Loading...
HomeMy WebLinkAboutIR 7491 INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 7491 S?), October 2, 1990 ORTo To the Mayor and Members of the City Council V S �TEx"y• Subject: ESTIMATED COST FOR IMPROVEMENTS AT MEACHAM AIRPORT FOR THE PAGE AVJET PROJECT In 1989 Page AvJet shared with the City of Fort Worth plans to expand their airplane maintenance facilities and expressed an interest in having these facilities located at Meacham Airport . Two major items were required by Page AvJet before they could commit to coming to Fort Worth. The first was that the City would agree to construct certain improvements at Meacham Airport around their hangar. The second requirement was that the City needed to be able to enter into an agreement with Page AvJet for the construction of the site improvements in time to allow Page AvJet to begin and complete the construction of Phase I of their facility within calendar year 1990 . In November 1989, City staff drafted an agreement to be considered by Page AvJet. At the same time, City staff began working with the engineering consultant hired by Page AvJet to determine the needed site improvements at Meacham Airport . Staff also worked with another outside engineering firm to estimate the cost of the improvements. Two cost estimates were made for the improvements, on December 29, 1989 and February 22 , 1990 . These estimates are detailed below and compared to the actual bid amount for the improvements . Because of Page AvJet 's schedule for the project , the design of the improvements was not completed before the estimated costs were finalzed and sent to the City Council (M&C-C-12194, February 27 , 1990) . Listed below are the different items to be purchased or constructed, the costs estimated on December 29, 1989 and February 22 , 1990 and the actual bid amounts . ESTIMATES ITEM _ 12(29190 2/22/90 BIDS Mobilization & Site Prep $ 0 $ 0 $250 ,730 Grading 158 , 500 107 , 000 193 , 430 Apron Paving & Taxiway J 1, 651 ,550 859, 209 763,736 Storm Drainage System 373 , 235 295 , 695 467 ,803 Water and Sewer 363 ,240 354, 450 333 ,749 Vehicle Parking & Roadways 474 , 433 266, 495 198 ,188 Parking Lighting 82 ,100 52 ,760 18 , 444 Apron Lighting 45 ,000 15 ,000 0 ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 7491 pagg 2 of To the Mayor and Members of the City Council p- DoE OPP 0 x 0 Subject: ESTIMATED COST FOR IMPROVEMENTS AT MEACHAM AIRPORT FOR THE PAGE 1413 AVJET PROJECT ESTIMATES 121291 W 7/2-21.911 Elect/Tel Ducts & Gas Lines 0 0 33,114 Temporary Parking & Roads 0 0 46, 689 Fire Protection Pump Station 0 0 459, 500 Fire & Foam Lines 0 0 88 , 995 Fuel Separation & Industrial Waste Lines 0 0 78 ,878 FAA Parking & Related Items 0 0 81 ,872 N. Main Street Widening 0 0 17 ,111 Landscaping & Fencing 0 0 31, 391 Contingencies 314,942 195,000 92, 368 Engineering 346,000 195,000 212,000 Water Dept Services 0 0 90 ,000 Geotechnical Testing 0 0 11,000 Fire Pumps 0 0 171,000 TOTAL $1,809,00 - —0— $2 z3.40,609, $11 639 X9 9 8 The major cost overrun in the bid amount was due to the type of fire protection system required for this project. Because the improvements were not designed at the time the final estimate was made, the type and the cost of the fire protection system was not known until the improvements were designed. The total cost of the fire protection system above the February 22 , 1990 estimate is $719,495. Another major item which contributed to the cost overrun was the mobilization and site preparation. The amount in the bid for this item was $250 ,730 . The February 22 , 1990 estimate did not include an amount for this item. ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 7491 Page 3 of �OfSORT,�o To the Mayor and Members of the City Council p !Y\ S rf✓✓xPy Subject: ESTIMATED COST FOR IMPROVEMENTS AT MEACHAM AIRPORT FOR THE PAGE ,°" AVJET PROJECT A comparison of the estimated and bid amounts indicate cost overruns in several areas . The two items listed above make up the major part of the cost difference between the estimate and the bids for this project . The City staff shares the City Council 's concerns regarding the difference between the estimated cost and the bid amount for the City's site improvements at Meacham Airport for the Page AvJet project . The reason for the unusually large difference is that in order to meet Page AvJet 's schedule the estimates had to be finalized and an agreement approved before the improvements were designed. The estimated cost does not include a cost for the fire protection system, because in February 1990 neither City staff nor the engineering firm were aware of what was going to be required in a fire protection system. The time frame of this project did not allow a detailed estimate to be made on all of the improvements . Should the City Council need more detailed information about the estimates or costs of this project , it will be provided upon request . 1�-�-David Ivory City Manager DAI :RG:saw ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS