HomeMy WebLinkAboutContract 60069-CO2FORT WORTH City of Fort Worth
= Change Order Request
CSC No. 60069-CO2
Project Name: I Water & Sanitary Sewer Replacement Contract 2019, WSM-0 Part 1 City Sec No.: 60069
Project No.(s):I 56002-0600430/070043015740010-103381-001780 1
NTP I N/A City Proj. No.: 103 841
Project Description:)
Water and Sewer Lines
Replacement and Pavement Improvements
Contractor: Jackson Construction, Ltd.
Change Order# 2 Date:
11/20/2024
City Project Mgr. Aaron Nivone
1
City Inspector: Byron McDonald
Phone Number: 817-392-8404
Phone Number: 817-392-8306
Dept.
Unit I Unit IIA
Unit IIB Sewer Unit III Totals
Contract Time
Water Sewer
Pavement
(Calendar days)
Original Contract Amount
$2,655,455.00 $1,320,558.00
$530,877.00 $490,533.00 $4,997,423.00
540
Extras to Date
$0.00 $27,630.00
$0.00 $0.00 $27,630.00
20
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
$2,655,455.00 $1,348,188.00
$530,877.00 $490,533.00 $5,025,053.00
560
[Amount of Proposed Change Order
$19,312.64 $36,950.00
$0.00 $0.00 $56,262.64
39
Revised Contract Amount
$2,674,767.64 $1,385,138.00
$530,877.00 $490,533.00 $5,081,315.64
599
Original Funds Available for Change Orders
$146,050.00 $101,829.00
$0.00 $24,527.00 $266,406.00
Remaining Funds Available for this CO
$146,050.00 $74,199.00
$0.00 $24,527.00 $238,776.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1.68%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $6,246,778.75
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Change Order No. 2 primarily provides for the following that are necessary on the project:
-Excavation and removal of previously unknown 16" CIP line that runs parallel to new 16" DIP, including trench excavation, backfill, pipe removal,
3/4" stone embedment, hauling of dirt spoils, hauling of abandoned pipe, extra dump fees, and 16" water abandonment & plug.
-Removal and replacement of existing leaking extra -depth fire hydrant at the intersection of Williams Rd & John T White Rd.
-Removal and replacement of brick pavers that were not included in original bid.
-installation of 12" DIP Sewer pipe with CLSM backfill.
-Additional one 4' Manhole with Odor Control Vent that was not included in original bid.
-Stabilizing existing Oncor power pole, required as it ran up against sewer manhole being replaced.
Staff concurs with the contractor's request for 39 additional calendar days for the change order.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Jackson Construction, Ltd. I Carmen Estep I `""" 111/20/2024
Onspector _ _ y _ Ir— Project Manager
"r �. U 11 /21 /2024 4° 0e A4'," 11 /21 /2024
Libector (Water DeR Lonstructi
o * 45. 12/04/2024 -, lft� 21, 2024 11:34 CSTIL11/21/2024
Assistant A
1 9/04/9094 �� 12/05/2024
iougi niaCK �u 4,...... ui� 6n ii m nnson �u c5, �ue414ayui�
M&C Number I N/A I M&C Date Approved I NIA I
FO RT WO RT H City of Fort Worth
= ' Change Order Additions
Project Name Water & Sanitary Sewer Replacement Contract 2019, WSM-0 Part 1 City Sec No.: 1 60069 j
Project No.(s): 56002-0600430/0700430/5740010-103381-001780 DOE No.1 N/A I City Proj. No.: l 103381-1
rrotect I Water and Sewer Lines Replacement and Pavement Improvements
Desrrintinn
Contractor Jackson Construction, Ltd, Change Order: F-2] Dater 11/20/2024
City Project Mgr. Aaron Nivone City Inspector I Byron McDonald
ADDITIONS
DESCRIP I ION
DEPT Qty Unit Unit Cost I Total
Excavate & Remove 16" CIP that runs parallel to new 16" DIP; includes additional
Unit I Water
250.00 LF $107.16
$26,790.00
trench excavation and backfill, pipe removal, 3/4" stone embedment, haul off of dirt
83
spoils, haul off of abandoned pipe, and extra dump fees
84
16" Water Abadonment Plug
Unit I Water
2.00 EA $4,034.32
$8,068.64
Remove & Replace Extra Depth Fire Hydrant with New at Williams Rd & John T
Unit I Water
1.00 EA $13,223.00
$13,223.00
85
White Rd.
4
8" DIP Sewer Pipe, CLSM Backfill (w/ Epoxy Lining, Protecto 401 or Equal)
Unit IIA Sewer
90.00 LF $300.00
$27,000.00
61
Remove & Replace Brick Pavers
Unit IIA Sewer
50.00 SF $15.00
$750.00
62
12" DIP Sewer Pipe, CLSM Backfill (w/ Epoxy Lining, Protecto 401 or Equal)
Unit IIA Sewer
20.00 LF $460.00
$9,200.00
21
4' Manhole w/ Odor Vent
Unit IIB Sewer
1.00 EA $29,000.00
$29,000.00
31
Remove Sidewalk
Unit IIB Sewer
931.00 SF $5.00
$4,655.00
32
Stabilize Existing Oncor Power Pole
Unit IIB Sewer
1.00 EA $3,635.00
$3,635.00
Unit I Water
$48,081.64
Unit IIA Sewer
$36,950.00
Unit IIB Sewer
$37,290.00
Unit III Pavement
Page 1 of 3
Additions Sub Total
$122,321.64
FORT WORTH City of Fort Worth
'—Jo — Change Order Deletions
Project Name Water & Sanitary Sewer Replacement Contract 2019, WSM-0 Part 1 City Sec No.: 60069
Project No.(s): I 56002-0600430/0700430/5740010-103381-001780 I DOE No. I N/A City Proj. No.: I 103381-1
Project Description I Water and Sewer Lines Replacement and Pavement Improvements
Contractor I Jackson Construction, Ltd. Change Order: 2 Date I 11/20/2024
City Project Mgr. I Aaron Nivone City Inspector: I Byron McDonald
DELETIONS
ITEM DESCRIPTION I DEPT I Qty Unit Unit Cost Total
81 9999.1001 Construction Allowance Unit I Water 0.287690 LS $100,000.00 $28,769.00
30 9999.1001 Construction Allowance Unit IIB Sewer 0.93 LS $40,000.00 $37,290.00
Page 2 of 3
I
Unit I Water
Unit IIA Sewer
Unit IIB Sewer
Unit III Pavement
Deletions Sub Total
$28,769.00
$37,290.00
$66,059.00
MWWBE Breakdown for this Change Order
MWBE Sub I Type of Service I Amount for this CO
Total $0.00
Previous Change Orders
co # I DATE I AMOUNT
Total 1 $0.00 1
Page 3 of 3
11/20/24
CPN 103381-1
Water and Sanitary Sewer Replacement Contract 2019, WSM-O, Part 1
Change Order 2 Notes
Staff has reviewed the requested prices and days and considers them to be fair and
reasonable.
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Digitally signed by Aaron Nivone
�°� ��&-&,e Date: 2024.11.13 10:17:28-06'00'
Signature
Aaron Nivone
Name of Employee
Professional Engineer
Title
dovanp
�ORt�9�d
ATTEST:
vc °j o
pO° °=4
o
°°
°°° ° b
00000000
aan� S4�
Jannette S. Goodall
Il�R4
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX