HomeMy WebLinkAboutContract 57621-R2CSC No. 57621-R2
CITY OF FORT WORTH
CONTRACT RENEWAL NOTICE
October 18, 2024
RJN Group,
Attn: Mr. Terrace Stewart
6701 Brentwood Stair Rd,
Fort Worth, Texas 76112
Re: Contract Renewal Notice - Second Renewal
In House CCTV Professional Services
Contract Number CSC: 57621
Renewal Contract Amount: $250,000
Contract Renewal Term No 2: September 1, 2024 to August 31, 2025
The above referenced contract with the City of Fort Worth, as renewed, expires with the
expenditure of funds. The funds for the contract have been expended or programmed. This letter
is to inform you that the City has appropriated funding and is exercising its right to renew the
contract in the original contract amount, which will be effective upon execution by the
designated Assistant City Manager. All other terms and conditions of the contract remain
unchanged. Please verify that the original payment, performance and maintenance bonds remain
active or if retired, provide updated bonds when you return this letter. Please sign in the space
indicated below and return this document, along with a copy of your current insurance
certificate, to the undersigned.
Please log onto PeopleSoft Purchasing at http://fortworthtexas.gov/purchasing to ensure
that your company information is correct and up-to-date.
If you have any questions concerning this Contract Renewal Notice, please contact me at
the telephone number listed below.
Sincerely,
Shweta Rao, P.E., PMP
Stormwater Infrastructure
Manager
(817)392-2587
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Contract Renewal Page 1 of2
ACCEPTED AND AGREED:
CITY OF FORT WORTH
cp�
By:
Name: Jesica McEachern
Title: Assistant City Manager
Date: 12/10/2024
APPROVAL RECOMMENDED:
Lauren Prieur (Dec 6, 202410:13 CST)
By:
Name: Lauren Prieur
Title: Director, Transportation & Public Works
Department
ATTEST:
By:
Name: Jannette Goodall
Title: City Secretary
CONTRACTOR:
nw"c � 9a k"yv
By: Daniel Jackson(Dec6,202408:13 CST)
Name: Daniel Jackson
Title: Sr. Vice President
Date: 12/06/2024
Contract Renewal
,o �p4EOR�°Ila
o � F0000000eo�sya��°a
�o
Pvo °=d
°aa� �xp544a
n0O64�4
CONTRACT COMPLIANCE MANAGER:
By signing I acknowledge that I am the person
responsible for the monitoring and administration
of this contract, including ensuring all
performance and reporting requirements.
1 Awe&�- ,elz&
By:
Name: Shweta Rao, P.E., PMP
Title: Stormwater Infrastructure Manager
APPROVED AS TO FORM AND LEGALITY:
Douglas Black (Dec 10, 2024 23:09 CST)
By:
Name: Douglas. W. Black
Title: Sr. Assistant City Attorney
AUTHORIZATION:
M&C:22-0275
Date Approved: April 12, 2022
Form 1295 Certification No.: NIA
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page 2 of2
rjn Engineering
Infrastructure
group for Tomorrow
October 15, 2024
Shweta Rao, P.E., PMP
Engineering Manager - Stormwater Infrastructure
Transportation and Public Works Department
Stormwater Management Division
1000 Throckmorton St. Fort Worth, TX 76102
www.rjn.com
SUBJECT: STORM DRAIN REHAB (IN-HOUSE CCTV PROFESSIONAL SERVICE
ASSISTANCE) - CONTRACT RENEWAL PROPOSAL FY25
PROJECT NUMBER: SWS-092
Dear Ms. Rao:
As part of the development of the City of Fort Worth, Transportation, and Public Works Department,
Stormwater Management's Storm Drain Rehabilitation Program has acquired the necessary
equipment to perform close circuit television (CCTV) inspections via City In -House Staff. To ensure
the City of Fort Worth properly and safely utilizes its newly purchased equipment to its full potential
and can meet this year's target goal of fifteen (15) miles of inspected Stormwater underground
infrastructure, RJN is pleased to provide this renewal proposal for staff training and the
corresponding condition assessment and route creation of inspected Stormwater pipes. RJN will
perform this training assignment as part of the Stormwater contract approved by the City Council on
April 12t", 2022. We estimate the fee for these tasks to not exceed the amount of $250,000. RJN is
prepared to commence the required training upon approval and Notice to Proceed from the City.
TASK ORDER DEVELOPMENT
This proposal provides professional services through task order assignments on an as -needed basis.
Some of these task orders may be urgent in nature and a rapid response capability is required.
The tasks below are intended to be a summary of the tasks that are anticipated to be provided for
this contract. Detailed descriptions of the specific tasks, budgets, and schedules will be developed at
the time of each task assignment. Potential tasks performed by the RJN team may include, but are
not limited to the following:
Task 1. Project Management
• Task assignments and allocation of resources
6701 Brentwood Stair Rd I Fort Worth, Texas 76112 1 (972) 437-4300
• Track the financial status and client billings
• Meet with City staff as necessary to discuss project progress or issues that arise
• Task Order Preparation
Task 2. CCTV Training of In -House Staff
• Develop a training program for CCTV procedures and protocols
• Develop Best Management Practices for a self-sufficient In -House CCTV program
• Determine required resources to support ongoing In -House program Training on the use of
equipment hardware and software
• Provide data management training in IT Pipes Web or other City acquired data management
software
• Provide GIS training for In -House CCTV data review staff
• Provide review feedback and training on performed inspections
Task 3. CCTV Data Processing, Data Management, and Route Generation for Transfer Into the Storm
Drain Rehabilitation Program
• QA/QC and data review and analysis of fifteen (15) miles of In -House inspections
• Provide data management of fifteen (15) miles of In -House captured inspections
• Generate route and spatial defect analysis of fifteen (15) miles of In -House inspections
• Create Data Deliverables for Integration Into City's GIS
Task 4. Project Meetings
• Monthly meetings with Storm Water Field Operation's (SWFO) management staff.
o In -person meetings at North Side Service Center
o Meeting once a month (12 meetings total)
o Attended by SWFO and Engineering staff
• Monthly field meetings with SWFO field staff for hands-on training.
o In -field meeting at a location selected by SWFO staff.
■ City of Fort Worth Storm Drain Rehab — Professional Service Assistance, Contract Renewal FY25 I Page 2
o The Engineer will be present during this workday and provide guidance and
clarity to any questions City staff might have.
o Provided feedback based on CCTV data review
o Meeting once a month (12 meetings total)
RJN looks forward to working with the City of Fort Worth and is pleased to submit this proposal for
your consideration. Please feel free to contact, Terrace Stewart at 214-998-4831 or Javier Valdez at
682-552-6428 if you have questions.
Sincerely,
Terrace Stewart, P.E.
Director of Infrastructure
ATTACHMENTS
Exhibit A — Rate Schedule
Exhibit B — Request for City of Fort Worth Data
Exhibit C — Proposed Schedule
Javier Valdez, E.I.T
Project Manager
■ City of Fort Worth Storm Drain Rehab — Professional Service Assistance, Contract Renewal FY25 I Page 3
YJI'1 EXHIBIT A
RATE SCHEDULE
City of Fort Worth
Labor Category 2024 Rate
($/hour)
Project Director
350.00
Sr. Project Manager
250.00
Project Manager
210.00
Project Engineer
150.00
Field Staff
95.00
GIS Analyst
135.00
Data Analyst
110.00
Clerical
154.00
■ City of Fort Worth Storm Drain Rehab — Professional Service Assistance, Contract Renewal FY25 I Page 4
rjn EXHIBIT B
group
REQUEST FOR CITY OF FORT WORTH DATA
DATA REQUESTED
RJN is requesting the following GIS data.
File Geodatabase containing the following feature classes of your most recent stormwater data set.
• Stormwater Pipes
• Stormwater Manholes
• Stormwater Inlets
• Stormwater Pipe Features
• Stormwater Outfalls
• Stormwater Infalls
• Stormwater Open Channel
• Stormwater Watershed Boundaries
This dataset will be used to process In -House inspected Stormwater assets.
0 City of Fort Worth Storm Drain Rehab — Professional Service Assistance, Contract Renewal FY25 I Page 5
rjn EXHIBIT C
group
PROPOSED SCHEDULE
RJN is prepared to start work immediately upon authorization of notice to Proceed. Work is to be
completed by the end of Fiscal Year 2025 (September 30, 2025).
0 City of Fort Worth Storm Drain Rehab — Professional Service Assistance, Contract Renewal FY25 I Page 6
M&C Review
Page 1 of 3
CITY COUNCIL AGENDA
Create New From This AIM&C
DATE: 4/12/2022 REFERENCE NO.: **M&C 22-0275 LOG NAME.
CODE: C TYPE: CONSENT PUBLIC
HEARING:
official site of the city of Fort Worth, Texas
FORT IVoRTf
IrY
20SWM IN-
HOUSE CCTV
-Lp7
SUBJECT: (ALL) Authorize Execution of an Engineering Agreement with RJN Group, Inc., in an
Amount Not to Exceed $250,000.00 to Support the City of Fort Worth's Storm Drain
Rehabilitation Program In -House Closed -Circuit Television Project with Up to Three
Renewals and a Maximum Contract Duration of Five Years, Adopt Attached Appropriation
Ordinance and Amend the Fiscal Years 2022-2026 Capital Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
Authorize execution of an engineering agreement with RJN Group, Inc., in an amount not to
exceed $250,000.00 to support the City of Fort Worth's Storm brain Rehabilitation Program In -
House Closed -Circuit Television project (City Project No. 103963) with up to three renewals at
the City of Fort Worth's soie option and a maximum contract duration of five years;.
Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in
the Starmwater Capital Fund in the amount of $250,000.00, from available funds, for the purpose
of funding the City of Fort Worth's Storm Drain Pipe Rehab project (City Project No. P00114);
and, decreasing estimated receipts and appropriations in the Unspecified project (City Project No.
UNSPEC) by the same amount; and
Amend the Fiscal Years 2022-2026 Capital Improvement Program.
DISCUSSION:
Approval of this Mayor and Council Communication will authorize execution of an engineering agreement
in an amount not to exceed $250,000.00 to assist the City of Fort Worth (City) in the implementation of the
Starmwater Management Program's Storm Drain Rehabilitation Program In -House Closed -Circuit
Television (CCTV) project by providing the following: training to use the equipment and software; assisting
staff with pipe evaluations to identify and prioritize corrective rehab measures, reviewing and performing
QA/QC of data; and, development of processes and protocols needed for a self-sufficient In -House
Program for our Storm Drain Rehabilitation Program.
The development of a Storm Drain Rehabilitation Program is a Level 1 Priority, Key Initiative included in
the 2018 Council adopted Starmwater Management Program Master Plan. Storm drain rehabilitation is
one of the Starmwater Management Program's top priorities due to the life safety risk that can happen
when deteriorating storm drain pipe creates sinkholes.
From a Request for Qualifications (RFQ) for storm water management professional and engineering
services dated July 29, 2021 and August 5, 2021, RJN Group, Inc., was selected as the most qualified
consultant for this work based on published selection criteria and their submitted specific proposal to
provide pipe assessment and condition program services.??RJN Group, Inc. proposes to perform the
scope of work for this contract for a not -to -exceed fee of $250,000.00.??The City will issue individual task
orders to authorize the consultant to perform work under this agreement until such time as the contract
funds have been expended.?The City, at its sole option, may renew this contract three times under the
same terms and conditions. ??Staff considers the fee to be fair and reasonable for the anticipated services
to be performed.
http.11apps.cfwnet.orglcouncil_acketlmc_review.asp?ID=29829&councildate=411212022 5/9/2022
M&C Review
Page 2 of 3
This contract will not result in any additional annual operating cost for the Transportation and Public Works
(TPW) Stormwater Management Division.
The funding was included in the FY2022-2026 Capital Improvement Program for project P00114. In order
to administratively track the spending of all funding sources in one project, appropriation ordinances are
needed to appropriate additional funds into the programmable project to jointly funded future Stormdrain
Pipe Rehab child projects. The action in this M&C will amend the Fiscal Year 2022 Adopted Budget as
approved in connection with Ordinance 25073-09-2021, Section 6, as listed on page 27.
Revised
Capital Fund Project FY2022 CIP Budget Change FY2022
Name Name appropriations Authority (Increase/Decrease) Budget
52002-
Stormwater P00114-
Capital Stormdrain
Project Pipe Rehab $1,600,000.00 This M&C $250,000.00 $1,850,000.00
MIWBE Office — A waiver of the goal for Business Equity subcontracting requirement has been approved
by the Department of Diversity and Inclusion -Business Equity Division, in accordance with the Business
Equity Ordinance, because the purchase of goods or services is from sources where subcontracting or
supplier opportunities are negligible.
This project is located in ALL COUNCIL DISTRICTS
FISCAL INFORMATIONXERTIFICATION:
The Director of Finance certifies that funds are available in the current capital budget, as previously
appropriated, in the Stormwater Capital Projects Fund for the Storm Drain Rehabilitation Program In House
CCTV project and upon approval of the above recommendations and adoption of the attached
appropriation ordinance, funds will be available in the Stormwater Capital Projects Fund for future identified
task order projects related to the Stormdrain Pipe Rehab programmable project to support the approval of
the above recommendation and execution of the engineering agreement. Prior to any expenditure being
incurred, the Transportation & Public Works Department has the responsibility to validate the availability of
funds.
TO
Fund Department Account Project
ID ID
FROM
Fund Department Account Project
ID ID
Submitted for Citv Manager's Office bv:
Originatinq Department Head:
Additional Information Contact:
Program Activity Budget Reference # Amount
Year (Chartfield 2)
Program I Activity Budget Reference # I Amount
Year (Chartfield 2)
Dana Burghdoff (8018)
William Johnson (7801)
Greg Simmons (7862)
httpJlapps.cfw,net.org/council_packet/mc review.asp?ID=29829&councildate=�4I12/2022 519I2022
M&C Review
Page 3 of 3
ATTACHMENTS
20SWM IN-HOUSE CCTV Funds Availabilitv.odf (CFW Internal)
20SWM IN-HOUSE CCTV 52002 A022(r2).docx (Public)
20SWM IN-HOUSE CCTV P00114 Proarammable Proi Bud Summarv.odf (CFW Internal)
20SWM IN-HOUSE CCTV Uodated FID t,able.xlsx (CFW Internal)
Form 1295 Certificate 100874808.odf (CFW Internal)
RJN Group SAM-2022.odf (CFW Internal)
Waiver SWS-092 In -House CCTV 012122.odf (CFW Internal)
http:llapps.cfwnet.org/council_packetlmc_review.asp?ID=29829&councildate=41] 212022 5/9/2022
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Second Contract Renewal Letter for RJN Group
M&C: 22-0275 CPN: N/A CSO: 57621 DOC#: 1
Purpose: This document is a contract renewal letter for RJN Group to conduct the
In House CCTV Program of the storm drain pipes for FY 2025. This contract will
be active from Sept 1, 2024.
Date: 10/18/2024
To:
Name
Department Initials Date Out
1.
Elizabeth Camargo
TPW - initial
2.
Daniel Jackson
RJN Group 12/06/2024
3.
Shweta Rao, PgM
TPW - Signature 12/06/2024
4.
Stephen Nichols, Sr. CPO
TPW -initial sti 12/06/2024
5.
Jennifer Dyke, AD
TPW -initial 12/06/2024
6.
Lauren Prieur, Director
TPW - Signature 12/06/2024
7.
Doug Black
Legal - signature -a- 12/10/2024
8_
Jesica McEachern
CMO - signature CO- 12/10/2024
11
9.
Jannette Goodall
CSO - signature -4- 12/11/2024
10.
TPW Contracts
TPW
11.
DOCUMENTS FOR CITY MANAGER'S
SIGNATURE: All documents received from any
and all City Departments requesting City Manager's signature for approval MUST BE ROUTED
TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip,
David
will review and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ENo
RUSH: []YES ®No SAME DAY: []YES []No
ROUTING TO CSO: ®YES ❑No
Action Required: File
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
El
NEXT DAY: ❑YES ❑No
Return To: TPWContracts (&,FortWorthTexas.2ov at ext. 7233 or 8363, for pickup when
completed. Thank you!