Loading...
HomeMy WebLinkAboutContract 58616-A2CSC No. 56816-A2 AMENDMENT No . 2 TO CITY SECRETARY CONTRACT No. 56816 WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 56816, (the CONTRACT) which was authorized by M&C 21-0924 on the 30th day of November, 2021 in the amount of $696,800.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount of $265,616.00 which was authorized by M&C 23-0704 on August 22, 2023; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2019, WSM-I, CPN 103415; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $66,100.00 (Water). 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,028,516.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth, Texas OFFICIAL RECORD W&SS Repl. Contract 2019, WSM-I Prof Services Agreement Amendment Template CPN 103415 Revision Date: 12/08/2023 CITY SECRETARY Page 1 of 2 FT. WORTH, TX EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City 1l of Fort Worth William Johnson (D c 5, 2024 10:48 CST) William M. Johnson Assistant City Manager DATE: 1 2/05/2024 ATTEST: Jannette Goodall City Secretary APPROVAL RECOMMENDED: ENGINEER Kimley-Horn and Associates, Inc. W-� /1.ma"' r.e- John R. Atkins, P.E. Senior Vice President bd�v�nnb DATE: 11 / 13/2024 ono 0 aa4n nEXA?o4p CGc���rto,�G�e� tfa��fe� Christopher Harder (Dec 2. 2024 07:40 CSi Christopher Harder, P.E. Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. AApzil Rose Escamilla, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: 4&-0e_ Douglas Black (Dec 2, 202417:38 CST) Douglas W. Black Sr. Assistant City Attorney M&C No.#: N/A M&C Date: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas W&SS Repl. Contract 2019, WSM-I Prof Services Agreement Amendment Template CPN 103415 Revision Date: 12/08/2023 Page 2 of 2 Kimley»>Horn November 8, 2024 April Rose Escamilla, P.E. Project Manager City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 RE: WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-1 Amendment No. 2 KHA No. 061018411 City Secretary No. 56816 — City Project No. 103415 Dear Ms. Escamilla: The City of Fort Worth (CITY) has requested that Kimley-Horn and Associates, Inc. (ENGINEER) perform additional services under Amendment No. 2 for the WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2019, WSM-1 project. We are pleased to submit our Amendment No. 2 to add the design of a new pressure reducing valve (PRV) station located southwest of the intersection of Maurice Avenue and Harper Street. This PRV is required for abandonment of an existing 12-inch water line on the Riverside Drive bridge. The 12-inch water line abandonment is part of the TxDOT joint -bid project to replace the Riverside Drive bridge decking and construction is expected to commence in January 2025. Tasks included as part of this amendment are further described as follows: TASK 4.0 — FINAL DESIGN — PRV STATION: ($51,848) ENGINEER will complete Final Design in accordance with the Original Contract and as follows: • ENGINEER to provide final design for pressure reducing valve station located southwest of the intersection of Maurice Avenue and Harper Street. TASK 7.0 — ROW/EASEMENT SERVICES — PRV STATION: ($5,560) ENGINEER will complete ROW/Easement Services in accordance with the Original Contract and for the following: • ENGINEER to provide ROW/easement services for pressure reducing valve station located southwest of the intersection of Maurice Avenue and Harper Street. TASK 8.0 — SURVEY AND SUE SERVICES — PRV STATION: ($8,692) ENGINEER will complete Survey and SUE Services in accordance with the Original Contract and for the following: • ENGINEER to provide survey services for pressure reducing valve station located southwest of the intersection of Maurice Avenue and Harper Street. Kimley»>Horn Page 2 We recommend that the CITY increase the budget by $66,100 for these additional services. The following tables summarize our recommended budget revisions, water design fees, and revised contract amount: Description Water Task 4 - Final Design (PRV Station) $51,848 Task 7 - ROW/Easement Services (PRV Station) $5,560 Task 8 - Survey and SUE Services (PRV Station) $8,692 Total $66,100 The following breakdown for water, sewer, and paving services is recommended: Water Fee Sewer Fee Paving Fee Original Contract $480,792 $216,008 $0 Amendment No. 1 $121,220 $104,396 Amendment No. 2 $66,100 $0 Total $668,112 $320,404 $40,000 $0 Total $51,848 $5,560 $8,692 $66,100 Total $696,800 $265,616 $66,100 $40,000 $1,028,516 The following table summarizes our recommended budget revisions and shows the revised contract amount: Task Number Original Amendment Amendment Revised Contract No.1 No.2 Contract Task 1 - Design Management $35,500 $1,200 - $36,700 Task 2 - Conceptual Design $52,260 - - $52,260 Task 3 - Preliminary Design $152,170 $24,800 - $176,970 Task 4 - Final Design $117,500 $71,400 $51,848 $240,748 Task 5 - Bid Phase Services $20,730 $14,100 - $34,830 Task 6 - Construction Phase Services $47,820 $40,200 - $88,020 Task 7 - ROW/Easement Services $11,100 - $5,560 $16,660 Task 8 - Survey and SUE $119,700 $31,516 $8,692 $159,908 Task 9 - Permitting $120,020 $102,400 - $222,420 Task 10 - Additional Services $20,000 ($20,000) - - Total Project $696,800 $265,616 $66,100 $1,028,516 Kim ey>>)Horn Page The total MWBE commitment for the original contract and Amendment No. 1 was $121,235 (12.6%). Amendment No. 2 total MWBE commitment is $9,138 (13.8%). The total revised MWBE commitment for the project is $130,373 (12.7%). The following tables summarize our revisions to the MWBE percentages: Primary Original Amend. Amend. Revised Revised Firm Responsibility Contract No.1 No.2 Contract % Prime Consultant Kimley-Horn and Assoc., Civil Engineering/ $464,640 $179,056 $47,762 $691,458 o 67.2/0 Inc. CCA MWBE Sub -Consultants Gorrondona and Survey/ $73,900 $24,560 $9,138 $107,598 10.5% Associates, Inc. Easements The Rios Group Subsurface Utility $22,775 $0 $0 $22,775 2.2% Engineering Non-MWBE Sub -Consultants CMJ, Inc. Geotechnical Report $56,850 $0 $9,200 $66,050 6.5% Cox McLain Archeological Services $12,455 $62,000 $0 $74,455 7.2% Bennett Trenchless Trenchless Engineering $66,180 $0 $0 $66,180 6.4% Engineers TOTAL $696,800 $265,616 $66,100 $1,028,516 100% Total Contract Description Original + Amend. No. 2 Amend. No. 1 Contract Amount $962,416 $66,100 Total Contract MWBE $121,235 $9,138 Total Contract MWBE Percentage 12.6% 13.8% City's MWBE Goal 9.00% - Kimley»>Horn Page 4 We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. .-� /1. E. John R. Atkins, P.E. Senior Vice President Attachments - Level of Effort Spreadsheet - OPCC - Schedule - Mayor and Council Communication Map - Form 1295 cc: Tony Sholola, P.E., Assistant Director of Water Department K:\FTW_Utilities\061018411-CFW-2019-WSM-1\PPP\POST_NTPWmendment-2\WSM-1 Amendment 2 Summary Ltr.docx EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Water and Santary Sewer Replacements Contract 2019, WSM-1 - Amendment No. 2 City Project No. 103415 Task No. Task Description Compensation Senior Professional ll $380.00 Labor(hours) Senior Professional $360.00 Professional $300.00 Analyst $250.00 Support Staff $150.00 Total Labor Cost Expense Subconsultant MWBE Non-MWBE Markup Travel / Reproduction) Fees/Permitting Total Expense Cost Task Sub Total 1.0 Project Management - Not Included 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 2.0 Conceptual Design - Not Included 0 0 0 0 0 $0 0 0 0 0 $0 $0 3.0 Preliminary Design (60%) - Not Included 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 4.0 1-mal Design 9 and 00 0 - PRV Station o 4 0 34 118 2 41,520 $0 $ ,,200 $920 $208 $10,328 $51,848 Geotechnical Investigation 90% Design Drawings Cover Sheet Sheet Index and General Notes Overall Existing Map PRV Site Plan PRV Vault Details PRV Structural Details PRV Connection Details Water Details (2) Electrical Legend and Abbreviations Electrical Site Plan Electrical One Line Diagram & Schematics Electrical Details (3) Electrical Cabinet Details Specifications Quantities/OPCC Deliverables Review with City/Meeting Notes Final 5100 %%, Plans and Specifications Final Ruantities/OPOC Deliverables 1 2 1 1 1 1 1 1 4 1 1 2 1 2 2 4 1 2 5 1 2 2 2 4 9 8 16 4 1 8 8 8 8 12 9 1 2 8 1 1 1 1 $800 $9,200 $920 CMJ $100 $108 $10,120 $10,920 $0 $0 $0 $500 $0 $500 $800 $0 $800 $1,300 $0 $1,300 $2,300 $0 $2,300 $2,300 $0 $2,300 $5,200 $0 $5,200 $1,550 $0 $1,550 $1,300 $0 $1,300 $250 $0 $256 $2,600 $0 $2,600 $2,600 $0 $2,600 $2,600 $0 $2,600 $2,600 $0 $2,600 $4,580 $0 $4,580 $2,600 $0 $2,600 $400 $100 $500 $1,860 $0 $1,860 $3,880 $0 $3,880 $1,100 $0 $1,100 $400 $108 $508 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FW WTR Official Release Date: 8.09.2012 11/8/2024 Page 1 of 2 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Water and Sanitary Sewer Replacements Contract 2019, WSM-1 - Amendment No. 2 City Project No. 103415 Task No. Task Description Compensation Senior Professional ll $380.00 Labor(hours) Senior Professional $360.00 Professional $300.00 Analyst $250.00 Support Staff $150.00 Total Labor Cost Expense Subconsultant MWBE Non-MWBE Markup Travel / Reproduction) Fees / Permitting Total Expense Cost Task Sub Total 5.0 Bid Phase Services - Not Included 0 0 01 0 0 $0 $0 $0 $0 $0 $0 $0 6.0 Construction Phase Services - Not Included 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 7.0 ROW/Easement Services - PRV Station 0 0 2 1,600 $3,600 $0 $360 $0 $3,960 $5,560 7.1 7.2 7.2.1 7.2.2 ROW Research ROW/Easement Preparation/Submittal Permanent (1) Temporary (1) 1 1 2 2 $0 $1,800 $1,800 $180 $180 Gorrondona Gorrondona $0 $0 $0 $0 $0 $800 $1,980 $2,780 $800 $1,980 $2,780 8.0 Survey and SUE Services - PRV Station 0 0 2 2,600 $5,538 $0 $554 $0 $6,092 $8,692 8.1 Design Survey 2 8 $2,600 $5,538 $554 Gorrondona $6,092 $8,692 9.0 Permitting - Not Included 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 10.0 Additional Services - Not Included 01 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 Subtotall 41 38 130 2 45,720 $9,138 $9,2001 $1,834 $208 $20,380 566,100 1 Water Line Footage I Sewer Line Footage 100 0 100 100 % Totals: $66,100 0 % 100% try i oral ree aoo, i uu (B) Survey Fee $8,692 (C) Total Fee (-) survey Fee $57,408 I Water Fee (100%of C) Sewer Fee f0%of C) 1 $57,408 $0 Description WP Water Sewer Conceptual Design (30%) 31 $17,222 $0 Preliminary Design (60%) 32 $34,445 $0 Final Design (10%) 33 $5,741 $0 Survey 51 $8,692 $0 Project Summary Total Hours 174 Subtotal $66,100 $0 Total Labor $45,720 Total I I $66,100 Total Expense $20,380 MWBE Subconsultant $9,138 Non-MWBE Subconsultant $9,200 MWBE Participation 13.8% City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FW WTR Official Release Date: 8.09.2012 11/8/2024 Page 2 of 2