigation or defense of any claim, other than for first aid, without our written consent; any Insured immediately send us copies of any demands, notices, summonses or legal papers received in connection with a claim or suit involving any Insured; if legal proceedings are begun, the Insured will forward to the Company a copy of each pleading or document received by the Insured or the Insured's representatives, together with copies of reports or investigations made by the Insured or the Insured's representatives with respect to such proceedings. 3. Defense The Company will not be required to assume the investigation, settlement or defense of any claim made, or suit brought, or proceedings instituted against the Insured or your underlying carrier or both, but will have the right and be given the opportunity to be associated in the investigation, adjustment, settlement or defense and trial of any such claim, suit or proceeding relative to any occurrence which, in the opinion of the Company, may create liability on the part of the Company under the terms of this policy. The Company may also settle any claim or suit, which in the opinion of the Company, may create liability on the part of the Company under the terms of this policy. If the Company avails itself of the right and opportunity to associate in the investigation, adjustment, settlement or defense of a claim the Company will do so at its own expense but not after the limits of this policy are exhausted. Court costs and interest, if incurred with the consent of the Company, will be borne by the Company and other interested parties in the proportion that each party's share of the "Ultimate Net Loss" bears to the total amount of "Ultimate Net Loss" sustained by all interested parties. CEXC1000 08 14 Page 2 of 7 4. Cancellation This policy may be canceled by the Named Insured by surrender thereof to the Company or by mailing to the Company written notice stating when thereafter the cancellation will be effective. This policy may be canceled by the Company by mailing to the Named Insured at the address shown in this policy, written notice stating when such cancellation will be effective; provided that the date of such cancellation by the Company will not be less than ten (10) days from the date of the notice of cancellation for non-payment of the premium or thirty (30) days from the date of the notice of cancellation for any reason other than non-payment of the premium. The mailing of notice as aforesaid will be sufficient proof of notice. The time of the surrender or the effective date and hour of cancellation stated in the notice will become the end of the policy period. Delivery of such written notice, either by the Named Insured or by the Company, will be equivalent to mailing. This policy will terminate immediately upon the termination of any "Underlying Insurance", whether by the Insured or by the issuer of the "Underlying Insurance". Notice of cancellation or non -renewal of all or part of the "Underlying Insurance" duly given by any such insurer will serve as notice of the cancellation or non -renewal of this policy by the Company. The Insured first named in the Declarations is authorized to act on behalf of all Named Insureds and other Insureds with respect to the giving and receiving of notice of cancellation and to be receiving of any return premium that may become payable under this policy. If the Named Insured cancels, earned premium will be computed in accordance with the short rate table and procedure in use for this policy. If the Company cancels, earned premium will be computed pro rata. Premium adjustment may be made either at the time cancellation is effected or as soon as practicable after cancellation becomes effective, but payment or tender of unearned premium is not a condition of cancellation. In the event of cancellation by the Named Insured, earned premium will in no case be less than the Policy Minimum Premium stated in the Declarations. 5. Maintenance of and Changes to "Underlying Insurance" The limits of the "Underlying Insurance" will be maintained in full effect during the currency of this policy except for reduction of such limits by exhaustion of aggregate limits (if any) contained therein by paying or by having been held liable to pay for damages for accident(s) or occurrence(s), whichever is applicable, during "Each Annual Period" of this Policy. Failure of the Insured to comply with the foregoing will not invalidate this policy, but in the event of such failure, the Company will be liable only to the extent that it would have been held liable had the Insured complied therewith. The Company will only be liable under this policy in the event of reduction or exhaustion of all of the limits of the "Underlying Insurance" and any other valid and collectible insurance by payment in connection with claim(s), and the Company will in no event drop down for any reason whatsoever including, but not limited to: (a) any exhaustion of a sublimit of any "Underlying Insurance"; or (b) uncollectibility, in whole or in part, of any "Underlying Insurance" whether due to financial impairment or insolvency, liquidation, or for any other reason; or (c) failure of the Insured to maintain any "Underlying Insurance". The risk of any gaps in coverage or uncollectibility for any reason is expressly retained by the Insured, and is not assumed or insured by the Company. As a condition precedent to coverage under this policy, the Insured will give to the Company written notice and full particulars of: (a) cancellation of any "Underlying Insurance"; (b) reduction and/or exhaustion of the limit(s) of the "Underlying Insurance"; (c) additional or return premium in connection with any "Underlying Insurance"; (d) any changes to the "Underlying Insurance" by rewrite, endorsement or otherwise; and (e) the initiation of any receivership, liquidation, dissolution, rehabilitation or similar proceeding by any regulatory authority or any other person or entity against the issuing company of any "Underlying Insurance". Such notice will be sent to the Company immediately upon receipt of such notice by any Insured. In the event of any changes to any "Underlying Insurance" during the policy period, this policy will become subject to any such changes upon the effective date of the changes in the "Underlying Insurance" only if and to the extent that consent of the Company is expressly endorsed hereon and provided that the Insured will pay any additional premium reasonably required by the Company for such changes. CEXC1000 08 14 Page 3 of 7 6. Cooperation The Insured will give the Company information and cooperation as the Company may reasonably require. 7. Subrogation and Recoveries In the event of any payment under this policy, the Company will be subrogated to all of the Insured's rights of recovery against any person or organization, and the Insured will execute and deliver all instruments and papers and do whatever else may be necessary to secure such rights. Any amount recovered after payment under this policy will be apportioned in the inverse order of payment to the extent of actual payment. The expenses of such recovery proceedings will be apportioned in the same ratio as the recoveries. 8. Assignment This policy and any and all rights hereunder are not assignable without the prior written consent of the Company. 9. Legal Actions Against Us There will be no right of action against us under this insurance unless: a. You have complied with all the terms of this policy; and b. The amount you owe has been determined by settlement with our consent or by actual trial and final judgment. This insurance does not give anyone the right to add us as a party in an action against you to determine your liability. 10. Other Insurance If other insurance applies to an "Ultimate Net Loss" that is also covered by this policy, this policy will apply excess of the other insurance. Nothing herein will be construed to make this policy subject to the terms, conditions and limitations of such other insurance. However, this provision will not apply if the other insurance is specifically written to be excess of this policy. Other insurance includes any type of self-insurance or other mechanism by which an Insured arranges for funding of legal liabilities. 11. When "Ultimate Net Loss" is Payable Coverage under this policy will not apply unless and until the Insured or the Insured's "Underlying Insurance" is obligated to pay the full amount of the "Underlying Insurance". When the amount of "Ultimate Net Loss" has finally been determined, we will promptly pay on behalf of the Insured the amount of "Ultimate Net Loss" falling within the terms of this policy. 12. Bankruptcy or Insolvency a. The bankruptcy, insolvency or inability to pay of any Insured, or of any Insured's estate, will not relieve us of our obligation to pay damages covered by this Policy. b. In the event of bankruptcy, insolvency or refusal or inability to pay, of any underlying insurer, the insurance afforded by this Policy will not replace such "Underlying Insurance", but will apply as if all the limits of any "Underlying Insurance" are fully available and collectible. 13. Service of Suit Pursuant to any statute of any state, territory or District of the United States which makes provision therefore, we hereby designate the Superintendent, Commissioner or Director of Insurance or other officer specified for that purpose in the statute, or his successor or successors in office, as our true and lawful attorney upon whom may CEXC1000 08 14 Page 4 of 7 be served any lawful process in any action, suit or proceeding instituted by or on behalf of you or any beneficiary hereunder, arising out of this Policy. Section 4 - Exclusions This Policy will not apply: To "Ultimate Net Loss": a. arising out of or contributed to in any way by the actual, alleged or threatened discharge, dispersal, release, migration, escape, or seepage of pollutants; or b. any loss, cost or expense arising out of any: 1) request, demand or order that any Insured or others test for, monitor, clean up, remove, contain, treat, detoxify, or neutralize, or in any way respond to, or assess the effects of pollutants; or 2) claim or suit whether by or on behalf of any governmental authority or any other entity for damages because of testing for, monitoring, cleaning up, removing, containing, treating, detoxifying, or neutralizing, or in any way responding to, or assessing the effects of pollutants. As used in this exclusion, pollutants means any solid, liquid, gaseous, or thermal irritant or contaminant including smoke, vapor, soot, fumes, acids, alkalis, chemicals, and waste. Waste includes material, to be recycled, reconditioned, reclaimed or disposed of. 2. To "Ultimate Net Loss" arising out of or in connection with: a. asbestos or asbestos -related material(s), regardless of whether used, manufactured, sold, handled, maintained, repaired, removed, disposed of, transported, distributed, installed by, or in any way connected with the Insured; or b. the existence of asbestos, in any goods, products, materials, storage devices, containers, wrappings, packaging, warehouses, buildings, or other structures of any kind, or any part thereof; or C. any goods or products which are damaged, contaminated, or otherwise affected by asbestos or any asbestos -related materials(s), lead or silica dust; or d. asbestos abatement activities, including clean-up, repair, or any other corrective measures which are occasioned by the existence of asbestos in any land, soil, water or watercourses, the atmosphere and/or building(s), whether voluntarily undertaken or required by any governmental body or other entity to eliminate asbestos material(s), lead or silica dust; or e. any supervision, instructions, recommendations, warnings, or advice given or which should have been given, and any obligation to share damages with or repay someone else who must pay damages in connection with a, b, c, or d above. 3. To "Ultimate Net Loss" arising out of any claim or claims made by or against the Insured with respect to any uninsured/underinsured motorist or automobile no fault or first party personal injury law. 4. To "Ultimate Net Loss" arising out of the Employee Retirement Income Security Act of 1974 (ERISA) as now or hereafter amended or any similar state or other governmental law. 5. To "Ultimate Net Loss" arising out of or that results from any consequence, direct or indirect, due to war, whether or not declared, or any act or condition incident to war. War includes invasion, act of a foreign enemy, hostilities, civil war, insurrection, rebellion, military or usurped power, strike, riot, civil commotion, revolution, or acts of terrorism. 6. To "Ultimate Net Loss": CEXC1000 08 14 Page 5 of 7 a. with respect to which an Insured under this policy is also an insured under a nuclear energy liability policy issued by Nuclear Liability Insurance Association, Mutual Atomic Energy Liability Underwriters or Nuclear Insurance Association of Canada, or would be an insured under any such policy but for its termination upon exhaustion of its limit of liability; or b. arising out of "hazardous properties" of "nuclear material' and with respect to which: 1) any person or organization is required to maintain financial protection pursuant to the Atomic Energy Act of 1954, or by any law amendatory thereof; or 2) the Insured is, or had this policy not been issued would be, entitled to indemnity from the United States of America, or any agency thereof, under any agreement entered into by the United States of America, or any agency thereof, with any person or organization. arising out of "hazardous properties" of "nuclear material' if: 1) the "nuclear material" a) is at any "nuclear facility" owned by, or operated by or on behalf of an Insured, or b) has been discharged or dispersed therefrom; 2) the "nuclear material' is contained in "spent fuel" or "waste" at any time process, handled, used, possessed, stored, transported, or disposed of by or on behalf of an Insured; or 3) the bodily injury or property damage arises out of the furnishing by an Insured of services material, parts or equipment in connection with the planning, construction, maintenance, operation or use of any nuclear facility, but if any such facility is located within the United States of America, its territories or possessions or Canada, this exclusion (3) applies to "Property Damage" to such nuclear facility any property threat. As used in this exclusion: "hazardous properties" includes radioactive, toxic or explosive properties; "nuclear material" means "source material," "special nuclear material" or "byproduct material"; "source material," "special nuclear material', and "byproduct material' have the meanings given them in the Atomic Energy Act of 1954 or in any law amendatory thereof; "spent fuel" means any fuel element or fuel component, solid or liquid, which has been used or exposed to radiation in a nuclear reactor; "waste" means any waste material: a) containing byproduct material, and b) resulting from the operation by any person or organization of any nuclear facility included within the definition of nuclear facility under paragraph a) or b) below: "nuclear facility" means: a) any "nuclear reactor"; b) any equipment or device designed or used for: 1) separating the isotopes or uranium or plutonium, 2) processing or utilizing spent fuel, or 3) handling, processing or packaging "waste"; c) any equipment or device used for the processing, fabricating, or alloying of special nuclear material if at any time the total amount of such material in the custody of the Insured at the premises where such equipment or device is located consists of or contains more than 25 grams of plutonium or uranium 233 or any combination thereof, or more than 250 grams of uranium 235; CEXC1000 08 14 Page 6 of 7 d) any structure, basin, excavation premises or place prepared or used for the storage or disposal of "waste"; and includes the site on which any of the foregoing is located, all operations conducted on such site and all premises used for such operations; "Nuclear reactor" means any apparatus designed or used to sustain nuclear fission in a self-supporting chain reaction or to contain a critical mass of fissionable material; "Property Damage" includes all forms of radioactive contamination of property. 7. To "Ultimate Net Loss" arising out of or in connection with punitive or exemplary damages, in whatever form assessed. CEXC1000 08 14 Page 7 of 7 I 2 3 4 5 6 ill 8 Bond Number: 4471950 SECTION 00 62 t3 PERFORMANCE BOND THE STATE OF TEXAS § COUNTY OF TARRANT § That we, West Fork Construction, LLC 006213-1 PERFORMANCE BOND Page I of 3 KNOW ALL BY THESE PRESENTS: , known as 9 "Principal" herein and SureTec Insurance Company , a corporate 10 surety(sureties, if more than one) duly authorized to do business in the State of Texas, known as 11 "Surety" herein (whether one or more), are held and firmly bound unto the Developer, Outpost 12 Fort Worth, LLC, authorized to do business in Texas ("Developer") and the City of Fort Worth, a 13 Texas municipal corporation ("City"), in the penal sure. of, 14 Four Hundred Ninety-six Thousand One Hundred Sixty-six & 181100 Dollars (S 496,166-18 ) 15 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the 16 payment of which sutra well and truly to be made jointly unto the Developer and the City as dual 17 obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly 18 and severally, firmly by these presents. 19 WHEREAS, Developer and City have entered into an Agreement for the construction of 20 community facilities in the Citv of Fort Worth by and through a Community 21 Facilities Agreement, CFA Number tyt -00%`1 ; and 22 WHEREAS, the Principal has entered into a certain written contract with the Developer awarded 23 the 26th day of September , 20 24 , which Contract is hereby referred to and made a 24 part hereof for all purposes as if fully set forth herein, to furnish atl materials, equipment labor 25 and outer accessories defined by law, in the prosecution of the Work, including any Change 26 Orders, as provided for in said Contract designated as SOMA Outpost Casitas. 27 NOW, THEREFORE, the condition of this obligation is such that if the said Principal 28 shall faithfully perform it obligations under the Contract and shall in all respects duly and 29 faithfully perform the Work, including Change Orders, under the Contract, according to the 30 plans, specifications, and contract documents therein referred to, and as well during any period of 31 extension of the Contract that may be granted on the part of the Developer and/or City, then this 32 obligation shall be and become null and void, otherwise to remain in full force and effect. CITY OF FORT WORTH SOW Outposi Casitas STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS 105365 Reviser! January 31, 2012 f Bond Number: 44719so 006213.2 PERFORMANCE BOND Page 2 of 3 I PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 2 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 3 Worth Division. 4 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 5 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 6 accordance with the provisions of said statue. 7 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED 8 this instrument by duly authorized agents and officers on this the 30th day of septernter 9 2024 - 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 ATTEST: Val) Secre r i as to Principal &Izdvd� Witness as to Surety Mark R. DeWitt PRINCIPAL: West Fork Construction, LLC ignatt L+��aiaLLr-na ,�..��Vl. NA2K.;.� AievutS�Q. Name and Title Address: 2421 W. 7th Street, Suite, Fort Worth, TX 76107 SURETY: SureTec Insurance Comoanv �: t�► 1� /.r� � a.� J i Ginger Hoke, Attorney -in -Fact Name and Title Address: 2103 CityWest Blvd., Suite 1300 Houston, TX 77042 Telephone Number: 469-872-8031 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. CTrY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 Som'I ouiposi Casitas 105365 2 Bond Number: 4471950 00 52 13 - 3 PERFORMANCE BOND Page 3 of 3 The date of the bond shall not be prior to the date the Contract is awarded. CM OF FORT WORTH SOAfA Outpost Casttas STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROTECTS JOS365 Revised January 31, 2012 Bond Number: 4471950 1 2 3 4 THE STATE OF TEXAS 5 6 COUNTY OF TARRANT 7 00 61 25 - I PROJECT RECORD DOCUMENTS Page 1 of SECTION 00 6214 PAYMENT BOND § KNOW ALL BY THESE PRESENTS: 8 That we West Rork Construction, LLC known as 9 "Principal" berein, and SureTec insurance Company a 10 corporate surety ( or sureties if more than one), duly authorized to do business in the State of Texas, I 1 known as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, 12 Outpost Fort Worth, LLC, authorized to do business in Texas "(Developer"), and the 13 City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum 14 of Four Hundred Ninety-six Thousand One Hundred Sixty-six & 181100 Dollars ($ 496,166.18 15 lawful money of the United States, to be paid in port Worth, Tarrant County, Texas, for the payment 16 of which sum well and truly be made jointly unto the Developer and the City as dual obligees, we 17 bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, 18 firmly by these presents: 19 WHEREAS, Developer and City have entered into an Agreement for the construction of 20 community facilities in the City of Fort Worth, by and through a Community Facilities Agreement, 21 CFA Number aK - ct:i�yand 22 WHEREAS, Principal has entered into a certain written Contract with Developer, awarded 23 the 26th day of September , 20 24 , which Contract is hereby referred to 24 and made a part hereof for all purposes as if fully set forth herein, to furnish all materials, 25 equipment, labor and other accessories as defined by law, in the prosecution of the Work as 26 provided for in said Contract and designated as SOMA Outpost Casitas. 27 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 28 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 29 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 30 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 31 force and effect. CITY OF FORT WORTH SOMA Outpost Casitas STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS 105365 Revised January 31, 2012 I 2 3 4 5 6 8 10 11 t2 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 Bond Number: 4471950 006125-3 PROJECT RECORD DOCUMENTS Page 3 of 3 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the 30th day of September , 2024 PRINCIPAL: West Fork Construction, LLC_ ATTEST: _ J Orr rincip ) 5ecre pie as t4Princi ATTEST: ur ) ary Taylor Fogle ;2e fitness as t urety�MarkR.DeWitt BY; <iade N lYlr El- n.rL►L M..Ja Ci iiih C'L _MrM r4E l7_ Name and Title = Address: 2421 W. 7th Street, Suite 350 ti Fort Worth, TX 7610T. SURETY: SureTec Insurance Comaanv BY: 6uRwan Gina_ er Hoke. Attorney -in -Fact Name and Title Address: 21 n3 CitvWest Blvd.. Suite 1300 Houston, TX 77042 Telephone Number: 469-872-8031 _ *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. if Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 SO,A i outpost Casnas 105365 Bond Number: 4471950 00 6125 - 2 PROJECT RECORD DOCUMENTS Page 2 of 3 1 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part 2 upon receiving notice from the Developer and/or City of the need thereof at any time within the 3 Maintenance Period. 4 5 NOW THEREFORE, the condition of this obligation is such that if Principal shall 6 remedy any defective Work, for which timely notice was provided by Developer or City, to a 7 completion satisfactory to the City, then this obligation shall become null and void; otherwise to 8 remain in full force and effect. 9 10 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely 11 noticed defective Work, it is agreed that the Developer or City may cause any and all such 12 defective Work to be repaired and/or reconstructed with all associated costs thereof being borne 13 by the Principal and the Surety under this Maintenance Bond; and 14 15 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 16 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 17 Worth Division; and 18 19 PROVIDED FURTHER, that this obligation shall be continuous in nature and 20 successive recoveries may be had hereon for successive breaches. 21 22 CITY OF FORT WORTH SOMA Outpost Casitcts STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS 105365 Revised January 31, 2012 Bond Number: 4471950 00 61 2s - 1 PROJECT RECORD DOCUMENTS Page 1 of 3 1 SECTION 00 62 19 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we West Fork Construction, LLC , known as 9 "Principal" herein and SureTec insurance Company a corporate surety 10 (sureties, if more than one) duly authorized to do business in the State of Texas, known as 11 "Surety" herein (whether one or more), are held and firmly bound unto the Developer, 12 Outpost Fort North, LLC, authorized to do business in Texas ("Developer") and the City of Fort 13 Worth, a Texas municipal corporation ("City"), in the sum 14 of Four Hundred Ninety-six Thousand One Hundred Sixty-six & 181100 Dollars ($ 496,166.18 ) 15 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment 16 of which sum well and truly be made jointly unto the Developer and the City as dual obligees and 17 their successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, 18 jointly and severally, firmly by these presents. 19 20 WHEREAS, Developer and City have entered into an Agreement for the construction of 21 community facilities in the City of Fort Worth by and through a Community Facilities Agreement, 22 CFA Number 1,4 -40ey and 23 WHEREAS, the Principal has entered into a certain written contract with the Developer 24 awarded the 26th day of September . 20 24 , which Contract is 25 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all 26 materials, equipment labor and other accessories as defined by law, in the prosecution of the 27 Work, including any Work resulting from a duly authorized Change Order (collectively herein, 28 the "Work") as provided for in said Contract and designated as SOMA Outpost Casitas; and 29 30 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 31 accordance with the plans, specifications and Contract Documents that the Work is and will 32 remain free from defects in materials or workmanship for and during the period of two (2) years 33 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and 34 CITY OF FORT WORTH SOMA Ouipws Casftas STANDARD CITY CONDITIONS -- DEVELOPER AWARDED PROJECTS 105365 Revised January 31, 2012 Bond Number: 4471950 00 61 25 - 2 PROJECT RECORD DOCUMENTS Page 2 of 2 I This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statute. 4 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED 5 this instrument by duly authorized agents and officers on this the 30th day of 6 September , 20 24 7 ATTEST: as to Principal PRINCIPAL: West Fork Construction, LLC BY: Si ature Name and Title Address: 2421 W. 7th Street, Suite 350 Fort Worth, TX 76107 SURETY: SureTec Insurance ComDanv ATTEST: BY: /1 &�Iilllsu kCFignatu y ,o Ginger Hoke, Attorney -in -Fact ur ) ecretary Taylor Fogle Name and Title �., Address: 2103 CityWest Blvd., Suite 1300 Houston, TX 77042 *iessaasto Surety Mark R. DeWitt Telephone Number: 469-872-8031 S 9 Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws 10 showing that this person has authority to sign such obligation. If Surety's physical address is 11 different from its mailing address, both must be provided.. 12 13 The date of the bond shall not be prior to the date the Contract is awarded. 14 END OF SECTION CITY OF FORT WORTH S02vM Outpost Caritas STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS 105365 Revised January 31, 2012 -A. Markel Insurance Company RIDER TO BE ATTACHED TO AND FORM A PART OF PERFORMANCE AND PAYMENT BONDS BOND NO. 4471950 Wherein West Fork Construction. LLC is named as Principal and Markel Insurance Company, as Surety in favor of Outnost Fort Worth, LLC as Obligee, in the amount of Four Hundred Ninety-six Thousand One Hundred Sixty-six & 181100 ($496,166.18) effective Seotember 30, 2024 for Two (2) Years, WHEREAS, when this bond was executed Outnost Fort Worth, LLC was named as Obligee, and WHEREAS, it is now desired that certain other parties be added as "Additional Obligees". NOW, THEREFORE, it is hereby understood and agreed that the following shall be considered as Additional Obligees under this bond: Citv of Fort Worth, Texas The foregoing, however, is subject to the following further provisions: (1) The Surety shall not be liable under this bond to the Obligees, or any of them, unless the said Obligees, or any of them, shall make payment to the Principal or Surety strictly in accordance with the term of said contract as to payments, and shall promptly perform all other obligations to be performed to by the Obligee under said contract at the time and in the manner therein set forth. (2) The Principal and the Surety shall not be liable to any one or to all of the Obligees in the aggregate in excess of the penal sum of the bond, to wit: $496.166.18. Signed, and sealed this 30th day of September, 2024. Signatures on following page MIC AS Dual Obligee Rider rev 10_2021 Page 1 of 2 Principal: West Fork Construction, LLC Markel Insurance Company By: --, _ . -_ ( . Signature Name: M41-UA i_ ��2R�i►.nn Title: 70A/c, r,4 Signature Name: Ginger Hoke Attorney A n-Fact MIC AS Dual Obligee Rider rev 10_2021 Page 2 of 2 POA# 4221328 JOINT LIMITED POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That SureTec Insurance Company, a Corporation duly organized and existing under the laws of the State of Texas and having its principal office in the County of Harris, Texas and Markel Insurance Company (the "Company"), a corporation duly organ+zed and existing under the laws of the state of Illinois, and having its principal administrative office in Glen Allen, Virginia, does by these presents make, constitute and appoint: D. Gregory Stiffs, Mark R. DeWitt, Ginger Hoke, Keeton Welch, Taylor Fogle Their true and lawful agent(s) and attorney(sM-m-fact, each in their separate capacity if more than one is named above, to make, execute, seal and deliver for and on their own behalf, individually as a surety or jointly, as co -sureties, and as their act and deed any and all bonds and other undertaking in suretyship provided, however, that the penal sum of anyone such instrument executed hereunder shall net exceed the sum of: Twenty Five Million and 00/100 Dollars ($25,000,000.00) This Power of Attorney is granted and is signed and sealed under and by the authority of the following Resolutions adopted by the Board of Directors of SureTec Insurance Company and Markel Insurance Company: "RESOLVED, That the President, any Senior Vice President, Vice President, Assistant Vice President, Secretary, Assistant Secretary, Treasurer or Assistant Treasurer and each of them hereby is authorized to execute powers of attorney, and such authority can he executed by use of facsimiie signature, which may be attested or acknowledged by any officer or attorney, of the company, qualifying the attorney or attorneys named in the given power of attorney, to execute in behalf of, and acknowledge as the act and deed of the SureTec insurance Company and Markel insurance Company, as the case may be, all bond undertakings and contracts of suretyship, and to affix the corporate seal thereto." IN WITNESS WHEREOF, Markel Insurance Company and SureTec Insurance Company have caused their official seal to be hereunto affixed and these presents to be signed by their duly authorized officers on the em day of August , 2024 SureTec Insurance Company p-URAN ``s �s�'RAN1, r ,MarkeGlnsurance Com pang v.tiid�•iiF W 9 t' SEAL 3 By. _I f `r 'l ••.2CMnv Y " ... , tindeyJennings,`+ ice President Michael C. Kerm ig, President * �� State of Texas - County of Harris- - On this 6th day of August , 202A A. D., before me, a Notary Public of the State of Texas, in and for the County of Harris, duly commissioned and qualified, came THE ABOVE OFFICERS OF THE COMPANIES, to me personally known to be the individuals and officers described in, who executed the preceding instrument, and they acknowledged the execution of same, and being by me duly sworn, disposed and said that they are the officers of the said companies aforesaid, and that the seals affixed to the proceeding instrument are the Corporate Seals of said Companies, and the said Corporate Seals and their signatures as officers were duly affixed and subscribed to the said instrument by the authority and direction of the said companies, and that Resolutions adopted by the Board of Directors of said Companies referred to in the preceding instrument is now In force. IN TESTIMONY WHEREOF, I have hereunto set my hand, and affixed my Official Seal at the County of Harris, the day and year first above written. Julie E. McClary, Notary Public y ' My commission expires 3/29/2026 we, the undersigned Officers of SureTec Insurance Company and Markel Insurance Company do herby certify thatthe original POWER OF A"IORN8yof which the foregoing is a full, true and correct copy is still in full force and effect and has not been revoked. IN WITNESS W HEREOF, we have hereunto set our hands, and affixed the Seals of said Companies, on the 30th day of September 2024__ SureTec Insurance Company Markel Insurance Company B By r M. Brent Beaty Asisistant Secretary _s-AndrewMaiquis,Askgantsefr tary i Any Instmment Issued in excess of the penalty stated above is teatly vmd and without any validity. 4221328 For verification ofthe authority of this Power you may call (713)812.0800 on any business day between 8:30 AM trio S:00 PM CST. POA# 4221328 JOINT LIMITED POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That SureTec Insurance Company, a Corporation duly organized and existing under the laws of the State of Texas and having its principal office in the County of Harris, Texas and Markel Insurance Company (the "Company"), a corporation duly organized and existing under the laws of the state of Illinois, and having its principal administrative office in Glen Allen, Virginia, does by these presents make, constitute and appoint: D. Gregory Stitts, Mark R. DeWitt, Ginger Hoke, Sarah C. Brown, Grace Rasmussen, Jessie Allen, Keeton Welch, Taylor Fogle Their true and lawful agent(s) and attorney(s)-in-fact, each in their separate capacity if more than one is named above, to make, execute, seal and deliver for and on their own behalf, individually as a surety or jointly, as co -sureties, and as their act and deed any and all bonds and other undertaking in suretyship provided, however, that the penal sum of any one such instrument executed hereunder shall not exceed the sum of: Twenty Five Million and 00/100 Dollars ($25,000,000.00) This Power of Attorney is granted and is signed and sealed under and by the authority of the following Resolutions adopted by the Board of Directors of SureTec Insurance Company and Markel Insurance Company: "RESOLVED, That the President, any Senior Vice President, Vice President, Assistant Vice President, Secretary, Assistant Secretary, Treasurer or Assistant Treasurer and each of them hereby is authorized to execute powers of attorney, and such authority can be executed by use of facsimile signature, which may be attested or acknowledged by any officer or attorney, of the company, qualifying the attorney or attorneys named in the given power of attorney, to execute in behalf of, and acknowledge as the act and deed of the SureTec Insurance Company and Markel Insurance Company, as the case may be, all bond undertakings and contracts of suretyship, and to affix the corporate seal thereto." IN WITNESS WHEREOF, Markel Insurance Company and SureTec Insurance Company have caused their official seal to be hereunto affixed and these presents to be signed by their duly authorized officers on the 28th day of June , 2024 . SureTec Insurance Company By.77)-Aea4< Michael C. Keimig, President State of Texas County of Harris: 0 {iP0%7' n GSEAL�;_ • :•�`` %hkylnsurance ompany Je Zing,, vice President On this 28th day of June , 2024 A. D., before me, a Notary Public of the State of Texas, in and for the County of Harris, duly commissioned and qualified, came THE ABOVE OFFICERS OF THE COMPANIES, to me personally known to be the individuals and officers described in, who executed the preceding instrument, and they acknowledged the execution of same, and being by me duly sworn, disposed and said that they are the officers of the said companies aforesaid, and that the seals affixed to the proceeding instrument are the Corporate Seals of said Companies, and the said Corporate Seals and their signatures as officers were duly affixed and subscribed to the said instrument by the authority and direction of the said companies, and that Resolutions adopted by the Board of Directors of said Companies referred to in the preceding instrument is now in force. IN TESTIMONY WHEREOF, I have hereunto set my hand, and affixed my Official Seal at the County of Harris, the day and year first above written. JUL_IE E. MCCLARY = Notary Public State of Texas By: Commission # 12947680-5 y Cornmission Epires March 29.2026 i � ie E. McClary, Notary Public ny commission expires 3/29/2026 We, the undersigned Officers of SureTec Insurance Company and Markel Insurance Company do herby certify that the original POWER OF ATTORNEYof which the foregoing is a full, true and correct copy is still in full force and effect and has not been revoked. IN WITNESS WHEREOF, we have hereunto set our hands, and affixed the Seals of said Companies, on the 17th day of J!UIV 202-4 . ur sura Company MarkelInsuran4eCompany a ) /Ma M. Br nt Beaty, A istant Secretary quis, As ' nt Se r tary Any Instrument Issued in excess of the penalty stated above is totally void and without any validity. 4221328 For verification of the authority of this Power you may call (713)812-0800 on any business day between 8:30 AM and 5:00 PM CST. SureTec Insurance Company THIS BOND RIDER CONTAINS IMPORTANT COVERAGE INFORMATION Limitation on Bond Penalty Increase Notwithstanding any provision in the bonds or subcontract to the contrary, the penal sum of this Bond shall automatically be adjusted to reflect the additive or deductive amounts of all change orders issued to the Subcontract Purchase Order; provided, however, that Obligee shall notify Surety if an individual change order increases the Subcontract Purchase Order Price by more than 15%, and, if at any point the aggregate amount of all change orders increases the Subcontract Purchase Order Price by more than 35% of the Subcontract Purchase Order Price, the Surety's consent shall be required to increase the penal sum of this Bond, such consent not to be unreasonably withheld. The failure to provide the required notice shall not release Surety from its obligations to the extent of the bond penalty in force prior the change that required such notice. Texas Rider 010106 SureTec Insurance Company IMPORTANT NOTICE Statutory Complaint Notice/Filing of Claims To obtain information or make a complaint: You may call the Surety's toll free telephone number for information or to make a complaint or file a claim at: 1-866-732-0099. You may also write to the Surety at: SureTec Insurance Company 9500 Arboretum Blvd., Suite 400 Austin, TX 78759 You may contact the Texas Department of Insurance to obtain information on companies, coverage, rights or complaints at 1-800-252- 3439. You may write the Texas Department of Insurance at: PO Box 149104 Austin, TX 78714- 9104 Fax#: 512-490-1007 Web: httD://www.tdi.state.tx.us Email: ConsumerProtection@tdi.texas.gov PREMIUM OR CLAIMS DISPUTES: Should you have a dispute concerning your premium or about a claim, you should contact the Surety first. If the dispute is not resolved, you may contact the Texas Department of Insurance. SIC TX Rider TDI Required Notices rev 07_2022 Page 1 of 1 ill SureTec Insurance Company RIDER TO BE ATTACHED TO AND FORM A PART OF PERFORMANCE AND PAYMENT BONDS BOND NO. 4471950 Wherein West Fork Construction, LLC is named as Principal and SureTec Insurance Company, as Surety in favor of Citv of Fort Worth, Texas as Obligee, in the amount of Six Hundred Fortv-one Thousand Nine Hundred Twentv-eiaht & 00/100 ($641,928.00) effective Julv 17, 2024 for SOMA Outpost Casitas. 105365. Fort Worth, TX. WHEREAS, when this bond was executed Citv of Fort Worth, Texas was named as Obligee, and WHEREAS, it is now desired that certain other parties be added as "Additional Obligees". NOW, THEREFORE, it is hereby understood and agreed that the following shall be considered as Additional Obligees under this bond: Outpost Fort Worth, LLC The foregoing, however, is subject to the following further provisions: (1) The Surety shall not be liable under this bond to the Obligees, or any of them, unless the said Obligees, or any of them, shall make payment to the Principal or Surety strictly in accordance with the term of said contract as to payments, and shall promptly perform all other obligations to be performed to by the Obligee under said contract at the time and in the manner therein set forth. (2) The Principal and the Surety shall not be liable to any one or to all of the Obligees in the aggregate in excess of the penal sum of the bond, to wit: $641.928.00 . Signed, and sealed this 17th day of July, 2024. Signatures on following page SIC AS Dual Obligee Rider rev 10_2021 Page 1 of 2 Principal: West Fork Construction, LLC SureTec Insurance Company By: r� Signature Name: Title: �1/%&.,Ael,.,� -I l C,ruF1 AAll r- n4 tz E R By: &4'v� lh-t' Name: Ginger Hoke Attorney -in -Fact SIC AS Dual Obligee Rider rev 10_2021 Page 2 of 2 POA# 4221328 JOINT LIMITED POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That SureTec Insurance Company, a Corporation duly organized and existing under the laws of the State of Texas and having its principal office in the County of Harris, Texas and Markel Insurance Company (the "Company'), a corporation duly organized and existing under the laws of the state of Illinois, and having its principal administrative office in Glen Allen, Virginia, does by these presents make, constitute and appoint: D. Gregory Stitts, Mark R. DeWitt, Ginger Hoke, Sarah C. Brown, Grace Rasmussen, Jessie Allen, Keeton Welch, Taylor Fogle Their true and lawful agent(s) and attorney(s)-in-fact, each in their separate capacity if more than one is named above, to make, execute, seal and deliver for and on their own behalf, individually as a surety or jointly, as co -sureties, and as their act and deed any and all bonds and other undertaking in suretyship provided, however, that the penal sum of any one such instrument executed hereunder shall not exceed the sum of: Twenty Five Million and 00/100 Dollars ($25,000,000.00) This Power of Attorney is granted and is signed and sealed under and by the authority of the following Resolutions adopted by the Board of Directors of SureTec Insurance Company and Markel Insurance Company: "RESOLVED, That the President, any Senior Vice President, Vice President, Assistant Vice President, Secretary, Assistant Secretary, Treasurer or Assistant Treasurer and each of them hereby is authorized to execute powers of attorney, and such authority can be executed by use of facsimile signature, which may be attested or acknowledged by any officer or attorney, of the company, qualifying the attorney or attorneys named in the given power of attorney, to execute in behalf of, and acknowledge as the act and deed of the SureTec Insurance Company and Markel Insurance Company, as the case may be, all bond undertakings and contracts of suretyship, and to affix the corporate seal thereto." IN WITNESS WHEREOF, Markel Insurance Company and SureTec Insurance Company have caused their official seal to be hereunto affixed and these presents to be signed by their duly authorized officers on the 28th day of June , 2024 . SureTec Insurance Company "%111411" Mary Insurance dmpany P Y RA ` 5V NCF `� c�V CF i� Cc (W f SEAL ;_ ,, ztrnto�•: • . Michael C. Keimig, President 1•-• " j �Y` (-XindeyJe ning , ice President State of Texas County of Harris: On this 28th day of June , 2024 A. D., before me, a Notary Public of the State of Texas, in and for the County of Harris, duly commissioned and qualified, came THE ABOVE OFFICERS OF THE COMPANIES, to me personally known to be the individuals and officers described in, who executed the preceding instrument, and they acknowledged the execution of same, and being by me duly sworn, disposed and said that they are the officers of the said companies aforesaid, and that the seals affixed to the proceeding instrument are the Corporate Seals of said Companies, and the said Corporate Seals and their signatures as officers were duly affixed and subscribed to the said instrument by the authority and direction of the said companies, and that Resolutions adopted by the Board of Directors of said Companies referred to in the preceding instrument is now in force. IN TESTIMONY WHEREOF, I have hereunto set my hand, and affixed my Official Seal at the County of Harris, the day and year first above written. JULIE E. MCCLARY Notary Public State of Texas By: Commission # 12947680-5 J ie E. McClary, Notary Public j Commission Expires March 29. 2026 i y commission expires 3/29/2026 We, the undersigned Officers of SureTec Insurance Company and Markel Insurance Company do herby certify that the original POWER OF ATTORNEY of which the foregoing is a full, true and correct copy is still in full force and effect and has not been revoked. IN WITNESS WHEREOF, we have hereunto set our hands, and affixed the Seals of said Companies, on the 17th day of Juiy 2024 9M.Br sura Company e t Beaty, Asistant Secretary Markel Insurance Compafiy t By: `And w Ma quis, As Lisint SFKrtary Any Instrument Issued in excess of the penalty stated above is totally void and without any validity. 4221328 For verification of the authority of this Power you may call (713)812-0800 on any business day between 8:30 AM and 5:00 PM CST. SureTec Insurance Company THIS BOND RIDER CONTAINS IMPORTANT COVERAGE INFORMATION Limitation on Bond Penalty Increase Notwithstanding any provision in the bonds or subcontract to the contrary, the penal sum of this Bond shall automatically be adjusted to reflect the additive or deductive amounts of all change orders issued to the Subcontract Purchase Order; provided, however, that Obligee shall notify Surety if an individual change order increases the Subcontract Purchase Order Price by more than 15%, and, if at any point the aggregate amount of all change orders increases the Subcontract Purchase Order Price by more than 35% of the Subcontract Purchase Order Price, the Surety's consent shall be required to increase the penal sum of this Bond, such consent not to be unreasonably withheld. The failure to provide the required notice shall not release Surety from its obligations to the extent of the bond penalty in force prior the change that required such notice. Texas Rider 010106 SureTec Insurance Company IMPORTANT NOTICE Statutory Complaint Notice/Filing of Claims To obtain information or make a complaint: You may call the Surety's toll free telephone number for information or to make a complaint or file a claim at: 1-866-732-0099. You may also write to the Surety at: SureTec Insurance Company 9500 Arboretum Blvd., Suite 400 Austin, TX 78759 You may contact the Texas Department of Insurance to obtain information on companies, coverage, rights or complaints at 1-800-252- 3439. You may write the Texas Department of Insurance at: PO Box 149104 Austin, TX 78714- 9104 Fax#:512-490-1007 Web: httr)://www.tdi.state.tx.us Email: ConsumerProtection@tdi.texas.gov PREMIUM OR CLAIMS DISPUTES: Should you have a dispute concerning your premium or about a claim, you should contact the Surety first. If the dispute is not resolved, you may contact the Texas Department of Insurance. SIC TX Rider TDI Required Notices rev 07_2022 Page 1 of 1 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS TABLE OF CONTENTS Article 1 — Definitions and Terminology.......... 1.01 Defined Terms ............................... 1.02 Terminology .................................. Article 2 — Preliminary Matters ....................... 2.01 Before Starting Construction...... 2.02 Preconstruction Conference........ 2.03 Public Meeting ............................ Page .............................................1 .............................................1 ............................................. 5 ....................................................... 6 ....................................................... 6 ....................................................... 6 ....................................................... 6 Article 3 — Contract Documents and Amending............................................................................................... 6 3.01 Reference Standards..................................................................................................................... 6 3.02 Amending and Supplementing Contract Documents.................................................................. 6 Article 4 — Bonds and Insurance....................................................................................................................... 7 4.01 Licensed Sureties and Insurers..................................................................................................... 7 4.02 Performance, Payment, and Maintenance Bonds........................................................................ 7 4.03 Certificates of Insurance............................................................................................................... 7 4.04 Contractor's Insurance.................................................................................................................. 9 4.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................12 Article 5 — Contractor's Responsibilities........................................................................................................12 5.01 Supervision and Superintendent.................................................................................................12 5.02 Labor; Working Hours................................................................................................................13 5.03 Services, Materials, and Equipment...........................................................................................13 5.04 Project Schedule..........................................................................................................................14 5.05 Substitutes and "Or-Equals".......................................................................................................14 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors).....................................16 5.07 Concerning Subcontractors, Suppliers, and Others...................................................................16 5.08 Wage Rates..................................................................................................................................18 5.09 Patent Fees and Royalties...........................................................................................................19 5.10 Laws and Regulations.................................................................................................................19 5.11 Use of Site and Other Areas.......................................................................................................19 5.12 Record Documents......................................................................................................................20 5.13 Safety and Protection.................................................................................................................. 21 5.14 Safety Representative.................................................................................................................21 5.15 Hazard Communication Programs.............................................................................................22 5.16 Submittals....................................................................................................................................22 5.17 Contractor's General Warranty and Guarantee..........................................................................23 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 5.18 Indemnification ............................................ 5.19 Delegation of Professional Design Services 5.20 Right to Audit: ............................................. 5.21 Nondiscrimination ........................................ Article 6 - Other Work at the Site....... 6.01 Related Work at Site ....... Article 7 - City's Responsibilities ............................................ 7.01 Inspections, Tests, and Approvals ....................... 7.02 Limitations on City's Responsibilities ................ 7.03 Compliance with Safety Program ........................ Article 8 - City's Observation Status During Construction....... 8.01 City's Project Representative ................................. 8.02 Authorized Variations in Work .............................. 8.03 Rejecting Defective Work ...................................... 8.04 Determinations for Work Performed ...................... Article 9 - Changes in the Work ...................... 9.01 Authorized Changes in the Work 9.02 Notification to Surety ................... Article 10 - Change of Contract Price; Change of Contract Time 10.01 Change of Contract Price ........................................... 10.02 Change of Contract Time ........................................... 10.03 Delays......................................................................... Article 11 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work ............ 11.01 Notice of Defects.............................................................................................................. 11.02 Access to Work................................................................................................................. 11.03 Tests and Inspections........................................................................................................ 11.04 Uncovering Work............................................................................................................. 11.05 City May Stop the Work................................................................................................... 11.06 Correction or Removal of Defective Work...................................................................... 11.07 Correction Period.............................................................................................................. 11.08 City May Correct Defective Work................................................................................... Article 12 - Completion .......................................... 12.01 Contractor's Warranty of Title ........... 12.02 Partial Utilization ................................ 12.03 Final Inspection ................................... 12.04 Final Acceptance ................................. Article 13 - Suspension of Work ..................................... 13.01 City May Suspend Work ............................. Article 14 - Miscellaneous ......................................... 14.01 Giving Notice ......................................... CITY OF FORT WORTH STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 24 24 25 25 26 26 26 26 26 27 a a ... 29 ... 29 ... 29 ... 29 ... 30 ... 30 ... 30 ... 30 ... 31 ................................. 32 ................................. 32 ................................. 32 ................................. 32 ................................. 33 ............................................................. 33 ............................................................. 33 34 34 14.02 Computation of Times................................................................................................................ 34 14.03 Cumulative Remedies................................................................................................................. 34 14.04 Survival of Obligations............................................................................................................... 35 14.05 Headings......................................................................................................................................35 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 1 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 1 of 35 ARTICLE 1— DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Agreement - The written instrument which is evidence of the agreement between Developer and Contractor covering the Work 2. Asbestos —Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 3. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 4. Buzzsaw — City's on-line, electronic document management and collaboration system. 5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. 6. City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by, its governing body through its City Manager, his designee, or agents authorized pursuant to its duly authorized charter on his behalf. 7. Community Facilities Agreement (CFA) A Contract between the Developer and the City for the Construction of one or more following public facilities within the City public right-of- way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs. A CFA may include private facilities within the right-of-way dedicated as private right-of- way or easement on a recorded plat. 8. Contract —The entire and integrated written document incorporating the Contract Documents between the Developer, Contractor, and/or City concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 9. Contract Documents —Those items that make up the contract and which must include the Agreement, and it's attachments such as standard construction specifications, standard City Conditions, other general conditions of the Developer, including: a. An Agreement CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-2 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 2 of 35 b. Attachments to the Agreement i. Bid Form ii. Vendor Compliance with State Law Non -Resident Bidder iii. Prequalification Statement C. Current Prevailing Wage Rates Table (if required by City) d. Insurance Accord Form e. Payment Bond f. Performance Bond g. Maintenance Bond h. Power of Attorney for Bonds i. Workers Compensation Affidavit j. MWBE Commitment Form( If required by City) k. General Conditions 1. Supplementary Conditions in. The Standard City Conditions n. Specifications specifically made part of the Contract Documents by attachment, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents o. Drawings P. Documentation submitted by contractor prior to Notice of Award. q. The following which may be delivered or issued after the effective date if the Agreement and, if issued become an incorporated part of the Contract Documents i. Notice to Proceed ii. Field Orders iii. Change Orders iv. Letters of Final Acceptance r. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 10. Contractor —The individual or entity with whom Developer has entered into the Agreement. 11. Day or day — A day, unless otherwise defined, shall mean a Calendar Day. 12. Developer — An individual or entity that desires to make certain improvements within the City of Fort Worth 13. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 14. Engineer —The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the Developer. 15. Final Acceptance — The written notice given by the City to the Developer and/or Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 3 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 3 of 35 16. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 17. General Requirements —A part of the Contract Documents between the Developer and a Contractor. 18. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 19. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 20. Milestone —A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 21. Non -Participating Change Order —A document, which is prepared for and reviewed by the City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 22. Participating Change Order —A document, which is prepared for and approved by the City, which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 23. Plans — See definition of Drawings. 24. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 25. Project —The Work to be performed under the Contract Documents. 26. Project Representative —The authorized representative of the City who will be assigned to the Site. 27. Public Meeting — An announced meeting conducted by the Developer to facilitate public participation and to assist the public in gaining an informed view of the Project. 28. Regular Working Hours — Hours beginning at 7: 00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 29. Samples Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 4 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 4 of 35 30. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 31. Site —Lands or areas indicated in the Contract Documents as being furnished by City or Developer upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City or Developer which are designated for the use of Contractor. 32. Specifications —That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 33. Standard City Conditions — That part of the Contract Documents setting forth requirements of the City. 34. Subcontractor —An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of apart of the Work at the Site. 35. Submittals All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 36. Superintendent — The representative of the Contractor who is available at all times and able to receive instructions from the City and/or Developer and to act for the Contractor. 37. Supplementary Conditions —That part of the Contract Documents which amends or supplements the General Conditions. 38. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 40. Weekend Working Hours — Hours beginning at 9: 00 a. in. and ending at 5: 00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 5 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 5 of 35 41. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Participating Change Order, Non -Participating Change Order, or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 42. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p. m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.13 through D are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. C. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 6 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 6 of 35 ARTICLE 2 — PRELIMINARY MATTERS 2.01 Before Starting Construction Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting the Work. New schedules will be submitted to City when Participating Change Orders or Non - Participating Change Orders occur. 2.02 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.03 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. ARTICLE 3 — CONTRACT DOCUMENTS AND AMENDING 3.01 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.02 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Participating Change Order or a Non -Participating Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 7 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 7 of 35 1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or 2. City's written interpretation or clarification. ARTICLE 4 — BONDS AND INSURANCE 4.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverage so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided Section 4.04. 4.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 4.01 and 4.02.C. 4.03 Certificates of Insurance Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee identified in these Standard City Conditions certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10- 8 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 8 of 35 1. The certificate of insurance shall document the City, an as "Additional Insured" on all liability policies. 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in these Standard City Conditions. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 9. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 0073 10-9 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 9 of 35 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 11. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 12. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either parry or the underwriter on any such policies. 13. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 4.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. 3. The limits of liability for the insurance shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations a. Statutory limits b. Employer's liability CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 10 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 10 of 35 1) $100,000 each accident/occurrence 2) $100,000 Disease - each employee 3) $500,000 Disease - policy limit B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. 1. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project 2. Contractor's Liability Insurance under this Section which shall be on a per project basis covering the Contractor with minimum limits of: a. $1,000,000 each occurrence b. $2,000,000 aggregate limit 3. The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. 4. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. 1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in an amount not less than the following amounts: a. Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 11 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 11 of 35 1) $1, 000, 000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: 2) $250,000 Bodily Injury per person 3) $500,000 Bodily Injury per accident / 4) $100,000 Property Damage D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the following requirements: 1. The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks owned and operated by: NONE Write the name of the railroad company. (If none, then write none) 2. The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. 3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: a. General Aggregate: NONE Enter limits provided by Railroad Company (If none, write none) b. Each Occurrence:: NONE Enter limits provided by Railroad Company (If none, write none) 4. With respect to the above outlined insurance requirements, the following shall govern: a. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at -grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. b. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights -of - CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 12 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 12 of 35 way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. c. If, in addition to a grade separation or an at -grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at -grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. d. If no grade separation is involved but other work is proposed on a railroad company's right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. 5. No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. 6. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 4.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the Developer and City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the Developer or City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the Developer or City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 5 — CONTRACTOR'S RESPONSIBILITIES 5.01 Supervision and Superintendent A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 13 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 13 of 35 Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 5.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 5.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 14 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 14 of 35 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 5.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and the General Requirements) proposed adjustments in the Project Schedule. 2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 9. Adjustments in Contract Time for projects with City participation shall be made by participating change orders. 5.05 Substitutes and "Or -Equals " A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or -Equal" Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 15 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 15 of 35 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 5.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 0125 00 and: 1) shall certify that the proposed substitute item will: i. perform adequately the functions and achieve the results called for by the general design; ii. be similar in substance to that specified; iii. be suited to the same use as that specified; and 2) will state: i. the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; ii. whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; iii. whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: i. all variations of the proposed substitute item from that specified; ii. available engineering, sales, maintenance, repair, and replacement services; and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 16 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 16 of 35 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 5.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.13. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Participating Change Order. 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors) A. The Contractor and any subcontractors are required to be prequalified for the work types requiring pre -qualification 5.07 Concerning Subcontractors, Suppliers, and Others A. Minority and Women Owned Business Enterprise Compliance: CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 17 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 17 of 35 ❑ Required for this Contract. (Check this box if there is any City Participation) ® Not Required for this Contract. It is City policy to ensure the full and equitable participation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent of the City's MWBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MWBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. C. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 18 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 18 of 35 Documents, Contractor shall provide City contract numbers and reference numbers to the Subcontractors and/or Suppliers. 5.08 Wage Rates ❑ Required for this Contract. ® Not Required for this Contract. A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 1 lth day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 19 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 19 of 35 occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 5.09 Patent Fees and Royalties A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 5.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.01. 5.11 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 20 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 20 of 35 other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and shall be entitled to recover its cost in doing so. The City may withhold Final Acceptance until clean-up is complete and cost are recovered. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 5.12 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 21 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 21 of 35 Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 5.13 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 5.14 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 22 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 22 of 35 5.15 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 5.16 Submittals A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal will be identified as required by City. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 5.16.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 5.16.C. B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 23 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 23 of 35 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 5.17 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City or Developer of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 24 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 24 of 35 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 4.02.13. The City will give notice of observed defects with reasonable promptness. 5.18 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 5.19 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 25 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 25 of 35 C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 5.16.C. 5.20 Right to Audit: A. The City reserves the right to audit all projects utilizing City funds B. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 5.21 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 26 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 26 of 35 ARTICLE 6 — OTHER WORK AT THE SITE 6.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. ARTICLE 7 — CITY'S RESPONSIBILITIES 7.01 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 11.03. 7.02 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 27 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 27 of 35 7.03 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 5.13. ARTICLE 8 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 8.01 City's Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City's representative during construction are set forth in the Contract Documents. A. City's Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Representative's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents. 8.02 Authorized Variations in Work City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City Developer, and also on Contractor, who shall perform the Work involved promptly. 8.03 Rejecting Defective Work City will have authority to reject Work which City's Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or completed. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 28 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 28 of 35 8.04 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). ARTICLE 9 — CHANGES IN THE WORK 9.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Participating Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a project with City participation, a Field Order may be issued by the City. 9.02 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. ARTICLE 10 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 10.01 Change of Contract Price A. The Contract Price may only be changed by a Participating Change Order for projects with City participation. 10.02 Change of Contract Time A. The Contract Time may only be changed by a Participating Change Order for projects with City participation. 10.03 Delays A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 29 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 29 of 35 ARTICLE 11— TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 11.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 11.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 11.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations approved by City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 30 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 30 of 35 3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the Testing Lab by Contractor. Developer/Contractor. City will forward all invoices for retests to 4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance until the Testing Lab is Paid E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. 11.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. 11.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 11.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 11.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 31 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 31 of 35 Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 11.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor and Developer should such additional warranty coverage be required. Contractor's obligations under this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 11.08 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 32 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 32 of 35 stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 11.09. ARTICLE 12 — COMPLETION 12.01 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment will pass to City no later than the time of Final Acceptance and shall be free and clear of all Liens. 12.02 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 12.03 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 33 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 33 of 35 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 12.04 Final Acceptance A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction of the following: 1. All documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; 2. consent of the surety, if any, to Final Acceptance; 3. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and 4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. 5. after all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. ARTICLE 13 — SUSPENSION OF WORK 13.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will stop contract time on City participation projects. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 34 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 34 of 35 available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. ARTICLE 14 — MISCELLANEOUS 14.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given i£ 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 14.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 14.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 35 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 35 of 35 14.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 14.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 01 11 00 SUMMARY OF WORK 011100-1 DAP SUMMARY OF WORK Page 1 of 3 5 A. Section Includes: 6 1. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 11 2. Division 1 - General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 A. Work Covered by Contract Documents 1. Work is to include furnishing all labor, materials, and equipment, and performing all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work 1. Any and all Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included on the standard bid item list, then the item shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. C. Use of Premises 1. Coordinate uses of premises under direction of the City. 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. 3. Use and occupy only portions of the public streets and alleys, or other public places or other rights -of -way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the City. a. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [Insert Project Number] Revised December 20, 2012 01 11 00 - 2 DAP SUMMARY OF WORK Page 2 of 3 1 b. Excavated and waste materials shall be stored in such a way as not to interfere 2 with the use of spaces that may be designated to be left free and unobstructed 3 and so as not to inconvenience occupants of adjacent property. 4 c. If the street is occupied by railroad tracks, the Work shall be carried on in such 5 manner as not to interfere with the operation of the railroad. 6 1) All Work shall be in accordance with railroad requirements set forth in 7 Division 0 as well as the railroad permit. 8 D. Work within Easements 9 1. Do not enter upon private property for any purpose without having previously 10 obtained permission from the owner of such property. 11 2. Do not store equipment or material on private property unless and until the 12 specified approval of the property owner has been secured in writing by the 13 Contractor and a copy furnished to the City. 14 3. Unless specifically provided otherwise, clear all rights -of -way or easements of 15 obstructions which must be removed to make possible proper prosecution of the 16 Work as a part of the project construction operations. 17 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, 18 lawns, fences, culverts, curbing, and all other types of structures or improvements, 19 to all water, sewer, and gas lines, to all conduits, overhead pole lines, or 20 appurtenances thereof, including the construction of temporary fences and to all 21 other public or private property adjacent to the Work. 22 5. Notify the proper representatives of the owners or occupants of the public or private 23 lands of interest in lands which might be affected by the Work. 24 a. Such notice shall be made at least 48 hours in advance of the beginning of the 25 Work. 26 b. Notices shall be applicable to both public and private utility companies and any 27 corporation, company, individual, or other, either as owners or occupants, 28 whose land or interest in land might be affected by the Work. 29 c. Be responsible for all damage or injury to property of any character resulting 30 from any act, omission, neglect, or misconduct in the manner or method or 31 execution of the Work, or at any time due to defective work, material, or 32 equipment. 33 6. Fence 34 a. Restore all fences encountered and removed during construction of the Project 35 to the original or a better than original condition. 36 b. Erect temporary fencing in place of the fencing removed whenever the Work is 37 not in progress and when the site is vacated overnight, and/or at all times to 38 provide site security. 39 c. The cost for all fence work within easements, including removal, temporary 40 closures and replacement, shall be subsidiary to the various items bid in the 41 project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [Insert Project Number] Revised December 20, 2012 011100-3 DAP SUMMARY OF WORK Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] i 11QI ZI] Icy I[ON I IQ I 12 13 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [Insert Project Number] Revised December 20, 2012 012500-1 DAP SUBSTITUTION PROCEDURES SECTION 0125 00 SUBSTITUTION PROCEDURES PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 4 The procedure for requesting the approval of substitution of a product that is not equivalent to a product which is specified by descriptive or performance criteria or defined by reference to 1 or more of the following: a. Name of manufacturer b. Name of vendor c. Trade name d. Catalog number 2. Substitutions are not "or -equals". B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Request for Substitution - General 1. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2. Certain types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or -equals," as determined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a. Or -equals are unavailable due to strike, discontinued production of products meeting specified requirements, or other factors beyond control of Contractor; or, CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 012500-2 DAP SUBSTITUTION PROCEDURES Page 2 of 4 b. Contractor proposes a cost and/or time reduction incentive to the City. 1.5 SUBMITTALS A. See Request for Substitution Form (attached) B. Procedure for Requesting Substitution 1. Substitution shall be considered only: a. After award of Contract b. Under the conditions stated herein 2. Submit 3 copies of each written request for substitution, including: a. Documentation 1) Complete data substantiating compliance of proposed substitution with Contract Documents 2) Data relating to changes in construction schedule, when a reduction is proposed 3) Data relating to changes in cost b. For products 1) Product identification a) Manufacturer's name b) Telephone number and representative contact name c) Specification Section or Drawing reference of originally specified product, including discrete name or tag number assigned to original product in the Contract Documents 2) Manufacturer's literature clearly marked to show compliance of proposed product with Contract Documents 3) Itemized comparison of original and proposed product addressing product characteristics including, but not necessarily limited to: a) Size b) Composition or materials of construction c) Weight d) Electrical or mechanical requirements 4) Product experience a) Location of past projects utilizing product b) Name and telephone number of persons associated with referenced projects knowledgeable concerning proposed product c) Available field data and reports associated with proposed product 5) Samples a) Provide at request of City. b) Samples become the property of the City. c. For construction methods: 1) Detailed description of proposed method 2) Illustration drawings C. Approval or Rejection 1. Written approval or rejection of substitution given by the City 2. City reserves the right to require proposed product to comply with color and pattern of specified product if necessary to secure design intent. 3. In the event the substitution is approved, if a reduction in cost or time results, it will be documented by Change Order. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 012500-3 DAP SUBSTITUTION PROCEDURES Page 3 of 4 4. Substitution will be rejected if: a. Submittal is not through the Contractor with his stamp of approval b. Request is not made in accordance with this Specification Section c. In the Developer's opinion, acceptance will require substantial revision of the original design d. In the City's or Developer's opinion, substitution will not perform adequately the function consistent with the design intent 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. In making request for substitution or in using an approved product, the Contractor represents that the Contractor: 1. Has investigated proposed product, and has determined that it is adequate or superior in all respects to that specified, and that it will perform function for which it is intended 2. Will provide same guarantee for substitute item as for product specified 3. Will coordinate installation of accepted substitution into Work, to include building modifications if necessary, making such changes as may be required for Work to be complete in all respects 4. Waives all claims for additional costs related to substitution which subsequently arise 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 012500-4 DAP SUBSTITUTION PROCEDURES Page 4 of 4 EXHIBIT A REQUEST FOR SUBSTITUTION FORM: PROJECT: DATE: We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature Recommended as noted Firm Not recommended Address By Date Date Remarks Telephone For Use by City: Approved Rejected City Date Recommended Received late CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 013119-1 DAP PRECONSTRUCTION MEETING SECTION 01 31 19 PRECONSTRUCTION MEETING PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 3 1. Provisions for the preconstruction meeting to be held prior to the start of Work to clarify construction contract administration procedures B. Deviations from this City of Fort Worth Standard Specification 1. No construction schedule required unless requested by the City. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the delivery of the distribution package to the City. a. The meeting will be scheduled and administered by the City. 2. The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3. Attendance shall include: a. Developer and Consultant b. Contractor's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 01 31 19 - 2 DAP PRECONSTRUCTION MEETING Page 2 of 3 e. Other City representatives f. Others as appropriate 4. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals m. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre -Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. MBE/SBE procedures hh. Final Acceptance ii. Final Payment J. Questions or Comments CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 013119-3 DAP PRECONSTRUCTION MEETING Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 013216-1 DAP CONSTRUCTION PROGRESS SCHEDULE Page 1 of 5 SECTION 0132 16 CONSTRUCTION PROGRESS SCHEDULE PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. General requirements for the preparation, submittal, updating, status reporting and management of the Construction Progress Schedule 2. Specific requirements are presented in the City of Fort Worth Schedule Guidance Document B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements IW4011[HrfW.1e177%'/u101e189ZIZy011117V A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES A. Definitions 1. Schedule Tiers a. Tier 1 - No schedule submittal required by contract. Small, brief duration projects b. Tier 2 - No schedule submittal required by contract, but will require some milestone dates. Small, brief duration projects c. Tier 3 - Schedule submittal required by contract as described in the Specification and herein. Majority of City projects, including all bond program projects d. Tier 4 - Schedule submittal required by contract as described in the Specification and herein. Large and/or complex projects with long durations 1) Examples: large water pump station project and associated pipeline with interconnection to another governmental entity e. Tier 5 - Schedule submittal required by contract as described in the Specification and herein. Large and/or very complex projects with long durations, high public visibility 1) Examples might include a water or wastewater treatment plant 2. Baseline Schedule - Initial schedule submitted before work begins that will serve as the baseline for measuring progress and departures from the schedule. 3. Progress Schedule - Monthly submittal of a progress schedule documenting progress on the project and any changes anticipated. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 013216-2 DAP CONSTRUCTION PROGRESS SCHEDULE Page 2 of 5 4. Schedule Narrative - Concise narrative of the schedule including schedule changes, expected delays, key schedule issues, critical path items, etc B. Reference Standards 1. City of Fort Worth Schedule Guidance Document 1.4 ADMINISTRATIVE REQUIREMENTS A. Baseline Schedule 1. General a. Prepare a cost -loaded baseline Schedule using approved software and the Critical Path Method (CPM) as required in the City of Fort Worth Schedule Guidance Document. b. Review the draft cost -loaded baseline Schedule with the City to demonstrate understanding of the work to be performed and known issues and constraints related to the schedule. c. Designate an authorized representative (Project Scheduler) responsible for developing and updating the schedule and preparing reports. B. Progress Schedule 1. Update the progress Schedule monthly as required in the City of Fort Worth Schedule Guidance Document. 2. Prepare the Schedule Narrative to accompany the monthly progress Schedule. 3. Change Orders a. Incorporate approved change orders, resulting in a change of contract time, in the baseline Schedule in accordance with City of Fort Worth Schedule Guidance Document. C. Responsibility for Schedule Compliance 1. Whenever it becomes apparent from the current progress Schedule and CPM Status Report that delays to the critical path have resulted and the Contract completion date will not be met, or when so directed by the City, make some or all of the following actions at no additional cost to the City a. Submit a Recovery Plan to the City for approval revised baseline Schedule outlining: 1) A written statement of the steps intended to take to remove or arrest the delay to the critical path in the approved schedule 2) Increase construction manpower in such quantities and crafts as will substantially eliminate the backlog of work and return current Schedule to meet projected baseline completion dates 3) Increase the number of working hours per shift, shifts per day, working days per week, the amount of construction equipment, or any combination of the foregoing, sufficiently to substantially eliminate the backlog of work 4) Reschedule activities to achieve maximum practical concurrency of accomplishment of activities, and comply with the revised schedule 2. If no written statement of the steps intended to take is submitted when so requested by the City, the City may direct the Contractor to increase the level of effort in manpower (trades), equipment and work schedule (overtime, weekend and holiday work, etc.) to be employed by the Contractor in order to remove or arrest the delay to the critical path in the approved schedule. a. No additional cost for such work will be considered. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 013216-3 DAP CONSTRUCTION PROGRESS SCHEDULE Page 3 of 5 D. The Contract completion time will be adjusted only for causes specified in this Contract. a. Requests for an extension of any Contract completion date must be supplemented with the following: 1) Furnish justification and supporting evidence as the City may deem necessary to determine whether the requested extension of time is entitled under the provisions of this Contract. a) The City will, after receipt of such justification and supporting evidence, make findings of fact and will advise the Contractor, in writing thereof. 2) If the City finds that the requested extension of time is entitled, the City's determination as to the total number of days allowed for the extensions shall be based upon the approved total baseline schedule and on all data relevant to the extension. a) Such data shall be included in the next updating of the Progress schedule. b) Actual delays in activities which, according to the Baseline schedule, do not affect any Contract completion date shown by the critical path in the network will not be the basis for a change therein. 2. Submit each request for change in Contract completion date to the City within 30 days after the beginning of the delay for which a time extension is requested but before the date of final payment under this Contract. a. No time extension will be granted for requests which are not submitted within the foregoing time limit. b. From time to time, it may be necessary for the Contract schedule or completion time to be adjusted by the City to reflect the effects of job conditions, weather, technical difficulties, strikes, unavoidable delays on the part of the City or its representatives, and other unforeseeable conditions which may indicate schedule adjustments or completion time extensions. 1) Under such conditions, the City will direct the Contractor to reschedule the work or Contract completion time to reflect the changed conditions and the Contractor shall revise his schedule accordingly. a) No additional compensation will be made to the Contractor for such schedule changes except for unavoidable overall contract time extensions beyond the actual completion of unaffected work, in which case the Contractor shall take all possible action to minimize any time extension and any additional cost to the City. b) Available float time in the Baseline schedule may be used by the City as well as by the Contractor. 3. Float or slack time is defined as the amount of time between the earliest start date and the latest start date or between the earliest finish date and the latest finish date of a chain of activities on the Baseline Schedule. a. Float or slack time is not for the exclusive use or benefit of either the Contractor or the City. b. Proceed with work according to early start dates, and the City shall have the right to reserve and apportion float time according to the needs of the project. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 013216-4 DAP CONSTRUCTION PROGRESS SCHEDULE Page 4 of 5 c. Acknowledge and agree that actual delays, affecting paths of activities containing float time, will not have any effect upon contract completion times, providing that the actual delay does not exceed the float time associated with those activities. E. Coordinating Schedule with Other Contract Schedules 1. W ere work is to be performed under this Contract concurrently with or contingent upon work performed on the same facilities or area under other contracts, the Baseline Schedule shall be coordinated with the schedules of the other contracts. a. Obtain the schedules of the other appropriate contracts from the City for the preparation and updating of Baseline schedule and make the required changes in his schedule when indicated by changes in corresponding schedules. 2. In case of interference between the operations of different contractors, the City will determine the work priority of each contractor and the sequence of work necessary to expedite the completion of the entire Project. a. In such cases, the decision of the City shall be accepted as final. b. The temporary delay of any work due to such circumstances shall not be considered as justification for claims for additional compensation. 1.5 SUBMITTALS A. Baseline Schedule 1. Submit Schedule in native file format and pdf format as required in the City of Fort Worth Schedule Guidance Document. a. Native file format includes: 1) Primavera (P6 or Primavera Contractor) 2. Submit draft baseline Schedule to City prior to the pre -construction meeting and bring in hard copy to the meeting for review and discussion. B. Progress Schedule 1. Submit progress Schedule in native file format and pdf format as required in the City of Fort Worth Schedule Guidance Document. 2. Submit progress Schedule monthly no later than the last day of the month. C. Schedule Narrative 1. Submit the schedule narrative in pdf format as required in the City of Fort Worth Schedule Guidance Document. 2. Submit schedule narrative monthly no later than the last day of the month. D. Submittal Process 1. The City administers and manages schedules through Buzzsaw. 2. Contractor shall submit documents as required in the City of Fort Worth Schedule Guidance Document. 3. Once the project has been completed and Final Acceptance has been issued by the City, no further progress schedules are required. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 013216-5 DAP CONSTRUCTION PROGRESS SCHEDULE Page 5 of 5 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. The person preparing and revising the construction Progress Schedule shall be experienced in the preparation of schedules of similar complexity. B. Schedule and supporting documents addressed in this Specification shall be prepared, updated and revised to accurately reflect the performance of the construction. C. Contractor is responsible for the quality of all submittals in this section meeting the standard of care for the construction industry for similar projects. 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 013233-1 DAP PRECONSTRUCTION VIDEO Page 1 of 2 SECTION 0132 33 PRECONSTRUCTION VIDEO PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative and procedural requirements for: a. Preconstruction Videos B. Deviations from this City of Fort Worth Standard Specification 1. Though not mandatory, it is highly recommended on infill developer projects. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Preconstruction Video 1. Produce a preconstruction video of the site/alignment, including all areas in the vicinity of and to be affected by construction. a. Provide digital copy of video upon request by the City. 2. Retain a copy of the preconstruction video until the end of the maintenance surety period. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 01 32 33 - 2 DAP PRECONSTRUCTION VIDEO Page 2 of 2 PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 SECTION 0133 00 DAP SUBMITTALS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 013300-1 DAP SUBMITTALS Page 1 of 8 General methods and requirements of submissions applicable to the following Work -related submittals: a. Shop Drawings b. Product Data (including Standard Product List submittals) c. Samples d. Mock Ups B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication f) Delivery g) Similar sequenced activities c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 013300-2 DAP SUBMITTALS Page 2 of 8 d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 03 30 00-08-B 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents 2. Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) `By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8 '/2 inches x 11 inches to 8 '/2 inches x 11 inches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 013300-3 DAP SUBMITTALS Page 3 of 8 2. The Project title and number 3. Contractor identification 4. The names of: a. Contractor b. Supplier c. Manufacturer 5. Identification of the product, with the Specification Section number, page and paragraph(s) 6. Field dimensions, clearly identified as such 7. Relation to adjacent or critical features of the Work or materials 8. Applicable standards, such as ASTM or Federal Specification numbers 9. Identification by highlighting of deviations from Contract Documents 10. Identification by highlighting of revisions on resubmittals 11. An 8-inch x 3-inch blank space for Contractor and City stamps F. Shop Drawings 1. As specified in individual Work Sections includes, but is not necessarily limited to: a. Custom -prepared data such as fabrication and erection/installation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates f. Special wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable to the Work 2. Details a. Relation of the various parts to the main members and lines of the structure b. Where correct fabrication of the Work depends upon field measurements 1) Provide such measurements and note on the drawings prior to submitting for approval. G. Product Data 1. For submittals of product data for products included on the City's Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City's Standard Product List, submittal data may include, but is not necessarily limited to: a. Standard prepared data for manufactured products (sometimes referred to as catalog data) 1) Such as the manufacturer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of compliances and applicability 4) Roughing -in diagrams and templates 5) Catalog cuts 6) Product photographs CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 013300-4 DAP SUBMITTALS Page 4 of 8 7) Standard wiring diagrams 8) Printed performance curves and operational -range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare -parts listing and printed product warranties 12) As applicable to the Work H. Samples As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: 1) Sections of manufactured or fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work I. Do not start Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1. Fabrication performed, materials purchased or on -site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals d. Samples 1) Distributed to the Project Representative 2. Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 013300-5 DAP SUBMITTALS Page 5 of 8 a. Shop Drawings 1) Distributed to the City 2) Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review 1. The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. b. Code 2 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 013300-6 DAP SUBMITTALS Page 6 of 8 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non -conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked b. Submittals for each item will be reviewed no more than twice at the City's expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the Developer at least 7 Calendar Days prior to release for manufacture. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 013300-7 DAP SUBMITTALS Page 7 of 8 9. When the shop drawings have been completed to the satisfaction of the City, the Contractor may carry out the construction in accordance therewith and no further changes therein except upon written instructions from the City. 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days following receipt of submittal by the City. L. Mock ups 1. Mock Up units as specified in individual Sections, include, but are not necessarily limited to, complete units of the standard of acceptance for that type of Work to be used on the Project. Remove at the completion of the Work or when directed. M. Qualifications 1. If specifically required in other Sections of these Specifications, submit a P.E. Certification for each item required. N. Request for Information (RFI) 1. Contractor Request for additional information a. Clarification or interpretation of the contract documents b. When the Contractor believes there is a conflict between Contract Documents c. When the Contractor believes there is a conflict between the Drawings and Specifications 1) Identify the conflict and request clarification 2. Sufficient information shall be attached to permit a written response without further information. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 013300-8 DAP SUBMITTALS Page 8 of 8 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 1040IZI]wlX40Y1.130 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 1 of 2 SECTION 0145 23 TESTING AND INSPECTION SERVICES PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Testing and inspection services procedures and coordination B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a. Contractor is responsible for performing, coordinating, and payment of all Quality Control testing. b. City is responsible for performing and payment for first set of Quality Assurance testing. 1) If the first Quality Assurance test performed by the City fails, the Contractor is responsible for payment of subsequent Quality Assurance testing until a passing test occurs. a) Final acceptance will not be issued by City until all required payments for testing by Contractor have been paid in full. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Testing 1. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be performed by the City, notify City, sufficiently in advance, when testing is needed. b. When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3. Distribution of Testing Reports a. Electronic Distribution 1) Confirm development of Project directory for electronic submittals to be uploaded to the City's document management system, or another form of distribution approved by the City. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised March 20, 2020 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 2 of 2 2) Upload test reports to designated project directory and notify appropriate City representatives via email of submittal posting. 3) Hard Copies a) 1 copy for all submittals submitted to the Project Representative b. Hard Copy Distribution (if required in lieu of electronic distribution) 1) Tests performed by City a) Distribute 1 hard copy to the Contractor 2) Tests performed by the Contractor a) Distribute 3 hard copies to City's Project Representative 4. Provide City's Project Representative with trip tickets for each delivered load of Concrete or Lime material including the following information: a. Name of pit b. Date of delivery c. Material delivered B. Inspection 1. Inspection or lack of inspection does not relieve the Contractor from obligation to perform work in accordance with the Contract Documents. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 03/20/2020 D.V. Magaiia Removed reference to Buzzsaw and noted that electronic submittals be uploaded through the City's document management system. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised March 20, 2020 015000-1 DAP TEMPORARY FACILITIES AND CONTROLS Page 1 of 4 SECTION 0150 00 TEMPORARY FACILITIES AND CONTROLS PART1- GENERAL 1.1 SUMMARY A. Section Includes: Provide temporary facilities and controls needed for the Work including, but not necessarily limited to: a. Temporary utilities b. Sanitary facilities c. Storage Sheds and Buildings d. Dust control e. Temporary fencing of the construction site B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Temporary Utilities 1. Obtaining Temporary Service a. Make arrangements with utility service companies for temporary services. b. Abide by rules and regulations of utility service companies or authorities having jurisdiction. c. Be responsible for utility service costs until Work is approved for Final Acceptance. 1) Included are fuel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as required for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic consumption by Contractor personnel and City's Project Representatives. c. Coordination 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised JULY 1, 2011 01 50 00 - 2 DAP TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 d. Contractor Payment for Construction Water 1) Obtain construction water meter from City for payment as billed by City's established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as required for Work, including testing of Work. 1) Provide power for lighting, operation of equipment, or other use. b. Electric power service includes temporary power service or generator to maintain operations during scheduled shutdown. 4. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and others performing work or furnishing services at Site. 5. Temporary Heat and Ventilation a. Provide temporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe working conditions. B. Sanitary Facilities 1. Provide and maintain sanitary facilities for persons on Site. a. Comply with regulations of State and local departments of health. 2. Enforce use of sanitary facilities by construction personnel at job site. a. Enclose and anchor sanitary facilities. b. No discharge will be allowed from these facilities. c. Collect and store sewage and waste so as not to cause nuisance or health problem. d. Haul sewage and waste off -site at no less than weekly intervals and properly dispose in accordance with applicable regulation. 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 4. Remove facilities at completion of Project C. Storage Sheds and Buildings 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off ground. 3. Store materials in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventory. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Final Acceptance. D. Temporary Fencing Provide and maintain for the duration or construction when required in contract documents E. Dust Control CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised JULY 1, 2011 01 50 00 - 3 DAP TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1. Contractor is responsible for maintaining dust control through the duration of the project. a. Contractor remains on -call at all times b. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Temporary Facilities 1. Maintain all temporary facilities for duration of construction activities as needed. 3.5 [REPAIR] / [RESTORATION] 3.6 RE -INSTALLATION 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES A. Temporary Facilities CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised JULY 1, 2011 01 50 00 - 4 DAP TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1. Remove all temporary facilities and restore area after completion of the Work, to a condition equal to or better than prior to start of Work. 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised JULY 1, 2011 015526-1 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 1 of 3 SECTION 0155 26 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative procedures for: a. Street Use Permit b. Modification of approved traffic control c. Removal of Street Signs B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 34 71 13 — Traffic Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this specification refer to the current reference standard published at the time of the latest revision date logged at the end of this specification, unless a date is specifically cited. 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 1.4 ADMINISTRATIVE REQUIREMENTS A. Traffic Control 1. General a. When traffic control plans are included in the Drawings, provide Traffic Control in accordance with Drawings and Section 34 71 13. b. When traffic control plans are not included in the Drawings, prepare traffic control plans in accordance with Section 34 71 13 and submit to City for review. 1) Allow minimum 10 working days for review of proposed Traffic Control. B. Street Use Permit 1. Prior to installation of Traffic Control, a City Street Use Permit is required. a. To obtain Street Use Permit, submit Traffic Control Plans to City Transportation and Public Works Department. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 015526-2 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 1) Allow a minimum of 5 working days for permit review. 2) Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. C. Modification to Approved Traffic Control Prior to installation traffic control: a. Submit revised traffic control plans to City Department Transportation and Public Works Department. 1) Revise Traffic Control plans in accordance with Section 34 71 13. 2) Allow minimum 5 working days for review of revised Traffic Control. 3) It is the Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. D. Removal of Street Sign 1. If it is determined that a street sign must be removed for construction, then contact City Transportation and Public Works Department, Signs and Markings Division to remove the sign. E. Temporary Signage 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting requirements of the latest edition of the Texas Manual on Uniform Traffic Control Devices (MUTCD). 2. Install temporary sign before the removal of permanent sign. 3. When construction is complete, to the extent that the permanent sign can be reinstalled, contact the City Transportation and Public Works Department, Signs and Markings Division, to reinstall the permanent sign. F. Traffic Control Standards 1. Traffic Control Standards can be found on the City's Buzzsaw website. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 015526-3 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 015713-1 DAP STORM WATER POLLUTION PREVENTION Page 1 of 3 SECTION 0157 13 STORM WATER POLLUTION PREVENTION PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for Storm Water Pollution Prevention Plans B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 3125 00 — Erosion and Sediment Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Activities resulting in less than 1 acre of disturbance a. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 2. Construction Activities resulting in greater than 1 acre of disturbance a. Measurement and Payment shall be in accordance with Section 3125 00. 1.3 REFERENCES A. Abbreviations and Acronyms 1. Notice of Intent: NOI 2. Notice of Termination: NOT 3. Storm Water Pollution Prevention Plan: SWPPP 4. Texas Commission on Environmental Quality: TCEQ 5. Notice of Change: NOC A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Integrated Storm Management (iSWM) Technical Manual for Construction Controls 1.4 ADMINISTRATIVE REQUIREMENTS A. General 1. Contractor is responsible for resolution and payment of any fines issued associated with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 01 57 13 - 2 DAP STORM WATER POLLUTION PREVENTION Page 2 of 3 B. Construction Activities resulting in: 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 3125 00 and Drawings. 2. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 1.5 SUBMITTALS A. SWPPP 1. Submit in accordance with Section 0133 00, except as stated herein. a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City as follows: 1) 1 copy to the City Project Manager a) City Project Manager will forward to the City Department of Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 0157 13 -3 DAP STORM WATER POLLUTION PREVENTION Page 3 of 3 B. Modified SWPPP 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City in accordance with Section 0133 00. 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 015813-1 DAP TEMPORARY PROJECT SIGNAGE Page 1 of 3 SECTION 0158 13 TEMPORARY PROJECT SIGNAGE PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Temporary Project Signage Requirements B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2- PRODUCTS 2.1 OWNER -FURNISHED [oR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 EQUIPMENT, PRODUCT TYPES, AND MATERIALS A. Design Criteria 1. Provide free standing Project Designation Sign in accordance with City's Standard Details for project signs. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 01 58 13 - 2 DAP TEMPORARY PROJECT SIGNAGE Page 2 of 3 B. Materials 1. Sign a. Constructed of 3/4-inch fir plywood, grade A-C (exterior) or better 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. General 1. Provide vertical installation at extents of project. 2. Relocate sign as needed, upon request of the City. B. Mounting options a. Skids b. Posts c. Barricade 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE A. General 1. Maintenance will include painting and repairs as needed or directed by the City. 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 0158 13 -3 DAP TEMPORARY PROJECT SIGNAGE DATE NAME 4/7/2014 M. Domenech Revision Log SUMMARY OF CHANGE Revised for DAP application Page 3 of 3 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 SECTION 0160 00 PRODUCT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 01 60 00 DAP PRODUCT REQUIREMENTS Page 1 of 2 1. References for Product Requirements and City Standard Products List B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A list of City approved products for use is available through the City's website at: httDs://apps.fortworthtexas.2ov/ProiectResources/ and following the directory path: 02 - Construction Documents\Standard Products List A. Only products specifically included on City's Standard Product List in these Contract Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the City. B. Any specific product requirements in the Contract Documents supersede similar products included on the City's Standard Product List. 1. The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City's Standard Product List. C. Although a specific product is included on City's Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that manufacturer's standard product. D. See Section 0133 00 for submittal requirements of Product Data included on City's Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised March 20, 2020 01 60 00 DAP PRODUCT REQUIREMENTS Page 2 of 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City's Standard Product List 4/7/2014 M.Domenech Revised for DAP application 03/20/2020 D.V. Magana Removed reference to Buzzsaw and noted that the City approved products list is accessible through the City's website. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised March 20, 2020 016600-1 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 1 of 4 SECTION 0166 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A. Delivery Requirements 1. Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 01 66 00 - 2 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 4. Deliver products or equipment in manufacturer's original unbroken cartons or other containers designed and constructed to protect the contents from physical or environmental damage. 5. Clearly and fully mark and identify as to manufacturer, item and installation location. 6. Provide manufacturer's instructions for storage and handling. B. Handling Requirements 1. Handle products or equipment in accordance with these Contract Documents and manufacturer's recommendations and instructions. C. Storage Requirements 1. Store materials in accordance with manufacturer's recommendations and requirements of these Specifications. 2. Make necessary provisions for safe storage of materials and equipment. a. Place loose soil materials and materials to be incorporated into Work to prevent damage to any part of Work or existing facilities and to maintain free access at all times to all parts of Work and to utility service company installations in vicinity of Work. 3. Keep materials and equipment neatly and compactly stored in locations that will cause minimum inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. a. Arrange storage to provide easy access for inspection. 4. Restrict storage to areas available on construction site for storage of material and equipment as shown on Drawings, or approved by City's Project Representative. 5. Provide off -site storage and protection when on -site storage is not adequate. a. Provide addresses of and access to off -site storage locations for inspection by City's Project Representative. 6. Do not use lawns, grass plots or other private property for storage purposes without written permission of owner or other person in possession or control of premises. 7. Store in manufacturers' unopened containers. 8. Neatly, safely and compactly stack materials delivered and stored along line of Work to avoid inconvenience and damage to property owners and general public and maintain at least 3 feet from fire hydrant. 9. Keep public and private driveways and street crossings open. 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to satisfaction of City's Project Representative. a. Total length which materials may be distributed along route of construction at one time is 1,000 linear feet, unless otherwise approved in writing by City's Project Representative. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 016600-3 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non -Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 01 66 00 - 4 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 017000-1 DAP MOBILIZATION AND REMOBILIZATION Page 1 of 4 SECTION 0170 00 MOBILIZATION AND REMOBILIZATION PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Mobilization and Demobilization a. Mobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies to the Site 2) Establishment of necessary general facilities for the Contractor's operation at the Site 3) Premiums paid for performance and payment bonds 4) Transportation of Contractor's personnel, equipment, and operating supplies to another location within the designated Site 5) Relocation of necessary general facilities for the Contractor's operation from 1 location to another location on the Site. b. Demobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies away from the Site including disassembly 2) Site Clean-up 3) Removal of all buildings and/or other facilities assembled at the Site for this Contract c. Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. 2. Remobilization a. Remobilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: 1) Demobilization a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b) Site Clean-up as designated in the Contract Documents 2) Remobilization a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site necessary to resume the Work. b) Establishment of necessary general facilities for the Contractor's operation at the Site necessary to resume the Work. 3) No Payments will be made for: a) Mobilization and Demobilization from one location to another on the Site in the normal progress of performing the Work. b) Stand-by or idle time c) Lost profits 3. Mobilizations and Demobilization for Miscellaneous Projects a. Mobilization and Demobilization CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 01 70 00 - 2 DAP MOBILIZATION AND REMOBILIZATION Page 2 of 4 1) Mobilization shall consist of the activities and cost on a Work Order basis necessary for: a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site for the issued Work Order. b) Establishment of necessary general facilities for the Contractor's operation at the Site for the issued Work Order 2) Demobilization shall consist of the activities and cost necessary for: a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly for each issued Work Order b) Site Clean-up for each issued Work Order c) Removal of all buildings or other facilities assembled at the Site for each Work Oder b. Mobilization and Demobilization do not include activities for specific items of work for which payment is provided elsewhere in the contract. 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects a. A Mobilization for Miscellaneous Projects when directed by the City and the mobilization occurs within 24 hours of the issuance of the Work Order. B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements IRM97[yW.307Z%140IBlel89,11101111114'9V A. Measurement and Payment 1. Mobilization and Demobilization a. Measure 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 2. Remobilization for suspension of Work as specifically required in the Contract Documents a. Measurement 1) Measurement for this Item shall be per each remobilization performed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Specified Remobilization" in accordance with Contract Documents. c. The price shall include: 1) Demobilization as described in Section 1.1.A.2.a.1) 2) Remobilization as described in Section 1.1.A.2.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 01 70 00 - 3 DAP MOBILIZATION AND REMOBILIZATION Page 3 of 4 Remobilization for suspension of Work as required by City a. Measurement and Payment 1) This shall be submitted as a Contract Claim in accordance with Article 10 of Section 00 72 00. 2) No payments will be made for standby, idle time, or lost profits associated with this Item. 4. Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The Work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Work Order Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include: 1) Mobilization as described in Section 1.1.A.3.a.1) 2) Demobilization as described in Section 1.1.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. Emergency Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The Work performed and materials furnished in accordance with this Item and measured as provided under "Measurement' will be paid for at the unit price per each "Work Order Emergency Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include 1) Mobilization as described in Section 1.1.A.4.a) 2) Demobilization as described in Section 1.1.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 01 70 00 - 4 DAP MOBILIZATION AND REMOBILIZATION 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP application Page 4 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 1 2 3 PART1- GENERAL 4 1.1 SUMMARY 5 6 7 8 9 10 11 12 1.2 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 017123-1 CONSTRUCTION STAKING AND SURVEY Pagel of 8 SECTION 01 71 23 CONSTRUCTION STAKING AND SURVEY A. Section Includes: 1. Requirements for construction staking and construction survey B. Deviations from this City of Fort Worth Standard Specification 1. See Changes (Highlighted in Yellow). C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Staking a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 2. Construction Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 3. As -Built Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. CITY OF FORT WORTH SOMA -OUTPOST CASITAS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105365 Revised February 14, 2018 01 71 23 - 2 CONSTRUCTION STAKING AND SURVEY Page 2 of 8 �I%=;1101y04;11Die cyOki 2 A. Definitions 3 1. Construction Survev - The survey measurements made prior to or while 4 construction is in progress to control elevation, horizontal position, dimensions and 5 configuration of structures/improvements included in the Project Drawings. 6 2. As -built Survev —The measurements made after the construction of the 7 improvement features are complete to provide position coordinates for the features 8 of a project. 9 3. Construction Staking — The placement of stakes and markings to provide offsets 10 and elevations to cut and fill in order to locate on the ground the designed 11 structures/improvements included in the Project Drawings. Construction staking 12 shall include staking easements and/or right of way if indicated on the plans. 13 4. Survev "Field Checks" — Measurements made after construction staking is 14 completed and before construction work begins to ensure that structures marked on 15 the ground are accurately located per Project Drawings. 16 B. Technical References 17 1. City of Fort Worth — Construction Staking Standards (available on City's Buzzsaw 18 website) — 01 71 23.16.01— Attachment A Survey Staking Standards 19 2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files (available 20 on City's Buzzsaw website). 21 3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision 22 4. Texas Society of Professional Land Surveyors (TSPS), Manual of Practice for Land 23 Surveying in the State of Texas, Category 5 24 25 1.4 ADMINISTRATIVE REQUIREMENTS 26 A. The Contractor's selection of a surveyor must comply with Texas Government 27 Code 2254 (qualifications based selection) for this project. 28 1.5 SUBMITTALS 29 A. Submittals, if required, shall be in accordance with Section 0133 00. 30 B. All submittals shall be received and reviewed by the City prior to delivery of work. 31 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 32 A. Field Quality Control Submittals 33 1. Documentation verifying accuracy of field engineering work, including coordinate 34 conversions if plans do not indicate grid or ground coordinates. 35 2. Submit "Cut -Sheets" conforming to the standard template provided by the City 36 (refer to 01 71 23.16.01 — Attachment A — Survey Staking Standards). 37 38 1.7 CLOSEOUT SUBMITTALS 39 B. As -built Redline Drawing Submittal CITY OF FORT WORTH SOMA -OUTPOST CASITAS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105365 Revised February 14, 2018 017123-3 CONSTRUCTION STAKING AND SURVEY Page 3 of 8 1 1. Submit As -Built Survey Redline Drawings documenting the locations/elevations of 2 constructed improvements signed and sealed by Registered Professional Land 3 Surveyor (RPLS) responsible for the work (refer to 01 71 23.16.01 — Attachment A 4 — Survey Staking Standards) . 5 2. Contractor shall submit the proposed as -built and completed redline drawing 6 submittal one (1) week prior to scheduling the project final inspection for City 7 review and comment. Revisions, if necessary, shall be made to the as -built redline 8 drawings and resubmitted to the City prior to scheduling the construction final 9 inspection. 10 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 11 1.9 QUALITY ASSURANCE 12 A. Construction Staking 13 1. Construction staking will be performed by the Contractor. 14 2. Coordination 15 a. Contact City and Developer's Project Representative at least one week in 16 advance notifying the City of when Construction Staking is scheduled. 17 b. It is the Contractor's responsibility to coordinate staking such that 18 construction activities are not delayed or negatively impacted. 19 3. General 20 a. Contractor is responsible for preserving and maintaining stakes. If City 21 surveyors or Developer's Project Representative are required to re -stake for 22 any reason, the Contractor will be responsible for costs to perform staking. If 23 in the opinion of the City, a sufficient number of stakes or markings have been 24 lost, destroyed disturbed or omitted that the contracted Work cannot take place 25 then the Contractor will be required to stake or re -stake the deficient areas. 26 B. Construction Survey 27 1. Construction Survey will be performed by the Contractor. 28 2. Coordination 29 a. Contractor to verify that horizontal and vertical control data established in the 30 design survey and required for construction survey is available and in place. 31 3. General 32 a. Construction survey will be performed in order to construct the work shown 33 on the Construction Drawings and specified in the Contract Documents. 34 b. For construction methods other than open cut, the Contractor shall perform 35 construction survey and verify control data including, but not limited to, the 36 following: 37 1) Verification that established benchmarks and control are accurate. 38 2) Use of Benchmarks to furnish and maintain all reference lines and grades 39 for tunneling. 40 3) Use of line and grades to establish the location of the pipe. 41 4) Submit to the City copies of field notes used to establish all lines and 42 grades, if requested, and allow the City to check guidance system setup prior 43 to beginning each tunneling drive. 44 5) Provide access for the City, if requested, to verify the guidance system and 45 the line and grade of the carrier pipe. CITY OF FORT WORTH SOMA -OUTPOST CASITAS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105365 Revised February 14, 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 01 71 23 - 4 CONSTRUCTION STAKING AND SURVEY Page 4 of 8 6) The Contractor remains fully responsible for the accuracy of the work and correction of it, as required. 7) Monitor line and grade continuously during construction. 8) Record deviation with respect to design line and grade once at each pipe joint and submit daily records to the City. 9) If the installation does not meet the specified tolerances (as outlined in Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct the installation in accordance with the Contract Documents. C. As -Built Survey 1. Required As -Built Survey will be performed by the Contractor. 2. Coordination a. Contractor is to coordinate with City to confirm which features require as - built surveying. b. It is the Contractor's responsibility to coordinate the as -built survey and required measurements for items that are to be buried such that construction activities are not delayed or negatively impacted. c. For sewer mains and water mains 12" and under in diameter, it is acceptable to physically measure depth and mark the location during the progress of construction and take as -built survey after the facility has been buried. The Contractor is responsible for the quality control needed to ensure accuracy. 3. General a. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features during the progress of the construction including the following: 1) W ter Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Minimum every 250 linear feet, including (2) Horizontal and vertical points of inflection, curvature, etc. (3) Fire line tee (4) Plugs, stub -outs, dead-end lines (5) Casing pipe (each end) and all buried fittings 2) Sanitary Sewer a) Top of pipe elevations and coordinates for force mains and siphon sanitary sewer lines (non -gravity facilities) at the following locations: (1) Minimum every 250 linear feet and any buried fittings (2) Horizontal and vertical points of inflection, curvature, etc. 3) Stormwater — Not Applicable b. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features after the construction is completed including the following: 1) Manholes a) Rim and flowline elevations and coordinates for each manhole 2) W ter Lines a) Cathodic protection test stations b) Sampling stations c) Meter boxes/vaults (All sizes) CITY OF FORT WORTH SOMA -OUTPOST CASITAS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105365 Revised February 14, 2018 017123-5 CONSTRUCTION STAKING AND SURVEY Page 5 of 8 1 d) Fire hydrants 2 e) Valves (gate, butterfly, etc.) 3 f) Air Release valves (Manhole rim and vent pipe) 4 g) Blow off valves (Manhole rim and valve lid) 5 h) Pressure plane valves 6 i) Underground Vaults 7 (1) Rim and flowline elevations and coordinates for each 8 Underground Vault. 9 3) Sanitary Sewer 10 a) Cleanouts 11 (1) Rim and flowline elevations and coordinates for each 12 b) Manholes and Junction Structures 13 (1) Rim and flowline elevations and coordinates for each 14 manhole and junction structure. 15 4) Stormwater — Not Applicable 16 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 17 1.11 FIELD [SITE] CONDITIONS [NOT USED] 18 1.12 WARRANTY ITS7\4'RNP1 94',1I311141V 20 A. A construction survey will produce, but will not be limited to: 21 1. Recovery of relevant control points, points of curvature and points of intersection. 22 2. Establish temporary horizontal and vertical control elevations (benchmarks) 23 sufficiently permanent and located in a manner to be used throughout construction. 24 3. The location of planned facilities, easements and improvements. 25 a. Establishing final line and grade stakes for piers, floors, grade beams, parking 26 areas, utilities, streets, highways, tunnels, and other construction. 27 b. A record of revisions or corrections noted in an orderly manner for reference. 28 c. A drawing, when required by the client, indicating the horizontal and vertical 29 location of facilities, easements and improvements, as built. 30 4. Cut sheets shall be provided to the City inspector and Survey Superintendent for all 31 construction staking projects. These cut sheets shall be on the standard city template 32 which can be obtained from the Survey Superintendent (817-392-7925). 33 5. Digital survey files in the following formats shall be acceptable: 34 a. AutoCAD (.dwg) 35 b. ESRI Shapefile (.shp) 36 c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use 37 standard templates, if available) 38 6. Survey files shall include vertical and horizontal data tied to original project 39 control and benchmarks, and shall include feature descriptions 40 PART 3 - EXECUTION 41 3.1 INSTALLERS CITY OF FORT WORTH SOMA -OUTPOST CASITAS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105365 Revised February 14, 2018 017123-6 CONSTRUCTION STAKING AND SURVEY Page 6 of 8 1 A. Tolerances: 2 1. The staked location of any improvement or facility should be as accurate as 3 practical and necessary. The degree of precision required is dependent on many 4 factors all of which must remain judgmental. The tolerances listed hereafter are 5 based on generalities and, under certain circumstances, shall yield to specific 6 requirements. The surveyor shall assess any situation by review of the overall plans 7 and through consultation with responsible parties as to the need for specific 8 tolerances. 9 a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical 10 tolerance. Horizontal alignment for earthwork and rough cut should not exceed 11 1.0 ft. tolerance. 12 b. Horizontal alignment on a structure shall be within .0.1 ft tolerance. 13 c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and 14 walkways shall be located within the confines of the site boundaries and, 15 occasionally, along a boundary or any other restrictive line. Away from any 16 restrictive line, these facilities should be staked with an accuracy producing no 17 more than 0.05ft. tolerance from their specified locations. 18 d. Underground and overhead utilities, such as sewers, gas, water, telephone and 19 electric lines, shall be located horizontally within their prescribed areas or 20 easements. Within assigned areas, these utilities should be staked with an 21 accuracy producing no more than 0.1 ft tolerance from a specified location. 22 e. The accuracy required for the vertical location of utilities varies widely. Many 23 underground utilities require only a minimum cover and a tolerance of 0.1 ft. 24 should be maintained. Underground and overhead utilities on planned profile, 25 but not depending on gravity flow for performance, should not exceed 0.1 ft. 26 tolerance. 27 B. Surveying instruments shall be kept in close adjustment according to manufacturer's 28 specifications or in compliance to standards. The City reserves the right to request a 29 calibration report at any time and recommends regular maintenance schedule be 30 performed by a certified technician every 6 months. 31 1. Field measurements of angles and distances shall be done in such fashion as to 32 satisfy the closures and tolerances expressed in Part 3.1.A. 33 2. Vertical locations shall be established from a pre -established benchmark and 34 checked by closing to a different bench mark on the same datum. 35 3. Construction survey field work shall correspond to the client's plans. Irregularities 36 or conflicts found shall be reported promptly to the City. 37 4. Revisions, corrections and other pertinent data shall be logged for future reference. 38 39 3.2 EXAMINATION [NOT USED] 40 3.3 PREPARATION [NOT USED] 41 3.4 APPLICATION 42 3.5 REPAIR / RESTORATION 43 A. If the Contractor's work damages or destroys one or more of the control 44 monuments/points set by the City or Developer's Project Representative, the monuments 45 shall be adequately referenced for expedient restoration. CITY OF FORT WORTH SOMA -OUTPOST CASITAS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105365 Revised February 14, 2018 017123-7 CONSTRUCTION STAKING AND SURVEY Page 7 of 8 1 1. Notify City or Developer's Project Representative if any control data needs to be 2 restored or replaced due to damage caused during construction operations. 3 a. Contractor shall perform replacements and/or restorations. 4 b. The City or Developer's Project Representative may require at anytime a 5 survey "Field Check" of any monument or benchmarks that are set be verified 6 by the City surveyors or Developer's Project Representative before further 7 associated work can move forward. 8 3.6 RE -INSTALLATION [NOT USED] 9 3.7 FIELD [oR] SITE QUALITY CONTROL 10 A. It is the Contractor's responsibility to maintain all stakes and control data placed by the 11 City or Developer's Project Representative in accordance with this Specification. This 12 includes easements and right of way, if noted on the plans. 13 B. Do not change or relocate stakes or control data without approval from the City. 14 3.8 SYSTEM STARTUP 15 A. Survey Checks 16 1. The City reserves the right to perform a Survey Check at any time deemed 17 necessary. 18 2. Checks by City personnel or 3' party contracted surveyor are not intended to 19 relieve the contractor of his/her responsibility for accuracy. 20 21 3.9 ADJUSTING [NOT USED] 22 3.10 CLEANING [NOT USED] 23 3.11 CLOSEOUT ACTIVITIES [NOT USED] 24 3.12 PROTECTION [NOT USED] 25 3.13 MAINTENANCE [NOT USED] 26 3.14 ATTACHMENTS [NOT USED] 27 END OF SECTION 28 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson Added instruction and modified measurement & payment under 1.2; added 8/31/2017 M. Owen definitions and references under 1.3; modified 1.6; added 1.7 closeout submittal requirements; modified 1.9 Quality Assurance; added PART 2 — PRODUCTS ; Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup. Removed "blue text"; revised measurement and payment sections for Construction 2/14/2018 M Owen Staking and As -Built Survey; added reference to selection compliance with TGC 2254; revised action and Closeout submittal requirements; added acceptable depth CITY OF FORT WORTH SOMA -OUTPOST CASITAS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105365 Revised February 14, 2018 017123-8 CONSTRUCTION STAKING AND SURVEY Page 8 of 8 measurement criteria; revised list of items requiring as -built survey "during" and "after" construction; and revised acceptable digital survey file format CITY OF FORT WORTH SOMA -OUTPOST CASITAS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 105365 Revised February 14, 2018 SECTION 0174 23 CLEANING PART1- GENERAL 1.1 SUMMARY 017423-1 DAP CLEANING Page 1 of 4 A. Section Includes: 1. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fall on newly painted surfaces. 2. Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 01 74 23 - 2 DAP CLEANING Page 2 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2- PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site. 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 01 74 23 - 3 DAP CLEANING Page 3 of 4 6. Handle materials in a controlled manner with as few handlings as possible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. 8. Remove all signs of temporary construction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do not burn on -site. B. Intermediate Cleaning during Construction 1. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 3. Confine construction debris daily in strategically located container(s): a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haul from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transported by flowing water during the storm. C. Exterior (Site or Right of Way) Final Cleaning 1. Remove trash and debris containers from site. a. Re -seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP application 01 74 23 - 4 DAP CLEANING Page 4 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 SECTION 0177 19 CLOSEOUT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY 017719-1 DAP CLOSEOUT REQUIREMENTS Page 1 of 3 A. Section Includes: 1. The procedure for closing out a contract B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Guarantees, Bonds and Affidavits 1. No application for final payment will be accepted until all guarantees, bonds, certificates, licenses and affidavits required for Work or equipment as specified are satisfactorily filed with the City. B. Release of Liens or Claims 1. No application for final payment will be accepted until satisfactory evidence of release of liens has been submitted to the City. 1.5 SUBMITTALS A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 017719-2 DAP CLOSEOUT REQUIREMENTS Page 2 of 3 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 CLOSEOUT PROCEDURE A. Prior to requesting Final Inspection, submit: 1. Project Record Documents in accordance with Section 0178 39 2. Operation and Maintenance Data, if required, in accordance with Section 0178 23 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 01 74 23. C. Final Inspection 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b. Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective or incomplete. 2. Upon receiving written notice from the City, immediately undertake the Work required to remedy deficiencies and complete the Work to the satisfaction of the City. 3. Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. 4. Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified spare parts b. Adequate oil and grease as required for the first lubrication of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses f. Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of all equipment D. Notice of Project Completion CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 017719-3 DAP CLOSEOUT REQUIREMENTS Page 3 of 3 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) f. Contractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP application CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 017823-1 DAP OPERATION AND MAINTENANCE DATA Page 1 of 5 SECTION 0178 23 OPERATION AND MAINTENANCE DATA PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Product data and related information appropriate for City's maintenance and operation of products furnished under Contract 2. Such products may include, but are not limited to: a. Traffic Controllers b. Irrigation Controllers (to be operated by the City) c. Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Schedule 1. Submit manuals in final form to the City within 30 calendar days of product shipment to the project site. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 0133 00. All submittals shall be approved by the City prior to delivery. 1.6 INFORMATIONAL SUBMITTALS A. Submittal Form 1. Prepare data in form of an instructional manual for use by City personnel. 2. Format a. Size: 8 1/2 inches x 11 inches b. Paper 1) 40 pound minimum, white, for typed pages 2) Holes reinforced with plastic, cloth or metal c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 01 78 23 - 2 DAP OPERATION AND MAINTENANCE DATA Page 2 of 5 d. Drawings 1) Provide reinforced punched binder tab, bind in with text 2) Reduce larger drawings and fold to size of text pages. e. Provide fly -leaf for each separate product, or each piece of operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. f. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subject matter covered in the manual 3. Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupings. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify each product by product name and other identifying symbols as set forth in Contract Documents. 2. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable information 3. Drawings a. Supplement product data with drawings as necessary to clearly illustrate: 1) Relations of component parts of equipment and systems 2) Control and flow diagrams b. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. c. Do not use Project Record Drawings as maintenance drawings. 4. Written text, as required to supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures. b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 01 78 23 - 3 DAP OPERATION AND MAINTENANCE DATA Page 3 of 5 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel giving: 1) Proper procedures in event of failure 2) Instances which might affect validity of warranties or bonds C. Manual for Materials and Finishes 1. Submit 5 copies of complete manual in final form. 2. Content, for architectural products, applied materials and finishes: a. Manufacturer's data, giving full information on products 1) Catalog number, size, composition 2) Color and texture designations 3) Information required for reordering special manufactured products b. Instructions for care and maintenance 1) Manufacturer's recommendation for types of cleaning agents and methods 2) Cautions against cleaning agents and methods which are detrimental to product 3) Recommended schedule for cleaning and maintenance 3. Content, for moisture protection and weather exposure products: a. Manufacturer's data, giving full information on products 1) Applicable standards 2) Chemical composition 3) Details of installation b. Instructions for inspection, maintenance and repair D. Manual for Equipment and Systems 1. Submit 5 copies of complete manual in final form. 2. Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts 1) Function, normal operating characteristics and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Operating procedures 1) Start-up, break-in, routine and normal operating instructions 2) Regulation, control, stopping, shut -down and emergency instructions 3) Summer and winter operating instructions 4) Special operating instructions c. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Alignment, adjusting and checking d. Servicing and lubrication schedule 1) List of lubricants required e. Manufacturer's printed operating and maintenance instructions f. Description of sequence of operation by control manufacturer 1) Predicted life of parts subject to wear 2) Items recommended to be stocked as spare parts g. As installed control diagrams by controls manufacturer It. Each contractor's coordination drawings 1) As installed color coded piping diagrams CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 01 78 23 - 4 DAP OPERATION AND MAINTENANCE DATA Page 4 of 5 i. Charts of valve tag numbers, with location and function of each valve j. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage k. Other data as required under pertinent Sections of Specifications 3. Content, for each electric and electronic system, as appropriate: a. Description of system and component parts 1) Function, normal operating characteristics, and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards 1) Electrical service 2) Controls 3) Communications c. As installed color coded wiring diagrams d. Operating procedures 1) Routine and normal operating instructions 2) Sequences required 3) Special operating instructions e. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking f. Manufacturer's printed operating and maintenance instructions g. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage h. Other data as required under pertinent Sections of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Provide operation and maintenance data by personnel with the following criteria: 1. Trained and experienced in maintenance and operation of described products 2. Skilled as technical writer to the extent required to communicate essential data 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 01 78 23 - 5 DAP OPERATION AND MAINTENANCE DATA Page 5 of 5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] DATE NAME 8/31/2012 D. Johnson 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE 1.5.A.1 — title of section removed Revised for DAP Application CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 017839-1 DAP PROJECT RECORD DOCUMENTS Page 1 of 4 SECTION 0178 39 PROJECT RECORD DOCUMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Work associated with the documenting the project and recording changes to project documents, including: a. Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to City's Project Representative. 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Accuracy of Records 1. Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. 2. Accuracy of records shall be such that future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 01 78 39 - 2 DAP PROJECT RECORD DOCUMENTS Page 2 of 4 3. To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 4. Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modification of the Work to proceed without lengthy and expensive site measurement, investigation and examination. 1.10 STORAGE AND HANDLING A. Storage and Handling Requirements 1. Maintain the job set of Record Documents completely protected from deterioration and from loss and damage until completion of the Work and transfer of all recorded data to the final Project Record Documents. 2. In the event of loss of recorded data, use means necessary to again secure the data to the City's approval. a. In such case, provide replacements to the standards originally required by the Contract Documents. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2- PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED] 2.2 RECORD DOCUMENTS A. Job set 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no charge to the Contractor, 1 complete set of all Documents comprising the Contract. B. Final Record Documents 1. At a time nearing the completion of the Work and prior to Final Inspection, provide the City 1 complete set of all Final Record Drawings in the Contract. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED 3.3 PREPARATION [NOT USED 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set 1. Immediately upon receipt of the job set, identify each of the Documents with the title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 017839-3 DAP PROJECT RECORD DOCUMENTS Page 3 of 4 2. Preservation a. Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. b. Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. c. Maintain the job set at the site of work. 3. Coordination with Construction Survey a. At a minimum clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4. Making entries on Drawings a. Record any deviations from Contract Documents. b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c. Date all entries. d. Call attention to the entry by a "cloud" drawn around the area or areas affected. e. In the event of overlapping changes, use different colors for the overlapping changes. Conversion of schematic layouts a. hi some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b. Show on the job set of Record Drawings, by dimension accurate to within 1 inch, the centerline of each run of items. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in ceiling plenum", "exposed", and the like). 3) Make all identification sufficiently descriptive that it may be related reliably to the Specifications. c. The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. B. Final Project Record Documents Transfer of data to Drawings a. Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. b. Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. c. Call attention to each entry by drawing a "cloud" around the area or areas affected. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 01 78 39 - 4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP Application CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 Page 1 of 1 1 APPENDIX 2 GC4,01 , 3 GC-4.02 Subsurface and Physical Conditions 4 GG 4M Unde -gr- .0 d F.,eilities 5 GG 4.01 Hao-ardous Envif-onmental Condition at Site 7 GG 6.0 Wage Rates 8 GG 6.04' Porto and Utilities 9 GC-6.21 'N9 s--.N , 10 GR-01 60 00 Product Requirements CITY OF FORT WORTH SOMA- OUTPOST CASITAS STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects CPN 105365 Revised December 20, 2012 GEOTECHNICAL EXPLORATION FORT WORTH CASITAS Off Cleveland Avenue Fort Worth, Texas ALPHA Report No. W231923-rev2 January 8, 202 2024 Prepared for: WILL MONCRIEF AND JOHN FRENCH 2204 Edwin Street Fort Worth, Texas 76110 Attention: Mr. Will Moncrief and John French Prepared By: ALPHA #\TESTING A Universal Engineering Sciences Company A L P H A #XTEST ING Geotechnical 5058 Brush Creek Road Tel: 817.496.5600 Construction Materials Fort Worth, Texas 76119 Fax: 817.496.5608 Environmental www.alphatesting.com A Universal Engineering Sciences Company TBPELS Firm No. 813 January 8, 2023 Will Moncrief and John French 2204 Edwin Street Fort Worth, Texas 76110 Attention: Mr. Will Moncrief and John French Re: Geotechnical Exploration Fort Worth Casitas Off Cleveland Avenue Fort Worth, Texas ALPHA Report No. W231923-rev2 Attached is the report of the geotechnical exploration performed for the project referenced above. This study was authorized by Mr. Will Moncrief on July 7, 2023 and performed in accordance with ALPHA Proposal No. 98589-revl, dated July 6, 2023. The purpose of this revision is to provide recommendations for pavement as requested by the Client. This report contains results of field explorations and laboratory testing and an engineering interpretation of these with respect to available project characteristics. The results and analyses were used to develop recommendations to aid design and construction of foundations. ALPHA TESTING, LLC appreciates the opportunity to be of service on this project. If we can be of further assistance, such as providing materials testing services during construction, please contact our office. Sincerely, ALPHA TESTING, LLC ,.. B RIAN J. H OYT .................. ........ .i+. 115745 .; . January 8, 2024 Karina Cohuo Geotechnical Project Manager BJH/KC/ws Copies: (I-PDF) Client 14�7 0 Brian J. Hoyt, P.E. Regional Manager TABLE OF CONTENTS ALPHA REPORT NO. W231923-REV2 1.0 PURPOSE AND SCOPE.................................................................................................1 2.0 PROJECT CHARACTERISTICS....................................................................................1 3.0 FIELD EXPLORATION.................................................................................................2 4.0 LABORATORY TESTS.................................................................................................2 5.0 GENERAL SUBSURFACE CONDITIONS....................................................................2 6.0 DESIGN RECOMMENDATIONS..................................................................................3 6.1 Demolition and Possible Fill................................................................................3 6.2 Potential Seasonal Movements.............................................................................3 6.2.1 Subgrade Improvement Using Moisture Conditioning...............................4 6.3 Slab -on -Grade Foundations..................................................................................5 6.4 Post -Tensioning Institute, Design of Post -Tensioned Slabs-on-Grade...................5 6.5 Area Pavement.....................................................................................................6 6.5.1 Pavement Subgrade Preparation................................................................6 6.5.2 Portland Cement Concrete (PCC) Pavement.............................................7 6.6 Drainage and Other Considerations......................................................................7 7.0 GENERAL CONSTRUCTION PROCEDURES AND GUIDELINES ............................8 7.1 Site Preparation and Grading................................................................................9 7.2 Foundation Excavations.....................................................................................10 7.3 Fill Compaction.................................................................................................10 7.4 Utilities..............................................................................................................11 7.5 Groundwater......................................................................................................12 8.0 LIMITATIONS.............................................................................................................12 APPENDIX A-1 Methods of Field Exploration Boring Location Plan — Figure 1 B-1 Methods of Laboratory Testing Logs of Borings Key to Soil Symbols and Classifications ALPHA Report No. W231923-rev2 11tX 1.0 PURPOSE AND SCOPE The purpose of this geotechnical exploration is for ALPHA TESTING, LLC (ALPHA) to evaluate for Will Moncrief and John French (Client) some of the physical and engineering properties of subsurface materials at a selected location on the subject site with respect to formulation of appropriate geotechnical design parameters for the proposed construction. The field exploration was accomplished by securing subsurface samples from test borings performed across the project site. Engineering analyses were performed from results of the field exploration and results of laboratory tests performed on representative samples. Also included are general comments pertaining to reasonably anticipated construction problems and recommendations concerning earthwork and quality control testing during construction. This information can be used to evaluate subsurface conditions and to aid in ascertaining construction meets project specifications. Recommendations provided in this report were developed from information obtained in the test borings depicting subsurface conditions only at the specific boring locations and at the particular time designated on the logs. Subsurface conditions at other locations may differ from those observed at the boring locations, and subsurface conditions at the boring locations may vary at different times of the year. The scope of work may not fully define the variability of subsurface materials and conditions that are present on the site. The nature and extent of variations surrounding the borings may not become evident until construction. If significant variations then appear evident, our office should be contacted to re- evaluate our recommendations after performing on -site observations and possibly other tests. 2.0 PROJECT CHARACTERISTICS It is proposed to construct 20 to 30 casitas with a footprint of about 500 SF each at a site generally located west of Cleveland Avenue and about 200 ft north of West Tucker Street in Fort Worth, Texas. A site plan illustrating the general outline of the property is provided as Figure 1, the Boring Location Plan, in the Appendix. At the time of the field exploration, the site consisted of existing single family homes with scattered trees. Review of historical images from Google Earth® indicate previous earthwork/clearing occurred and demolition of residences previously occurred in the project area. No information regarding previous development in the project area was provided to us. Review of the topographical maps available at www.dfwmaDs.com indicate the site slopes down towards the northwest (Approximate Elev. 658 ft to 654 ft). We understand it is anticipated the casitas will be supported on a slab foundations designed for post construction seasonal movements of about I inch. Grading plans were not provided for this study. Based on conversations with the Client, we understand maximum cutting and filling of up to 2 ft will be required achieve final grades in the building pad. 1 ALPHA Report No. W231923-rev2 11t% 3.0 FIELD EXPLORATION Subsurface conditions on the site were explored by drilling three (3) test borings to a depth of about 20 ft each. The test borings were performed in general accordance with ASTM Standard D 420 using standard rotary drilling equipment. The approximate locations of the test borings are shown on the Boring Location Plan, Figure 1, enclosed in the Appendix. Details of drilling and sampling operations are briefly summarized in Methods of Field Exploration, Section A-1 of the Appendix. Subsurface types encountered during the field exploration are presented on the Log of Boring sheets included in the Appendix. The boring logs contains our Field Technician's and Engineer's interpretation of conditions believed to exist between actual samples retrieved. Therefore, these boring logs contains both factual and interpretive information. Lines delineating subsurface strata on the borings logs is approximate and the actual transition between strata may be gradual. 4.0 LABORATORY TESTS Selected samples of the subsurface materials were tested in the laboratory to evaluate their engineering properties as a basis in providing recommendations for residential foundation design and earthwork construction. A brief description of testing procedures used in the laboratory can be found in Methods of Laboratory Testing, Section B-1 of the Appendix. Individual test results are presented on the Log of Boring sheets in the Appendix. 5.0 GENERAL SUBSURFACE CONDITIONS Based on geological maps available from the Bureau of Economic Geology, published by The University of Texas at Austin, the project site lies within the undivided Pawpaw, Weno Limestone, and Denton Clay formation. This undivided formation generally consist of alternating layers of limestone and marl (limey shale). Residual overburden soils associated with these undivided formations generally consist of clay soils characterized by moderate to high shrink -swell potential. Subsurface conditions encountered in the borings generally consisted of clay and shaly clay to approximate depths of 8 ft to 15 ft beneath the ground surface underlain by limestone and/or shale extending to the 20 ft termination depth of the borings. Limestone layers about 3 ft and 4 ft thick were encountered between the shaly clay layers in Borings 1 and 2, respectively, at depths of about 10 ft and 8 ft beneath the ground surface. More detailed stratigraphic information is presented on the attached Log of Boring sheets. Most of the materials encountered in the borings are considered relatively impermeable and are anticipated to have a relatively slow response to water. Therefore, several days of observation would be required to evaluate actual groundwater levels within the depths explored. Also, the groundwater level at the site is anticipated to fluctuate seasonally depending on the amount of rainfall, prevailing weather conditions and subsurface drainage characteristics. Free groundwater was not encountered in the borings. However, it is common to encounter seasonal groundwater from natural fractures within the clayey matrix, at the soil/rock (limestone and/or shale) interface or from fractures in the rock (limestone and/or shale), particularly during or after periods of precipitation. If more detailed groundwater information is required, monitoring wells or piezometers can be installed. ALPHA Report No. W231923-rev2 Further details concerning subsurface materials and conditions encountered can be obtained from the Log of Boring sheets provided in the Appendix. 6.0 DESIGN RECOMMENDATIONS The following design recommendations were developed on the basis of the previously described Project Characteristics (Section 2.0) and General Subsurface Conditions (Section 5.0). If project criteria change, our office should conduct a review to determine if modifications to the recommendations are required. Further, it is recommended our office be provided with a copy of the final building plans and specifications for review prior to construction. The following design criteria was developed assuming grading will consist of maximum cuts and fill of 2 ft. Cutting or filling on the site more than 2 ft can alter the recommended foundation design parameters. Therefore, it is recommended our office be contacted before performing other cutting and filling on site to verify appropriate design parameters are utilized for final foundation design. 6.1 Demolition and Possible Fill As discussed in Section 2.0, we understand existing structures will be demolished prior to new construction. In addition, previously existing residences were demolished and cleared prior to our field investigation. Any soil disturbed due to removal of structures or foundations should be re - compacted in accordance with recommendations provided in Section 6.2 or 7.3, as applicable. All foundation elements of the existing structures should be removed or cut off at least 1 ft below finished grade or 1 ft below the new structural elements, whichever is deeper. All abandoned utility lines should be either removed or positively sealed to prevent possible water seepage into subgrade soils. Although not encountered in the borings, existing fill material may be present on the property in areas that were not explored. If compaction records for existing fill cannot be obtained, the existing fill should be considered as uncontrolled fill. Uncontrolled fill is generally not considered suitable for support of foundations due to the risk of under -compacted zones resulting in failures of weak soil and/or indeterminate levels of settlement. Any existing uncontrolled fill should be removed from the building pad area and replaced with engineered fill as recommended in Section 6.2 or 7.3, as applicable. 6.2 Potential Seasonal Movements Our findings indicate slab foundations constructed within 2 ft of existing grade could experience post construction seasonal movements of about 7 inches due to shrinking and swelling of active clays. Potential seasonal movements were estimated assuming fill material used to raise the grade will consist of onsite or similar material with a plasticity index of 44 or less. If the plasticity index of material used to raise the grade is higher than 44, potential movements could be higher than our estimates. Slab foundations supported on uncontrolled fill are also subject to indeterminate settlements. Potential seasonal movements were estimated using results of absorption swell tests, from methods outlined by the Texas Department of Transportation (TxDOT) Test Method Tex-124-E and engineering judgment and experience. The estimated movements were calculated assuming the 3 ALPHA Report No. W231923-rev2 moisture content of the in -situ soil within the normal zone of seasonal moisture content change varies between a "dry" condition and a "wet" condition as defined by methods outlined in Texas Department of Transportation Test Method Tex-124-E. Also, it was assumed a 1 psi surcharge load from the floor slab acts on the subgrade soils. Movements exceeding those predicted herein could occur if the existing soils are exposed to an extended dry period, positive drainage of surface water is not maintained or if soils are subject to an outside water source, such as leakage from a utility line or subsurface migration from off -site locations. We understand it is desired to reduce potential movements of the foundations to about 1 inch. Potential movements of the foundations could be reduced to about 1 inch by placing a minimum thickness of 2 ft of non -expansive fill between the bottom of the floor slab and the top surface of moisture conditioned soil extending a depth of 10 ft below the non -expansive fill cap or to the top surface of limestone, whichever is encountered first. Moisture conditioning is described in Section 6.2.1. Non -expansive fill material could consist of select fill or flexible base material as described in Section 7.3. 6.2.1 Subgrade Improvement Using Moisture Conditioning Movement of the foundations could be reduced to about 1 inch by placing a 2 ft non - expansive material between the bottom of the slab and the top surface of moisture - conditioned soil extending to a depth of 10 ft below the non -expansive fill cap or to the top surface of limestone, whichever is encountered first. Limestone was encountered at depths of about 8 ft to 10 ft below the ground surface in the borings. Moisture -conditioning consists of over -excavating the site soils, then processing and compacting the specified minimum thickness of soil at a "target" moisture content approximated to be at least 5 percent above the material's optimum moisture content as determined by the standard Proctor method (ASTM D 698). The moisture -conditioned soil, free of debris and any rock fragment greater than 4 inches, should be placed in about 8-inch thick loose lifts and compacted to a dry density of 93 to 97 percent of standard Proctor maximum dry density. Moisture conditioning of the on -site soil should extend throughout the entire building area, below any adjacent flatwork and at least 5 ft beyond the area of floor slab. In entrance areas and at outward swinging doors, moisture conditioning should extend at least 10 ft beyond the perimeter of the work area. However, non -expansive material should not extend beyond the building limits. If flatwork or paving is not planned adjacent to the structure (i.e. above the moisture -conditioned soils), a moisture barrier consisting of a minimum of 10 mil plastic sheeting with 8 to12 inches of soil cover should be provided above the moisture -conditioned soils. Moisture -conditioned soils should be maintained in a moist condition prior to placement of the required thickness of non -expansive material, flatwork or plastic sheeting. The resulting estimated potential seasonal movement (about 1 inch) was calculated assuming the moisture content of the moisture -conditioned soil varies between the "target" moisture content and the "wet" condition while the deeper undisturbed in -situ soil within the normal zone of seasonal moisture content change varies between the "dry" condition and the "wet" condition as defined by methods outlined in TxDOT Test Method Tex-124- E. 4 ALPHA Report No. W231923-rev2 The purpose of moisture -conditioning is to reduce the free swell potential of the moisture - conditioned soil to 1 percent or less. Additional laboratory tests (i.e., standard Proctors, absorption swell tests, etc.) should be conducted during construction to verify the "target" moisture content for moisture -conditioning (estimated at 5 percentage points above the material's optimum moisture content as defined by ASTM D 698) is sufficient to reduce the free swell potential of the processed soil to 1 percent or less. In addition, it is recommended samples of the moisture -conditioned material be routinely obtained during construction to verify the free swell of the improved material is 1 percent or less. Installation of moisture -conditioned clays should be monitored and tested on a full-time basis by a representative of ALPHA to verify the soils tested were placed with the proper lift thickness, moisture content, and degree of compaction. Moisture conditioning should be monitored and tested on a full-time basis by ALPHA to verify materials tested are placed with the proper degree of moisture and compaction as presented in this report. Field density tests should be performed for each lift of fill placed in each building pad area. 6.3 Slab -on -Grade Foundations Slab -on -grade foundations should be designed with exterior and interior grade beams adequate to provide sufficient rigidity to the foundation system. A net allowable bearing pressure of 1.5 kips per sq ft can be used for all grade beams bearing on moisture improved subgrade as discussed in Section 6.2. Grade beams should bear a minimum depth of 12 inches below final grade and should have a minimum width of 10 inches considering the recommended bearing capacity. To reduce cracking as normal movements occur in foundation soils, all grade beams and slab foundations should be adequately reinforced with steel (conventional reinforcing steel and/or post - tensioned reinforcement). It is common to experience some minor cosmetic distress to structures with slab -on -grade foundation systems due to normal ground movements. A properly designed and constructed moisture barrier should be placed between the slabs and subgrade soils to retard moisture migration through the slabs. 6.4 Post -Tensioning Institute. Design of Post -Tensioned Slabs -on -Grade Design parameters in Table A were evaluated based on the conditions encountered in the borings and using information and correlations published by PTI Third Edition and VOLFLO 1.5 computer program provided by Geostructural Tool Kit, Inc. (GTI). TABLE A PTI Design Parameters Potential Seasonal Movement =1 inch (After Subgrade Improvement as Described in Section 6.2) Edge Moisture Distance, ft (em) EDGE LIFT 4.0 CENTER LIFT .E Differential Soil Movement, inches (ym) 1.2 (swell) 1.0 (shrink) ALPHA Report No. W231923-rev2 11tX 6.5 Area Pavement To permit correlation between information from test borings and actual subgrade conditions exposed during construction, a qualified Geotechnical Engineer should be retained to provide subgrade monitoring and testing during construction. If there is any change in project criteria, the recommendations contained in this report should be reviewed by our office. Calculations used to determine the required pavement thickness are based only on the physical and engineering properties of the materials used and conventional thickness determination procedures. Pavement joining buildings should be constructed with a curb and the joint between the building and curb should be sealed. Related civil design factors such as subgrade drainage, shoulder support, cross -sectional configurations, surface elevations, reinforcing steel, joint design and environmental factors will significantly affect the service life and must be included in preparation of the construction drawings and specifications, but all were not included in the scope of this study. Normal periodic maintenance will be required for all pavement to achieve the design life of the pavement system. The recommended pavement sections are considered the minimum necessary to provide satisfactory performance based on the expected traffic loading. In some cases, City minimum standards for pavement section construction may exceed those recommended. 6.5.1 Pavement Subgrade Preparation The exposed surface of the pavement subgrade soil should be scarified to a depth of 6 inches and mixed with a minimum 7 percent hydrated lime (by dry soil weight) in conformance with TxDOT Standard Specification Item 260. Assuming an in -place unit weight of 100 pcf for the pavement subgrade soils, this percentage of lime equates to about 32 lbs of lime per sq yard of treated subgrade. The actual amount of lime required should be confirmed by additional laboratory tests (ASTM C 977 Appendix XI) prior to construction. The soil -lime mixture should be compacted to at least 95 percent of standard Proctor maximum dry density (ASTM D 698) and within the range of 0 to 4 percentage points above the mixture's optimum moisture content. In all areas where hydrated lime is used to stabilize subgrade soil, routine Atterberg-limit tests should be performed to verify the resulting plasticity index of the soil -lime mixture is at/or below 15. Subgrade improvement could also consist of a minimum 6 inch layer of flexible base material. Flexible base used for pavement subgrade should consist of material meeting the requirements of TxDOT Standard Specifications Item 247, Type A, Grade 1-2. The flexible base should be compacted to at least 95 percent of standard Proctor maximum dry density (ASTM D 698) and within the range of 2 percentage points below to 2 percentage points above the material's optimum moisture content. We recommend subgrade improvement procedures extend at least 1 ft beyond the edge of the pavement to reduce effects of seasonal shrinking and swelling upon the extreme edges of pavement. Improvement of the pavement subgrade soil will not prevent normal seasonal movement of the underlying untreated materials. Pavement and other flatwork will have the same potential for movement as slabs constructed directly on the existing undisturbed soils. 6 ALPHA Report No. W231923-rev2 Good perimeter surface drainage with a minimum slope of 2 percent away from the pavement is recommended. Normal maintenance of pavement should be expected over the life of the structures. 6.5.2 Portland Cement Concrete (PCC) Pavement Following subgrade improvement as recommended in Section 6.5.1, PCC (reinforced) pavement sections are recommended in Table B. TABLE B Recommended PCC Pavement Sections Paving Areas and/or Type Parking Areas Subjected Exclusively to Passenger Vehicle Traffic, Drive Lanes, Fire Lanes, Areas Subject to Light Volume Truck Traffic Dumpster Traffic Areas, Areas subject to Moderate Volume Truck Traffic, Subgrade Thickness, Inches Scarified and Compacted (native), 6 6 inches Improved per Section 6.5.1 6 inches Improved per Section 6.5.1 PCC Thickness, Inches PCC should have a minimum compressive strength of 3,000 psi at 28 days in parking areas subjected exclusively to passenger vehicle traffic. We recommend a minimum compressive strength of 3,500 psi at 28 days for the drive lanes, fire lanes, and truck areas. Concrete should be designed with 4.5+1.5 percent entrained air. Joints in concrete paving should not exceed 15 ft. Reinforcing steel should consist of No. 3 bars placed at 18 inches on -center in two directions. Improvement of the pavement subgrade is recommended for drive lanes, fire lanes, bus lanes and pavement subject to truck traffic. Improvement of the pavement subgrade is not necessary for pavements subjected exclusively to passenger vehicle traffic, although improvement in these areas would be generally beneficial to the long-term performance of the pavement. Improvement of the subgrade is described in Section 6.5.1. Alternatively, mechanical improvement of the pavement subgrade could be eliminated by increasing the PCC thickness in the pavement sections presented in Table B by 1 inch. Prior to construction of pavement on unimproved subgrade soil, the exposed subgrade should be scarified to a depth of at least 6 inches and compacted to at least 95 percent of standard Proctor maximum dry density (ASTM D 698) and within the range of -1 to +3 percentage points of the material's optimum moisture content. 6.6 Drainage and Other Considerations Adequate drainage should be provided to reduce seasonal variations in the moisture content of foundation soils. All pavement and sidewalks within 5 ft of the building should be sloped away from the structures to prevent ponding of water around the foundation. Final grades within 5 ft of the structures should be adjusted to slope away from the structures at a minimum slope of 2 percent. Maintaining positive surface drainage throughout the life of the structures is essential. ALPHA Report No. W231923-rev2 In areas with pavement or sidewalks adjacent to the new structures, a positive seal must be maintained between the structure and the pavement or sidewalk to minimize seepage of water into the underlying supporting soils. Post -construction movement of pavement and flatwork is common. Normal maintenance should include inspection of all joints in paving and sidewalks, etc. as well as re -sealing where necessary. Several factors relate to civil and architectural design and/or maintenance, which can significantly affect future movements of the foundation and floor slab system: • Preferably, a complete system of gutters and downspouts should carry runoff water a minimum of 5 ft from the completed structure. • Large trees and shrubs should not be allowed closer to the foundations than a horizontal distance equal to roughly one-half of their mature height due to their significant moisture demand upon maturing. • Moisture conditions should be maintained "constant" around the edge of the slabs. Ponding of water in planters, in unpaved areas, and around joints in paving and sidewalks can cause slab movements beyond those predicted in this report. • Planter box structures placed adjacent to the buildings should be provided with a means to assure concentrations of water are not available to the subsoil stratigraphy. • Architectural design of the floor slabs should avoid additional features such as wing walls as extensions of the slab. • The root systems from existing trees at this site will have dried and desiccated the surrounding clay soils, resulting in soil with near -maximum swell potential. Clay soils surrounding tree root mats in areas to be covered with grade slabs (including, but not limited to foundations, sidewalks, driveways, patios, etc.) should be removed to a minimum depth of 1 ft below the root ball and compacted in -place with moisture and density control as described in Section 7.3. Trench backfill for utilities should be properly placed and compacted as outlined in Section 7.4 and in accordance with requirements of local City standards. Since granular bedding backfill is used for most utility lines, the backfilled trench should not become a conduit and allow access for surface or subsurface water to travel toward the new structures. Concrete cut-off collars or clay plugs should be provided where utility lines cross building lines to prevent water from traveling in the trench backfill and entering beneath the structures. 7.0 GENERAL CONSTRUCTION PROCEDURES AND GUIDELINES Variations in subsurface conditions could be encountered during construction. To permit correlation between test boring data and actual subsurface conditions encountered during construction, it is recommended a registered Professional Engineering firm be retained to observe construction procedures and materials. 8 ALPHA Report No. W231923-rev2 Some construction problems, particularly degree or magnitude, cannot be anticipated until the course of construction. The recommendations offered in the following paragraphs are intended not to limit or preclude other conceivable solutions, but rather to provide our observations based on our experience and understanding of the project characteristics and subsurface conditions encountered in the borings. 7.1 Site Preparation and Grading Although not encountered in the borings, existing fill material may be present on the property in areas that were not explored. Existing fill materials could contain organics, boulders, rubble and other debris which could be encountered during site grading and general excavation. The earthwork and excavation contracts should contain provision for removal of unsuitable materials in the existing fill. Test pit excavations performed prior to construction can be used to evaluate the depth, lateral extent and composition of uncontrolled fill at this site. ALPHA would be pleased to provide this service if desired. All areas supporting slab foundations, flatwork or areas to receive new fill should be properly prepared. • After completion of the necessary stripping, clearing, and excavating and prior to placing any required fill, the exposed subgrade should be carefully evaluated by probing and testing. Any undesirable material (organic material, wet, soft, or loose soil) still in place should be removed. • The exposed subgrade should be further evaluated by proof -rolling with a heavy pneumatic tired roller, loaded dump truck or similar equipment weighing approximately 20 tons to check for pockets of soft or loose material hidden beneath a thin crust of possibly better soil. • Proof -rolling procedures should be observed routinely by a Professional Engineer or his designated representative. Any undesirable material (organic material, wet, soft, or loose soil) exposed from the proof roll should be removed and replaced with well -compacted material as outlined in Section 7.3. • Prior to placement of any fill, the exposed subgrade should then be scarified to a minimum depth of 6 inches and recompacted as outlined in Section 7.3. If fill is to be placed on existing slopes (natural or constructed) steeper than six horizontal to one vertical (6:1), the fill materials should be benched into the existing slopes in such a manner as to provide a minimum bench width of five (5) ft. This should provide a good contact between the existing soils and new fill materials, reduce potential sliding planes, and allow relatively horizontal lift placements. Even if fill is properly compacted as recommended in Section 7.3, fills in excess of about 10 ft are still subject to settlements over time of up to about 1 to 2 percent of the total fill thickness. This should be considered when planning or placing deep fills. 9 ALPHA Report No. W231923-rev2 Slope stability analysis of embankments (natural or constructed) and global stability analysis for retaining walls was not within the scope of this study. The contractor is responsible for designing any excavation slopes, temporary sheeting or shoring. Design of these structures should include any imposed surface surcharges. Construction site safety is the sole responsibility of the contractor, who shall also be solely responsible for the means, methods and sequencing of construction operations. The contractor should also be aware that slope height, slope inclination or excavation depths (including utility trench excavations) should in no case exceed those specified in local, state and/or federal safety regulations, such as OSHA Health and Safety Standard for Excavations, 29 CFR Part 1926, or successor regulations. Stockpiles should be place well away from the edge of the excavation and their heights should be controlled so they do not surcharge the sides of the excavation. Surface drainage should be carefully controlled to prevent flow of water over the slopes and/or into the excavations. Construction slopes should be closely observed for signs of mass movement, including tension cracks near the crest or bulging at the toe. If potential stability problems are observed, a geotechnical engineer should be contacted immediately. Shoring, bracing or underpinning required for the project (if any) should be designed by a professional engineer registered in the State of Texas. Due to the nature of the clay soils found near the surface of the borings, traffic of heavy equipment (including heavy compaction equipment) may create pumping and general deterioration of shallow soils. Therefore, some construction difficulties should be anticipated during periods when these soils are saturated. 7.2 Foundation Excavations All foundation excavations should be properly monitored to verify loose, soft, or otherwise undesirable materials are removed, and foundations will bear on satisfactory material. Soil exposed in the base of all foundation (grade beam) excavations should be protected against detrimental change in condition, such as surface sloughing or side disturbance, rain, or excessive drying. Surface runoff should be drained away from excavations and not allowed to pond in the bottom of the excavation. Concrete for foundations should be placed as soon as practical after the excavation is made. That is, the exposed foundation soils should not be allowed to become excessively dry or wet before placement of concrete. 7.3 Fill Comnaction Select fill used as non -expansive material in the building pad should have a liquid limit less than 35, a plasticity index (PI) not less than about 4 nor greater than 15 and contain no more than 0.5 percent fibrous organic materials, by weight. All select material should contain no deleterious material and should be compacted to a dry density of at least 95 percent standard Proctor maximum dry density (ASTM D 698) and within the range of 1 percentage point below to 3 percentage points above the material's optimum moisture content. The plasticity index and liquid limit of material used as select non -expansive material should be routinely verified during placement using laboratory tests. Visual observation and classification should not be relied upon to confirm the material to be used as select, non -expansive material satisfies the Atterberg-limit criteria. 10 ALPHA Report No. W231923-rev2 Flexible base used as non -expansive material in the building pad should consist of material meeting the requirements of TxDOT Standard Specifications Item 247, Type A or D, Grade 1-2 or 3. The flexible base should be compacted to at least 95 percent of standard Proctor maximum dry density (ASTM D 698) and within the range of 2 percentage points below to 2 percentage points above the material's optimum moisture content. The following are recommendations pertain to general fill compaction. Moisture conditioned soil should conform to the recommendations provided in Section 6.2. Clay with a plasticity index equal to or greater than 25 should be compacted to a dry density between 93 and 98 percent of standard Proctor maximum dry density (ASTM D 698). The compacted moisture content of the clays during placement should be within the range of 2 to 6 percentage points above optimum. Clay fill should be process and the largest particle or clod should be less than 6 inches prior to compaction. Where mass fills are deeper than 10 ft, the fill/backfill below 10 ft should be compacted to at least 100 percent of standard Proctor maximum dry density (ASTM D 698) and within — 2 to +2 percentage points of the material's optimum moisture content. The portion of the fill/backfill shallower than 10 ft should be compacted as outlined above. Compaction should be accomplished by placing fill in about 8-inch thick loose lifts and compacting each lift to at least the specified minimum dry density. Field density and moisture content tests should be performed on each lift. 7.4 Utilities Where utility lines are deeper than 10 ft, the fill/backfill below 10 ft should be compacted to at least 100 percent of standard Proctor maximum dry density (ASTM D 698) and within —2 to +2 percentage points of the material's optimum moisture content. The portion of the fill/backfill shallower than 10 ft should be compacted as previously outlined. Density tests should be performed on each lift (maximum 12-inch thick) and should be performed as the trench is being backfilled. Even if fill is properly compacted, fills in excess of about 10 ft are still subject to settlements over time of up to about 1 to 2 percent of the total fill thickness. This should be considered when designing pavement over utility lines and/or other areas with deep fill. If utility trenches or other excavations extend to or beyond a depth of 5 ft below construction grade, the contractor or others shall be required to develop an excavation safety plan to protect personnel entering the excavation or excavation vicinity. The collection of specific geotechnical data and the development of such a plan, which could include designs for sloping and benching or various types of temporary shoring, is beyond the scope of this study. Any such designs and safety plans shall be developed in accordance with current OSHA guidelines and other applicable industry standards. 11 ALPHA Report No. W231923-rev2 11tX 7.5 Groundwater Groundwater was not encountered in the borings at the time of this study. However, from our experience, shallow groundwater could be encountered in excavations for foundations, utilities and other general excavations at this site. The risk of seepage increases with depth of excavation and during or after periods of precipitation. Standard sump pits and pumping may be adequate to control seepage on a local basis. In any areas where cuts are made, attention should be given to possible seasonal water seepage that could occur through natural cracks and fissures in the newly exposed stratigraphy. In these areas subsurface drains may be required to intercept seasonal groundwater seepage. The need for these or other dewatering devices should be carefully addressed during construction. Our office could be contacted to visually observe final grades to evaluate the need for such drains. 8.0 LIMITATIONS Professional services provided in this geotechnical exploration were performed, findings obtained, and recommendations prepared in accordance with generally accepted geotechnical engineering principles and practices. The scope of services provided herein does not include an environmental assessment of the site or investigation for the presence or absence of hazardous materials in the soil, surface water or groundwater. ALPHA, upon written request, can be retained to provide these services. ALPHA is not responsible for conclusions, opinions or recommendations made by others based on this data. Information contained in this report is intended for the exclusive use of the Client (and their designated design representatives), and is related solely to design of the specific structures outlined in Section 2.0. No party other than the Client (and their designated design representatives) shall use or rely upon this report in any manner whatsoever unless such party shall have obtained ALPHA's written acceptance of such intended use. Any such third party using this report after obtaining ALPHA's written acceptance shall be bound by the limitations and limitations of liability contained herein, including ALPHA's liability being limited to the fee paid to it for this report. Recommendations presented in this report should not be used for design of any other structures except those specifically described in this report. In all areas of this report in which ALPHA may provide additional services if requested to do so in writing, it is presumed that such requests have not been made if not evidenced by a written document accepted by ALPHA. Further, subsurface conditions can change with passage of time. Recommendations contained herein are not considered applicable for an extended period of time after the completion date of this report. It is recommended our office be contacted for a review of the contents of this report for construction commencing more than one (1) year after completion of this report. Non- compliance with any of these requirements by the Client or anyone else shall release ALPHA from any liability resulting from the use of, or reliance upon, this report. Recommendations provided in this report are based on our understanding of information provided by the Client about characteristics of the project. If the Client notes any deviation from the facts about project characteristics, our office should be contacted immediately since this may materially alter the recommendations. Further, ALPHA is not responsible for damages resulting from workmanship of designers or contractors. It is recommended the Owner retain qualified personnel, such as a Geotechnical Engineering firm, to verify construction is performed in accordance with plans and specifications. 12 APPENDIX ALPHA Report No. W231923-rev2 11t\ A-1 METHODS OF FIELD EXPLORATION Using standard rotary drilling equipment, a total of three (3) test borings were performed for this geotechnical exploration at the approximate locations shown on the Boring Location Plan, Figure 1. The boring locations were staked by using a handheld GPS device or by pacing/taping and estimating right angles from landmarks which could be identified in the field and as shown on the site plan provided during this study. The locations of the test borings shown on the Boring Location Plan are considered accurate only to the degree implied by the methods used to define them. Relatively undisturbed samples of the cohesive subsurface materials were obtained by hydraulically pressing 3-inch O.D. thin -wall sampling tubes into the underlying soils at selected depths (ASTM D 1587). These samples were removed from the sampling tubes in the field and evaluated visually. One representative portion of each sample was sealed in a plastic bag for use in future visual evaluation and possible testing in the laboratory. Texas Department of Transportation Texas Cone Penetration (TCP) tests were completed in the field to determine the apparent in -place strength characteristics of the rock type materials. A 3- inch diameter steel cone driven by a 170-pound hammer dropped 24 inches is the basis for TxDOT strength correlations. Depending on the resistance (strength) of the materials, either the number of blows of the hammer required to provide 12 inches of penetration, or the inches of penetration of the cone due to 100 blows of the hammer are recorded on the field logs and are shown on the Log of Boring sheets as "TX Cone" (reference: TxDOT Test Method TEX 132-E). Logs of borings are included in the Appendix. The logs show visual descriptions of subsurface strata encountered using the Unified Soil Classification System. Sampling information, pertinent field data, and field observations are also included. Samples not consumed by testing will be retained in our laboratory for at least 14 days and then discarded unless the Client requests otherwise. 1 `r` i A L R N A'kT EST I N G APPROXIMATE BORING LOCATION GEOTECHNICAL EXPLORATION FORT WORTH CASITAS WHERE IT ALL BEGINS OFF CLEVELAND AVENUE FORT WORTH, TEXAS ALPHA PROJECT NO. W231923 FIGURE 1 BORING LOCATION PLAN ALPHA Report No. W231923-rev2 11tX B-1 METHODS OF LABORATORY TESTING Representative samples were evaluated and classified by a qualified member of the Geotechnical Division and the borings logs were edited as necessary. To aid in classifying the subsurface materials and to determine the general engineering characteristics, natural moisture content tests (ASTM D 2216), Atterberg-limit tests (ASTM D 4318), and dry unit weight determinations were performed on selected samples. In addition, unconfined compressive strength tests (ASTM D 2166) and pocket -penetrometer tests were conducted on selected soil samples to evaluate soil shear strength. Results of these laboratory tests are provided on the Log of Boring sheets. In addition to the Atterberg-limit tests, the expansive properties of the clay soils were further analyzed by absorption swell tests. The swell test is performed by placing a selected sample in a consolidation machine and applying either the approximate current or expected overburden pressure and then allowing the sample to absorb water. When the sample exhibits very little tendency for further expansion, the height increase is recorded and the percent free swell and total moisture gain calculated. Results of the absorption swell tests are provided on the attached Log of Boring sheets. A L P H A TEST ING 5058 Brush Creek Rd. Fort Worth, Texas 76119 Phone: 817-496-5600 BORING NO.: 1 Sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W231923 WHERE IT ALL BEGINS www.alphatesting.com Client: SoMa Casitas, LP Location: Fort Worth, Texas Project: Fort Worth Casitas Surface Elevation: Start Date: 10/10/2023 End Date: 10/10/2023 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS -7On Rods (ft): NONE oZAfter Drilling (ft): DRY O 7After Hours (ft): MATERIAL DESCRIPTION jDark Brown CLAY Brown SHALY CLAY 5 10 Tan LIMESTONE with clay seams and layers Tan SHALY CLAY with limestone fragments 15 Gray SHALE with limestone fragments 20 TEST BORING TERMINATED AT 20 FT 4.0 Hammer Drop (lbs / in): 170 / 24 oS .4 d E a) t _ x > o uE 4)75 m� & O -o .2 a o oZ 00 c a� (n U) Ofx� o o a Z J rl T H a a- 1 2.5 20 4.5+ 16 65 21 44 7.7 4.5+ 10 4.5+ 15 55 19 36 3.3 4.5+ 12 10.0 13.0 4.5+ 17 15.0 100/ 11 20.0 , 0.75" A L P H A TEST ING 5058 Brush Creek Rd. Fort Worth, Texas 76119 Phone: 817-496-5600 BORING NO.: 2 Sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W231923 WHERE IT ALL BEGINS www.alphatesting.com Client: SoMa Casitas, LP Location: Fort Worth, Texas Project: Fort Worth Casitas Surface Elevation: Start Date: 10/10/2023 End Date: 10/10/2023 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS -7On Rods (ft): NONE oZAfter Drilling (ft): DRY O 7After Hours (ft): MATERIAL DESCRIPTION Dark Brown CLAY Brown SHALY CLAY 5 Tan LIMESTONE 10 Tan SHALY CLAY j 15 j Tan LIMESTONE with clay seams 20 TEST BORING TERMINATED AT 20 FT 4.0 8.0 Hammer Drop (lbs / in): 170 / 24 oS .4 d E a) t _ x (D C a �> w� -Jo .J2 °oa� a c UOC 5i •y2aoWoZ 3 (n U) Of o a Z Jl Tx� H a a 1 4.5 23 4.5+ 17 4.5+ 17 62 19 43 4.5+ 19 till 8 " 12.0 4.5 17 45 18 27 0.1 15.0 100/ 10 20.0 , 2.50" 5058 Brush Creek Rd. BORING NO.: 3 A L P H TEST ING Fort Worth, Texas 76119 Sheet 1 1 A Phone: 817-496-5600 of Fax: 817-496-5608 PROJECT NO.: W231923 WHERE IT ALL BEGINS www.alphatesting.com Client: SoMa Casitas, LP Location: Fort Worth, Texas Project: Fort Worth Casitas Surface Elevation: Start Date: 10/10/2023 End Date: 10/10/2023 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: Hammer Drop (lbs / in): 170 / 24 GROUND WATER OBSERVATIONS m -.S .4 E - a> t _ x 0n Rods (ft): NONE T o N U� �� j U, E E C J - 8-1Z7 ZAfter Drilling (f): DRY � 3 >r?j a vc =nCD SFAfter Hours (f): a zo o0— aa .9 0 3 U oZ Ma aT H ?U) MATERIAL DESCRIPTION Dark Brown CLAY - 3.5 2.6 52 22 - 3.5 14 _ 4.0 Brown SHALY CLAY - 5 4.5+ 19 - 4.5+ 19 - 4.5+ 18 54 19 35 0.4 10 10.0 Tan LIMESTONE _ 12.0 Gray LIMESTONE with clay seams L 13 - 15 - 0.50.50" 100/ L 11 _20 20.0 2.25" TEST BORING TERMINATED AT 20 FT A L P H A+ T E S T I N G KEY TO SOIL SYMBOLS WHERE IT ALL BEGINS AND CLASSIFICATIONS SOIL & ROCK SYMBOLS RELATIVE DENSITY OF COHESIONLESS SOILS (blows/ft) ® (CH), High Plasticity CLAY VERY LOOSE 0 TO 4 ® (CL), Low Plasticity CLAY LOOSE 5 TO 10 MEDIUM 11 TO 30 (SC), CLAYEY SAND DENSE 31 TO 50 VERY DENSE OVER 50 (SP), Poorly Graded SAND (SW), Well Graded SAND SHEAR STRENGTH OF COHESIVE SOILS (tsfl (SM), SILTY SAND VERY SOFT LESS THAN 0.25 SOFT 0.25 TO 0.50 IN(ML), SILT FIRM 0.50 TO 1.00 STIFF 1.00 TO 2.00 ® (MH), Elastic SILT VERY STIFF 2.00 TO 4.00 HARD OVER 4.00 19 LIMESTONE RELATIVE DEGREE OF PLASTICITY (PI) ® SHALE / MARL LOW 4 TO 15 SANDSTONE MEDIUM 16 TO 25 HIGH 26 TO 35 o (GP), Poorly Graded GRAVEL VERY HIGH OVER 35 (GW), Well Graded GRAVEL ® (GC), CLAYEY GRAVEL RELATIVE PROPORTIONS (%) (GM), SILTY GRAVEL (OL), ORGANIC SILT TRACE 1 TO 10 LITTLE 11 TO 20 SOME 21 TO 35 (OH), ORGANIC CLAY AND 36 TO 50 15mm 1♦ S SAMPLING SYMBOLS PARTICLE SIZE IDENTIFICATION (DIAMETER) ■SHELBY TUBE (3" OD except where BOULDERS 8.0" OR LARGER noted otherwise) COBBLES 3.0" TO 8.0" SPLIT SPOON (2" OD except where COARSE GRAVEL 0.75' TO 3.0" noted otherwise) FINE GRAVEL 5.0 mm TO 3.0" ® AUGER SAMPLE COURSE SAND 2.0 mm TO 5.0 mm ❑ TEXAS CONE PENETRATION MEDIUM SAND FINE SAND 0.4 mm TO 5.0 mm 0.07 mm TO 0.4 mm ROCK CORE (2" ID except where SILT CLAY 0.002 mm TO 0.07 mm LESS THAN 0.002 mm noted otherwise) CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 09/23/2024 Class A (Sidewalk, ADA Ramps, Driveways, Curb/Guner, Median Pavement) 9/92022 03 30 00 Ma Design American carte C'sawy 30CAF029 9/92022 03 30 00 M. Design Argos DIOOOOO1043S 9/9/2022 03 30 00 M. Design Argos DIOOO0001055 6/24/2024 03 30 00 M. Design MR Town Concrete 302050-1 9/92022 03 30 00 M. Design Bum.. Texas 30U101AG 4/12024 03 30 00 M. Des Bumco Texas 30USOOBG 9/92022 033000 M. Des Carder Concrete FWCC502001 9/92022 033000 M. Design Carder Concrete FWCC502021 9/92022 033000 Ma Design Charleys Concrete 3759 9/9/2022 033000 Ma Design Charleys Concrete 4502 9/92022 033000 Ma Design Chisholm Tral Rcdr Ma C13020AE 9/9/2022 033000 Ma Design City Concrete Company 30HA2011 9/92022 03 30 00 Ma Design Cow Town Rcdr Ma 253-W 9/92022 033000 Ma Design Cow To—Rcdr Ma 250 9/92022 033000 Ma Design Cow To—Rcdr Ma 350 1/29/2024 033000 Ma Design Espada Ready M. R3050AEWR 9/92022 03 30 00 Mix Design GCH Concrete Sc—s GCH4000 9/92022 033000 Mix Design Holcn-SOR, lac 1261 9/92022 033000 Mix Design Holcn-SOR, Jac 5177 9/92022 03 30 00 M. Design Holcim - SOR, lac. 5409 9/92022 033000 M. Design Wgmm Concrete&Aggregates 2MWR-147QW5D5 9/92022 03 30 00 M. Design Ing = Concrete & Aggregates 2MWR-70J23504 4/72023 033000 M. Design Liquid Stone C301D 9/92022 03 30 00 M. Design Mart. Manetta R2136214 9/92022 03 30 00 M. Design Mart. Manetta R2136014 4/12023 03 30 00 M. Design Man. Mnetta R21361414 6/12023 03 30 00 M. Design Man. Martin R2136R20 6/12023 033000 Ma Design Mart. Martin R21361420 112/2022 033000 Ma Design Mal. Mancha R2141K24 8/42023 033000 Ma Design Marta, Manetta R2136R14 4/72023 03 30 00 Ma Design Martin Mancha R2136K14 9/92022 03 30 00 Ma Design Mat. Manetta R2131314 9/92022 03 30 00 Ma Design Mart. Marietta R2132214 9/92022 03 30 00 Ma Design Mart. Marietta D9490SC 10/4/2023 033000 Ma Design NBRReady Mue CLS A-YY 1 OA/2023 033000 Mix Design NBR Ready Mix CLS A -NY 033000 Mix Des.g Osbum 30A50MR 17/10/2023 I/18/2023 03 30 00 Mix Design Rapid Rcdr Mix RRM5020A 11/24/2023 03 30 00 M. Design Rapid Redi M. RRM5525A �9/9/2022 03 30 00 M. Design Redr-Mix IOLI1504 9/92022 03 30 00 Ma Design Redr-Min 10J11524 9/9/2022 03 30 00 M. Design Redr-Min VOJ11524 9/92022 03 30 00 M. Design SRM Concrete 30050 9/92022 03 30 00 M. Design Tarrant Cncrele FW5025A 9/92022 03 30 00 M. Design Tarrant Concrete CP5020A 10/102/22 133110 Mw De,rgn Taman Cpnrxele TCFW5020A 9/9/2022 033000 M. Design Tarrant Concrete FW5525A2 9/9/2022 033000 3 30 00 Ma Design Trin Ready Min 3020AE 9/9/2022 03 3000 Ma Design Tme Gnt Redr Ma 0250 230 9/9/2022 03 30 00 Ma DeZ Tme Gnt Redr M. 0250 2301 Class CB (In Manholes, Junction Boxes,k.ncasement. Blocicht, Collars, Liehtpc le Foundations) 9/92022 0330 00 Mu Design American Concrete Company 40CNF065 9/92022 03 30 00 M. Design Argos D70000001061 9/92022 03 30 00 Mu Design Argos D70000001055 9/92022 03 30 00 M. Design Argos DI000001615 9/92022 03 30 00 M. Design ChaWy's Cncretc 4502 9/92022 03 30 00 M. Design Bumco Texas 40U5OOBG 9/92022 03 30 00 M. Design Cow Town Rcdr M. 255-2 9/92022 033000 M. Design Cow Town Rcdr Ma 355 9/92022 03 30 00 Ma Design Cow Town Redr Ma 255 9/9/2022 03 30 00 Ma Design Cow Town Redr Ma 2" 9/92022 03 30 00 Ma Design Cow Town Redr Ma 370 9/9/2022 03 30 00 Ma Design Cow Town Red, Ma 353 9/92022 03 30 00 Ma Design Cow Town Red, Ma 257 9/92022 03 30 00 Ma Design Cow T.— Red, Ma 357 9/92022 033000 Ma Design Holcn-SOR, lac. 1701 9/92022 033000 Ma Design Holcn-SOR, lac. 1551 9/92022 033000 Mix Design Holcn-SOR, lac. 5409 4272023 033000 Mix Design Lrqurd Stan, C361DNFA 9/92022 03 30 00 Mix Design Mann Marc. R2141230 8/4/2023 03 30 00 M. Design Mat. Marietta R2141 R24 11202023 03 30 00 M. Design Mart. Marietta R2146R33 11/20/2023 03 30 00 M. Design Mart. Marietta R2146K33 9/9/2022 03 30 00 M. Design Mart. M.— R2142233 9/9/2022 03 30 00 M. Design Mart. M—.R2136224 9/9/2022 03 30 00 M. Design Mart. M—.R2141233 9/9/2022 03 30 00 M. Design Mart. M—.R2146038 8/42023 033000 M. Design Mart. Mare. R2146R35 9/122023 3 30 00 033000 Ma Design NOR Ready Ma CLS PI-YY 9/9/2022 03 30 00 Ma Design NOR Ready M. TX CYY 9/9/2022 033000 3 30 00 Ma Design NOR Ready Ma TX C-NY 1/182023 033000 Ma Design Rapid Rcdr Ma RRM5320A 1/18/2023 03 30 00 Ma Design Rapid Rc& Ma RRM6020ASS 9/9/2022 033000 Ma Design Rd AA. IRJ11524 9/9/2022 03 30 00 Ma Design Rd AA. 15611524 12/5/2022 03 30 00 M. Design Redr-M. IOK115C4 )00 p,r Concrete for Sidewalks & ADA Ramps )00 psr Concrete for Sidewalks, Curbs )00 psr Coa—Ir for Wlets, Ju..I— Boxes, Manholes, Chanel L.—, Sidewalks, Dnveways, Curb & Guner )00 psr Covaele for Curbs and Stdewalks )00 psr Concrete M. for Flatwork )OOpsi Coac.. Ma for Sidewalks )00 psr for Sidewalk,, Dnveways, Ramps, Cmb &Gutter, Flatwork 500 psr concrete for Sidewalks, Dnveways, Ramps, Cmb &Gutter )00 psr Concrete Ma for Sidewalks )00 psr Concrete Ma for Sidewalks )00 psr Concrete for Days, Curb & Gutter )00 psr Comets Ma for Blocking Sidewalks, Fl—.,k, I.& )00 psi Concrete Ma Sidewalks, ADA Ramps, Dnveway., Curb & Gutter, Safety End Treatments, Non-T.DOT Rc—.g Walls )00 psr Concrete Ma for Sidewalks, Dpveways, ADA Ramps )00 psr Concrete Ma for Sidewalks, Dpveways, ADA Ramps 00 Sacks / 3,000 psi Concrete for Sidewalks, Ramps, Wlets, and Manholes )00 psi Concrete for for Sidewalks, Ramps, Headwalls, laic., and Simm Drain Sao— )00 psi Coccrete Mix for Sidewalks )00 psi Coccrete Mix for Sidewalks )00 On Cmv r Ma f Sidewalks, la1et. )00 On Cm,,(, Ma for Sidewalks, ADA Ramps )00 On Cm,,(, for Sidewalk, ADA Ramps 000 psi Cc— for Sidewalks, Approaches, and Dnveways. 000 psi C—.w for Sidewalks & Ramps 000 pa C—.w for Sidewalks & Ramps 00 sacks / 3,000 psr concrete for Sidewalks 000 psr Coac.. for Sidewalks and Ramps 000 psr Coac.. for Sidewalks and Ramps 000 psr Concrete for J.-- Boxes, Sidewalks and Ramps 00 such / 3,500 psr Concrete for Sidewalks and Ramps 000 psr concrete for sidewalks and ramps 000 psr Concrete for Sidewalks & Ramps 000 pa Concrete for Sidewalks & Ramps 000 pa Concrete for Sidewalks & Ramps 00 Sacks / 3,000 psi Concrete for Sidewalks & Ramps, and Curb & Gutter 00 Sacks / 3,000 psi Concrete for Salmalks & Ramps, and Curb & Gutter SK / 3,000 psi Concrete for Sidewalks )00 pa Coccrete bar Curb, Gutter, Driveways, Sidewalk, Ramps 500 tanConcrete for Valley Gutters, Sidewalks, Approaches, ADA Ramps 00 Swka / 4,000 psr C,,mt, Ma for Sidewalks, Curb & Gutter, Sewer Manhole, WIGS, & Ju.Gmn Bones )00 psr Co...:: Ma f Driveway., Sidewalks, ADA Ramps )00 psi Co...AMa for Curb & Guner 000 psi Cc— for Sidewalks, Ramps, WIG., Ju..boa Boxes, Thm,t Blocks, Curb and Gulley, Driveways, Bamer Ramp )00 psi Concrete M. for Curb & Gulley, Driveways, Sidewalks, ADA Ramps )00 psi Concrete M. for Curb rid Gutter )00 psr Comets to, Sidewalks 500 psr Concrete Ma for Sidewalks, Drive Approaches, ADA Ramp, Curb and Gutter )00 psr Concrete for Sidewalk )00 psr Concrete Ma for Flatwork, Curb &Gutter, Driveways, Sidewalk,, ADA Ramps )00 psi Concrete Ma for Curb & Gutter, Driveways, Sidewalks, ADA Ramps psr Concrete for Manholes & Utility Snucmres psr Covcrele for la1Gs, Boxes, E.r..ml, Block.g tanCovaele Boxes, Manholes, Chanel Liners, Sidewalks, Driveways, Curb & Gulley psr Covaele for la1Gs, Boxes, Encasement, Blocking psr Covcrele Ma for Sidewalks, Bfckmg psr Conaele Ma for Sturm Dram StmGures, Driveways, Screen Walls, Collate psr Concrete M�xf Wlel,, Thmst BWck.g Coacrele Encasemnt psi C=I, M. for WIGs, Thmst Block.g Concrete Encasement psr Comets Ma for Flat &,la1Gs, Thmst Blocking Concrete Encasement psr Comets Ma for Cast -in -Place Box Culverts psr Comets Ma for Cast-m-Place Box Culverts psi Concrete Ma for Sidewalks, ADA Ramps, Driveways, Curb & Gutter, Safety End T.—., Non-T.DOT Reta..g Walls psi Concrete ma for Valley Gutters, Lrghtpole Foundations pa Concrete Ma for Valley Go.., Ughtpole Foundations psr Concrete Ma for Sturm Dm. Stmcmres, Snrmry Sewer Manholes, Junction Box psi Concrete Ma for Block.g P.Coccrete Mix for Sidewalks, la1eN I psi Concrete for Rc..mg wall, driveway, lunchm box apron, approach I psi Concrete for Manholes, lalets & Headwalls, Valve Pads Sacks / 4,000 psr Concrete for Junctin Box, Box Culvert, Sidewalks and Ramps. Sack / 4,OOO psr Covaele Mix fin ClP Sewer Mnholes Sacks / 4,000 psr Cmmc, Ma for CIP Sewer Mmh.lc, )psi Cc— for Mnholes, Wlels&Headwalls DOpsiC_c for Curbla1Gs DO psr Cm,,w for Storrn Stmcmrea, Wlels, Bl,,k g & Encasement DO psr Cmcrete for Wlels, Storm Draw Stmcton s 1 Sacks / 4,500 psr Comets to, la1Gs, Manholes, rid Headwalls D Such / 4,000 psr Comets to, Collars, Mnholes, Box Culverts 10 psi Concrete Ma for Curb la1Gs s)psi Concrete Ma for Curb la1Gs b psr Comets for Blocking H) psi Concrete for Strom Dram Stmcttues IO psr Concrete Ma for Throat Blocks, Valve Pads IO psr Concrete Ma for Ca,b.-Place Storm D.. Stmcmres 10 On Coamir for Throat Blocks, VW, Pads 3-5" Slump; 3-(1%Ala 3-5" SWmp; 36%An 3-5" SWmp; 36%An 3-5" SWmp; 36%An 3-5" SWmp; 3-6% An 3-5" SWmp; 36% An 3-5" SWmp; 3-6% An 3-5" SWmp; 36% Ar 3-5" SWmp; 36% Ar 3-5" SWmp; 3-6% Au 3-5" SWmp; 4.5-7.5%Au 3-5" Slump; 3-6% Au 3-5" Slump; 3-6% Au 3-5" Slomp; 3-6% Au 3-5" Slomp; 3-6% Au 3-5" Slomp; 3-6% Au 3-5" Slump; 3-6% Au 3-5" Slump; 3-6% Au 3-5" Slump; 3-6% Av 3-5" SWmp; 36%Au 3-5" SWmp; 36%An 3-5" SWmp; 36%An 3-5" SWmp; 36%An 3-5" SWmp; 36%Air 3-5" SWmp; 3-6% An 3-5" SWmp; 3-6% An 3-5" SWmp; 3-6% Ar 3-5" SWmp; 36% Ar 3-5" SWmp; 36% Ar 3-5" SWmp; 3-6% Au 3-5" SWmp; 3-6% Au 3-5" Slump; 3-6% Au 3-5" Slump; 3-6% Au 3-5" Slump; 4.5-7.5%Au 3-5" Slump; 3-6% Au 3-5" mp Slu; 36 Au % 3-5" Slump; 3-6% Au 3-5" Slump; 36% Av 3-5" SWmp; 36% Ai, 3-5" SWmp; 36% Aa 3-5" SWmp; 3-6 An 3-5" SWmp; 3-6 An 3-5" SWmp; 3-6 An 3-5" SWmp; 36%An 3-5" SWmp; 3-6% An 3-S" SWmp; 3-6% Ar 3-S" SWmp; 36°/" Am 3-5" SWmp; 36°/" Av 3-5" SWmp; 3-6% Au 3-5" SWmp; 3-6% Au 3-5" SWmp; () %An 3-5" SWmp; 3-6 An 3-5" SWmp; 3-6 An 3-5" SWmp; 3-6 An 3-5" SWmp; 36%An 3-5" SWmp; 36"h An 3-5" SWmp; 3-6% An 3-5" SWmp; 36°/" Av 3-5" SWmp; 36°/" Av 3-5" SWmp; 36 % Au 3-5" SWmp; 3-6% Au 3-5" Slump; 3-6% Au 3-5" Slump; 3-6% Au 3-5" Slump; 3-6% Au 3-5" Slomp; 3-6% Au 3-5" Slomp; 36 % Au 3-5" Slomp; 36 % Au 3-5" Slump; 36 % Au 3-5" Slump; 36 % Av 3-5" SWmp; 3-6 An 3-5" SWmp; 3-6 An 3-5" SWmp; 36%An 311, SWmp; 4.5-7.5%An M" SWmp; 36%An 3-5" SWmp; 36%An 3-5" SWmp; 3-6% An 3-5" SWmp; 36°/" Au 3-5" SWmp; 36°/" Av 3-5" SWmp; 3-6% Ar 3-5" SWmp; 3-6% Au 3-5" SWmp; 36%Au 3-5" Slump; 3-6% Au 3-5" Slump; 3-6% Au 3-5" Slump; 36 % Au 3-5" SWmp; 36%An CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 09/23/2024 12/52022 1 03 30 00 Mu Des��f Redi-Mix 156115C4 4000 psi Concrete for CIP Stoma Draw Sm W,, 3-5" SWmp, 36% Ah 4000 Z 1112 2022 03 30 00 Mu Des Redi-Mu 14 P25P4 45500 psi Concr fr SWm Dmfl S—Wm 3-5" SWmp, 3fi% 1 SRM Ct 5050 FW5320A and Collars 9/920224 03 30 00 M. Design TapanV Con aete 3000 psi Concrete MlxTfor'Bloakfg 3-5" SM_ 36% 1 10/102022 03 30 Mi. crate TCFW6025A2 4000 psi Concrete for Manholes 3-5" SWmp, 3fi%Ah C� X, m BA y{t` 4walls. Culverts. Dr Iled Shafh) Drilled fl.m - 9/92022 03 30 00 Ma Design Bumco Texas 36U500BG 3600 psi Concrete Mu for Lighting and Traffic Signal Foundations (Drilled Shafts) 5 5-7 5" SWmp; 3-6 An 6/21/2023 03 30 00 Mm Design Cow Town Redi Mu 360-DS 3600 psi Concrete for Drilled Shaft/U6tWg and Traffic Signal Foundation (DrM d Shafts) 5 5-7 5" SWmp; 3-6 An 12/5/2022 03 30 00 Mu Design Ho1Cvn - SOR, fc. 1822 3600 psi Concrete for (DrM d ShaDsl/LiA Mtf and Traffic Signal Foundations 5 5-7 5" SWmp; 0-3 'Ai' 9/9/2022 033000 3 30 00 M. Design Ho1Cvn - SOR, fc. 1859 4000 psi Concrete for (DdU d ShaDs)/Lightfeand Traffic Signal Foundations 5 5-7 5" SWmp; 36% Ai' 14/7/2023 033000 M. Design fgmm Concrete & Aggregates IOLQS50N 3.600 psi Concrete for (Drilled Shafls)/L,6tf and Traffic Signal Foundations 5 5-7 5" SWmp; 36% Ai' 4/7/2023 03 30 00 M. Design Liqu,d Slone C361DHR 3.600 psi Concrete for (Drilled ShafD/Li6tfg and Traffic Signal Foundations 5 5-7 5" SWmp; 36%An 6/27/2023 03 30 00 M. Design Marl. M_ U2146N41 6.44sacks /3.600 psi Conuete for (Drilled Shafts) / Lighting and Traffic Sigoal Foundations 5-7" SWmp; 36%Ai, 6/27/2023 03 30 00 M. Design Marl. Manetta U2146K45 6.65 sacks / 3.600 psi Concrete for (DrBled Shaba) / Lighting and Trafic Signal Foundations 5-7" SWmp; 36%Ai' 8/42023 03 30 00 M. Design Marl. Manetta U2146R41 6.44 sacks / 4.500 psi Concrete for (DrM d Piers)/Li6t Pole bases. 5-7" SWmp; 3-6%- 8/22/2024 03 30 00 M. Design NBR Ready Mix 135K2524 3500 psi Concrete for (D'MW Shaft) LighM k Foundations 5 5" SWmp; 36% AQ 8/22/2024 03 30 00 Mu Design NBR Ready Mix 135K0524 3500 psi Concrete for (D'MW Sha(t) Lightpole Foundations 5 5" SWmp; 36% AQ 5/15/2023 03 30 00 M. Design Red, -Mx SOL115D5 3600 psi Concrete for (DrM d Shaf) /L 61h and Traffic Simal Foundations 5 5-7 5" SW—; 36%Air bther Applications 9/92022 03 30 00 Mu Design Argos DIOOO0001083S 4000 ps, Concrete for VW, Pads, Wlets, Sttucmres, Headwalls, Thmsl Blocking 3-5" SWmp; 36% Air .1022 03 M W Mu Design Argos D10000001083 4000 ps, Concrete for Valve Pads, flats, Stmcmres, Headwalls, Thmsl Blockmg 3-5" SWmp; 36% Air 9/9/2022 03 30 00 M. Design Argos D70000001681 4000 ps, Concrete for Headwalls, Retaining Walls, Box Culverts, Valley Gutters 3-5" SWmp; 3-6 Ai, 9/92022 03 30 00 M. Design Csder Concrete FWCC602001 4000Is, Concrete for Sl— Drain Slmcmre,, Manholes, Headwalls, Remmmg Walls, Valley Goners, Dnve Approaches 3-5" SWmp; 36%Ah 9/92022 03 30 00 Mu Design Charley, Concrete 4518 4000 psi Concrete for Headwalls, Win —ally 3-5" SWmp, 36% Ah 9/92022 03 30 00 Mu Design Charley, Concrete 5642 4000 pi Concrete for Storm Dram Stmcmre, 3-5" SWmp, 3fi%Ah 9/92022 033000 Mu Design City Concrete Compnany 40LA2011 4000p,i Concrete Mu for Storm Draw SWCWres 3-5"SWmp, 36%Ah 9/92022 03 30 00 Mu Des , Cw Tovm Red, Id& 260-2 3600 p,i Concrete Ma for Box Culvert,, Headwall, 3-5" Slump; 36%Ah 9/92022 03 30 00 Mu Des , Cow Tovm Redi Mu 360-1 3600 pal Concrete Mu for Box Culverts, Headwalls, Wig tls 3-5" Slump; 36%Ah 9/92022 03 30 00 Mu Des , Cow Tovm Redi Mu 260-1 3600 psi Concrete Mu for Headwalls 3-5" Slump; 3fi % Ah 1/29/2024 03 30 00 Mu Des , Eshada Ready Ma R3655AEWR 5.50 Sacks / 3,600 Mi Concrete for Headwalls, Wf all,, and Culverts 3-5" Slump; 3fi % Air 9/9/2022 03 30 00 Mu Desw, OCH Concrete Services GCH4000 4000 pal Concrete for for Sidewalks, Ramps, Headwalls, flats, and $Wm Draw Simc 3-5" Slump; 36%Air 9/9/2022 033000 Mu Des, Holcim -SOR, fc. 1851 4500 pai Concrete£orSform Drew Simclmes, Hand Placed Pavfg 3-5"Slump; 36%Air 4/l/2023 03 30 00 Mu Des,gp Martf Marietta 310LBP 3,600 psi Concrete for Reteffg Walls 3-5" Slump; 4-7%Air 8/30/2023 033000 Mi. DZe Martf Marietta R2141R30 5.85 SK/4,000psi Cneretefr Box Clverts&Headwalls 3-5"SWmp; 36%Air 9/92022 03 30 00 Mix Design Martf Marietta R2146035 4,000 psi Concrete for Manholes, flats & Headwalls, Valve Pads 3-5" Slump; 36 % Air 12/5/2022 03 30 00 Mix Desi¢ Redi-Mix 1OL115CI 3600 psi Concrete for Manhole, flat, ]unction Box, Headwall 3-5" Slump; 3-6% Air 9/92022 03 3000 Mix Desigp SRM Concrete 40050 4,000 psi Concrete ibr Headwalls, ReWffg Wall, Collars 3-5" Slump; 3-6% An 9/92022 03 3000 Mix Desigp SRM Concrete 35022 3,600 psi Concrete ibr Junction Box, ReWffg Walls 3-5" Slump; 3-6% An 4/l/2024 033000 M. 4FW6020A2 9/92022 03 30 00 Mu Des�� TR—tt Concrete 4000 p,i Concrete Mix for Storm Dram SWctures 3-5" SWmp, 36% Ai, Cl... P(Mac fe pl. ced�Pavfe) 9/92022 32 13 13 Mu Design Argos DIOOO0001617 3600 ps, Concrete for Mach.e Placed Paving 1-3" SWmp;') °, Ai, b/24/2024 32 13 13 Ma Design B,g Town CvcreAe 360060-1 3600 ps, CvcreAe for Mach.e Placed Paving 1-3" SWmp; 36% Air 6/24/2024 32 13 13 Ma Design B,g Town Cvc,(, 362060-1 3600 ps, C ,,(, for Mmh.ce Placed Paving 1-3" SWmp; 36%Air 9/92022 321313 Mu Design Csder Covcrete FWCC552091 3600 ps, for Machine Placed Pay.g 1-3"SWmp;36%Av 9/92022 321313 Mrs Design Carder Covcrete FWCC602091 4000 ps, for Machine Placed Pay.g 1-3"SWmp;3b%An' 9/92022 32 13 13 Ma Destgn CharWys Concrete 5167 3600 ps, Cvaele Ma for Machine Placed Pay.g 1-3" SWmp; 36%An 9/92022 32 13 13 M. Dear C,ty Covcrete Cmpmy 36LA2011 3600 ps, Cvrxele Mrs f Mach.e Placed Pay.g 1-3" SWmp; 3-6% AQ 9/92022 33 13 13 M. Des,gn Cow Tow. Red, M. 257-M 3600 ps, Concrete Ma f Mach.e Placed Pay.g 1-3" Stamp; 36°/" Av I1/142022 32 l3 13 Ma Destgn Cow Towv Red, M. 317-M 3600 ps, Concrete M. for Mach.e Placed Pay.g 1-3" SWmP; 36% Av 9/920'22 32 l3 13 M.De Cow Towv Red, M. 260-M 4000 ps, Cvaete M. for Mach.e Placed Pay.g 1-3" SWmp; 36 % t 1/92022 32 l3 13 Ma Des,gn Cow Town Red, M. 360-M 4000 ps, Concrete Ma for Mach.e Placed Pay.g 1-3" SWmp; 36 % t 2/62024 32 L313 M.Des,go 8s da Ready M. TD3655AEWR 5.50 Sacks/3,600 ps, C.—for Mach.e Placed Pay.g 1-3"SWmp; 3-6 t 9/92022 321313 Ma Des,go fgrary Cvcrem&Aggregates 2MWR-056PS5D5 4000 ps, C.— Mach.e Placed Pay.g 1-3"SWmp; 3-6 t 8/42023 321313 M.Des,gn Mart. Manetta Q2141R27 5.69 sacks/4,000 ps, Concrete for Mach.e Placed Pay.g 1-3"Slump; 3-6 t 112/2022 32 l3 13 Ma Des,gn Mart. Manetta Q2141K30 4,000 ps, Cm,,w for Mach.e Placed Pay.g 1-3" Slump; 36 % t l0/4/2023 32 l3 13 M. Des,gn NBR Ready Mu TX C SF-YY 5.50 Sacks / 3,600 ps, Concrete for Mach.e Placed Pay.g 1-3" Slump; 36 % t 10/4/2023 32 l3 13 Mix Des,gn NBR Ready Mu TX C SF -NY 5.50 Sacks / 3,600 ps, Concrete for Mach.e Placed Pay.g 1-3" Slump; 36 % t 9/162024 32 l3 13 Mix Des,gn SRM Concrete 40025 4000 ps, Concrete for Mach.e Placed Pay.g 1-3" Slump; 3-6% Av 9/92022 321313 Mix Des,gn Tarrant Concrete FW5520AMP 3600 ps, Concrete fin Machine Placed Pay.g 1-3"Slump; 3-6 Av 9/92022 32 13 13 M. Design T. G. Red, M. 0255 2301 3600 ps, Concrete M. for Machine Placed Pay.g 1-3" SWmp; 3.56.5 % An 9/92022 32 13 13 Mu De m Tme Gnt Redi Mu 0260 2302 4000 p Concrete Mu for Machine Placed Pay.g 1-3" SWmp; 3.56.5%Ah' CWss H (Han Pl_d Pavan¢) 9/91022 32 13 13 Mu Design American Concrete Company 45CAF076 4500 ps, Concrete for Hand Placed Paving 3-5" SWmp; 36% Ai' .1022 32 13 13 Mu Design Argos D70000001273 4500 ps, Concrete for Hand Pl c d Paving 3-5" SWmp; 36% Ai' 9/912122 32 13 13 Mu Des Argos D10000001737 4500 psr Concrete for Hand Placed Paving 3-5" SWmp; 36% AQ 9/92022 32 13 13 M. Design Argos D70000002107 4500 psr Concrete for Hand Placed Paving 3-5" SWmp; 36%A' 9/92022 32 13 13 M. Design Argos DI0000001791 4500 psr Concrete for Hand Pl—d Pay.g 3-5" SWmp; 36°' 9/92022 32 13 13 Mu Des,gn Argos D10000001103 4500 psr Concrete for Hand Placed Pay.g 3-5" SWmp; 36% AQ 5/22023 32 13 13 Mu Des,gn B,g D Concrete CM14520AE 4500 psr Concrete for Hand Placed Pay.g 3-5" SWmp; 36 % AQ 9/92022 32 13 13 Mu Desrgn Brg Town Concrete 452065-1 4500 psr hand placed pawng 3-5" SWmp; 36 % An 9/9/2 2 32 l3 13 Ma Des,gn Brg Town Concrete 450065-1 4500 Ps, hand placed pay.g 3-5" SWmP; 36% Av 9/92022 32 l313 Ma Des,gn Bumco Texas 45U500BG 4500per Cvcrete Mafor Hand Placed Pay.g, Srom Stmcv 3-5"SWmp; 36%t 9.022 321313 M. Des,gn Carder Concrete FWCC602021 4500 psr covc.. for Hand Placed Pay.g 3-5"SWmp; 3-6 t 9/92022 32 l3 13 Ma Des,go Charkye Covcrete 4609 4500 psr Covaere M. for Hand Placed Pay.g, MaMoles 3-5" SWmp; 3fi % t 9/92022 32 l3 13 M. Des,go Charley, Covcrem 6103 4500 per C.— M. for Hand Placed Pay.g, MaMoles 3-5" SWmp; 3fi % t 9/92022 32 l3 13 Ma Des,gn C,ty Co w Compavy 45NA2011 4500 psr Concrete M. for Hand Placed Pay.g 3-5" Slump; 3fi % t 9/92022 32 l3 13 Ma Desrgn Cow Towv Redr Ma 265 4500 psr Concrete Ma for Hand Placed Pay.g 3-5" Slump; 36 % Av 9/92022 32 l3 13 Ma Des,gn Cow Towv Red, M. 365 4500 psr Covcrete Ma for Hand Placed Pay.g 3-5" Slump; 36 % t l/29/2024 321313 Mix Des,gn Esnade Ready Mu R4560AEWPJ 6.00 Sacks/4,500 ps, Concrete for Hand Placed Pay.g 3-5"Slump; 4-6 t 9/92022 32 l3 13 Mix Des,gn GCH Concrete Se GCH4500 4500 ps, Concrete Hand Placed Pay.g 3-5" Slump; 36 % t 9/92022 32 l3 13 Mix Des,gn Holc., - SOR, Mc 1851 4500 ps, Concrete fin SWm Dm. Snac.re,, Hand Placed Pay.g 3-5" Slump; 3-6% Av 9/92022 321313 Mu Design fgmm Concrete&Aggregates 2MWR-161PS5EM 4500 ps,Conmele M.for Hand Placed Pay.g 3-5'SWmp; 3.56.5%Ai' 9/92022 32 13 13 M. De gn I, Concrete & Aggregates 2MWR-161UV5DM 4500 ps, Concrete for Hand PWced Paving 3-5" SWmp; 36% AQ 9/92022 32 13 13 Mu Design fgmm Concrete &Aggregates 2MWR-IOMQS50N 4500 ps, Concrete for Hand Placed Paving 3-5" SWmp; 36 ' A' I12/2022 32 13 13 Mu Design Marl. Manetta R2146N35 6.11 sacks / 4,500 ps, concrete for Hand Place Pay.g, flats, Manholes, Headwalls 3-5" SWmp; 36%A " 8/42023 32 13 13 M. Des Marl. Manetta R2146R36 6.17 / 4,500 N, Concrete for Hand Placed Pay.g 3-5" Skimp; 36%A , CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 09/23/2024 32 13 13 M.6 esip Ma321313 Mi, 119pMartin M—Im321313 imm.ft'. Mi. DeslipiMartinMaricr.32 13 13 Mu Deli Marietta 32 13 13 Mi. Dee'i Martin M.mtm 32 13 13 Mi, Des,, Martin Ma6ema 32 13 13 Mr, Des', Martin Marietta 32 13 13 Mu D.p Martin Marietta 32 l3 13 Mu Des', Martin Marietta 321313 Mi. Des�i Martin Marietta 321313 Mi. DIF Mart. Marietta 32 13 13 Mi. Des�i Mart. Marietta 32 l3 13 Mi. DesVr NBR Ready Mi, 32 l3 13 Mi. Dx NBR Ready Mis 321313 Mu DesV Oalmm 321313 Mi, Desp Rapid Redi Mi, 321313 Mix Des- Red' 32 l3 13 Mix Deslan Redi-Mu 32 13 13 Mix Design Redi-Mi. 32 13 13 Mi, Des0 Redi-Mix 32 13 13 Mz Dell; SRM Concrete 32 13 13 Mi. Desl�i SRM Concrete 32 13 13 Mu Deli Tarrant Concrete 32 13 13 Mi. Del i Tarrant Concrete 32 13 13 Mi. Del i Tarrant Concrete 32 13 13 Mi. Des i Titan Ready Mu 321313 Mi. Des i Tme Grit Redi Mu 321313 Mi Des i T. Grit Redi Mi. 321313 Design Tme Grit Redi Mi. lass HE ( Eery Strength Paving) 32 13 13 ix Des�� Hia D Cum- 32 13 13 Mu Des��ji Hamco Texas 32 13 13 Mix Desl�i huleys C nc i 321313 Mu Dee'pi Cow Town Redi Mu 321313 Mi, Del i Cow Town Redi Mi. 321313 Mu Desi Cow Tovm Redi Mu 321313 Mi, Des i Cow Tovm Redi Mu 32 13 13 Mi. Des Estrada Ready Mi, 321313 Mi,D.#w- Holctm- SOR,luc. 32 l3 13 Mr, D_ Liquid Stone 32 13 13 Mu D.VV Mart. Marietta 321313 Mix Des Redi-Min 321313 Mix DeeV SRMC verete 32 l3 13 Mix DesWr SRM Concrete 32 13 13 M. Des Tamm Concrete 321313 alas S ridge ix Des�rj� abs Top Slabs of Direct Tartaut Concrete Trafl c Cohen/ AJ��ra rh Slabs) 32 13 1 f Mix Dell' Cow Town R din ivlix 32 13 13 Mix Des��i Cow Town Redi Mix 32 13 13 Mix Desl�i Cow Town Redi Mix 321313 Mu, Dee'i Estrada Ready Mix 32 13 13 Mu De p Man. Ma6,ma 321313 Mr, Des', Man. Marietm 321313 Mu Desp NBRReady Mu 321313 Mr, Des#, NBR Ready Mi, 32 l3 13 Mix Dead Redi-Min 32 l3 13 M& Des,Wp SRM Conorale Concrete Base Tnmch R ami, 03 34 16 Mu D,,�p Humco Texas 03 34 16 Mu Des," Hamco Texas ontrolled Low Btrengr6 Material 0334 13 Mu Del Hamco Texas 03 34 13 Mix Des�� Carder Concrete .3313 Mu, Desgi Garda, C.ncrem 033413 M&D., City Concrete Comrany 03 34 13 Mr, Deefi Cow Town Redi Mu 03 34 13 Mu Desp Man. Ma6,ma 0334 13 Mi. DIV, NBR Ready Mu 033413 Concrete Ri Mi, Design 'f Tarsal Concrete 37 00 tr� Des��f Marietta I31 31 37 00 Mu Design (Man. Man. Marietta R2146N36 R2146K36 R2146K37 R2146R44 R2146K44 R2146P36 R2146K36 R2147241 R2146236 R2146036 R2146242 R2146042 CLS P2-YY CLS P2-NY 45A60MR RRM6320AHP 10MI 1524 10MI15D4 10M11504 145CD5P4 45023 45000 FW6020AHP FW60AHP TCFW6020AHP TRC4520 0260.2301 0265.2301 270.230 I4500AE 55UI20AG 6589 370-INC 375-NC 370-NC 380-NC 4575AESC 2125 C451DHR-A R2161K70 10NI 1507 50310 40326 FW6520AMR FW7520AMR 4,500 pMi Concrete for Hand Placed Pavin,°g o 6.22sa k/C4,SOOtpsioCono for Hanad Placed Pavi�P. 6.60 Sacks / 4,500 psi Concrete Mi. for Hand Placed Paving 6.60 Sacks / 4,500Ijlei Concrete Mu for Hand Placed Paving 4,500 psi Concrete for Hand Placed Paving 4,500 psi C=mte for Hand Placed Paving 4,500 psi Concrete for Hand Placed Paving 4,500 psi Concrete for Hand Placed Paving 4,500 psi Concrete for Hand Placed Paving, fleet 4,500 psi Concrete for Hand Placed Paving 4,500 psi Concrete for Hand Placed Pavirl�r 6.50 Sacks / 4,500 psi Concrete f, Hand Placed Paving 6.50 Sacks / 4,5W psi Comm, f, Hand Placed Paving 6 SK / 4,500 psi Concrete for Hand Placed Paving 4500 psi Concrete f, Haad Placed Pa"y 4500 psi Concrete Mix fr Hand Placed Paving 4500 psi Concrete Mi, for Hand Placed Paving, Storm Drain Sma,mres 4500 psi Concrete Mix fr Hand Placed Paving 4500 psi Concrete Mi. for Hand Placed Paving, Smmr Drain Structures 4,500 psi Concrete for Hand Placed Paving 4,500 psi Concrete for Hand Placed Paving 4500 psi Concrete Mi. for Hand Placed Paving 4500 psi Concrete Mi. for Hand Placed Paving 4500 psi Concrete Mi. for Hand Placed Paving 4500 psi Concrete for Hand Placed Paving 4500 psi Concrete Mi, for Hand Placed Paves° 4500 psi Concrete Mi.for Valley Gutters, Hand Placed Paving 5000 psi Concrete for Hand Placed Paving 4500 psi Concrete for H�'� Early StrengthP^�aprv-u'�`Rp 4000 psi Cuncrve M. 4500 psi Concrete Mu for r H?g wily Strength Paving 4500 psi Concrete for DES Pavmg 5000 psi Concrete for DES Paving 4500 psi Concrete for HES Paving 4500 fljjsi Concrete for HES Pa 1.50 Sacks / 4,500 epi (3,000 �i (aJ 3day) Concrem fr HES Paving 5000 �i C ncrele BE Pavmg 4500Mi Comrete for HES P.7 6'000 psi (3,000 psif� 241naJ HES Pavi' 4500 psi (2600 psi {a, �41nsJ Concrete Mu � HES Paving 5,000 psi C""r' or HES Paving 4,500 (3,000 (1a, 3-0ays) psi Concrete i r HES Paving 4500 (3000 psi 3.mys) psi HES Pavl9 450013000 pei , 3-d ws psi Concrete RES Paving 31" Slum, 3-6% Air 31" Shnn,, 36%Atr lump 3-5" Sh,, 36%Ate 31" Slump, 3-%Ate 3-5" Slump, 36% Ah 3-5" Slump, 3-6% Air 3-5" Slump, 36%Ate 3-5" Stamp; 4.5-7.5%Air 3-5" Slump; 3-6% Air 3-5" Slump; 36%Air 3-5" Slump; 36% Air 3-5" Slump; 3-6% Air 3-5" Slump; 36 % Air 3-5" Sim"; 36 % Air Slump; 3-5" 3-6% Air Slump; 3-5" 3-6% Air 3-5" Slump; 3-6% Air 3-5" Slump; 36 % Au Slump; 3-5" 36 % Au 3-5" Slump, 3-6 Air 3-5" Slump, 3-6% Air 31" Slum,, 36% 13-5" Slump, 36%Ate 311. Slump, 3-6% Air 3-5" Slump, 36% Air3". Slump, 3-6% Air 3-5" Slump, 36%Air 3-5" Slump; 3.56.5%Air 3-5" Slump; 3-6% Air 31" Shunp, 3-6 Air 3-5" Shun,, 36%Air 31" Shun,, 36% 13-5" Slum,, 36%Ate 31:: Slump, 36% 1lu 3-5" Smp, 3-6% Air 3-5" Slump, 3-6 Air 3-5" Slump; 36%Air 3-5" Slump; 36%Air 3-5" Slump; 3-6% Atr 3-5" Slump; 3-6% Air 3-5" Slump; 4.56.5%Air 3-5" Slump; 3-6% Air 3-5" Slump; 36%Air 3-5" Slump; 3-6% Air 3-5" Slump; 3-6% Air 260 e Sabs 4000psiCConcrMfo.- Booxx Cuvrt, Hdwls 35 3661 360 4MuforBriSbBhnsHwalls 000 pF SSmp 3-5lmp,36%Ate 365-STX 4000 sii Concrete for Bridge sl s, m� slabs ofdvect traffic rat a s, apq ..h slabs-TXDOT Class S-No Fly Ash 3-5" Slrmr' 36%Ate R4060AEWR 6.00 3 arks / 4,000 �gj i Con a for Brdge Slabs, Top Slabs, and Approach Slabs 4-6 Slump, 36%Ate M7842344 4,000 psi C. ft,f.,Bridae Deck 3-5"Slump, 4.5-7.5%Ate R2146P33 6.01 sacks / 4,000 Rai concrete for B, Deck 3-5" Slump, 36% Air TX S-NY 5.50 Sacks / 4000psr Concrete Mu for C s S Smb Paving -No Fly Ash 3-5" Slump, 36%Ate TX S-YY 4.50 Sacks / 400 Conc,ele Mu fo, Class S Slab Paving 3-5" Slump; 36 % Air 156115D4 4000 psi Bridges 3-5"Sl.mp;36%Air D100008553CB 4,000gppa�i Concrete fo, Bdridge Approach Slab, Deck Slab 3-5" Slump; 36 te %A I08Y4 0BA IS00 psl lozub, M'afo Bes-f.,Trench RepT 11.1 Shhim,, 3-6% Air OIY61OBF 100}lsiConcrete Mix fur Flowable Fill Flowable, 8.5-11.5%Ate FWCC359101 50-150 psi Plowable Fill - CLSM 3-5" ShangQ, 8-12%Ate FWFF237501 50-150 psi Flowable Fill - CLSM Plowable, 8.5-11.5%Ate I1-350-FF 50-150 si Concrete for Flowable Fill-CLSM Flowable, 8-12%Ate Mi.#9 70nMi�lowable Fdl-CLSM 7-9"Slump, 8-11%Ate FL W25A 8-10"SluoJp�, FTW FLOW FR,L I50,,sQQiFsiconcretefm HowabbleFiWCLSM 8-12%Ate FWFF150CLSM 50-150Mi Flowable Fill-CLSM Plowable; 8-l2%Ate R21160330 I4,000 psi Concrete for R map 3I., Slum,, 3-6% Air Asahall Paving 9/9Y1022 32 12 16 Mu Design Austin Asphalt FT5BI17965 FTM:17965 PG64-22 Ty B Fme Base 9/9/'2022 321216 Mu Design Austin Asphalt FTIB139965 FTIB139965PG64-22Ty BF.e Base 9/9/2022 321216 Ma Design Ault. Asphalt ITIB117.2 FTIBI17.2 PG64-22 TW.B Fme Base 5/1R024 32 1216 Mu Design Reynolds Asphalt 340-DG-B P 340-DG-B PG64-22 Type B Base Course 9/9/2022 32 12 16 Ma Design Reynolds Asphalt I112B I112B PG64-22 Type B Fme Base 9/9/2022 32 12 16 Ma Design Reynolds Asphalt 1612B 1612B PG64-22 Type B Fme Base 12/5/2022 33 12 16 Mm Design Suumount Pavmg 3076BV6422 3076BV6422 PG62-22 Type B Fme Base 9/92022 32 1216 Mu Design Suummm: Pavmg 34 1 -BRAP6422ERG 34 1 -BRAP6422ERG PG64-22 Type B Fme Base 9/92022 32 1216 Ma Design TXBrT 37-211305-20 37-211305-20 PG64-22 Type B Fme Base 9/9/2022 32 1216 Ma Design TXBrT 44-211305-17 44-211305-17 PG64-22 Type B Fme Base 9/9/'2022 32 1216 Mu, Design TXBIT 211305 (1757) 211305 (1757) PG64-22 Type B Fme Base CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 09/23/2024 9/9/2022 32 12 14 Mu Design ITXBIT 4/1/2024 32 12 16 etttdble Mix Des�e my Sp�nce aDW$-Pavers TXHIT 9/9/2022 321320 Pine Hall Brick(Winstou Salem, NC) 9/9/2022 321320 DWS-Pavers Western Brick C..(Houstom TX) 9/9/2022 321320 �'21321 DWS-Composae 9/9/2022 DWS-Composite ADA "s(WlMin -M� 4/72023 321320 DWS-Pavers S1.1 ADA Somtions(Wt knigtZ MA) Silicone Joint Sealant 9/92022 132 D 73 Joint Scala,[ Dow 9/9/2022 32 13 73 Joint S.Im Tremco 9/92022 32 13 73 Joint Sealant Pecors 9/9/2022 32 13 73 Join[Scalant Crsfco 11 Trench Embedment Sand 9/92022 33 05 10 Embedment Sand Silver Creek Materials 9/92022 33 05 10 Embedment Sand Crouch Matenals 9/92022 33 05 10 Embedment Sand F and L Dvt Movers 9/9/2022 33 05 10 Embedment Sand F and L Did Movers 9/92022 3305 10 Embedment Sand I. Top Madm ManeOa I64 224125-18 PO I64 224125-18 PO70 2pe 2 TyD Fine Surface 344 MAC-SP-D 70-22XR 344 MAC-SP-D 70-22XR SAC A-R T— D Fme Surface Tackle Pavers Delegable Warning Pavers Armor Tile IT mg, Brick CB Composite P—, D:wmble Wamine Pevers 890SL 1890SL-Cold Applied,Single Component, Silicone Joint Sealant 900SL 900SL-Cold Applied, Single Component, Silicone Joint Sealant 300SL 300SL-Cold Applied, Single Component, Silicone Joint Sealant RoadSaver Silicone RoadSaver Silicone - Cold Applied, Single Component, Silicone Joint Sealant U011ry Embednent Sand U: ny Embedment Sand Uldtry Embedment Sand Uldtry Embedment Sand Utdny Embedmmt Sand Storm Sewer-M-1,1 s & Basen/Frarlres & Covers/Standl,:r und) 33-05-13 9282018 33013 Madrale Frames sad Covers A —Cast (G- Steel Compevy, LTD) IMHRC 4220605 MHRC #220605 (Si.- "'24" DW 19/28/2018 330513 Manhole Covu Neenah Foundry NP-1274-T91 NP-1274-T91(Size -32"Din.) 1928/2018 33 Manhole Framesand Covers Neenah Foundry NP-1741-LM(Hmged) NP-1743-LM(Hinged)(Size-32"Die.) 9/28/2018 330513 Manhole Frame Neenah Foundry NP-1930-30 NP-1930-30(Size-32.25"Die.) 9/282018 330513 Manhole Frames and Covers Neenah Foundry R-1743-HV R-1743-HV(Sime-32"Din.) 4/32019 330513 Manhole Frames and Covers SIP lndasnies++ 1279ST 22795T (Size-24"Die.) 4/3/2 330513 Manhole Frames end Covers SIP Industries++ 2280ST 2280ST (Sims-32"Dig.) 11118/2020 330513 Manhole Frames and Covers EJ( Fomtally East Jordan I—NV.&O E11033 Z2/A EJ1033 Z2/A(Sim -32.25"Dk,) 330513 Cmbinlet Covers SIP Industries++ 2296T 2296T(Sim -"""24"Dk,) �3/82024 6/18/2024 330513 Curb Inlet Covers SIP lndastries++ 1I2279STN 2279STN(Size-24"Dk,) •*Note: Annewdere(opmen and urn innallarian manho/e /ids sxa/l med the minimum 30-inrx opening requlemenras specled in Ciry Speril+ra�ian 33 OS l3. Arrysmal/er opening sius wJl Duty De allowedfor exisn'ng manxo/es rMr require replaremenrframesgnd rovers. Storm Sewer - Inlet & Structures 33-05-13 10/8/2020 33 49 20 Curb We. Forteme 10/8/2020 33 4920 Curb Inlets Fonema 10/82020 33 49 20 Cmb Inlets Fonema 10/8/2020 33 49 20 Cmb Inlets Fonema 10/8/2020 33 39 20 Manhole Fonema 10/8/2020 33 39 20 Manhole Fonema 10/8/2020 333920 Manhole Fonema 10/8/2020 333920 Manhole I'm 10/8/2020 333920 Manhole I'm 10/8/2020 333920 Mmhole Fodema 3/192021 349 20 Curb Inlets Thompson Pipe Group 3/19/2121 333492 0 Curb Inlets Thompson Pipe Group 3/19/2021 33 49 20 Curb Inlets Thompson Pipe Group 3/19/2021 333920 Manhole Thompson Pipe Gpap 3/19/2021 333920 Manhole Thompson Pipe Gcap 3/19/2021 333920 Manhole Thompson Pipe Oroap 3/19/2021 333920 Manhole Thompson Pipe Gcap 3/19/2021 333920 Manhole Thompson Pipe Gcap 3/19/2021 333920 Manhole Thompson Pipe Gcap 3/19/2021 333920 Menhole Thompson Pipe(Jroup 3/19/2021 333920 Manhole Thompson Pipe Gonp 3/19/2021 333920 Manhole Thompson Pipe(1rouP 3/19/2021 333920 Manhole Thompson Pipe Goup 3/19/2021 333920 Manhole Thompson Pipe Goup 3/192021 33 39 20 Manhole Thompson Pipe Goup 3/19/2021 33 39 20 Manhole Thompson Pipe Goup 3/19/2021 33 39 20 Manhole Thompson Pipe Goup 3/19/2021 33 39 20 Manhole Thompson Pipe Goup 13/19/202: 33 49 20 Drop Inlet Thompson Pipe Goup 13/19/20233 49 20 Drop lnlg Thompson Pipe Goup 13/19/2021 33 49 20 Drop Inlet Thompson Pipe Goup 18/28/2023 33 49 10 Manhole Oldcasde 8/28/2023 33 49 10 Manhole OldcaetIe 8282023 33 49 10 Manhole OldcastIe 8/282023 33 49 10 Manhole Oldcasde 8/28/2023 33 49 10 Manhole 01& le 8/28/2023 33 49 10 Manhole 01& le 8/28/2023 334910 Manhole Oldcastle 8/28/2023 334910 Manhole Rieke, Materials 8/28/2023 333920 Curb Inlet ] 0 k 3' Rises Thompson Pipe Gcap 8/28/2023 333920 Cnrb Inlet 15 k3' Rises Thompson Pipe Gonp 8/28/2023 333920 Cutb Inlet 20'x 3' Rises Thompson Pipe Gonp 1/12/2024 334920 Drop Inlet AmeriTex Pipe&Products 1/12/2024 334920 Drop Inlet Ame U. Pipe&Products 1/19/2024 334920 Manhole AmetiTex Pipe&Products 1/19/2024 334920 Manfiole AmeriTex Pipe&Products 1/192024 334920 Manhole AmeriTex Pipe&Prodacts 1/19/2024 33 49 20 Manhole AmeffT Pipe &Products 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products 1/19/2024 33 49 20 Manhole Amerfiex Pipe &Products 1/19/2024 33 49 20 Manhole AmeriTex Pipe &Products 1/19/2024 334920 Medrale A —Tex Pipe&Products 7/16/2024 33 49 20 Curb Ides =,Tex Pipe &Prod- 7/16/2024 33 49 20 Curb Ides A —Tex Pipe &Prodmre •*Note: Pre -cast inkms are appored/rMe s gelponion /Men—e fast,/my. SraBe llpom'on x3-005-PRECAST'" (Sim -10' X 31 x3-0PRECAST::-PRECAST'" (Size -10' X 31 x4.5-0PRECAST'-PRECAST'" (Siu -10' X 4.51 x4.5R-0p2e0g-PRE(CCAAST�'"nk�(rSiu -10' X 4.5� 14 :4A09-PREEAST_ (Siu-TX 41 34 ]0-PRECAST-TOP (Size - 5' X 51 :54 -PRECAST-BASE (Size - 5' X 51 :6411-PRECAST-TOP (Si. - 6' X 6) :6411-PRECAST-BASE (Si. - 6' X 6) IX3-005-PRECAST INLET"" (Size - l0' X 31 IX3-405-PRECAST INLET"^ (Size - l5' X 31 X3-005-PRECAST INLET" (Size - 20' X 7) C4409-PRECAST TOP (Size - 4' X 41 C4409-PRECAST BASE (S¢e - TX 41 C4-012-PRECAST 4-17 RISER (Si. -4' X 41 C5-0l0-PRECAST TOP (Si. - 5' X 51 C5-0l0-PRECAST BASE (Sim - 5' X 51 C5412-PRECAST 5-17 RISER (Si. - 5' X 51 C64 I 1-PRECAST TOP (Sim - 6' X 61 C64 -PRECAST BASE (Sim-6'X61 C6412-PRECAST 6-17 RISER (Size - 6' X 61 C7411-PRECAST TOP (Si, - TX 71 C7411-PRECAST BASE (Size -7' X 71 C7412-PRECAST 4-17 RISER (S¢e -7' X 71 C841 I -PRECAST TOP (Size -8' X 81 C841l_PRECAST BASE (Size -8' X 81 C8412-PRECAST 5-17 RISER (S¢e -8' X 81 C4408-PRECAST INLET (Si a-4'X 41 C5408-PRECAST INLET (Si a-5'X 51 C6408-PRECAST INLET (Size - 6' X 61 4' x T Snicked Mmhole (Size -T X 4) 5x8Stom Jmton Box (Siz-5X 8) 4'x4' Stomton xSiz-4'X41 5' x 5' Storm Jmction Box (Size- 5' X 51 6' x 6' Storm Juuctiou Box (Size -6' X 61 8' x 8' Storm Juuctiou Box Base (Size - 8' X 81 5' x 8' Storm Junction Box Base (Size - 5' X 81 -4'X 41 Inlet Riser (Size - 3 F11 hilet Riser (Size - 3 F11 Inlet Risen (Si. - 3 FF) Drop Inlet (4' X 41 Drop Inlet (5' X 51 Precast 4'x4' Storm Junction Box Precas4 5k5' Stomt Junction Box T Precast T—nion MIT (T MH on the top of 5' 1B) Precast 6k,& Storm Junction Box 6' Precast Tanslnon MIT (T MH on the top of 6' 1B) Pmem 8M' Storm Junction Box 8' Precast Taasinon MIT (4' MIT on the top of 8' 1B) Tvm C Stpmt Drain Manhole on Box (4' MIT on the top of RCB) I500 P—m- (Size 10'. 31 IS0 Precast'" (Si,, 15' x 31 are requued ro be rear m-Plate No eroprlmu & 1hh regairemenrsbal/be a/lowed. FASTM D5893 TM D5893 TM D5893 TM D5893 ASTM C33 ASTM C33 ASTM C33 ASTM C33 ASTM C33 ASTM A48 AASHTO M3N ASTM A48 AASHTO M306 ASTM A48 AASHTO M306 ASTM A48 AASHTO M306 ASTM A48 AASHTO M306 ASTM A48 AASHTO M306 ASTM A48 AASHTO M306 ASTM A536 AASHTO M306 ASTM A48 AASHTO M306 ASTM A48 AASHTO M306 ASTM C913 ASTM C913 AS C913 AS C913 AS C913 AS C913 AS C913 ASTM C913 ASTM C913 ASTM C913 ASTM 615 ASTM 615 AS 615 AS 615 AS M 615 AS 615 AS 615 AS 615 AS 615 AS 615 AS 615 AS 615 AS 615 ASTM 615 ASTM 615 AS 615 AS 615 AS 615 AS 615 ASTM 615 ASTM 615 ASTM C478 ASTM C478 ASTM C478 AS C478 AS C478 AS M C478 AS M C478 AS M C433 AS 1M C913-16 AS C913-16 AS C913-16 AS C913 AS C913 AS C913 ASTM C913 ASTM C913 AS C913 AS C913 AS C913 ASTM C913 AS M C913 AS M C913 ASTM C913 CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 09/23/2024 Storm Sewer -Pl— & Boxes 33-05-13 3341 13 Storm Dram Prpee Ad—ed D..ge Systems, Inc (ADS) ADS HP Storm Polwmvvleue (PP) Pipe (Sim -12" - 601 ASTM F2881 & A SHTO M330 334110 Sturm Dram Pipes Rinker Materials Reinforced Concrete Pipe To— end Goove Joint Pipe (Size -21"or 1—) ASTM C76, C655 334110 C.1—Box Rinker Mmerlals Reinforced Concrete Box Culvert(Sze- Verions) ASTM C789, C850 3341 10 Storm Drain Pipes Ame ffe Pipe &Pmdacts Reinforced Concrete Pipe Tongue end Goove Joint Pipe' (Size -15" .1Imer) ASTM C76, C506 344110 C.N. Box AmeriT-P��'PPe&Pmdacts Reinforced Concrete Box C.1 er (size -Various)) ASTM C1433,C1577 3541 10 Storm Drain Pipes The T— Co. Reinforced Concrete Pipe Tongue and Goove Joint Pipe' (Size -15" or huger) ASTM C76, C506 3341 10 C — Box The Tumer Co. Reinforced Concrete Box Culvert (size - Various) ASTM C1433,C1577 3341 10 Storm Dmin Pipes Thomlt�(��on Pipe Goup Reinforced Concrete Pipe Tongue and Goove Joint Pipe' (Size Various) ASTM C76, C506 334110 CM" Box Oldcastle Reinforced Concrete Box Culvert ASTM C1433,C1577 33 41 10 Stmm Dmm Ppee Old —de Reinforced Concrete Pipe Tongue and Goove Joint Pipe' (Size Various) ASTM C76, C506 CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 9-3-24 IApprovall Spec No. IClasssification Manufacturer Model No. National Spec Size Water & Sewer - Manholes & Bases/Components 33-39-10 (Rev 2/3/16) 07/23/97 33 05 13 Urethane Hydrophilic Waterstop Asahi Kogyo K.K. Adeka Ultra -Seal P-201 ASTM 132240/13412/13792 04/26/00 33 05 13 Offset Joint for 4' Diam. MH Hanson Concrete Products Drawing No. 35-0048-001 04/26/00 33 05 13 Profile Gasket for 4' Diam. MH. Press -Seal Gasket Corp. 250-4G Gasket ASTM C-443/C-361 SS MH 1126199 33 05 13 HOPE Manhole Adjustment Rings Ladtech, Inc HDPE Adjustment Ring Traffic and Non -traffic area 5/13105 33 05 13 Manhole External Wrap Canusa - CPS WrapidSeal Manhole Encapsulation System Water & Sewer - Manholes & Bases/Fiberelass 33-39-13 (1/8/13) 1/26/99 33 39 13 Fiberglass Manhole Fluid Containment, Inc. Flowme ASTM 3753 Non -traffic area 08/30/06 33 39 13 Fiberglass Manhole L.F. Manufacturing Non -traffic area Water &Sewer - Manholes & Bases/Frames & Covers/Rectammlar 33-05-13 (Rev 2/3/16) * 33 05 13 IManhole Frames and Covers I Westem Iron Works, Bass & Hays Foundry 1001 24"x40" WD Water & Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13 (Rev 2/3/16) " 3305 13 Manhole Frames and Covers Westem Iron Works, Bass & Hays Foundry 30024 24" Dia. * 3305 13 Manhole Frames and Covers McKinley It. Works Inc. A 24 AM 24" Dia. 08/24/18 33 05 13 Manhole Frames and Covers Neenah Foundry R-1272 ASTM A48 & AASHTO M306 24" Dia. 08/24/18 33 05 13 Manhole Frames and Covers Neenah Foundry NF 1274 ASTM A48 & AASHTO M306 30" Dia. 33 05 13 Manhole Frames and Covers Sigma Corporation MH-144N 33 05 13 Manhole Frames and Covers Sigma Corporation MH-143N 33 05 13 Manhole Frames and Covers Pont-A-Mousson GTS-STD 24" dia. 33 05 13 Manhole Frames and Covers Neenah Casting 24" dia. 10/31/06 33 05 13 Manhole Frames and Covers (Hinged) Powerseal Hinged Ductile Iron Manhole ASTM A536 24" Dia. 7/25/03 3305 13 Manhole Frames and Covers Saint-Gobain Pipelines (Pamrex/rexus) RE32-R8FS 30" Dia. 01/31/06 3305 13 30" Dia. MH Ring and Cover East Jordan Iron Works V1432-2 and V1483 Designs AASFITO M306-04 30" Dia. 11/02/10 3305 13 30" Dia. MH Ring and Cover Sigma Corporation MH1651FWN & MH16502 30" Dia 07/19/1 t 3305 13 30" Dia. MH Ring and Cover Star Pipe Products MR32FTWSS-DC 30" Dia 08/10/11 3305 13 30" Dia. MH Ring and Cover Accucast 220700 Heavy Duty with Gasket Ring 30" Dia 30" ERGO XL Assembly 10/14/13 3305 13 30" Dia. MH Ring and Cover (Hinged & Lockable) East Jordan Iron Works with Cam Lock/MPIC/T-Gasket ASSHTO MI 05 & ASTM A536 30" Dia 06/01/17 3405 13 30" Dia. MH Ring and Cover (Lockable) CI SIP Industries 2280 (32") ASTM A 48 30" Dia. 12/05/23 3405 13 30" Dia. MH Ring and Cover (Hinged & Lockable) CI SIP Industries 4267WT - Hinged (32") ASTM A 48 30" Dia. CAP-ONE-30-FTW, Composite, w/ Lock .111111 33 OS 13 30" Dia. MH Ring and Cover Composite Access Products, L.P. w/o Hing 30" Dia. 10/07/21 3405 13 30" Dia. MH Ring and Cover Trumbull Manufacturing 32"(30") Frame and Cover 30" Dia. Water & Sewer - Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight 33-05-13 (Rev 2/3/16) * 3305 13 Manhole Frames and Covers Pont-A-Mousson Fortnight 24" Dia. * 3305 13 Manhole Frames and Covers Neenah Casting 24" Dia. * 3305 13 Manhole Frames and Covers Western Iron Works,Bass & Hays Foundry 300-24P 24" Dia. * 3305 13 Manhole Frames and Covers McKinley Iron Works Inc. WPA24AM 24" Dia. 03/08/00 3305 13 Manhole Frames and Covers Accucast RC-2100 ASTM A 48 24" Dia. 04/20/01 3305 13 Manhole Frames and Covers (SIP)Serampore Industries Private Ltd. 300-24-23.75 Ring and Cover ASTM A 48 24" Dia. Water & Sewer - Manholes & Bases/Precast Concrete ( tev 1/8/13) * 33 39 10 Manhole, Precast Concrete Hydro Condurt Corp SPL Item 449 ASTM C 478 48" * 33 39 10 Manhole, Precast Concrete Wall Concrete Pipe Co. Inc. ASTM C-443 48" 09/23/96 33 39 10 Manhole, Precast Concrete Concrete Product Inc. 48" I.D. Manhole w/ 32" Cone ASTM C 478 48" w/32" cone 12/05/23 33 39 10 Manhole, Precast Concrete The Turner Company 72" I.D. Manhole w/ 32" Cone ASTM C 478 72" 05/08/18 33 39 10 Manhole, Precast Concrete The Turner Company 48", 60" I.D. Manhole w/ 32" Cone ASTM C 478 48", 60" Manhole, nrng an at top, 09/0324 33 39 10 Manhole, Precast Concrete Oldcastle Precast Inc. Transmon es Con ASTM C 478 48" to 84" LD. 06/09/10 33 39 10 Manhole, Precast (Reinforced Polymer)Concrete US Composite Pipe Reinforced Polymer Concrete ASTM C-76 48" to 72" 1 09/06/19 33 3920 Manhole, Precast Concrete Forterra Pipe and Precast 60" & 72" I.D. Manhole w/32" Cone ASTM C-76 60" & 72" 10/07/21 32 39 20 Manhole, Precast Concrete Forterra Pipe and Precast 48" I.D. Manhole w/32" Cone ASTM C-77 48" 10/07/21 33 3920 Manhole, Precast Reinforced Polymer) Concrete Armorock 48" & 60" I.D. Manhole w/32" Cone 48" & 60" 10/07/21 33 3920 Manhole, Precast (Hybrid) Polymer & PVC Geneva Pie and Precast Predl Systems) 48" & 60" I.D. Manhole w/32" Cone 48" & 60" Non Traffic Areas ASTM C-478; ASTM C-923; 03/07/23 33 39 20 Manhole, Precast Concrete AmeriTex Pipe and Products, LLC 48" & 61" LD. Manhole w/32" Con: ASTM C-443 03/07/23 33 39 20 Manhole, Precast (Reinforced Polymer) Concrete P3 Polymers, Rockgards:p 48" & 60" I.D. Manhole w/32" Conc 04/28/07 Manhole, Precast (Reinforced Polymer) Concrete Amite:h USA Meyer Polycrete Pipe Sewer -(WAC) Wastewater Access Chamber 33 39 40 12/29/23 33 39 20 I Wastewater Access Chamber I Onickstream Solutions, Inc. Water & Sewer - Manholes & Bases/Rehab Svstems/Cementitious * E1-14 Manhole Rehab Systems Ouadex 04/23/01 E1-14 Manhole Rehab Systems Standard Cement Materials, Inc. E1-14 Manhole Rehab Systems AP/M Pe —mom 4/20/01 E1-14 Manhole Rehab System Strong Company 5/12/03 E1-14 Manhole Rehab System (Liner) Triplex Lining System 08/30/06 General Concrete Repair FlexKrete Technologies Type 8 Maintenace Shaft (Poopit) Relmer MSP Strong Seal MS2A Rehab System MH repair product to stop infiltration ASTM D5813 Vinyl Polyester Reparr Product For use when Sod. MH cannot be installed due to depth Misc. Use * From Original Standard Products List 1 FORT WORTH® CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 9-3-24 (Approval Spec No. IClasssification I Manufacturer Model No. National Spec Size Water & Sewer - Manholes & Bases/Rehab Svstems/NonCementitious 05/20/96 E1-14 Manhole Rehab Systems Spravrog, Spray Wall Polyurethane Coating ASTM D639/D790 12/14/01 Coating for Corrosion protecticn(Exterior) ERTECH Series 20230 and 2100 (Asphatic Emulsion) Structures Only 01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1BB, Sl, S2 Acid Resistance Test Sewer Applications 8/28/2006 I Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications 33 OS 16, 33 39 10, RR&C Dampproofing Non-Fibered Spray For Exterior Coating of Concrete 03/19/18 33 39 20 Coating for Corrosion protection(Exterior) Sherwin Williams Grade (Asphatic Emulsion) Structures Only Water & Sewer - Manhole Inserts - Field Onerations Use Onlv (Rev 2/3/16) * 33 05 13 Manhole Insert Knutson Enterprises Made to Order - Plastic ASTM D 1248 For 24" dia. * 33 05 13 Manhole Insert South Western Packaging Made to Order - Plastic ASTM D 1248 For 24" dia. * 33 05 13 Manhole Insert Nofiow-Inflow Made to Order - Plastic ASTM D 1248 For 24" dia. 09/23/96 3305 13 Manhole Insert Southwestern Packing & Seals, Inc. Lifesaver - Stainless Steel For 24" dia. 09/23/96 3305 13 Manhole Insert Southwestern Packing & Seals, Inc. TetherLok - Stainless Steel For 24" dia Water & Sewer - Pine Casing Spacers 33-05-24 (07/01/13) 11/04/02 Steel Band Casing Spacers Advanced Products and Systems, Inc. Carbon Steel Spacers, Model SI 02/02/93 Stainless Steel Casing Spacer Advanced Products and Systems, Inc. Stainless Steel Spacer, Model SSI 04/22/87 Casing Spacers Cascade Waterworks Manufacturing Casing Spacers 09/14/10 Stainless Steel Casing Spacer Pipeline Seal and Insulator Stainless Steel Casing Spacer Up to 48" 09/14/10 Coated Steel Casin Spacers Pipeline Seal and Insulator Coated Steel Casing Spacers Up to 48" 05/10/11 Stainless Steel Casing Spacer Powerseal 4810 Powerchock Up to 48" 03/19/18 Casing Spacers BWM SS-12 Casing Spacer(Stainless Steel) FB-12 Casing Spacer (Coated Carbon Steel) 0-1-ISCasing Spacers BWM for Non_rressure Pipe and Grouted Casing 03/29/22 33 05 13 Casing Spacers CCI Pipeline Systems CSC12, CSS12 Per Manuf Manufacturers Requirements (Sewer 09/03/24 33 OS 13 Casing Spacers Raci (Completely HDPE) , __ ,,. , , 8" - 12" (Sewer Only) Water & Sewer - Pines/Ductile Iron 33-11-10(1/8/13) * 33 11 10 Ductile Iron Pipe Griffin Pipe Products, Co. Super Bell-Tite Ductile Iron Pressure Pipe, AW WA C150, C151 08/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co. American Futile Pipe (Bell Spigot) AW WA C150, C151 08/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co. American Flex Ring (Restrained Joint) AW WA C150, C151 * 33 11 10 Ductile Iron Pipe U.S. Pipe and Foundry Co. AW WA C150, C151 * 33 11 10 Ductile Iron Pipe McWane Cast Iron Pipe Co. AW WA C150, C151 Water & Sewer - Utility Line Marker (08/24/2018) Sewer - Coating [s/EDo%v 33-39-60 (01/08/13). 02/25/02 Epoxy Lining System Sauereisen, Inc SewerGard 21 ORS LA County 9210-1.33 12/14/01 Epoxy Lining System Ertech Technical Coatings Ertech 2030 and 2100 Series 04/14/05 Interim Ductile Iron Pipe Coating Induron Protecto 401 ASTM B-117 01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, SIBB, Sl, S2 Acid Resistance Test 8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer - Coatines/Polvurethane 3" thru 24" 4" thin 30" 4" thin 30" Ductile Iron Pipe Only Sewer Applications Sewer Applications Sewer - Combination Air Valves 05/25/18 33-31-70 Air Release Valve A.R.I. USA, Inc. D025LTP02(Composite Body) 2" Sewer - PiDes/Concrete * E1-04 Conc. Pipe, Reinforced Wall Concrete Pipe Co. Inc. ASTM C 76 * E1-04 Conc. Pipe, Reinforced Hydro Conduit Corporation Class III T&G, SPL Item #77 ASTM C 76 * E1-04 Conc. Pipe, Reinforced Hanson Concrete Products SPL item #95 P lanhole,- ASTM C 76 * EI-04 Conc. Pipe, Reinforced Concrete Pipe & Products Co. hic. ASTM C 76 Sewer - Pine Enlarement Svstem (Method)33-31-23 (01/18/13) PIM System PIM Corporation Polyethylene PIM Corp., Piscam Way, N.J. Approved Previously McConnell Systems McLat Construction Polyethylene Houston, Texas Approved Previously TRS Systems Trenchless Replacement System Polyethylene Calgary, Canada Approved Previously Sewer - PiDe/Fiberelass Reinforced/ 33-31-13(1/8/13) 7/21/97 3331 13 Cent. Cast Fiberglass (FRP) Hobas Pipe USA, Inc. Hobas Pipe (Non -Pressure) ASTM D3262/D3754 03/22/10 3331 13 Fiberglass Pipe (FRP) Ameron Bondstrand RPMP Pipe ASTM D3262/D3754 04/09/21 3331 13 Glass -Fiber Reinforced Polvmer Pipe (FRP) Thompson Pipe Group Thompson Pipe (Flowtite) ASTM D3262/D3754 ASTM D3262, ASTM D3681, 03/07/23 3331 13 Fiberglass Pipe (FRP) Future Pipe Industries Fiberstrong FRP ASTM D4161, AW WA M45 ASTM D3262, ASTM D3517, 09/03/24 3331 13 Fiberglass Pipe (FRP) Superlit Bum Sanavi A.S. Superlit FRP ASTM 3754, AW WA C950 * From Original Standard Products List 2 CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 9-3-24 IApprovall Spec No. [Classsification I Manufacturer I Model No. I National Spec I Size Sewer - Piue/Polvnter Pioe 4/14/05 Polymer Modified Concrete Pro, —'to- USA Meyer Polycrete Pipe ASTM C33, A276, F477 8" to I Q", Class V 06/09/10 El-9 Reinforced Polymer Concrete Pipe US Composite Pioe Reinforced Polymer Concrete Pose ASTM C-76 Sewer - Piues/HDPE 33-31-23(1/8/13), * High -density polyethylene pipe Phillips Dnscopipe, Inc. Ooticore Ductile Polyethylene Pipe ASTM D 1248 8" * H:gh-densny polyethylene pipe Plesco Inc. ASTM D 1248 8" * High -density polyethylene pipe Polly Pipe, Inc. ASTM D 1248 8" High -density polyethylene pipe CSR Hydro Condud/Pioelme Systems McConnell Pipe Enlargement ASTM D 1248 Sewer - PIDes/PVC (Pressure Sewer) 33-11-12 (4/1/131 12/02/11 33-11-1� DR -Id PVC Pressure Pipe P,pelife Jctstream PVC Pressure Pipe AW WA C900 4" thru 12" 10/22/14 33-11-12 DR-14 PVC Pressure Pipe Royal Budding Products Royal Seal PVC Pressure Pipe AW WA C900 4" thru 12" Sewer - Piues/PVC* 33-31-20 (7/1/13), * 33-31-20 PVC Sewer Pioe 1-M Manufacturing Co., Inc. (JM Eagle) SDR-26 (PSI 15) ASTM D 3034 4" - 15" 12/23/97* 33-31-20 PVC Sewer Pipe Diamond Plastics Corporation SDR-26 (PSI 15) ASTM D 3034 4" thru 15" * 33-31-20 PVC Sewer Pipe Lamson Vylon Pipe SDR-26 (PSI 15) ASTM D 3034 4" thru 15" 12/05/23 33-31-20 PVC Sewer Pipe Vinyltech PVC Pipe SDR-26 (PSI 15) ASTM D3034 4" thru 15" 12/05/23 33-31-20 PVC Sewer Pipe Vinyltech PVC Pipe Gravity Sewer PS 115 ASTM F 679 18" * 33-31-20 PVC Sewer P' 1-M Manufacturin\v�Co, Ina (1M Eagle) PS 115 ASTM F 679 18" - 28" 05/06/05 33-31-20 PVC Solid Wall Pipe Dtamond Plastics Corporation PS 115 ASTM F-679 18" to 48" 04/27/06 33-31-20 PVC Sewer Fittings Harco SDR-26 (PS 115) Gasket Finings ASTM D-3034, D-1784, etc 4" - 11" * 33-31-20 PVC Sewer Fittings Plastic Trends, Inc.(Westlake) Gasketed PVC Sewer Main Finings ASTM D 3034 1 3/19/2018 33 3120 PVC Sewer Pipe Pioelife Jet Stream SDR 26 (PS 115) ASTM F679 18"- 24" 1 3/19/2018 33 3120 PVC Sewer PTe Pioelife Jet Stream SDR 26 ASTM D3034 4"- 15" 1 3/29/2019 33 3120 Gasketed Fittings (PVC) GPK Products, Inc. SDR 26 ASTM D3034 4"- 15" 1 10/21/2020 33 3120 PVC Sewer Pipe NAPCO(Westlake) SDR 26 ASTM D3034 4" - 15" 1 10/22/2020 33 3120 PVC Sewer Pipe Sanderson Pipe Corp. SDR 26 ASTM D3034 4"- 15" 1 10/21/2020 1 333120 PVC Sewer Pipe NAPCO(Westlake) SDR 26 PS 115 ASTM F-679 18"-36" * From Original Standard Products List FORT WORTH® CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 9-3-24 08/28/02 Double Strap Saddle Smith Blau 4317 Nylon Coated Double Strap Saddle 07/23/12 33-12-10 Double Strap Service Saddle Mueller Company DR2S Double (SS) Strap DI Saddle AWWA C800 1"-2" SVC, up to 24" Pipe 03/07/23 33-12-10 Double Strap Service Saddle Powerseal 3450AS, Incl. Corp. Stop, Dbl Strap, Stainless NSF ANSI 372 1"-2' SVC, up to 24" Pipe 10/27/87 Curb Stops -Ball Meter Valves McDonald 6100M,6100MT & 61 OMT 3/4" and 1" 1.1.7 Curb Stops -Ball Meter Valves McDonald 4603B, 4604B, 6100M, 610OTM and 6101M 1%" and 2" FB600-7NL, FB1600-7-NL, FV23-777-W-NL, 5/25/201. 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., hic. L22-77NL AWWA C800 _ FB600-6-NL, FB1600-6-NL, FV23-666-W- 5/25/2018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., hic. NL, L22-66NL AWWA C800 1-1/2" FB600-4-NL, FB1600-4-NL, B11-444-WR- 5/25/2018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., hic. NL, B22444-WR-NL, L28-44NL AWWA C800 I, B-25000N, B-24277N-3, B-20200N-3, H- AWWA C800, ANSF 61, 5/25/2.1. 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15000N, , H-1552N, H142276N ANSI/NSF 372 _ B-25000N, B-20200N-3, B-24277N-3,H- AWWA C800, ANSE 61, 5/25/2018 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15000N, H-14276N, H-15525N ANSI/NSF 372 1-1/2 B-25000N, B-20200N-3,H-15000N, H- AWWA C800, ANSF 61, 5/25/2018 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15530N ANSI/NSF 372 1" 01/26/00 Coated Tapping Saddle with Double SS Straps JCM Industries, Inc. #406 Double Band SS Saddle 1"-2' Taps on up to 12" 0/5121/12 33-12-25 Tapping Sleeve (Coated Steep JCM Industries, Inc. 412 Tapping Sleeve ESS AWWA C-223 Up to 30" w/12" Out 03/29/22 33-12-25 Tapping Sleeve (Coated or Stainless Steep JCM Industries, hic. 415 Tapping Sleeve AWWA C-223 Concrete Pipe Only 05/10/11 Tapping Sleeve (Stainless Steep Powerseal 3490AS (Flange) & 3490MJ 4"-8" and 16" 02/29/12 33-12-25 Tapping Sleeve (Coated Steel) Romac FTS 420 AWWA C-223 U p to 42" w/24" Out 02/29/12 33-12-25 Tapping Sleeve (Stainless Steep Romac SST Stainless Steel AWWA C-223 Up to 24" w/12" Out 02/29/12 33-12-25 Tapping Sleeve (Stainless Steep Romac SST III Stainless Steel AWWA C-223 Up to 30" w/12" Out 05/10/11 Joint Repair Clamp Powerseal 3232 Bell Joint Repair Clamp 4" to 30" Plastic Meter Box w/Composite Lid DEW Plastics Inc. DFW37C-12-IEPAF FTW Plastic Meter Box w/Composite Lid DEW Plastics Inc. DFW39C-12-IEPAF FTW 08/30/06 Plastic Meter Box w/Composite Lid DEW Plastics Inc. DFW65C-14-IEPAF FTW Class "A" Concrete Meter Box Bass & Hays CMB37-B12 1118 LID-9 Concrete Meter Box Bass & Hays CMB-18-Dual 1416 LID-9 Concrete Meter Box Bass & Hays CMB65-B65 1527 LID-9 Water - Bolts. Nuts. and Gaskets 33-11-05 (01/08/13) None Water - Combination Air Release 33-31-70 (01/08/13) * E I-11 Combination Air Release Valve GA Industries, Inc. Empire Air and Vacuum Valve, Model 935 ASTM A 126 Class B, ASTM A 1" & 2" * EI-11 Combination Air Release Valve Multiplex Manufacturing Co. Crispin Air and Vacuum Valves, Model No. 1/2" 1" & 2" * E1-11 Combination Air Release Valve Valve and Primer Corp. APCO #143C, #145C and #147C 1", 2' & 3" Water - Dry Barrel Fire Hvdrants 33-1240 (01/15/14) 10/01/87 E-1-12 Dry Barrel Fire Hydrant American -Darling Valve Drawing Nos. 90-18608, 94-18560 AWWA C-502 03/31/88 E-1-12 Dry Barrel Fire Hydrant American Darling Valve Shop Drawing No. 94-18791 AWWA C-502 09/30/87 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Shop Drawing No. D-19895 AWWA C-502 01/12/93 E-1-12 Dry Barrel Fire Hydrant American AVK Company Model 2700 AWWA C-502 08/24/88 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Drawings D20435, D20436, B20506 AWWA C-502 E-1-12 Dry Barrel Fire Hydrant ITT Kennedy Valve Shop Drawing No. D-80783FW AWWA C-502 09/24/87 E-1-12 Dry Barrel Fire Hydrant M&H Valve Company Shop Drawing No. 13476 AWWA C-502 Shop Drawings No. 6461 1.11.7 E-1-12 DryBarrel Fire Hydrant Mueller Company A423 Centurion AW WA C-502 Shop Drawing FH-12 01/15/88 E1-12 Dry Barrel Fire Hydrant Mueller Company A-423 Super Centurion 200 AWWA C-502 10/09/87 E-1-12 Dry Barrel Fire Hydrant U.S. Pipe & Foundry Shop Drawing No. 960250 AWWA C-502 09/16/87 E-1-12 Dry Barrel Fire Hydrant American Flow Control (AFC) Water- Pacer WB67 AWWA C-502 08/12/16 33-12-40 Dry Barrel Fire Hydrant EJ (East Jordan Iron Works) WaterMaster 5CD250 Water - Meters 02/05/93 E101-5 Detector Check Meter Ames Company Model 1000 Detector Check Valve AWWA C550 4" - 10" 08/05/04 Magnetic Drive Vertical Turbine Hersey Magnetic Drive Vertical AWWA C701, Class 1 3/4" - 6" * From Original Standard Products List 4 CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 9-3-24 IApprovall Spec No. IClasssification Manufacturer Model No. National Spec Size Water - Piues/PVC (Pressure Water) 33-31-70 (01/08/13) AWWA C900, AWWA C605, 1.113 33-11-12 PVC Pressure Pipe Vinyltech PVC Pipe DR14 ASTM D1784 4"-16" AWWA C900, AWWA C605, 12/05/23 33-I1-12 PVC Pressure Pie Vin (tech PVC Pie DR18 ASTM D1784 16"-18" AWWA C900, AWWA C605, 09/03/24 33-I1-12 PVC Pressure Pie Northern Pie Products DR14 ASTM D17M 4"-16" AW WA C900, AW WA C605, 09/03/24 33-1142 PVC Pressure Pipe Northern Pipe Products DR18 ASTM D1784 16"-18" 3/19/2018 33 11 12 PVC Pressure Pipe Pipelife Jet Stream DR14 AWWA C900 4"-12" 1 3/19/2018 33 11 12 PVC Pressure Pipe Pipelife Jet Stream DR18 AWWA C900 16"-24" 1 5/25/2018 33 11 12 PVC Pressure Pipe Diamond Plastics Corporation DR 14 AWWA C900 4"-12" 5/25/2018 33 11 12 PVC Pressure Pipe Diamond Plastics Corporation DR 18 AWWA C900 16"-24" AWWA C900-16 UL 1285 12/6/2018 33 11 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/b/a JM Eagle DR 14 ANSI/NSF 61 4"-28" FM 1612 AWWA C900-16 UL 1285 12/6/2018 33 11 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/b/a JM Eagle DR 18 ANSI/NSF 61 16"-24" FM 1612 9/6/2019 33 11 12 PVC Pressure Pipe Underground Solutions Inc. DR14 Fusible PVC AWWA C900 4" - 8" 9/6/2019 33 11 12 PVC Pressure Pipe NAPCO(Westlake) DR18 AWWA C900 16"-24" 9/6/2019 33 11 12 PVC Pressure Pipe NAPCO(Westlake) DR14 AWWA C900 4"- 12" 9/6/2019 33 11 12 PVC Pressure Pipe Sanderson Pipe Corp. DR14 AWWA C900 4"- 12" Water - PioesNalves & Fittinas/Ductile Iron Fittings 33-11-11 (01/08/13) 07/23/92 EI-07 Ductile Iron Fittings Star Pipe Products, Inc. Mechanical Joint Fittings AW WA C153 & C110 * E1-07 Ductile Iron Fittings Griffin Pipe Products, Co. Mechanical Joint Fittings AWWA C 110 * E1-07 Ductile Iron Fittings McWane/Tyler Pipe/ Union Utilities Division Mechanical Joint Fittings, SSB Class 350 AW WA C 153, C 110, C III 08/11/98 EI-07 Ductile Iron Fittings Sigma, Co. Mechanical Joint Fittings, SSB Class 351 AWWA C 153, C 110, C 112 02/26/14 EI-07 MJ Fittings Accucast Class 350 C-153 MJ Fittings AW WA C153 4"-12" 05/14/98 E1-07 Ductile Iron Joint Restraints Ford Meter Box CoXiii-Flange Uni-Flange Series 1400 AW WA C111/C153 4" to 36" 05/14/98 E1-24 PVC Joint Restraints Ford Meter Box Co.fUni-Flange Uni-Flange Series 1500 Circle -Lock AW WA C111/C153 4" 124" 11/09/04 E1-07 Ductile Iron Joint Restraints One Bolt, Inc. One Bolt Restrained Joint Fitting AW WA C111/CI16/C153 4" to 12" 02/29/12 33-11-11 Ductile Iron Pipe Mechanical Joint Restraint EBAA Iron, Inc. Megalug Series 1100 (for DI Pipe) AW WA C111/CI16/C153 4" to 42" 02/29/12 33-11-11 PVC Pipe Mechanical Joint Restraint EBAA Iron, Inc. Megalug Series 2000 (for PVC Pipe) AW WA CI I I/C116/C153 4" to 24" 08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLC4 - SLCIO AW WA C111/C153 4" to 10" 03/06/19 33-11-11 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLCS4 - SLCS12 AW WA C111/C153 4" to 12" 08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLUE AW WA C111/C153 12" to 24" 08/10/98 E1-07 MI Fittings(DIP) Sigma, Co. Sigma One-Lok SLDE AW WA C153 4" - 24" 10/12/10 E1-24 Interior Restrained Joint System S & B Tmhncial Products Bulldog System ( Diamond Lok 21 & JM ASTM F-1624 4" to 12" 08/16/06 E1-07 Mechanical Joint Fittings SIP Induaries(Serampore) Mechanical Joint Fittings AW WA C153 4" to 24" 11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. PVC Stargrip Series 4000 ASTM A536 AW WA CI I I 11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. DIP Stargrip Series 3000 ASTM A536 AW WA CI I I EZ Grip Joint Restraint (EZD) Black For DIP 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Induaries(Serampore) ASTM A536 AW WA CI I I 3"-48" EZ Grip Joint Restraint (EZD) Red for C900 .111-18 33-11-11 Mechanical Joint Ret armor Glands SIP Induaries(Serampore) DR14 PVC Pipe ASTM A536 AW WA CI I I 4 -12 EZ Grip Joint Restraint (EZD) Red for C900 .111-18 33-1141 Mechanical Joint -at.- Glands SIP Industries(Serampore) DR18 PVC Pipe ASTM A536 AW WA C111 16"-24" * From Original Standard Products List 5 FORT WORTH® CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 9-3-24 Approval Spec No. �Classsification J Valve* 33Manufacturer Water Pil) & Fittings/Resilient Seated Gate (05/13/15) Model No. National Spec Size - alves Resilient Wedged Gate Valve w/no Gears -12-20 American Flow Control Series 2500 Drawing # 94-20247 16" I 12/13/02 Resilient Wedge Gate Valve American Flow Control Series 2530 and Series 2536 AW WA C515 30" and 36" I I 08/31/99 Resilient Wedge Gate Valve American Flow Control Series 2520 & 2524 (SO 94-20255) AW WA C515 20" and 24" I I 05/18/99 Resilient Wedge Gate Valve American Flow Control Series 2516 (SD 94-20247) AW WA C515 16" I I 10/24/00 E1-26 Resilient Wedge Gate Valve American Flow Control Series 2500 (Ductile Iron) AW WA C515 4" to 12" I I 08/05/04 Resilient Wedge Gate Valve American Flow Control 42" and 48" AFC 2500 AW WA C515 42" and 48" I I 05/23/91 E1-26 Resilient Wedge Gate Valve American AVK Company American AVK Resilient Settled GV AW WA C509 4" to 12" I I01/24/02 E1-26 Resilient Wedge Gate Valve American AVK Company 20" and smaller I I * E1-26 Resilient Seated Gate Valve Kennedy 4" - 12" I I E1-26 Resilient Seated Gate Valve M&H 4" - 12" I I * E1-26 Resilient Seated Gate Valve Mueller Co. 4" - 12" I I 11/08/99 Resilient Wedge Gate Valve Mueller Co. Series A2361 (SD 6647) AW WA C515 16" I 01/23/03 Resilient Wedge Gate Valve Mueller Co. Series A2360 for 18"-24" (SD 6709) AW WA C515 24" and smaller I 05/13/05 Resilient Wedge Gate Valve Mueller Co. Mueller 30" & 36", C-515 AW WA C515 30" and 36" I 01/31/06 Resilient Wedge Gate Valve Mueller Co. Mueller 42" & 48", C-515 AW WA C515 42" and 48" I 01/28/88 E1-26 Resilient Wedge Gate Valve Clow Valve Co. AW WA C509 4" - 12" I 10/04/94 Resilient Wedge Gate Valve Clow Valve Co. 16" RS GV (SD D-20995) AW WA C515 16" I 11/08/99 EI-26 Resilient Wedge Gate Valve Clow Valve Co. Clow RW Valve (SD D-21652) AW WA C515 24" and smaller I 11/29/04 Resilient Wedge Gate Valve Clow Valve Co. Clow 30" & 36" C-515 AW WA C515 30" and 36" (Note 3) 11/30/12 Resilient WedgF Gate Valve Clow Valve Co. Clow Valve Modal 2638 AW WA C515 24" to 48" (Note 3) 05/08/91 E1-26 Resilient Seated Gate Valve Stockh un Valves & Fittings AW WA C 509, ANSI 420 - stem, 4" - 12" I * E1-26 Resilient Seated Gate Valve U.S. Pipe and Foundry Co. Metroseal 250, requirements SPL #74 3" to 16" 10/26/16 33-12-20 Resilient Seated Gate Valve EJ (East Jordan Iron Works) EJ FImMast.r Gat. Valve & Box.a 08/24/18 Mateo Gate Valve Mateo-Norea 225 MR AW WA/ANSI C115/An21.15 4" to 16" I Water - PiDes/Valves & Fittings/Rubber Seated Butterfly Valve 33-12-21 (07/10/14) I I * EI-30 Rubber Seated Butterfly Valve Henry Pratt Co. AW WA C-504 24" I * E1-30 Rubber Seated Butterfly Valve Mueller Co. AW WA C-504 24"and smaller I 1/11/99 E1-30 Rubber Seated Butterfly Valve Dezurik Valves Co. AW WA C-504 24" and larger I 06/12/03 E1-30 Valmatm American Butterfly Valve Valmatic Valve and Manufacturing Com. Valmatic American Butterfly Valve. AW WA C-504 Up to 84" diameter I 04/06/07 E1-30 Rubber Seated Butterfly Valve M&H Valve M&H Style 4500 & 1450 AW WA C-504 24" to 48" 03/19/18 33 12 21 Rubber Seated ButterflyValve G. A. Industries Golden Anderson AW WA C504 Butter fly Valve AW WA C-504 30"-54" 09/03/24 33 12 21 Rubber Seated ButterFl Valve American AVK Com an AW WA C504 Butterfl Valve Class 250B AW WA C-504 24" - 48" Water - Polved vlene Encasement 33-11-10 (01/08/13) I 05/12/05 E1-13 Polyethylene Encasment Flexsol Packaging Fulton Enterprises AW WA C105 8 mil LLD I I 05/12/05 E1-13 Polyethylene Encasment Mountain States Plastics (MSP) and AEP Ind. Standard Hardware AW WA C105 8 mil LLD I I 05/12/05 E1-13 Polyethylene Encasment AEP Industries Bullstrong by Cowtown Bolt & Gasket AW WA C105 8 mil LLD I I 09/06/19 33-11-11 Polyethylene Encasment Northtown Products Inc. PE Encasement for DIP AW WA C105 8 mil LLD I I I I Water - SamDline Station I I 09/02/24 1 331250 Water Sampling Station Mueller Water Products, Inc. Model BSS01-36-MUDG2-CSD-NL, Freeze Proof. Hasp for Locking Access Hatch Water - Automatic Flusher HG6-A-IN-2-BRN-LPRR(Portable) 10/21/20 Automated Flushing System Mueller Hydrostuard HG2-A-IN--2-PVC-018-LPLG(Perinanent) 04/09/21 Automated Flushing System Kupferle Foundry Company Eclipse #9800wc 04/09/21 Automated Flushing System Kupferle Foundry Company Eclipse #9700 (Portable) The Fort Worth Water Department's Standard Products List has been developed to minimize the submittal review of products which meet the Fort Worth Water Department's Standard Specifications during utility construction projects. When Technical Specifications for specific products, are included as part of the Construction Contract Documents, the requirements of the Technical Specification will ovemde the Fort Worth Water Department's Standard Specifications and the Fort Worth Water Department's Standard Products List and approval of the specific products will be based on the requirements of the Technical Specification whether car not the specific product meets the Fort Worth Water Department's Standard Specifications or is on the Fort Worth Water Yellow Highlight indicates recent changes * From Original Standard Products List