Loading...
HomeMy WebLinkAboutContract 56957-CO4CSC No. 56957-CO4 FORT WORTH City of Fort Worth —11FOw_ Change Order Request Project Name:1 Water and Sanitary Sewer Replacement Contract 88 Project No.(s)] C01955 ` Project Description:1 Water and Sanitary Sewer Replacement Contract 88 Contractor: I Gra-Tex Utilities, Inc. City Project Mgr.1 Scott Taylor Phone Number] 817-392-7240 City Sec No.: 1 56957 DOE No. I N/A City Proj. No.: l 01955 Change Order 4 4 Date 101212024 City Inspector: Kevin Jackson Phone Number: 682-328.7823 Dept. Water Sewer Original Contract Amount $1,738,551.66 $2,155,765.76 Extras to Date $11,248.80 $103,848.80 Credits to Dale Pending Change Orders (in M&C Process) Contract Cost to Date $1,749,800.46 $2,259,614.56 Amount of Proposed Change Order f24,451.08 $67,088.00 Revised Contract Amount $ ,774,251.54 $2,326,702.56 Original Funds Available for Change Orders $100,000.00 $130,000.00 Remaining Funds Available for this CO $75,548.92 $26,151.20 Additional Funding (if necessary) $40,936.80 CHANGE ORDERS to DA TE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) Totals Contract Time (Calendar days) $3,894,317.42 450 $115,097.60 120 $4,009,415.02 570 $91,539.08 087 $4,100,954.10 657 $230,000.00 $101,700.12 $40,936.80 5.31 % $4,867,896.78 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No. 4 primarily provides compensation for the following pay items that are necessary on the project: Point repairs at six locations on a project sanitary sewer main where sags were identified. Demolition and remobilization to the job site after work stoppage due to an adjacent none project water main break repaired by Field Operation Crews and design for wheel chair ramp at the Magnolia/Mansfield intersection. The removal and replacement of the ring and cover for 8 project manholes with bolt down lids as required by Water Field Operations to eliminate illegal dumping. • The removal and replacement of 12-inches of sidewalk with crushed rock against the curb in accordance with TDLR requirements to maintain a buffer between the curb and sidewalk. Staff concurs with the contractors request for 87 additional calendar days on the change order. There are suffucient funds available in the project to pay for the change order. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Companyna Name I Contractor Name I onlyFtor Signature I Date Gra-Tex Utilities, IJohn Crowley ` v i Inspector - Director (Wier Dept) C�r�c`rHi� tla�dev ��r���op;er�aru�rtUeCy,IU14V—: �> Senior Assistant City Attorney ouglas Black (De, 10, 20242 :27 CST) W M&C Number r— NIA Date p�# Uq t i Proj�ructlon;Su�';pervisor , �� Da e Uzi %q Date Con (TP�) Date 12/09/2024 12/3/24 Date Assistant City Manager Date 12/10/2024 19/11 /9n94 William" " D 111, 212411:11 CST) Council Action (If Required M&C Date Approved — NIA OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORT WOR-r vi City of Fort Worth Change Order Additions Project Name I Water and Sanitary Sewer Replacement Contract 88 City Sec No.: L56957 Project No.(s): I C01955 DOE No. City Proj. No.: j 01955 Project Water and Sanitary Sewer Replacement Contract 88 Description Contractor I Gra Tex Uilities, Inc. Change Order: Date: j 1012l2024 City Project Mgr. t Scott Taylor i City Inspector Kevin Jackson ADDITIONS ITEM R'1?'Tii N DEPT Qtv [Unit Unit Cost Total 59 Remobilization Fee Water 1.00 LS $14,000.00 $14,000.00 80 Sanitary Sewer Spot Repairs for Sags on Line A Sewer 6,00 EA $4,748.00 $28,488.00 81 Remove Ring and Cover and Install Bolt Down Lid Line E Sewer 8.00 EA $4,150.00 $33,200.00 82 Epoxy Repairs for Manholes Sewer 8.00 EA $675.00 $5,400.00 60 Cleanup of Litter & Debris Water 1.00 LS $1,165.00 $1,165.00 61 Restore Old Historic Tiles Water 1.00 LS $1,050.00 $1,050.00 62 Double Cut and Remove 12-inchwidth of Sidewalk, Install Crushed Rock Water 186.00 LF $44.28- $8,236.08 Water $24,451.08 Sewer $67,088.00 Page 2 of 4 (Additions Sub Total $91,539.08 FORT WORTH City of Fort Worth Change Order Deletions Project Name Water and Sanitary Sewer Replacement Contract 88 City Sec No.: 56957 Project No,(s): C01955 I DOE No. I N/A City Proj. No.: 01955 Project Description I Water and Sanitary Sewer Replacement Contract 88 f Contractor I Gra-Tex Utilities, Inc, I Change Order: ® Date 10/2/2024 City Project Mgr. Scott Taylor City Inspector: I I<evin Jackson ITEM DESCRIPTION DELETIONS DEPT Qty Unit Unit Cost Total Water Sewer Page 3 of 4 (Deletions Sub Total MWWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders cO # DATE AMOUNT Total $0.00 Page 4 of 4 12/9/2024 Water and Sanitary Sewer Replacement Contract 88 CSC: 56957 CPN:01955 Change Order 4 Notes Staff has reviewed the requested prices and days and considers them to be fair and reasonable. .Contract Compliance Manaaer By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Scott Taylor, P.E. Name of Employee Project Manager Title 44pvop��Il P cF FORr�aa� ATTEST: OVo =0 .�=c�xx aa4 TEXAS Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX