Loading...
HomeMy WebLinkAboutContract 60740-CO1PROJECT NAME: CONTRACT: C FA # CITY PROJECT # FID # X# CITY SECRETARY CONTRACT # FILE # INSPECTOR: PROJECT MANAGER: DEVELOPER -AWARDED -PROJECT CHANGE ORDER Buttercup Lane & Boswell Drive 16-Inch Water Main Rehabilitation (A) Water (B) Paving CFA23-0166 I CITY PARTICIPATION: 105037 30114-0200431-105037-EO7685 X-27912 60740 N/A YES Russell Rogers Phone No: Sandip Adhikari Phone No: 817-392-8424 CHANGE ORDER No: 1 CSC No. 60740-CO 1 CONTRACT UNIT WATER SEWER DRAINAGE PAVING STREET LIGHTS Developer Developer Developer Developer ' Cost City Cost Developer Cost City Cost Cost City Cost Cost City Cost Cost City Cost ORIGINAL CONTRACT $98,221.29 $1,228,942.19 $0.00 $0.00 $0.00 $0.00 $0.00 $322,315.48 $0.00 $0.00 EXTRAS TO DATE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 CREDITS TO DATE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 CONTRACT TO DATE $98,221.29 $1,228,942.19 $0.00 $0.00 $0.00 $0.00 $0.00 $322,315.48 $0.00 $0.00 AMOUNT OF PROP. CHANGE ORDER $18,887.75 $14,621.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 REVISED CONTRACT AMOUNT $117,109.04 $1,243,563.55 $0.00 $0.00 $0.00 $0.00 $0.00 $322,315.48 $0.00 $0.00 TOTAL REVISED CONTRACT AMOUNT PER UNIT $1,360,672.59 $0.00 $0.00 $322,315.48 $0.00 REVISED COST SHARE Dev. Cost: $117,109.04 City Cost: $1,565,879.03 TOTAL REVISED CONTRACT $1,682,988.07 CONTRACT DAYS 120 120 3 123 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Revised: 12-17-2018 Page 1 You are directed to make the following changes in the contract documents: UNIT I: WATER IMPROVEMENTS CITY BID ITEM CFW Unit Developer PAY ITEM # # QUANTITY UNIT I ITEM DES91�IPTION Price 1 UNIT PRICE Cost Citv Cost I TOTAL 3311.0001 33 0.091181 TON Ductile Iron Water Fittings w/ Restraint $12,063.871 $700.00 1$400.00 $1,100.00 I 0170.0101 I 47* I 1 I EA I Specified Remobilization I $32,409.11 I$18,187.75 1 $14,221.36 I $32,409.11 TOTAL UNIT I: WATER IMPROVEMENTS 18� ,887.7 $14,621.36 33 509.11 Asterisk (") indicates New Pay Item Revised: 12-17-2018 Page 2 REASONS FOR CHANGE ORDER 1 Time that Western Municipal spent to excavate the Tie -In location on Lancaster Ave. and backfilling the trench once it was determined that we couldn't tie-in at that time. 2 During excavation of the Tie -In point on Sandy Lane, Western Municipal Construction came across an unknown active 6" water line extending from the west side of Sandy Lane that required additional fittings and time to keep tied in. This change order is for the additional time and material that it cost for the 6" water line to be tied in to the new water line running down Buttercup Lane. GMcivil By: Name: Ryan Spears Title: Project Engineer APPROVAL RECOMMENDED: CFW- Water Department By: Name: Suby Varughese Title: Engineering Manager RECOMMENDED: CFW - 'Contract Compliance Manager By: Name: Sandip Adhikari Title: Sr Professional Engineer M&C Number: 23-1073 M&C Date Approved: 12/12/2023 Western Municipal Construction Mid -Cities Logistics Owner, LLC of Texas, LLC BY: �Il� By: Name: Name: Clint Wilson Title: Authorized Signatory Title: Project Manager APPROVED: CFW - Assistant City Manager By: Dane-ghd0f(o 16�l021 1)AtsT) Name: Dana Burghdoff Title: Assistant City Manager APPROVED AS TO FORM AND LEGALITY: CFW - Assistant City Attorney r, By: Name: Richard McCracken Title: Sr. Assistant City Attorney FOp Tq�II `OF O� i8 °°a°y°° Owe° 10 DO$aso ATTEST *Contract Compliance Manager (Project Manager): R By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, include VVVV ensuring all performance and reporting requirements. Jannette S. Goodall City Secretary ❑There are NO City Funds associated with this Contract OThere are City Funds associated with this Contract OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Revised: 12-17-2018 Page 3 PROJECT NAME: CONTRACT: CFA # CITY PROJECT # FID # X# CITY SECRETARY CONTRACT # FILE # INSPECTOR: PROJECT MANAGER: DEVELOPER -AWARDED -PROJECT CHANGE ORDER Buttercup Lane & Boswell Drive 16-Inch Water Main Rehabilitation (A) Water (B) Paving CFA23-0166 CITY PARTICIPATION] 105037 30114-0200431-105037-EO7685 X-27912 60740 N/A YES Russell Rogers Phone No: Sandip Adhikari Phone No: 817-392-8424 CHANGE ORDER No: CONTRACT UNIT WATER SEWER DRAINAGE PAVING STREET LIGHTS Developer Developer Developer Developer Cost City Cost Developer Cost City Cost Cost City Cost Cost City Cost Cost City Cost ORIGINAL CONTRACT $98,221.29 $1,228,942.19 $0.00 $0.00 $0.00 $0.00 $0.00 $322,315.48 $0.00 $0.00 EXTRAS TO DATE $18,887.75 $14,621.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 CREDITS TO DATE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 CONTRACT TO DATE $117,109.04 $1,243,563.55 $0.00 $0.00 $0.00 $0.00 $0.00 $322,315.48 $0.00 $0.00 AMOUNT OF PROP. CHANGE ORDER $1,520.64 $10,137.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 REVISED CONTRACT AMOUNT $118,629.68 $1,253,701.15 $0.00 $0.00 $0.00 $0.00 $0.00 $322,315.48 $0.00 $0.00 TOTAL REVISED CONTRACT AMOUNT PER UNIT $1,372,330.83 $0.00 $0.00 $322,315.48 $0.00 REVISED COST SHARE Dev. Cost: $118,629.68 City Cost: $1,576,016.63 TOTAL REVISED CONTRACT $1,694,646.31 CONTRACT DAYS 120 3 123 5 128 Revised: 12-17-2018 Page 1 You are directed to make the following changes in the contract documents: UNIT I: WATER IMPROVEMENTS CITY BID ITEM CFW Unit Developer PAY ITEM # # QUANTITY UNIT ITEM DF,SCRIPTION Price UNIT PRICE Cost City Cost TOTAL 0170.0101 38` 1 EA Specified Remobilization $8,000.00 $1,520.64 $6,479.36 $8,000.00 `9999.0003 39` 1 EA 2"Tapping Saddle $2,500.00 $0.00 $2,500.00 $2,500.00 `9999.0004 40` 1 EA Cut and Plug Saddle at the main $1,158.24 $0.00 $1,158.24 $1,158.24 TOTAL UNIT I: WATER IMPROVEMENTS $1,520.64 $10,137.60 11 658.24 Asterisk (*) indicates New Pay Item Revised: 12-17-2018 Page 2 REASONS FOR CHANGE ORDER 1 Due to discrepancies in the waterline testing process; the 12" PVC stub out at station 15+96.66 will need to be sampled before construction can continue with the next contractor connecting the stubout to the neighborhood to the north. This will take additional time to complete since the 16" Water Main has already been connected to the extisting Fort Worth system and a tapping saddle needs to be installed to collect samples. This change order impacts City Cost Participation GMcivil By: Name: Ryan Spears Title: Project Engineer APPROVAL RECOMMENDED: CFW - Water Department 5�4✓a By: Name: Suby Varughese Title: Engineering Manager RECOMMENDED: CFW- *Contract Compliance Manager By: tiC Name: Sandip Adhikari Title: Sr Professional Engineer M&C Number: 23-1073 M&C Date Approved: 12/12/2023 Western Municipal Construction Mid -Cities Logistics Owner, LLC of Texas, LLC By: I�741-191� By: Name: (--'a)JeffKnowles Name: Clint Wilson —morized Signatory Title: Title: Project Manager APPROVED: CFW- Assistant City Manager By: D—B,,ghdorr(-16 02413ACST) Name: Dana Burghdoff Title: Assistant City Manager APPROVED AS TO FORM AND LEGALITY: CFW - Assistant City Attorney By: s.zo2avzo Name: Richard McCracken Title: Sr. Assistant City Attorney ATTEST * Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, include ensuring all performance and reporting requirements. Jannette S. Goodall City Secretary []There are NO City Funds associated with this Contract OThere are City Funds associated with this Contract Revised: 12-17-2018 Page 3 PROJECT NAME: CONTRACT: CFA # CITY PROJECT # FID # X# CITY SECRETARY CONTRACT # FILE # INSPECTOR: PROJECT MANAGER: DEVELOPER -AWARDED -PROJECT CHANGE ORDER Buttercup Lane & Boswell Drive 16-Inch Water Main Rehabilitation (A) Water (B) Pavinq CFA23-0166 CITY PARTICIPATION: 105037 30114-0200431-105037-EO7685 X-27912 60740 N/A YES Russell Rogers Phone No: Sandip Adhikari Phone No: 817-392-8424 CONTRACT UNIT WATER SEWER DRAINAGE Developer Developer Developer Cost City Cost Developer Cost City Cost Cost City Cost Cost ORIGINAL CONTRACT $98,221.29 $1,228,942.19 $0.00 $0.00 I $0.00 $0.00 $0.00 EXTRAS TO DATE $20,408.39 $24,758.96 $0.00 $0.00 I $0.00 $0.00 $0.00 CREDITS TO DATE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 CONTRACT TO DATE $118,629.68 $1,253,701.15 $0.00 $0.00 $0.00 $0.00 $0.00 AMOUNT OF PROP. CHANGE ORDER $2,129.75 $15,531.69 $0.00 $0.00 $0.00 $0.00 $0.00 REVISED CONTRACT AMOUNT $120,959.43 $1,269,232.84 $0.00 $0.00 I $0.00 $0.00 $0.00 TOTAL REVISED CONTRACT AMOUNT PER UNIT $1,390,192.27 $0.00 $0.00 $ REVISED COST SHARE Dev. Cost: $120,959.43 City Cost: TOTAL REVISED CONTRACT $1,712,507.75 CHANGE ORDER No: 3 PAVING STREET LIGHTS Developer City Cost Cost City Cost $322,315.48 $0.00 $0.00 $0.00 $0.00 I $0.00 $0.00 $0.00 $0.00 $322,315.48 $0.00 $0.00 $0.00 $0.00 $0.00 $322,315.48 $0.00 $0.00 122,315.48 $0.00 $1,591,548.32 CONTRACT DAYS 120 8 128 0 128 Revised: 12-17-2018 Page 1 You are directed to make the following changes in the contract documents: UNIT I: WATER IMPROVEMENTS CITY BID ITEM CFW Unit Developer PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION Price UNIT PRICE Cost City Cost TOTAL 0170.0101 41* 1 EA Specified Remobilization $13,623.35 $2,329.75 $11,293.60 $13,623.35 3311.0001 33 0.2228215 TON Ductile Iron Water Fittings w/ Restraint I $12,063.87` $0.00 $2,688.09 $2,688.09 3305.0202 42* 10 CY Imported Embedment/Baddlll, CBS $155.00 $0.00 $1,550.00 $1,550.00 TOTAL UNIT I: WATER IMPROVEMENTS $2.329.75 $15,531.69 $17,861.44 Asterisk (*) indicates New Pay Item Revised: 12-17-2018 Page 2 REASONS FOR CHANGE ORDER 1 While hand digging around the existing water line on Lancaster Ave. a joint on the existing line failed once the surrounding area was excavated. After the initial assessment with the CoFW Inspector and valve crews it was determined that additional fittings are needed to repair the pipe, but this repair could be completed during normal buisness hours. However, the CoFW later received a call that residents of the surrounding area were without service and requested that WMC work to repair the failed joint and complete the tiein as soon as possible. The above pricing is for the labor, equipment, fuel, and additional material needed to complete the repair & tie-in on Lancaster Ave. This change order impacts City Cost Participation GMcivil By: Name: Ryan /Spears Title: Project Engineer APPROVAL RECOMMENDED: CFW- Water Department By: Name: Suby Varughese Title: Engineering Manager RECOMMENDED: CFW- 'Contract Compliance Manager By: Name: Sandip Adhikari Title: Sr Professional Engineer M&C Number: 23-1073 M&C Date Approved: 12/12/2023 Western Municipal Construction Mid -Cities Logistics Owner, LLC of Texas, LLC By: �� By: Name: p / 1 i,ffKnowlcs Name: Clint Wilson Title: thorized Signatory Title: Project Manager APPROVED: CFW- Assistant City Manager J�G{NGi �Gtk Name: Dana Burghdoff Title: Assistant City Manager APPROVED AS TO FORM AND LEGALITY: CFW- Assistant City Attorney Name: Richard McCracken Title: Sr. Assistant City Attorney ATTEST ' Contract Compliance Manager (Project Manager): A $ y By signing I acknowledge that I am the person responsible U for the monitoring and administration of this contract, include ensuring all performance and reporting requirements. Jannette S. Goodall City Secretary �ptr FAR>typAd ❑There are NO City Funds associated with this Contract od p doo of OThere are City Funds associated with this Contract oaa i oo 5p adpn nE4p4ga OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Revised: 12-17-2018 Page 3 PROJECT NAME: CONTRACT: C FA # CITY PROJECT# FID # X# CITY SECRETARY CONTRACT # FILE # INSPECTOR: PROJECT MANAGER: DEVELOPER -AWARDED -PROJECT CHANGE ORDER Buttercup Lane & Boswell Drive 16-Inch Water Main Rehabilitation (A) Water (B) Paving CFA23-0166 CITY PARTICIPATION:I 105037 30114-0200431-105037-EO7685 X-27912 60740 N/A YES Russell Rogers Phone No: Sandip Adhikari Phone No: 817-392-8424 WATER Developer Cost City Cost ORIGINAL CONTRACT $98,221.29 $1,228,942.19 EXTRAS TO DATE $22,738.14 $40,290.65 CREDITS TO DATE $0.00 $0.00 CONTRACT TO DATE $120,959.43 $1,269,232.84 AMOUNT OF PROP. CHANGE ORDER $0.00 $9,880.00 REVISED CONTRACT AMOUNT $120,959.43 $1,279,112.84 TOTAL REVISED CONTRACT AMOUNT PER UNIT $1,400,072.27 REVISED COST SHARE Dev. Cost: TOTAL REVISED CONTRACT CONTRACT UNIT SEWER DRAINAGE Developer Developer Cost City Cost Cost City Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 I $0.00 $120,959.43 City Cost: $1,722,387.75 CHANGE ORDER No: 4 PAVING STREET LIGHTS Developer Developer Cost City Cost Cost City Cost $0.00 $322,315.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $322,315.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $322,315.48 $0.00 $0.00 $322,315.48 $0.00 $1,601,428.32 CONTRACT DAYS 120 8 128 1 129 Revised: 12-17-2018 Page 1 You are directed to make the following changes in the contract documents: PAY ITEM # 3346.3001 Asterisk (*) indicates New Pay Item UNIT I: WATER IMPROVEMENTS CITY BI#D ITEM QUANTITY UNIT ITEM DESCRIPTION P`Unit ner Price UNIT PRICE DeCostCity Cost TOTAL 43* I C 95 LF I 6" Trench Drain $104.00 $0.00 $9,880.00 $9,880.00 TOTAL UNIT 1: WATER IMPROVEMENTS $0.00 $9,880.00 9 880.00 Revised: 12-17-2018 Page 2 1:M� Viel16J76].zyUllL,W=9i1031=1 7 1 Where ground water is flowing out of the valve stem guide at Station 26+15, Western Municipal Construction (WMC) will install a 6" Trench Drain and connect it to the existing storm drainage system at the intersection of Lancaster & Boswell. This will alleviate ground water from flowing up through the valve stem guide. This change order impacts City Cost Participation GMcivil By. / Name: Ryan Spears Title: Project Engineer APPROVAL RECOMMENDED: CFW - Water Department sus ✓ Pr By: Name: Suby Varughese Title: Engineering Manager RECOMMENDED: CFW- *Contract Compliance Manager By: e Name: Sandip Adhikari Title: Sr Professional Engineer M&C Number: 23-1073 M&C Date Approved: 12/12/2023 Western Municipal Construction Mid -Cities Logistics Owner, LLC of Texas, LLC By: i� II By: Name: �B. Jeff Knowles Name: Clint Wilson put@r?[t;;�9 �iguawiy Title: Title: Project Manager APPROVED: APPROVED AS TO FORM AND LEGALITY: CFW - Assistant City Manager CFW - Assistant City Attorney iklNGt §Gl�� By: Dana BurgM1doff (sec 16, 02413 BCST) �v/J By: kicM1arJFcchcken (6ec 15, mi4 xt la csi� Name: Dana Burghdoff Name: Richard McCracken Title: Assistant Citv Manager Title: Sr. Assistant City Attorney ATTEST * Contract Compliance Manager (Project Manager): - _4- By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, include ensuring all performance and reporting requirements. Jannette S. Goodall City Secretary ❑There are NO City Funds associated with this Contract I]There are City Funds associated with this Contract Revised: 12-17-2018 Page 3