AMENDMENT No . 2
TO CITY SECRETARY CONTRACT No. 56816
WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn Associates,
Inc., (ENGINEER) made and entered into City Secretary Contract No. 56816,
(the CONTRACT) which was authorized by M&C 21-0924 on the 30th day of
November, 2021 in the amount of $696,800.00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in
the amount of $265,616.00 which was authorized by M&C 23-0704 on August
22, 2023; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Water and Sanitary Sewer Replacement Contract 2019, WSM-I, CPN
103415; and
WHEREAS, it has become necessary to execute Amendment No. 2 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $66,100.00 (Water).
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $1,028,516.00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
City of Fort Worth, Texas OFFICIAL RECORD W&SS Repl. Contract 2019, WSM-I
Prof Services Agreement Amendment Template CPN 103415
Revision Date: 12/08/2023 CITY SECRETARY
Page 1 of 2
FT. WORTH, TX
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City
1l of Fort Worth
William Johnson (D c 5, 2024 10:48 CST)
William M. Johnson
Assistant City Manager
DATE: 1 2/05/2024
ATTEST:
Jannette Goodall
City Secretary
APPROVAL RECOMMENDED:
ENGINEER
Kimley-Horn and Associates, Inc.
W-� /1.ma"' r.e-
John R. Atkins, P.E.
Senior Vice President
bd�v�nnb DATE: 11 / 13/2024
ono 0
aa4n nEXA?o4p
CGc���rto,�G�e� tfa��fe�
Christopher Harder (Dec 2. 2024 07:40 CSi
Christopher Harder, P.E.
Director, Water Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
AApzil Rose Escamilla, P.E.
Project Manager
APPROVED AS TO FORM AND LEGALITY:
4&-0e_
Douglas Black (Dec 2, 202417:38 CST)
Douglas W. Black
Sr. Assistant City Attorney
M&C No.#: N/A
M&C Date: N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas W&SS Repl. Contract 2019, WSM-I
Prof Services Agreement Amendment Template CPN 103415
Revision Date: 12/08/2023
Page 2 of 2
Kimley»>Horn
November 8, 2024
April Rose Escamilla, P.E.
Project Manager
City of Fort Worth Water Department
1000 Throckmorton Street
Fort Worth, TX 76102
RE: WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-1
Amendment No. 2
KHA No. 061018411
City Secretary No. 56816 — City Project No. 103415
Dear Ms. Escamilla:
The City of Fort Worth (CITY) has requested that Kimley-Horn and Associates, Inc. (ENGINEER)
perform additional services under Amendment No. 2 for the WATER AND SANITARY SEWER
REPLACEMENT CONTRACT 2019, WSM-1 project.
We are pleased to submit our Amendment No. 2 to add the design of a new pressure reducing valve
(PRV) station located southwest of the intersection of Maurice Avenue and Harper Street. This PRV is
required for abandonment of an existing 12-inch water line on the Riverside Drive bridge. The 12-inch
water line abandonment is part of the TxDOT joint -bid project to replace the Riverside Drive bridge
decking and construction is expected to commence in January 2025. Tasks included as part of this
amendment are further described as follows:
TASK 4.0 — FINAL DESIGN — PRV STATION: ($51,848)
ENGINEER will complete Final Design in accordance with the Original Contract and as follows:
• ENGINEER to provide final design for pressure reducing valve station located southwest of
the intersection of Maurice Avenue and Harper Street.
TASK 7.0 — ROW/EASEMENT SERVICES — PRV STATION: ($5,560)
ENGINEER will complete ROW/Easement Services in accordance with the Original Contract
and for the following:
• ENGINEER to provide ROW/easement services for pressure reducing valve station
located southwest of the intersection of Maurice Avenue and Harper Street.
TASK 8.0 — SURVEY AND SUE SERVICES — PRV STATION: ($8,692)
ENGINEER will complete Survey and SUE Services in accordance with the Original Contract and for
the following:
• ENGINEER to provide survey services for pressure reducing valve station located
southwest of the intersection of Maurice Avenue and Harper Street.
Kimley»>Horn
Page 2
We recommend that the CITY increase the budget by $66,100 for these additional services. The
following tables summarize our recommended budget revisions, water design fees, and revised
contract amount:
Description Water
Task 4 - Final Design (PRV Station) $51,848
Task 7 - ROW/Easement Services (PRV Station) $5,560
Task 8 - Survey and SUE Services (PRV Station) $8,692
Total $66,100
The following breakdown for water, sewer, and paving services is recommended:
Water Fee Sewer Fee Paving Fee
Original Contract $480,792 $216,008 $0
Amendment No. 1 $121,220 $104,396
Amendment No. 2 $66,100 $0
Total $668,112 $320,404
$40,000
$0
Total
$51,848
$5,560
$8,692
$66,100
Total
$696,800
$265,616
$66,100
$40,000 $1,028,516
The following table summarizes our recommended budget revisions and shows the revised contract
amount:
Task Number
Original
Amendment
Amendment
Revised
Contract
No.1
No.2
Contract
Task 1 - Design Management
$35,500
$1,200
-
$36,700
Task 2 - Conceptual Design
$52,260
-
-
$52,260
Task 3 - Preliminary Design
$152,170
$24,800
-
$176,970
Task 4 - Final Design
$117,500
$71,400
$51,848
$240,748
Task 5 - Bid Phase Services
$20,730
$14,100
-
$34,830
Task 6 - Construction Phase Services
$47,820
$40,200
-
$88,020
Task 7 - ROW/Easement Services
$11,100
-
$5,560
$16,660
Task 8 - Survey and SUE
$119,700
$31,516
$8,692
$159,908
Task 9 - Permitting
$120,020
$102,400
-
$222,420
Task 10 - Additional Services
$20,000
($20,000)
-
-
Total Project
$696,800
$265,616
$66,100
$1,028,516
Kim ey>>)Horn
Page
The total MWBE commitment for the original contract and
Amendment No. 1 was $121,235 (12.6%).
Amendment No. 2 total MWBE commitment is $9,138 (13.8%).
The total revised MWBE commitment
for the project is $130,373 (12.7%). The following tables
summarize our revisions to the
MWBE
percentages:
Primary Original
Amend.
Amend.
Revised
Revised
Firm
Responsibility Contract
No.1
No.2
Contract
%
Prime Consultant
Kimley-Horn and Assoc.,
Civil Engineering/
$464,640
$179,056
$47,762
$691,458
o
67.2/0
Inc.
CCA
MWBE Sub -Consultants
Gorrondona and Survey/ $73,900
$24,560
$9,138 $107,598
10.5%
Associates, Inc. Easements
The Rios Group Subsurface Utility $22,775
$0
$0 $22,775
2.2%
Engineering
Non-MWBE Sub -Consultants
CMJ, Inc. Geotechnical Report $56,850
$0
$9,200 $66,050
6.5%
Cox McLain Archeological Services $12,455
$62,000
$0 $74,455
7.2%
Bennett Trenchless Trenchless Engineering $66,180
$0
$0 $66,180
6.4%
Engineers
TOTAL $696,800
$265,616
$66,100 $1,028,516
100%
Total Contract
Description
Original +
Amend. No. 2
Amend. No. 1
Contract Amount
$962,416
$66,100
Total Contract MWBE
$121,235
$9,138
Total Contract MWBE Percentage
12.6%
13.8%
City's MWBE Goal
9.00%
-
Kimley»>Horn
Page 4
We appreciate the opportunity to be of continued service to the City. Please contact us if we need to
provide any further information.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES, INC.
.-� /1. E.
John R. Atkins, P.E.
Senior Vice President
Attachments - Level of Effort Spreadsheet
- OPCC
- Schedule
- Mayor and Council Communication Map
- Form 1295
cc: Tony Sholola, P.E., Assistant Director of Water Department
K:\FTW_Utilities\061018411-CFW-2019-WSM-1\PPP\POST_NTPWmendment-2\WSM-1 Amendment 2 Summary Ltr.docx
EXHIBIT B-2
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
Water and Santary Sewer Replacements Contract 2019, WSM-1 - Amendment No. 2
City Project No. 103415
Task No.
Task Description
Compensation
Senior
Professional ll
$380.00
Labor(hours)
Senior
Professional
$360.00
Professional
$300.00
Analyst
$250.00
Support
Staff
$150.00
Total Labor
Cost
Expense
Subconsultant
MWBE Non-MWBE Markup
Travel /
Reproduction)
Fees/Permitting
Total
Expense
Cost
Task Sub
Total
1.0
Project Management - Not Included
0
0
0
0
0
$0
$0
$0
$0
$0
$0
$0
2.0
Conceptual Design - Not Included
0
0
0
0
0
$0
0
0
0
0
$0
$0
3.0
Preliminary Design (60%) - Not Included
0
0
0
0
0
$0
$0
$0
$0
$0
$0
$0
4.0
1-mal Design 9 and 00 0 - PRV Station
o
4
0
34
118
2
41,520
$0
$ ,,200
$920
$208
$10,328
$51,848
Geotechnical Investigation
90% Design Drawings
Cover Sheet
Sheet Index and General Notes
Overall Existing Map
PRV Site Plan
PRV Vault Details
PRV Structural Details
PRV Connection Details
Water Details (2)
Electrical Legend and Abbreviations
Electrical Site Plan
Electrical One Line Diagram & Schematics
Electrical Details (3)
Electrical Cabinet Details
Specifications
Quantities/OPCC
Deliverables
Review with City/Meeting Notes
Final 5100 %%, Plans and Specifications
Final Ruantities/OPOC
Deliverables
1
2
1
1
1
1
1
1
4
1
1
2
1
2
2
4
1
2
5
1
2
2
2
4
9
8
16
4
1
8
8
8
8
12
9
1
2
8
1
1
1
1
$800
$9,200
$920
CMJ
$100
$108
$10,120
$10,920
$0
$0
$0
$500
$0
$500
$800
$0
$800
$1,300
$0
$1,300
$2,300
$0
$2,300
$2,300
$0
$2,300
$5,200
$0
$5,200
$1,550
$0
$1,550
$1,300
$0
$1,300
$250
$0
$256
$2,600
$0
$2,600
$2,600
$0
$2,600
$2,600
$0
$2,600
$2,600
$0
$2,600
$4,580
$0
$4,580
$2,600
$0
$2,600
$400
$100
$500
$1,860
$0
$1,860
$3,880
$0
$3,880
$1,100
$0
$1,100
$400
$108
$508
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
Typical Water and Sewer Replacement
FW WTR Official Release Date: 8.09.2012
11/8/2024
Page 1 of 2
EXHIBIT B-2
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
Water and Sanitary Sewer Replacements Contract 2019, WSM-1 - Amendment No. 2
City Project No. 103415
Task No.
Task Description
Compensation
Senior
Professional ll
$380.00
Labor(hours)
Senior
Professional
$360.00
Professional
$300.00
Analyst
$250.00
Support
Staff
$150.00
Total Labor
Cost
Expense
Subconsultant
MWBE Non-MWBE Markup
Travel /
Reproduction)
Fees / Permitting
Total
Expense
Cost
Task Sub
Total
5.0
Bid Phase Services - Not Included
0
0
01
0
0
$0
$0
$0
$0
$0
$0
$0
6.0
Construction Phase Services - Not Included
0
0
0
0
0
$0
$0
$0
$0
$0
$0
$0
7.0
ROW/Easement Services - PRV Station
0
0
2
1,600
$3,600
$0
$360
$0
$3,960
$5,560
7.1
7.2
7.2.1
7.2.2
ROW Research
ROW/Easement Preparation/Submittal
Permanent (1)
Temporary (1)
1
1
2
2
$0
$1,800
$1,800
$180
$180
Gorrondona
Gorrondona
$0
$0
$0
$0
$0
$800
$1,980
$2,780
$800
$1,980
$2,780
8.0
Survey and SUE Services - PRV Station
0
0
2
2,600
$5,538
$0
$554
$0
$6,092
$8,692
8.1
Design Survey
2
8
$2,600
$5,538
$554
Gorrondona
$6,092
$8,692
9.0
Permitting - Not Included
0
0
0
0
0
$0
$0
$0
$0
$0
$0
$0
10.0
Additional Services - Not Included
01
0
0
0
0
$0
$0
$0
$0
$0
$0
$0
Subtotall
41
38
130
2
45,720
$9,138
$9,2001
$1,834
$208
$20,380
566,100
1 Water Line Footage
I Sewer Line Footage
100
0
100
100 % Totals: $66,100
0 %
100%
try i oral ree aoo, i uu
(B) Survey Fee $8,692
(C) Total Fee (-) survey Fee $57,408
I Water Fee (100%of C) Sewer Fee f0%of C)
1 $57,408 $0
Description
WP
Water
Sewer
Conceptual Design (30%)
31
$17,222
$0
Preliminary Design (60%)
32
$34,445
$0
Final Design (10%)
33
$5,741
$0
Survey
51
$8,692
$0
Project Summary
Total Hours
174
Subtotal
$66,100
$0
Total Labor
$45,720
Total
I
I
$66,100
Total Expense
$20,380
MWBE Subconsultant
$9,138
Non-MWBE Subconsultant
$9,200
MWBE Participation
13.8%
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
Typical Water and Sewer Replacement
FW WTR Official Release Date: 8.09.2012
11/8/2024
Page 2 of 2